Loading...
HomeMy WebLinkAboutLD 1460-Transmittal-Plans Ck 1 ADM17-0034 Department of Public Works Dennis Schmidt, Director Shawn H. O’Brien, Assistant Director 7 County Center Drive T: 530.538.7681 Oroville, California 95965 F: 530.538.7171 buttecounty.net/publicworks October 4, 2017 Wes Gilbert, P.E. W. Gilbert Engineering 141 Yellowstone Dr., Suite 110 Chico, CA 95973 Re: ECP for Li Zhang – APN 065-210-072 To Whom It May Concern: With reference to the above subject, enclosed is: Road and Drainage Plans -CK #1 Drainage Calculations Engineers Estimate ECP ACTION REQUIRED: Resubmit plans and /or other data in accordance with changes in red. Review and comment on the following: Remarks: 1. A plan checking deposit has not been received. Submit a minimum $148 plan checking deposit prior to continued plan checking. 2. The plan should show contour lines and where the proposed fiber rolls or silt fences are to be installed. 3. Both temporary and permanent erosion control measures are required. Sheet ER-3 lists a number of erosion control BMP’s, but it is not clear which of the BMP’s are to be installed. The plan should specifically state which BMP’s are required and where they are to be installed. 4. If hydro seeding is to be used, the application rate and seed mixture should be specified. 5. Inspection and maintenance requirements per the attached documentation should be included with the BMP notes. 6. If construction activity is anticipated between November 15 and April 1, the preparer of the ECP shall certify that the conditions are suitable for such construction. If you should have any questions, please call (530) 538-7266, Monday through Friday, 8:00 a.m. to 4:00 p.m. Sincerely, Eric Schroth, P.E., L.S. Associate Civil Engineer cc: Tom Fossum – Deputy Director Public Works Department encl.