WORK WRITE-UP -
APPLICANT Janet Wood
PROPERTY ADDRESS 1360 Boucher St
CITY, STATE, ZIP': Chico, Ca 95928 ✓ JN.,,,-.
MAILING ADDRESS SEE PROPERTY ADDRESS 9
CITY, STATE, ZIP SEE PROPERTY ADDRESS
PHONE NUMBER (916) 342-61B7 t'"
DATE October 20, 1992
The following work is to be performed by licensed contractors and/or the
homeowner for the purpose of bringing the subject property, which has
been found to be substandard, into compliance with local housing/building
codes and regulations. The contractor or owner, in the case of an owner
performing his/her own work, shall be responsible for determining the
applicable code requirements and for performing work in compliance
therewith.
Estimates shall be based only on the work specified in this work write-
up. Contractors discovering or suspecting an error or omission in either
this write-up or plans (when applicable) shall promptly report to the
Housing Rehabilitation Consultant (916-456-4784) so that items in
question may be -investigated for possible addition to required work.
All work must be performed in compliance with published "grades and
standards". Materials must match, be of equivalent quality, or exceed
those published on'"materials list". If not listed, "medium grade"
should be assumed.
Owner's preference for style and color should be followed wherever
possible. Please see attached Materials Allowance Breakdown for
guidelines pertaining to allowances
Any measurements and drawings attached hereto are to be considered
approximations unless otherwise stated. The responsibility for
determining the exactness of structural measurements and other
specifications shall be that of the contractor and shall be a condition
implicit in all bid or proposal submittals.
1
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
1. PERMITS
A copy of the building permit will be required BEFORE construction begins
and shall be provided by the contractor. The contractor will secure all
necessary permits to complete the entire project and must submit to the
local entity a signed -off building permit at the completion of the
project.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN, OBTAIN, AND MAINTAIN
RECORDS OF ALL REQUIRED PERMITS.
$
Provide dumpster service or daily removal of construction debris for
duration of contract. Premises to be left in a broom clean condition on
a daily basis.
If the value of this bid exceeds $1,000, smoke detectors will be required
in each sleeping room and in each hallway leading to sleeping areas and
on each floor. Smoke detectors shall be hard wired and interconnected
with battery back up in areas of new work and may be the battery type in
other areas that are existing.
(QUANTITY: 3 )
H
"Nol.xlhh1!Z;11_oulawl
Remove the existing concrete footing and piers where needed.
Form and pour 2'x 2'x 12" deep concrete pier pads. Use #4 rebar grids at
12" O.C. base of pads 3" above soil. Locate pads centrally under main
support beams at spans as specified in U.B.C. Align and re -support
floor with tight -fitting 4"x4" vertical fir posts.
(LOCATION: Where Needed)
Install a new perimeter foundation system for the existing residence.
All new work to be to current UBC and local jurisdictional codes.
2
Im
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
----------------------------------------
----------------------------------------
t
Replace the main service entry panel with 100 amp CB main service in a
rain -tight entrance panel box, (Crouse -Hinds 3C -002 -AR or any approved
equal).
Check for re -use of existing weather head/periscope or provide new
weather head/periscope. Service feeds to meet all current local and
national electrical codes for replacements. Reconnect existing circuits
to new panel. Balance loads for existing circuits.
New circuits: GFCI breaker of the same amperage on circuits feeding the
bathrooms, kitchen counter outlets, one in garage, one in laundry, and
any exterior outlets; a 20 amp circuit breaker for the laundry outlets,
one 30 amp 240V for the water heater (if existing); one 50 amp 240 V for
the stove; four 15 amp 120V lights/general purpose; three 20 amp 120V
dedicated for the kitchen; one 20 amp 120V general purpose outlet
circuit; two blank spaces.
Provide and install No. 8 bare copper hard drawn ground wire from the
grounding terminal of the service entrance box and fastened to the street
side of the metallic water service pipe and to a rod 1/2" x 8" copper
ground set 1" above grade. Use a bronze grounding clamp. Ground wire
must be in conduit where exposed to any external damage. ID all existing
and new circuits at service panel/sub panel(s) in ink.
Rewire the existing runs in the attic. All existing switches, outlets,
receptacle boxes, and junction boxes need to be checked for
serviceability and replaced as necessary. All receptacles within 6 ft of
all sinks or bathtubs shall be GFCI protected. Exposed wiring in the
garage [ below 7"] must be encased in walls or in approved metal tubing.
