Loading...
HomeMy WebLinkAbout000-000-00721 2011 ID sERVV s GEOTECHNICAL REPORT For Dan Andreasen Clean-Rite/Build-Rite Chico, California March 24, 2008 APPLIED TESTING CONSULTANTS 3060 Thomtree Drive, Suite #10 Chico, CA 95973 Clean-RiteBuild-Rite March 24, 2008 TABLE OF CONTENTS 1.0 INTRODUCTION............................................................................................................. 1 1.1 General.........................................................................................................................1 1.2 Scope........................................................................................................................... 1 1.3 Attachments................................................................................................................. 1 2.0 FINDINGS .....................................................................................................:................... 1 2.1 Site Description........................................................................................................... 1 2.2 Subsurface Soil Conditions......................................................................................... 1 2.3 Ground Water.............................................................................................................. 2 3.0 CONCLUSIONS AND RECOMMENDATIONS............................................................ 2 3.1 Site Clearing ..................................................... ..... 2 .................................:..................... 3.2 Site Preparation.....:...................................................................................................... 2 3.3 Soil Expansion Potential.............................................................................................. 3 3.4 Liquefaction Potential.................................................................................................. 3 3.5 In Place Relative Density............................................................................................ 3 3.6 Site Geology & Seismicity........................................................................................:. 3 3.7 Foundation Design ........................................................................................................ 5 3.8 Slab-on-Grade..............................................................................................................5 3.9 Pavement Design ......................................................................................................... 6 4.0 LIMITATIONS....................................:............................................................................. 6 Figures: Figure 1: Site Location Figure 2: Test Pit Location Plan Figure 3: Unified Soil Classification System Figure 4: Earthquake Epicenter Map Appendix A — Field Investigation Description & Logs Appendix B — Laboratory Test Data \\0tto\C\Work\2008\007-C1ean Rite Soils\report.doc page 1 Clean-Rite/Build-Rite March 24, 2008 1.0 INTRODUCTION 1.1 General We have completed a geotechnical engineering investigation of the site for the proposed Clean-Rite/Build-Rite in Chico, California. The purpose of our investigation was to explore the site, investigate subsurface soil conditions, and to provide design recommendations for the preparation of the proposed development. This report represents the results of our work. 1.2 Scope The scope of our work included: a field exploration consisting of four Test Pits, testing and analysis of soil samples obtained from Test Pits 1 thru 4, and the preparation of a report containing our findings and recommendations. 1.3 Attachments _ This report contains Site and Test Pit Location Plans, Profile Logs for Test Pits 1 thru 4, and our Laboratory Test Data Sheets (including Atterburg Limits & Gradations). See Figures and Appendices. 2.0 FINDINGS 2.1 Site Description The development site is located at 2684 Highway 32, between Indigo Lane and Regent Lane in Chico, California, and is 1.75 acres in size (see Figure 1). The site is bordered by developed land on the north, south and west sides, and by railroad tracks and orchards on the east sides. The proposed development for the site is for commercial metal buildings. On the date of our visit, 28 February 2008, the build sites had previously been cleared of trees and leveled. The site is mostly farmland and is rectangular in shape. 