HomeMy WebLinkAbout000-000-000I BUILDING ENERGY ANALYSIS REPORT
PROJECT:
F -BUTTE
COUNTY
MAR 2 7 2012
Dan Andreasen
��
' - 2684 Highway 32
�EOk gERVICES
Chico, CA
Project Designer:
3045 CERES AVENUE, SUITE 135
CHICO, CA.95973
(530) 892-2700-
Report
92-2700
Report Prepared by:
Aaron Klemenok
0
3045 Ceres Ave.
Chico, California 95973
(530) 892-2700
Job Number:
07-069 A
Date:
3/20/2012
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
Ene Pro 5.1 by Ener Soft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A
I. TABLE OF CONTENTS I
Cover Page
Table of Contents
Nonresidential Performance Title 24 Forms
Form ENV -MM Envelope Mandatory Measures
Form LTG -MM Lighting Mandatory Measures
Form MECH-MM Mechanical Mandatory Measures
HVAC System Heating and Cooling Loads Summary
1
2
3
28
29
30
31
EnergyPro 5.1 by EnergySoft Job Number: ID: 07-069 A User Number: 7309 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 C
Project Name
Date
Dan Andreasen
3/20/2012
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
2684 Highway 32 Chico
CA Climate Zone 11
5,540
n/a
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and om plete.
Documentation Author
Name Aaron K/emenok
Signature �Ay`,�/��uy^
Company
Date 3/20/2012
Address 3045 Ceres Ave.
Phone (530) 892-2700
City/State/Zip Chico, California 95973
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
—/I
4/ l3/ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as empt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name GARY HAWKINS ARCHITECT
Signature
Company to z —` Z
Address 3045 CERES AVENUE, SUITE 135
License #VW
City/State2ip CHICO, CA 95973
Phone (530) 892-2700
Principal Mechanical Designer
Name GARY HAWKINS ARCHITECT
Signa
Company Date
Address 3045 CERES AVENUE, SUITE 135 License #
City/State/Zip CHICO, CA 95973 Phone (530) 892-2700
Principal Lighting Designer
Name GARY HAWKINS ARCHITECT
Sig tur
Company Date
Address 3045 CERES AVENUE, SUITE 135 License #
City/State/Zip CHICO, CA 95973 Phone (530)' 892-2700
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
m ENV-1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
m LTG-1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
❑ LTG-2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat.
0 LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft User Number.- 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 3 of 34
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1 C
Project Name Date
Dan Andreasen 3/20/2012
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard Proposed Compliance
Energy Comoonent Desian Design Marain --- - -,
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
12.14
12.04
0.10
86.95
81.64
5.31
41.54
40.83
0.70
0.00
0.00
0.00
0.00
0.00
0.00
9.09
8.71
0.38
53.33
56.76
-3.43
57.99
57.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
261.04
257.98
3.06
Percent better than Standard
GENERAL INFORMATION
1.2%1 ( 1.2 % excludi
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
BUILDING COMPLIES
Building Orientation (SVIq 210 deg Conditioned Floor Area 5.540 sqft.
Number of Stories 1 Unconditioned Floor Area 14,616 sqft.
Number of Systems 2 Conditioned Footprint Area 3,440 sqft.
Number of Zones 12 Natural Gas Available On Site Yes
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Gross Area
(S 149
2,207
(NVIO
715
(NE)
1,006
(SE)
629
4,557
3,279
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
0.851 W/sgft.
157,922
sqft.
sqft.
sqft.
sqft.
sqft.
sgft.
Glazina Area
352
112
46
0
510
0
Proposed
0.906 W/sqft.
203,446
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazina Ratio
15.9%
15.7%
.4.5%
0.0%
11.2%
0.0%
Prescriptive Values for
Comparison only. See
LTG -1 C for allowed LPD.
I EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Page 4 of 34
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C
Project Name
Dan Andreasen
Date
3/20/2012
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
W/sf'
Ctrl.
Credits
W/sf 2
Allowed LPD
Proc.
Loads
W/sf
Area Tailored
W/sf 3 W/sf °
1st Floor Window side
Office
Office > 250 sqft
1,254
0.809
Meeting
Convention/ConferencelMee
147
1.265
Support
Convention/Conference/Mee
56
2.036
1st Floor Ware side
Support
Corridor/Restroom/Support
1,020
0.708
Break
Lounge, Recreation
228
1.000
Office
Office > 250 sqft
735
1.322
Warehouse 1
Industrial Work, High Bay
9,916
1.322
Warehouse 2
Industrial Work, High Bay
3,500
1.051
Shop
Industrial Work, Low Bay
1,200
2.492
2nd Floor Window side
Office
Office > 250 sqft
1,090
0.941
2nd Floor Ware side
Support
CorridorlRestroom/Support
769
0.744
Cont.
