Loading...
HomeMy WebLinkAbout000-000-000I BUILDING ENERGY ANALYSIS REPORT PROJECT: F -BUTTE COUNTY MAR 2 7 2012 Dan Andreasen �� ' - 2684 Highway 32 �EOk gERVICES Chico, CA Project Designer: 3045 CERES AVENUE, SUITE 135 CHICO, CA.95973 (530) 892-2700- Report 92-2700 Report Prepared by: Aaron Klemenok 0 3045 Ceres Ave. Chico, California 95973 (530) 892-2700 Job Number: 07-069 A Date: 3/20/2012 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. Ene Pro 5.1 by Ener Soft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A I. TABLE OF CONTENTS I Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form LTG -MM Lighting Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary 1 2 3 28 29 30 31 EnergyPro 5.1 by EnergySoft Job Number: ID: 07-069 A User Number: 7309 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 C Project Name Date Dan Andreasen 3/20/2012 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2684 Highway 32 Chico CA Climate Zone 11 5,540 n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: m New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and om plete. Documentation Author Name Aaron K/emenok Signature �Ay`,�/��uy^ Company Date 3/20/2012 Address 3045 Ceres Ave. Phone (530) 892-2700 City/State/Zip Chico, California 95973 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to —/I 4/ l3/ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as empt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name GARY HAWKINS ARCHITECT Signature Company to z —` Z Address 3045 CERES AVENUE, SUITE 135 License #VW City/State2ip CHICO, CA 95973 Phone (530) 892-2700 Principal Mechanical Designer Name GARY HAWKINS ARCHITECT Signa Company Date Address 3045 CERES AVENUE, SUITE 135 License # City/State/Zip CHICO, CA 95973 Phone (530) 892-2700 Principal Lighting Designer Name GARY HAWKINS ARCHITECT Sig tur Company Date Address 3045 CERES AVENUE, SUITE 135 License # City/State/Zip CHICO, CA 95973 Phone (530)' 892-2700 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV-1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. m LTG-1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG-2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. 0 LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number.- 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 3 of 34 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1 C Project Name Date Dan Andreasen 3/20/2012 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Comoonent Desian Design Marain --- - -, Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 12.14 12.04 0.10 86.95 81.64 5.31 41.54 40.83 0.70 0.00 0.00 0.00 0.00 0.00 0.00 9.09 8.71 0.38 53.33 56.76 -3.43 57.99 57.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 261.04 257.98 3.06 Percent better than Standard GENERAL INFORMATION 1.2%1 ( 1.2 % excludi Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg BUILDING COMPLIES Building Orientation (SVIq 210 deg Conditioned Floor Area 5.540 sqft. Number of Stories 1 Unconditioned Floor Area 14,616 sqft. Number of Systems 2 Conditioned Footprint Area 3,440 sqft. Number of Zones 12 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (S 149 2,207 (NVIO 715 (NE) 1,006 (SE) 629 4,557 3,279 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 0.851 W/sgft. 157,922 sqft. sqft. sqft. sqft. sqft. sgft. Glazina Area 352 112 46 0 510 0 Proposed 0.906 W/sqft. 203,446 sqft. sqft. sqft. sqft. sqft. sqft. Glazina Ratio 15.9% 15.7% .4.5% 0.0% 11.2% 0.0% Prescriptive Values for Comparison only. See LTG -1 C for allowed LPD. I EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Page 4 of 34 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 C Project Name Dan Andreasen Date 3/20/2012 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf' Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads W/sf Area Tailored W/sf 3 W/sf ° 1st Floor Window side Office Office > 250 sqft 1,254 0.809 Meeting Convention/ConferencelMee 147 1.265 Support Convention/Conference/Mee 56 2.036 1st Floor Ware side Support Corridor/Restroom/Support 1,020 0.708 Break Lounge, Recreation 228 1.000 Office Office > 250 sqft 735 1.322 Warehouse 1 Industrial Work, High Bay 9,916 1.322 Warehouse 2 Industrial Work, High Bay 