2.2 Subsurface Soil Conditions _ With a backhoe, excavations were made to depths of one and a half to seven and a half feet, as seen in Test Pit Logs 1 thru 4. It was determined that the test pits were of sufficient depth to represent the soil profile of the site. All excavations revealed relatively consistent _ subsurface soil for the site. The surface soils are predominately ML -sandy silt. After the test pits were dug and soil samples taken, the holes were filled with excavated material. The backfill materials in the holes were not properly compacted to any standard specifications. \\Otto\C\Work\2008\007-Clean Rite Soils\report.doc Page 1 Clean-Rite/Build-Rite March 24, 2008 2.3 Ground Water Groundwater evidence was not discovered in the test pits at the time of our exploration. Perched water was not encountered. 3.0 CONCLUSIONS AND RECOMMENDATIONS At the time that this report is being prepared, it is our understanding that the proposed construction at this site consists of lightweight commercial construction with slab -on -grade foundations. The recommendations contained in this report are based upon these assumptions. Prior to commencement of earthwork of the site a pre -construction meeting will be required in order to ensure that the recommendations included in this report are conveyed and performed in the manner in which they were intended. A representative of our office, the builder, the general engineer, the structural engineer and/or architect, and the governing jurisdiction should all be in attendance. A minimum of 72 hours notice will be required to coordinate scheduling. 3.1 Site Clearing- Prior learing Prior to site grading, all trees, surface weeds, expansive clays, and organics should be removed from the construction areas. The soil portion of this material can either be removed or stockpiled for later use in landscape areas. After' clearing has been completed, a representative of our office shall inspect the site to verify that all vegetation and loose debris have been removed prior to the commencement of construction. The extent of soil removal may vary depending upon the findings of this. subsequent inspection. Loose soils may be exposed after scarification requiring further removal. 3.2 Site Preparation Tree roots larger than one inch in diameter within five feet of the building pads or within driveways or roadways shall be removed, over excavated and replaced with properly compacted engineered fill. Any existing septic and water systems shall be removed, over excavated and replaced with properly compacted engineered fill. The finished pads may vary from the scarified depth. Building pads are to bear on a minimum of 24 inches of non - expansive, compacted soil. Fills shall be compacted in accordance with the procedures described in the following paragraphs. Prior to placement of engineered fill within the pad areas, all tree stumps and roots shall be removed and replaced with compacted engineered fill. The exposed sub -grades should be moisture conditioned and compacted to a minimum of 90% relative compaction, based on test method ASTM D1557. Engineered fill should be placed in 8" loose lifts, moisture conditioned and compacted to 90% relative compaction. The compacted thickness of each layer shall not exceed 6 inches. Compaction control and testing should be performed by a qualified testing agency to insure the recommendations of this report are followed. Depending on the amount of rock encountered in the on-site or import soils. We recommend \\Otto\C\Wodd2008\007-Clean Rite Soils\report.doc page 2 Clean-Rite/Build-Rite March 24, 2008 that compaction testing be performed using Sand Cone methods (per ASTM D1556), or Nuclear Density methods (per ASTM D2922). Prior to placement of engineered fill ,within roadways, all tree stumps and roots shall be removed and replaced with compacted engineered fill. The exposed sub -grades should be moisture conditioned and compacted to a minimum of 95% relative compaction, based on test method ASTM D1557. Engineered fill and road base should be placed in 8" loose lifts, moisture conditioned and compacted to 95% relative compaction. We also recommend that the road sub -grade be benched to facilitate compaction efforts and increase surface stability. The compacted thickness of each layer shall not exceed 6 inches. Compaction control and testing should be performed by a qualified testing agency to insure the recommendations of this report are followed. Depending on the amount of rock encountered in the on-site or import soils. We recommend that compaction testing be performed using Sand Cone methods (per ASTM D1556)., or Nuclear Density methods (per ASTM D2922). If imported off-site material is required to build the pads to finish grade, it must be approved by a representative from our office and meet the following minimum criteria. Import material must have a plasticity index of less than 4; be non -expansive (EI<20); have 100% passing the 3" sieve; 30% to 60% passing the #4 sieve; and no more than 20% passing the 4200 sieve. 