Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
B20-0642 CF CORRECTIONS NOTICE
B21-0683 CF PC
B21-0683 CF PC (2)
04-1244_030-430-019_CALFIRE INSPECTION
072-180-006 CF FES 11-21-23 Bidwell Marina
072-180-006 CF FES 11-21-23 Bidwell Marina_001
4009-9602 CSFM LISTING
4009-9602 DATASHEET
4090-9051 CSFM LISTING
4090-9051 DATASHEET
4098-9714 CSFM LISTING
4098-9714 DATASHEET
4098-9733 CSFM LISTING
4098-9733 DATASHEET
4098-9772 CSFM LISTING
4098-9772 DATASHEET
4098-9792 CSFM LISTING
4099-9005 CSFM LISTING
4099-9005 DATASHEET
4606-9202 CSFM LISTING
4606-9202 DATASHEET
49AV CSFM LISTING
49AV DATASHEET
49AV-APPLC DATASHEET
49MTV-APPLW CSFM LISTING
49MTV-APPLW DATASHEET
49VO-APPLC CSFM LISTING
49VO-APPLC DATASHEET
A007-9201 CSFM LISTING
A007-9201 DATASHEET
B07-0456_062_440_007 CF FINAL INSPECTION
B07-0456_062-440-007_CALFIRE INSPECTION
B07-0456_062-440-007_CALFIRE INSPECTION (4)
B09-1852 SOIU Unit 170
B09-1852 SOIU Unit 180
B09-1852 SOIU Unit 190
B10-0511 CF REF
B10-1523 CF Final Inspection
B11-0058 CF REF
B12-0718 CF FINAL INSPECTION
B13-0209 CALFIRE FINAL INSPECTION
B13-0377 CALFIRE FINAL INSPECTION
B13-0846 CF Final Inspection
B13-1201 CALFIRE FINAL INSPECTION
B13-1327 CALFIRE UNDEGROUND TANK INSPECTION
B13-1516_069-460-048_CALFIRE INSPECTION
B13-1656 CALFIRE Underground Tank Inspection
B13-1711 CALFIRE FINAL INSPECTION
B13-2005 CALFIRE FINAL INSPECTION
B14-0143 CALFIRE FINAL INSPECTION
B14-0350 CALFIRE Final Inpsection
B14-0431 CF FINAL INSPECTION
B14-0431 CF FINAL INSPECTION (2)
B14-0608_027-180-041_CALFIRE INSPECTION
B14-0813_058-340-024_CALFIRE INSPECTION
B14-1248 CF Final Inspection
B14-1392CF PC
B14-1474_058-200-036_CALFIRE INSPECTION
B14-1745 CF FINAL INSPECTION
B14-1762_027-360-156_CALFIRE INSPECTION
B15-0209 CF Final Inspection
B15-0381_079-240-064_CALFIRE INSPECTION
B15-0486 CF Final Inspection
B15-0648 CF PC
B15-0722 CF PC
B15-1081_026-090-015_CALFIRE INSPECTION
B15-1196 CALFIRE FINAL INSPECTION
B15-1232_030-211-050_CALFIRE INSPECTION
B15-1644 CF Final Inspection
B15-2004_024-230-042_CALFIRE INSPECTION
B15-2055 CALFIRE FINAL INSPECTION
B15-2233_038-070-023_CALFIRE INSPECTION
B15-2233_038-070-023_CALFIRE INSPECTION (4)
B15-2528_027-360-198_CALFIRE INSPECTION
B15-2612_030-500-026_CALFIRE INSPECTION
B15-2628 CALFIRE FINAL INSPECTION
B15-2628 CALFIRE FINAL INSPECTION (2)
B15-2732_063-310-002_CALFIRE INSPECTION
B15-2921_039-080-093_CALFIRE INSPECTION
B15-2956_017-190-005_CALFIRE INSPECTION
B15-2956_017-190-005_CALFIRE INSPECTION (4)
B15-2956_017-190-005_CALFIRE INSPECTION (7)
B16-0145 CALFIRE FINAL INSPECTION
B16-0222_041-030-147_CALFIRE INSPECTION
B16-0269_079-180-023_CALFIRE INSPECTION
B16-0269_079-180-023_CALFIRE INSPECTION (4)
B16-0273 FINAL INSPECTION
B16-0381_042-310-008_CALFIRE INSPECTION
B16-0413 CF Sprinkler Test
B16-0413 CF Sprinkler Test (2)
B16-0464 CF FINAL INSPECTION
B16-0593 CALFIRE FINAL INSPECTION
B16-0916_079-130-021_CALFIRE INSPECTION
B16-0945 CALFIRE FINAL INSPECTION FM
B16-1056 CF Final Inspection
B16-1099 CF Correction Notice
B16-1099 CF Final Inspection/Correction
B16-1099_072-310-047_CALFIRE INSPECTION
B16-1196 CF Final Inspection
B16-1216_063-240-063_CALFIRE INSPECTION
B16-1251_010-360-024_CALFIRE INSPECTION
B16-1251_010-360-024_CALFIRE INSPECTION (4)
B16-1297_041-030-147_CALFIRE INSPECTION
B16-1338 CF Final Inspection
B16-1351 CALFIRE FINAL INSPECTION
B16-1489 CALFIRE Final Inspection
B16-1489_042-770-012_CALFIRE INSPECTION
B16-1492_062-330-025_CALFIRE INSPECTION
B16-1534_050-020-002_CALFIRE INSPECTION
B16-1778 CF Final Inspection
B16-1778 CF Final Inspection (2)
B16-1778 CF Final Inspection (3)
B16-1783 CALFIRE FINAL INSPECTION
B16-1797 CALFIRE Pre Inspection
B16-1901 CF FINAL INSPECTION
B16-1924_047-220-096_CALFIRE INSPECTION
B16-1928 FINAL INSPECTION
B16-2005_047-750-090_CALFIRE INSPECTION
B16-2145 CF Final Inspection
B16-2203 CALFIRE Address Sign
B16-2203_041-410-023_CALFIRE INSPECTION
B16-2233 CALFIRE FINAL INSPECTION FM
B16-2249 CALFIRE FINAL INSPECTION
B16-2311_041-650-003_CALFIRE INSPECTION
B16-2338_071-150-026_CALFIRE INSPECTION
B16-2361 047-120-023 Berberian Nut Company, 6100 Wilson Landing Road, Corrected 5-Year Sprinkler Inspection Report, 12.27.23
B16-2361 047-120-023 CF FS 5 Year Sprinkler Report - Berberian Nut 1-23-2023
B16-2361 047-120-023 CF FS 5 Year Sprinkler Report - Berberian Nut 1-23-2023 (2)
B16-2361 047-120-023 CF FS Annual Sprinkler Report - Berberian Nut 12-21-2021
B16-2363_018-020-014_CALFIRE INSPECTION
B16-2373_025-110-024_CALFIRE INSPECTION
B16-2418_031_180_105 CF FINAL INSPECTION
B16-2419_031_180_106 CF FINAL INSPECTION
B16-2420_031_180_110 CF FINAL INSPECTION
B16-2422_031_180_108 CF FINAL INSPECTION
B16-2423_031_180_107 CF FINAL INSPECTION
B16-2424_031_180_104 CF FINAL INSPECTION
B16-2425_031_180_111
B16-2427_058-560-008_CALFIRE INSPECTION
B16-2431 CALFIRE Final Inspection
B16-2471 CALFIRE FIRE ALARM INSPECTION
B16-2512_028-440-015_CALFIRE INSPECTION
B16-2527 CF Final Inspection
B16-2527_039-300-003_CALFIRE INSPECTION
B16-2555_028-400-010_CALFIRE INSPECTION
B16-2598_040-140-038_CALFIRE INSPECTION
B16-2598_040-140-038_CALFIRE INSPECTION (4)
B16-2643_007-230-016_CALFIRE INSPECTION
B16-2664 CF Pre Inspection
B16-2668_071-400-027_CALFIRE INSPECTION
B16-2678 CALFIRE FINAL INSPECTION FM
B16-2699_040-280-054_CALFIRE INSPECTION
B16-2708 CF Final Inspection
B16-2718 CALFIRE Final Inspection
B16-2756_040-280-070_CALFIRE INSPECTION
B16-2756_040-280-070_CALFIRE INSPECTION (4)
B16-2780 CALFIRE FIRE ALARM INSPECTION
B16-2781_041-030-073_CALFIRE INSPECTION
B16-2782 CALFIRE FINAL INSPECTION
B16-2806_039-150-060_CALFIRE INSPECTION
B16-2809_041-540-004_CALFIRE INSPECTION
B16-2826_027-100-022_CALFIRE INSPECTION
B16-2851_025-120-016_CALFIRE INSPECTION
B16-2851_025-120-016_CALFIRE INSPECTION (4)
B16-2885 CAL FIRE FINAL INSPECTION
B16-2885_047-780-044_CALFIRE INSPECTION
B16-2902_071-090-022_CALFIRE INSPECTION
B16-2903 CALFIRE FINAL INSPECTION
B16-2915_041-470-062_CALFIRE INSPECTION
B16-2916 CF Final Inspection
B16-2916_041-600-002_CALFIRE INSPECTION
B17-0119 CALFIRE PRE INSPECTION
B17-0193 CF FINAL INSPECTION
B17-0193 CF FINAL INSPECTION (2)
B17-0193 CF FINAL INSPECTION (3)
B17-0193_005-370-014_CALFIRE INSPECTION
B17-0194_027-250-036_CALFIRE INSPECTION
B17-0252_079-240-064_CALFIRE INSPECTION
B17-0252_079-240-064_CALFIRE INSPECTION (4)
B17-0252_079-240-064_CALFIRE INSPECTION (7)
B17-0274_079-360-030_CALFIRE INSPECTION
B17-0274_079-360-030_CALFIRE INSPECTION (4)
B17-0281 CALFIRE CORRECTIONS NOTICE
B17-0281_068-410-006_CALFIRE INSPECTION
B17-0281_068-410-006_CALFIRE INSPECTION (4)
B17-0308 CALFIRE FINAL INSPECTION
B17-0308_069-560-023_CALFIRE INSPECTION
B17-0331_058-280-011_CALFIRE INSPECTION
B17-0378_047-780-007_CALFIRE INSPECTION
B17-0404_040-140-069_CALFIRE INSPECTION
B17-0406 CALFIRE Statement of Intended Use
B17-0419_042-590-056_CALFIRE INSPECTION
B17-0430_042-020-020_CALFIRE INSPECTION
B17-0440 CALFIRE FINAL INSPECTION
B17-0459_041-360-093_CALFIRE INSPECTION
B17-0482_062-250-011_CALFIRE INSPECTION
B17-0491 CF Final Inspection
B17-0500 CALFIRE Statement of Intended Use
B17-0510_061-480-060_CALFIRE INSPECTION
B17-0528_056-180-008_CALFIRE INSPECTION
B17-0594 CALFIRE FINAL INSPECTION
B17-0603_042-030-052_CALFIRE INSPECTION
B17-0604 CALFIRE Pre Inspection
B17-0605 CALFIRE PRE INSPECTION
B17-0613_072-240-013_CALFIRE INSPECTION
B17-0617_068_130_142 CF FINAL INSPECTION
B17-0643_042-740-020_CALFIRE INSPECTION
B17-0659_047-200-098_CALFIRE INSPECTION
B17-0660_025-080-003_CALFIRE INSPECTION
B17-0675_030-038-010_CALFIRE INSPECTION
B17-0695 CAL FIRE PRE INSPECTION
B17-0695_058-500-044_CALFIRE INSPECTION
B17-0705_055-350-035_CALFIRE INSPECTION
B17-0733_042-020-020_CALFIRE INSPECTION
B17-0736_047-780-040_CALFIRE INSPECTION
B17-0740_039-460-082_CALFIRE INSPECTION
B17-0741_040-340-026_CALFIRE INSPECTION
B17-0741_040-340-026_CALFIRE INSPECTION (3)
B17-0747_040-060-091_CALFIRE INSPECTION
B17-0753_065-410-026_CALFIRE INSPECTION
B17-0764_064-220-026_CALFIRE INSPECTION
B17-0764_064-220-026_CF LETTER OF INTENT
B17-0782_030-038-005_CALFIRE INSPECTION
B17-0784 CALFIRE PC Letter
B17-0786 CALFIRE FINAL INSPECTION
B17-0792 CALFIRE PRE INSPECTION
B17-0792_028-340-017_CALFIRE INSPECTION
B17-0808 CF Final Inspection
B17-0834_042-020-020_CALFIRE INSPECTION
B17-0834_042-020-020_CALFIRE INSPECTION (4)
B17-0851 CAL FIRE PRE INSPECTION
B17-0872_039-500-002_CALFIRE INSPECTION
B17-0900 CALFIRE FINAL INSPECTION
B17-0900_028-460-030_CALFIRE INSPECTION
B17-0905 CF Final Inspection
B17-0906_072-530-010_CALFIRE INSPECTION
B17-0909_041-640-017_CALFIRE INSPECTION
B17-0931_058-450-012_CALFIRE INSPECTION
B17-0948_060-250-003_CALFIRE INSPECTION
B17-0968 CF Address Signs 1
B17-0968 CF Address Signs 2
B17-0968_022-080-032_CALFIRE INSPECTION
B17-0983_072-330-098_CALFIRE INSPECTION
B17-0983_072-330-098_CALFIRE INSPECTION (4)
B17-0985 CF Final Inspection
B17-0985_055-540-034_CALFIRE INSPECTION
B17-1030_047-500-048_CALFIRE INSPECTION
B17-1030_047-500-048_CALFIRE INSPECTION (4)
B17-1033_072-300-026_CALFIRE INSPECTION
B17-1036_040-280-094_CALFIRE INSPECTION
B17-1040 CF Final Inspection
