Loading...
HomeMy WebLinkAbout027-082-014=uo-/2--jjq- 7/� 93-2812' B HEV LYN2 ROVILLECSPARKSCPORCH/SF V. (x J _ t DD I y RESIDENTIAL • ,,�-------- -- --- m 93-2812 B 027-08-2-015. WORTH, EVELYN HOLLANDS Y 2$7q S VILLA,.OROVILLE CONTR: LAWSOM &.SPARKS COVER EXISTING PORCH/SF S I e 19 A JAB FINALED (Date ` 1 Signature I V=OK O=Not OKNot _ 1• = Not Readgable MOBILE. HOMES Date/Initials MOBILE HOME UTILITIES (Plans) OK except #'a " 1. Zoning Requirements -Setbacks -Easements 2. Soils; Special MH Support Sketch 3. Sewer; Location -Test -Fall -C/O Concrete 4. Water; Location -Test -Easement Needed (Sketch) 5. Electricity; Location-Clearences-Grnd-/ /Amp -Concrete 6. Gas; Location -Test -Wrap: / /"L"ft. / /"Net. or/ /'L"ft./ /"LPG 7. Well Clearance & Disconnect 8. Utility Clearance Date/Initials MOBILE HOME INSTALLATION (Plans) OK except #'s 1. Zoning Requirements -Setbacks Easements 2. Footings; Size -Spacing -Marriage Line 3.. Gas; MH Test -Demand -Valve -Connector 4. Electricity; MH Test -Crossovers -Breakers -Clearances 5. Drain; MH Test -Fell -Flex Connector 6. Water; MH Test -Regulator -Connector 7. Water and Sewer Connected -C/O to Grade -HD Approval 8. Gas and Electricity Tagged •9. Exits; Insp.-Sketch 10. Cert. of Occupancy MISCELLANEOUS Date/Initial DECKS, COVERS, CARPORTS, GARAGES, (Plans)OK except #'a 1. Zoning Requirements -Setbacks -Easements 2. Footings; Soils -Size -Depth -Spacing -Connectors -Steel 3. Decks; Griders and/or Joists -Decking -Bracing -Stairs -Rails 4. Wood Awn.; Posts-Beams-Rftrs.-Connectors Shthg.-Rfg.-Bracing 5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures 6. Carports; Windows -Doors 7. Electric 8. Frmg; Sils-Anchors-Studs-Rftrs-Trusses 9. Siding; Nailing -Veneer -Stucco -Mesh 10. Roof; Shthg-Roofing 11. Ext.; Steps -Doors -Lendings Date/Initials POOLS (Plans) OK except #'s 1. Setbacks -Easements 2. Soils; Compaction -Structure Stability 3. Pool Structure; Steel -Connections -Thickness Dead Men -Lining 4. Elec.; Receptacles and Lighting, Distances-GFI 5. Elec.; Pool Lighting; 15 volts-GFI 6. Elec.;Enclosurea; Conduit Entries -Terminals -Listed 7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater 8. Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg. Boxes-Enclosures-PaneIboa rds-Ins. to Main In Conduit 9. Health Department Approval 10. Plumb.; Cir. Test -Water Supply Test V=OK O=Not OK - = Not Applicable = Not Ready RESIDENTIAL (Single & Duplex) Iq. Date/Initials UNDERFLOOR (Plans) OK except #'s ` 1. Zoning -Setbacks -Easements -Flood -Slope 2. Ftg., Main; Soils-Elec. Grnd.-/ P' Ftg. Depth 3. Ftg., Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth 4. Ftg., Porches & Decks; Soils -Steel-/ /Ftg. Depth 5. Stemwalls, Main; Steel-Blockouts-Wrapped I 6. Stemwalls, Garage; Steel-Blockouts-Wrapped i, 6a. Hold Downs and Special Anchors 7. Slab; Steel -Wrapped �. 8. Piers -Fireplace Ftg.-Steel 9. D.W.V.; Fell -Fitting -Test -2 Way C/O -Sewer Test 10. UF. Gas Pipe; Size -Anchors - yard gas piping: size -test 11. Water Pipe; Test -Anchor -Regulator -Service Test ! 12. Electric; Underground 13. Pienums & Ducts; Clearance -Material -Support -Ina. ' 14. Girders -Sills -Anchor Bolts -Joists -Vents -Cripples 15. Access & Ventilation �l• 16. Insulation 3r i. s' Date/Initials PLUMBING (Permit) OK except #'s 16. Water Htr.; Vent -Access -Combustion Air -Baffle 17. Water Pipe; Test & Anchor -Nail Protection 18. D.W.V.; Test -Fittings & Anchor -Nasi Protection 19. Shower Pan; Test, First Floor -Tub Access 20. Test Tub & Shower, Second Floor -Tub Access 21. Gas Pipe; Size & Anchors i ; Date/initials ELECTRICAL (Permit) OK except #'s 22." Fixture & Transformer Clearance -Ins. Protection 23. Elec. Receptacles Spacing -Lights & Switches at Doors 24.,Size Boxes & No. of Conductors -Stapled 25.tiRomex Installed Close to Edge of Studs & C.J. 26. Equip. Ground made up w/Meth. Fastners-Bond Gas & Water 27. 