3.3 Soil Expansion Potential .The surface and near surface soils encountered at the site were found to contain a certain amount of clay, which has potential for volumetric changes. An Expansion Index tests was performed per ASTM D 4829 on one sample, which in our judgment contained the most expansive potential clay (see Attachment 1). The test result indicated an E.I. 12, which is below the limit of 20 set forth in CBC 1802.3.2 and considered to be non -expansive. 3.4 Liquefaction Potential No soils were observed that would be prone to liquefaction in the subsurface excavation. If sands are discovered during site excavation, ATC shall be� notified of the presence of such soils. 3.5 In Place Relative Density In Place Relative Density tests were not performed on the surface soils. 3.6 Site Geology & Seismicity Butte County and the surrounding area are located on the western portion of a faulted and downwarped series of ancient metamorphic rocks of the Western Sierra Nevada Mountain Range. Granitic rocks associated with Mesozoic thrust faulting are located in the eastern portion of the County. In the western portion of the County, gently folded younger and sometimes faulted sediments of the Sacramento Valley overlie older metamorphic rocks similar to those of the Sierra Nevada. The stratigraphic and structural trend of metamorphic _ rocks is generally northward with steeply dipping bedding in most places. The basic site \\Otto\C\Work\2008\007-C1ean Rite Soils\report.doc page 3 Clean-Rite/Build-Fite March 24, 2008 geologic formation is a Pleistocene alluvium (Modesto Formation). The formations and geologic structure of the County appear to be controlled or strongly modified by Cenozoic faults extending along the western portion of the Sierra Nevada Mountains and trending north-northwest along with the Big Bend, Camel Peak; Dogwood Peak, Rich Bar, and Melones faults, most of which lie to the north and east of Butte County in the area of volcanic intrusions. The more recent seismic activity lies with the Cleveland Hills fault (1975-1976), Swain Ravine (Late Quaternary), Spenceville Fault Zone (Late Quaternary, possibly Holocene) and the Highway 49 Fault Zone (Late Quaternary). Most Sierra Nevada faults are a combination of strike slip and thrust movements. (Bailey, Geology of Northern California, California Division of Mines and Geology.) The site is not within an Alquist-Priolo Special Studies Zone, according to the State of California and the USGS. There are no faults running directly through the site, according to the book "Maps of Known Active Fault Near -Source Zones in California and Adjacent Portions of Nevada" prepared by California Geological Survey (formerly the California Department of Conservation Division of Mines and Geology) in cooperation with SEAOC. Earthquake related ground shaking should be expected during the life of structures constructed on this site. The California Geological Survey has defined an active fault as one that has had surface displacement in the last 11,000 years, or has experienced earthquakes in recorded history. Using the EQSEARCH computer program by Blake (2000), a 100 -mile radius search was performed of historic events, (with a minimum magnitude of 4.0), dating from the years 1800 to 2004. A total of 277 earthquakes were found with a maximum magnitude of 6.4; the earthquake closest to the site was about 4.7 miles (7.6 km) away and the largest site acceleration was about 0.171g, (computed using attenuation relationships from Boore et al. 1997, Sadigh et al. 1997,. Abrahamson & Silva 1997 and Campbell & Bozorgnia 1997). Based on the EQFAULT computer program by Blake (2000), the maximum deterministic peak ground acceleration (PGA) was computed to be 0.467g, (again computed using attenuation relationships from Boore et al. 1997, Sadigh et al. 1997, Abrahamson & Silva 1997 and Campbell & Bozorgnia 1997). Based on the California Geological Survey, the probabilistic peak ground acceleration (PGA) that has a 