Loading...
HomeMy WebLinkAbout000-000-015r 1 NEW HOUSING UNITS Butte County Jail 33 County,"Center Drive Oroville. California �F 1 Reference Documents for. FOUNDATION PERMIT PACKAGE Civil Specifications Geotechnical Report July;26, 1993 '�, - -- -.. r- - --•�. .. �... ...�.� rs rte.... - :-..-.a.- � :...,.tx�,.wry?t'.a�.-s*"^as.e,.�_.�ti�st.++.., -.x.- .�.r, ....,e•dr r, 1 I 9 ' NEW HOUSING UNITS FOR BUTTE COUNTY JAIL TABLE OF CONTENTS ' FOR TECHNICAL SPECIFICATIONS ' PAGES INCLUSIVE DIVISION 2 - SITE WORE: ' Section 02010 Subsurface Conditions 02010-1 - 02010-1 Geotechnical Investigation Report Section 02117 Clearing and Grubbing 02117-1 - 02117-1 ' Section 02210 Site Grading 02210-1 - 02210-1 Section 02221 Trenching, Backfilling & Compacting 02221-1 - 02221-5 ' :Section Section 02232 02280 Roadway Base Weed and Termite Control 02232-1 02280-1 - 02232-1 - 02280-1 Section 02513 Asphaltic Concrete Paving 02513-1 - 02513-1 Section 02721 Storm Sewerage Systems 02721-1 - 0227221-3 Section 02722 Sanitary Sewerage Systems 02772-1 - 02772-•S ' Section 02830 Chain Link: Fencing u Gates 02830-1 - 02830-2 1 I 9 I 9 SECTION 02010 SUBSURFACE CONDITIONS PART 1 - GENERAL 1. DESCRIPTION A. A geotechnical investigation report, dated November 19, 1992 was prepared by Kleinfelder, Inc., hereinafter referred to as the Soils Engineer. A copy of this report may be inspected at the following locations: B. Although this report was obtained for -the Owner's use in design and is not a part of the Contract Documents, the report and log of borings is herein made available for the Contractor's use and information. The report is not a warrant of subsurface conditions but a guide to the general conditions that may, in the opinion of the Soils Engineer, reasonably be expected. The Contractor is to form his own conclusions regarding the nature of the soils which may be encountered during construction and difficulties he may encounter to complete all work within the scope of the project. C. The Owner assumes no responsibility in respect to the sufficiency or raccuracy of the investigation, and there is no warranty or guarantee, either expressed or implied, that the conditions indicated are uniformly correct or that unforeseen conditions may not be uncovered. 2. ADDITIONAL INFORMATION A. The Contractor should visit the site and acquaint himself with all ` existing conditions. Prior to bidding, bidders may make their own subsurface investigation, but any site visits or subsurface investigations shall be performed only under time schedules and arrangements approved in advance by the Owner. 3. QUALITY ASSURANCE A. The Soils Engineer may be retained by the Owner to perform observation and testing services of work in connection with excavation, filling, and grading. All grading work that does not meet the Soils Engineer's requirements must be removed and reworked to meet the requirements. However, the Contractor should not deviate from the Contract Documents without specific and written approval from the Owner. B. All import material must be approved by the Soils Engineer prior to being brought to the site. The Contractor must notify the Soils - Engineer ten (10) working days in advance of proposed start of grading. ' C. Notify the Soils Engineer 48 hours in advance of start of operations. 1 02010 - n �KL KLEINFELDER 1 . GEOTECHNICAL INVESTIGATION REPORT PROPOSED HOUSING UNITS BUTTE COUNTY JAIL OROVILLE, CALIFORNIA RECEM N 0 V 2 5 1992 Iffim & LM 1 . This document was prepared for use only by the client, only for the purposes stated, and within a reasonable time .'� from issuance. Non-commercial, educational, and scientific use of this report by regulatory agencies is regarded as a "fair use" and not a violation of copyright. Regulatory agencies may make additional copies of this document for internal use. Copies may also be made available to the public as required by law. The reprint must. acknowledge the copyright and indicate that permission to reprint has been received. Copyright 1992 Meinfelder, Inc. All Rights Reserved. 1 k14 KLEINFELDER November 19, 1992 Count of Butte c/o Kitchell CEM 501 J Street, Suite 630 Sacramento, CA 95814 Attention: Mr. Ron Duek Subject: GEOTECHNICAL INVESTIGATION REPORT PROPOSED HOUSING UNITS BUTTE COUNTY JAIL OROVILLE, CALIFORNIA Dear Mr. Duek: Kleinfelder is pleased to present the attached geotechnical investigation report for two proposed housing units to be constructed within the existing Butte County Jail facility located in Oroville, California. 'The purpose of our investigation was to explore and evaluate the subsurface conditions at various locations on the site in order to develop geotechnical engineering recommendations for project design and construction. Based on the results of our field investigation and laboratory testing programs, it is our professional opinion the site may be developed for the proposed housing units using conventional grading and foundation construction techniques. However, due to the presence of expansive soils within portions of the site and loose, potentially compressible surficial soils (located primarily within an existing, on-site drainage swale), modifications in the approach to site grading will be required during site development. Specific- recommendations regarding these existing soil conditions as well as general recommendations regarding the geotechnical aspects of project design and construction are presented in the following report. 1 Recommendationsrovided herein are contingent on the provisions outlined in the ADDITIONAL SERVICES and LIMITATIONS sections of this report. The project Owner should become familiar with these provisions in order to assess further involvement by Kleinfelder and other potential impacts to the proposed project. We appreciate the opportunity of providing our services for this project.. If you have questions regarding this report or if we may be of further assistance, please contact the undersigned. cc: Client (6) ' R2189/23-4452-01 COW ht 1992 Kleinfelder, Inc. KLEp COW 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 1 Very truly yours, KL ELDER, INC �J ian�dall D. Harris, P.E. Staff En ine ' A R. eith Bro n, P.E. Senior Engineer �. RDH:RKB:mh cc: Client (6) ' R2189/23-4452-01 COW ht 1992 Kleinfelder, Inc. KLEp COW 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 1 TABLE OF CONTENTS M KLEINFELDER Page Number INTRODUCTION.................................................................................................... 1 ProposedConstruction.............................................................................................1 PreviousInvestigation................................................................................................ 2 Purpose and Scope of Services................................................................................ 2 SITECONDITIONS........................................................................................ Surface..........................................................................:.............................................. 4 Subsurface................................................................................................................... 4 CONCLUSIONS AND RECOMMENDATIONS .............................................. 5 General..............:........................:........................................:...................................... 5 ExpansiveSoils.................................................:........................................................ 5 Loose, Surficial Soils................................................................................................. 6 SitePreparation......................................................................................................... 6 Subdrain Within Existing Drainage Swale............................................................ 8 TemporaryExcavations............................................................................................ 9 EngineeredFill........................................................................................................10 TrenchBackfill....................................................................... - 1 PermanentSlopes....................................................................................................13 SpreadFoundations...............................................................................................14 RetainingWalls.......................................................................................................15 Interior Concrete Slabs Supported-On-Grade....................................................17 Exterior Concrete Slabs Supported-On-Grade..................................................18 Pavements.................................................................................................................18 ADDITIONAL SERVICES.................................................................................. 21 ProjectBid Documents........................................................................................... 21 Plans and Specifications Review........................................................................... 21 Construction Observation and Testing................................................................21 rw� TABLE OF CONTENTS KLEINFELDER Page Number Additional Copies of Report................................................................................. 22 LINHTATI O N S........................................................................................................ 23 APPENDIXA........................................................................................................ A-1 FIELD INVESTIGATION AND LABORATORY TESTING ..................A-1 FieldInvestigation.................................................................................................A-1 LaboratoryTesting,.............................................................................................. A-2 Listof Attachments...............................................................................................A-3 M -It k`■ KLEINFELDER GEOTECHNICAL INVESTIGATION REPORT PROPOSED HOUSING UNITS BUTTE COUNTY JAIL OROVILLE, CALIFORNIA INTRODUCTION In this report we present the results of our geotechnical investigation for two proposed housing units to be constructed within the existing Butte County Jail facility located in Oroville, California. The site location relative to existing streets and topographic features is shown on Plate 1. This report includes our recommendations related to the geotechnical aspects of project design and construction. Conclusions and recommendations presented in this report are based on the subsurface conditions encountered at the locations of our explorations and ' the provisions and requirements outlined in the ADDITIONAL SERVICES and LIMITATIONS sections of this report. Recommendations presented herein should not be extrapolated to other areas or used for other projects without our prior review. i PROPOSED CONSTRUCTION The proposed project will involve construction of two, single -story, concrete tilt -up or masonry block buildings with concrete slab -on -grade floors. Each proposed building will encompass approximately 26,500 square feet in plan area. Maximum anticipated wall and column loads will be about 5 kips per lineal foot and 60 kips, respectively. Appurtenant construction will include asphalt concrete pavements and underground utilities. Grading plans were not available at the time this report was prepared; however, as site topography is moderately sloping, earthwork cuts and fills of about 5 to 7 feet in vertical extent are expected to achieve level building pads (at or near Elevation 250 feet) and provide vehicular access and positive surface drainage. -Excavations.—for undergo d� trutilities_arenot anticipated to^exceed 3 to 5 feet.below existing site grade., A plot plan indicating the proposed building layout is shown on Plate 2. R2189/23-4452-01 Page 1 of 23 November 19,1992 Copyright 1992 Kleinfelder, Inc. hn KLEINFELDER I PREVIOUS INVESTIGATION Kleinfelder previously -performed a geotechnical investigation for an adjoining site. The purpose of that investigation was to explore and evaluate site subsurface conditions in order to develop geotechnical engineering recommendations for project design and construction. The scope of that study included subsurface explorations involving 4 test pits to a maximum depth of 9 feet below then -existing grade, laboratory testing, and engineering analyses. Results of this previous investigation are presented in a report entitled "GEOTECHNICAL ENGINEERING REPORT, BUTTE COUNTY DETENTION FACILITY, MINIMUM SECURITY DORMITORY, OROVILLE, CALIFORNIA," dated July 11, 1984 (Kleinfelder File No. A-2484-1). PURPOSE AND SCOPE OF SERVICES The purpose of our investigation was to explore and evaluate the subsurface conditions at various locations on the site in order to develop recommendations related to the geotechnical aspects of project design and construction. The scope of our services was outlined in our proposal dated July 16, 1992, and included the following: o A review of available subsurface information contained in our files pertinent to the proposed construction and project site. o Exploration of the subsurface conditions at various locations within the area of the proposed construction utilizing 5 exploratory test pits. o Limited laboratory testing of representative samples obtained during the field investigation to evaluate relevant engineering parameters of the subsurface soils. o Engineering analyses on which to base our recommendations for the design and construction of the geotechnical aspects of the project. o Preparation of this report which includes: • A description of the proposed project; • A description of the surface and subsurface site conditions encountered during our field investigation; • Recommendations related to the geotechnical aspects of: - Site preparation and engineered fill; R2189/23-4452-01 Page 2 of 23 November 19, 1992 Copyright 1992 Kleinfelder, Inc. 1 kn KLEINFELDER - r 82189/23-4452-U1 Copyright 1992 Meinfelder, Inc. . Page 3 of 23 November 19, 1992 Temporary excavations, and trench backfill; P rY - Permanent slopes and erosion protection; - Foundation design and construction; - Earth retaining walls; - Concrete slabs supported -on -grade; Asphalt concrete pavements; and • An appendix which includes a summary of our field investigation and laboratory testing programs. r 82189/23-4452-U1 Copyright 1992 Meinfelder, Inc. . Page 3 of 23 November 19, 1992 0 k'q KLEINFELDER I SITE CONDITIONS SURFACE The site consists of a rectangular -shaped parcel located immediately west of the existing Butte County Jail at 33 County Center Drive in Oroville, California. The site is bounded by an earthen mound (part of an existing gun range) and an equipment storage yard to the north, the existing jail to the east, and undeveloped property to the south and west. Currently, the site is essentially undeveloped. However, buried water and sewer lines and an overhead power line cross the site in a north -south