2 Appliance Circuts in Kitchen & Conductor Size/GFI 28. Subfeed Wire Size / / ga. Cu or AI-A.C. Wire Size / / ga. Cu or Al 29. Range Circ. / / ga. Cu or AI -Oven Circ. / / ga. Cu or Al. Insulated Neutral ❑ Yes ❑ No 30. Service -Riser Conductors & Ground -Main Disconnect 31. Equip. Clearances Panels -Motors -Mach. Equip. 32. Clothes Closet Light -Shower Light -Spa Light 33. Smoke Detector Date/Initials MECHANICAL (Permit) OK except #'s 34. A.C. Ducts Insulation & Support 35. Vent Fan; Exhaust above insulation 36. Condensate Drain & Overflow; Size & Grade 37. Furnance-Vent; Access -Comb. Air -Return Air Vent -115 outlet 38. Attic Access & Platform if Furnance in Attic Date/Initials FRAMING (Plans) OK except #'s 39. Sils, Proper Material & Anchors 40. Walls Studs -Nailing, Spacing & Bracing -Plates -Sound 41. Bearing Walls over Girders & Floor Nailing 42. Draft Stop in Walls (rat proof) 43. Fire Stops; Furred Ceilings -Stairs -Chases -Tub 44. Headers & Beam -Size & Bearing Date/Initials FRAMING (Continued) 45. Hangers -Post Caps -Anchors -Connectors 46. Ong. Joist-Rftr. ties-Purliri=roof Brac-Truss-Shthng.-Rfng 47. Fireplace Ties or Type A Flue -Fireplace Throat clearance 48. Attic Access; Size & Romex Protection -Draft Stop -Ins. Baffles 49. Bdrm. Windows or Exiting Doors -Sill Hgt. & Dimensions 50. Garage Fire Protection Framing 51. Property Line Firewall & Openings 52. Ext. Doors -One 3' -Check Garage -3rd Story, 2 Exits 53. Stairs; Width -Headroom -Rise -Run -Landing -Fire Protection 54. plywood on Roof Overhang -Attic Vents -Rafter Outriggers 55. Siding -Nailing Veneer 56. Stucco Mesh -Drip Screed -Fd. Vents-Underflr. Access 57. Glazing Area -Glass Protection -Skylights -Plastic 58. Shear Walls; Nailing -Bolts 59. Insulation -Walls -Ceilings 60. Infiltration -Walls -Windows Date/Initials FINAL (Plans) OK except #'s 61. Ext. Steps -Door & Sidelight Protection -Landings 62. Smoke Detector 63. Furnace; Vents -Clearance -Comb. Air -Connector - In Garage; Above Floor -Ducts -Mach. Protection 64. Bedroom Exiting 65. G.F.I. & Bath Fixtures & Tub Access -Spa 66. Elec. Trim & Subpanel; Breaker Sizes & Labels 67. Stairs & Rails 68. Fireplace or Stove; Clearances -Hearth 69. Elec. Outlets at Wood Panel; Int. & Ext. 70. Kit.Fixt. & Appliance; Grnd.-Air Gap -Cooking Clearance 71. Elec. Outlets & Receptacles at Kit. Counter 72. Garage Fire Door; Swing -Landing -Closer 73. A.C. Duct in Garage -Damper 74. Wtr. Htr.; Vents -Clearance -Comb. Air-Connector-P.R.V. In Garage; Above Floor -Mach. Protection 75. Plb., Elec. & Mach. Equip. Listed for Location 76. Elec. Receptacles in Garage; (G.F.I.)-Romex Protection 77. Insulation -Foam -Looked in Attic ❑ Yes 78. Guard Rails & Deck Construction -Post Caps 79. Fdn. Vents & Crawl Hole Door-Drainagge & Wood -Earth Clearance Looked under Floor ❑ Yes 80. Following instld.; Drive ❑ Yes ❑ No; Walks ❑ Yes ❑ No; Planters ❑ Yes ❑ No 81. Stucco; Brown -Finish 82. A.C. Unit; Disconnect, Electrical, Plumbing 83. Vents Above Roof; Plbg -Appliance-Fireplace.-Clearance to Openings 84. Water Well; Disconnect, Electrical, Plumbing 85. Exterior Elec. Trim; G.F.I. Receptacle -Underground 86. Ventilation Throughout House 87. Glass Protection 88. Corrections from Previous Inspections 89. Gas Test -Meters Tagged; Gas -Electric 90. Water & Sewer Connected -C/O to Grade -HD Approval _ 91. Energy Compliance Certlficate-Other Certificates Comments at Final: COUNTY OF BUTTE - DEPARTMENT OF DEVE40PMENT SERV - BUILDING DIVISION 7 County Center Drive - Oroville, California 95965 - Tele one ( 16) 538-7541 PERMIT NO. APPLICATION AND PERMI 93-2812 ASSf.