HomeMy WebLinkAboutB16-0840 CALFIRE Underground Hydro Test (2) Hydrant Flow Test Report Test Date: 11/16/17 Test Time: 11:00 am Address: 1156 Oroville Chico Hwy Requested by: Wes Gilbert Engineering Purpose of Test: Determine hydrant system available gpm Conducted by: Chris Kohler, Aaron Macomber Test Hydrant Locations: #1 Test Hydrant: Hydrant NW of entrance #2 Flow Hydrant: Hydrant NE of entrance Hydrant # Outlet Size Pitot Static PSI Residual PSI Flow Observed (GPM) Flow at 20 PSI Residual 1 60 50 2 2.5 6 411 869 Total Flow Observed 411 gpm 869 gpm Note: This test was conducted per NFPA 291. Foothill Fire Protection (FFP) is not the controlling water district and cannot guarantee the flows above. It shall also be noted the time that the test was conducted. This test time may not reflect the available flow while the water system is at its highest demand from the existing services. FFP assumes no responsibility for loss or damages if this flow test data is used.