Convention/Conference/Me
241
0.772
Notes: 1. See LTG -1 C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C
items marked with asterisk, see LTG -1 -C by others) (by others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System 1st Floor Window side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System 1st Floor Ware side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System 2nd Floor Window side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System 2nd Floor Ware side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number.' 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 5 of 34
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
1 3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
5,540
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N. E, S, W or in Degrees:'
210 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
a
c
O 3:
M
N W
O z
o
LL
:5
M.`
>N
0
OC
N
w>
`
-
w U
3
>
O C
•
.
U
�
x
CV
6
d
c
o
_
'D
O 670
c
l0
a
l0
U-
1
1
Slab
1,162
(N)
0.730
None
4.4.7-A1
New
❑
❑
2
Wall
152
(NK9
. 0.102
R-13
4.3.1-A3
New.
❑
❑
3
Wall
514
I'S K9
0.102
R-13
4.3.1-A3
New
❑
❑
4
Slab
147
(N)
0.730
None
4.4.7-A 1
New
❑
❑
5
Roof
147
(SIA9
0.043
R-22
4.2.1-A6
New
❑
❑
6
Wall
102
(NE)
0.102
R-13
4.3.1-A3
New
❑
❑
7
Wall
116
(NV19
0.102
R-13
4.3.1-A3
New
❑
❑
8
Slab
56
(N)
0.730
None
4.4.7-A 1
New
❑
❑
9
Roof
56
(SM
0.043
R-22
4.2.1-A6
New
❑
❑
10
Wall
81
(NIM
0.102
R-13
4.3.1-A3
New
El
El1.
See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
a
C
O
1pN
" w
O Z
`
O
RLL
2>
o
ca
a 'o
>�
U
N
¢
= 'o
u1 U)
C
>
O
p)
r
o ;°
0 cn
m
a
ci-
R
LL
1
Window
112
(NIA
0.350
NFRC
0.310
NFRC
❑
New
❑
❑
2
Window
352
(SlAq
0.350
NFRC
0.310
NFRC
❑
New
❑
❑
3
Window
46
(NE)
0.350
NFRC
0.310
NFRC
❑
New
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 6 of 34
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
5,540
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: M Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School M Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space >_ 8000 ftZ (If checked include the ENV -4C with submittal)
Phase of Construction: M New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component M Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
210 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
N
.a?
a
c
N
cy
UF
Oz
O
M
��
0 c
L
cm
w>
V
.2
S
WU
cc
`
°m
m°y
>
`
°�
d
U
v
x
aci
c
r
o�
(cY
0n
a
=i
11
Slab
1,113
(N)
1 0.730
None
4.4.7-A 1
New
❑
❑
12
Roof
421
(S Ko
0.043
R-22
4.2.1-A6
New
❑
❑
13
wall
266
(SE)
0.102
R-13
4.3.1-A3
New
❑
❑
14
Wall
298
(NE)
0.102
R-13
4.3.1-A3
New
❑
❑
15
Wall
106
(SM
0.102
R-13
4.3.1-A3
New
❑
❑
16
Slab
228
(N)
0.730
None
4.4.7-A1
New
❑
❑
17
Roof
228
(SVIq
0.043
R-22
4.2.1-A6
New
❑
❑
18
Wall
74
(SVIO
0.102
R-13
4.3.1-A3
New
❑
❑
19
Wall
89
(NE)
0.102
R-13
4.3.1-A3
New
❑
❑
20
Door
720W
1.450
None
1
4.5.1-A1
New
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Fenestration
Type
a
o
.Y U1
C
0 LU
O Z
O
>
O N
> U)2
¢
d
u=i in
o>
l-
O
Tag/ID
c
N
Occ
ci u�
n°.
Li
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
.❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 7 of 34
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
5,540
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Blldlooatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: m New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
210 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
y
4
c
0 3
C V)
dW
Oz
0
V•`
li
d
S>
U¢
&
0
::�
w>cU-
0
C
:!�
O y
0o
O C
y�
v
x
a
d
ca
�¢
c
o
3
c�
Ui
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
1 3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
. 5, 540
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal)
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
I 210 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
.r
Q
C
03
V)
UF
OZ
0
t;7
n
4)��
Ucc
&!
C
W>
O t
WLL
O
�>
O t
U-
N
CL
�Q
c
o
7
VN
y
a
ti
31
Wall
258
(SE)
1 0.102
R-13
4.3.1-A3
New
❑
❑
32
Door
20
(SE)
1.450
None
4.5.1-A1
New
❑
❑
33
Wall
482
(SM
0.102
R-13
4.3.1-A3
New
❑
❑
34
Door
20
(SK9
1.450
None
4.5.1-A1
New
❑
❑
35
Door
20
(SMO
1.450
None
4.5.1-A1
New
❑
❑
36
Wall
116
(NM
0.102
R-13
4.3.1-A3
New
❑
❑
37
Wall
83
(StM
0.102
R-13
4.3.1-A3
New
❑
❑
38
Roof
241
(SM
0.043
R-22
4.2.1-A6
New
❑
❑
39
1 Wall
167
(NE)
0.102
R-13
4.3.1-A3
New
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
a
c 3:N
C N
' W
O Z
V
LL
>
V `
LL 'o
> N
U
=
N
U V
= 'o
N N
c
L
>
O
o
.p 3
o :°
2-
U V)
m
a
m
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ 1
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
11❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20T16:15:12 /D: 07-069 A Page 9 of 34
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV -1 C
Project Name
Dan Andreasen
Date
3/20/2012
ROOFING PRODUCT COOL ROOFS
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
SRI that have a Ll -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C.