3,500 1.051 Shop Industrial Work, Low Bay 1,200 2.492 2nd Floor Window side Office Office > 250 sqft 1,090 0.941 2nd Floor Ware side Support CorridorlRestroom/Support 769 0.744 Cont. Convention/Conference/Me 241 0.772 Notes: 1. See LTG -1 C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1 -C by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System 1st Floor Window side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System 1st Floor Ware side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System 2nd Floor Window side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System 2nd Floor Ware side incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number.' 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 5 of 34 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 1 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area 5,540 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N. E, S, W or in Degrees:' 210 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType a c O 3: M N W O z o LL :5 M.` >N 0 OC N w> ` - w U 3 > O C • . U � x CV 6 d c o _ 'D O 670 c l0 a l0 U- 1 1 Slab 1,162 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 2 Wall 152 (NK9 . 0.102 R-13 4.3.1-A3 New. ❑ ❑ 3 Wall 514 I'S K9 0.102 R-13 4.3.1-A3 New ❑ ❑ 4 Slab 147 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 5 Roof 147 (SIA9 0.043 R-22 4.2.1-A6 New ❑ ❑ 6 Wall 102 (NE) 0.102 R-13 4.3.1-A3 New ❑ ❑ 7 Wall 116 (NV19 0.102 R-13 4.3.1-A3 New ❑ ❑ 8 Slab 56 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 9 Roof 56 (SM 0.043 R-22 4.2.1-A6 New ❑ ❑ 10 Wall 81 (NIM 0.102 R-13 4.3.1-A3 New El El1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type a C O 1pN " w O Z ` O RLL 2> o ca a 'o >� U N ¢ = 'o u1 U) C > O p) r o ;° 0 cn m a ci- R LL 1 Window 112 (NIA 0.350 NFRC 0.310 NFRC ❑ New ❑ ❑ 2 Window 352 (SlAq 0.350 NFRC 0.310 NFRC ❑ New ❑ ❑ 3 Window 46 (NE) 0.350 NFRC 0.310 NFRC ❑ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 6 of 34 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area 5,540 Addition Floor Area n/a GENERAL INFORMATION Building Type: M Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School M Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ftZ (If checked include the ENV -4C with submittal) Phase of Construction: M New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component M Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 210 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType N .a? a c N cy UF Oz O M �� 0 c L cm w> V .2 S WU cc ` °m m°y > ` °� d U v x aci c r o� (cY 0n a =i 11 Slab 1,113 (N) 1 0.730 None 4.4.7-A 1 New ❑ ❑ 12 Roof 421 (S Ko 0.043 R-22 4.2.1-A6 New ❑ ❑ 13 wall 266 (SE) 0.102 R-13 4.3.1-A3 New ❑ ❑ 14 Wall 298 (NE) 0.102 R-13 4.3.1-A3 New ❑ ❑ 15 Wall 106 (SM 0.102 R-13 4.3.1-A3 New ❑ ❑ 16 Slab 228 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 17 Roof 228 (SVIq 0.043 R-22 4.2.1-A6 New ❑ ❑ 18 Wall 74 (SVIO 0.102 R-13 4.3.1-A3 New ❑ ❑ 19 Wall 89 (NE) 0.102 R-13 4.3.1-A3 New ❑ ❑ 20 Door 720W 1.450 None 1 4.5.1-A1 New ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Fenestration Type a o .Y U1 C 0 LU O Z O > O N > U)2 ¢ d u=i in o> l- O Tag/ID c N Occ ci u� n°. Li ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ .❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 7 of 34 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area 5,540 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blldlooatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 210 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType y 4 c 0 3 C V) dW Oz 0 V•` li d S> U¢ & 0 ::� w>cU- 0 C :!� O y 0o O C y� v x a d ca �¢ c o 3 c� Ui CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 1 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area . 