10% probability of exceedance in 50 years was computed to be 0.187g. Properly designed structures, using the current California Building Code requirements, should be constructed to reduce the damage from a strong ground shaking. Based upon our research the following ASCE 7-05 (2007 California Building Code) earthquake design criteria should be used by the Structural Engineer: \\Otto\C\Work\2008\007-Clean Rite Soils\report.doc Page 4 Clean-RiteBuild-Rite March 24, 2008 ASCE 7-05 Seismic Variables, (USGS based) Site Class: D Ss, Period 0.2 sec.: 0.610g S1, Period 1.0 sec.: 0.233g SMs = Fa x Ss: 0.800g SMI = Fv x S1: 0.450g SDs = 2/3 x SMs: 0.533g SD1 = 2/3 x SMI: 0.300g Seismic Coefficients: F,,=1.312, F,=1.935 3.7 Foundation Design Our field investigation and laboratory test results indicate that the existing native soils, at the proposed site, are adequate for support of lightweight residential construction and an agricultural storage facility. The buildings proposed for this site may be supported upon conventional spread footings and continuous perimeter footings. Based on results of our laboratory testing performed on samples of the predominant soil type encountered, foundations should be designed in accordance with the recommendations provided below. For this project, finish pad subgrade shall be defined as, "the surface on which the capillary break/moisture barrier materials are placed." Foundations bearing on native or fill materials may be sized for vertical compression loads utilizing maximum allowable soil pressures of 1,500 pounds per square foot (psf) for dead and live loads, and may be increased to 2,000 pounds for all loads including wind or seismic forces. Lateral sliding resistance may be computed using a friction coefficient of, µ = 0.35. Foundation designs accounting for lateral bearing may use a lateral bearing pressure of 250 pcf. Plasticity index testing, along with gradation analysis, were performed on several samples that are representative of the subsurface soil types encountered. The results of these tests are included in the attachments. Although the structural engineer should make the final determination of foundation reinforcement, we recommend as a minimum, that foundations contain a single #4 bar placed at the top and bottom of all foundations. It is further recommended, that foundation reinforcement should be consistent. 3.8 Slab -on -Grade Interior slab -on -grade floors should be underlain with a 4" layer of free -draining gravel. The gravel should be graded, such that, 100% passes the 1" sieve, and not more than 2% passes the 94 sieve. Over the gravel, should be a durable vapor barrier of visqueen, which is 10 ml. \\0tto\C\Work\2008\007-C1ean Rite Soils\report.doc page 5 Clean-Rite/Build-Rite March 24, 2008 or thicker, covered by 2" of moist, clean sand. These will both serve as capillary moisture deterrents, as well as, to promote uniform curing of the slab concrete. For slab -on -grades, we recommend that slabs be reinforced with reinforcing bars or welded wire fabric. This reinforcing will minimize cracking, if minor differential settlement occurs beneath the slab. It is important that the slab reinforcing be located in the middle of the. slab, and it be held in place during concrete placement. See section 3.3 for additional subgrade recommendations. Contraction joints should be installed at intervals not to exceed twenty feet in any one direction. Such joints may be formed by deep (3/4") wet grooving while the concrete is still plastic, or by the installation of Zip Strips. 3.9 Pavement Design We have been advised that pavement design would not be required within this report. However, we were requested to provide R -Value testing on a sample of material encountered within the proposed street sections. One sample was obtained for R -Value testing. The results of the R -value testing areas follows: Table 1.0 - R -Value Test Result Test Pit # Sample Depth Exudation Pressure (psi) R -Value TP4 18" 300 20 4.0 LIMITATIONS Our recommendations are based upon the information provided regarding the proposed construction, combined with our analysis of site conditions revealed by the field exploration and laboratory testing programs. We have used our best engineering judgment, based upon the information provided and the data generated from our investigation. Our test pits were dug in locations determined to be representative of the site. However, if the proposed construction is modified or re-sited, or if it