❑
❑
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a Ll -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C.
❑
❑
❑
El The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/
13❑
❑
❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from
the Cool Roof criteria below.
❑
❑
❑
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
❑
❑
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 51b/ft' z 5lb/ft2
Product
Type2
Aged Solar
Reflectance
Thermal
Emmitance
SRI'
Pass
Fail6
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ ❑
❑ ❑
❑ 4
❑
❑
❑ j ❑
❑ ❑
❑ 4
❑
❑
❑ 1 ❑
❑ ❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.om/products/search.php
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(pj�jua, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at.http://www.energy.ca.gov/title24
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
EnergyPro 5.1 by Energ ySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A
Pae 10 of 34
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description
ENV -2A
Test Performed By:
Fenestration Products Name or ID Area of like
Requiring Testing or Verification Products
Building Envelope
. Acceptance Test
DUAL GLAZE LOWE 510
El
13
11
11
11
EnergyPro 5.1 by EnergySoft User Number. 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 11 of 34
I . .
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C
Project Name
Dan Andreasen
Date
3/20/2012
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG -1- INST (Retain a copy and verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG -2A and LTG -3A (Retain a copy and verify form is completed and signed.)
Field Inspect -or ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is onl for:
® CONDITIONED SPACE ❑ UNCONDITIONED SPACE
® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts
Installed Watts
A
B
C
D
E
F
G
H
None
or
Item
Tag
Complete Luminaire Description'
(Le, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballasts
_
.�o
a �s
;r E
3: J
How wattage
Was determined
a)
o m
8 •CZ
E E
Z J
LL
X
a)�
�
c
Field.`
Fins ector27
CEC
Default
From
NA8
o
v
16 C9
Q
N'
a LL.
(1) 2 ft U- Tube T8
36.0
❑
11.
3
108
0 �.
(2) 4 ft Fluorescent T8 Rapid Start Elec
62.0
®
❑
15
930
FO
(2) 18w Compact Fluorescent Triple 4 Pin Elec
38.0
®
❑
2
761,
❑ °'. `,❑ `
(4) 4 ft Fluorescent T8 Rapid Start Elec
114.0
IZI
❑
18
2,052
,; DVN;, ❑'
(3) 4 ft Fluorescent T8 Rapid Start Elec
93.0
®
❑
18
1,674
❑ c ❑
(3) 18w Compact Fluorescent
60.0
®
❑
3
180
_; ❑:`a
❑
❑�
❑; �;,0•:
❑
❑
El 0
❑
❑
❑
❑
a o
❑
❑
❑: ; ❑ ;
Installed Watts Page Total:
5,020
Building total number of pages:
Installed Watts Building Total
Sum of all pages)
5;020
Enter into LTG -1 C Pa e 4 of 4
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Pae 12 of 34
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C
Project Name
Dan Andreasen
Date
3/20/2012
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed.)
Field Inspector ❑
Certificate of Acceptance, LTG -2A and LTG -3A (Retain a copy and verify form is completed and signed.)
Field Ins ector ❑
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:.
❑ CONDITIONED SPACE m UNCONDITIONED SPACE
® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
with §146(a).
Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
0.2 watts per square foot is totaled below.
Luminaire (Type, Lamps, Ballasts)
Installed Watts
A
B
C
D
E
F
G
H
Nonen.
Item
Tao I
Complete Luminaire Description'
(Le, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballasts
�'a)
ia
� -J
How wattage
Was determined
O N
.(Z
E E
z -
U-
X x
CDor
m
c �
Field
Inspectoe:
O
O)
CEC :p co
Default 0
From Q H
NA8
N
a `ii
54w Linear Fluorescent T5 HO Elec (4 Bulb)
230.0
❑ ❑
86
19,780
❑ ❑
❑.. El
❑ ❑
a. ❑ .
❑ ❑
m❑..
❑ ❑
❑ ❑
❑ ❑
❑ o.
❑ ❑
o• d .
❑ ❑"
❑ - o
[3 1:1
�❑ ❑
❑ ❑
❑" ❑
❑ ❑
d `❑"
❑ ❑
o:, :o
❑ ❑
- a , oe
❑ ❑
=o EY.;
Installed Watts Page Total:
19,780
Building total number of pages:
Installed Watts Building Total
Sum of all pages)
19,780
Enter into LTG -1 C Page 4 of 4'1
1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
Ener Pro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 13 of 34
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
LTG -1 C'
Project Name
Dan Andreasen
Date
3/20/2012
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2,
automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls —
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
controls for retail stores > 50,000 ft2, in accordance with Section 131.
MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST
Field;. y
''1"ns ector ," :
Number Special
Type/ Description of Units Location in Buildin Features
Pass
F..,ail :..
❑
o''
❑ .:
❑
o
o-
❑
❑
o;
❑ '
❑
-; o
a
❑
❑
E
❑
0.
o
❑
❑
13
0
01
❑
rho.
❑
SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
Field Inspector's Notes or Discrepancies:
Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A
Page 14 of 34
CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C
Project Name
Date
Dan Andreasen 1
3/20/2012
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST
NOT BE COMBINED FOR COMPLIANCE
Indoor Lighting Power for Conditioned S aces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting 5,020
Installed Lighting
19,780
from Conditioned LTG -1C Page 2
from Unconditioned LTG -1C, Page 2
Lighting Control Credit _ 0
Lighting Control Credit _
0
Conditioned Spaces from LTG -2C
Unconditioned Spaces from LTG -2C
Adjusted Installed = 5,020
Adjusted Installed =
19,780
Lighting Power
Lighting Power
Complies if Installed:5 Allowed
Complies if Installed:5 Allowed
Allowed Lighting Power
5,020
Allowed Lighting Power
Conditioned Spaces from LTG -3C or PERF -1
Unconditioned Spaces from LTG -3C)21'924
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space
shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type
requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential
Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the
responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless
the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement
agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements
of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can
receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the
owner of the building for their records.
LTG -2A and
Luminaires Controlled
LTG -3A.
Controls and
Sensors and
Number of
Automatic
Luminaires
Daylighting Controls
Equipment Re uirin Testing
Description
controlled
Location
Acce tante
EnergyPro 5.1 by EnergySoh User Number 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 15 of 34
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11 75,540
T otal Cond. Floor Area
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Ur itinned Spaces
affiddavi avit
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
1. 210 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equi ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
A O Smith ELJF-20
❑
p
Equipment T e3:
Electric Res HW Boiler
❑
❑
Number of Systems
1
❑
Max Allowed Heating Capacity'
15,358 Btu/hr
❑
Minimum Heating Efficiency'
98%
❑
Max Allowed Coolin Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
n/a
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
n/a
❑
❑
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
DHW Heater
❑
p
Equi ment Type 3:
Gas Fired DHW Boiler
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
40,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
0.60 EF
❑
❑
Max Allowed Cooling 'Capacity'
n/a
❑
❑
Cooling Efficiency'
n/a
❑
❑
Duct Location/ R -Value
n/a
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
n/a
❑
❑
Economizer
n/a
❑
❑
Thermostat
n/a
❑
❑
Fan Control
n/a
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener Pro 5.1 by Ener Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 16 of 34
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
5,540
Addition Floor Area
1 n/a
GENERAL INFORMATION
Buildin Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
210 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ul ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
1st Floor Window side
❑
❑
Equipment T e3:
Split DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
60,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
92% AFUE
❑
❑
Max Allowed Cooling Capacity'
48,000 Btu/hr
❑ _
❑
Cooling Efficiency'
13.0 SEER / 11.0 EER
❑
❑
Duct Location/ R -Value
Attic, Ceiling Ins, vented/ 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Yes
❑
❑
Economizer
No Economizer
❑
0
Thermostat
Setback Required.
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
1st Floor Ware side
❑
❑
Equipment T e3:
Split DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
60,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
92% AFUE
❑
❑
Max Allowed Coolinq Capacity'
36,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.0 EER
❑
❑
Duct Location/ R -Value
Attic, Ceiling Ins, vented/ 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Yes
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener Pro 5.1 by EnergySoft User Number.- 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 17 of 34
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Dan Andreasen
Date
3/20/2012
Project Address
2684 Highway 32 Chico
Climate Zone
11
Total Cond. Floor Area
5,540
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ® New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
210 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
2nd Floor Window side
❑
❑
Equipment T e3:
Split DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
60, 000 Btu/hr
❑
❑
Minimum Heating Efficiency'
92% AFUE
❑
❑
Max Allowed Cooling Capacity'
48,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.0 EER
❑
❑
Duct Location/ R -Value
Attic, Ceiling Ins, vented/ 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Yes
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC -1, RTU -1, HP -1
2nd Floor Ware side
❑
❑
Equipment T e3:
Split DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
60,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
92% AFUE
❑
❑
Max Allowed Cooling Capacity'
36,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.0 EER
❑
❑
Duct Location/ R -Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Yes
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 18 of 34
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Dan Andreasen 3/20/2012
Discreaancies:
EnergyPro 5 1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 !D: 07-069 A Page 19 of 34 1
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1C
Project Name
Date
Dan Andreasen
3/20/2012
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air.