5, 540 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 210 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType .r Q C 03 V) UF OZ 0 t;7 n 4)�� Ucc &! C W> O t WLL O �> O t U- N CL �Q c o 7 VN y a ti 31 Wall 258 (SE) 1 0.102 R-13 4.3.1-A3 New ❑ ❑ 32 Door 20 (SE) 1.450 None 4.5.1-A1 New ❑ ❑ 33 Wall 482 (SM 0.102 R-13 4.3.1-A3 New ❑ ❑ 34 Door 20 (SK9 1.450 None 4.5.1-A1 New ❑ ❑ 35 Door 20 (SMO 1.450 None 4.5.1-A1 New ❑ ❑ 36 Wall 116 (NM 0.102 R-13 4.3.1-A3 New ❑ ❑ 37 Wall 83 (StM 0.102 R-13 4.3.1-A3 New ❑ ❑ 38 Roof 241 (SM 0.043 R-22 4.2.1-A6 New ❑ ❑ 39 1 Wall 167 (NE) 0.102 R-13 4.3.1-A3 New ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type a c 3:N C N ' W O Z V LL > V ` LL 'o > N U = N U V = 'o N N c L > O o .p 3 o :° 2- U V) m a m LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 11❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20T16:15:12 /D: 07-069 A Page 9 of 34 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name Dan Andreasen Date 3/20/2012 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a Ll -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. ❑ ❑ ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a Ll -factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV -2C. ❑ ❑ ❑ El The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ 13❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from the Cool Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 51b/ft' z 5lb/ft2 Product Type2 Aged Solar Reflectance Thermal Emmitance SRI' Pass Fail6 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ j ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.om/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pj�jua, — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at.http://www.energy.ca.gov/title24 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.1 by Energ ySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 10 of 34 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Requiring Testing or Verification Products Building Envelope . Acceptance Test DUAL GLAZE LOWE 510 El 13 11 11 11 EnergyPro 5.1 by EnergySoft User Number. 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 11 of 34 I . . CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C Project Name Dan Andreasen Date 3/20/2012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST (Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A (Retain a copy and verify form is completed and signed.) Field Inspect -or ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is onl for: ® CONDITIONED SPACE ❑ UNCONDITIONED SPACE ® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the ® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G H None or Item Tag Complete Luminaire Description' (Le, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts _ .�o a �s ;r E 3: J How wattage Was determined a) o m 8 •CZ E E Z J LL X a)� � c Field.` Fins ector27 CEC Default From NA8 o v 16 C9 Q N' a LL. (1) 2 ft U- Tube T8 36.0 ❑ 11. 3 108 0 �. (2) 4 ft Fluorescent T8 Rapid Start Elec 62.0 ® ❑ 15 930 FO (2) 18w Compact Fluorescent Triple 4 Pin Elec 38.0 ® ❑ 2 761, ❑ °'. `,❑ ` (4) 4 ft Fluorescent T8 Rapid Start Elec 114.0 IZI ❑ 18 2,052 ,; DVN;, ❑' (3) 4 ft Fluorescent T8 Rapid Start Elec 93.0 ® ❑ 18 1,674 ❑ c ❑ (3) 18w Compact Fluorescent 60.0 ® ❑ 3 180 _; ❑:`a ❑ ❑� ❑; �;,0•: ❑ ❑ El 0 ❑ ❑ ❑ ❑ a o ❑ ❑ ❑: ; ❑ ; Installed Watts Page Total: 5,020 Building total number of pages: Installed Watts Building Total Sum of all pages) 5;020 Enter into LTG -1 C Pa e 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Pae 12 of 34 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 C Project Name Dan Andreasen Date 3/20/2012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A (Retain a copy and verify form is completed and signed.) Field Ins ector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for:. ❑ CONDITIONED SPACE m UNCONDITIONED SPACE ® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the ® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts) Installed Watts A B C D E F G H Nonen. Item Tao I Complete Luminaire Description' (Le, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts �'a) ia � -J How wattage Was determined O N .