Loading...
HomeMy WebLinkAbout005-404-003IN 005t -4,. '003O:-4- jANET-.-W-0-0D - --136d-*BbU6:HEk',§TR'EE'T-',- CH'I'CO IETTERV`.,� ,REHAB e la HOU S = NG RRPAI R PROGRAM CONNERLY & ASSOCIATES, 2215 21ST STREET, SACRAMENTO, CA 95818 <916) 456-4784 ... ' E DILI'�ATI.D*N'::. GR: ................... _.............._....:.:.:.:.:.:.:...... . 6C..P C::F.::I:CAT:isOflf9;::::::::::::::::::::::::::::::::::::::::::::: ........ WORK WRITE-UP - APPLICANT Janet Wood PROPERTY ADDRESS 1360 Boucher St CITY, STATE, ZIP': Chico, Ca 95928 ✓ JN.,,,-. MAILING ADDRESS SEE PROPERTY ADDRESS 9 CITY, STATE, ZIP SEE PROPERTY ADDRESS PHONE NUMBER (916) 342-61B7 t'" DATE October 20, 1992 The following work is to be performed by licensed contractors and/or the homeowner for the purpose of bringing the subject property, which has been found to be substandard, into compliance with local housing/building codes and regulations. The contractor or owner, in the case of an owner performing his/her own work, shall be responsible for determining the applicable code requirements and for performing work in compliance therewith. Estimates shall be based only on the work specified in this work write- up. Contractors discovering or suspecting an error or omission in either this write-up or plans (when applicable) shall promptly report to the Housing Rehabilitation Consultant (916-456-4784) so that items in question may be -investigated for possible addition to required work. All work must be performed in compliance with published "grades and standards". Materials must match, be of equivalent quality, or exceed those published on'"materials list". If not listed, "medium grade" should be assumed. Owner's preference for style and color should be followed wherever possible. Please see attached Materials Allowance Breakdown for guidelines pertaining to allowances Any measurements and drawings attached hereto are to be considered approximations unless otherwise stated. The responsibility for determining the exactness of structural measurements and other specifications shall be that of the contractor and shall be a condition implicit in all bid or proposal submittals. 1 HOUSING REPAIR PROGRAM - WORK WRITE-UP - 1. PERMITS A copy of the building permit will be required BEFORE construction begins and shall be provided by the contractor. The contractor will secure all necessary permits to complete the entire project and must submit to the local entity a signed -off building permit at the completion of the project. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN, OBTAIN, AND MAINTAIN RECORDS OF ALL REQUIRED PERMITS. $ Provide dumpster service or daily removal of construction debris for duration of contract. Premises to be left in a broom clean condition on a daily basis. If the value of this bid exceeds $1,000, smoke detectors will be required in each sleeping room and in each hallway leading to sleeping areas and on each floor. Smoke detectors shall be hard wired and interconnected with battery back up in areas of new work and may be the battery type in other areas that are existing. (QUANTITY: 3 ) H "Nol.xlhh1!Z;11_oulawl Remove the existing concrete footing and piers where needed. Form and pour 2'x 2'x 12" deep concrete pier pads. Use #4 rebar grids at 12" O.C. base of pads 3" above soil. Locate pads centrally under main support beams at spans as specified in U.B.C. Align and re -support floor with tight -fitting 4"x4" vertical fir posts. (LOCATION: Where Needed) Install a new perimeter foundation system for the existing residence. All new work to be to current UBC and local jurisdictional codes. 2 Im HOUSING REPAIR PROGRAM - WORK WRITE-UP - ---------------------------------------- ---------------------------------------- t Replace the main service entry panel with 100 amp CB main service in a rain -tight entrance panel box, (Crouse -Hinds 3C -002 -AR or any approved equal). Check for re -use of existing weather head/periscope or provide new weather head/periscope. Service feeds to meet all current local and national electrical codes for replacements. Reconnect existing circuits to new panel. Balance loads for existing circuits. New circuits: GFCI breaker of the same amperage on circuits feeding the bathrooms, kitchen counter outlets, one in garage, one in laundry, and any exterior outlets; a 20 amp circuit breaker for the laundry outlets, one 30 amp 240V for the water heater (if existing); one 50 amp 240 V for the stove; four 15 amp 120V lights/general purpose; three 20 amp 120V dedicated