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Re uirin Testing or Verification
Qty.
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
A O Smith ELJF-20
1
❑
❑
❑
❑
❑
❑
m
❑
❑
❑
Trane 60/48
1
❑
®
m
❑
❑
❑
❑
❑
❑
m
Trane 60/36
1
❑
®
m
❑
❑
❑
❑
❑
❑
m
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
El .
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EneigyPro 5.1 by EnerqySoft User Number: 7309 RunCode:
2012-03-20716:15:12
ID: 07-069 A Page 20 of 34
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part4 of 4) MECH-1C
Project Name
Dan Andreasen
Date
3/20/2012
TEST DESCRIPTION
MECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Re uirin Testing
Qty.
Fault
Detection &
Diagnostics
for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Test Performed By:
A O Smith ELJF-20
1
❑
❑
❑
0
Trane 60148
1
❑
❑
❑
❑
Trane 60/36
1
❑
❑
❑
❑
❑
❑
❑_
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Ener Pro 5.1 by Ener.gySoft User Number.' 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 21 of 34
INDOOR LIGHTING POWER ALLOWANCE LTG -3C
Project Name
Dan Andreasen
Date
3/20/2012
ALLOWED LIGHTING POWER Chose One Method
A Separate LTG -3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this
page are only for:
❑ CONDITIONED SPACES ® UNCONDITIONED SPACES
COMPLETE BUILDING METHOD
WATTS
BUILDING CATEGORY From §146 Table 146-E PER(ft)
X
COMPLETE
BLDG. AREA
=
ALLOWED
WATTS
Comp Bldg Auditorium 1.50
14,616
21,924
TOTALS
AREA
WATTS
AREA CATEGORY METHOD
WATTS
BUILDING CATEGORY From §146 Table 146-F PER(ft)
X
Area ft2
=
ALLOWED
WATTS
TOTALS
AREA.
WATTS
TAILORED METHOD
Total Allowed Watts using the Tailored Method taken from LTG -4C Pae 1 of 4 Row 3
The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG -4C set of forms. A separate set of LTG -
4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces.
EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 22
1
AIR SYSTEM REQUIREMENTS Part 1 of 2
Project Name
Dan Andreasen
Indicate Air Systems Type Central, Single Zone, Packa e,
Item or System Tags
i.e. AC 1, RTU 1, H P 1 1st Floor Window side 1st Floor Ware side
Number of Systems 1 1
Indicate Pane Reference on Plans or Schedule and indicate the al
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R -value
PRESCRIPTIVE MEASURES
Calculated Design Heating.Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121
121
122
122
122
122
123
124
92% AFUE
13.0 SEER / 11.0 EER
n/a
n/a
Yes
290 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented/ 8.0
n/a
30,000 Btu/hr
n/a
22,625 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
92% AFUE
13.0 SEER / 11.0 EER
n/a
n/a
Yes
297 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
MECH-2C
Date
3/20/2012
VAV, or etc...)
2nd Floor Window side
1
92% AFUE
13.0 SEER / 11.0 EER
n/a
n/a
Yes
164 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Ceiling Ins, vented / 8. 01 Attic, Ceiling Ins, vented / 8.0
n/a
30, 000 Btu/hr
n/a
16,895 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
30,000 Btu/hr
n/a
21,973 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
I144(k) I Yes I Yes I Yes I
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number., 7309 Run Code: 2012-03-20716:15:12 /D: 07-069 A rage z,:% or J4 t
AIR SYSTEM REQUIREMENTS
Part 1 of'2) MECH-2C
Project Name
1
Date
Dan Andreasen
3/20/2012
Indicate
Air Systems Type Central, Single Zone, Packa e, VAV, or etc...