(Z E E z - U- X x CDor m c � Field Inspectoe: O O) CEC :p co Default 0 From Q H NA8 N a `ii 54w Linear Fluorescent T5 HO Elec (4 Bulb) 230.0 ❑ ❑ 86 19,780 ❑ ❑ ❑.. El ❑ ❑ a. ❑ . ❑ ❑ m❑.. ❑ ❑ ❑ ❑ ❑ ❑ ❑ o. ❑ ❑ o• d . ❑ ❑" ❑ - o [3 1:1 �❑ ❑ ❑ ❑ ❑" ❑ ❑ ❑ d `❑" ❑ ❑ o:, :o ❑ ❑ - a , oe ❑ ❑ =o EY.; Installed Watts Page Total: 19,780 Building total number of pages: Installed Watts Building Total Sum of all pages) 19,780 Enter into LTG -1 C Page 4 of 4'1 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Ener Pro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 13 of 34 CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 C' Project Name Dan Andreasen Date 3/20/2012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2, automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft2, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST Field;. y ''1"ns ector ," : Number Special Type/ Description of Units Location in Buildin Features Pass F..,ail :.. ❑ o'' ❑ .: ❑ o o- ❑ ❑ o; ❑ ' ❑ -; o a ❑ ❑ E ❑ 0. o ❑ ❑ 13 0 01 ❑ rho. ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 14 of 34 CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1C Project Name Date Dan Andreasen 1 3/20/2012 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 5,020 Installed Lighting 19,780 from Conditioned LTG -1C Page 2 from Unconditioned LTG -1C, Page 2 Lighting Control Credit _ 0 Lighting Control Credit _ 0 Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed = 5,020 Adjusted Installed = 19,780 Lighting Power Lighting Power Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allowed Lighting Power 5,020 Allowed Lighting Power Conditioned Spaces from LTG -3C or PERF -1 Unconditioned Spaces from LTG -3C)21'924 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. LTG -2A and Luminaires Controlled LTG -3A. Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Re uirin Testing Description controlled Location Acce tante EnergyPro 5.1 by EnergySoh User Number 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 15 of 34 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 75,540 T otal Cond. Floor Area Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Ur itinned Spaces affiddavi avit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 1. 210 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equi ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 A O Smith ELJF-20 ❑ p Equipment T e3: Electric Res HW Boiler ❑ ❑ Number of Systems 1 ❑ Max Allowed Heating Capacity' 15,358 Btu/hr ❑ Minimum Heating Efficiency' 98% ❑ Max Allowed Coolin Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 DHW Heater ❑ p Equi ment Type 3: Gas Fired DHW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 40,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 0.60 EF ❑ ❑ Max Allowed Cooling 'Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.1 by Ener Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 16 of 34 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area 5,540 Addition Floor Area 1 n/a GENERAL INFORMATION Buildin Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 210 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ul ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 1st Floor Window side ❑ ❑ Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 60,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 92% AFUE ❑ ❑ Max Allowed Cooling Capacity' 48,000 Btu/hr ❑ _ ❑ Cooling Efficiency' 13.0 SEER / 11.0 EER ❑ ❑ Duct Location/ R -Value Attic, Ceiling Ins, vented/ 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS Yes ❑ ❑ Economizer No Economizer ❑ 0 Thermostat Setback Required. ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 1st Floor Ware side ❑ ❑ Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 60,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 92% AFUE ❑ ❑ Max Allowed Coolinq Capacity' 36,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.0 EER ❑ ❑ Duct Location/ R -Value Attic, Ceiling Ins, vented/ 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS Yes ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.1 by EnergySoft User Number.