for the kitchen; one 20 amp 120V general purpose outlet circuit; two blank spaces. Provide and install No. 8 bare copper hard drawn ground wire from the grounding terminal of the service entrance box and fastened to the street side of the metallic water service pipe and to a rod 1/2" x 8" copper ground set 1" above grade. Use a bronze grounding clamp. Ground wire must be in conduit where exposed to any external damage. ID all existing and new circuits at service panel/sub panel(s) in ink. Rewire the existing runs in the attic. All existing switches, outlets, receptacle boxes, and junction boxes need to be checked for serviceability and replaced as necessary. All receptacles within 6 ft of all sinks or bathtubs shall be GFCI protected. Exposed wiring in the garage [ below 7"] must be encased in walls or in approved metal tubing. • �. o411. Provide and install -R-30 blown insulation in the attic over the living area of residence. NOTE: PROVIDE CANT STRIPS AT EAVES WHERE RIGID INSULATION IS USED. (APPROXIMATE SQUARE FOOTAGE: 1,200 ) H Provide and install Kraft paper -faced R-11 fiberglass insulation in the exterior walls. r 3 R] HOUSING REPAIR PROGRAM - WORK WRITE-UP - ---------------------------------------- ---------------------------------------- fl�1I4Ii16. 1P41O ::_k,� a. Doors: Replace deteriorated door with a new 1-3/4" thick, S -C exterior door to fit the existing opening. Provide and install three standard butt hinges and "SCHLAGE" or equal, polished brass finish, 1" single cylinder entry lockset and 1" single cylinder dead bolt. Provide adjustable vinyl weatherstripping at jambs and an ex- truded aluminum threshold with vinyl inserts. Provide a 1/2" peephole with a minimum 160 degree field of vision. Key all door locks alike. (LOCATION: Front Entry ) (MATERIALS ALLOWANCE: See attached Materials Allowance Breakdown) Replace deteriorated door with a new 1-3/8" thick S -C door to fit existing opening. Provide and install three standard butt hinges, "SCHLAGE" or equal, with a polished brass finish, 1" single cylinder entry lockset, and a 1" single cylinder dead bolt. (LOCATION: Rear Entry ) (MATERIALS ALLOWANCE: See Attached Materials Allowance Breakdown) 11 b. Windows: Remove existing deteriorated window units. Install All - .Weather or approved equal, (bronze/satin) anodized aluminum replacement windows in existing window openings with (vertical/horizontal) slider, pin locks and screens. Every sleeping room shall have at least one operable window or door approved for emergency escape or rescue which shall open directly into a public street, public alley, yard or exit court. All escape or rescue windows shall have a minimum net clear openable area of 5.7 square feet. The minimum net clear openable height dimension shall be 24 inches. The minimum net clear openable width dimension shall be 20 inches. The finish sill height shall be not more than 44 inches above the floor. NOTE: CONTRACTOR TO VERIFY ALL.WINDOW SIZES (SIZE AND QUANTITY: 2-3x3, 7-3x5, 1-4x4, 2-5x5 ) (TYPE OF GLASS: Dual glazed- ) $ Remove existing wood siding on the dwelling. Provide and install new plywood siding, over 15# non -perforated felt paper. Door and window trims to match existing. All fasteners to be galvanized. 4 HOUSING REPAIR PROGRAM - WORK WRITE-UP - Strip and dispose of existing deteriorated roof covering over residence to bare wood sheathing. Remove all nails or pound flat. Provide and install 3/8" CDX plywood sheathing over entire roof area. Nail and space as per manufacturer's specifications. Provide and install a 240 lb, 25 -yr, Class "C" fire- rated fiberglass composition roof shingles per manufacturer's specifications. Install over a layer of 30# non -perforated roofing felt. REPLACE ALL SHEET METAL WITH NEW: including roof jacks, crickets, saddles and or flashing/edge strips. NOTE: ALL ROOFS TO HAVE A 5 YEAR WARRANTY ON LABOR/INSTALLATION AND A SUPPLIERS WARRANTY ON ALL MATERIALS INSTALLED. (APPROXIMATE NUMBER OF SQUARES: 4 ) . IN Provide and install all materials necessary to replace the deteriorated subfloor in the bathroom and back porch. Provide and install all materials necessary to replace the deteriorated wood on the front porch floor. Provide and install a double cast iron kitchen sink, with a new single lever Delta or equal faucet. Include new shut offs and supply tubes. (MATERIALS ALLOWANCE: See Attached Materials Allowance Breakdown) Remove deteriorated vinyl floor. Provide and install 3/8" particle board underlayment. Securely nail and