Loading...
HomeMy WebLinkAbout000-000-003_ BUILDING ENERGY ANALYSIS REPORT PROJECT: Dan Andreasen 2684 Highway 32 Chico, CA Project Designer: 3045 CERES AVENUE, SUITE 135 CHICO, CA 95973 (530) 892-2700 Report Prepared by: Aaron Klemenok .3045 Ceres Ave. Chico, California 95973 (530) 892-2700 Job Number: 07-069 Building "B" Date: 3/20/2012 "U"T Coua MAR 2 7 2012 - IyINEIAPM ENT SERVICES .,a f. The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft; LLC — www.energysoft.com. Energ Pro 5.1 by Energ Soft User Number: 7309 RunCode: 2012-03-20T14:55:45 ID: 07-069 Building 'B" I i,t TABLE OF CONTENTS I Cover Page Table of Contents Form LTG -1-C Certificate of Compliance Form LTG -3-C Indoor Lighting Power Allowance Form LTG -MM Lighting Mandatory Measures 1 2 3 7 8 EnergyPro 5.1 by EnergySoft Job Number ID: 07-069 Building "B" User Number: 7309 1 CERTIFICATE OF COMPLIANCE (Part 3 .of 4) LTG -1 C Project Name Dan Andreasen Date 3/20/2012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION. ENERGY CHECKLIST Fill in controls forall spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas.> 250 ftz, automatic daylighting controls for daylit areas > 2,500 ftz, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ftz, in accordance with Section 131. MANDATORY LIGHTING CONTROLS — FIELD INSPECTION ENERGY CHECKLIST���d. . �,� Ins ectorz. Number Special Type/ Description of Units Location in Building FeaturesPassFa11 , i 1-1150 ❑ ❑ `ti® ❑®o ❑ ❑ AR] MM, 5101.171 ❑INo ®... ❑ A W �e.f ❑ moo. '� ��o . . r W ❑ mor bo HP ❑ ��r-sw � �. ❑ Ki"��.DIx � �.® ❑ fps . �a �`�® SPECIAL FEATURES INSPECTION, CHECKLIST See Page 2 of 4 of LTG -1C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's. Notes or Discrepancies: Eneeg Pro 5.1 by Eneeg Soft User Number.' 7309 RunCode: 2012-03-20T14:55:45.;, ID: 07-069 Building "B" Page 5 of 8 CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1 C Project Name Date Dan Andreasen 1 3/20/2012 Project Address Climate Zone Total Cond. Floor Area Unconditioned Floor Area 2684 Highway 32 Chico 11 0 11,500 GENERAL INFORMATION Building Type: ❑ Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ School ❑ Relocatable Public ❑ Conditioned Spaces m Unconditioned Spaces School Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Method of Compliance: m Complete Building ❑ Area Category ❑ Tailored Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Signature e'� Name Aaron Klemenok Company Date 3/20/2012 Address CEA # 3045 Ceres Ave. CEPE # City/State/Zip Phone Chico, California 95973 (530) 892-2700 The Principal Lighting Designer's Declaration Statement 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this b it 'ng permit application. Name Signat GARY HAWKINS ARCHITECT Company Phone (530) 42-2700 AddressLicense # 3045 CERES AVENUE, SUITE 135 City/State/Zip CHICO, CA 95973 Date -22 Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures Note.Block: LIGHTING COMPLIANCE FORMS & WORKSHEETS check box if worksheets is included For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published by the California Energy Commission. © LTG -1 C Pages 1 through 4 Certificate of Compliance. All Pages required on plans for all submittals. m LTG -2C Lighting Controls Credit Worksheet LTG -3C Indoor Lighting Power Allowance ❑ LTG -4C Pages 1 through 4 Tailored Method Worksheet ❑ LTG -5C Pages 1 and 2 . Line Voltage Track Lighting Worksheet EnergyPro 5.1 by EnergySoft User Number- 7309 RunCode: 2012-03-20T14:55:45 ID: 07-069 Building 'B" Page 3 of 8 CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1 C Project Name Dan Andreasen Date 3/20/2012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST (Retain a copy and verify form is completed and signed.) Field Inspector ❑ Certificate of Acceptance, LTG -2A