direction. Additionally, a drainage swale crosses the site from the south down to the north; an access road crosses this swale near the middle of the site utilizing a culvert and earth fill. Existing site vegetation consists , of low -to -high grasses and sparse trees. Site topography slopes gently -to -moderately downward towards the north. SUBSURFACE ' Near -surface soils encountered in our test pits consisted predominantly of very -loose -to - medium -dense sandy silt and very -soft -to -hard silty and sandy clay to depths of about 3-1/2 feet below existing site grade. Below these near -surface soils, medium -dense -to -very- , dense, weakly -to -strongly cemented sandy silt and gravelly sand were encountered to the maximum depth explored (6-1/2 feet below existing site grade). At the time of our field investigation, no free groundwater was encountered in any of our test pits. It should be noted that groundwater conditions within the area may vary depending on rainfall, irrigation practices, and/or runoff conditions not apparent at the time of our field investigation. A discussion of the field investigation and laboratory testing programs is presented in Appendix A of this report. Detailed descriptions of the subsurface conditions encountered during our field investigation are presented on the Logs of Test Pits, Plates A-3 through A-7 of the appendix. R2189/23-4452-01 Page 4 of 23 November 19,1992 , Copyright 1992 Meinfelder, Inc. CONCLUSIONS AND RECOMMENDATIONS GENERAL k`i KLEINFELDER Based on the results of our field investigation and laboratory testing programs, it is our professional opinion the site may be developed for the proposed housing units using conventional grading and foundation construction techniques. However, due to the presence of expansive soils within portions of the site and loose, potentially compressible surficial soils (located primarily within an existing, on-site drainage swale), modifications in the approach to site grading will be required during site development. Specific recommendations regarding these existing soil conditions as well as general recommendations regarding the geotechnical aspects of project design and construction are presented below. EXPANSIVE SOILS Based on the results of our field investigation And laboratory testing programs, near - surface, mottled light yellow-brown, brown, dark brown, yellow and/or red clay soils encountered within Test Pits TP -1, TP -2, and TP -4 are moderately -to -highly expansive. Expansive soils are characterized by their ability to undergo significant volume change (shrink or swell) due to variations in moisture content. Changes in soil moisture content can result from rainfall, landscape irrigation, utility leakage, roof drainage,, perched groundwater, drought, or other factors and may cause unacceptable settlement or heave of structures, concrete slabs supported -on -grade, or pavements supported over these materials. The lateral and vertical extent of potentially expansive soils within specific areas of the site could not be evaluated with the available data. Therefore, we recommend a representative from Kleinfelder be present during site grading to evaluate proposed building and pavement areas for the presence of near -surface, expansive soils. In the event expansive soils are encountered (or suspected) within 24 inches of finished subgrade, we recommend these materials be excavated (to a depth of at least 24 inches below finished subgrade) and replaced with non -expansive soil, placed and compacted in accordance with recommendations provided below for engineered fill. Excavated, expansive soil should either be: (1) disposed of off-site; (2) placed in landscape areas of the project; or (3) placed within the lower -portion (i.e. at least 24 inches below finished subgrade) of deep fills. R2189/23-4452-01 " Page 5 of 23 November 19,1992 Copyright 1992 Kleinfelder, Inc. hn KLEINFELDER I LOOSE, SURFICIAL SOILS Based on the results of our field investigation, loose, surficial soils are present within the existing, on-site drainage swale (which traverses the site in a north/south direction) to depths of approximately 2 feet below existing site grade. In our opinion, these materials are potentially compressible and could result in excessive settlement of structural improvements (including an engineered fill) located over this area. Therefore, we recommend all loose, surficial soils associated with the existing drainage swale and located within the area of proposed development be completely removed and replaced with engineered fill. Based on available information, we estimate the average depth of removal required to remove existing loose soils will be on the order of 2 feet below existing site grade; actual depths will vary and should be field verified by our representative during site grading. Excavated soils may be reused as engineered fill provided any debris exceeding 3 inches in maximum dimension and all organic or deleterious material are removed and disposed of off-site or outside the construction limits. Preparation of the subgrade exposed by overexcavation and requirements for engineered fill should be in accordance with recommendations provided below (see sections entitled "SITE PREPARATION" and "ENGINEERED FILL'). SITE PREPARATION Stripping and Grubbing Prior to general site grading, existing vegetation, organic topsoil, and any debris should be stripped and disposed. of outside the construction limits. We estimate the depth of stripping to be approximately *1 to 3 inches over a majority of the site. Deeper stripping or grubbing may be required where concentrations of organic soils or tree roots are encountered during site grading. Stripped topsoil (less any debris) may be stockpiled and reused for landscape purposes; howevei, this material should not be incorporated into any engineered fill. Existing Utilities, Wells, and/or Foundations Abandoned utility lines, septic tanks, cesspools, wells, and/or foundations (if any) encountered within the area of construction should be removed and disposed of off-site; existing wells should be abandoned in accordance with applicable regulatory requirements. Existing utility pipelines which extend beyond the limits of the proposed construction and R2189/23-4452-01 Page 6 of 23 November 19,1992 Copyright 1992 Kleinfelder, Inc. t h� KLEINFELDER will be abandoned in-place should be plugged with cement grout to prevent migration of soil and/or water. All excavations resulting from removal activities should be cleaned of loose or disturbed material (including all previously -placed backfill) and dish -shaped (with sides sloped 3(h):1(v) or flatter) to permit access for compaction equipment. Exploratory Test Pit Backfill Loosely -placed backfill associated with exploratory test pits performed for this study and which are located in areas of future structures, concrete slabs supported -on -grade, or pavements should be completely removed and replaced with engineered fill (up to finished subgrade). The approximate location of exploratory test pits performed for this study are shown on Plate 2. Recommendations for engineered fill are provided below (see section entitled "ENGINEERED FILL"). Loose, Surficial Soils Within Existing Drainage Swale We recommend all loose, surficial soils associated with the existing drainage swale and located within the area of proposed development be completely removed and replaced with engineered fill. Based on available information, we estimate the average depth of removal required to remove existing loose soils will be on the order of 2 feet below existing site grade; actual depths will vary and should be field verified by our representative during site grading. Excavated soils may be reused as engineered fill provided any debris exceeding 3 inches in maximum dimension and all organic or deleterious material are removed and disposed of off-site or outside the. construction limits. Preparation of the subgrade exposed by overexcavation and requirements for engineered fill should be in accordance with recommendations provided below (see sections entitled "Scarification and Compaction" and "ENGINEERED FILL"). Scarification and Compaction Following site stripping and any required grubbing and/or overexcavation (including those for removal of test pit fill and/or loose, surficial soils within the existing, on-site drainage swale), we recommend all areas to receive engineered fill or. to be used for the future support of structures or concrete slabs supported -on -grade be scarified to a depth .of 8 inches, uniformly moisture -conditioned to between 0 and 5 percent above the optimum moisture content, and compacted to at least 90 percent of the maximum dry density as R2189/23-4452-01 Copyright 1992 Kleinfelder, Inc. Page 7 of 23 November 19,1992 M51% L: h4 KLEINFELDER determined by ASTM (American Society for Testing and Materials) Test Method D 1557*; within pavement areas the scarified subgrade should be compacted to at least 95 percent relative compaction. Scarification and compaction may not be required within earthwork cut areas consisting of cemented soils and if approved by the project Geotechnical Engineer during construction. IMPORTANT NOTE: In-place scarification and compaction may not be adequate to density all disturbed soil within areas grubbed or otherwise disturbed below a depth of about 8 inches. Therefore, overexcavation of disturbed soil, scarification and compaction of the exposed subgrade, and replacement with engineered fill may be required to sufficiently density all disturbed soil. WARNING: Should site grading be performed during or subsequent to wet weather, near - surface ' site soils may be significantly above optimum moisture content. Perched groundwater may also develop above dense, cemented on-site soils, saturating near -surface materials. These conditions could hamper equipment maneuverability and efforts to compact site soils to the recommended compaction criteria. Disking to aerate, chemical treatment, replacement with drier material, stabilization with a geotextile fabric or grid, or other methods may be required to reduce excessive soil moisture and/or facilitate earthwork operations. SUBDRAIN WITHIN EXISTING DRAINAGE SWALE Prior to placing fill within the existing, on-site drainage swale, it may be necessary to install a subdrain along the bottom of the swale. Plate 3 presents a typical subdrain detail. In general, a subdrain should be installed if significant subsurface seepage or surface infiltration is anticipated to collect within the swale and if this water could adversely impact the proposed development. We recommend subdrain requirements (including location, lateral extent, and outlet conditions) be evaluated by the project Geotechnical and Civil Engineers based on the conditions encountered after removal of loose, surficial soils and after review of planned finished grades (which were not available at the time this report was prepared). *This test procedure should be used wherever relative compaction, maximum dry density, or optimum moisture content is referenced within this report. R2189/23-4452-01 Page 8 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. h'9 KLEINFELDER TEMPORARY EXCAVATIONS General All excavations, must comply with applicable local, state, and federal safety regulations including the current OSHA Excavation and Trench Safety Standards. Construction site safety generally is the sole responsibility of the Contractor, who shall also be solely responsible for the means, methods, and sequencing of construction operations. We are providing the information below solely as a service to our client. Under no circumstances should the information provided be interpreted to mean that Kleinfelder is assuming ' responsibility for construction site safety or the Contractor's activities; such responsibility is not being implied and should not be inferred. Excavations and Slopes The Contractor should be aware that slope height, slope inclination, or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state, and/or federal safety regulations (e.g., OSHA Health and Safety Standards for ' Excavations, 29 CFR Part 1926, or successor regulations). Such regulations are strictly enforced and, if they are not followed, the Owner, Contractor, and/or earthwork and utility subcontractors could be liable for substantial penalties. Near -surface soils encountered during our field investigation consisted predominately of sandy silt, silty and sandy clay, and gravelly sand. -In our opinion these soils would be considered a Type B soil when applying the OSHA regulations. For this soil type OSHA recommends a maximum slope inclination of 1(h):1(v) or flatter for excavations 20 feet or less in depth. Steeper cut slopes may be utilized for excavations less than 5 feet deep depending on the strength, moisture content, and homogeneity of the soils as observed in the field. IMPORTANT NOTE: Flatter slopes and/or trench shields may be required if loose, cohesionless soils and/or water are encountered along the slope face. Construction Considerations Heavy construction equipment, building materials, excavated soil, and vehicular traffic should not be allowed within 1/3 the slope height from the top of any excavation. Where the stability of adjoining buildings, walls, or other structures is endangered- by excavation R2189/b-4452-01 Page 9 of 23 November 19, 1992 Copyright 1992 Kleinfelder, Inc. h4 KLEINFELDER operations, support systems such as shoring, bracing, or underpinning may be required to provide structural stability and to protect personnel working within the excavation. Shoring, bracing, or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of California. During wet weather, earthen berms or other methods should be used to prevent runoff water from entering all excavations. All runoff water should be collected and disposed of outside the construction limits. Anticipated Excavation Conditions Based on the excavation conditions encountered within our test pits, we anticipate on-site soils should be excavatable to depths of approximately 5 feet below existing site grade using conventional earthwork and trenching equipment. Trench excavations which extend into strongly -cemented soils (encountered in Test Pit TP -2) are anticipated to be difficult and may require a track -mounted excavator (such as a Caterpillar 225) equipped with a ripper tooth or hydro -hammer. ENGINEERED FILL Materials All engineered fill soils should be nearly -free of organic or other deleterious debris, essentially non -plastic, and less than 3 inches in maximum dimension. In general, well - graded mixtures of gravel, sand, non -plastic silt, and small quantities of clay are acceptable for use as engineered fill. Specific requirements for engineered fill, as well as applicable test procedures to verify material suitability, are provided below. 82189/234452-01 Page 10 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. hn K.LEINFELDER ' Test Procedures Gradation Percent ' Sieve Size ` Passing ASTMI Caltrans2 UBC3 AASHTO4 3 inch 100 C 136 202' --- T 88 3/4 inch 70-100 C 136 202 _ --- ' No. 4 50-100 C 136 202 _ T 88 No. 40 - 30-100 C 136 --- --- T 88 No. 50 30-100 --- 202 No. 200 15.