B17-1040_039-470-017_CALFIRE INSPECTION
B17-1042 CALFIRE FINAL INSPECTION
B17-1042_058-360-099_CALFIRE INSPECTION
B17-1044_042-160-004_CALFIRE INSPECTION
B17-1046_042-120-024_CALFIRE INSPECTION
B17-1051_027-220-057_CALFIRE INSPECTION
B17-1059_065-370-024_CALFIRE INSPECTION
B17-1062_022-350-045_CALFIRE INSPECTION
B17-1062_022-350-045_CALFIRE INSPECTION (4)
B17-1063_024-180-064_CALFIRE INSPECTION
B17-1063_024-180-064_CALFIRE INSPECTION (4)
B17-1090 CF Final Inspection
B17-1090_041-030-152_CALFIRE INSPECTION
B17-1099_063-220-011_CALFIRE INSPECTION
B17-1102_042-020-020_CALFIRE INSPECTION
B17-1102_042-020-020_CALFIRE INSPECTION (4)
B17-1162 CALFIRE FINAL INSPECTION
B17-1162_072-500-031_CALFIRE INSPECTION
B17-1180_030-250-056_CALFIRE INSPECTION
B17-1186_078-070-010_CALFIRE INSPECTION
B17-1202 CF Final Inspection
B17-1202_009-330-009_CALFIRE INSPECTION
B17-1208_047-250-206_CALFIRE INSPECTION
B17-1215_042-160-019_CALFIRE INSPECTION
B17-1215_042-160-019_CALFIRE INSPECTION (4)
B17-1224_040-040-028_CALFIRE INSPECTION
B17-1228_024-180-014_CALFIRE INSPECTION
B17-1231_027-250-036_CALFIRE INSPECTION
B17-1247 CALFIRE PRE INSPECTION
B17-1254_001-193-009_CALFIRE INSPECTION
B17-1265_058-210-180_CALFIRE INSPECTION
B17-1265_058-210-180_CALFIRE INSPECTION (4)
B17-1268_058-260-003_CALFIRE INSPECTION
B17-1269_072-600-021_CALFIRE INSPECTION
B17-1270_079-110-003_CALFIRE INSPECTION
B17-1271_017-300-045_CALFIRE INSPECTION
B17-1272_072-270-010_CALFIRE INSPECTION
B17-1273_072-270-010_CALFIRE INSPECTION
B17-1279 CALFIRE FINAL INSPECTION
B17-1279_022-202-003_CALFIRE INSPECTION
B17-1283 CALFIRE UNDERGROUND LPG TANK
B17-1283 CF Final Inspection
B17-1283_047-750-073_CALFIRE INSPECTION
B17-1292_010-270-072_CALFIRE INSPECTION
B17-1296_069-560-022_CALFIRE INSPECTION
B17-1303_071_290_065 CF PRE INSPECTION
B17-1305_079-300-036_CALFIRE INSPECTION
B17-1307 CALFIRE FINAL INSPECTION
B17-1307_038-170-038_CALFIRE INSPECTION
B17-1309 CALFIRE FINAL INSPECTION
B17-1309_005-393-009_CALFIRE INSPECTION
B17-1314_040-232-005_CALFIRE INSPECTION
B17-1323_041-080-125_CALFIRE INSPECTION
B17-1329_047-290-066_CALFIRE INSPECTION
B17-1336 CALFIRE PRE INSPECTION
B17-1351_055-290-055_CALFIRE INSPECTION
B17-1351_055-290-055_CALFIRE INSPECTION (4)
B17-1351_055-290-055_CALFIRE INSPECTION (7)
B17-1354_021-230-058_CALFIRE INSPECTION
B17-1366_042_020_020 CF FINAL INSPECTION
B17-1368 CALFIRE PRE INSPECTION
B17-1369 CF FINAL INSPECTION
B17-1369_056-280-070_CALFIRE INSPECTION
B17-1374 CF FINAL INSPECTION
B17-1374_031-060-054_CALFIRE INSPECTION
B17-1386_071-490-001_CALFIRE INSPECTION
B17-1386_071-490-001_CALFIRE INSPECTION (4)
B17-1391_063-040-022_CALFIRE INSPECTION
B17-1395_047-480-002_CALFIRE INSPECTION
B17-1399_047-770-042_CALFIRE INSPECTION
B17-1414_001-140-029_CALFIRE INSPECTION
B17-1418_002-630-014_CALFIRE INSPECTION
B17-1418_002-630-014_CALFIRE INSPECTION (4)
B17-1420_040-160-064_CALFIRE INSPECTION
B17-1440_058-360-099_CALFIRE INSPECTION
B17-1441_058-360-099_CALFIRE INSPECTION
B17-1463_072-050-022_CALFIRE INSPECTION
B17-1468_063-310-011_CALFIRE INSPECTION
B17-1495 CALFIRE FIRE ALARM INSPECTION
B17-1495 CALFIRE FIRE ALARM TEST
B17-1502_047-610-020_CALFIRE INSPECTION
B17-1505_042-020-020_CALFIRE INSPECTION
B17-1518_068-150-097_CALFIRE INSPECTION
B17-1540 CF Final Inspection
B17-1540_047-710-022_CALFIRE INSPECTION
B17-1552_047-750-059_CALFIRE INSPECTION
B17-1561 CALFIRE FINAL INSPECTION
B17-1561_038-190-002_CALFIRE INSPECTION
B17-1563 CF FINAL INSPECTION
B17-1563_047-780-043_CALFIRE INSPECTION
B17-1565_069-270-018_CALFIRE INSPECTION
B17-1575 CF Final Inspection
B17-1575_047-690-008_CALFIRE INSPECTION
B17-1576 CF Final Inspection
B17-1576_047-690-008_CALFIRE INSPECTION
B17-1577_047-690-008_CALFIRE INSPECTION
B17-1582 CF FINAL INSPECTION
B17-1582_060-110-089_CALFIRE INSPECTION
B17-1600_039-560-043_CALFIRE INSPECTION
B17-1643_039-660-001_CALFIRE INSPECTION
B17-1718_017-240-010_CALFIRE INSPECTION
B17-1719_042-590-038_CALFIRE INSPECTION
B17-1750_062-160-054_CALFIRE INSPECTION
B17-1751 CALFIRE PRE AND FINAL INSPECTION
B17-1766_047-710-017_CALFIRE INSPECTION
B17-1766_047-710-017_CALFIRE INSPECTION (4)
B17-1767_030-230-062_CALFIRE INSPECTION
B17-1770_066-360-020_CALFIRE INSPECTION
B17-1770_066-360-020_CALFIRE INSPECTION (4)
B17-1771_058-370-044_CALFIRE INSPECTION
B17-1771_058-370-044_CALFIRE INSPECTION (4)
B17-1793 CF Final Inspection
B17-1793_028-170-172_CALFIRE INSPECTION
B17-1795_039-100-021_CALFIRE INSPECTION
B17-1802_065-180-025_CALFIRE INSPECTION
B17-1806_026-212-010_CALFIRE INSPECTION
B17-1806_026-212-010_CALFIRE INSPECTION (7)
B17-1826_062-710-004_CALFIRE INSPECTION
B17-1843 CALFIRE FINAL INSPECTION
B17-1843_072-460-030_CALFIRE INSPECTION
B17-1861_068-140-078_CALFIRE INSPECTION
B17-1894_069-190-018_CALFIRE INSPECTION
B17-1897_027-150-008_CALFIRE INSPECTION
B17-1909_040-260-057_CALFIRE INSPECTION
B17-1935 CALFIRE FINAL INSPECTION
B17-1935_072-210-046_CALFIRE INSPECTION
B17-1943_039-480-020_CALFIRE INSPECTION
B17-1950_040-280-054_CALFIRE INSPECTION
B17-1960_047-330-037_CALFIRE INSPECTION
B17-1964_060-230-018_CALFIRE INSPECTION
B17-1971_027-070-079_CALFIRE INSPECTION
B17-1971_027-070-079_CALFIRE INSPECTION (4)
B17-1982_056-280-061_CALFIRE INSPECTION
B17-1987_047-200-083_CALFIRE INSPECTION
B17-1994_029-220-013_CALFIRE INSPECTION
B17-1994_029-220-013_CALFIRE INSPECTION (4)
B17-2010 CF Final Inspection
B17-2010_063-150-004_CALFIRE INSPECTION
B17-2026_017-110-030_CALFIRE INSPECTION
B17-2032_040-610-006_CALFIRE INSPECTION
B17-2072_041_080_144_CF FINAL INSPECTION
B17-2072_041-080-144_CALFIRE INSPECTION
B17-2087_038-070-014_CALFIRE INSPECTION
B17-2087_038-070-014_CALFIRE INSPECTION (4)
B17-2098 CALFIRE FINAL INSPECTION
B17-2098_068-130-102_CALFIRE INSPECTION
B17-2104_007-330-023_CALFIRE INSPECTION
B17-2114_058-680-044_CALFIRE INSPECTION
B17-2114_058-680-044_CALFIRE INSPECTION (4)
B17-2124_031-180-018_CALFIRE INSPECTION
B17-2128_063-360-041_CALFIRE INSPECTION
B17-2138_039-160-010_CALFIRE INSPECTION
B17-2138_039-160-010_CALFIRE INSPECTION (4)
B17-2143_040-630-010_CALFIRE INSPECTION
B17-2152_069-260-002_CALFIRE INSPECTION
B17-2152_069-260-002_CALFIRE INSPECTION (4)
B17-2160_072-240-014_CALFIRE INSPECTION
B17-2160_072-240-014_CALFIRE INSPECTION (4)
B17-2166_072-240-014_CALFIRE INSPECTION
B17-2188_078-040-016_CALFIRE INSPECTION
B17-2190_047-450-002_CALFIRE INSPECTION
B17-2190_047-450-002_CALFIRE INSPECTION (4)
B17-2196 CALFIRE FINAL INSPECTION
B17-2196_072-550-015_CALFIRE INSPECTION
B17-2198_040-360-008_CALFIRE INSPECTION
B17-2205 CF Final Inspection
B17-2205 CF Final Inspection (2)
B17-2205 CF Final Inspection (3)
B17-2205 CF Final Inspection (4)
B17-2205 CF Final Inspection (5)
B17-2205_065-210-072_CALFIRE INSPECTION
B17-2215_010-300-031_CALFIRE INSPECTION
B17-2215_010-300-031_CALFIRE INSPECTION (4)
B17-2217 CF Final Inspection
B17-2217_021-160-049_CALFIRE INSPECTION
B17-2219_079-240-064_CALFIRE INSPECTION
B17-2220 CALFIRE Pre Inspection
B17-2235 CF Final Inspection
B17-2235_065-203-011_CALFIRE INSPECTION
B17-2271_027-240-029_CALFIRE INSPECTION
B17-2271_027-240-029_CALFIRE INSPECTION (4)
B17-2281 CF FINAL INSPECTION
B17-2281_047-670-046_CALFIRE INSPECTION
B17-2284_024-120-010_CALFIRE INSPECTION
B17-2321_007-550-042_CALFIRE INSPECTION
B17-2337_068-130-026_CALFIRE INSPECTION
B17-2342_072-550-024_CALFIRE INSPECTION
B17-2342_072-550-024_CALFIRE INSPECTION (4)
B17-2343_047-490-007_CALFIRE INSPECTION
B17-2347 CF Overhead Sprinkler Hydro Test
B17-2364 CALFIRE Pre Inspection
B17-2364_064-270-023_CALFIRE INSPECTION
B17-2401_030-430-019_CALFIRE INSPECTION
B17-2401_030-430-019_CALFIRE INSPECTION (4)
B17-2404_062_240_008 CF FINAL INSPECTION
B17-2405_041-540-032_CALFIRE INSPECTION
B17-2407_072-330-003_CALFIRE INSPECTION
B17-2411_040-140-091_CALFIRE INSPECTION
B17-2420 CF FINAL INSPECTION
B17-2420_028-270-185_CALFIRE INSPECTION
B17-2439_021-131-024_CALFIRE INSPECTION
B17-2439_021-131-024_CALFIRE INSPECTION (4)
B17-2439_021-131-024_CALFIRE INSPECTION (7)
B17-2459_047-770-048_CALFIRE INSPECTION
B17-2460 CALFIRE PRE Inspection
B17-2460_007_460_029 CF FINAL INSPECTION
B17-2484_040-140-015_CALFIRE INSPECTION
B17-2488_047_060_025 CF FINAL INSPECTION
B17-2488_047-060-025_CALFIRE INSPECTION
B17-2490_040-110-016_CALFIRE INSPECTION
B17-2523_047-750-022_CALFIRE INSPECTION
B17-2539_079-380-054_CALFIRE INSPECTION
B17-2552_005-385-003_CALFIRE INSPECTION
B17-2557_006-660-034_CALFIRE INSPECTION
B17-2568 CF FINAL INSPECTION
B17-2568 CF FINAL INSPECTION (2)
B17-2568_001-165-009_CALFIRE INSPECTION
B17-2590_030-200-090_CALFIRE INSPECTION
B17-2592_047-450-005_CALFIRE INSPECTION
B17-2602_072-210-029_CALFIRE INSPECTION
B17-2619_030-062-005_CALFIRE INSPECTION
B17-2626 CAL FIRE FINAL INSPECTION
B17-2631_047-280-066_CALFIRE INSPECTION
B17-2631_047-280-066_CALFIRE INSPECTION (4)
B17-2631_047-280-066_CALFIRE INSPECTION (7)
B17-2654 CALFIRE Pre Inspection
B17-2662_047-200-084_CALFIRE INSPECTION
B17-2669 CF FINAL INSPECTION
B17-2669 CF Final Inspection (2)
B17-2669_041-140-005_CALFIRE INSPECTION
B17-2681 CF Final Inspection
B17-2681_039-530-001_CALFIRE INSPECTION
B17-2682_006-660-013_CALFIRE INSPECTION