is discovered during construction that subsurface conditions differ from those encountered at the boring locations, we should be afforded the opportunity to review the new information or changed conditions, to determine if our conclusions and recommendations must be modified. We do not claim that our _ recommendations are- suitable for discovery items or other site changes other than the conditions and testing specifically discussed in this report. Furthermore we cannot be held responsible for discovery items or other site changes. The investigation is intended to develop geotechnical recommendations from the soils and conditions revealed by the test pits and subsequent laboratory work. It is not intended that _ our investigation will un -earth or detect items or problems deliberately or inadvertently concealed by others. Ash pits, buried trees or other concealed items and their discovery are not the responsibility of ATC. Furthermore we cannot be held responsible for concealed items. \\0tto\C\Work\2008\007-C1ean Rite Soils\report.doc page 6 Clean-Rite/Build-Rite March 24, 2008 If there is a substantial lapse of time between the submission of our report and the start of construction at the site, or if the conditions have changed, due to natural causes or construction operations at, or adjacent to the site, we urge that this report be reviewed to determine the applicability of the conclusions and recommendations considering the changed conditions and time lapse. This report should not be used after 3 years. We would appreciate the opportunity' to review the final plans and specifications to determine if the intent of our recommendations has been implemented in those documents. Applied Testing Consultants is not the foundation design engineer for this project. Design for consolidation, differential settlement and bearing on fill materials are by others. We emphasize that Applied Testing Consultants does not represent that these test results and/or recommendations are suitable, whether or not modified, for any other site or development on. this site, other than the one for which they were specifically prepared. Applied Testing Consultants disclaims responsibility for these test results and/or recommendations if they are used whole or in part at any other site or type of development on this site. Applied Testing Consultants (ATC) 0001, Brad Fo ythe President & Director of Operations \\0tto\c\Work\2008\007-C1ean Rite Soils\report.doc Charles Roberts, PE, MS C-038692 Exp. 3/31/09 Staff Engineer page 7 Clean-Rite/Build-Rite March 24, 2008 Figures V15%, 01000 FEET 0 500 1000METM Pnnted Cmm TOPO! 02001 National Oeogmphic Ho!dirtp (w .lopoxorn) IQ 40. 4k v Se3 w 0 !P 44 4 lie, gp yy TP 3 TP 2 .4 4A 0 a Zt AO vi v v, T IF 0 Ot AvilAt- TP 4 Owl "MM"I'll 0A o 0 <D "F' V. In; 60 Ilk Ilk A, 4,91 V 4 Se -Qq 41 IV'fira p M1 it It 41 #v 4fo rure Fig I Test Pit Location Plan -44 1. VM' OW- f -q' IQ 40. 4k v Se3 w 0 !P 44 4 lie, gp yy TP 3 TP 2 .4 4A 0 a Zt AO vi v v, T IF 0 Ot AvilAt- TP 4 Owl "MM"I'll 0A o 0 <D "F' V. In; 60 Ilk Ilk A, 4,91 V 4 Se -Qq 41 IV'fira p M1 it It 41 f-- A TN 't MN 0 15%0 0 1000 FEET 0 Printed from TOPO! @92001 Natiorml Geq #v rure Fig I Test Pit Location Plan f-- A TN 't MN 0 15%0 0 1000 FEET 0 Printed from TOPO! @92001 Natiorml Geq UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS SYMBOLS CODE TYPICAL NAMES Grain Size = Drive Sample: no recovery GW `•"� Well graded gravels or gravel - sand mixtures, little or no fines = Final Water Level Above 305 COBBLES o � 0 O Poorly graded gravels or gravel - sand mixtures, little of no fines Cl)t� GRAVELSGp 6 (More than 11 of coarse GM 76.2 to 19.1 Silty gravels, gravel - sand - silt mixtures O z - fraction > No. 4 sieve size) A -:I N No. 4 to No. 200 4.76 to 0.074 coarse ( c) No. 4 to No. 10 y o medium (m) GC ' Clayey gravels, gravel -sand -clay mixtures No. 40 to No. 200 0.420 to 0.074 SILT & CLAY Below No. 200 Below 0.074 CD $W •' . Well graded sands or gravely sands, little or no fines W o SP Poorly graded sands of gravely sands, little or now fines r/� y N R: o d0 SANDS (More than 4 of coarse U fraction < No. 4 sieve size) SM Silty sands, sand - silt mixtures SC Clayey sands, sand -clay mixtures ML Inorganic silts and very fine sands, rock , silty or clayey fine sands or clayey silts with slight plasticity C o a zCL SILTS & CLAYS Inorganic clays of low to medium plasticity, gravely clays, sandy .