-70 1 C 136 202 --- . T88 Plasticity ' Liquid Plasticity Lima Index < 30 < 12 D 4318 204 --- T 89, T 90 Organic` Content Less than 3% D 2974 --- ---. T 267 Expansion Potential ' Less than 20% --- --- 29-2 --- Maximum Dly Density More than 105 pcf D 1557 --- --- T 180. ' We anticipate . some -to -most of the on-site soils (depending on depth of excavation) will meet the requirements indicated, above and may be used in engineered fills. However, on. site, mottled light yellow-brown, brown, dark brown, yellow, and/or red clay soils (encountered in Test Pits TP -1, TP- 2, and TP -4) are considered expansive and should not be used in any engineered fill located within; 24 inches of finished subgrade. We recommend a representative from Kleinfelder be present during site grading to evaluate the suitability of excavated soil for use as engineered fill. All imported fill materials to be ' used for engineered fill should be sampled and tested by Kleinfelder prior to being transported to the site. I American Society for Testing and Materials Standards (latest edition) 2 State of California, Department of Transportation, Standard Test Methods (latest edition) 3 Uniform Building Code (latest edition) 4 American Association of State Highway and Transportation Officials, Standard Specifications for Transportation Materials and Methods of Sampling and Testing (latest edition) 'R2189/B4452-01 Page it of 23 November, 19,1992 Copyright 1992 Meinfelder, Inc. h'q KLEINFELDER Compaction Criteria Soils used for engineered fill should be uniformly moisture -conditioned to between 0 and 5 percent above the optimum moisture content, placed in horizontal lifts less than 8 inches in loose thickness, and compacted to at least 90 percent relative compaction. Fills exceeding 5 feet in thickness should be compacted to at least 93 percent relative compaction for their full depth. Fill placed within nonstructural areas of the project (e.g., areas that will not support structures, concrete slabs supported -on -grade, pavements, or other improvements) may be compacted to a minimum relative compaction of 85 percent. IMPORTANT NOTE: At the time of our field investigation, near -surface soils appeared to be significantly above optimum moisture content. This condition could hamper equipment maneuverability and efforts to compact site soils to the recommended compaction criteria. Disking to aerate, chemical treatment, replacement with drier material, or other methods may be required to reduce excessive soil moisture. TRENCH BACKFILL Pipe zone backfill (i.e., material beneath and in the immediate vicinity of the pipe) should consist of native or imported soil less than one inch in maximum dimension; trench zone backfill (i.e., material placed between. the pipe zone backfill and finished subgrade) may consist of native soil which meets the requirements for engineered fill provided above.. All trench backfill should be placed and compacted in accordance with recommendations provided above for engineered fill. Within pavement areas, trench backfill should be compacted to at least 95 percent relative compaction within 12 inches of finished subgrade. Mechanical compaction is recommended; ponding or jetting should be avoided, especially in areas supporting structural loads or beneath concrete slabs supported -on -grade, pavements, or other improvements. If import material is used for pipe or trench zone backfill, we recommend it consist of fine- grained sand. In general, coarse-grained sand and/or gravel should not be used for pipe or trench zone backfill due to the potential for soil migration into the relatively large void spaces present in this type of material and water seepage along trenches backfilled with coarse-grained sand and/or gravel. R2189/23-4452-01 Page 12 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. 0 r�`■ KLEIN FELDER ' PERMANENT SLOPES . ' General We recommend all cut and fill slopes up to a maximum height of 10 feet be constructed at ' a gradient no steeper than 2(h):1(v). Slopes exceeding 30 feet in vertical height should include at least one terrace as outlined in Section 7012 of the Uniform Building Code ' (UBC), latest edition. Key and Bench Requirements Fill placed on existing fill or natural slopes steeper than 5(h):1(v) should be keyed and benched into the existing slope. 'In general, keyways should extend into firm, undisturbed soil and/or rock, be a minimum of 8 feet wide, 2 to 4 feet deep (below existing site grade), and extend the full length of the slope. A typical key and bench detail is shown on Plate 4. 1 Erosion Control ' To reduce the potential for surface erosion, all cut and fill slopes should be surfaced with asphalt or concrete paving material, or vegetated with deep-rooted perennial grasses. If fill slopes are to be paved, the slopes should be overbuilt and trimmed back to provide a well - compacted subgrade for -the paved surface. To further reduce the potential for surface erosion, a berm or "V" ditch may be located at the top of slopes subject to significant overland water flows in order to intercept and redirect surface runoff. ' Cut Slope Seepage Subsurface seepage may be encountered seasonally along cut slopes which traverse on-site U_ cemented soils . and overlying surficial soils. This potential seepage may result in the overland flow of water, adversely impacting proposed project features. Therefore, we recommend the project Civil Engineer review the subsurface information available in this report with respect to site grading plans (which were not available at the'time this report was prepared) in order to assess potential impacts to the proposed project (if any) and to develop possible mitigation measures (if required). R2189/23-4452-01 Page 13 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. k4 KLEINFELDER SPREAD FOUNDATIONS Allowable Bearing Pressures We recommend spread footings constructed of reinforced concrete and founded on undisturbed native soil and/or engineered fill be used for support of the proposed housing units. For these structures, footings should be a minimum of 12 inches wide and embedded a minimum of 12 inches below the lowest final adjacent subgrade`. An allowable bearing pressure of 2,500 pounds per square foot (psf) may be used for spread foundations with the above minimum dimensions. The allowable bearing pressure will vary with footing width and embedment. Therefore, the minimum allowable bearing pressure provided above may be increased by 250 psf for each additional foot of width and by 500 psf for each additional foot of embedment up to a maximum allowable bearing pressure of 4,000 psf. The allowable bearing pressure provided above is a net value; therefore, the weight of the foundation (which. extends below grade) may be neglected when computing dead loads. The allowable bearing pressure applies to dead plus live loads, includes a calculated factor of safety of at least 3, and may be increased by 1/3 for short-term loading due to wind or seismic forces. Estimated Settlements Total settlement of an individual foundation will vary depending on the plan dimensions of the foundation and the actual load supported. Based on anticipated foundation dimensions and loads, we estimate maximum settlement of foundations designed and constructed in accordance with the preceding recommendations to be on the order of 3/4 inch. Differential settlement between similarly loaded, adjacent footings is expected to be less than 1/4 inch. Settlement of all foundations is expected to occur rapidly and should be essentially complete shortly after initial application of the loads. "Within this report, subgrade refers to the top surface of undisturbed native soil; native soil compacted during site preparation, or engineered fill. R2189/23-4452-01 Page 14 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. k" KLEINFELDER Lateral Resistance Resistance to lateral loads (including those due to wind or seismic forces) may be provided by frictional resistance between the bottom of concrete foundations. and the underlying ' soils, and by passive soil pressure against the sides of the foundations. A coefficient of friction of 0.35_ may be used between cast -in-place concrete foundations and the underlying soil. Passive pressure available in engineered fill or undisturbed native soil may be taken as equivalent to the pressure exerted by a fluid weighing 350 pounds per cubic foot (pcf). IMPORTANT NOTE: Lateral resistance parameters provided above are ultimate values. Therefore, a suitable factor of safety should be applied to these values for design purposes. The appropriate factor of safety will depend on the design condition and should be determined by the project Structural Engineer. Depending on the application, typical factors of safety could range from 1.0 to 1.5. Construction Considerations Structures located near the top (or bottom) of'a cut or fill slope should maintain a minimum set -back in accordance with requirements indicated in Figure No. 29-1. (page 591) of the Uniform Building Code (UBC), 1991 edition, or 5 feet (measured horizontally from the top of slope to the closest point of approach of the structure), whichever is greater. Prior to placing steel or concrete, footing excavations should be cleaned of all debris, loose or soft soil, and water. All footing excavations should be observed by the project Geotechnical Engineer just prior to placing steel or concrete . to verify the recommendations contained herein are implemented during construction. RETAINING WALLS Lateral Earth Pressures If retaining walls are utilized in this project, they should be designed to resist the earth pressure exerted by the retained, compacted backfill plus any additional lateral force that will be applied to the wall due to surface loads placed at or near the wall. The at -rest earth pressure against walls that are restrained at the top and with level backfill may be taken as equivalent to the pressure exerted by a fluid weighing 55 pounds per cubic foot (pcf). Fifty R2189/23-4452-01 Page 15 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. 0 kn KLEINFELDER percent of any uniform areal surcharge placed at the top of a restrained wall may be assumed to act as a uniform horizontal pressure over the entire height of the wall. Retaining walls that are not restrained at the top and with level backfill may be designed for an active earth pressure developed by an equivalent fluid weighing 35 pcf. Thirty percent of any uniform surcharge may be assumed to act as a uniform horizontal pressure over the entire height of the wall. Foundation Support Retaining walls (if any) may be supported on shallow spread foundations similar to those recommended above for the planned buildings (see section entitled "SPREAD FOUNDATIONS"). Wall Drainage The above -recommended values do not include lateral pressures due to hydrostatic forces. Therefore, wall backfill should be free draining and provisions should be made to collect and dispose of excess water that may accumulate behind earth retaining structures. Wall drainage may be provided by free -draining gravel surrounded by synthetic filter fabric or by prefabricated, synthetic drain panels. In either case, drainage should be collected by perforated pipes and directed to a sump, storm drain, weep hole(s), or other suitable location for disposal. We recommend drainrock consist of durable stone having 100 percent passing the 1 -inch sieve and zero percent passing the No. 4 sieve. Synthetic filter fabric should have an equivalent opening size (EOS), U.S. Standard Sieve, of between 40 and 70, a permeability of at least 0.02 centimeters per second, a minimum flow rate of 50 gallons per minute per square foot of fabric, and a minimum puncture strength of 50 pounds. Backfill Placement All backfill should be placed and compacted in accordance with recommendations provided above for engineered fill. Light equipment should be used during backfill compaction to minimize possible overstressing of the wall. R2189/23-4452-01 Page 16 of 23 Copyright 1992 Meinfelder, Inc. November 19,1992 , h� KLEINFELDE9 ' INTERIOR CONCRETE SLABS SUPPORTED -ON -GRADE ' Subgrade Preparation Prior to constructing interior concrete slabs supported -on -grade, surficial soils should be scarified to a minimum depth of 8 inches, uniformly moisture -conditioned to between 0 and 5 percent above the optimum moisture content, and compacted to at least 90 percent relative compaction. Scarification and compaction may not be required if floor slabs are to be placed directly on undisturbed engineered fill, or native soil compacted during site preparation, or within earthwork cut areas consisting of cemented soils and if approved by ' the project Geotechnical Engineer during construction. IRock Capillary Break We recommend interior concrete slabs supported -on -grade be underlain by a capillary break to reduce the potential for soil moisture migrating upwards toward the slab. This capillary break should consist of compacted, free -draining crushed rock at least 4 inches thick, graded 'so that 100 percent passes the 1 -inch sieve and less than 5 percent passes the No. 4 sieve. In general, Caltrans Class 2 aggregate base or similar materials do not meet the above recommendations and should not be used to underlay interior concrete slabs supported -on -grade. IMPORTANT NOTE: A capillary break may not be required for some types of construction (such as warehouses, equipment buildings, garages, and other nonhabitable structures). For these types of structures, the gravel capillary break recommended above ' may be omitted and the slab placed directly on the prepared subgrade or other approved surface. In the event omission 'of the capillary break is considered, we recommend Kleinfelder review the planned structure in order to assess the applicability of the approach and provide (if necessary) additional recommendations regarding subgrade preparation and/or support. ' Vapor Barrier A vapor barrier is recommended under all interior concrete slabs supported -on -grade which will be covered with moisture -sensitive floor coverings. A plastic or vinyl membrane may be used for this purpose and should be placed over the rock capillary break to reduce the potential for upward migration of water vapor towards the slab. To promote more ' uniform curing of the slab and provide protection of the membrane during construction, R2189/234452-01 Page 17 of 23 November 19, 1992 Copyright 1992 Meinfelder, Inc. i hn KLEINFELDER fine -to -medium -grained sand, 2 inches thick, should be placed on top of the membrane prior to placing slab concrete. This sand should be moistened immediately prior to concrete placement. WARNING: Concrete should not be placed if sand overlying the vapor barrier has been allowed to become wet (due to precipitation or excessive moistening) or if standing water is present above the membrane. Excessive water beneath interior floor slabs could result in significant vapor transmission through the slab, adversely affecting moisture -sensitive floor coverings. EXTERIOR CONCRETE SLABS SUPPORTED -ON -GRADE Subgrade Preparation Prior to constructing exterior concrete slabs supported -on -grade*, surficial soils should be scarified to a minimum depth of 8 inches, uniformly moisture -conditioned to between 0 and 5 percent above the optimum moisture content, and compacted to at least 90 percent relative compaction. Scarification and compaction may not be required if exterior slabs are to be placed directly on undisturbed engineered fill, or native soil compacted during site preparation, or within earthwork cut areas consisting of cemented soils and if approved by the project Geotechnical Engineer during construction. PAVEMENTS General One resistance value (R -value) test was performed on a representative sample of the anticipated pavement subgrade materials encountered at the site. A laboratory R -value of 10 was obtained on a sample from Test Pit TP -1. Recommended Sections Pavement sections presented in the table below are based on the laboratory -obtained R -values and current Caltrans design procedures. Traffic indexes of 4.0 and 5.5 were assumed for the design of automobile parking areas and automobile driveways/access ways, respectively. Traffic indexes assumed above should be reviewed by the project *Within this report exterior concrete slab supported -on -grade refers. to walkways, driveways, patios, etc. and specifically excludes roadway pavements. R2189/23-4452-01 Page 18 of 23 Copyright 1992 Kleinfelder, Inc. November 19, 1992 SAF �`■ KLEINFELDER Owner, Architect, and/or Civil Engineer to evaluate their suitability for; this project. Changes in the traffic indexes will affect the corresponding pavement section. - Recommended Pavement Sections* Assumed Asphalt Aggregate Traffic Concrete Base ' Pavement Description Index fee inches feet inches Automobile Parking Areas 4.0 0.20 2-1/2 0.60 7 ' Automobile Driveways/Access Ways 5.5 0.25 3 0.90 11 Pavement sections provided above are contingent on the following recommendations being ' implemented during construction. o All pavement subgrades should be scarified to a depth of 8 inches below - finished subgrade elevation, uniformly moisture conditioned to between 0 ' and 3 ercent above the optimum moisture content, and compacted to at least 95 percent relative compaction. , ' o Within areas consisting of cemented soils, compaction of pavement subgrades may be omitted provided subgrade soils are undisturbed prior to placing aggregate base and if approved by the project Geotechnical Engineer during construction. o Subgrade soils should be in a stable, non -pumping condition at the time aggregate base materials are placed and compacted. r o Aggregate base materials should be compacted to at least 95 percent relative compaction. o Adequate drainage (both surface and subsurface) should be provided such that the subgrade soils and aggregate base materials are not allowed to become wet. o Aggregate base materials should meet current. Caltrans specifications for Class 2 aggregate baserock. o Asphalt pavingmaterials and placement methods should meet current Caltrans specifcations for asphalt concrete. *Caltrans design procedures for asphalt concrete pavements provide sections in units of feet, rounded to the nearest 0.05 feet. We have also provided sections in units of inches, rounded to the nearest 1/2 -inch. Sections provided above include a Gravel. Equivalent Safety Factor of 0.2 (as recommended by Caltrans). R2189/23-4452-01 Page 19 of 23 November 19,1992 Copyright 1992 Kleinfelder, Inc. 4 1y%,J KLEINFELDER o All concrete curbs separating pavement and landscaped areas should extend into the subgrade and below the bottom of adjacent, aggregate base materials. Unstable Subgrade In the event unstable (pumping) subgrades are encountered within planned pavement areas, we recommend a heavy, rubber -tired vehicle (typically a loaded water truck) be used to test the load/deflection characteristics of the finished subgrade materials. We recommend this vehicle have a minimum rear axle load (at the time of testing) of 16,000 pounds with tires inflated to at least 65 pounds per square inch pressure. If the tested surface shows a visible deflection extending more than 6 inches from the wheel track at the time of loading, or a visible crack remains after loading, corrective measures should be implemented. Such measures could include disking to aerate, chemical treatment, replacement with drier material, or other methods. We recommend Kleinfelder be retained to assist in developing which method (or methods) would be applicable for this project. Variations in Subgrade Materials Pavement sections provided above are based on the soil conditions encountered during our field investigation, our assumptions regarding final site grades, and limited laboratory testing. In the event actual pavement subgrade materials are significantly different than those tested for this study, we recommend representative subgrade samples be obtained and additional R -value tests performed. Should the results of these tests indicate a significant difference, the design pavement section(s) provided above may need to be revised. R2189/234452-01 Page 20 of 23 November 19, 1992 Copyright 1992 Kleinfelder, Inc.. Il F F1 ADDITIONAL SERVICES PROJECT BID DOCUMENTS kn KLEINFELDER It has been our expenence�contractors bidding on the project often contact us to discuss the geotechnical aspects of the project. Informal contacts between Kleinfelder and an individual contractor could result in misleading or incomplete information being provided to the contractor. Therefore, we recommend a pre=bid meeting be held to answer any questions about the report prior to submittal of bids. If this is not possible, questions or clarifications regarding this report should be directed to the project Owner or his designated representative. After consultation with Kleinfelder, the project Owner (or his representative) should provide clarifications or additional information to. all contractors bidding the job. PLANS AND SPECIFICATIONS REVIEW We recommend Kleinfelder conduct a general review of final plans and specifications to, evaluate that our earthwork and foundation recommendations have been properly interpreted and implemented during design. In the event Kleinfelder is not retained to perform this recommended review, we will assume no responsibility for misinterpretation of our recommendations. CONSTRUCTION OBSERVATION AND TESTING We recommend .thai all earthwork during construction be monitored by a representative from Kleinfelder, including site preparation, placement of all engineered fill and trench backfill, construction of slab and roadway subgrades, and all foundation excavations. The purpose of these services would be to provide Kleinfelder the opportunity to observe the soil conditions encountered during construction, evaluate the applicability of the recommendations presented in this report to the soil conditions encountered, and recommend appropriate changes in design or construction procedures if conditions differ from those described herein. ' R2189/23-4452-01 Page 21 of 23 November 19, 1992 Copyright 1992 Kleinfelder, Inc. KLEINFELDER ADDITIONAL COPIES OF REPORT . We have provided the addressee (as listed on the attached cover letter) with 6, bound copies of this report. If additional copies are required, we can provide copies at an additional cost (in accordance with our current fee schedule) and after receipt of a written request from our client. Under no circumstances will we provide a copy of the report to other design consultants or contractors without written permission from our client. . 82189/23-4452-01 Page 22 of 23 November 19,1992 Copyright 1992 Meinfelder, Inc. kn KLEINFELDER LIMITATIONS Recommendations contained in this report are based on our field observations and subsurface explorations, limited laboratory tests, and our present knowledge of the proposed construction. It is possible that soil conditions could vary between or beyond the points explored. If soil conditions are encountered during construction which differ from those described herein, we should be notified immediately in order that a review may be made and any supplemental recommendations provided. If the scope of the proposed construction, including the proposed loads or structural locations, changes from that described in this report,'our recommendations should also be reviewed. We have prepared this report in substantial accordance with the generally accepted geotechnical engineering practice as it exists in the site area at the time of our study. No warranty is expressed or implied. The recommendations provided in this report are based on the assumption that an adequate program of tests and observations will be conducted by Kleinfelder during the construction phase in order to evaluate compliance with our recommendations. This report may be used only by the client and only for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both on site and off site) or other factors may change over time, and additional work may be required with the passage of time. Any party other than the client who wishes to use this report shall notify Kleinfelder of such intended use. Based on the intended use of the report, Kleinfelder may require that additional work be performed and that an updated report be issued. Non- compliance with any of these requirements by the client or anyone else will release Kleinfelder from any liability resulting from the use of this report by any unauthorized party. R2189/2374452-01 Copyright 1992 Meinfelder, Inc. Page 23 of 23 November 19, 1992 ' . _ (•?BO I___"'iii... -- .----- X00= __ _/ 1 �•. u' � 1 •`i-'- - \ ♦ c00 �� a t4 ee�o C4Nq,L' ,87.North 9iV - e az �� i �:.• ii l U / P a• _ \� •••o e• IWell (1 o red13M Gr RDEN OR ,• 4 el 264 �`• Ing I° 345 �- �T omps0 .9 A Cz<o� I ?• r ermalit/ ' , I l version D 1 11,6 \ CORP _� ■ i . ��00 • • Butte C- n Nelson � , / .. ' �": -�, ♦' g. --.• ' Park. �_� L[ �I ..i;.�0 +� ' ^`. �` •�! �� NelwnAve • �'t •S• ♦ FI alio —1 1 e UE 1.7 l• IJ 7. 9M .7%7 9,p •t �rJ( EIM 269 60 �; L•:J�_.I ly .III` i� PSE % G' • --' I •' Ire �• '- on J _ ---i I o r .�' � M .r � • 1. r I r a ♦4%� �.� .. • PLUAtIi`5.... .. •.._ A_V€ 11 / • I • .' 7 ' GR I ; 4 2 ' �• 239 •. •: .. U :7.. • { ,rr /� 0 00-TFStner Riveti� • 1 _ o. �)' \ I Filtl 1 .AYE h 200 -- ISO a Q •� i 9 l . 1° VL Sch / I ' p• u o ''vO � Hevi♦� ; � o 'c��l IField I . Sierra Ave •\ , `' / I 9 •61 l+ , ' - P � ".•j ••~• tib 100E .' ; fn I Q m ` •�� o �O o • rJli 1 Bile I i Park e� • ° .. . — — 13 r Ste Cem��j� — -il8 heile�r '� n - �wll �,' ,d • •' v 1 N Seh • • J( IYE -- 10 I V - 11 - ,ri I�i;T i er : 'r •0� e „ ' w o e AVE•vE lig s 1 r""•'a, ►' f I .I 7G °l �r ` ' • I O 1 a Yt.Af�lrovl �\ LEGEND • SCALE 1:240W ' CALIF T 0 1 MILE �% QUADRANGLE LTION OG1000 0 1000 2000 3000 <000 5000 6000 7000 FEET 1 i REFERENCE;'OROVLLE QUADRANGLE' ' USGS 7.5 n*w* lopogmpHe map. 1970. SITE LOCATION MAP PLATE K L E 1 N F E L D E R PROPOSED BUILDING ADDITION 1 BUTTE COUNTY JAIL PROJECT N o . 23-4452-01 OROVI_LE, CALIFORNIIA I Copyright Kleirtieldw. k1C. 1992 �r r r r �■ �r �r r� rr r si rr r rr r r r rr r ------------ SL711.01NG O il-W N.PRSUN.Pt4.A=, ^001-n-WAL INFO NIU. Sa /W,%LABLr. UFbN m<xjr.3T. TP -3 AL ' C. PARrlr+c c. Accsss r�.o I. SCALE IN FEET J TP o ao eo 1;0 IualpnMArq �1 N Af-MdW- LOCAMC7.+ CO' It. M' WATOX MA11J r r To Sr MLOUT@O LCopyright Klaillelder, Ix. 1992 E . AC,=SS AOI O LEGEND APPROXIMATE TEST PIT LOCATION 1 1 1 'i 1 11 ENGINEERED FILL BENCH DRAINROCK If- 18' MIN.—� ORIGINAL GROUND SURFACE 111 SYNTHETIC FILTER FABRIC 6 -INCH -DIAMETER PERFORATED PVC PIPE (perforations placed down) NO SCALE NOTES: 1. Subdrain should be excavated into competent subgrade•as evaluated by the project Geotechnical Engineer during construction. - 2. Surfaces to receive Mter fabric should be free of loose or extraneous material and sharp objects, that might damage the filter fabric during Installation. 3. Drainrock should consist of durable stone having 100 percent passing the 1 -inch sieve and zero percent passing the No. 4 sieve. 4. Synthetic filter fabric should have an equivalent opening size (EOS), U.S. Standard Sieve, of between 40 and 70, a permeability of at least 0.02 centimeters per second, a minimum flow rate of 50 gallons per minute per square foot of fabric, and a minimum punture strength of 50 pounds. 5. In general, woven fabrics are less susceptible to clogging than non -woven fabrics. Therefore, in areas subject to sustained subsurface water flows, a woven fabric should be used. In areas of intermittent water flows, a non -woven fabric may be used. 6. Synthetic filter fabric should be placed in accordance with manufacturer's recommendations. 7. Perforated pipe should consist of schedule 40 PVC, 6 inches in diameter, with 1/4 -inch -diameter (maAmum) perforations, 12 to 24 inches on -center, placed down. Pipe invert should be no more than 2 inches above trench bottom. 8. Pipe drainage should be collected in a solid conduit and directed to a storm drain, ditch, or other suitable location for disposal. 9. Perforated pipe should be sloped a minimum of one percent (1%) to drain. kn'KLE1 N FELDER PROJECT NO. 234452-01 OPYrigfit Kleinfelder. tnG 1991 TYPICAL SUBDRAIN DETAIL PLATE PROPOSED BOLDING ADDITION 3 BUTTE COUNTY JAL OROVLLE, CALFORMA 11 . I 1 EXISTING GROUND EXISTING GROUND SURFACE SURFACE BEFORE depth fF 81L ►run- width'-'( GRADING BENCHES ENGINEERED FILL FINISHED GRADE_ i TYPICAL SLOPE - i KEYWAY PERFORATED PIPE SEEPAGE (see Note 3 below) 2 it min depth fF 81L ►run- width'-'( DRAIN DETAIL !.''.! NO SCALE •tDRAIN TRENCH DRAINROCK PERFORATED PIPE SYNTHETIC FILTER FABRIC Is* min. NOTE 1. Benches should be sloped at least two percent (20%) away from the natural slope to facilitate drainage of the Till embankment. Benches and keyway should be excavated to competent subgrade as evaluated by the project Geotechnical Engineer during construction. 2. Cut slopes between benches should be no steeper than 1(h):1(v) and should not exceed 3 feet in height Slopes may be steepened if the vertical offset between adjacent benches is less than one foot. 3. If seepage is present during construction or is suspected by the project Geotechnical Engineer based on subsurface conditions encountered subsequent to site stripping or during initial grading, subdrain(s) should be constructed of perforated PVC pipe surrounded by drainrock, encased in a synthetic filter fabric. Specific requirements are provided below (also see detail above). a) Drain trench depth(s) will vary depending on subsurface conditions encountered during construction. In general, the depth should be at least the height of the adjoining (downslope) cut; actual depth(s) should be evaluated by the project Geotechnical Engineer during construction. ' b) Drainrock should consist of durable stone having 100 percent passing the 1 -inch sieve and zero percent passing the No. 4 sieve. C) Synthetic filter fabric should have an equivalent opening sae (EOS), U.S. Standard Sieve, of between 40 and 70, a permeability of at least 0.02 centimeters per second, a minimum flow rate of 50 gallons per minute per square foot of fabric, and a minimum puncture strength of 50 pounds. d) In general, woven fabrics are less susceptible to clogging than non -woven fabrics. Therefore, in areas subject to sustained subsurface water flows, a woven fabric should be used. In areas subject to intermittent flows, a non -woven fabric may be used. e) Synthetic flier fabric should be placed in accordance with manufacturer's recommendations. n Perforated pipe should consist of schedule 40 PVC, 4 to 6 inches in diameter, with 1/4 -inch -diameter (maximum) perforations, 12 to 24 inches on -center, placed down. Pipe invert should be no more than 2 inches above the bottom of drain trench. 