B17-2683 CF Final Inspection
B17-2683_039-530-001_CALFIRE INSPECTION
B17-2688_072-330-013_CALFIRE INSPECTION
B17-2688_072-330-013_CALFIRE INSPECTION (4)
B17-2710_040-260-056_CALFIRE INSPECTION
B17-2722 CALFIRE PRE INSPECTION
B17-2722 CF FINAL INSPECTION
B17-2726 CALFIRE Plan Check Correction Letter
B17-2727_007-390-012_CALFIRE INSPECTION
B17-2737_047-220-097_CALFIRE INSPECTION
B17-2746_024-140-032_CALFIRE INSPECTION
B17-2749_007-200-044_CALFIRE INSPECTION
B17-2794 CALFIRE PRE INSPECTION
B17-2794 CF Final Inspection
B17-2809 CALFIRE PRE INSPECTION
B17-2809 CF FINAL INSPECTION
B17-2809 CF Final Inspection (2)
B17-2828 CALFIRE OVERHEAD SPRINKLER HYDRO TEST
B17-2828 CALFIRE OVERHEAD SPRINKLER HYDRO TEST (2)
B17-2828 CALFIRE OVERHEAD SPRINKLER HYDRO TEST 2
B17-2828 CF Fire Alarm Inspection
B17-2853 CF Fire Alarm Inspection
B17-2911_041-250-105_CALFIRE INSPECTION
B17-2920_040-670-010_CALFIRE INSPECTION
B17-2925 CF Final Inspection
B17-2925_056-410-026_CALFIRE INSPECTION
B17-2925_056-410-026_CALFIRE INSPECTION (3)
B17-2928_039-370-103_CALFIRE INSPECTION
B17-2940 CALFIRE PC Response
B17-2940 CF Overhead Sprinkler Hydro Test 2018
B17-2940 Overhead Sprinkler Hydro Test 2018 Facility
B17-2940_040-200-006_CALFIRE INSPECTION
B17-2980_047-790-001_CALFIRE INSPECTION
B17-2985_047-390-001_CALFIRE INSPECTION
B17-2989_072-210-047_CALFIRE INSPECTION
B17-2996_061-630-028_CALFIRE INSPECTION
B17-3004_039-230-122_CALFIRE INSPECTION
B17-3009_040-550-014_CALFIRE INSPECTION
B17-3027_028-220-038_CALFIRE INSPECTION
B17-3027_028-220-038_CALFIRE INSPECTION (4)
B17-3038_079-270-011_CALFIRE INSPECTION
B17-3039 CF FINAL INSPECTION
B17-3039_065-010-080_CALFIRE INSPECTION
B17-3046_071-480-014_CALFIRE INSPECTION
B18-0015 CF FINAL INSPECTION
B18-0015 CF FINAL INSPECTION (2)
B18-0015_065-340-012_CALFIRE INSPECTION
B18-0021 CALFIRE PRE INSPECTION
B18-0023_072-140-055_CALFIRE INSPECTION
B18-0038 CF Final Inspection
B18-0038_028-210-017_CALFIRE INSPECTION
B18-0047_028-240-040_CALFIRE INSPECTION
B18-0051 CF FINAL INSPECTION
B18-0051_039-390-045_CALFIRE INSPECTION
B18-0053_031-202-036_CALFIRE INSPECTION
B18-0054_042-050-015_CALFIRE INSPECTION
B18-0055_042-090-021_CALFIRE INSPECTION
B18-0061_010-270-050_CALFIRE INSPECTION
B18-0062 CALFIRE PRE and FINAL INSPECTION
B18-0073 CF FINAL INSPECTION
B18-0073_028-330-042_CALFIRE INSPECTION
B18-0079 CF Final Inspection
B18-0079_028-300-045_CALFIRE INSPECTION
B18-0107_040-360-010_CALFIRE INSPECTION
B18-0107_040-360-010_CALFIRE INSPECTION (4)
B18-0108_071-480-010_CALFIRE INSPECTION
B18-0115_026-090-005_CALFIRE INSPECTION
B18-0132_039-390-062_CALFIRE INSPECTION
B18-0150 CF PC
B18-0154_031-203-030_CALFIRE INSPECTION
B18-0166_022-100-035_CALFIRE INSPECTION
B18-0192_028-330-031_CALFIRE INSPECTION
B18-0193_079_370_030 CF PRE INSPECTION
B18-0202 CF Final Inspection
B18-0202_040-050-061_CALFIRE INSPECTION
B18-0205 CF Final Inspection
B18-0205_072-460-032_CALFIRE INSPECTION
B18-0208 CF PC Letter
B18-0208 CF Photo Bollards
B18-0215 CF Address Sign
B18-0215_027-350-023_CALFIRE INSPECTION
B18-0215_027-350-023_CALFIRE INSPECTION (4)
B18-0216_063-360-040_CALFIRE INSPECTION
B18-0217 CF Final Inspection
B18-0217_028-260-054_CALFIRE INSPECTION
B18-0223_025_170_075 CF FINAL INSPECTION
B18-0223_025-170-075_CALFIRE INSPECTION
B18-0238_047-710-022_CALFIRE INSPECTION
B18-0253_039-460-003_CALFIRE INSPECTION
B18-0255_024-170-080_CALFIRE INSPECTION
B18-0280_064-770-021_CALFIRE INSPECTION
B18-0298 CALFIRE UNDERGROUND LPG INSPECTION
B18-0305_071-490-002_CALFIRE INSPECTION
B18-0306 CF Final Inspection
B18-0306_060-240-014_CALFIRE INSPECTION
B18-0311_040-390-001_CALFIRE INSPECTION
B18-0327_028-240-038_CALFIRE INSPECTION
B18-0332_030-110-080_CALFIRE INSPECTION
B18-0332_030-110-080_CALFIRE INSPECTION (4)
B18-0334_042-010-116_CALFIRE INSPECTION
B18-0352_065-300-013_CALFIRE INSPECTION
B18-0369_033-010-077_CALFIRE INSPECTION
B18-0383_072-090-021_CALFIRE INSPECTION
B18-0385_071-290-076_CALFIRE INSPECTION
B18-0393_068-130-068_CALFIRE INSPECTION
B18-0397 CF FINAL INSPECTION
B18-0397 CF PC
B18-0398_027-200-022_CALFIRE INSPECTION
B18-0402_071-480-015_CALFIRE INSPECTION
B18-0404_001-193-005_CALFIRE INSPECTION
B18-0407_073-350-020_CALFIRE INSPECTION
B18-0421 CF PC
B18-0443_042-020-020_CALFIRE INSPECTION
B18-0448_058-680-042_CALFIRE INSPECTION
B18-0451_078-130-004_CALFIRE INSPECTION
B18-0453_025-160-118_CALFIRE INSPECTION
B18-0456 CF PC
B18-0461_009-340-123_CALFIRE INSPECTION
B18-0465_033-027-002_CALFIRE INSPECTION
B18-0476_068-160-079_CALFIRE INSPECTION
B18-0494 CF PC
B18-0495_028-260-051_CALFIRE INSPECTION
B18-0500_042-020-020_CALFIRE INSPECTION
B18-0501_038-070-043_CALFIRE INSPECTION
B18-0507_047-320-032_CALFIRE INSPECTION
B18-0514_079-260-022_CALFIRE INSPECTION
B18-0520_047-440-037_CALFIRE INSPECTION
B18-0539_047-790-017_CALFIRE INSPECTION
B18-0540_026-250-062_CALFIRE INSPECTION
B18-0543_072-330-094_CALFIRE INSPECTION
B18-0551 CF PC
B18-0555 CF FINAL INSPECTION
B18-0555 CF Final Inspection (2)
B18-0555_028-220-046_CALFIRE INSPECTION
B18-0557 CF PC
B18-0559_047-420-012_CALFIRE INSPECTION
B18-0561_042-170-089_CALFIRE INSPECTION
B18-0587_072-112-022_CALFIRE INSPECTION
B18-0587_072-112-022_CALFIRE INSPECTION (4)
B18-0588_024-090-083_CALFIRE INSPECTION
B18-0591_038-160-040_CALFIRE INSPECTION
B18-0596_040-580-029_CALFIRE INSPECTION
B18-0598_079-100-015_CALFIRE INSPECTION
B18-0600_047-790-011_CALFIRE INSPECTION
B18-0605 CF PC
B18-0607 CF PC
B18-0609 CF PC LETTER
B18-0621_028-210-049_CALFIRE INSPECTION
B18-0624_039-060-088_CALFIRE INSPECTION
B18-0644_041-080-074_CALFIRE INSPECTION
B18-0644_041-080-074_CALFIRE INSPECTION (4)
B18-0658_064_120_014_CALFIRE INSPECITON
B18-0658_064-120-014_CALFIRE INSPECTION
B18-0658_064-120-014_CALFIRE INSPECTION (3)
B18-0659_072-210-033_CALFIRE INSPECTION
B18-0710_043-270-005_CALFIRE INSPECTION
B18-0713 CF FInal Inspection
B18-0713_047-060-022_CALFIRE INSPECTION
B18-0713_047-060-022_CALFIRE INSPECTION (4)
B18-0715_078-150-012_CALFIRE INSPECTION
B18-0737_072-460-008_CALFIRE INSPECTION
B18-0737_072-460-008_CALFIRE INSPECTION (4)
B18-0747 CF PC
B18-0749_017-120-001_CALFIRE INSPECTION
B18-0761_024-230-064_CALFIRE INSPECTION (3)
B18-0770_041-400-056_CALFIRE INSPECTION
B18-0795 CF PRE INSPECTION CONFIRMATION
B18-0803_079-290-021_CALFIRE INSPECTION
B18-0805_024-051-016_CALFIRE INSPECTION
B18-0805_024-051-016_CALFIRE INSPECTION (4)
B18-0806_069-530-054_CALFIRE INSPECTION
B18-0841_030-072-018_CALFIRE INSPECTION
B18-0852_063-360-048_CALFIRE INSPECTION
B18-0853 CF Suppression Hood Inspection
B18-0853 CF Suppression Hood Inspection (2)
B18-0858_039_470_031_CAL FIRE INSPECTION
B18-0858_039-470-031_CALFIRE INSPECTION
B18-0880_047_500_019 CF FINAL INSPECTION
B18-0881_006-660-015_CALFIRE INSPECTION (8)
B18-0881_006-660-015_CALFIRE INSPECTION (9)
B18-0892 CF PC
B18-0893_027-010-005_CALFIRE INSPECTION
B18-0895_042-170-081_CALFIRE INSPECTION
B18-0896_010-120-014_CALFIRE INSPECTION
B18-0902_073-100-018_CALFIRE INSPECTION
B18-0911_009-220-015_CALFIRE INSPECTION
B18-0936 CF Final Inspectio
B18-0936 CF FINAL INSPECTION
B18-0936_063-040-022_CALFIRE INSPECTION
B18-0950_065-050-014_CALFIRE INSPECTION
B18-0965_066-520-008_CALFIRE INSPECTION
B18-0989_042-050-087_CALFIRE INSPECTION
B18-0989_042-050-087_CALFIRE INSPECTION (4)
B18-0990_028-130-023_CALFIRE INSPECTION
B18-1000_028-230-008_CALFIRE INSPECTION
B18-1000_028-230-008_CALFIRE INSPECTION (4)
B18-1005_028-210-049_CALFIRE INSPECTION
B18-1032_041-030-069_CALFIRE INSPECTION
B18-1039_028-330-031_CALFIRE INSPECTION
B18-1062_047-430-048_CALFIRE INSPECTION
B18-1074_064_150_015_CF PRE INSPECTION
B18-1074_064-150-015_CALFIRE INSPECTION
B18-1082_056-150-082_CALFIRE INSPECTION
B18-1084_056-100-067_CALFIRE INSPECTION (3)
B18-1090_028-210-040_CALFIRE INSPECTION
B18-1092 CF PC
B18-1099_028-210-058_CALFIRE INSPECTION
B18-1102_059-092-003_CALFIRE INSPECTION
B18-1124_047-790-027_CALFIRE INSPECTION
B18-1125_047-790-030_CALFIRE INSPECTION
B18-1128_031-202-058_CALFIRE INSPECTION
B18-1129 CF PC
B18-1140_058-170-078_CALFIRE INSPECTION
B18-1140_058-170-078_CALFIRE INSPECTION (3)
B18-1140_058-170-078_CALFIRE INSPECTION (5)
B18-1142 CF FINAL INSPECTION
B18-1142_007-230-012_CALFIRE INSPECTION
B18-1143 Overhead Sprinkler Hydro Test
B18-1160_028_420_115 CF PRE INSPECTION
B18-1176 CF FINAL INSPECTION
B18-1176 CF PRE INSPECTION CONFIRMATION
B18-1183_039-190-022_CALFIRE INSPECTION
B18-1185 CF PC
B18-1197_069-530-028_CALFIRE INSPECTION
B18-1212_043-670-013_CALFIRE INSPECTION
B18-1212_043-670-013_CALFIRE INSPECTION (4)
B18-1219 CF Address
B18-1219 CF Address (2)
B18-1219_042-160-010_CALFIRE INSPECTION
B18-1221_024-010-091_CALFIRE INSPECTION
B18-1223_006-400-038_CALFIRE INSPECTION
B18-1223_006-400-038_CALFIRE INSPECTION (3)
B18-1229 CF PRE INSPECTION CONFIRMATION
B18-1248_002-630-013_CALFIRE INSPECTION
B18-1253 CF FINAL INSPECTION
B18-1253_058-560-012_CALFIRE INSPECTION
B18-1265_043-580-020_CALFIRE INSPECTION
B18-1265_043-580-020_CALFIRE INSPECTION (3)
B18-1285_026-212-010_CALFIRE INSPECTION
B18-1285_026-212-010_CALFIRE INSPECTION (4)
B18-1292_028-110-021_CALFIRE INSPECTION
B18-1300 CF Final Inspection