�s PARC L�(JUrr5 UU LL UU ZONING 5 BUILDING PERMIT OWNUUER EVELYN HOLLANDSWORTH TELEPHONE SQ. FT. OCC. BUILDING VALUATION OWNER'S MAILING ADDRESS 2787 S VILLA, OROVILLE 95965 115 C 1495 CONTRACTOR'S NAME LAWSON & SPARKS TELEPHONE CONTRACTOR'S MAILING ADDRESS Fireplace CONSTRUCTION LENDER UNKNOWN Total Valuation Is Filing Fee $ 20.00 LENDER'S MAILING ADDRESS Permit Fee $ 35.00 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ 911-00 Energy Plan Checking Fee $ ARCHITECT OR ENGINEER'S MAILING ADDRESS Penalty $ BUILDING ADDRESS 2787 S VILLA. OROVILLE PERMIT FEE $ 78.00 PLUMBING PERMIT Filing Fee 20.00 Each Trap 7.00 Solar or heat pump water heater 23.00 Water piping 15,00 LOT NO. SUBDIVISION'S NAME PARCEL MAP Each gas water heater or vent 15.00 USE OF STRUCTURE SF JP Duplex ❑ Mobilehome ❑ Other SPECIFY Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 Mobile Home S G W @20.00 TYPE OF WORK New ❑ Addition ❑ Remodel ElUtilities ❑ Installation ❑ Other Cy. Describe Work: COVER OVER EXISTING PORCH PERMIT FEE $ Contractor ELECTRICAL PERMIT Filing Fee 20.00 Main Service ( 000v OR LESS ) 23.00 200A OR LESS Main Service , 200A TO 1000A ) 46.00 NEW CONST. DWELLING OCC P. S0. OR ADDNS. 8 ACC. BLDS. ) 3.50 FT. CONTRACTORS LICENSE LAW I declare under penalty of perjury (check one) O 1 am a licensed under provisions of Chapter 9, Division 3 of the Business and Professions C my license is in full force apsl effect. License No. , bZ Classification f ❑ 1, as the owner, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec 7044) ❑ 1, as the owner, am exclusively contracting with licensed contractors. (Sec 7044) ❑ 1 am exempt under Sec. Business and Professions Code forthis reason NEW CONST. MULTI -OUTLET NON-RESID. ( BRANCH CIRCUITS ) @7.50 ( POWER APPARATUS ) 8 SINGLE OUTLET CIR. @ r00 Ex. Occup. ( OUTLET OR FIXTURES ) B2L . Ex. Occu FI%EDAPPWS.Ofl p' ( OUTLETS (RESID.) EA. ) 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 WORKER'S COMPENSATION INSURANCE 1 declare under penalty of perjury (check one): ❑ This permit is for $100.00 (valuation) or less. I have placed on file with the County of Butte Dept. of Development Services, Building Division a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -insure. ❑ 1 shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. Notice to Applicant: If after making this statement, should you become subject to the Worker's Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit will be revoked. PERMIT FEE $ Contractor MECHANICAL PERMIT Filing Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FEE $ Contractor I certify that I have read this application and state that the above information is correct. I agree to comply to all Butte County Ordinances and California State Laws relating to building construction, and hereby authorize representatives of the County of Butte to enter upon the above mentioned property for inspection purposes. I also agree to save, indemnify and keep harmless the County of Butte against all liabilities, judgments, costs, and expenses which may in any way accrue against said County ' consequence of the granting of this rmit. X� Date �_l� igIn- Applicant - ID ner ❑ Contractor ❑ Agent An OSHA permit is required for excavations over 5"0" deep and demolition or construction of structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee $ ocC CONST. TYPE TOTAL FEE $ 78.00 HA2. D. FEES IMP F10OD� 0%/ cDF PARCEL PD HD �-' IV �r This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work indicated above for which fees have been paid. DIRECTOR OF PUBLIC WORKS Date PERMIT EXPIRES ON 9 �� [Date) Receipt 148375 WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT � ;, . by '•Y. ..f .h'''} •ti �`+*y COUNTYOF BUTTE - DEPARTMENTOFEOPMENTS RVI S - BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA95965 - HONE (916) 538-7541 / a PERMIT APPLICATIONaDATA SHEET OWNER Aleh SW n� A P. No. DDS % -080-01.