9) Pipe drainage should be directed (in a solid conduit) to a storm drain, ditch, or other suitable location for disposal. h) Perforated pipe should be sloped a minimum of one percent (10/6) to drain. TYPICAL KEY & BENCH DETAL PLATE KLEIN F E L D E R PROPOSED BULDING ADDITION BUTTE COUNTY JAL 4 PROJECT N0. 23-4452-01 OROVLL, CALFORNIA �IQPyrtgnt Kteinfelder, Inc. 1991 KLEINFELDER 1 ' APPENDIX A tFIELD INVESTIGATION AND LABORATORY TESTING FIELD INVESTIGATION General ' The subsurface conditions at the site were explored on November 9, 1992, by excavating 5 test pits to depths ranging from 5 to 6-1/2 feet below existing grade. Test pits were ' excavated using a John Deere 510 tractor -mounted backhoe equipped with a 24 -inch -wide bucket. The locations of test pits performed for this investigation are shown on Plate 2. 'IMPORTANT NOTE: Test pits were located in the field by visual sighting and or pacing from existing site features. Therefore, the location of test pits shown on Plate 2 should be considered approximate and may vary from that indicated on the plate. ' Our engineer maintained a log of the test pits, visually classified soils encountered according to the Unified Soil Classification System (see Plate A-1), and obtained bulk ' samples of the subsurface materials. A key to the Logs of Test Pits is presented on Plate A-2 of this appendix; Logs of Test Pits are presented on Plates A-3 through A-7. Sampling Procedures Soil samples were obtained by collecting representative bulk samples of each soil strata encountered within the test excavations. Soil samples obtained from the test pits were packaged and sealed in the field to reduce moisture loss and were returned to our ' . Sacramento laboratory for further testing. After the test pits were completed they were backfilled with the excavated soil. Backfill was loosely placed and not compacted to the requirements typically specified for engineered fill. WARNING: Structures, slabs -on -grade, or pavements located over these areas may experience excessive -settlement. Removal and compaction of test pit fill is recommended prior to construction of improvements over these areas. ' R2189/23-4452-01 Page A-1 November 19, 1992 Copyright 1992 Meinfelder, Inc. kn KLEINfELDER I LABORATORY TESTING General Laboratory tests were performed on selected samples to aid in soil classification and to evaluate physical properties of the soils which may affect the geotechnical aspects of project design and construction. A description of the laboratory testing program is presented below; a summary of all laboratory tests performed is presented on the Summary of Laboratory Tests, Plate A-8. Moisture Content A moisture content test was performed to evaluate moisture -conditioning requirements during site preparation and earthwork grading in general accordance with ASTM Test Method D 2216. Results of this test is presented on the logs and is summarized on the Summary of Laboratory Tests. Sieve Analysis Sieve analyses were performed to evaluate the gradational characteristics of the material and to aid in soil classification. Tests were performed in general accordance with ASTM Test Method C 136. Results of these tests are presented on the logs and are summarized on the Summary of Laboratory Tests. Atterberg Limits Atterberg Limits tests were performed to aid in soil classification and to evaluate the plasticity characteristics of the material. Additionally, test results were correlated to published data to evaluate the shrink/swell potential of near -surface site soils. Tests were performed in general accordance with ASTM Test Method D 4318. Results of these tests are presented on the logs and are summarized on the Summary of Laboratory Tests. R -Value A resistance value (R -value) test was performed on a bulk soil sample obtained from Test Pit TP -1 to evaluate pavement support characteristics of the near -surface site soils. Test procedures were in general accordance with Caltrans Test Method 301. Results of this test are presented on Plate A-9. R2189/23-4452-01 Page A-2 November 19, 1992 Copyright 1992 Kleinfelder, Inc. r 11 1 ' LIST OF ATTACHMENTS The following plates are attached and complete this appendix. Plate A-1 Unified Soil Classification System Plate A-2 Log Key Plate A-3 Log of Test Pit TP -1 ' Plate A-4 Log of Test Pit TP -2 Plate A-5 Log of Test Pit TP -3 Plate A-6 Log of Test Pit TP -4 Plate A-7 Log of Test Pit TP -5 Plate A-8 Summary of Laboratory Tests Plate A-9 Resistance Value R2189/23=4452-01 Copyright 1992 Kleinfelder, Inc. Page A-3 k'q KLEINFELDER November 19, 1992 i 1 1 1 1 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS USCS TYPICAL SYMBOL DESCRIPTIONS SOIL CLASSIFICATION SYSTEM PLATE k" KLEIN F E L D E R PROPOSED BUILDING ADDITION BUTTE COUNTY JAIL A-1 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA :opyright Kleinfelder, Inc. 1992 GW WELL -GRADED GRAVELS GRAVEL -SAND CLEAN GRAVELS f MIXTURES WITH LITTLE OR NO FINES WITH LITTLE OR f GRAVELS NO FINES 4wG P POORLY GRADED GRAVELS, GRAVEL SAND 40 MIXTURES WITH LITTLE OR NO FINES 0 SILTY GRAVELS, GRAVEL -SILT -SAND MORE THAN HALF COARSE FRACTION GRAVELS GM MIXTURES IS LARGER THAN WITH OVER CLAYEY GRAVELS, GRAVEL -SAND -CLAY COARSE THE #4 SIEVE 12% FINES GRAINED �7 G C SOILS MIXTURES - �+,A, WELL -GRADED SANDS, SAND -GRAVEL (MORE THAN HALF OF MATERIAL IS CLEAN SANDS - `� Yr MIXTURES WITH LITTLE OR NO FINES LARGER THAN - THE #200 SIEVE) WITH LITTLE OR SANDS NO FINES c P POORLY -GRADED SANDS, SAND -GRAVEL J MIXTURES WITH LITTLE OR NO FINES . MORE THAN HALF COARSE FRACTION SM SILTY SANDS, SAND GRAVEL -SILT MIXTURES 1S SMALLER THAN SANDS WITH THE #4 SIEVE OVER 12% FINES SC CLAYEY SANDS, SAND -GRAVEL -SILT MIXTURES INORGANIC SILTS & VERY FINE SANDS, M L SILTY OR CLAYEY FINE SANDS, CLAYEY SILTS WITH SLIGHT PLASTICITY SILTS AND CLAYS INORGANIC CLAYS OF LOW TO MEDIUM CL PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS FINE LIQUID LIMIT LESS THAN 50 GRAINEDORGANIC OL SILTS & ORGANIC SILTY CLAYS SOILS OF LOW PLASTICITY (MORE THAN HALF MH INORGANIC SILTS, MICACEOUS OR OF MATERIAL IS DIATOMACEOUS FINE SAND OR SILT SMALLER THAN THE #200 SIEVE) SILTS AND CLAYS C H INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS LIQUID LIMIT GREATER THAN 50 O H ORGANIC CLAYS & ORGANIC SILTS OF MEDIUM -TO -HIGH PLASTICITY d HIGHLY ORGANIC SOILS 3" PT PEAT, HUMUS, SWAMP SOILS . i WITH HIGH ORGANIC CONTENTS SOIL CLASSIFICATION SYSTEM PLATE k" KLEIN F E L D E R PROPOSED BUILDING ADDITION BUTTE COUNTY JAIL A-1 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA :opyright Kleinfelder, Inc. 1992 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LOG SYMBOLS �1 BULK / BAG SAMPLE r' MODIFIED CALIFORNIA SAMPLER (2-1/2 inch outside diameter) CALIFORNIA SAMPLER (3 inch outside diameter) STANDARD PENETRATION SPLIT SPOON SAMPLER ?i?€ (2-1/2 inch outside diameter) SHELBY TUBE (3 inch outside diameter) NQ SIZE CORE BARREL (2 inch inside, 2-1/2 inch outside diameter) WATER LEVEL (level after completion) WATER LEVEL (level where first encountered) PERCENT FINER -4 THAN THE NO. 4 SIEVE (ASTM Test Method C 136) PERCENT FINER -200 THAN THE NO. 200 SIEVE (ASTM Test Method C 117) LL LIQUID LIMIT (ASTM Test Method D 4318) PI PLASTICITY INDEX (ASTM Test Method D 4318) EI EXPANSION INDEX (UBC Standard 29-2) COL COLLAPSE POTENTIAL OC ORGANIC CONTENT (ASTM Test Method D 2974) SE SAND EQUIVALENT (Caltrans Test Method 217) GENERAL NOTES 1. Lines separating strata on the logs represent approximate boundaries only. Actual transitions may be gradual. 2. No warranty is provided as to the continuity of soil conditions between individual sample locations. 3. Logs represent general soil conditions observed at the point of exploration on the date indicated. 4. In general,.Unified Soil Classification designations presented on the logs were evaluated by visual methods only. Therefore, actual designations (based on laboratory tests) may vary. LOG KEY PLATE kTj K L E I N F E L D E R PROPOSED BUILDING ADDITION BUTTE COUNTY JAIL A-2 PROJECT NO. 234452-01. OROVILLE, CALIFORNIA It copyright Kleinfelder, Inc. 1992 Date Completed: 11/9/92 Logged By: R. HARRIS Total Depth: 5 feet FIELD LABC r M ~ 0 Zai M 7 L ai r O \ 3 a+ ++ 7 C i4J CL a So i� ma..oa E� 1 2 3 >4. 4 5 10 Surface Conditions: Vegetation consisting of low-lying grasses Groundwater. No free groundwater encountered DESCRIPTION 4 Approximate Surface Elevation (ft): 257 o R-Value=10 Sandy SILT (ML): Red -brown, moist, mediu See Plate A-9 dense, fine -to -coarse grained, with fine -to -coarse gravel and trace clay Silty CLAY (CH): Mottled fight yellow-brov and red, moist, hard, with fine sand brown, moist, very dense, moderately -to - strongly cemented, fine grained Test pit completed at a depth of approximately 5 feet below existing site grade. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. LOG OF TEST PIT TP -1 PLATE 1 of. 1 K L E I N F E L D E R PROPOSED BUILDING ADDITION BUTTE COUNTY JAILA-3 PROJECT NO. 23-452-01 OROVILLE, CALIFORNIA )pyright Kleinfelder, Inc. 1992 Date Completed: 11/9/92 Logged By: R. HARRIS Total Depth: 5 feet FIELD LABC Y CL ti ~ Z 4 r 7 L yJ •� ar t CL n. 3 No N m 0. L 80 dD EU\ ::( 1 1.0 2.0 7 3 5 1 10 Surface Conditions:. Vegetation consisting of low -to -high grasses Groundwater. No free groundwater encountered DESCRIPTION Approadmate Surface Elevation (ft): 249 LL=51 Silty CLAY (CH): Mottled light yellow and red, PI=27 moist -to -wet, stiff, weakly cemented, blocky structure, with some fine sand 0 i10 Sandy SILT (ML): Light -brown -to -yellow-brown with red stringers, moist, medium dense, weakly cemented, fine -to -medium grained grades dense, moderately cemented grades with trace black, very dense, strongly cemented Test pit terminated at a depth of approximately 5 feet below existing site grade due to essential backhoe refusal. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. LOG OF TEST PIT TP- 2 PLATE K L E I N FEL D E R PROPOSED BUILDING ADDITION 1 of 1 BUTTE COUNTY JAIL A-4 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA >pyright Kteinfetder, Inc. 1992 Date Completed: 11/9/92 Surface Conditions: Vegetation consisting of low-lying grasses and sparse trees Logged By: R. HARRIS Groundwater. No free groundwater encountered Total Depth: 5-1/2 feet w L CLa C! a. N 4 z • -1 (A w N .-01 m .0 8 0. 4J a i U CI 3 0. 7 C 4-1 N 0 0 E U ,r 1 Y 2 5 3 L N DESCRIPTION Approximate Surface Elevation (ft): 244 Sandy SILT (ML): Brown, wet, loose-to-mec dense, fine -to -coarse grained, with some fine -to -coarse gravel j:jj so diutdense, grained, with red -brown, moist, dense, weakly cemented, fine -to -coarse grained, with silt Test pit completed at a depth of approximately 5-1/2 feet below existing site grade. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. LOG OF TEST PIT TP- 3 PLATE k4KLEI N F E L D E R PROPOSED BUILDING ADDITION 1 of 1 BUTTE COUNTY JAIL A-5 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA )pyright Kteinfelder, Inc. 1992 Date Completed: 11/9/92 Surface Conditions: Vegetation consisting of low-lying grasses and sparse trees; drainage swale Logged By. R. HARRIS Groundwater. No free groundwater encountered Total Depth: 6-1/2 feet 1 1 I I I 33 I -200=5g o 5 DESCRIPTION Approximate Surface Elevation (ft): 243 Sandy CLAY (CL): Mottled dark brown, bro; yellow, and red; wet; very soft; fine -to -coarse grained uraveuy NP"Nu k3m): xea-Drown win some yellow-brown, moist, medium -dense -to- dense, fine -to -coarse grained, with silt Test pit completed at a depth of approximately 6-1/2 feet below existing site grade. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. 10 LOG OF TEST PIT TP- 4 PLATE K L E I N F E L D E R PROPOSED BUILDING ADDITION 1 of 1 BUTTE COUNTY JAIL A-6 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA copyright Ueinfelder, Inc. 1992 a ~ Z .0 it \ 4J 4-1 7 C a E 0 0 41 a 41 r C 3Cw ..C L a 1 1 I I I 33 I -200=5g o 5 DESCRIPTION Approximate Surface Elevation (ft): 243 Sandy CLAY (CL): Mottled dark brown, bro; yellow, and red; wet; very soft; fine -to -coarse grained uraveuy NP"Nu k3m): xea-Drown win some yellow-brown, moist, medium -dense -to- dense, fine -to -coarse grained, with silt Test pit completed at a depth of approximately 6-1/2 feet below existing site grade. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. 10 LOG OF TEST PIT TP- 4 PLATE K L E I N F E L D E R PROPOSED BUILDING ADDITION 1 of 1 BUTTE COUNTY JAIL A-6 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA copyright Ueinfelder, Inc. 1992 Date Completed: ,11/9/92 Surface Conditions: Vegetation consisting of sparse low-lying grasses Logged By. R. HARRIS Groundwater. No free groundwater encountered Total Depth: 5-1/2 feet FIELD LABORATORY 4J r CL 3 Z Aj L47 DESCRIPTION r r .11 a . � ] C r 0 •.q 4j L r a CL r E r E r -4 C r 7 C� L ru •a C o o t 4 r Approximate Surface Elevation (ft): 240 C! N m n. 0 0 Q. E UNI 0 ►- Gravelly SAND (SP/SM): Red -brown, moist, dense, fine -to -coarse grained, with some silt Test pit completed at a depth of approximately 5-1/2 feet below existing site grade. Elevation Reference: Non -titled map by Barnhart Brown and Associates, printed April 7, 1992. LOG OF TEST PIT TP- 5 PLATE k" K L E I N F E L D E R PROPOSED BUILDING ADDITION 1 of 1 BUTTE COUNTY JAIL A-7 PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA copyright Kleinfelder, Inc. 1992 n D 0 O + a"' t � EST PI NO. SAMPLE NO. SAMPLE DEPTH (ft) DRY UNIT WEIGHT (pcf) MOISTURE CONTENT C% dry weight) PARTICLE SIZE SIEVE SIZE —Percent Passing ATTERBERG LIMITS OTHER TESTS 1 .� 3/4 �� #4 #10 #40 #200 L. L. P. I. TP -1 2 0-3 R -Value = 10 See Plate A-9 Z O 1 r m TP -2 1 0 51 27 {! is + cTP-4 J In m 1 }-2} 33 54. 42 18 r v m Ov-vcn 0:10 m <m09 rr-0u) n m0m.� nzv0 v °° _n r c� r MFEO Z G) D D —I 00 vm . o� Z. Cn Cn D ' SAMPLE LOCATION: Test Pit TP -1 at a depth of 0 -to -3 feet SAMPLE DESCRIPTION: Red -brown Sandy SILT DATE SAMPLED: November 9, 1992 ' EXUDATION PRESSURE - lb/sq in 4M 7M cM 100 90 80 70 60 ui 50 3 J Q 40 M 30 20 10 0 1.V 1•4 1.4 1.0 US z.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 COVER THICKNESS BY EXPANSION PRESSURE - ft 1 SPECIMEN 2.� ' 2.s EXUDATION PRESSURE, Ib/sq in 2.0 240 1 I 1.8 14 W F- r- 1.6 ' O J M 61 1.4 22 H N 11 8 } 1.2 00 MOISTURE AT TEST, % 18.2 N 1.0 21.4 W Z U 0.8 108.4 102.7 M Z F- R VALUE AT 3001b/sq in EXUDATION PRESSURE 0.6 Q W R VALUE BY EXPANSION PRESSURE (TI= ) ' 00.4 0.2 ' 0 100 90 80 70 60 ui 50 3 J Q 40 M 30 20 10 0 1.V 1•4 1.4 1.0 US z.