glue all edges and fields. Apply joint filler at all seams, for smooth finish. Provide and install vinyl sheet floor covering with rubber molded baseboard. Use adhesive recommended by vinyl manufacturer. Property owner will select color and design of floor covering. (APPROXIMATE SQUARE YARDAGE: 6 ) (LOCATION: Bathroom ) (MATERIALS ALLOWANCE: See attached Materials Allowance Breakdown) 5 HOUSING REPAIR PROGRAM - WORK WRITE-UP - Provide and install formica cabinet top with a 4" backsplash. owner to select color and style of top. (LOCATION: Kitchen ) Property (APPROXIMATE LINEAL FEET: 16 ) (MATERIALS ALLOWANCE.: See attached Materials Allowance Breakdown) Clean all interior walls, ceilings, doors, and trim of all rooms. Remove all dirt and grease to achieve a sound painting surface. Fill all irregularities in areas to be painted with approved fillers and sand [or texture] to match existing surfaces in kind. Paint interior walls and ceilings of all with a premium quality latex paint installed as per manufacturer's specifications. Paint color to match existing as closely as possible. Paint trim, doors, walls and ceilings of kitchens and baths with a premium quality semi gloss latex enamel, installed as per manufacturer's specifications. Colors to match existing as closely as possible. SUBTOTAL $ OVERHEADZPROFIT $ TOTAL $ Any deviation from this bid in cost, materials, labor or scheduling shall be documented in a change order in accordance with the provisions in the owner/contractor agreement. 63- 6�,ga PREPARED BY TO CELIZ DATE Inspector 6 HOUSING REPAIR PROGRAM WORK WRITE-UP - The undersigned hereby certifies that the above information is accurate to the best of his/her knowledge, that he/she agrees to abide by regulations and specifications set forth in this proposal and attached Materials Allowance Breakdown, and that he/she has the authority to legally bind and negotiate for: COMPANY NAME: ADDRESS: TELEPHONE: CONTRACTOR LICENSE: EXP. DATE: DATE I ACCEPT THIS PROPOSAL SUBJECT TO LOAN APPROVAL AND EXECUTION OF OWNER/CONTRACTOR AGREEMENT. OWNER OWNER 23 7 DATE DATE HOUSING REPAIR PROGRAM - WORK WRITE-UP - MATERIALS ALLOWANCE BREAKDOWN October 20, 1992 Material allowances are applicable only on those items identified in the attached Work Write Up. These allowances, when listed, are minimum purchase prices which are intended to maintain a given level of quality. All items purchased as "allowances" must be approved by the homeowner. At the owner's request, the contractor will submit all receipts for allowanced items. If it is determined that the contractor has spent less on allowanced items than the amount specified in this Breakdown, that amount will be credited to the "Owner" in the form of a change order reduction in the original contract amount. Plumbing Water heater (50ga1) $250 Kitchen sink (stainless steel, 20 gauge min) $ 75 Kitchen sink (cast iron porcelain) $160 Fixtures (bath and kitchen, Delta or better) $ 70 Water closet $150 Bathtub (cast iron) $250 Bathtub/shower surround (cultured marble) $500 Shower pan (cultured marble) $250 Enclosure (tempered glass) $120 Electrical Bathroom exhaust fan (no light) $ 25 Light fixtures (interior and exterior) $ 20 Light fixtures (florescent kitchen) $150 Doors Exterior (steel, prehung, 6 panel) $100 Interior (prehung) $ 50 Screen door (security) $ 80 Screen door (regular) $ 50 Cabinetry Kitchen cabinets $150/LF Counter top (formica) $ 17/LF Bathroom vanity -(including cultured marble top) $400 Bathroom medicine cabinet $ 50 Appliances Oven/stove (4 burner gas stove/oven) Air conditioner (1,400 BTU window,unit) Wood burning stove (or pellet) Flooring Vinyl (medium to high quality) Carpet (medium to high quality) Miscellaneous Gable end attic vents ■ $350 $500 $1,300 $ 15/yd $ 21/yd $ 30 HOUSING REPAIR PROGRAM - WORK WRITE-UP - Bathrcom Enclosed Porch Bedroom #2 Kitchen Bedroom.#1 Livngroom Tom Reid Division of Environmental Ilealtl�.,......_........ , Jim Glander Building Inspection Division 7 County Center Drive Oroville,-California 95965 Gentleman: 1/We request an inspection of the property identified below for the purpose of obtaining financial assistance for home repairs under the County's Community Development Block Grant Rehabilitation Program. I/We understand that if this inspection uncovers health and safety. violations, we may he required to remedy L hese problems whether or not we receive financial assistance under tris program. SIGNED: wne Wae . ae 13G�S�� roper y —A-(Td ress T gone -� ��