Item or System Tags
i.e. AC -1, RTU -1, HP -1
2nd Floor Ware side
Number.of Systems
1
Indicate Pa
a Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
T-24 Sections
Heating Equipment Efficiency
112(a)
92% AFUE
Cooling Equipment Efficiency
1 12 a
13.0 SEER / 11.0 EER
HVAC Heat Pump Thermostat
112(b), 112 c
n/a
Furnace Controls/Thermostat
112(c), 115 a
n/a
Natural Ventilation
121 b
Yes
Mechanical Ventilation
-121(b)
152 cfm
VAV Minimum Position Control
121 c
No
Demand Control Ventilation
121 c
No
Time Control
-122(e)
Programmable Switch
Setback and Setup Control
122(e)
Setback Required
Outdoor Damper Control
122(f)
Auto
Isolation Zones
122
n/a
Pipe Insulation
123
Duct Location/ R -value
124
Attic, Ceiling Ins, vented/8.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
144(a & b
n/a
Proposed Heating Capacity
144(a & b
30,000 Btu/hr
Calculated Design Cooling Load
144(a & b
n/a
Proposed Cooling Capacity
144(a & b
16,852 Btu/hr
Fan Control
144(c)
Constant Volume
DP Sensor Location
144(c)
Supply Pressure Reset (DDC only)
144(c)
Yes
Simultaneous Heat/Cool
144(d)
No
Economizer
144(e)
No Economizer
Heat Air Supply Reset
144(f)
Constant Temp
Cool Air Supply Reset
144 f
Constant Temp
Electric Resistance Heating'
144
Air Cooled Chiller Limitation
144(i)
Duct Leakage Sealing. If Yes, a
Yes
MECH-4-A must be submitted
144 k
1. Total installed capacity (MBtu/hr) of all electric heat
on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
Energ Pro 5.1 by Energ Soft User Number: 7309
RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 24 of 34
WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2)- MECH-2C
Project Name
Date
Dan Andreasen
1 3/20/2012
WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
Item or System Tags
- A O Smith ELJF-20
(i.e. AC -1, RTU -1, HP -1)
a
Number of Systems
1
Indicate Page Reference on Plans or Specification 2
MANDATORY MEASURES
T-24 Sections
Equipment Efficiency
112 a 98
Pipe Insulation
123 HW Piping
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls
144(a & b n/a
Cooling Tower Flow Controls
144(h) n/a
Variable Flow System Design
144(h) n/a
Chiller and Boiler Isolation
144(i) n/a
CHW and HHW Reset Controls
144 0) n/a
WLHP Isolation Valves
144(j) n/a
VSD on CHW, CW & WLHP Pumps>5HP
144(i) n/a
DP Sensor Location
144(i) n/a
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each chiller, cooling tower, boiler,
and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where
the required features are documented. If a requirement is not applicable, put "N/A" in the column next to
applicable section.
Service Hot Water, Pool Heating -
Item or System Tags
DHWHeater
(i.e. INH -1, WHP, DHW, etc...)'
Number of Systems
1
Indicate Page Reference on Plans or Schedule
MANDATORY MEASURES
T-24 Sections
SERVICE HOT WATER
Certified Water Heater
111, 113 a 50gal gas
Water Heater Efficiency
113(b) 0.60 EF
Service Water Heating Installation
113(c) Controls Req.
Pipe Insulation
123 Required
POOL AND SPA
Pool and Spa Efficiency and Control
114 a n/a
Pool and Spa Installation
114 b n/a.
Pool Heater — No Pilot Light
115(c) n/a
Spa Heater — No Pilot Light
115(d) n/a
Pipe Insulation
123 n/a
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the
column.
Energ Pro 5.1 by Ene Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 25 of 34
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Dan Andreasen
Date
3/20/2012
MECHANICAL VENTILATION 121 b 2
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B.
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System
Condition
Area
ft2
CFM
per
ft2
Min CFM
By Area
B X C
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50%. of
Design Zone
Supply
CFM
B X 0.4
CFM / ft2
Max. of
Columns
H, J. K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
Office
1,254
0.15
188
1881
188
Meeting
147
0.50
74
74
74
Support
56
0.50
28
28
28
1st Floor Window side
Total
290
290
Support
1,020
0.15
153
153
153
Break
228
0.50
114
114
34
80
Office
735
0.151
110
110
110
1st Floor Ware side
Total
377
297
Office
1,090
0.15
164
164
164
2nd Floor Window side
Total
164
164
Support
769
0.15
1151
115
115
Cont.
241
0.50
121
121
36
84
2nd Floor Ware side
Total
236
152
Totals
Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section 121, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K
Condition area ft2 x 0.4 CFM / ft2; or
L
Maximum of Columns H, J, K, or 300 CFM
M
This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than. the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
Ene Pro 5.1 b Ene Soft User Number: 7309 RunCode: 2012-03-20716:15:12
ID: 07-069 A
Page 26 of 34
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5C
Project Name
Dan Andreasen
Date
3/20/2012
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type
City. Efficiency
Tons
Pump
Ot . GPM BHP Control
DHW / BOILER SUMMARY
System Name Type
Distribution Ot Rated Input
Vol.
(Gals).
Energy Factor
or RE
Standby Loss Tank Ext.
or Pilot R -Value Status
A O Smith ELJF-20 Small Elec.
Hydronic Heating 1 15,358
19
98.0%
n/a n/a Nevv
50 gal gas Small Gas
Kitchen Pipe Ins 1 40,000
50
0.60
n/a n/a New
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Hot Water Piping Length ft
Control Ot . HP
Type
In Plenum
Outside Buried Add 1/2" Insulation
13
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name Type
City. Output Aux. kW Jw
Eff iciency
Output
Eff iciency Status
Trane 60/48 Split DX
1 60,000 0.0
92% AFUE 48,000
13.0 SEER / 11.0 EER New
Trane 60/36 Split DX
1 60,000 0.0
92% AFUE 36,000
13.0 SEER / 11.0 EER New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN
RETURN FAN
System Name Fan Type-
Economizer Type
CFM
BHP CFM BHP
Trane 60/48 Constant Volume
No Economizer
1,750
0.75 none
Trane 60/36 Constant Volume
No Economizer
1,750
0.75 none
Ener Pro 5.1 by EnergySoft User Number: 7309
RunCode: 2012-03-20716:15:12
ID: 07-069 A
Pae 27 of 34
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
Dan Andreasen
3/20/2012
DESCRIPTION
Building En4o a Measures:
Installed insulating material shall have been certified by the manufacturer to comply with the California Quality.