-v,1 d LL < 50" clays, sil clays, lean clays OL Organic silts and organic silty clays of low plasticity pA.l „.N Z� o --i- MH I I I 1 I 1 1 I (I I Inorganic silts, micaceous of diatomaceous fine sandy or silty C7 SILTS &CLAYS 1 1 I 1 coils, elastic silts CH Inorganic clays of high plasticity, fat clays a, N o ww LL > 50 OH ♦ Organic clays of medium to high plasticity, organic silty clays, .organic silts HIGHLY ORGANIC SOILS PT—_ – Peat and other highly organic soils OTHER SYMBOLS – – – = Estimated or gradational material change line = Observed material change line Laboratory Tests PI = Plasticity Index EI = Expansion Index UCC = Unconfined Compression Test TR = Triaxial Compression Test GR = Gradation Analysis (Sieve) CON = Consolidation Test GRAIN SIZE CLASSIFICATION CLASSIFICATION = Drive Sample: 2-1/2" O.D. Below/ ft. Description California sampler Grain Size = Drive Sample: no recovery sieve size = Initial Water Level –V–f = Final Water Level – – – = Estimated or gradational material change line = Observed material change line Laboratory Tests PI = Plasticity Index EI = Expansion Index UCC = Unconfined Compression Test TR = Triaxial Compression Test GR = Gradation Analysis (Sieve) CON = Consolidation Test GRAIN SIZE CLASSIFICATION CLASSIFICATION RANGE OF GRAIN SIZE Below/ ft. Description U.S. Standard Grain Size " sieve size in Millimeters BOULDERS Above 12" Above 305 COBBLES 12" to 3" 305 to 76.2 GRAVEL ' 3" to No. 4 76.2 to 4.76 cwarse\.se (c) 3" to 3/4" 76.2 to 19.1 fine ( f) 3/4" to No. 4 19.1 to 4.76 SAND No. 4 to No. 200 4.76 to 0.074 coarse ( c) No. 4 to No. 10 4.76 to 2.00 medium (m) No. 10 to No. 40 2.00 to 0.420 fine ( f) No. 40 to No. 200 0.420 to 0.074 SILT & CLAY Below No. 200 Below 0.074 CONSISTENCY CLASSIFICATION COHESIVE SOILS GRANULAR SOILS Description Below/ ft. Description Below/ ft. Very Soft <3 Very Loose <5 Soft 3-5 Loose 5-15 Medium ( firm) 6-10 Medium Dense 1640 Stiff 11-20 Dense 41-65 Very Stiff 21-40 Very Dense > 65 Hard > 40 Figure 3 APPLIED TESTING CONSULTANTS 3060 Thorntree Drive, Suite #10 - Chico, CA 95973 - Telephone: (530) 891-6625 - Facsimile: (530) 891-4243 1100 1000 900 800 EARTHQUAKE EPICENTER MAP Clean Rite 700 600 500--% f ,l 400-- 300 200 LEGEND .� X M=4 i 100 0 M=5 ❑ M=6 M=7 0 Z1 0 O M=8 _100- -400 -300 -200 -100 0 100 200 300 400 500 600 Figure 4: Earthquake Epicenter Map Clean-Rite/Build-Rite March 24, 2008 Appendix A 1 2 3 H 4. w W A 5 6 7 8 9 Test Pit Log PROJECT: Clean Rite CLIENT: Dan Andreasen LOCATION: Chico, CA EQUIPMENT: JD 510 Clear Sprouting Annuals TEST PIT NUMBER: 1 DATE EXCAVATED: 2/28/08 TOTAL DEPTH: -6'-9" LOGGED BY: C. Roberts Attachment (1) A DDT T.71 TrQ'rTTT(_ !'nATCTTT T d ArTQ 3060 Thomtree Drive, Suite #10 - Chico, CA 95973 - Telephone: (530) 891-6625 - Facsimile: (530) 891-4243 2 3 H 4 W Q 5 6 7 8 9 Test Pit Log PROJECT: Clean Rite CLIENT: Dan Andreasen LOCATION: Chico, CA EQUIPMENT: JD 510 ° ° 0 Dark Brown Sandy Silt with ° 0. ° minimal vegitation ° °F— o Sample TP2-S 1 @ -3'-0" - GR, PI, ML -Sandy Silt 0° ° 0°° ° ° Roots 0 o° 0•° ° o Tan/Brown Sandy Silt Sample TP2-S2 @ -3'-6" TEST PIT NUMBER: 2 DATE EXCAVATED: 2/28/08 TOTAL DEPTH: -7'-6" LOGGED BY: B. Forsythe Sample TP2-S3 @ -6'-6" - Grading Terminated @ -7'-6" Attachment (2) APPLIED TESTING CONSULTANTS 3060 Thomtree Drive, Suite #10 - Chico, CA 95973 - Telephone: (530) 891-6625 - Facsimile: (530) 891-4243 Test Pit Log PROJECT: Clean Rite CLIENT: Dan Andreasen LOCATION: Chico, CA EQUIPMENT: JD 510 TEST PIT NUMBER: 3 DATE EXCAVATED: 2/28/08 TOTAL DEPTH: -7'-0" LOGGED BY: B. Forsythe 6 7 8 9 Attachment (3) APPLIED TESTING CONSULTANTS 1 2 3 H 4 a w Q 5 6 7 8 9 Test Pit Log PROJECT: Clean Rite CLIENT: Dan Andreasen LOCATION: Chico, CA EQUIPMENT: JD 510 TEST PIT NUMBER: 4 DATE EXCAVATED: 2/28/08 TOTAL DEPTH: -1'-6" LOGGED BY: B. Forsythe Attachment (4) APPLIED TESTING CONSULTANTS 3060 Thorntree Drive, Suite #10 - Chico, CA 95973 - Telephone: (530) 891-6625 - Facsimile: (530) 891-4243 Clean-Rite/Build-Rite March 24, 2008 Appendix B Sieve Analvsis - Combined Client: Dan Andreasen Address: 1200 W East Ave City, State, zip: Chico, CA 95926 Attn.: Dan Andreasen Project: Clean-Rite/Build-Rite. Sample source: Sampled by ATC Sample Description: ML -Sandy Silt Sample location: Test Pit 1, Sample 1 Sample depth: taken at minus V-0" Start Wt, Course: 2,797.1 g Start Wt. fine: 484.1 g Sample No: TPI -S1 Date: 11 -Mar -08 Tech: B. Carter Sieve Size Weight Retained Percent retained Cumulative Percent Specified Retained Passing 4 1/2 100.0% 4 100.0% 31/2 100.0% 3 0.0 100.0% 21/2 0.0 g 100.0% 2 