- 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 17 of 34 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Dan Andreasen Date 3/20/2012 Project Address 2684 Highway 32 Chico Climate Zone 11 Total Cond. Floor Area 5,540 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 210 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 2nd Floor Window side ❑ ❑ Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 60, 000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 92% AFUE ❑ ❑ Max Allowed Cooling Capacity' 48,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.0 EER ❑ ❑ Duct Location/ R -Value Attic, Ceiling Ins, vented/ 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS Yes ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 2nd Floor Ware side ❑ ❑ Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 60,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 92% AFUE ❑ ❑ Max Allowed Cooling Capacity' 36,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.0 EER ❑ ❑ Duct Location/ R -Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS Yes ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pae 18 of 34 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Dan Andreasen 3/20/2012 Discreaancies: EnergyPro 5 1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 !D: 07-069 A Page 19 of 34 1 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1C Project Name Date Dan Andreasen 3/20/2012 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air. Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control A O Smith ELJF-20 1 ❑ ❑ ❑ ❑ ❑ ❑ m ❑ ❑ ❑ Trane 60/48 1 ❑ ® m ❑ ❑ ❑ ❑ ❑ ❑ m Trane 60/36 1 ❑ ® m ❑ ❑ ❑ ❑ ❑ ❑ m ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El . ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EneigyPro 5.1 by EnerqySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 20 of 34 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part4 of 4) MECH-1C Project Name Dan Andreasen Date 3/20/2012 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: A O Smith ELJF-20 1 ❑ ❑ ❑ 0 Trane 60148 1 ❑ ❑ ❑ ❑ Trane 60/36 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑_ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ener Pro 5.1 by Ener.gySoft User Number.' 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 21 of 34 INDOOR LIGHTING POWER ALLOWANCE LTG -3C Project Name Dan Andreasen Date 3/20/2012 ALLOWED LIGHTING POWER Chose One Method A Separate LTG -3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: ❑ CONDITIONED SPACES ® UNCONDITIONED SPACES COMPLETE BUILDING METHOD WATTS BUILDING CATEGORY From §146 Table 146-E PER(ft) X COMPLETE BLDG. AREA = ALLOWED WATTS Comp Bldg Auditorium 1.50 14,616 21,924 TOTALS AREA WATTS AREA CATEGORY METHOD WATTS BUILDING CATEGORY From §146 Table 146-F PER(ft) X Area ft2 = ALLOWED WATTS TOTALS AREA. WATTS TAILORED METHOD Total Allowed Watts using the Tailored Method taken from LTG -4C Pae 1 of 4 Row 3 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG -4C set of forms. A separate set of LTG - 4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces. EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 22 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 Project Name Dan Andreasen Indicate Air Systems Type Central, Single Zone, Packa e, Item or System Tags i.e. AC 1, RTU 1, H P 1 1st Floor Window side 1st Floor Ware side Number of Systems 1 1 Indicate Pane Reference on Plans or Schedule and indicate the al MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R -value PRESCRIPTIVE MEASURES Calculated Design Heating.Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121 121 122 122 122 122 123 124 92% AFUE 13.0 SEER / 11.0 EER n/a n/a Yes 290 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented/ 8.0 n/a 30,000 Btu/hr n/a 22,625 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 92% AFUE 13.0 SEER / 11.0 EER n/a n/a Yes 297 cfm No No Programmable Switch Setback Required Auto n/a MECH-2C Date 3/20/2012 VAV, or etc...) 2nd Floor Window side 1 92% AFUE 13.0 SEER / 11.0 EER n/a n/a Yes 164 cfm No No Programmable Switch Setback Required Auto n/a Ceiling Ins, vented / 8. 01 Attic, Ceiling Ins, vented / 8.0 n/a 30, 000 Btu/hr n/a 16,895 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 30,000 Btu/hr n/a 21,973 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp I144(k) I Yes I Yes I Yes I 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number., 7309 Run Code: 2012-03-20716:15:12 /D: 07-069 A rage z,:% or J4 t AIR SYSTEM REQUIREMENTS Part 1 of'2) MECH-2C Project Name 1 Date Dan Andreasen 3/20/2012 Indicate Air Systems Type Central, Single Zone, Packa e, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 2nd Floor Ware side Number.of Systems 1 Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 