- Proposed Building Use Building Inspector Date At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED BY 1. All items have been submitted„ . . . . . . . . . . . . . . 2. Plot plans, 3/4 sets, signed by &parer of plans. ......................... . 3_ Complete plans, 3/4 sets, signed by preparer of plans . ...................... .4. Engineered plans and calcs, 3/4�sets, with wet signature on plans . ............. 5. Hazardous Material Form. ............................................. . 6. Energy Design Compliance and supporting documentation . .................. 7. Statement of Intent for Non -Heated and A/C Buildings . ...................... 8. Engineered truss details and layout in duplicate (required prior to plan check). ... . 9. Mobilehome data and manufacturer's installation instructions, 2 sets. ........... 10. Fees of $ ......................................... . 11. Impact fees as shown on attached schedule . .............................. 12. California Department of Forestry plan approval/fees. ....................... . 13. Flood elevation letter (100 year flood) by California Engineer . ................. . 14. Sanitation and plot plan approval Health Department . ............ 15. City of Chico plumbing permit . ......................................... 16. Plot plan and business license approval from City of Biggs/Gridley. ............. 17. Planning approval for (A) Use: (B) Parking: . ......... 18. Contact Land Development about (A) Improvements (B) Drainage. ........... 19. Driveway permit (construction approval required prior to occupancy). ..... . 20. Pre -inspection for PR�"�nrequ� required. . . to Building g Ins Inspector (Date) 21. Contractor's license information. (No., Name Style, Classification) . .............. 22._,Certificate of Workmans Compensation Insurance . .......................... 23. Owner -Builder Verification (Given to owner , Mail to owner _)............ 24. Recorded copy of Agricultural Acknowledgement Statement . .................. 25. Letter of signature authorization . ........................................ 26. Copy of recorded deed of parcel creation and 60 right of way to a public road. .... . 27. Letter of intent on building use . .......................................... 28. Mobilehome utility clearance . .......................................... 29. Documentation of legal access . ..................... :.................. 30. Documentation of 50% subdivision developed or (A) Road improvements completed and (B) Parcel meets zoning area and frontage requirements . ............... 31. Existing violations/expired permits . ...................................... 32. Plan check list . ..................................................... 33. 34. When'you issue the permit, process as follows: Mail to owner. Mail to contractor. Telephone and hold for pickup at Orn office. Deliver with inspector. Other Parcel Creation Acreage Applica Dat Copy of Haz-Mat form sent Health Dept. Fire Dept. ' Air Pollution 15ate Copy of plans sent Health Dept. Fire Dept. Other Date By The following data must be submitted prior to permit issuance: (Circle new item not checked above). 1. Index permit for above items No. 2. Additional items required: Contractor, designer, owner, was advised of above required data by _ phone -mail Counter by _ Date Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter ty _ Date Plans checked by Date Plans approved by Date Sets of plans on hold in File cabinet AP folder 4^ 1�912/- Copy - Department of Public Worksg'