§118(a):
Standards for insulating material, Title 20 Chapter 4, Article 3.
All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
§118(c):
Sections 2602. and 707 of Title 24, Part 2.
The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
§118(f):
of no less than R-13 between framing members.
All Exterior Joints and openings in the building that are observable sources of.air leakage shall be caulked, gasketed,
§117(a):
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. .
Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
§116(a) 3:
applicable default SHGC.
Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
§116(b):
weatherstripped (except for unframed glass doors and fire doors).
EnergyPro 5.1 bV Ener Soft User Number. 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pa a 28 of 34
LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM
Project Name7312012012
ate
Dan Andreasen
Indoor Lighting
Measures:
§131(d): Shut-off Controls
For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting.
1.
This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time
switch, or other device capable of automatically shutting off the lighting.
.
Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible
2
override switch in sight of the lights. The area of override is not to exceed 5,000 square feet.
Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall
§119(h):
be. certified and installed as directed by the manufacturer.
Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the
§111:
Directory. All installed fixtures shall be certified.
§131(a):
Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy
sensor device for each area with floor -to -ceiling walls.
Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts
§131(b):
per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the
room.
Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for
the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch;
§131(c):
or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on
the adjacent lot. Diagram of shading during different times of the year is included on plans.
§131(c):
Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6.
Outdoor Lighting Measures:
§130(c)1:
Mandatory lighting power determination for medium base sockets without permanently installed ballasts
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens
§132(a):
per Watt or are controlled by a motion sensor.
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances,
§132(b):
canopies, and all outdoor sales areas meet the Cutoff Requirements.
§132(c)1:
All permanently installed outdoor lighting meets the control requirements listed.
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements
§132(c):
listed.
Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20716:15:12 /D: 07-069 A Page 29 of 34
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
7Date
Dan Andreasen
3/20/2012
Equipment and System Efficiencies
Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
§111:
with the applicable.standard.
§115(a):
Fan type central furnaces shall not have a pilot light.
Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
§123:
equipment, shall be insulated in accordance with Standards Section 123.
Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
§124:
the CMC Standards.
Controls
§122(e):
Each space conditioning system shall be installed with one of the following:
1A.
Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
1 B.
An occupancy sensor to control the operating period of the system; or
1 C.
A 4 -hour timer that can be manually operated to control the operating period of the system.
Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
2
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(8)'
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
§122(c):
authorized personnel.
Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
§122(b):
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b):
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
§121(e):
on these plans.
All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
§122(f):
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f):
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c)
Installation
3.
Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump
2
when hot water is not required.
Ener Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 30 of 34
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Dan Andreasen
Date
3/20/2012
System Name
1 st Floor Window side
Floor Area
1,457
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 2,421
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 290
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output perS stem 60,000
34,117
4,616
1,346
20,582
Total Output (Btuh) 30,000
0
Output Btuh/s ft 20.6
1,706
1,029
Cooling System
0
0
Output perSystem 48,000
6,885
-2,502 290
14,559
Total Output (Btuh) 24,000
1 0
2,114
0
Total Output (Tons) 2.0
1,706
1,029
Total Output (Btuh/s ft) 16.5
Total Output s ft/Ton 728.5
1 44,414
37,199
Air System
CFM perSystem
1,750
HVAC EQUIPMENT SELECTION
Airflow cfm
875
Trane 60/48
22,625
0
30,000
Airflow cfm/s ft
0.60
Airflow cfm/Ton)
437.5
Outside Air (%)
33.1 %
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
22,625
0
Sep 3 PM
30,000
Jan 1 AM
Outside Aircfm/s ft 0 20
Note: -values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak)
22 OF 53 OF
Q.
Outside Air
290 cfm Supply Fan
875 cfm
69 OF
53 OF 85 OF
Heating Coil
84 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
98/68°F 83!64°F 83/64°F 59/55°F
,,--1 —1
Outside Air 2
290 cfm Supply Fan Cooling Coil61
875 cfm
76/63°F
JJ 1H
/ 56 OF
..__............__._..., ,
52.1 % Rt30M
74/62°F
EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12
ID: 07-069 A Page 31 of 34
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Dan Andreasen
Date
3/20/2012
System Name
1 st Floor Ware side
Floor Area
1,983
ENGINEERING CHECKS
SYSTEM LOAD
Number of S stems
1
COIL
CFM
Total Room Loads 1,647
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 297
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK
COIL HTG.