0.0 g 100.0% 1 1/2 0.0 100.0% 1 O.O.g 100.0% 3/4 0.0 g 100.0% 1/2 23.8.g 0.9% 0.9% 99.1% 3/8 12.9 q 0.5% 1.3% 98.7% #4 29.2 g 1.0% 2.4% 97.6% #8 0.9 g 0.2% 2.5% 97.5% #16 1.5 g 0.3% 2.8% 97.2% #30 11.2 q 2.3% 5.1% 94.9% #50 41.5 g 8.4% 13.5% 86.5% #100 61.2 g 12.3% 25.8% 74.2% #200 66.5 g 13.4% 39.2%1 60.8% sand fraction SF 36.87% gravel fraction GF 2.36% SF/GF= 15.65 This test was performed according to Cal Trans Test 202 Sieve Analysis - Combined Sample No. TP1-S1 Client: Dan Andreasen Date: 11 -Mar -08 Address: 1200 W East Ave Tech: B. Carter City, state, zip: Chico, CA 95926 Attn.: Dan Andreasen Project: Clean-Rite/Build-Rite Sample source: Sampled by ATC Sample Description: ML -Sandy Silt Sample location: Test Pit 1, Sample 1 Sample depth: taken at minus 1'-0" D,o = n/a CU = n/a Dao = n/a Cc = n/a D60 GRADATION CURVE U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS E- 100.0% 90.0% 80.0% 3 70.0% �. 60.0% w 50.0% Z 40.0% 30.0% z 20.0% U W 10.0% LUa 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS Plasticity Index Project: Clean-Rite/Build-Rite Client: Dan Andreasen , Address 1200 W East Ave City, State, Zip: Chico, CA 95926 Attention: Dan Andreasen Source: Sampled by ATC Material Description: ML -Sandy Silt 3.27 Liquid Limit:, Trial Number: Tin Label: Wet Weight +,Tare: Dry Weight + Tare: Weight of Water: Weight of Tare: Weight of Dry Soil: Moisture Content: Number of Blows: Sample No: TP1-S1 Date: 13 -Mar -08 Technician: John D. 1 2 3 4 5 6 3 4 5 33.13 29.84 28.91 - 29 26.37 25.64 4.13 3.47 3.27 15.5 15.37 15.53 13.5 11 10.11 30.59% 31.55% 32.34% 31 24 19 Liquid Limit, LL Plastic Limit, PL 31 25 . Plastic Limit: Trial Number: Tin Label: Wet Weight +Tare: Dry Weight + Tare: Weight of Water: Weight of•Tare: Weight of dry soil: " e 3L.OV% c 32.00% 0 31.50% 0 u> 31.00% Plasticity Index, PI 6 Below A Line ' 1 2 3 4 5 6 4 5 21.57 20.37 20.32 19.35 1.25 1.02 15.35 15.31 4.97 4.04 25.15% 25.25% N 30.50% 0 E 30.00% 10 Liquid Limit number of blows 100 Y = -0:0016x + 0.4055 Sieve Anaivsis - Combined Client: Dan Andreasen Address: 1200/111 East Ave city; State, zip: Chico, CA 95926 Ann.: Dan Andreasen Project: Clean-Rite/Build-Rite Sample source: Sampled by ATC Sample Description: ML -Sand/ Silt . Sample location: Test Pit 2, Sample 1 Sample depth: taken at minus V-0" Start Wt, Course: 29,301.0 g Start Wt. fine: 500.8 g Sample No: TP2-S1 Date: 11 -Mar -08 Tech: John D. Sieve Size Weight Retained Percent retained Cumulative Percent Specified Retained Passing 41/2 100.0% 4 100.0% 31/2 100.0% 3 0.0 g 100.0% 21/2 0.0 g 100.0% 2 0.0 g 100.0% 1 1/2 0.0 q 100.0% 1 0.0 g 100.0% 3/4 0.0 g 100.0% 1/2 31.3 g 0.1% 0.1% 99.9% 3/8 18.1 g 0.1% 0.2% 99.8% #4 35.4 g 0.1% 0.3% 99.7% #8 2.4 g 0.5% 0.8% 99.2% #16 3.3 Q 0.7% 1.4% 98.6% #30 13.1 g 2.6% 4.0% 96.0% #50 43.3 g 8.6% 12.7% 87.3% #100 56.3 g 11.2% 23.9% 76.1% #200 58.1 g 11:6% 35.4% 64.6% sand fraction SF 35.14% gravel fraction GF 0.29% SF/GF= 121.43 This test was performed according to Cal Trans Test 202 Sieve Analysis - Combined Sample No: TP2-S1 Client: Dan Andreasen Date: 11 -Mar -08 Address: 1200 W East Ave Tech: John D. City, State, zip: Chico, CA 95926 Attn.: Dan Andreasen Project: Clean-Rite/Build-Rite Sample source: Sampled by ATC Sample Description: ML -Sandy Silt Sample location: Test Pit 2, Sample 1 Sample depth: taken at minus 1'-0" Dio = n/a CU = n/a Dso = n/a CC = n/a Dso = n/a GRADATION CURVE U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS H 100.0% 90.0% L 80.0% 70.0% } m 60.0% w 50.0% 7 LL 40.0% 30.0% z 20.0% U w 10.0% LUa 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS Plasticity Index Project: Clean-Rite/Build-Rite Client: Dan Andreasen Address 1200 W East Ave City, State, Zip: Chico, CA 95926 Attention: Dan Andreasen Source: Sampled by ATC Material Description: ML -Sandy Silt 4.1.5 Liquid Limit: Trial Number: Tin Label: Wet Weight + Tare: Dry Weight + Tare: Weight of Water: Weight of Tare: . Weight of Dry Soil: Moisture Content: Number of Blows: Sample No: TP2-S1 Date: 13 -Mar -08 Technician: John D. 1 21 3 4 5 6 8 9' 10 28.885 '27-.76 30.85 25.41 24.56 26.7 3.48 3.20 4.1.5 15.39 15.55 15.09 10.02 9.01 11.61 34.68% 35.52% 35.75% 30 25 20 Liquid Limit, LL IPlastic Limit, PL 35 26 Plastic Limit: Trial Number: Tin Label: Wet Weight + Tare: Dry Weight + Tare: Weight of Water: Weight of Tare: Weight of dry soil: Plasticity Index, PI .. 