92% AFUE Cooling Equipment Efficiency 1 12 a 13.0 SEER / 11.0 EER HVAC Heat Pump Thermostat 112(b), 112 c n/a Furnace Controls/Thermostat 112(c), 115 a n/a Natural Ventilation 121 b Yes Mechanical Ventilation -121(b) 152 cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control -122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Location/ R -value 124 Attic, Ceiling Ins, vented/8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 30,000 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 16,852 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) No Economizer Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144 f Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a Yes MECH-4-A must be submitted 144 k 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 24 of 34 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2)- MECH-2C Project Name Date Dan Andreasen 1 3/20/2012 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags - A O Smith ELJF-20 (i.e. AC -1, RTU -1, HP -1) a Number of Systems 1 Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112 a 98 Pipe Insulation 123 HW Piping PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b n/a Cooling Tower Flow Controls 144(h) n/a Variable Flow System Design 144(h) n/a Chiller and Boiler Isolation 144(i) n/a CHW and HHW Reset Controls 144 0) n/a WLHP Isolation Valves 144(j) n/a VSD on CHW, CW & WLHP Pumps>5HP 144(i) n/a DP Sensor Location 144(i) n/a 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating - Item or System Tags DHWHeater (i.e. INH -1, WHP, DHW, etc...)' Number of Systems 1 Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113 a 50gal gas Water Heater Efficiency 113(b) 0.60 EF Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 123 Required POOL AND SPA Pool and Spa Efficiency and Control 114 a n/a Pool and Spa Installation 114 b n/a. Pool Heater — No Pilot Light 115(c) n/a Spa Heater — No Pilot Light 115(d) n/a Pipe Insulation 123 n/a 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. Energ Pro 5.1 by Ene Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Page 25 of 34 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Dan Andreasen Date 3/20/2012 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B. C D E F G H I J K L M N Zone/System Condition Area ft2 CFM per ft2 Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50%. of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J. K, 300 CFM Design Minimum Air Setpoint Transfer Air Office 1,254 0.15 188 1881 188 Meeting 147 0.50 74 74 74 Support 56 0.50 28 28 28 1st Floor Window side Total 290 290 Support 1,020 0.15 153 153 153 Break 228 0.50 114 114 34 80 Office 735 0.151 110 110 110 1st Floor Ware side Total 377 297 Office 1,090 0.15 164 164 164 2nd Floor Window side Total 164 164 Support 769 0.15 1151 115 115 Cont. 241 0.50 121 121 36 84 2nd Floor Ware side Total 236 152 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than. the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Ene Pro 5.1 b Ene Soft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Page 26 of 34 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Dan Andreasen Date 3/20/2012 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type City. Efficiency Tons Pump Ot . GPM BHP Control DHW / BOILER SUMMARY System Name Type Distribution Ot Rated Input Vol. (Gals). Energy Factor or RE Standby Loss Tank Ext. or Pilot R -Value Status A O Smith ELJF-20 Small Elec. Hydronic Heating 1 15,358 19 98.0% n/a n/a Nevv 50 gal gas Small Gas Kitchen Pipe Ins 1 40,000 50 0.60 n/a n/a New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length ft Control Ot . HP Type In Plenum Outside Buried Add 1/2" Insulation 13 CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type City. Output Aux. kW Jw Eff iciency Output Eff iciency Status Trane 60/48 Split DX 1 60,000 0.0 92% AFUE 48,000 13.0 SEER / 11.0 EER New Trane 60/36 Split DX 1 60,000 0.0 92% AFUE 36,000 13.0 SEER / 11.