MODIFIED USE PERMIT#88-35A
`
02
AM
H. Earl Parker, Jr.
P.O. Box 2441
Marysville, CA 95901
CERTIFIED MAIL
county
LAND OF NATURAL WEALTH AND BEAUTY
PLANNING DEPARTMENT
7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965-3397
TELEPHONE: (916) 538-7601
A
Re: Use Permit, AP 028-090-002 and
AP 028-230-009
Dear Mr. Parker:
Enclosed is your validated Modified Use Permit No. 88-35A to allow a change in Condition
14 for property zoned A-160 and A-5 located approximately 1/4 mile east of La Porte Road,
south of Bangor.
Should you have any questions regarding this matter, please contact this office between
10:00 a.m. and 3:00 p.m.
Sincerely,
i
. A. cher
Director of Planning
BAK:lr
Enc.
cc: Department of Public Works (2)
Environmental Health
Department of Forestry
MINING AND RECLAMATION PERMIT
BUTTE COUNTY PLANNING COMMISSION March 16, 1990
DATE (Registered Mail receipt)
88-35a (modifying UP 88-35)
PERMIT NO.
AP 28-09-2.28-23-9
ASSESSOR'S PARCEL NO.
Pursuant to the provisions of Chapter 13 of the Butte County Code and the special.
conditions set forth below:
H. Earl Parker, Jr. is hereby granted an amended Mining Permit to allow a change in
Condition #14, and as a condition of approval, to provide for the reclamation of
this mined area in accordance with the approved Reclamation Plan on file.
1. As a condition of
approval for the permit or the reclamation plan, or both,
periodic inspections
of the site by the public works department shall be
made to evaluate
continuing compliance with the permit and the reclamation
plan.
2. The Public Works
Director may suspend the permit for a period not to exceed
fifteen (15) days
where continuation of a violation will adversely affect
the public. In
the event of a suspension, or should the Public Works
Director request
disciplinary action, the Planning Commission shall
immediately set a
hearing thereon with not less than five (5) days' notice
to the operator.
The Planning Commission, after completion of the hearing,
may suspend or revoke the permit, or modify the permit, or may place the
operator on probation should the violation found to exist be of a serious
nature, adversely affecting the health and welfare of the residents of the
County.
3. Upon a finding by the Planning Commission that a supplemental guarantee. for
the reclamation of the mined land is necessary, a reasonable surety bond,
lien on the property or a portion thereof, or other security conditioned
upon the faithful performance of the reclamation plan shall be . filed with
the public works department.
SPECIAL CONDITIONS:
1. Preserve the trees north and east of the quarry site to provide a visual
screen from La Porte Road and Los Verjeles Road.
2. The. eastern and northern portions of the site to be preserved in a natural
3.
state, leaving the visible hillside undisturbed. Quarry operation to be
conducted in the southern and western areas of site as proposed.
Provide traffic control and stop La Porte Road traffic during actual
blasting operations.
4. Operations, including maintenance, warmup of
equipment,
truck operations
with the operating hours being
from 6:00 a.m.
to 6:00 p.m.
Monday through
Saturday,- and blasting hours
will be between
10:00 a.m.
and 2:00 p.m.,
Monday through Saturday. No
blasting will be
allowed on
observed national
holidays as stated (January 1,
Martin Luther
King Day,
Easter Sunday,
Memorial Day, July 4, Labor
Day, Veterans
Day, Thanksgiving Day, and
Christmas). There will be
no chain saw
operations on-site after the
specified hours.
5. Construct an access road approach to improve the encroachment driveway and
to protect the La Porte Road roadbed.
6. Erosion control measures shall be implemented at the time of quarry
operations, including:
a. Stabilization of all graded areas and exposed soil surfaces. Access
road to be gravelled.
b. Proper development of roadside drainages.
7. Grading permits shall be obtained where required as per the 1976 Uniform
Building Code.
8. The access road to be regularly watered as needed to control dust.
9. If any archaeological sites are encountered during quarry operations, a
professional archaeologist is to be . contacted immediately to survey the
discovery prior to further site disturbance. (Society for California
ARchaeology, Chico State University Dr. Keith Johnson, (916) 895-6192; CSU
Archaeology Lab at (916) 895-6256.
10. Obtain streambed alteration permit from the Department of Fish and Game for
the bridge structure to be constructed over the intermittent drainage near
Site A.
11. Design the backslope of the excavated material to withstand an earthquake
with a magnitude of at least 6.5 on the Richter scale.
12. Comply with the proposed reclamation plan for the areas to be mined.
Reclamation shall take place as mining progresses. Once a particular open
pit area is finished as far as mining, reclamation - shall begin immediately
for that area. (Planning Department)
13. Submit to periodic inspection of the sites by the Public Works Department
to evaluate continuing compliance with the mining permit and reclamation
plan. (Planning Department).
14. Applicant will be
required to repair any extensive damage which
may occur
to roadways as a
result of heavy
hauling. It is understood and
agreed that
permittee, at its
own discretion
and expense, may contract the
services of
a registered engineer to examine
the subject 'road before- any job
begins and
then examine road
when the job
is completed to aid in determing
the extent
and responsibility
of damage
in cooperation with the Butte County
Department of Public Works. (Department of Public Works)
15. Comply with any applicable regulations that may be required by the
California Regional Water Quality Control Board. (Environmental Health)
16. Comply with any requirements or regulations of the Butte County
Environmental Health Department.- (Environmental Health)
17. Comply with all other applicable State and local statutes, ordinances, and
regulations. (Planning Department)
I hereby declare that I have read the foregoing conditions, that they are
in fact the conditions which were imposed upon the granting of this mining
permit, and that I agree to abide fully by said conditions.
DATED:
APPLICANT