9 -Bellow A Line � ... �■mss Sieve Analvsis - Combined client:. Dan Andreasen Address: 1200 W East Ave City, State, zip: Chico, CA 95926 Attn.: Dan Andreasen Project: Clean-Rite/Build-Rite Sample source: Sampled by ATC Sample Description: 100.0% Sample location: Test Pit 2, Sample 3 Sample depth: taken at minus 6-6" 100.0% 23,769.0 g 0.0 g Start Wt, Course: Start Wt. fine: ' 496.6 g 21/2 Sample No: TP2-S3 Date: 11 -Mar -08 Tech: B. Carter Sieve Size Weight Retained Percent retained Cumulative Percent Specified Retained 'Passing 41/2 100.0% 4 100.0% 31/2 100.0% 3 0.0 g 100.0% 21/2 0.06 100.0% 2 0.0 g 100.0% 1 112 0.0 q 100.0% 1 0.0 g 100.0% 3/4 0.0 g 100.0% 1/2 0.0 g 100.0% 3/8 24.5 0.1% 0.1% 99.9% #4 9.8 g 0.0% 0.1% 99.9% #8 1.2 0.2% 0.4% 99.6% #16 4.8 g 1.0% 1.4% 98.6% ##30 16.4 q 3.3% 4.6% 95.4% #50 56.1 g 11.3% 15.9% 84.1% #100 71.2 14.3% 30.2% 69.8% #200 100.5 g 20.2% 50.5% 49.5% sand fraction SF 50.31% gravel fraction GF 0.14% S F/G F= 348.63 This test was performed according to Cal Trans Test 202 Sieve Analysis - Combined Sample No: TP2-S3 Client: Dan Andreasen Date: 11 -Mar -08 Address: 1200 W East Ave Tech: B. Carter City, State, zip: Chico, CA 95926 Attn.: Dan Andreasen Project: Clean-Rite/Build-Rite Sample source: Sampled by ATC Sample Description: 0 Sample location: Test Pit 2, Sample 3 Sample depth: taken at minus 6'-6" Dio = n/a CU D30 = n/a CC = n/a D60'=1 n/a GRADATION CURVE U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS H 100.0% 90.0% 80.0% w 70.0% �. 60.0% W 50.0% LL 40.0% 30.0% z 20.0% V 10.0% w a 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS Plasticity Index Project: Clean-Rite/Build-Rite Sample No: TP3,-S1 Client: Dan Andreasen Date: 13 -Mar -08 Address 1200 W East Ave Technician: John D. City, State, Zip: Chico, CA 95926 Attention: Dan Andreasen Source: Sampled by ATC Material Description: 0 Liquid Limit: Trial Number: Tin Label: Wet Weight + Tare: Dry Weight + Tare: Weight of Water: Weight of Tare: Weight of Dry Soil: Moisture Content: Number of Blows: 1 2 3 4 5 6 13 14- 15 31.371 31.819 30.274 27.22 27.49 26.25 4.15 4.33 4.02 15.172 15.2 15.338 12.048 12.29 10.912 34.45% 35.22% 36.88% 311 241 19 Liquid Limit, LL Plastic Limit, PL Plasticity Index, PI 35 1 17 19 Above A Lline Plastic Limit: Trial Number: Tin Label: Wet Weight + Tare: Dry Weight + Tare: Weight of Water: Weight of Tare: Weight of dry soil 10 100 number of blows ", y = -0.0016x + 0.4055 Expansion Index Test Sample No: TP3-S1 . Client: Dan Andreasen Project: Clean-Rite/Build-Rite contact: Dari Andreasen Soil description: 0 Sample location: Test Pit 3, Sample 1 Sample taken by: Sampled by ATC Depth of sample: taken at minus V-6" Moisture determination Gross wet wt: 355.0 Gross dry wt: 319.2 Pan wt: 79.1 Net dry wt: 240.1 Moisture Loss: 35.8 Moisture content: 0.0085 Density determination 0.0120 Wt of soil & ring: 555.0 Tare of ring: 200.1 Net compacted soil wt: 354.9 Dry Density, pcf: 93.7 Saturation determination Volume of solids: 0.555 Volume of water: 0.224 Volume of air: 0.221 Degree of saturation: 50.3% Gross final wet wt: 388.9 Gross final dry wt: 379.8 Final moisture loss: 91.2 Final net dry wt: 300.7 Final moisture content: 30.3% This test was performed per ASTM D-4829-88 Start 2 4 r 3/22/08 E E c 1( 11 12 1< 1� 1: 1( 1i 1f 1S 2( Final Date: 21-Mar=08 Tech: B. Carter Time Reading 10:00:00 AM 0.0000 11:00:00 AM 0.0031 1:00:00 PM 0.0061 2:00:00 PM 0.0075 3:00:00 PM 0.0085 8:00:00 AM 0.0120 9:00:00 AM 0.0120 10:00:00 AM 0.0120 10:00 0.0120 Expansion Index: 12 SIEVE ANALYSIS Sieve Size M Materials Testing, Inca . 2-1/2" 2" T 17' 3/4" 1/2" Road 865 Lotting Lane, Suite A As Received ---. 78798ort California 96002 Vacaville, California 95688 21.7 212. -1116, fax 222-1611 (707) 4474025, fax 4474143 3 Client: Applied Testing Consultants JChent No: 0800=004. 11 3060.Th6mtree Drive, Suite 10 Report No:0300-005 Chico, CA' 95973 Date: 03/11/08 Project: Clean Rite Building Submitted by: Client Submitted Date!.. 03/06/08 --- "R" VALUE TEST RESULTS (CTM -301) Sample: 1 . Description:. , Brown Clayey Sand Location: --- TP14 SIEVE ANALYSIS Sieve Size 3" 2-1/2" 2" 1-1/2" 17' 3/4" 1/2" 3/8" #4 As Received ---. 2 102.8 21.7 212. 0 0 15 3 --- Pass)... 130 0 0 11 As Used --- Pass). RESISTANCE VALUE Specimen Number Dry Unit Weight, PCF Moisture. N. Exudation. Pressure (PSI) Expansion. - Pressure DW Readin & PSF R -Value 1 107.4 19.5 314 0 0 20. 2 102.8 21.7 212. 0 0 15 3 101.0 23.1 130 0 0 11 R -Value @ 300 PSI Exudation Pressure = 20 R -Value @.Expansion. Construction Materials Testing and Quality Control Services f Soil - Concrete - Asphalt - Steel - Masonry