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 COVER THICKNESS BY EXPANSION PRESSURE - ft 1 SPECIMEN A B C EXUDATION PRESSURE, Ib/sq in 328 240 120 EXPANSION DIAL (0.0001") 14 11 5 EXPANSION PRESSURE, ]b/sq ft 61 48 22 RESISTANCE VALUE, R 11 8 2 MOISTURE AT TEST, % 18.2 19.3 21.4 DRY DENSITY AT TEST, Ib/cu ft 108.4 102.7 102.7 R VALUE AT 3001b/sq in EXUDATION PRESSURE 10 R VALUE BY EXPANSION PRESSURE (TI= ) ' RESISTANCE VALUE K L E I N F E L D E R PROPOSED BUILDING ADDITION 'BUTTE COUNTY JAIL PROJECT NO. 23-4452-01 OROVILLE, CALIFORNIA Copyright Kieinfetder, Inc. 1992 PLATE A-9 11 SECTION 02010 SUBSURFACE CONDITIONS ' PART 1 - GENERAL ' 1. DESCRIPTION A. A geotechnical investigation report included herein, dated November ' 19, 1992 was prepared by Kleinfelder, Inc., hereinafter referred to as the Soils Engineer. B. The report is not a warrant of subsurface conditions but a guide.to ' the general conditions that may, in the opinion of the Soils Engineer, reasonably be expected. The Contractor is to form his own conclusions regarding the.nature of the soils which may be en- countered during construction and difficulties he may encounter to complete all work within the scope of the project. C. The Owner assumes no responsibility in respect to the sufficiency or ' accuracy of the investigation, and there is no warranty or guarantee, either expressed or implied, that the conditions indicated are uniformly correct or that unforeseen conditions may ' not be uncovered. 2. ADDITIONAL INFORMATION A. The Contractor should visit the site and acquaint himself with all existing conditions. Prior to bidding, bidders may make their own subsurface investigation, but any site visits or subsurface investigations shall be performed only under time schedules and arrangements approved in advance by the Owner. ' 02010 - 1 L 3. QUALITY ASSURANCE ' A. The Soils Engineer may be retained by the Owner to perform observation and testing services of work in connection with excavation, filling, and grading. All grading work that does not ' meet the Soils Engineer's requirements must be removed and reworked to meet the requirements. However, the Contractor should not ' deviate from the Contract approval from the Owner. Documents without specific and written B. All import material must be approved by the Soils Engineer prior to being brought to the site. The Contractor must notify the Soils ' Engineer ten (10). working days in advance of proposed start of grading. ' C. Notify the Soils Engineer 48 hours in advance of start of operations. 1 ' 02010 - 1 L SECTION 02117 CLEARING AND GRUBBING PART 1 - GENERAL 1. DESCRIPTION A. Clearing of all fences, trees and miscellaneous site structures. B. Excavation and disposal of stumps, roots, and buried debris. C. Protection of Existing Improvements PART 2 - MATERIALS: NOT USED PART 3 - EXECUTION A. Use equipment suitable for the work. B. Grub out stumps and roots to a depth of not less than 12 inches.below the original ground surface. C. Dispose of cleared material off of the site. Burning of materials will not be permitted. 02117 - 1 1 F SECTION 02210 SITE GRADING PART 1 - GENERAL A. Work of this section includes furnishing all equipment, labor and materials to grade the site to specified contours and elevations in accordance with the recommendations in the Geotechnical Investigation Report dated November 19, 1992, prepared by Kleinfelder, Inc. PART 2 - MATERIALS ' A. EXCAVATION: All excavation.shall be unclassified, and the Contractor shall excavate all material of whatever substance encountered to the lines and grades shown on the plans. ' B. ENGINEERED FILL SOILS should be nearly -free of organic or other deleterious debris, essentially non -plastic, and less than 3 inches in maximum dimension. In general, well -graded mixtures of gravel, sand, non -plastic silt, and small quantities of clay are acceptable for use as ' engineered fill. Specific requirements for engineered fill as well as applicable test procedures to verify material suitability, are provided in the Geotechnical Investigation Report by Kleinfelder, Inc. PART 3 - EXECUTION ' A. EXCAVATION: The Contractor shall excavate the site to the lines and grades shown on the plans. Excavated material shall be utilized in embankment sections, except for debris or deleterious material, which ' shall be disposed of off the site by the Contractor. B.. ENGINEERED FILL: Engineered Fill should be uniformly moisture - conditioned to between 0 and 5 percent above the optimum moisture ' content, placed in horizontal lifts less than 8 inches in loose thickness, and compacted to at least 90 percent relative compaction. ' Fills.exceeding 5 feet in thickness should be compacted to at least 93 percent relative compaction for their full depth. Fill placed within nonstructural areas of the project (e.g., areas that will not support structures, concrete slabs supported -on -grade, pavements, or other improvements) may be compacted to a minimum relative compaction of 85 ' percent. ' C. FINISH GRADING: Final surfaces shall be graded to a smooth uniform finish and shall conform to the grade, profiles and cross-sections shown on the plans. Tops and corners of slopes shall be rounded. Finish grades shown on the plans are to be the elevations of the finished surfaces, and the Contractor shall make allowances for the depth of 1 special surfaces and such as aggregate base and paving. 02210 - 1 1 ' SECTION 02221 TRENCHING, BACKFILLING AND COMPACTING PART 1 - GENERAL ' A. Work of this section includes furnishing all equipment, labor and materials to complete trench excavation.and backfill for underground utilities and appurtenances. PART 2 - MATERIALS ' A. NATIVE BACKFILL shall be the material excavated from the trench. The native material used for backfill shall be free of roots and debris, lumps, frozen material, and rocks larger than 3 inches in greatest ' dimension. Wherever rock is used in the trench, sufficient fine material shall be placed with the rock to prevent any voids in the backfill. ,. Where used as backfill within a roadway prism, the native material shall be selected and shall have a minimum sand equivalent of 30. A roadway prism is that portion of a street or highway within the outside lines of ' slopes or ditches, and includes traffic lanes, shoulders, and ditches. B. SELECTED NATIVE BACKFILL MATERIAL shall have a maximum size of 3/4 -inch and a minimum sand equivalent of 30.' Native material from the trench excavation may be used wherever available. If sufficient suitable material is not available from adjacent excavation, selected native material shall be hauled from approved trench areas or local borrow areas obtained by the Contractor. C. IMPORTED BEDDING MATERIAL shall be sand, or crushed rock free of loam or ' vegetable matter. It shall be reasonably well graded from coarse to fine with maximum size of 3/4 -inch. D. CONCRETE for encasing pipe shall be Class C concrete in accordance with Section 90 of the State Standard Specifications. ' PART 3 - EXECUTION A. GENERAL: The Contractor shall excavate whatever substance encountered ' to the lines and grades shown on the Plans. All material suitable for use as backfill shall be piled in an orderly manner.a sufficient distance from the side of the trench to avoid overloading the trench ' wall and to prevent material from sliding into the trench. The Contractor shall do such grading as is necessary to prevent surface water from entering the excavation. 1 1 02221 - 1 1 Except with the specific approval of the Engineer, no more than 200 feet of open trench shall be excavated in advance of laying the pipe. Not more -than 50 feet of trench excavation shall remain unbackfilled at the end of each day's work. The remainder of the trench shall be backfilled, compacted, and opened to traffic. All operations shall be carried out in an orderly fashion. Backfilling, compacting, and cleanup work shall be accomplished as sections of the pipe installation are approved and traffic through the work shall be impeded or obstructed as little as possible. Where it is necessary to cross fences, temporary gates, barriers, or other satisfactory obstructions shall be installed by the Contractor as required to keep livestock from entering or leaving the property. All cut fences shall be restored to original condition upon completion of backfilling of the trench. Where it is necessary to cross irrigation or drainage ditches, the backfill in the bottom and banks of such ditches shall be carefully placed and compacted to avoid settlement. Shape of the banks and bottom shall be restored and the ditches left in good condition. As shown on the plans, rock cobbles shall be placed over the trench to prevent erosion in drainage swales. Where removal of grass, plants, or landscaping is required, sod shall be carefully cut and removed, and plants shall be carefully removed. Rock, cinder, or bark landscaping shall be carefully removed and stored for later replacement. Sod and plants removed shall be carefully shaded and watered until they can be replaced. Any plant or sod which does not survive the removal and replacement shall be replaced with new plants or sod of similar species of the largest available size. Where removal of brush or trees is required, such removal shall be accomplished by the Contractor without damage to adjacent property. Where trees exist within a right-of-way adjacent to the trench, removal of the trees shall be subject to the approval of the governing body. Unless otherwise specifically approved by the Engineer, such removed material shall be disposed of away from the site. B. EXPLOSIVES: If explosives are used for excavation, the Contractor shall obtain the necessary permits and comply with all local regulations. The utility companies or agencies supplying sewer, water, electrical, telephone, cable television, or gas service shall be informed if blasting is to be done in the vicinity of their facilities. Notice shall also be given to residents in the vicinity which may be affected by the explosive work. 02221 - 2 1 rte r 1 e' 1 ... M . C. WIDTH OF TRENCH: Except where otherwise specifically permitted, banks of trenches shall be vertical, and shall be of uniform width from top to bottom. Trenches shall be a minimum of 12 inches wider than the external diameter of the pipe. The maximum width of the trench, measured at the top of the pipe, shall not exceed the width allowed for various strengths of pipe as may be specified elsewhere in the applicable sections of these Standard Specifications. If no maximum width .is elsewhere specified, the width measured at the top of the pipe shall not exceed the external diameter of the pipe, exclusive of bells and collars, plus 24 inches. D. STRIPPING OF TOPSOIL: Where the trench crosses cultivated, residential, or meadow land not in a roadway, the top 12 inches of soil shall be stripped and stockpiled separately from the balance of the excavated material so that later it may be placed in the top of the trench backfill. E. BRACING OF TRENCHES: Where required to prevent caving of the trench, the Contractor shall furnish and install bracing and sheeting as necessary to protect the excavation and to meet safety regulations. If required by the Engineer, the Contractor shall install sheeting and bracing as required to permit the Engineer safe access to the trench for ' inspection of the work. However, this requirement does not relieve the Contractor of the responsibility for maintaining the trench to meet safety regulations. F. DEPTH OF TRENCH: The bottom of the trench shall be carried to the lines and grades shown on the Plans with proper allowance for the thickness of the pipe and for the type of bedding specified. Any part of the trench ' excavated below the proper grade shall be corrected with approved bedding material compacted to 95 percent relative density, at the Contractor's expense. 1 1 G. APPURTENANCES: Excavations for manholes, valve vaults and other similar structures shall be large enough to provide proper working room. Any over -depth in excavation shall be corrected with concrete or other approved material. Excavations for thrust blocks for pressure pipelines hall be of the minimum size shown on the Plans, and shall be carried into firm undisturbed material for such distance as required to develop full bearing for the thrust block against the trench wall. H. REMOVAL OF WATER: The Contractor shall remove and dispose of all water entering the excavation Disposal of water shall be done in a manner to prevent damage or nuisance to adjacent properties. Sufficient pumping equipment.shall be provided to maintain the trench in a dry condition during the bedding and initial backfilling of the pipe.. 02221 - 3 I. IMPORTED BEDDING: Where the soil encountered in the bottom of the trench is unstable and unsuitable as a base for the pipe, such soil shall be removed to the depth specified by the Engineer. Imported bedding material shall then be installed in a layer the full width of the trench and of proper thickness to form the bed for the pipe. After the imported bedding has been placed and spread, it shall be compacted to proper grade to not less than 90 percent relative density. J. CONCRETE ENCASEMENT: Shall be installed at the locations and in the manner shown on the Plans. The pipe shall be temporarily supported on masonry blocks. Supports shall be set accurately to grade with a minimum of two supports per joint of pipe. After the pipe has been laid and approved for covering, the pipe shall be bedded and encased in concrete as detailed on the Plans. Great care shall be taken not to float or shift the pipe during the concreting operation. K. GENERAL: No backfilling shall be done until the installation to be covered has been inspected and approved for covering. Backfilling shall be carried out in an orderly fashion and, in general, shall be done as soon as approval has been given to cover the pipe. Compaction of the backfill shall proceed simultaneously with backfilling operations. All excess backfill material.shall be removed from within the right-of- way and disposed of by the Contractor. The location of the disposal site shall be the responsibility of the Contractor and shall be subject to the approval of the Engineer. Removal of excess material shall be done immediately following backfilling. Where trenches cross county roads, backfilling shall be completed immediately following excavation. No trenches across roads shall remain open overnight. All crossings shall be backfilled, compacted, and open to traffic at the end of each day's work. Major road crossings shall be excavated and backfilled in half widths of the travelled way so that at least one-half of the roadway is open to controlled traffic at all times during the work. L. BEDDING AND COVERING PIPE: The bed for the pipe shall be final -graded by hand to the line and grade to which the pipe is to be laid, making proper allowance for the thickness of the pipe. The bed shall be hand - raked ahead of the pipe laying operation to remove any stones or lumps which will interfere with smooth and proper bedding. Bell holes shall be hand -dug at the location of the joints and shall be of sufficient size to allow proper making of the joint and to prevent the collar or bell of the pipe from bearing on the bottom of the trench. After the pipe has been laid and approved for covering, imported bedding material shall be placed evenly on both sides of the pipe the full width of the trench. This material shall be placed by hand in 6 -inch layers and each layer shall be compacted to 90 percent relative density by use of approved tampers. Regardless of the size of the pipe being installed, at least 6 inches of imported bedding material shall be placed over pressure pipelines and 12 inches of imported bedding material shall be placed over gravity pipelines. 