and LTG -3A (Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: ❑ CONDITIONED SPACE m UNCONDITIONED SPACE ® The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the ® calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type; Lamps, Ballasts Installed Watts A B C D E F G H None or Item Tag Complete Luminaire Description' (Le, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts) r1t — EE � How wattage Was determined o m � Z- U- X o `° c 3 `'Field'. I"ns ectoiz CEC Default NA8 m o o cmjn 0 o Q ,-0- LL 54w Linear Fluorescent T5 HO Elec (4 Bulb) 230.0 ❑ ❑ 44 10,120 (4) 18w C.F. ELECT. VANITY 80.0 ® ❑ 5 400 ❑' ❑, ❑ ❑ ❑. :. ❑ ❑ ❑ :o;:I ❑ ❑ n, o. ❑ ❑ ❑. -❑, ❑ ❑ d a ❑ ❑ ❑ 11 ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ o:: ❑ .; ❑ ❑ C0". a ❑ ❑ a ❑ ❑ ❑ o ❑ ❑ ❑ ❑ 110. ❑ ❑ o n ❑; ❑ ❑ ❑ ❑ Installed Watts Page Total: 10,520 Building total number of pages: Installed Watts Building Total Sum of alla es 10,520 Enter into LTG -1 C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T14:55:45 ID: 07-069 Building 'B" Page 4 of 8 CERTIFICATE OF COMPLIANCE Part 4 of 4 LTG -1C Project Name Date Dan Andreasen 1 3/20/2012 CONDITIONED AND UNCONDITIONED SPACE.LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 0 Installed Lighting 10,520 from Conditioned LTG -1C, Page 2 from Unconditioned LTG -1 C, Page 2 Lighting Control Credit _ 0 Lighting Control Credit _ 0 Conditioned S aces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed = 0 Adjusted Installed 10,520 Lighting Power Lighting Power Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allowed Lighting PowerAllowed 0 Lighting Power Conditioned Spaces from LTG -3C or PERF -1 Unconditioned Spaces from LTG -3C)11,500 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A and LTG -3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the. number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A and LTG -3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A and LTG -3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. LTG -2A and Luminaires Controlled LTG -3A Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Re uirin Testing Description controlled Location Acceptance El 13 El 13 EnergyPro 5.1 by EnergySoh User Number 7309 RunCode: 2012-03-20714:55:45 ID: 07-069 Building `B" Page 6 of 8 INDOOR LIGHTING POWER ALLOWANCE LTG -3C Project Name Dan Andreasen Date 3/20/2012 ALLOWED LIGHTING POWER Chose One Method A Separate LTG -3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: ❑ CONDITIONED SPACES ® UNCONDITIONED SPACES COMPLETE BUILDING METHOD BUILDING CATEGORY From §146 Table 146-E WATTS PER(ft) X COMPLETE BLDG. AREA = ALLOWED WATTS Comp Bldg Ind Work, High Bay 1.00 11,500 11,500 TOTALS AREA WATTS AREA CATEGORY METHOD WATTS BUILDING CATEGORY From 146 Table 146-F PER(ft) X Area ft2 = ALLOWED WATTS TOTALS AREA WATTS TAILORED METHOD Total Allowed Watts using. the Tailored Method taken from LTG -4C Pae 1 of 4 Row 3 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG -4C set of forms. A separate set of LTG - 4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces EnergyPro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T14:55:45 ID: 07069 Building 'B" Pa e 7 of 8 LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Dan Andreasen 3/20/2012 Indoor Lighting. Measures: §131(d): Shut-off Controls For every floor, all interior Iighting.systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section. 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified.and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)l : Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)l : All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. Energ Pro 5.1 by EnergySoft User Number: 7309 RunCode: 2012-03-20T14:55:45 ID: 07-069 Building 'B" Page 8 of 8