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type- Economizer Type CFM BHP CFM BHP Trane 60/48 Constant Volume No Economizer 1,750 0.75 none Trane 60/36 Constant Volume No Economizer 1,750 0.75 none Ener Pro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 ID: 07-069 A Pae 27 of 34 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Date Dan Andreasen 3/20/2012 DESCRIPTION Building En4o a Measures: Installed insulating material shall have been certified by the manufacturer to comply with the California Quality. §118(a): Standards for insulating material, Title 20 Chapter 4, Article 3. All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of §118(c): Sections 2602. and 707 of Title 24, Part 2. The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value §118(f): of no less than R-13 between framing members. All Exterior Joints and openings in the building that are observable sources of.air leakage shall be caulked, gasketed, §117(a): weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. . Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the §116(a) 3: applicable default SHGC. Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be §116(b): weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.1 bV Ener Soft User Number. 7309 RunCode: 2012-03-20T16:15:12 ID: 07-069 A Pa a 28 of 34 LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name7312012012 ate Dan Andreasen Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. . Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible 2 override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall §119(h): be. certified and installed as directed by the manufacturer. Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the §111: Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; §131(c): or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens §132(a): per Watt or are controlled by a motion sensor. All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, §132(b): canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements §132(c): listed. Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20716:15:12 /D: 07-069 A Page 29 of 34 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name 7Date Dan Andreasen 3/20/2012 Equipment and System Efficiencies Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply §111: with the applicable.standard. §115(a): Fan type central furnaces shall not have a pilot light. Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC §123: equipment, shall be insulated in accordance with Standards Section 123. Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of §124: the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the 2 system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to §122(c): authorized personnel. Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the §122(b): heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified §121(e): on these plans. All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all §122(f): openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump 2 when hot water is not required. Ener Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 30 of 34 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dan Andreasen Date 3/20/2012 System Name 1 st Floor Window side Floor Area 1,457 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 2,421 Return Vented Lighting Return Air Ducts Return Fan Ventilation 290 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perS stem 60,000 34,117 4,616 1,346 20,582 Total Output (Btuh) 30,000 0 Output Btuh/s ft 20.6 1,706 1,029 Cooling System 0 0 Output perSystem 48,000 6,885 -2,502 290 14,559 Total Output (Btuh) 24,000 1 0 2,114 0 Total Output (Tons) 2.0 1,706 1,029 Total Output (Btuh/s ft) 16.5 Total Output s ft/Ton 728.5 1 44,414 37,199 Air System CFM perSystem 1,750 HVAC EQUIPMENT SELECTION Airflow cfm 875 Trane 60/48 22,625 0 30,000 Airflow cfm/s ft 0.60 Airflow cfm/Ton) 437.5 Outside Air (%) 33.1 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 22,625 0 Sep 3 PM 30,000 Jan 1 AM Outside Aircfm/s ft 0 20 Note: -values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 22 OF 53 OF Q. Outside Air 290 cfm Supply Fan 875 cfm 69 OF 53 OF 85 OF Heating Coil 84 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 98/68°F 83!64°F 83/64°F 59/55°F ,,--1 —1 Outside Air 2 290 cfm Supply Fan Cooling Coil61 875 cfm 76/63°F JJ 1H / 56 OF ..__............