02221 - 4 1 1 ' Particular care shall be taken to attain the required compaction in the material supporting the underside of the pipe. Compaction of bedding material around the pipe and up to the top of the required imported bedding material by jetting or ponding shall not be permitted. M. BACKFILL NOT WITHIN TRAVELLED WAYS: Where the trench is not within a travelled way or public road right-of-way, native backfill shall be ' placed in accordance with requirements provided in Section 02210 for ENGINEERED FILL. Where the trench is in landscaping, cultivated areas, or meadow land, the topsoil shall be replaced and the trench finished ' uniformly with the surrounding ground. Elsewhere, the trench shall be finished by mounding the excess material over the trench within the ' limits indicated on the Plans without obstructing existing drainage. Upon completion of the backfilling, the work area shall be smoothed and ' restored similar to adjacent, undisturbed land, and excess material shall be removed from the work site. N. BACKFILL WITHIN TRAVELLED WAYS, ROADS, AND COUNTY ROADS: In public roads, backfill and compaction shall be done in accordance with the terms of the excavation permit. The following requirements are minimums and do not relieve the Contractor of the responsibility of complying with any more stringent requirements of the permit. 1 02221 - 5 The trench shall be backfilled in accordance with requirements provided in Section 02210 for ENGINEERED FILL. Prior to commencing backfilling operations, the Contractor shall notify the Engineer of the method of compaction which he intends to use. No method will be approved until the Contractor has demonstrated, under actual field conditions, that such method will produce the degree of compaction required. Where jetting is permitted, the top layer of backfill material shall be mechanically tamped. The trench backfill shall be compacted to a relative compaction of not less than 90 percent. The upper 12 inches of the trench backfill (not including the road base) shall be compacted to 95 percent relative ' compaction. Immediately after backfilling, any excess material shall be removed and ' disposed of in an approved disposal area. 0. COMPACTION TESTING: Where a degree of relative compaction is specified, compaction tests will be made in accordance with the Standard ASTM 01557. All densities shall be expressed as a relative compaction in terms of the maximum obtained in the laboratory by the foregoing standard procedure. Field density tests shall be performed in accordance with ASTM D2922, Method B, using nuclear methods, or D1556, using the sand cone. P. CLEAN-UP: The Contractor shall clean up and dispose of'all trash, debris, and excess material, and shall remove his equipment from the ' site of the work as completed. 1 02221 - 5 ' SECTION 02232 ROADWAY BASE PART 1 - GENERAL A. Work of this section includes furnishing all equipment, labor and materials to place aggregate base under driveways and parking areas as shown on the drawings. ' PART 2 - MATERIALS A. Aggregate Base shall be Class 2 in accordance with Section 26 of the Caltrans Standard Specifications. The thickness shall be as dimensioned on the Drawings, and shall conform to the grading specifications as set forth in the Caltrans Standard Specifications. The maximum size of aggregate shall be three quarter (3/4) inch. PART 3 - EXECUTION A. Aggregate Base, Class 2, shall be installed as provided in Section 26 of the Caltrans Standard Specifications. The relative compaction of each layer of compacted base material shall not be less than 95%. B. The finish grade of the aggregate base shall be within 1/4 inch (0.02 foot) of the grades shown on the Drawings within any 10 -foot radius. . ' C. Aggregate base placement shall be approved by the owner before surfacing materials are placed. 02232 - 1 SECTION 02280 WEED AND TERMITE CONTROL PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. Drawinas and General Provisions of Contract and Supplementary Conditions and other Division 1 Specification Sections, apply to this section. 1.02 SUMMARY: A. Provide weed control treatment for all soil at areas of concrete and asphalt -concrete paving, and termite control treatment at areas of new building construction and five feet beyond building perimeter. B. Weed control and termite control treatments to be executed by a certified applicator for minimum of five year treatment in accordance with all local and state codes and environmental regulations. 1.03 SUBMITTALS: A. In accordance with Division 1, provide data to show compliance with above requirements. WEED AND TERMITE CONTROL x.2280 -i ' SECTION 02513 ' ASPHALTIC CONCRETE PAVING PART 1 - GENERAL A. Work of this section includes furnishing all equipment, labor and materials to place new paving, replacement of existing paving and repair of paving. PART 2 - MATERIALS A. ASPHALTIC EMULSION PAINT BINDER shall be asphalt emulsion conforming to the requirements of Section 94 of the Caltrans Standard Specifications. ' B.. ASPHALT CONCRETE shall be Type B, conforming to the requirements of Section 39 of the Caltrans Standard Specifications. Asphalt shall be Viscosity Grade AR -4000 paving asphalt, conforming to Section 92 of the ' Standard Specifications. C. AGGREGATE for the asphalt concrete finish course shall conform to the requirements of Section 39-2.02 of the Caltrans Standard Specifications ' for 1/2 -inch maximum, medium grading. PART 3 - EXECUTION A. Paint binder shall be applied to the existing pavement at a rate of 0.05 ' to 0.10 gallons per square yard and shall be applied in accordance with the requirements of Section 39-4.02 of the Caltrans Standard Specifications. B. Asphalt Concrete shall be spread and compacted in layers as per the requirements of Section 39-6.01 of the Caltrans Standard Specifications and shall be spread with a self-propelled paver conforming to the ' requirements of Section 39-5.01 of the Caltrans Standard Specifications. Spreading and compaction operations shall conform to the requirements of Section 39-5 and 39-6 of the Caltrans Standard Specifications. ' C. Finish asphalt surfacing shall be thoroughly compacted and free draining and shall be free of ruts, humps, depressions or other irregularities. The Contractor shall test for any irregularities by applying water to ' the finished asphalt surface if so requested by the Owner. t 02513 - 1 l I SECTION 02721 STORM SEWERAGE SYSTEMS PART 1 - GENERAL 1. Scope: a. Includes but not limited to - 1) Furnish and install storm sewerage system complete as shown on the Drawings. PART 2 - MATERIALS A. REINFORCED CONCRETE STORM DRAIN PIPE shall be bell and spigot rubber gasket joint pipe conforming to ASTM C76, with joints conforming to ASTM C443. Pipe shall be designed for the trench depth and width where installed, but no less than Class III as specified in ASTM C76. B. ASBESTOS -CEMENT STORM DRAIN shall have rubber gasket joints with asbestos -cement collars. Pipe shall be in accordance with ASTM C663, Type II, or STM C428, Type II. Joints shall be in accordance with ASTM D1869. Fittings and plugs shall be of the same material as the pipe. Pipe shall be designed for the trench depth and width where installed, but no less than Class III. - C. CORRUGATED POLYETHYLENE TUBING AND F.ITTINGS shall conform to ASTM F 405-89 and ASTM F 667-85. All tubing shall be non -perforated. D. FITTINGS AND ACCESSORIES shall be as manufactured and furnished by the pipe supplier, or approved equal, and have bell and/or spigot configurations compatible with that of the pipe. E. CAST -IN-PLACE CONCRETE: All materials used in cast -in-place concrete shall be Class A concrete in accordance with Section 90 of the State Standard Specification. F. ON-SITE CATCH BASINS shall be Cook Concrete Products 18x18 precast catch basins with cast iron frame and grate rated for H-20 traffic loads. G. MORTAR shall be proportioned with one part portland cement to two parts clean, well -graded sand which will,pass a 1/8 -inch screen. Admixtures may be used not exceeding the following percentages of weight of cement: Hydrated lime, 10 percent; diatomaceous earth or other inert materials, ' 5 percent. Consistency of mortar shall be such that it will readily adhere to the surfaces. Mortar mixed for longer than 30 minutes shall. not be used. u 02721 - 1 PART 3 - EXECUTION A. PREPARATION OF THE TRENCH: The trench shall be prepared to receive the pipe as specified in Section 02 221 of these specifications entitled, Trenching, Backfilling, and Compaction. The excavation and preparation of the trench shall be completed a sufficient distance in advance of the pipe laying to prevent dislodged material from entering the pipe. B. INSTALLATION OF THE PIPE: Before lowering into the trench, the pipe shall be inspected for defects, and all cracked or broken pipe shall be discarded. The ends and interior of the pipe shall be clean. Belled ends shall be laid upgrade. Handling of the pipe shall be accomplished in a manner that will not damage the pipe. At manholes, pipe shall be installed so that there is a joint not more than 2 feet from the manhole wall. After lowering the pipe into the trench, the bell or coupling end and spigot shall be cleaned of any foreign matter and a suitable lubricant applied to the joint. The joint shall be made in the manner recommended by the manufacturer. Care shall be taken not to buckle or disturb previously laid pipe. Each joint shall be inspected to insure that it is properly made before backfilling. Care shall be taken to prevent any dirt or foreign matter from entering the open end of the pipe. Where it is necessary to cut pipe, such cuts shall be neatly made. The laid pipe shall be true to line and grade and, when complete, the storm drain shall have a smooth and uniform invert. Connections to pipe stubs of a different pipe material shall be made with a suitable connector. Connectors must be approved by the Architect prior to installation. C. BACKFILLING THE TRENCH: After the laid pipe has been inspected and approved by the Architect, the trench shall be backfilled as required under Section 02221 of these specifications entitled Trenching, Backfilling, and Compaction. D. CAST -IN-PLACE CONCRETE: Concrete work shall conform to Section 90 of the State Standard Specifications. Drop inlets shall be constructed only when the temperature is above 35 degrees Fahrenheit. All work shall be protected against freezing. Water shall be removed from the excavation and the excavation maintained "dry" during construction of the drop inlet and during the time required for the concrete or mortar to develop sufficient strength to resist rupture by groundwater . pressure. All pipes connected to drop inlets shall have a joint within 2 feet of the inlet wall. E. DROP INLETS: The subgrade for the drop inlet base shall be carefully prepared to provide a firm support for the drop inlet, and prevent future settlement of the drop inlet. 02721 - 2 1 02721 - 3 Drop inlet inverts shall be.formed either by -laying pipe through and cutting out the top portion before completion of the base of the drop ' inlet, or by forming.a "U" shaped channel in the concrete base slab. Cut edges of pipe laid through the drop inlet shall be fully covered by concrete when the drop i.nlet invert is -complete. The finished invert shall be smooth and true to grade. No mortar or broken pieces of pipe ' shall be allowed to enter the storm drain pipe. After completion of the drop inlet,. all plugs shall be completely removed from the storm drain pipe and all loose material shall be removed from the drop inlet. F. PIPE STUBS for future connections shall be not more than 3 feet long and shall be.plugged with standard gasketed plugs. 1 02721 - 3 ISECTION 02722 ' SANITARY SEWERAGE SYSTEMS PART 1 - GENERAL A. Work of this section includes furnishing all equipment, labor and materials to install the sanitary sewerage system complete as shown on the drawings. Begin sewer pipe 5 feet from building foundation and ' connect to the existing sewerage system as shown on the drawings. PART 2 - MATERIALS A. POLYVINYL CHLORIDE (PVC) SEWER PIPE shall be integral bell and spigot pipe conforming to ASTM Specification D3033 or D3034, with a maximum dimensional ration (DR) of 35. Provision must be made for contraction and expansion at each joint with a rubber ring gasket conforming to ASTM F477 and/or ASTM D3212. Minimum "pipe stiffness" at 5% deflection shall be 46 psi.for all sizes when tested in accordance with ASTM Test Method D2412. Maximum pipe deflection shall not exceed 5% of the nominal manufacturer's average inside pipe diameter, and shall be determined as ' specified in the paragraph of this specification entitled, "PIPE DEFLECTION TESTING". B. FITTINGS AND ACCESSORIES shall be as manufactured and furnished by the pipe supplier, or approved equal, and have bell and/or spigot configurations compatible with that of the pipe. ' C. CAST -IN-PLACE CONCRETE: All materials used in cast -in-place concrete shall be class B concrete in accordance with the applicable portions of Sections 51 and 90 of the State Standard Specifications. D. PRECAST CONCRETE MANHOLE SECTIONS: All precast sections, including riser sections, cones, grade rings, and flat slab tops, shall conform to ASTM C478, and the dimensions as shown on Butte County Department of Public Works Standard S-19 and S-25. Grade rings shall be a standard product, manufactured particularly for use in manhole construction, sized to fit the cones on which they are to be placed, and the wall ' thickness shall not be less than that of the cones. Grade rings shall be not less than 2 inches, nor more than 6 inches high. All precast components shall have tongue and groove ends. E. MANHOLE FRAMES AND COVERS: Principal dimensions shall be as shown on Butte County Department of Public Works Standard S-24. Iron castings shall conform to ASTM A48, Class 30. Castings shall be of consistently high quality, and shall be free of material and manufacturing defects. Covers shall have at least one blind pick hole or recessed lifting lug. Horizontal bearing surfaces shall be machined to smooth, plane surfaces providing for full contact between the frame and cover. 