B18-1351 CF FINAL INSPECTION
B18-1392 CF PRE INSPECTION
B18-1396_028-390-048_CALFIRE INSPECTION
B18-1430 CF PC
B18-1432 CF PC
B18-1441_047_750_095 CF PRE INSPECTION
B18-1443_017-_050_029 CF FINAL INSPECTION
B18-1444_025-340-070_CALFIRE INSPECTION
B18-1449_047_370_041 CF FINAL INSPECTION
B18-1457 CF FINAL INSPECTION
B18-1485 CF PRE INSPECTION CONFIRMATION
B18-1485_047-100-117_CALFIRE INSPECTION
B18-1486 CF PC
B18-1486_065_500_027 CF PRE INSPECTION
B18-1489_018_440_090 CF PRE INSPECTION
B18-1489_018-440-090_CALFIRE INSPECTION
B18-1498_024-060-008_CALFIRE INSPECTION
B18-1498_024-060-008_CALFIRE INSPECTION (4)
B18-1503_062-350-003_CALFIRE INSPECTION
B18-1503_062-350-003_CALFIRE INSPECTION (4)
B18-1511_027_060_054 CF PRE INSPECTION
B18-1532 CF Letter
B18-1532 CF Letter (2)
B18-1532 CF PC
B18-1532 CF Photo 1
B18-1532 CF Photo 2
B18-1532 CF Photo 3
B18-1532 CF Photo 4
B18-1532 CF Photo 5
B18-1532 CF Sprinkler Letter
B18-1532 CF Sprinkler Letter (2)
B18-1581_069-420-022_CALFIRE INSPECTION
B18-1583_017-290-012_CALFIRE INSPECTION
B18-1603 CF PRE INSPECTION CONFIRMATION
B18-1605_072-330-088_CALFIRE INSPECTION
B18-1607_038-090-039_CALFIRE INSPECTION
B18-1625_040-170-010_CALFIRE INSPECTION
B18-1625_040-170-010_CALFIRE INSPECTION (4)
B18-1638_072-050-017_CALFIRE INSPECTION
B18-1638_072-050-017_CALFIRE INSPECTION (4)
B18-1642 CF PC
B18-1642 CF Suppression Hood Inspection
B18-1651_061-430-014_CALFIRE INSPECTION
B18-1652 CF PRE INSPECTION CONFIRMATION
B18-1652_072-200-024_CALFIRE INSPECTION
B18-1659_028-250-026_CALFIRE INSPECTION
B18-1659_028-250-026_CALFIRE INSPECTION (4)
B18-1670_079-170-009_CALFIRE INSPECTION
B18-1670_079-170-009_CALFIRE INSPECTION (4)
B18-1673 CF PC2
B18-1677_072-200-033_CALFIRE INSPECTION
B18-1697 CF PC
B18-1713 CF PRE INSPECTION CONFIRMATION
B18-1725_025-060-031_CALFIRE INSPECTION
B18-1731_007-550-024_CALFIRE INSPECTION
B18-1732_041-100-076_CALFIRE INSPECTION
B18-1732_041-100-076_CALFIRE INSPECTION (4)
B18-1737 CF PRE INSPECTION CONFIRMATION
B18-1737_065-180-026_CALFIRE INSPECTION
B18-1741 CF PC
B18-1741_042-170-006_CALFIRE INSPECTION
B18-1758_028-250-024_CALFIRE INSPECTION
B18-1758_028-250-024_CALFIRE INSPECTION (4)
B18-1765_066-180-006_CALFIRE INSPECTION
B18-1765_066-180-006_CALFIRE INSPECTION (4)
B18-1780 CF PC
B18-1800_072-210-038_CALFIRE INSPECTION
B18-1800_072-210-038_CALFIRE INSPECTION (4)
B18-1805_021-134-006_CALFIRE INSPECTION
B18-1805_021-134-006_CALFIRE INSPECTION (4)
B18-1846 CF FInal Inspection
B18-1846_029-120-005_CALFIRE INSPECTION
B18-1864_009-340-136_CALFIRE INSPECTION
B18-1864_009-340-136_CALFIRE INSPECTION (4)
B18-1869_072-040-007_CALFIRE INSPECTION
B18-1869_072-040-007_CALFIRE INSPECTION (3)
B18-1873_006-670-002_CALFIRE INSPECTION
B18-1873_006-670-002_CALFIRE INSPECTION (5)
B18-1888_078-100-009_CALFIRE INSPECTION
B18-1944_039-570-024_CALFIRE INSPECTION
B18-1946_072-540-002_CALFIRE INSPECTION
B18-1946_072-540-002_CALFIRE INSPECTION (4)
B18-1985_072-460-028_CALFIRE INSPECTION
B18-2008_069-130-060_CALFIRE INSPECTION
B18-2008_069-130-060_CALFIRE INSPECTION (4)
B18-2025_040-680-011_CALFIRE INSPECTION
B18-2028 SOIU
B18-2029_042-610-046_CALFIRE INSPECTION
B18-2033_039-570-035_CALFIRE INSPECTION
B18-2033_039-570-035_CALFIRE INSPECTION (4)
B18-2033_039-570-035_CALFIRE INSPECTION (7)
B18-2059_069-250-029_CALFIRE INSPECTION
B18-2116_069-360-007_CALFIRE INSPECTION
B18-2121_039-250-041_CALFIRE INSPECTION
B18-2125_022-160-075_CALFIRE INSPECTION
B18-2172 CF FINAL INSPECTION
B18-2172_025-020-041_CALFIRE INSPECTION
B18-2182 CF Fire Alarm Inspection
B18-2182 CF Fire Alarm Inspection (2)
B18-2196_047-380-004_CALFIRE INSPECTION
B18-2232 CF FA 2018 025-200-127 Spin_&_Sport_Club_-_1788_Highway_99,_Gridley,_CA_95948
B18-2232 CF FA 2018 025-200-127 Spin_&_Sport_Club_-_1788_Highway_99,_Gridley,_CA_95948 (2)
B18-2232 CF FA 2018 025-200-127 Spin_&_Sport_Club_-_1788_Highway_99,_Gridley,_CA_95948 (3)
B18-2232 CF FA 2018 025-200-127 Spin_&_Sport_Club_-_1788_Highway_99,_Gridley,_CA_95948 (4)
B18-2232 CF Sprinkler Test
B18-2236_072-460-004_CALFIRE INSPECTION
B18-2267_040-080-067_CALFIRE INSPECTION
B18-2286 CF Pre Inspection
B18-2287_063-350-001_CALFIRE INSPECTION
B18-2294 CF PC
B18-2348_047-100-114_CALFIRE INSPECTION
B18-2356_071-470-012_CALFIRE INSPECTION
B18-2356_071-470-012_CALFIRE INSPECTION (5)
B18-2369_040-160-079_CALFIRE INSPECTION
B18-2369_040-160-079_CALFIRE INSPECTION (4)
B18-2391 CAL FIRE Pre Inspection
B18-2417_047-370-029_CALFIRE INSPECTION
B18-2421_065-530-021_CALFIRE INSPECTION
B18-2421_065-530-021_CALFIRE INSPECTION (4)
B18-2441_025-100-039_CALFIRE INSPECTION
B18-2473 CF PC
B18-2476_047-680-027_CALFIRE INSPECTION
B18-2480_047-670-047_CALFIRE INSPECTION
B18-2502 CF Fire Door Test
B18-2502 CF Fire Door Test (2)
B18-2502 CF PC
B18-2502 Fire Door
B18-2505_069-130-020_CALFIRE INSPECTION
B18-2550_039-270-009_CALFIRE INSPECTION
B18-2566_027-330-007_CALFIRE INSPECTION
B18-2566_027-330-007_CALFIRE INSPECTION (4)
B18-2631_064-050-009_CALFIRE INSPECTION (4)
B18-2635 CF PC
B18-2635 MSDS
B18-2647_056-390-034_CALFIRE INSPECTION (4)
B18-2650 CF PC
B18-2660 CF Final Inspection
B18-2686 CF PC
B18-2720 BerbarianSheller_FP_11-31-18 Calcs
B18-2748 SBM Sprinkler Plans 12-14-18
B18-2780_029-153-011_CALFIRE INSPECTION (4)
B18-2865_028-370-035_CALFIRE INSPECTION (4)
B18-2874 CF Pre Inspection
B18-2885_047-580-019_CALFIRE INSPECTION
B18-2922 CF Final Inspection
B18-2922 CF Final Inspection (2)
B18-2949 CF Pre Inspection
B18-2992 CF PC
B18-2992_009-021-017_CALFIRE INSPECTION (4)
B18-2999 CF PC
B18-2999 CF PC (2)
B18-3003 CF PC
B18-3016_079-270-076_CALFIRE INSPECTION
B18-3016_079-270-076_CALFIRE INSPECTION (3)
B18-3054_071-250-046_CALFIRE INSPECTION
B18-3069_064-410-029_CALFIRE INSPECTION
B18-3070 CF FINAL INSPECTION
B18-3076 CF Final Inspection
B18-3076_071-470-014_CALFIRE INSPECTION
B18-3095 CF PC
B18-3121 CF Final Inspection
B18-3127 CF FINAL INSPECTION
B18-3127_039-230-090_CALFIRE INSPECTION
B19-0016_047-440-037_CALFIRE INSPECTION
B19-0045 CF FINAL INSPECTION
B19-0045_040-060-077_CALFIRE INSPECTION
B19-0053 CF PC
B19-0065_017-110-045_CALFIRE INSPECTION
B19-0065_017-110-045_CALFIRE INSPECTION (3)
B19-0075 CF FINAL INSPECTION
B19-0075_025-320-035_CALFIRE INSPECTION
B19-0079_007-550-042_CALFIRE INSPECTION
B19-0100 CF FNAL INSPECTION
B19-0100 Plans- Fire Approved
B19-0103_027-270-022_CALFIRE INSPECTION
B19-0103_027-270-022_CALFIRE INSPECTION (4)
B19-0140 CF PC
B19-0144_079-170-002_CALFIRE INSPECTION
B19-0165 CF PC
B19-0175_040-280-109_CALFIRE INSPECTION
B19-0182_047-200-065_CALFIRE INSPECTION
B19-0182_047-200-065_CALFIRE INSPECTION (4)
B19-0192_073-380-015_CALFIRE INSPECTION
B19-0194_058-680-052_CALFIRE INSPECTION
B19-0226_005-415-005_CALFIRE INSPECTION
B19-0261_047-350-105_CALFIRE INSPECTION
B19-0279_017-220-006_CALFIRE INSPECTION
B19-0291 CF PC
B19-0299_040-180-030_CALFIRE INSPECTION
B19-0302_047-290-012_CALFIRE INSPECTION
B19-0303 CF Final Inspection
B19-0303 CF Final Inspection (2)
B19-0316_060-230-010_CALFIRE INSPECTION
B19-0320_047-440-037_CALFIRE INSPECTION
B19-0320_047-440-037_CALFIRE INSPECTION (4)
B19-0338_038-070-003_CALFIRE INSPECTION
B19-0347_079-220-002_CALFIRE INSPECTION
B19-0348_030-540-006_CALFIRE INSPECTION
B19-0348_030-540-006_CALFIRE INSPECTION (4)
B19-0351_027-310-024_CALFIRE INSPECTION
B19-0359 CF PC
B19-0383_033-010-066_CALFIRE INSPECTION
B19-0393_047-440-037_CALFIRE INSPECTION
B19-0393_047-440-037_CALFIRE INSPECTION (3)
B19-0400 CF Final Inpsection
B19-0427_047-440-037_CALFIRE INSPECTION
B19-0427_047-440-037_CALFIRE INSPECTION (4)
B19-0428 CF PC
B19-0450_027-320-011_CALFIRE INSPECTION
B19-0450_027-320-011_CALFIRE INSPECTION (4)
B19-0461_007-440-019_CALFIRE INSPECTION
B19-0461_007-440-019_CALFIRE INSPECTION (4)
B19-0462 CF FINAL INSPECTION
B19-0462 CF FINAL INSPECTION (2)
B19-0472 CF PC (2)
B19-0478_047-790-020_CALFIRE INSPECTION
B19-0496_042-430-013_CALFIRE INSPECTION
B19-0503 CF PC
B19-0503 CF PC (2)
B19-0528_040-080-075_CALFIRE INSPECTION
B19-0539_047-460-026_CALFIRE INSPECTION
B19-0539_047-460-026_CALFIRE INSPECTION (3)
B19-0541_041-080-113_CALFIRE INSPECTION
B19-0552 CF PC
B19-0553_040-200-006_CALFIRE INSPECTION
B19-0554_040-200-006_CALFIRE INSPECTION
B19-0556_066-410-025_CALFIRE INSPECTION
B19-0556_066-410-025_CALFIRE INSPECTION (4)
B19-0569_028-400-029_CALFIRE INSPECTION
B19-0593 CF PC
B19-0595 CF PRE INSPECTION
B19-0602_047-780-002_CALFIRE INSPECTION
B19-0606_072-450-046_CALFIRE INSPECTION
B19-0613_039-360-117_CALFIRE INSPECTION
B19-0623_066-260-024_CALFIRE INSPECTION
B19-0623_066-260-024_CALFIRE INSPECTION (4)
B19-0624 CF PC
B19-0626_066-270-043_CALFIRE INSPECTION
B19-0626_066-270-043_CALFIRE INSPECTION (4)
B19-0627 CF PC
B19-0628 CF PC
B19-0628 CF PC Corrected
B19-0629 CF PC
B19-0630 CF PC
B19-0637 CF PC
B19-0655_050-260-024_CALFIRE INSPECTION
B19-0656_030-462-018_CALFIRE INSPECTION
B19-0661_065-510-009_CALFIRE INSPECTION
B19-0676_030-430-014_CALFIRE INSPECTION
B19-0676_030-430-014_CALFIRE INSPECTION (4)
B19-0679_040-400-093_CALFIRE INSPECTION
B19-0686 CF PC
B19-0687 CF PC
B19-0700_065-510-003_CALFIRE INSPECTION
B19-0700_065-510-003_CALFIRE INSPECTION (4)