• �. o411.
Provide and install -R-30 blown insulation in the attic over the living
area of residence.
NOTE: PROVIDE CANT STRIPS AT EAVES WHERE RIGID INSULATION IS USED.
(APPROXIMATE SQUARE FOOTAGE: 1,200 )
H
Provide and install Kraft paper -faced R-11 fiberglass insulation in the
exterior walls.
r
3
R]
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
----------------------------------------
----------------------------------------
fl�1I4Ii16. 1P41O ::_k,�
a. Doors: Replace deteriorated door with a new 1-3/4" thick, S -C
exterior door to fit the existing opening. Provide and install
three standard butt hinges and "SCHLAGE" or equal, polished brass
finish, 1" single cylinder entry lockset and 1" single cylinder dead
bolt. Provide adjustable vinyl weatherstripping at jambs and an ex-
truded aluminum threshold with vinyl inserts. Provide a 1/2"
peephole with a minimum 160 degree field of vision. Key all door
locks alike.
(LOCATION: Front Entry )
(MATERIALS ALLOWANCE: See attached Materials Allowance Breakdown)
Replace deteriorated door with a new 1-3/8" thick S -C door to fit
existing opening. Provide and install three standard butt hinges,
"SCHLAGE" or equal, with a polished brass finish, 1" single cylinder
entry lockset, and a 1" single cylinder dead bolt.
(LOCATION: Rear Entry )
(MATERIALS ALLOWANCE: See Attached Materials Allowance Breakdown)
11
b. Windows: Remove existing deteriorated window units. Install All -
.Weather or approved equal, (bronze/satin) anodized aluminum
replacement windows in existing window openings with
(vertical/horizontal) slider, pin locks and screens.
Every sleeping room shall have at least one operable window or door
approved for emergency escape or rescue which shall open directly
into a public street, public alley, yard or exit court.
All escape or rescue windows shall have a minimum net clear openable
area of 5.7 square feet. The minimum net clear openable height
dimension shall be 24 inches. The minimum net clear openable width
dimension shall be 20 inches. The finish sill height shall be not
more than 44 inches above the floor.
NOTE: CONTRACTOR TO VERIFY ALL.WINDOW SIZES
(SIZE AND QUANTITY: 2-3x3, 7-3x5, 1-4x4, 2-5x5 )
(TYPE OF GLASS: Dual glazed- )
$
Remove existing wood siding on the dwelling.
Provide and install new plywood siding, over 15# non -perforated felt
paper. Door and window trims to match existing. All fasteners to be
galvanized.
4
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
Strip and dispose of existing deteriorated roof covering over residence
to bare wood sheathing. Remove all nails or pound flat.
Provide and install 3/8" CDX plywood sheathing over entire roof area.
Nail and space as per manufacturer's specifications.
Provide and install a 240 lb, 25 -yr, Class "C" fire- rated fiberglass
composition roof shingles per manufacturer's specifications. Install
over a layer of 30# non -perforated roofing felt.
REPLACE ALL SHEET METAL WITH NEW: including roof jacks, crickets, saddles
and or flashing/edge strips.
NOTE: ALL ROOFS TO HAVE A 5 YEAR WARRANTY ON LABOR/INSTALLATION AND A
SUPPLIERS WARRANTY ON ALL MATERIALS INSTALLED.
(APPROXIMATE NUMBER OF SQUARES: 4 )
.
IN
Provide and install all materials necessary to replace the deteriorated
subfloor in the bathroom and back porch.
Provide and install all materials necessary to replace the deteriorated
wood on the front porch floor.
Provide and install a double cast iron kitchen sink, with a new single
lever Delta or equal faucet. Include new shut offs and supply tubes.
(MATERIALS ALLOWANCE: See Attached Materials Allowance Breakdown)
Remove deteriorated vinyl floor.
Provide and install 3/8" particle board underlayment. Securely nail and
glue all edges and fields. Apply joint filler at all seams, for smooth
finish.
Provide and install vinyl sheet floor covering with rubber molded
baseboard. Use adhesive recommended by vinyl manufacturer. Property
owner will select color and design of floor covering.