02772 - 1 F. FLUSH -HOLE FRAME AND COVER: Frame and covers shall be cast iron, conforming to ASTM A48, Class 30. The frame and cover shall be as shown -on Butte County Department of Public Works Standard S-23. G. JOINT SEALING COMPOUND COMPONENTS shall be RAM-NEK primer and joint sealing compound, KENT -SEAL primer and joint sealant, or approved equal. H. MANHOLE WATER STOPS shall be installed on PVC sewer pipe with stainless steel bands to make a watertight seal between the pipe wall and the concrete manhole base. I. PIPE, BENDS AND FITTINGS used in flush -holes and drop manhole construction as well as manhole stubs shall conform to the applicable sections of these Standard Specifications for sewer pipe. J. MORTAR shall be proportioned with one part portland cement to two parts clean, well -graded sand which will pass a 1/8 -inch screen. Admixtures may be used not exceeding the following percentages of weight of cement: Hydrated lime, 10 percent; diatomaceous earth or other inert materials, 5 percent. Consistency of mortar shall be such that it will readily adhere to the surfaces. Mortar mixed for longer than 30 minutes shall not be used. PART 3 - EXECUTION A. PREPARATION OF THE TRENCH: The trench shall be prepared to receive the pipe as specified in the section of these specifications entitled, "TRENCH, EXCAVATION AND BACKFILL". The excavation and preparation of the trench shall be completed a sufficient distance in advance of the pipe laying to prevent dislodged material from entering the pipe. B. INSTALLATION OF THE PIPE: Before lowering into the trench, the pipe shall be inspected for defects, and all cracked or broken pipe shall be discarded. The ends and interior of the pipe shall be clean. Belled ends shall be laid upgrade. Handling of the pipe shall be accomplished in a manner that will.not damage the pipe. At manholes, pipe shall be installed so that there is a joint not more than 2 feet from the manhole wall. After lowering the pipe into the trench, the bell or coupling end and spigot shall be cleaned of any foreign matter and a suitable lubricant applied to the joint. The joint shall be made in the manner recommended by the manufacturer. Care shall be taken not to buckle or disturb previously laid pipe. Each joint shall be inspected to insure that it is properly made before backfilling. Care shall be taken to prevent any dirt or foreign matter from entering the open end of the pipe. Where it is necessary to cut pipe, such cuts shall be neatly made. The laid pipe shall be true to line and grade and, when complete, the sewer shall have a smooth and uniform invert. 02772 - 2 Connections to pipe stubs of a different pipe material shall be made with a suitable connector. Connectors must be approved by the Architect prior to installation. C. CAST -IN-PLACE CONCRETE: Concrete work shall conform to the Standard Details and. the applicable portions of Sections 51 and 90 of the State ' Standard Specifications. A groove shaped to match the tongue of the first precast concrete riser section of the manhole shall be formed in the base slab. A circular metal form suited to the particular precast manhole manufacturer's joint ' shall be used to form the groove. Except as specified herein, all precast manhole sections shall be set in joint sealing compound. Joint sealing compound components shall be applied in the field. One brush coat of primer shall be applied to the tongue and groove surfaces to be sealed, then the preformed strip of sealing compound shall be pressed firmly to the dry, clean, primed joint surface (groove portion). Precast sections shall be set evenly in a full bed of sealing compound. After the precast sections have been placed, the interior joint surface shall be trimmed smooth with a trowel or sharp tool to remove any access joint compound projecting into the ' manhole Grade rings may be set with mortar if necessary for adjustment of the final cover elevation. Mortar joints shall not be more than 3/4 - inch thick. Excess mortar shall be trimmed flush. The outside of each mortar joint shall be sealed with an approved bituminous sealing compound. 02772 - 3 D. GENERAL MANHOLE CONSTRUCTION: Manholes shall be constructed only when the temperature is above 32 degrees Fahrenheit. All work shall be ' protected against freezing. Water shall be removed from the excavation and the excavation maintained "dry" during construction of the manhole and during the time required for the concrete or mortar to develop ' sufficient strength to resist rupture by groundwater pressure. All pipes connected to manholes shall. have a joint within 2.feet of the manhole wall. The subgrade for the manhole base shall be carefully prepared to provide a firm support for the manhole, and 'prevent future settlement of the manhole. Particular care shall be taken with deep manholes and manholes located in wet locations. Manhole inverts shall be formed as shown on the Standard Details, either by laying pipe through and cutting out the top portion before completion ' of the base of the manhole, or by forming a "U" shaped channel in the concrete base slab. Cut edges of pipe laid through the manhole shall be fully covered by concrete when the manhole invert is complete. The ' finished invert shall be smooth and true to grade. No mortar or broken pieces of pipe shall be allowed to enter the sewer pipe. A groove shaped to match the tongue of the first precast concrete riser section of the manhole shall be formed in the base slab. A circular metal form suited to the particular precast manhole manufacturer's joint ' shall be used to form the groove. Except as specified herein, all precast manhole sections shall be set in joint sealing compound. Joint sealing compound components shall be applied in the field. One brush coat of primer shall be applied to the tongue and groove surfaces to be sealed, then the preformed strip of sealing compound shall be pressed firmly to the dry, clean, primed joint surface (groove portion). Precast sections shall be set evenly in a full bed of sealing compound. After the precast sections have been placed, the interior joint surface shall be trimmed smooth with a trowel or sharp tool to remove any access joint compound projecting into the ' manhole Grade rings may be set with mortar if necessary for adjustment of the final cover elevation. Mortar joints shall not be more than 3/4 - inch thick. Excess mortar shall be trimmed flush. The outside of each mortar joint shall be sealed with an approved bituminous sealing compound. 02772 - 3 E. INSTALLATION OF FRAMES AND COVERS NOT IN ROADWAYS: Frames and covers shall be joined to the top of the manhole or structure so that the cover, when placed, will be at the proper elevation and so that no ground or surface water may enter the manhole or structure. The finish grade at the tops of manholes will be established after the excavation has been backfilled and compacted to true subgrade. F. INSTALLATION OF FRAMES AND COVERS IN ROADWAYS: Roadways are defined as . the paved part of all roads, driveways, and parking areas, public or private, and in addition, the unpaved shoulders of public roads. Concrete collars shall be installed around frames of manholes in roadways. Installation shall be as shown on the Standard Details. Portland. cement concrete shall be primed with an asphalt emulsion before it is overlaid with asphalt concrete. After completion of the manhole, all plugs shall be completely removed from the sewers and all loose material shall be removed from the manhole. G. PIPE STUBS for future connections shall not be more than 2 feet long and shall be plugged with standard gasketed plugs. H. DROP CONSTRUCTION AT MANHOLES shall be as shown on Butte County Department of Public Works Standard S-20. Particular care shall be taken to support the entering pipe on well -compacted material. I. FLUSH -HOLES shall be constructed as shown on Butte County Department of Public Works Standard S-22. The frame shall be joined to the riser pipe so that groundwater will be prevented from entering the sewer. J. BACKFILLING THE TRENCH: After the laid pipe has been inspected ad approved by the Architect, the trench shall be backfilled as required under the section of these specifications entitled "TRENCH EXCAVATION AND BACKFILL". K. CLEANING SEWERS: The pipe shall be cleaned in the following manner: The Contractor shall furnish an inflatable rubber ball of a size that will inflate to fit snugly into the pipe. The ball may, at the option of the Contractor, be used without a tag line; or a rope or cord may be fastened to the ball to enable the contractor to know and control its position at all times. The ball shall be placed in the last cleanout or manhole on the pipe to be cleaned, and water shall be introduced behind it. The ball shall pass through the pipe with only the force of the water impelling it. All debris flushed out ahead of the ball shall be removed at the first manhole where its presence is noted. In the event cemented or wedged debris, or a damaged pipe shall stop the ball, the Contractor shall remove the obstruction. 02772 - 4 L. WATERTIGHTNESS TEST: a. GENERAL: Tests for watertightness shall be made by the Contractor in the presence of the Owner. The Contractor shall furnish all labor, tools, materials, and equipment required to make•the tests. No testing for final acceptance of pipe will be done until the trench has been fully backfilled and acceptably compacted to finish grade, or if the sewer is under pavement, to the pavement subgrade. All sections of pipe shall be tested, and tests shall be made from manhole to manhole. The sewer shall be complete with trenches backfilled prior to testing. Where leakage is in excess of the specified rate, the sewer shall immediately be uncovered and the amount of leakage reduced by the Contractor to a quantity within the specified rate before the sewer is accepted. In addition, -the Contractor shall repair all visible leaks. The Owner will determine whether the test is to be by exfiltration or by infiltration. In most instances an exfiltration test will be required. Exfiltration tests shall be made with air except where the use of water is approved by the Owner. b. EXFILTRATION AIR TEST: Air Testing shall be done immediately following the cleaning of the pipe. Air shall be slowly supplied to the plugged pipe installation until the internal air pressure reaches 4.0 psi greater than the average back pressure of any groundwater that may submerge to the pipe. At least 2 minutes shall be allowed for temperature stabilization. The rate of air loss shall then be determined by measuring the time interval required for the internal pressure to decease from 3.0 to 2.5 psi greater than the average back pressure of any groundwater that may submerge the pipe. The pipeline shall be considered acceptable when tested at an average pressure of 2.75 psi greater than the average back pressure of any groundwater that may submerge the pipe, if the section under•te$t does not lose air at a rate greater than 0.0010 cubic feet per minute per square foot of internal pipe surface. Test time in seconds = 42.5 times the internal diameter of the pipe in inches. C. EXFILTRATION TEST WITH WATER: Water testing shall be done by filling the upper manhole with water to a depth of at least 3 feet over the top of the pipe or groundwater level, whichever is higher, with the end plugged at the lower manhole. The rate of leakage shall be determined by measuring the amount of water required to maintain the water level in the upper manhole. The test shall be maintained for a period of at least 2 hours. The Owner may, at his discretion, require a longer test period. Leakage shall not be in excess of the rate of 20 gallons per inch of pipe diameter per 1,000 feet of pipe per day. 02772 - 5 1 d. INFILTRATION TEST: In the event, that sufficient groundwater is present, an infiltration test maybe made. In this case, the pipe ' shall be tested for watertightness by installing plugs at the upper end of the pipe at the lower end on the exit side of a manhole. The rate of leakage will be determined by periodically , removing and measuring the water accumulated at the lower manhole. Leakage shall not be in excess of the rate specified for water testing by exfiltration. M. PIPE DEFLECTION TESTING: If flexible pipe material is used, the pipe , installation shall be tested for excessive deflection after all backfill and resurfacing materials have been placed and the line has been cleaned. ' A mandrel having an outside diameter of 95% of the average manufactured internal diameter shall be pulled through the pipeline. If the mandrel ' does not pass freely through the pipe, the pipe shall be re -excavated, bedded and backfilled to adequately support the pipe and reduce the pipe deflections to 5% or less. The pipeline shall then be retested for both ' deflection and watertightness. Should tests performed by the Owner within one year of the original testing.and acceptance, show deflection in excess of 7.5%, of the pipe diameter, the Contractor shall re -excavate, bed and backfill the pipe to provide adequate support and reduce the deflection to 5% or less. The pipeline shall be retested for deflections. The Contractor shall , reimburse the Owners cost of testing for all lines which require repair. 11 1 02772 - 6 E Ti T ]l. :U 'J VC:7JlJ CHAIN LINK FENCING AND GATES PART i - GENERAL 1.oi RELATED DOCUMENTS: A. Drawings and General Provisions of Contract and Supplementary Conditions and other Division 1 Specification Sections, apply to this section. 1.o2 SUMMARY: A. Chain lino: fencing and gates as shown on Drawinas, B. Miscellaneous chain link: closures as shown on Drawings. 1.03 r3 SUBMITTALS: A. Refer to Division 1 for submitting the following: 1. Product data. 2. Shoo Drawings. 3. Manufacturer's certification. 1.U4 QUALITY ASSURANCE: A. Manufacturer of chain link fence materials shall be a member of the Chain Link: Fence Manufacturer='s Institute. B. Chain link fence materials shall be produced in accord with Standard Specifications published by the Chain Link Fence Manufacturer's Institute and so certified in writing by the manufacturer. 1.05 MATERIALS: A. Size of framing members to be minimum as shown on Drawings and as required by above referenced standard specifications. B. All framing members to be hot -dip zinc coating galvanized. 2" x-9 ga. fabric to be zinc -coated steel chain link-. fence fabric.- 3/8" 11 ga. fabric to be steel with aluminum coating. All in accordance with above'referenced standard specifications. CHAIN LINK FENCING AND GATES 02830-1 C. 24" diameter slncle coil concealing barbed tape to be eauai to All:_ed Silent Swordsman (no tknown eoual) with standard cialvaniZed steel c'�i'e wire. Maximum coil loop spacing to be 12" for 15'-U" deployment of. each roll. D. Accessory items, hardware. etc., to be of suitable size and construction for proper installation of fencing and working of gates, all members to be galvanized. E. Concrete: Provide concrete consisting of portland cement complying with ASTM C -15e;, aggregates complying with ASTM C-33, and clean water. Mix materials to obtain concrete with a minimum 28 -day compressive strength of 2000 psi, using. at least 3 sacks of cement per cubic yard, 1" maximum size aggregate, maximum 3" slump. 1.o6 INSTALLATION: A. Installation of work: to be in accordance with above referenced standard specifications and to suit conditions at the project for secure, tamper-resistant assembly. CHAIN LINE': PENC I NG AND GATES o2830-2