B19-0706 CF FINAL INSPECTION
B19-0706_047-190-031_CALFIRE INSPECTION
B19-0709 CF PC
B19-0721_040-400-093_CALFIRE INSPECTION
B19-0740 CF PC
B19-0741_058-590-033_CALFIRE INSPECTION
B19-0742 CF PC
B19-0743_047-440-037_CALFIRE INSPECTION
B19-0759 CF PC
B19-0776 CF PC
B19-0782_047-120-023_CALFIRE INSPECTION
B19-0787_002-070-027_CALFIRE INSPECTION (4)
B19-0787_002-070-027_CALFIRE INSPECTION (7)
B19-0789 CF FINAL INSPECTION
B19-0793_047-610-025_CALFIRE INSPECTION
B19-0793_047-610-025_CALFIRE INSPECTION (5)
B19-0800_041-330-068_CALFIRE INSPECTION
B19-0800_041-330-068_CALFIRE INSPECTION (4)
B19-0804_028-080-001_CALFIRE INSPECTION
B19-0804_028-080-001_CALFIRE INSPECTION (4)
B19-0816 CF PC
B19-0816_066-160-006_CALFIRE INSPECTION
B19-0817 CF PC (2)
B19-0824 CF PC
B19-0824_017-160-005_CALFIRE INSPECTION
B19-0824_017-160-005_CALFIRE INSPECTION (4)
B19-0836 CF PC
B19-0837 CF PC
B19-0839 CF Final Inspection
B19-0839 CF Final Inspection (2)
B19-0839 CF Final Inspection (3)
B19-0839 CF PC
B19-0847 CF PC
B19-0849 CF PC
B19-0852 CF PC
B19-0868 CF PC
B19-0877 CF PC
B19-0879 CF PC
B19-0888 CF PC
B19-0905 CF PC
B19-0913 CF PC
B19-0932_056-370-011_CALFIRE INSPECTION
B19-0934 CF PC
B19-0948 CF PC
B19-0949 CF PC
B19-0950_041-600-020_CALFIRE INSPECTION
B19-0950_041-600-020_CALFIRE INSPECTION (4)
B19-0953 CF PC
B19-0956_047-670-045_CALFIRE INSPECTION
B19-0956_047-670-045_CALFIRE INSPECTION (4)
B19-0966 CF PC
B19-0968 CF PC
B19-0970 CF PC
B19-0972 CF Pre Inspection
B19-0982 CF PC
B19-1053 CF PC
B19-1058 CF PC
B19-1060 CF PC
B19-1076 CF PC
B19-1077 CF PC
B19-1078 CF PC
B19-1079 CF PC
B19-1091 CF Hood Steam Clean August 2019
B19-1091 CF Hood Steam Clean August 2019 (2)
B19-1091 CF PC
B19-1097 CF PC
B19-1107 CF PC
B19-1124 CF PC
B19-1127 CF PC
B19-1146 CF PC
B19-1149 CF PC
B19-1154 CF PC
B19-1162 CF PC
B19-1163 CF PC
B19-1165 CF PC
B19-1166 CF PC
B19-1167 CF PC
B19-1176 CF PC
B19-1190 CF PC
B19-1201 CF PC
B19-1217 CF PC
B19-1219 CF PC
B19-1222 CF PC
B19-1232 CF PC
B19-1232 CF PC (2)
B19-1233 CF FINAL INSPECTION
B19-1245 CF PC
B19-1251 CF PC
B19-1254 CF PC
B19-1260 CF PC
B19-1262 CF PC
B19-1263 CF PC
B19-1266 CF PC
B19-1270 CF PC
B19-1271 CF PC
B19-1275 CF PC
B19-1293 CF PC
B19-1320 CF FINAL INSPECTION
B19-1320 CF FINAL INSPECTION (2)
B19-1320 CF PC
B19-1327 CF PC
B19-1343 CF Final Inspection
B19-1343 CF Final Inspection (2)
B19-1343 CF PC
B19-1348 CF PC
B19-1352 CF PC
B19-1354 CF PC
B19-1355 CF PC
B19-1359 CF PC
B19-1374 CF PC
B19-1384 CF PC
B19-1385 CF PC
B19-1387 CF PC
B19-1400 CF PC
B19-1406 CF PC
B19-1411 CF PC
B19-1412 CF PC
B19-1417 CF PC
B19-1438 CF PC
B19-1445 CF PC
B19-1458 CF PC
B19-1462 CF PC
B19-1464 CF PC
B19-1492 CF FINAL INSPECTION
B19-1492 CF FINAL INSPECTION (2)
B19-1492 CF PC
B19-1500 CF PC
B19-1501 CF PC
B19-1503 CF PC
B19-1510 CF PC
B19-1511 CF PC
B19-1513 CF PC
B19-1525 CF PC
B19-1531 CF PC
B19-1549 CF PC
B19-1557 CF PC
B19-1557 WestgateHardwoods_FP_6-18-19 Fire Approved
B19-1568 CF PC
B19-1579 CF PC
B19-1580 CF PC
B19-1598 CF PC
B19-1616 CF PC
B19-1617 CF PC
B19-1633 CF PC
B19-1637 CF PC
B19-1647 CF Drop Test Fire Door
B19-1647 CF PC Pavia Hulling
B19-1650 CF PC
B19-1651 CF PC
B19-1655 CF PC
B19-1677 CF PC
B19-1689 CF PC
B19-1709 CF PC
B19-1732 CF PC
B19-1732 CF PC 2
B19-1748 CF PC
B19-1749 CF PC
B19-1750 CF PC
B19-1754 CF PC
B19-1758 CF Fire Alarm 2019 Kitchen
B19-1758 CF PC
B19-1768 CF PC
B19-1769 CF PC
B19-1771 CF PC
B19-1773 CF PC
B19-1774 CF PC
B19-1775 CF PC
B19-1789 CF PC
B19-1789 CF PC #2
B19-1789 CF PC #2 (2)
B19-1797 CF PC
B19-1800 CF PC
B19-1828 CF PC
B19-1828 Site Plan Updated 7-9-19
B19-1836_068-346-008_CALFIRE INSPECTION
B19-1840 SOIU
B19-1853 CF PC
B19-1856 CF PC
B19-1857 CF PC
B19-1857_009-300-088_CALFIRE INSPECTION
B19-1864 CF PC
B19-1879 CF FINAL INSPECTION
B19-1879 CF FINAL INSPECTION (2)
B19-1879 CF PC
B19-1882 CF PC
B19-1898 CF PC
B19-1909_073-090-011_CALFIRE INSPECTION
B19-1911 CF PC
B19-1916 CF PC
B19-1928_066-280-054_CALFIRE INSPECTION
B19-1946_071-400-036_CALFIRE INSPECTION
B19-1955_047-150-155_CALFIRE INSPECTION
B19-1957 CF PC
B19-1960_047-480-012_CALFIRE INSPECTION
B19-1961_066-150-006_CALFIRE INSPECTION
B19-1962 CF PC
B19-1963 CF PC
B19-1968_064-560-041_CALFIRE INSPECTION
B19-1984 CF PC
B19-1985 Cf PC
B19-1988 CF PC
B19-2009 CF PC
B19-2010 CF PC
B19-2012 CF PC
B19-2037 CF PC
B19-2076 CF PC
B19-2127 CF PC
B19-2130 CF PC
B19-2136 CF FINAL INSPECITON
B19-2136 CF FINAL INSPECITON (2)
B19-2136 CF PC
B19-2147 CF PC
B19-2151 CF PC
B19-2159 CF PC
B19-2167 CF PC
B19-2201_071-160-061_CALFIRE INSPECTION
B19-2204_009-122-006_CALFIRE INSPECTION
B19-2219_066-060-022_CALFIRE INSPECTION
B19-2225_022-280-021_CALFIRE INSPECTION
B19-2258 Fire Hydrant Map -- 073019
B19-2266_047-440-074_CALFIRE INSPECTION
B19-2272_066-030-010_CALFIRE INSPECTION
B19-2274_066-170-021_CALFIRE INSPECTION
B19-2304_047-790-026_CALFIRE INSPECTION
B19-2307_058-330-073_CALFIRE INSPECTION
B19-2314_017-280-002_CALFIRE INSPECTION
B19-2317_063-040-069_CALFIRE INSPECTION
B19-2318_063-240-009_CALFIRE INSPECTION
B19-2327_040-280-123_CALFIRE INSPECTION
B19-2328_040-280-123_CALFIRE INSPECTION
B19-2338_040-650-009_CALFIRE INSPECTION
B19-2343 CF PC
B19-2346 CF PC
B19-2376 CF PC
B19-2383_064-620-045_CALFIRE INSPECTION
B19-2397 CF PC
B19-2399 CF PC
B19-2401 CF PC
B19-2402_058-520-052_CALFIRE INSPECTION
B19-2414 CF PC
B19-2430 CF PC
B19-2446 CF PC
B19-2457 CF PC
B19-2465 CF PC
B19-2467 CF PC
B19-2512 CF PC
B19-2523 CF PC
B19-2531 CF PC
B19-2531 CF PC (2)
B19-2531 CF PC (3)
B19-2536 CF PC
B19-2537 CF PC
B19-2538 CF PC
B19-2538 CF PC (2)
B19-2546 CF PC
B19-2586 CF PC
B19-2594 CF PC
B19-2615_055-540-007_CALFIRE INSPECTION
B19-2619 CF PC
B19-2624 CF PC
B19-2624 CF PC (2)
B19-2636 CF PC
B19-2645 CF PC
B19-2645 CF PC (2)
B19-2645 CF PC (3)
B19-2648 CF PC
B19-2648 CF PC (2)
B19-2648 CF PC (3)
B19-2649 CF PC
B19-2649 CF PC (2)
B19-2650 CF PC
B19-2653 CF PC
B19-2653 CF PC (2)
B19-2658 CF PC
B19-2658 CF PC (2)
B19-2663 CF PC
B19-2663 CF PC (2)
B19-2666 CF PC
B19-2666 CF PC (2)
B19-2666 CF PC (3)
B19-2667 CF PC
B19-2667 CF PC (2)
B19-2668 CF PC
B19-2690 CF PC
B19-2690 CF PC (2)
B19-2700 CF PC
B19-2700 CF PC (2)
B19-2700 CF PC (3)
B19-2716 CF PC
B19-2716 CF PC (2)
B19-2716 CF PC (3)
B19-2721 CF PC
B19-2721 CF PC (2)
B19-2721 CF PC (3)
B19-2724 CF PC
B19-2724 CF PC (2)
B19-2724 CF PC (3)
B19-2724 CF PC (4)
B19-2727 CF PC
B19-2743 CF PC
B19-2743 CF PC (2)
B19-2772 SOIU Banger Winery Revised
B19-2773 CF PC
B19-2773 CF PC (2)
B19-2773 CF PC (3)
B19-2782 CF PC
B19-2782 CF PC (2)
B19-2782 CF PC (3)
B19-2788 CF PC
B19-2788 CF PC (2)
B19-2788 CF PC (3)
B19-2790 CF PC
B19-2790 CF PC (2)
B19-2790 CF PC (3)
B19-2791 CF PC (5).doc
B19-2791 CF PC (6).doc
B19-2791 CF PC.doc
B19-2792 CF PC
B19-2792 CF PC (2)
B19-2797 CF PC
B19-2800 CF PC
B19-2800 CF PC (2)
B19-2820 CF PC
B19-2820 CF PC (2)
B19-2820 CF PC (3)
B19-2821 CF PC
B19-2821 CF PC (2)
B19-2821 CF PC (3)
B19-2839 CF PC
B19-2839 CF PC (2)
B19-2839 CF PC (3)
B19-2843 CF PC
B19-2847 CF PC
B19-2847 CF PC (2)
B19-2847 CF PC (3)
B19-2855 CF PC
B19-2856 CF PC
B19-2856 CF PC (2)
B19-2874 CF PC
B19-2874 CF PC (2)
B19-2874 CF PC (3)
B19-2877 CF PC
B19-2877 CF PC (2)
B19-2877 CF PC (3)
B19-2895 CF PC
B19-2895 CF PC (2)
B19-2895 CF PC (3)
B19-2898 CF PC
B19-2911 CF PC
B19-2911 CF PC (2)
B19-2912 CF PC
B19-2912 CF PC (2)
B19-2912 CF PC (3)
B19-2912 CF PC (4)
B19-2946 CF PC
B19-2946 CF PC (2)
B19-2947 CF PC
B19-2947 CF PC (2)
B19-2968 CF PC
B19-2985 CF PC
B19-2985 CF PC (2)
B19-2985 CF PC (3)
B19-2992 CF PC
B19-3023 CF PC
B19-3023 CF PC (2)
B19-3023 CF PC (3)
B19-3030 CF PC
B19-3030 CF PC (2)
B19-3030 CF PC (3)
B19-3042 CF PC
B19-3042 CF PC (2)
B19-3056 CF PC
B19-3056 CF PC (2)
B19-3056 CF PC (3)
B19-3064 CF PC Helena_Response_Letter
B19-3064 CF PC Helena_Response_Letter (2)
B19-3091 CF PC
B19-3091 CF PC (2)
B19-3092 CF PC
B19-3092 CF PC (2)
B19-3093 CF PC
B19-3117 CF PC
B19-3117 CF PC (2)
B19-3118 CF PC
B19-3118 CF PC (2)
B19-3118 CF PC (3)
B19-3123 CF PC
B19-3123 CF PC (2)
B19-3125 CF PC
B19-3125 CF PC (2)
B19-3125 CF PC (3)
B19-3132 CF PC
B19-3132 CF PC (2)
B19-3136 CF PC
B19-3136 CF PC (2)
B19-3136 CF PC (3)
B19-3136 CF PC (4)
B19-3142 CF Final Inspection
B19-3142 CF PC
B19-3142 CF PC (2)
B19-3142 CF PC (3)
B19-3152 CF PC
B19-3152 CF PC (2)
B19-3171 CF PC
B19-3171 CF PC (2)
B19-3181 CF PC
B19-3181 CF PC (2)
B19-3181 CF PC (3)
B19-3195 CF PC
B19-3195 CF PC (2)
B19-3199 CF PC
B19-3199 CF PC (2)
B19-3199 CF PC (3)
B19-3201 CF PC
B19-3201 CF PC (2)
B19-3201 CF PC (3)
B19-3203 CF PC
B19-3203 CF PC (2)
B19-3204 CF PC
B19-3204 CF PC (2)
B19-3204 CF PC (3)
B19-3205 CF PC
B19-3205 CF PC (2)
B19-3238 CF PC (2).doc
B19-3238 CF PC (3).doc
B19-3238 CF PC (4).doc
B19-3238 CF PC.doc
B19-3255 CF PC
B19-3255 CF PC (2)
B19-3255 CF PC (3)
B19-3276 CF PC
B19-3276 CF PC (2)
B19-3276 CF PC (3)
B19-3279 CF PC
B19-3279 CF PC (2)
B19-3285 CF PC
B19-3285 CF PC (2)
B19-3290 CF PC
B19-3290 CF PC (2)
B19-3326 CF PC
B19-3326 CF PC (2)
B19-3343 CF Setback Variance Request
B19-3384 CF FE Map
B19-3384 CF Fire Evac Plan
B19-3384 CF Mixer Sketch
B19-3384 CF Site Sketch 1
B19-3395 CF PC
B19-3506 042-090-085 CF RC2 Hazardous Materials List