(APPROXIMATE SQUARE YARDAGE: 6 )
(LOCATION: Bathroom )
(MATERIALS ALLOWANCE: See attached Materials Allowance Breakdown)
5
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
Provide and install formica cabinet top with a 4" backsplash.
owner to select color and style of top.
(LOCATION: Kitchen )
Property
(APPROXIMATE LINEAL FEET: 16 )
(MATERIALS ALLOWANCE.: See attached Materials Allowance Breakdown)
Clean all interior walls, ceilings, doors, and trim of all rooms. Remove
all dirt and grease to achieve a sound painting surface. Fill all
irregularities in areas to be painted with approved fillers and sand [or
texture] to match existing surfaces in kind.
Paint interior walls and ceilings of all with a premium quality latex
paint installed as per manufacturer's specifications. Paint color to
match existing as closely as possible. Paint trim, doors, walls and
ceilings of kitchens and baths with a premium quality semi gloss latex
enamel, installed as per manufacturer's specifications.
Colors to match existing as closely as possible.
SUBTOTAL $
OVERHEADZPROFIT $
TOTAL $
Any deviation from this bid in cost, materials, labor or scheduling shall
be documented in a change order in accordance with the provisions in the
owner/contractor agreement.
63- 6�,ga
PREPARED BY TO CELIZ DATE
Inspector
6
HOUSING REPAIR PROGRAM
WORK WRITE-UP -
The undersigned hereby certifies that the above information is accurate
to the best of his/her knowledge, that he/she agrees to abide by
regulations and specifications set forth in this proposal and attached
Materials Allowance Breakdown, and that he/she has the authority to
legally bind and negotiate for:
COMPANY NAME:
ADDRESS:
TELEPHONE:
CONTRACTOR
LICENSE: EXP. DATE:
DATE
I ACCEPT THIS PROPOSAL SUBJECT TO LOAN APPROVAL AND EXECUTION OF
OWNER/CONTRACTOR AGREEMENT.
OWNER
OWNER
23
7
DATE
DATE
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
MATERIALS ALLOWANCE BREAKDOWN
October 20, 1992
Material allowances are applicable only on those items identified in the
attached Work Write Up. These allowances, when listed, are minimum
purchase prices which are intended to maintain a given level of quality.
All items purchased as "allowances" must be approved by the homeowner.
At the owner's request, the contractor will submit all receipts for
allowanced items. If it is determined that the contractor has spent less
on allowanced items than the amount specified in this Breakdown, that
amount will be credited to the "Owner" in the form of a change order
reduction in the original contract amount.
Plumbing
Water heater (50ga1) $250
Kitchen sink (stainless steel, 20 gauge min) $ 75
Kitchen sink (cast iron porcelain) $160
Fixtures (bath and kitchen, Delta or better) $ 70
Water closet $150
Bathtub (cast iron) $250
Bathtub/shower surround (cultured marble) $500
Shower pan (cultured marble) $250
Enclosure (tempered glass) $120
Electrical
Bathroom exhaust fan (no light) $ 25
Light fixtures (interior and exterior) $ 20
Light fixtures (florescent kitchen) $150
Doors
Exterior (steel, prehung, 6 panel) $100
Interior (prehung) $ 50
Screen door (security) $ 80
Screen door (regular) $ 50
Cabinetry
Kitchen cabinets $150/LF
Counter top (formica) $ 17/LF
Bathroom vanity -(including cultured marble top) $400
Bathroom medicine cabinet $ 50
Appliances
Oven/stove (4 burner gas stove/oven)
Air conditioner (1,400 BTU window,unit)
Wood burning stove (or pellet)
Flooring
Vinyl (medium to high quality)
Carpet (medium to high quality)
Miscellaneous
Gable end attic vents
■
$350
$500
$1,300
$ 15/yd
$ 21/yd
$ 30
HOUSING REPAIR PROGRAM
- WORK WRITE-UP -
Bathrcom Enclosed Porch
Bedroom #2 Kitchen
Bedroom.#1 Livngroom
Tom Reid
Division of Environmental Ilealtl�.,......_........ ,
Jim Glander
Building Inspection Division
7 County Center Drive
Oroville,-California 95965
Gentleman:
1/We request an inspection of the property identified below for the purpose of
obtaining financial assistance for home repairs under the County's Community
Development Block Grant Rehabilitation Program. I/We understand that if this
inspection uncovers health and safety. violations, we may he required to remedy