PEAK
Heating System
Sensible
Latent
CFM
Sensible
Output peiSystem 60,000
30,653
3,966
- 1,779
25,567
Total Output Btuh) 30,000
0
Output Btuh/s ft 15.1
1,533
1,278
Cooling System
0
0
Output perSystem 36,000
8,406
-229 297
14,869
Total Output Btuh) 18,000
0
1,533
42,125
F 3,737
0
Total Output (Tons) 1.5
1,278
Total Output (Btuh/s ft) 9.1
Total Output s ft/Ton 1,322.0
42,993
Air System
CFM perSystem
1.750
HVAC EQUIPMENT SELECTION
Airflow cfm
875
Trane 60/36
16,895
0
30,000
Airflow (cfm/s ft)
0.44
Airflow cfm/Ton
583.3
Outside Air %
34.0%
Total Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
16,895
01
Jul 3 FM
30,000
Jan 1 AM
Outside Air cfm/s ft 0 15
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating
Peak
22 OF 53 OF
Outside Air
297 cfm Supply Fan
875 cfm
69 OF
53 OF 85 OF
Heating Coil
83 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
102 / 71 OF 85 ! 65
Outside Air
297 cfm
76/63°F
OF 85 / 65 OF 55/ 53 OF
Supply Fan Cooling Coil
875 cfm
57 / 54 OF
_..._...._...
51.1 % ROOM
74/62°F
EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12
ID: 07-069 A Page 32 of 34
9
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Dan Andreasen
Date
3/20/2012
System Name
2nd Floor Window side
Floor Area
1,090
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL COOLING
CFM Sensible
Total Room Loads 1,405 24,909
Return Vented Lighting 0
Return Air Ducts 11245
Return Fan 0
Ventilation 164 3,973
Supply Fan 0
Supply Air Ducts 1,245
TOTAL SYSTEM LOAD 1 31,374
PEAK
COIL HTG.
PEAK
Heating System
Latent
CFM
Sensible
output perSystem 60,000
2,180
356
8,470
Total Output (Btuh) 30,000
Output Btuh/s ft 27.5
423
Cooling System
0
Output perSystem 48,000
-710
164
8,333
Total Output (Btuh) 24,000
11470
0
Total Output (Tons) 2.0
423
Total Output Btuh/s ft) 22.0
Total Output s ft/Ton 545.0
17,650
Air System
CFM perSystem
1,750
HVAC EQUIPMENT SELECTION
Airflow cfm
875
Trane 60/48 21,973
0
30,000
Airflow (cfm/s ft) 0.80
Airflow cfm/Ton)
437.5
Outside Air (%)
18.7%
Total Adjusted System Output L 21,973
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
0
Sep 3 PM
30,000
Jan 1 AM
Outside Air (cfm/s ft) 0.15
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating. Peak
22 OF 61 OF 61 OF 93 OF
Outside Air
164 cfm Supply Fan Heating Coil
875 cfm
70 OF
92 OF
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
98/68°F 80163°F 80/62°F 56/53°F
M
Outside Air c
164 cfm pp y Cooling Coil 57154 F
AL Supply Fan 0
875 cfm _........ _..............._.. _.
47.2% ROOM
75161 OF 74161 OF
EnergyPro 5.1 by EnergySoff
User Number. 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 33 of 34
y
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Dan Andreasen
Date
3/20/2012
System Name
2nd Floor Ware side
Floor Area
1,010
ENGINEERING CHECKS.
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,192
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 152
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output perSystem 60,000
15,123
2,525 487
11,764
Total Output (Btuh) 30,000
0
Output Btuh/s ft 29.7
756
588
Cooling System
00
Output erSystem 36,000
4,236
-775
152
7,693
Total Output Btuh 18,000
0
1,750
0
Total Out put(Tons) 1.5
756
588
Total Output Btuh/s ft) 17.8
Total Output s ft/Ton 673.3
20,871
20,634
Air System
CFM perSystem
1,750
HVAC EQUIPMENT SELECTION
Airflow cfm
875
Trane 60/36 16,852
0
30,000
Airflow cfm/s ft)
0.87
Airflow cfm/Ton)
583.3
Outside Air (/o)
17.3 %
Total Ad 16,852
Adjusted System Output
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK
0
Aug 2 PM
30,000
Jan 1 AM
Outside Air (cfm/s ft)
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
22 OF 61 OF 61 OF 93 OF
Outside Air
152 cfm Supply Fan Heating Coil
875 cfm
69 OF
93 °F
[ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak
101 /70°F 79!65°F 79/65°F 61 /58°F
Outside Air Ar
152 cfm Supply Fan Cooling Coil 62 / 58 OF
...
875 cfm 56.1 % ^ ROOM
75!64°F 74!63°F
EnergyPro 5.1 by EnergySoft
User Number: 7309 RunCode: 2012-03-20716:15:12 /D: 07-069 APage 34 of 34