B19-3506 042-090-085 CF RC2 Sheet A1
B19-3506 042-090-085 SOIU BCFD
B19-3590 CF AVAG SOIU
B19-3634 CF FINAL INSPECTION
B19-3679 CF PC
B19-3685 CF PC
B19-3701 CF PC
B19-3701 CF PC (2)
B19-3702 CF PC
B19-3702 CF PC (2)
B19-3734 CF PC
B19-3741 CF PC
B19-3752 CF PC
B19-3753 CF PC
B19-3756 CF PC
B19-3756 CF PC (2)
B19-3769 Revised Site Plan
B19-3775 CF Fire Alarm Inspection
B19-3781 CF PC
B19-3781 CF PC (2)
B19-3786 CF PC
B19-3790 CF PC
B19-3791 CF PC
B19-3791 CF PC (2)
B19-3798 CF PC
B19-3799 CF PC
B19-3806 CF PC
B19-3809 CF PC
B19-3817 CF PC
B19-3817 CF PC (2)
B19-3832 CF PC
B19-3862 CF PC
B19-3862 CF PC (2)
B19-3908 CF PC
B19-3911 CF PC
B19-3914 CF PC
B19-3931 CF PC
B19-3931 CF PC (2)
B19-4087 PLANS approved CF Redline
B19-4156 CF PC
B19-4169 CF PC
B19-4181 CF PC
B19-4181 CF PC (2)
B19-4181 CF Site Plan Correction
B19-4181 CF VARIANCE REQUEST
B19-4181 CF VARIANCE REQUEST (2)
B19-4207 CF PC
B19-4207 CF PC (2)
B19-4210 CF PC
B19-4210 CF PC (2)
B19-4229 CF PC
B19-4229 CF PC (2)
B19-4242 CF PC
B19-4242 CF PC (2)
B19-4315 CF PC
B19-4315 CF PC (2)
B19-4326 CF PC
B19-4326 CF PC (2)
B19-4328 CF PC
B19-4328 CF PC (2)
B19-4335 CF PC
B19-4335 CF PC (2)
B19-4343 CF PC
B19-4348 CF SOIU
B19-4348 CF SOIU (2)
B19-4350 CF PC
B19-4351 CF PC
B19-4353 CF PC
B19-4365 CF PC
B19-4365 CF PC (2)
B19-4366 CF Setback Request
B19-4373 CF PC
B19-4373 CF PC (2)
B19-4378 CF PC
B19-4378 CF PC (2)
B19-4378 CF PC (3)
B19-4381 CF PC
B19-4381 CF PC (2)
B19-4386 CF PC
B19-4386 CF PC (2)
B19-4389 CF PC
B19-4389 CF PC (2)
B19-4392 CF PC
B19-4392 CF PC (2)
B19-4395 CF PC
B19-4395 CF PC (2)
B19-4398 CF PC
B19-4398 CF PC (2)
B19-4401 CF PC
B19-4401 CF PC (2)
B19-4406 CF PC
B19-4406 CF PC (2)
B19-4407 CF PC
B19-4418 CF PC
B19-4418 CF PC (2)
B19-4419 CF PC
B19-4419 CF PC (2)
B19-4420 CF PC
B19-4420 CF PC (2)
B19-4421 CF PC
B19-4421 CF PC (2)
B19-4422 CF PC
B19-4422 CF PC (2)
B19-4423 CF PC
B19-4423 CF PC (2)
B19-4424 CF PC
B19-4424 CF PC (2)
B19-4425 CF PC
B19-4425 CF PC (2)
B19-4426 CF PC
B19-4426 CF PC (2)
B19-4427 CF PC
B19-4427 CF PC (2)
B19-4428 CF PC
B19-4428 CF PC (2)
B19-4431 CF PC
B19-4431 CF PC (2)
B19-4432 CF PC
B19-4432 CF PC (2)
B19-4450 CF PC
B19-4450 CF PC (2)
B19-4450 CF PC (3)
B19-4451 CF PC
B19-4451 CF PC (2)
B19-4453 CF PC
B19-4455 CF PC
B19-4455 CF PC (2)
B19-4457 CF PC
B19-4457 CF PC (2)
B19-4472 CF PC
B19-4472 CF PC (2)
B19-4476 CF PC
B19-4476 CF PC (2)
B19-4478 CF PC
B19-4478 CF PC (2)
B19-4479 CF PC
B19-4479 CF PC (2)
B19-4488 CF PC
B19-4488 CF PC (2)
B19-4493 CF PC
B19-4493 CF PC (2)
B19-4500 CF PC
B19-4500 CF PC (2)
B19-4509 CF PC
B19-4509 CF PC (2)
B19-4510 CF PC
B19-4510 CF PC (2)
B19-4511 CF PC
B19-4511 CF PC (2)
B19-4515 CF PC
B19-4515 CF PC (2)
B19-4518 CF PC
B19-4518 CF PC (2)
B19-4532 CF PC
B19-4532 CF PC (2)
B19-4533 CF PC
B19-4533 CF PC (2)
B19-4534 CF PC
B19-4534 CF PC (2)
B19-4536 CF PC
B19-4536 CF PC (2)
B19-4539 CF PC
B19-4539 CF PC (2)
B19-4544 CF PC
B19-4544 CF PC (2)
B19-4545 CF PC
B19-4545 CF PC (2)
B19-4547 CF PC
B19-4547 CF PC (2)
B19-4548 CF PC
B19-4548 CF PC (2)
B19-4551 CF PC
B19-4551 CF PC (2)
B19-4552 CF PC
B19-4552 CF PC (2)
B19-4553 CF PC
B19-4554 CF PC
B19-4554 CF PC (2)
B19-4556 CF PC
B19-4556 CF PC (2)
B19-4559 CF PC
B19-4559 CF PC (2)
B19-4561 CF PC
B19-4561 CF PC (2)
B19-4562 CF PC
B19-4562 CF PC (2)
B19-4565 CF PC
B19-4565 CF PC (2)
B19-4571 CF PC
B19-4571 CF PC (2)
B19-4574 CF PC
B19-4578 CF PC
B19-4578 CF PC (2)
B19-4582 CF PC
B19-4582 CF PC (2)
B20-0029 CF PC
B20-0071 CF PC
B20-0071 CF PC (2)
B20-0167 CF PC
B20-0182 CF PC
B20-0182 CF PC (2)
B20-0198 CF PC
B20-0198 CF PC (2)
B20-0202 CF PC
B20-0202 CF PC (2)
B20-0239 CF PC
B20-0239 CF PC (2)
B20-0300 CF PC
B20-0300 CF PC (2)
B20-0312 CF PC
B20-0312 CF PC (2)
B20-0317 CF PC
B20-0317 CF PC (2)
B20-0336 CF PC
B20-0336 CF PC (2)
B20-0340 CF PC
B20-0340 CF PC (2)
B20-0341 CF PC
B20-0341 CF PC (2)
B20-0367 CF PC
B20-0367 CF PC (2)
B20-0393 CF PC
B20-0393 CF PC (2)
B20-0500 CF PC
B20-0500 CF PC (2)
B20-0500 CF PC (3)
B20-0510 CF CORRECTIONS NOTICE
B20-0510 CF CORRECTIONS NOTICE (2)
B20-0510 CF PC
B20-0510 CF PC (2)
B20-0510 CF PC (3)
B20-0514 CF PC
B20-0514 CF PC (2)
B20-0514 CF PC (3)
B20-0515 CF PC
B20-0515 CF PC (2)
B20-0515 CF PC (3)
B20-0517 CF CORRECTIONS NOTICE
B20-0517 CF CORRECTIONS NOTICE (2)
B20-0517 CF PC
B20-0517 CF PC (2)
B20-0517 CF PC (3)
B20-0521 CF PC
B20-0521 CF PC (2)
B20-0521 CF PC (3)
B20-0530 CF PC
B20-0530 CF PC (2)
B20-0530 CF PC (3)
B20-0546 CF CORRECTIONS NOTICE
B20-0546 CF CORRECTIONS NOTICE (2)
B20-0546 CF PC
B20-0557 CF CORRECTIONS NOTICE
B20-0557 CF CORRECTIONS NOTICE (2)
B20-0557 CF Exception Letter
B20-0557 CF Exception Letter (2)
B20-0557 CF PC
B20-0557 CF PC (2)
B20-0561 CF PC
B20-0561 CF PC (2)
B20-0563 CF PC
B20-0563 CF PC (2)
B20-0566 CF PC
B20-0566 CF PC (2)
B20-0566 CF PC (3)
B20-0570 CF PC
B20-0570 CF PC (2)
B20-0571 CF PC
B20-0571 CF PC (2)
B20-0574 CF PC
B20-0574 CF PC (2)
B20-0576 CF CORRECTIONS NOTICE
B20-0576 CF CORRECTIONS NOTICE (2)
B20-0576 CF Exception Request
B20-0576 CF Exception Request (2)
B20-0577 CF PC
B20-0577 CF PC (2)
B20-0583 CF PC
B20-0583 CF PC (2)
B20-0590 CF PC
B20-0590 CF PC (2)
B20-0604 CF PC
B20-0609 CF PC
B20-0609 CF PC (2)
B20-0620 CF PC
B20-0620 CF PC (2)
B20-0640 CF PC
B20-0640 CF PC (2)
B20-0641 CF CORRECTIONS NOTICE
B20-0641 CF CORRECTIONS NOTICE (2)
B20-0641 CF Exception Letter
B20-0641 CF Exception Letter (2)
B20-0641 CF PC
B20-0642 CF Exemption Request
B20-0643 CF CORRECTIONS NOTICE
B20-0643 CF CORRECTIONS NOTICE (2)
B20-0643 CF PC
B20-0644 CF PC
B20-0644 CF PC (2)
B20-0656_030-031-006 CALFIRE INSPECTION
B20-0659 CF Exception Letter
B20-0659 CF CORRECTIONS NOTICE
B20-0659 CF PC
B20-0661 CF CORRECTIONS NOTICE
B20-0672 CF PC
B20-0672 CF PC (2)
B20-0688 CF PC
B20-0688 CF PC (2)
B20-0694 CF PC
B20-0694 CF PC (2)
B20-0701 CF CORRECTION NOTICE
B20-0701 CF Exception to Standard
B20-0701 CF PC
B20-0701 CF PC (2)
B20-0701 CF Site Plan with mitigations
B20-0711 CF PC
B20-0711 CF PC (2)
B20-0711 CF PC (3)
B20-0717 CF PC
B20-0721 CF PC
B20-0721 CF PC (2)
B20-0728 CF PC
B20-0728 CF PC (2)
B20-0740_007-550-024 CALFIRE INSPECTION
B20-0747 CF CORRECTIONS NOTICE
B20-0747 CF Expetion Letter
B20-0747 CF PC
B20-0748 CF PC
B20-0759_058-220-023 CALFIRE INSPECTION
B20-0763_007-550-004 CALFIRE INSPECTION
B20-0769-0770 CF PC
B20-0769-0770 CF PC (2)
B20-0769-0770 CF PC (3)
B20-0803 CF PC
B20-0804_042-160-023 CALFIRE INSPECTION
B20-0805_064-650-027 CALFIRE INSPECTION
B20-0816_039-610-048 CALFIRE INSPECTION
B20-0836 CF CORRECTIONS NOTICE
B20-0836 CF PC
B20-0839_058-280-009 CALFIRE INSPECTION
B20-0873_041-340-035 CALFIRE INSPECTION
B20-0895 CF PC
B20-0898 CF PC
B20-0898 CF PC (2)
B20-0906 CF PC
B20-0916 CF PC
B20-0917 CF PC
B20-0919 CF PC
B20-0921 CF PC
B20-0922 CF PC
B20-0922 CF PC (2)
B20-0925 CF PC
B20-0930 CF PC
B20-0930 CF PC (2)
B20-0931 CF CORRECTIONS NOTICE
B20-0942 CF PC
B20-0951 CF PC
B20-0951 CF PC (2)
B20-0954 CF PC
B20-0954 CF PC (2)
B20-0955 CF PC
B20-0973 CF PC
B20-0978 CF CORRECTIONS NOTICE
B20-0978 CF CORRECTIONS NOTICE (2)
B20-0979 CF PC
B20-0980 CF PC
B20-0980 CF PC (2)
B20-0981 CF PC
B20-0986 CF CORRECTIONS NOTICE
B20-0986 CF CORRECTIONS NOTICE (2)
B20-1008 CF CORRECTIONS NOTICE
B20-1008 CF CORRECTIONS NOTICE (2)
B20-1008 CF PC
B20-1008 CF PC (2)
B20-1009 CF CORRECTIONS NOTICE
B20-1009 CF CORRECTIONS NOTICE (2)
B20-1009 CF PC
B20-1013 CF CORRECTIONS NOTICE
B20-1013 CF CORRECTIONS NOTICE (2)
B20-1014 CF PC
B20-1016 CF CORRECTIONS NOTICE
B20-1016 CF CORRECTIONS NOTICE (2)
B20-1040 CF PC
B20-1075 CF PC
B20-1075 CF PC (2)
B20-1088 CF CORRECTIONS NOTICE
B20-1088 CF CORRECTIONS NOTICE (2)
B20-1091 CF PC
B20-1094 CF PC
B20-1095 CF PC
B20-1100 047-040-003 CF FA 2020
B20-1100 047-040-003 CF FA 2020 (2)
B20-1104 CF FA 2021
B20-1104 CF FA COC
B20-1105 CF PC
B20-1106 PLANS Fire Approved
B20-1108 CF PC
B20-1113 CF PC
B20-1119 CF PC
B20-1119 CF PC (2)
B20-1124 CF CORRECTIONS NOTICE
B20-1124 CF CORRECTIONS NOTICE (2)
B20-1124 CF PC
B20-1128 CF CORRECTIONS NOTICE
B20-1128 CF PC
B20-1131 CF PC
B20-1131 CF Updated Site Plan with Mitigations Revised plans
B20-1131_055-540-047 CALFIRE INSPECTION
B20-1133 CF PC
B20-1142 CF CORRECTIONS NOTICE
B20-1142 CF CORRECTIONS NOTICE (2)
B20-1142 CF PC
B20-1142 CF PC (2)
B20-1145 CF CORRECTIONS NOTICE
B20-1145 CF CORRECTIONS NOTICE (2)
B20-1145 CF PC
B20-1145 CF PC (2)
B20-1206 CF PC
B20-1225 CF PC
B20-1225 CF PC (2)
B20-1234 CF PC
B20-1234 CF PC (2)
B20-1249 CF CORRECTIONS NOTICE
B20-1249 CF CORRECTIONS NOTICE (2)
B20-1249 CF PC
B20-1321 CF CORRECTIONS NOTICE
B20-1321 CF PC
B20-1321 CF PC (2)
B20-1322 CF PC
B20-1322 CF PC (2)
B20-1336 CF PC
B20-1380 CF PC
B20-1386 CF PC
B20-1386 CF PC (2)
B20-1399 CF CORRECTIONS NOTICE
B20-1399 CF CORRECTIONS NOTICE (2)
B20-1399 CF PC
B20-1407 CF CORRECTIONS NOTICE
B20-1407 CF PC
B20-1410 CF CORRECTIONS NOTICE
B20-1410 CF PC
B20-1412 CF CORRECTIONS NOTICE
B20-1412 CF PC
B20-1438 CF CORRECTIONS NOTICE
B20-1438 CF PC
B20-1439 CF PC
B20-1467 CF CORRECTIONS NOTICE
B20-1467 CF CORRECTIONS NOTICE (2)
B20-1467 CF PC
B20-1503 CF CORRECTIONS NOTICE
B20-1503 CF CORRECTIONS NOTICE (2)
B20-1503 CF PC
B20-1503 CF PC (2)