__._..., , 52.1 % Rt30M 74/62°F EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Page 31 of 34 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dan Andreasen Date 3/20/2012 System Name 1 st Floor Ware side Floor Area 1,983 ENGINEERING CHECKS SYSTEM LOAD Number of S stems 1 COIL CFM Total Room Loads 1,647 Return Vented Lighting Return Air Ducts Return Fan Ventilation 297 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output peiSystem 60,000 30,653 3,966 - 1,779 25,567 Total Output Btuh) 30,000 0 Output Btuh/s ft 15.1 1,533 1,278 Cooling System 0 0 Output perSystem 36,000 8,406 -229 297 14,869 Total Output Btuh) 18,000 0 1,533 42,125 F 3,737 0 Total Output (Tons) 1.5 1,278 Total Output (Btuh/s ft) 9.1 Total Output s ft/Ton 1,322.0 42,993 Air System CFM perSystem 1.750 HVAC EQUIPMENT SELECTION Airflow cfm 875 Trane 60/36 16,895 0 30,000 Airflow (cfm/s ft) 0.44 Airflow cfm/Ton 583.3 Outside Air % 34.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 16,895 01 Jul 3 FM 30,000 Jan 1 AM Outside Air cfm/s ft 0 15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 53 OF Outside Air 297 cfm Supply Fan 875 cfm 69 OF 53 OF 85 OF Heating Coil 83 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102 / 71 OF 85 ! 65 Outside Air 297 cfm 76/63°F OF 85 / 65 OF 55/ 53 OF Supply Fan Cooling Coil 875 cfm 57 / 54 OF _..._...._... 51.1 % ROOM 74/62°F EnergyPro 5.1 by EnergySoft User Number: 7309 Run Code: 2012-03-20716:15:12 ID: 07-069 A Page 32 of 34 9 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dan Andreasen Date 3/20/2012 System Name 2nd Floor Window side Floor Area 1,090 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING CFM Sensible Total Room Loads 1,405 24,909 Return Vented Lighting 0 Return Air Ducts 11245 Return Fan 0 Ventilation 164 3,973 Supply Fan 0 Supply Air Ducts 1,245 TOTAL SYSTEM LOAD 1 31,374 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible output perSystem 60,000 2,180 356 8,470 Total Output (Btuh) 30,000 Output Btuh/s ft 27.5 423 Cooling System 0 Output perSystem 48,000 -710 164 8,333 Total Output (Btuh) 24,000 11470 0 Total Output (Tons) 2.0 423 Total Output Btuh/s ft) 22.0 Total Output s ft/Ton 545.0 17,650 Air System CFM perSystem 1,750 HVAC EQUIPMENT SELECTION Airflow cfm 875 Trane 60/48 21,973 0 30,000 Airflow (cfm/s ft) 0.80 Airflow cfm/Ton) 437.5 Outside Air (%) 18.7% Total Adjusted System Output L 21,973 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 0 Sep 3 PM 30,000 Jan 1 AM Outside Air (cfm/s ft) 0.15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating. Peak 22 OF 61 OF 61 OF 93 OF Outside Air 164 cfm Supply Fan Heating Coil 875 cfm 70 OF 92 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 98/68°F 80163°F 80/62°F 56/53°F M Outside Air c 164 cfm pp y Cooling Coil 57154 F AL Supply Fan 0 875 cfm _........ _..............._.. _. 47.2% ROOM 75161 OF 74161 OF EnergyPro 5.1 by EnergySoff User Number. 7309 RunCode: 2012-03-20T16:15:12 /D: 07-069 A Page 33 of 34 y HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dan Andreasen Date 3/20/2012 System Name 2nd Floor Ware side Floor Area 1,010 ENGINEERING CHECKS. SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,192 Return Vented Lighting Return Air Ducts Return Fan Ventilation 152 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 60,000 15,123 2,525 487 11,764 Total Output (Btuh) 30,000 0 Output Btuh/s ft 29.7 756 588 Cooling System 00 Output erSystem 36,000 4,236 -775 152 7,693 Total Output Btuh 18,000 0 1,750 0 Total Out put(Tons) 1.5 756 588 Total Output Btuh/s ft) 17.8 Total Output s ft/Ton 673.3 20,871 20,634 Air System CFM perSystem 1,750 HVAC EQUIPMENT SELECTION Airflow cfm 875 Trane 60/36 16,852 0 30,000 Airflow cfm/s ft) 0.87 Airflow cfm/Ton) 583.3 Outside Air (/o) 17.3 % Total Ad 16,852 Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 0 Aug 2 PM 30,000 Jan 1 AM Outside Air (cfm/s ft) Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 61 OF 61 OF 93 OF Outside Air 152 cfm Supply Fan Heating Coil 875 cfm 69 OF 93 °F [ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 101 /70°F 79!65°F 79/65°F 61 /58°F Outside Air Ar 152 cfm Supply Fan Cooling Coil 62 / 58 OF ... 875 cfm 56.1 % ^ ROOM 75!64°F 74!63°F EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20716:15:12 /D: 07-069 APage 34 of 34