HomeMy WebLinkAboutB16-0840 CALFIRE Underground Hydro Test (2)
Hydrant Flow Test Report
Test Date: 11/16/17 Test Time: 11:00 am
Address: 1156 Oroville Chico Hwy
Requested by: Wes Gilbert Engineering
Purpose of Test: Determine hydrant system available gpm
Conducted by: Chris Kohler, Aaron Macomber
Test Hydrant Locations:
#1 Test Hydrant: Hydrant NW of entrance
#2 Flow Hydrant: Hydrant NE of entrance
Hydrant # Outlet
Size
Pitot Static
PSI
Residual PSI Flow Observed
(GPM)
Flow at 20
PSI
Residual
1 60 50
2 2.5 6 411 869
Total Flow
Observed
411 gpm
869 gpm
Note: This test was conducted per NFPA 291. Foothill Fire Protection (FFP) is not the controlling water district and cannot guarantee the
flows above. It shall also be noted the time that the test was conducted. This test time may not reflect the available flow while the water
system is at its highest demand from the existing services. FFP assumes no responsibility for loss or damages if this flow test data is used.