B20-1506 CF PC
B20-1507 CF CORRECTIONS NOTICE
B20-1507 CF PC
B20-1512 CF PC
B20-1524 CF CORRECTIONS NOTICE
B20-1524 CF CORRECTIONS NOTICE (2)
B20-1524 CF PC
B20-1552 CF Exception Request Letter
B20-1552 CF Exception Request Letter (2)
B20-1552 CF Exception Request Site Plan 7-23-20
B20-1552 CF Exception Request Site Plan 7-23-20 (2)
B20-1552 CF PC
B20-1559 CF CORRECTIONS NOTICE
B20-1565 CF PC (2)
B20-1572 CF PC
B20-1590 CF PC
B20-1607 CF CORRECTIONS NOTICE
B20-1607 CF PC
B20-1607 CF PC (2)
B20-1643 CF PC
B20-1667 CF CORRECTIONS NOTICE
B20-1667 CF PC
B20-1673 CF CORRECTIONS NOTICE
B20-1673 CF PC
B20-1673 CF PC (2)
B20-1690 CF CORRECTIONS NOTICE
B20-1690 CF PC
B20-1698 CF PC
B20-1698 CF PC (2)
B20-1708 CF PC
B20-1724 CF PC
B20-1724 CF PC (2)
B20-1774 CF CORRECTIONS NOTICE
B20-1774 CF PC
B20-1774 CF PC (2)
B20-1775 CF CORRECTIONS NOTICE
B20-1775 CF PC
B20-1776 CF CORRECTIONS NOTICE
B20-1776 CF CORRECTIONS NOTICE (2)
B20-1776 CF PC
B20-1778 CF CORRECTIONS NOTICE
B20-1778 CF Exception Request (2)
B20-1788 CF PC
B20-1806 Amended Site Plan 8-16-20
B20-1806 Amended Site Plan 8-16-20 (2)
B20-1822 CF PC
B20-1825 CF PC
B20-1839 CF CORRECTIONS NOTICE
B20-1839 CF PC
B20-1843 Evidence_&_Morgue Radio Test
B20-1843 Evidence_&_Morgue Radio Test (2)
B20-1847 CF PC
B20-1852 CF PC
B20-1852 CF PC (2)
B20-1869 CF PC
B20-1870 CF PC
B20-1870 CF PC (2)
B20-1888 CF PC
B20-1888 CF PC (2)
B20-1895 CF PC
B20-1905 CF PC
B20-1907 CF CORRECTIONS NOTICE
B20-1907 CF PC
B20-1916 CF PC
B20-1916 CF PC (2)
B20-1917 CF CORRECTIONS NOTICE
B20-1917 CF PC
B20-1926 CF PC
B20-1950 CF PC
B20-1950 CF PC (2)
B20-1957 CF CORRECTIONS NOTICE
B20-1957 CF CORRECTIONS NOTICE (2)
B20-1957 CF PC
B20-1957 CF PC (2)
B20-1959 CF PC
B20-1961 CF CORRECTIONS NOTICE
B20-1961 CF PC
B20-2000 CF PC
B20-2003 Site Plan 10-2-20
B20-2015 CF PC
B20-2015 CF PC (2)
B20-2064 CF PC
B20-2066 CF PC
B20-2072 CF CORRECTIONS NOTICE
B20-2072 CF PC
B20-2097 CF CORRECTIONS NOTICE
B20-2097 CF PC
B20-2100 CF PC
B20-2111 CF PC
B20-2114 CF PC
B20-2114 CF PC (2)
B20-2126 CF PC
B20-2134 CF PC
B20-2143 CF PC
B20-2159 CF PC
B20-2170 CF PC
B20-2170 CF PC (2)
B20-2172 CF PC
B20-2186 CF PC
B20-2188 CF PC
B20-2201 CF PC
B20-2203 CF PC
B20-2203 CF PC (2)
B20-2254 CF PC
B20-2309 CF SOIU
B20-2345 CF PC Response
B20-2345 CF PC Response (2)
B20-2402 031-040-028 CF FA 2022 BCSO Morgue
B20-2424 CF Site Plan 9-16-20
B20-2451 CF Exception Site Plan 1-27-21
B20-2518 SOIU
B20-2560 CF PC
B20-2560 CF PC (2)
B20-2560 CF PC (3)
B20-2919 CF PC
B20-2935 CF PC
B20-2935 CF PC (2)
B20-2952 CF PC
B20-2962 CF PC
B20-2962 CF PC (2)
B20-2977 CF PC
B20-2988 CF PC
B20-2990 CF PC
B20-3030 CF PC
B20-3030 CF PC (2)
B20-3151 CF PC
B20-3151 CF PC (2)
B20-3214 CF PC
B20-3214 CF PC (2)
B20-3226 CF PC
B20-3226 CF PC (2)
B20-3231 CF PC
B20-3237 CF PC
B20-3237 CF PC (2)
B20-3287 CF PC
B20-3315 CF PC
B20-3323 CF PC
B20-3325 CF PC
B20-3325 CF PC (2)
B20-3350 CF PC
B20-3363 CF PC
B20-3363 CF PC (2)
B20-3392 CF PC
B20-3447 CF PC
B20-3449 CF PC
B20-3487 CF PC
B20-3607 CF PC
B20-3638 CF PC
B20-3640 CF PC
B20-3640 CF PC (2)
B20-3648 CF SOIU
B20-3656 CF PC
B20-3663 CF PC
B20-3675 CF PC
B21-0003 CF PC
B21-0003 CF PC (2)
B21-0156 CF FA AVAG 2021
B21-0156 CF FA AVAG 2021 (2)
B21-0194 CF PC
B21-0194 CF PC (2)
B21-0225 CF PC
B21-0225 CF PC (2)
B21-0241 Plans
B21-0241 Submittal and plans
B21-0241 Submittal and plans (2)
B21-0258 CF PC
B21-0258 CF PC (2)
B21-0260 CF PC
B21-0260 CF PC (2)
B21-0271
B21-0271 (2)
B21-0294 CF PC (2)
B21-0294 CF PC (3)
B21-0351 CF PC
B21-0351 CF PC (2)
B21-0388 CF PC
B21-0388 CF PC (2)
B21-0391 CF PC
B21-0391 CF PC (2)
B21-0394 CF PC
B21-0469 CF PC
B21-0469 CF PC (2)
B21-0487 CF PC
B21-0493 CF PC
B21-0493 CF PC (2)
B21-0500 CF PC
B21-0500 CF PC (2)
B21-0510 CF PC
B21-0510 CF PC (2)
B21-0515 CF CORRECTIONS NOTICE
B21-0515 CF PC
B21-0515 CF PC (2)
B21-0531 CF PC
B21-0531 CF PC (2)
B21-0547
B21-0564 CF PC
B21-0564 CF PC (2)
B21-0583 CF PC
B21-0583 CF PC (2)
B21-0600 CF PC
B21-0600 CF PC (2)
B21-0606
B21-0606 (2)
B21-0611 CF PC
B21-0672 CF PC
B21-0672 CF PC (2)
B21-0681 CF PC
B21-0681 CF PC (2)
B21-0690
B21-0690 (2)
B21-0694 CF PC
B21-0704 CF PC
B21-0704 CF PC (2)
B21-0708 CF PC
B21-0708 CF PC (2)
B21-0735 CF PC
B21-0735 CF PC (2)
B21-0737 CF PC
B21-0737 CF PC (2)
B21-0787 CF PC
B21-0787 CF PC (2)
B21-0793 CF PC
B21-0793 CF PC (2)
B21-0807 CF PC
B21-0807 CF PC (2)
B21-0851 CF PC
B21-0851 CF PC (2)
B21-0877 CF PC
B21-0877 CF PC (2)
B21-0880 CF PC
B21-0880 CF PC (2)
B21-0904
B21-0904 (2)
B21-0928 CF PC
B21-0928 CF PC (2)
B21-0955 CF PC
B21-0955 CF PC (2)
B21-0960 CF PC
B21-0960 CF PC (2)
B21-0998 CF PC
B21-0998 CF PC (2)
B21-1011 CF PC
B21-1011 CF PC (2)
B21-1021 CF PC
B21-1022 CF PC
B21-1022 CF PC (2)
B21-1023 CF PC
B21-1023 CF PC (2)
B21-1069 CF PC
B21-1069 CF PC (2)
B21-1070 CF PC
B21-1070 CF PC (2)
B21-1071 CF PC
B21-1071 CF PC (2)
B21-1073 CF PC
B21-1073 CF PC (2)
B21-1085 CF CORRECTIONS NOTICE
B21-1085 CF CORRECTIONS NOTICE (2)
B21-1087 CF PC
B21-1087 CF PC (2)
B21-1093 CF PC
B21-1093 CF PC (2)
B21-1133
B21-1133 (2)
B21-1148 CF CORRECTIONS NOTICE
B21-1148 CF CORRECTIONS NOTICE (2)
B21-1178 CF PC
B21-1178 CF PC (2)
B21-1184 CF PC
B21-1184 CF PC (2)
B21-1187 CF PC
B21-1187 CF PC (2)
B21-1190 CF PC
B21-1190 CF PC (2)
B21-1193 CF PC
B21-1193 CF PC (2)
B21-1208 CF PC
B21-1208 CF PC (2)
B21-1213 CF PC
B21-1223 CF PC
B21-1223 CF PC (2)
B21-1229 Site Plan Revised 3-10-22
B21-1229 Site Plan Revised 3-10-22 (2)
B21-1241 CF PC
B21-1241 CF PC (2)
B21-1258 CF PC
B21-1258 CF PC (2)
B21-1294 CF PC
B21-1294 CF PC (2)
B21-1312 CF PC
B21-1312 CF PC (2)
B21-1322 CF PC
B21-1326 CF PC
B21-1326 CF PC (2)
B21-1329 CP PC
B21-1329 CP PC (2)
B21-1351 CF PC
B21-1351 CF PC (2)
B21-1369 CF PC
B21-1369 CF PC (2)
B21-1391 CF PC
B21-1391 CF PC (2)
B21-1391 CF PC (3)
B21-1393 CF PC
B21-1393 CF PC (2)
B21-1396 CF PC
B21-1396 CF PC (2)
B21-1399 CF PC
B21-1399 CF PC (2)
B21-1401 CF PC
B21-1412 CF PC
B21-1412 CF PC (2)
B21-1416 CF PC
B21-1416 CF PC (2)
B21-1418 CF PC
B21-1418 CF PC (2)
B21-1428 CF PC
B21-1428 CF PC (2)
B21-1429 CF PC
B21-1429 CF PC (2)
B21-1457 CF PC
B21-1457 CF PC (2)
B21-1468 CF PC
B21-1470
B21-1470 (2)
B21-1472 CF PC
B21-1472 CF PC (2)
B21-1480 CF PC
B21-1480 CF PC (2)
B21-1508 CF PC
B21-1508 CF PC (2)
B21-1519 CF PC
B21-1519 CF PC (2)
B21-1526 CF PC
B21-1526 CF PC (2)
B21-1528 CF PC
B21-1528 CF PC (2)
B21-1535 CF PC
B21-1535 CF PC (2)
B21-1536 CF PC AVAG FS Underground
B21-1537 CF PC
B21-1537 CF PC (2)
B21-1540 CF PC
B21-1540 CF PC (2)
B21-1560 CF PC
B21-1560 CF PC (2)
B21-1693 CF PC
B21-1693 CF PC (2)
B21-1718 CF PC
B21-1718 CF PC (2)
B21-1734 CF PC
B21-1734 CF PC (2)
B21-1752 CF PC
B21-1752 CF PC (2)
B21-1761 CF PC
B21-1761 CF PC (2)
B21-1768 CF PC
B21-1768 CF PC (2)
B21-1771 CF PC
B21-1771 CF PC (2)
B21-1772
B21-1772 (2)
B21-1780 CF PC
B21-1786 CF PC
B21-1786 CF PC (2)
B21-1801
B21-1801 (2)
B21-1806
B21-1806 (2)
B21-1836 CF PC
B21-1836 CF PC (2)
B21-1849 CF PC
B21-1849 CF PC (2)
B21-1850 CF PC
B21-1850 CF PC (2)
B21-1855 CF PC
B21-1855 CF PC (2)
B21-1878 CF PC
B21-1878 CF PC (2)
B21-1878 CF PC (3)
B21-1929 CF PC
B21-1929 CF PC (2)
B21-1931 CF PC
B21-1931 CF PC (2)
B21-2068 CF PC
B21-2068 CF PC (2)
B21-2070 CF PC
B21-2070 CF PC (2)
B21-2071 CF PC
B21-2071 CF PC (2)
B21-2075 CF PC
B21-2075 CF PC (2)
B21-2129 CF PC
B21-2129 CF PC (2)
B21-2166 CF PC
B21-2166 CF PC (2)
B21-2229 CF PC
B21-2229 CF PC (2)
B21-2305 CF PC
B21-2305 CF PC (2)
B21-2388 065-400-041 Variance Request
B21-2388 Site Plan 9-2-21
B21-2404 CF PC
B21-2404 CF PC (2)
B21-2465 CF PC
B21-2465 CF PC (2)
B21-2466 CF PC
B21-2466 CF PC (2)
B21-2477 CF PC
B21-2477 CF PC (2)
B21-2478 CF PC
B21-2478 CF PC (2)
B21-2480 CF PC
B21-2480 CF PC (2)
B21-2487 CF PC
B21-2487 CF PC (2)
B21-2489 CF PC
B21-2489 CF PC (2)
B21-2514 CF PC
B21-2514 CF PC (2)
B21-2627 CF PC
B21-2627 CF PC (2)
B21-2636 CF PC
B21-2636 CF PC (2)
B21-2640 CF PC
B21-2640 CF PC (2)
B21-2641 CF PC
B21-2641 CF PC (2)
B21-2643
B21-2643 (2)
B21-2655 CF PC
B21-2655 CF PC (2)
B21-2687 CF PC
B21-2687 CF PC (2)
B21-2695 CF PC
B21-2695 CF PC (2)
B21-2706 CF PC
B21-2706 CF PC (2)
B21-2711 CF PC
B21-2711 CF PC (2)
B21-2733 CF PC
B21-2733 CF PC (2)
B21-2737 and B21-2738 CF PC
B21-2737 and B21-2738 CF PC (2)
B21-2738 CF PC
B21-2738 CF PC (2)
B21-2756 CF FA 2021
B21-2756 CF FA Inspection 2021
B21-2756 CF FA Inspection 2021 (2)
B21-2756 CF FA Invoice 2021
B21-2756 CF Hood System 2021
B21-2761_B21-2763 to B21-2771
B21-2761_B21-2763 to B21-2771 (10)
B21-2761_B21-2763 to B21-2771 (2)
B21-2761_B21-2763 to B21-2771 (3)
B21-2761_B21-2763 to B21-2771 (4)
B21-2761_B21-2763 to B21-2771 (5)
B21-2761_B21-2763 to B21-2771 (6)
B21-2761_B21-2763 to B21-2771 (7)
B21-2761_B21-2763 to B21-2771 (8)
B21-2761_B21-2763 to B21-2771 (9)
B21-2761_B21-2763 to B21-2771 CF PC
B21-2761_B21-2763 to B21-2771 CF PC (2)
B21-2768 CF PC
B21-2768 CF PC (2)
B21-2772 CF PC
B21-2772 CF PC (2)
B21-2784 CF PC
B21-2784 CF PC (2)
B21-2792 CF PC
B21-2792 CF PC (2)
B21-2796 CF PC
B21-2796 CF PC (2)
B21-2806 CF PC
B21-2806 CF PC (2)
B21-2813 CF PC
B21-2813 CF PC (2)
B21-2817 CF PC
B21-2817 CF PC (2)
B21-2829
B21-2829 (2)
B21-2842 CF PC (2)
B21-2864/2865 CF PC
B21-2864/2865 CF PC (2)
B21-2864/2865 CF PC (3)
B21-2876 CF PC
B21-2876 CF PC (2)
B21-2907 CF PC
B21-2907 CF PC (2)
B21-2911 CF PC
B21-2911 CF PC (2)
B21-2934 CF PC
B21-2934 CF PC (2)
B21-2950 CF PC
B21-2950 CF PC (2)
B21-2962 CF PC
B21-2962 CF PC (2)
B21-2963 CF PC
B21-2963 CF PC (2)
B21-2968 CF PC
B21-2968 CF PC (2)
B21-2991 CF PC
B21-2991 CF PC (2)
B21-2995 CF PC
B21-2995 CF PC (2)
B21-3015 CF PC
B21-3015 CF PC (2)
B21-3018 CF PC
B21-3037 CF PC
B21-3049 CF PC
B21-3049 CF PC (2)
B21-3066 CF PC
B21-3066 CF PC (2)
B21-3083 CF PC
B21-3092 CF PC
B21-3092 CF PC (2)
B21-3120 CF FA 2022
B21-3124 CF FA
B21-3124 CF FA (2)
B21-3124 CF FA Customer Activity
B21-3124 CF FA Customer Activity (2)
B21-3128 CF FA 2023 024-260-093
B21-3157 CF PC
B21-3157 CF PC (2)
B21-3185 CF PC
B21-3185 CF PC (2)
B21-3191 CF PC
B21-3223 CF PC
B21-3249 CF PC
B21-3249 CF PC (2)
B21-3495 Revised Site Plan 2-28-2022
B21-3495 Revised Site Plan 2-28-2022 (2)
B21-3505 041-230-009 CF FA 2023
B21-3631 SOIU
B21-3631 SOIU (2)
B22-0066 050260020 Updated Site Plan 5.24.22
B22-0347 Updated Site Plan 02-23-22
B22-0347 Updated Site Plan 02-23-22 (2)
B22-0481 Address at Street
B22-0481 Fire Ext closeup
B22-0481 Fire Extinguisher #1 Suite A
B22-0481 Fire Extinguisher #1 Suite B
B22-0481 Fire Extinguisher #2 Suite A
B22-0481 Fire Extinguisher #2 Suite B
B22-1641 Revised SITE PLAN 5-25-2022
B22-1641 Revised SITE PLAN 5-25-2022 (2)
B22-1694 RC2 PLANS - APPROVED Revised
B22-1694 RC2 PLANS - APPROVED Revised (2)
B22-1694 Updated Plans 6-15-22
B22-1789 Revised Plan 6-01-2022
B22-1932 042-060-074 CF SOIU 1 - Copy
B22-1932 042-060-074 CF SOIU 2
B22-1932 042-060-074 CF SOIU 2 - Copy
B22-1932 042-060-074 CF SOIU 3
B22-1942 SITE REVISED 07-06-22
B22-1987 PLOT PLANS Revised 6-30-22
B22-1987 PLOT PLANS Revised 6-30-22 (2)
B22-2047 SITE PLAN Revised 7-14-2022
B22-2047 SITE PLAN Revised 7-14-2022 (2)
B22-2052 CF PC BSA Climbing Tower (2)
B22-2140 Site Plan Revised 7-12-22
B22-2140 Site Plan Revised 7-12-22 (2)
B22-2173 Site Plan Revised 8-2-2022
B22-2173 Site Plan Revised 8-2-2022 (2)
B22-2233 041-230-009 CF FA 2023
B22-2914 SITE PLAN Revised 9-16-22
B22-2914 SITE PLAN Revised 9-16-22 (2)
B22-3032 SITE PLAN Revised
B22-3032 SITE PLAN Revised (2)
B22-3055 SITE Revised 10-12-22
B22-3089 SITE PLAN Revised 9-22-22
B22-3089 SITE PLAN Revised 9-22-22 (2)
B22-3221 SITE PLAN Revised 10-6-22
B22-3221 SITE PLAN Revised 10-6-22 (2)
B22-3318 SITE PLAN Revised 10-18-22
B22-3318 SITE PLAN Revised 10-18-22 (2)
B22-3454 RC2 SITE 11-3-2022
B22-3488 SITE PLAN Revised 11-14-22
B22-3488 SITE PLAN Revised 11-14-22 (2)
B22-3507 SITE PLAN Revised 11-21-2022
B22-3558 SITE PLAN revised 11-14-22
B22-3558 SITE PLAN revised 11-14-22 (2)
B22-3562 RC2 EMS CONTINGENCY PLAN
B22-3562 RC2 EMS CONTINGENCY PLAN Updated 9-12-23
B22-3655 PLANS Revised 11-23-2022
B22-3655 PLANS Revised 11-23-2022 (2)
B22-3675 SITE PLAN Revised 1-3-2023
B22-3675 SITE PLAN Revised 1-3-2023 (2)
B22-3830 SOIU
B22-3830 SOIU (2)
B22-3933 SITE PLAN Revised 12-21-22
B22-3933 SITE PLAN Revised 12-21-22 (2)
B22-4053 Site Plan Revised
B22-4053 Site Plan Revised (2)
B22-4159 PLANS Site Plan Revised
B22-4159 PLANS Site Plan Revised (2)
B22-4162 SITE PLAN Revised 1-5-23
B22-4162 SITE PLAN Revised 1-5-23 (2)
B22-4206 PLANS Revised Site Plan
B22-4206 PLANS Revised Site Plan (2)
B22-4210 SITE PLAN Revised
B22-4210 SITE PLAN Revised (2)
B22-4211 THE RIDGE LOT 107 PLAN 2R Revised
B22-4211 THE RIDGE LOT 107 PLAN 2R Revised (2)
B22-4213 THE RIDGE LOT 102 PLAN 3 Revised
B22-4214 THE RIDGE LOT 103 PLAN 1 Revised
B22-4214 THE RIDGE LOT 103 PLAN 1 Revised (2)
B22-4215 THE RIDGE LOT 104 PLAN 2 Revised
B22-4215 THE RIDGE LOT 104 PLAN 2 Revised (2)
B22-4216 THE RIDGE LOT 105 PLAN 2R Revised
B22-4216 THE RIDGE LOT 105 PLAN 2R Revised (2)
B22-4217 THE RIDGE LOT 106 PLAN 4 Revised
B22-4217 THE RIDGE LOT 106 PLAN 4 Revised (2)
B22-4218 THE RIDGE LOT 108 PLAN 4R Revised
B22-4218 THE RIDGE LOT 108 PLAN 4R Revised (2)
B22-4219 THE RIDGE LOT 109 PLAN 1R Revised
B22-4219 THE RIDGE LOT 109 PLAN 1R Revised (2)
B23-0042 SITE PLAN Revised
B23-0042 SITE PLAN Revised (2)
B23-0385 PC PLANS APPROVED
B23-0527_ 071-300-029 RC1 -Dunk Res_Plans 11-7-2023
B23-1021 Honey Run Creek Bridge Report
B23-1021 Honey Run Creek Bridge Report (2)
B23-1021 SITE PLAN REVISED 11-16-23
B23-1021 SITE PLAN REVISED 11-16-23 (2)
B23-1025 SITE PLAN Revised 5-3-23
B23-1025 SITE PLAN Revised 5-3-23 (2)
B23-1110 A1.0 revised
B23-1110 A1.0 Revised (3)
B23-1110 A1.0 Revised (4)
B23-1110 A3.0 revised
B23-1110 A3.0 revised (2)
B23-1186 006-670-013 Appeals Hearing
B23-1186 006-670-013 The Barn AMMR Fire PC1
B23-1216,1217,1218 and B23-1223,1224,1225 CF PC Orchard View Gridley
B23-1216,1217,1218 and B23-1223,1224,1225 CF PC Orchard View Gridley (2)
B23-1230 SOIU Sunsweet Dryer
B23-1446 5-24-23 revised site plan
B23-1567 RVSD SITE 7-18-2023
B23-2099 038-280-003 Fire AMMR
B23-2099 Fire AMMR Letter
B23-2099 Fire AMMR Letter (2)
B23-2186 066-290-031 Site Plan 8-3-23
B23-2219 040-120-036 Fire Hydrant Pipe Line Calculations 062923
B23-2219 040-120-036 Fire Hydrant Pipe Line Calculations 062923 (2)
B23-2219 040-120-036 Fire Hydrant Pipe Line Calculations 062923 (3)
B23-2219 040-120-036 FIRE HYDRANT PLAN 062923
B23-2219 040-120-036 Geo Report
B23-2219 040-120-036 ODW storm drain_durham_CA_Bid#_3075989_8-16-2023_0756_AM
B23-2219 040-120-036 ODW storm drain_durham_CA_Bid#_3075989_8-16-2023_0756_AM (2)
B23-2219 040-120-036 ODW_30316
B23-2219 RC2 Plans 040-120-036
B23-2438 SRA Site Plan Revision 8-16-23
B23-2438 SRA Site Plan Revision 8-16-23 (2)
B23-2549 Site CF Revised
B23-2549 Site CF Revised (2)
B23-2585 SETBACK VARIANCE EXCEPTION LETTER
B23-2784 PLANS REVISED
B23-2784 PLANS REVISED (2)
B23-2881 SITE PLAN REVISION
B23-2913 SITE PLAN 11-14-23
B23-2913 SITE PLAN 11-14-23 (2)
B23-3043 SITE CF REVISED
B23-3043 SITE CF REVISED (2)
B23-3062 039-210-092 SOIU
B23-3134 SITE PLAN REVISED 12-20-23
B23-3134 SITE PLAN REVISED 12-20-23 (2)
B24-0282 Revised Site Plan 5-24-24
B24-0406 071-370-019 BC FS #61 - CAL FIRE PC-1 - PLANS
B24-0406 071-370-019 BC FS 61 - CAL FIRE PC-1 RESPONSE
B24-1262 040-310-087 CF FA
B24-1262 040-310-087 CF FA (2)
B24-1262 040-310-087 OAK RIDGE CABINETS, Fire Alarm Supplement-APPLIANCES, 4-27-2023 (Annual)
B24-1262 040-310-087 OAK RIDGE CABINETS, Fire Alarm Supplement-DEVICES, 4-27-2023 (Annual)
B24-1262 040-310-087 OAK RIDGE CABINETS, Fire Alarm-ADEMCO 128FB, 4-27-2023 (Annual)
B24-1262 CF FA Q9222941_System Event Report
B24-1787 Updated Site Plan 1-31-25 (2)
B24-1790 SITE MAP REVISED 7-30-24
B24-1790 SITE MAP REVISED 7-30-24 (2)
B24-2139 066-270-006 CF PC comment response letter
B24-2139 066-270-006 CF PC comment response letter (2)
B24-2342 SITE PLAN REVISED 9-26-24
B24-2342 SITE PLAN REVISED 9-26-24 (2)
B24-2344 & B24-2351 SITE PLAN REVISED 9-26-24
B24-2419 010-180-035 CF FA 2024
B24-2419 010-180-035 CF FA 2024 (2)
B24-2810 PLANS REVISED 11-29-2024
B24-2810 PLANS REVISED 11-29-2024 (2)
B24-2812 APP
B24-2812 HYDRAULIC CALCS
B24-2812 INTAKE FORMS
B24-2812 PLAN
B24-2812 PUMP SPECS
B24-2960 042-020-145 Updated Site Plan 1-31-25
B25-0030 CF PC
B25-0030 CF PC (2)
B25-0164 025-200-118 Avatar Foods 88074_FP1 Delta2
B25-0164 025-200-118 Avatar Foods CF FA Avatar Natural Foods - Gridley - New Deal
B25-0164 025-200-118 Avatar Foods CF FA Invoice 24910 - Activation of fire system
B25-0164 025-200-118 Avatar Foods CF FE Avatar Food- Extinguisher Layout (1)
B25-0164 025-200-118 Avatar Foods CF FP Order_W54035 (1)
B25-0164 025-200-118 Avatar Foods CF FS 03.2025 Billing
B25-0164 025-200-118 Avatar Foods CF FS 91257_FP1-2
B25-0164 025-200-118 Avatar Foods CF FS QRFS_Quote_1000002301 (3) (1)
B25-0164 025-200-118 Avatar Foods CF FS Tuscany Cookies 2025 Hydrant - APPROVED
B25-0164 025-200-118 Avatar Foods Hydrant Flow Test Report - APPROVED
B25-0333 SITE PLAN REVISED
B25-0333 SITE PLAN REVISED (2)
B25-0572 RC2 PLANS
B25-0971 SITE PLAN REVISED 5-29-25
B25-0971 SITE PLAN REVISED 5-29-25 (2)
B25-1878 SITE PLAN REVISED 08-06-25
B25-1878 SITE PLAN REVISED 08-06-25 (2)
Brewfest Layout
Bridges-Slater and Son Documents-1993-1994
CAL FIRE Setback Variance Letter
Cal Fire Watch Log 040-570-015
CF FA Inspection 2022
CF RC 2Water Tank Building Sheet 4 - Jan 2024 - Stamped and Signed
CF RC2 Butte County Fire Department Plan Check Response Letter dated January 15, 2024
CF RC2 Water Tank Building Sheet 1 - Jan 2024 - Stamped and Signed
CF RC2 Water Tank Building Sheet 2 - Jan 2024 - Stamped and Signed
CF RC2 Water Tank Building Sheet 3 - Jan 2024 - Stamped and Signed
DOC-1044I-SDS-Booklet
DOC-1301H-Suppliers-Declaration-of-Conformity
DOC-1460C-Fire-Ventless-Submittal-Package
Emergency Plan
eventhistory-803637277
fire_spec_sheet_en
HWF-2A SPEC SHEET
HWF-2A-COM CSFM LISTING
Letter for B20-0708 105 BESSINE LANE-KELLY RIDGE
NFPA ROC OROVILLE
Raleigh Court - Full Event Site Layout
SDS Ethylene Glycol
SDS Waste Ethylene Glycol
SDS-Used-Waste-Oil
Site Plan Revised 20220621
Statement of Intended Use RID
Westgate_Hardwoods_- Plan Revisions Showroom Sprinklers
Williams-Canyon-Ranch-Construction (Two-Bridges)