HomeMy WebLinkAbout030-080-022030-080-022 P MIT#97-2147
OLRY, Scott i; -/I O -P / 11'p19F
1682 Sweem St., Oroville
Add 2 Bedrooms & Conv Laundry to
Bath/SF
y � a
RESIDENTIAL
' 030-080-022 PERMIT#97-2147
OLRY, Scott !
PERMIT NC.—
{ 1682`Sweem'St.; Oroville -i
1 Add 2 Bedrooms & Conv Laundry to
PERMIT EX;1 •a',— _ I
r.f �BatYi:/dSF-
�
�+ OWNER
ONTR.
ASSESSOR PARCEL
LOCATION.
/
//Vi' 1
ii
+t
A
OFFICE COPY
r
t
}
Temp. Power Pole ;
> i Called PG&E
r
Temp. Elec. Service
Celled PG&E ,.
Temp. Gas Service /
t; Called PG&E /
j JOB FINALED (Date)
Signature
�i
4
R t. �
V=OK , w
0 = Not OK
_NottApplicable MOBILE HOMES
Date MOBILE HOME UTILITIES (Plans) OK except #'s
1. Zoning Requirements - Setbacks - Easements
2. Soils; Special MH Support Sketch
3. Sewer, Location-Test-FallC)O Concrete
4. Water, Location -Test -Easement Needed (Sketch) .
5. Electricity; Location-ClearancesSmd-/ /Amp -Concrete
6. Gas; Location -Test -Wrap; / ttft
/ /Nat or/ /VfL/ /LPG
7. Well Clearance & Disconnect
8. Utility Clearance
'MISCELLANEOUS
Date DECKS, CQVERSi CARPORTS, GARAGES (Plans) OK except #'s
t. Zoning RequirgmentsSetbacks-Easements
2. Footings; Soits-Size-Dep"pacng-ConnectorsSteel
3. Docks; Girders and/orJoists-DeckirTg-BracingStairs-Rails
.-4. Wood Awn.; Posts-Beams-Rftrs.-Connectors
Shthg.-R!B,Bracing - '
5. Alum. Awn.;.Columns-ConnectionsSplice-0ecal-Enclosures
6. Carports; Windows -Doors
7. Electric
8. Fnng.;Sils-AnciwrsS.tuds-Rffrs-Trusses
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
MOBILE HOME INSTALLATION (Plans) OK ZMt #'s
1. Zoning Requirements- Setbacks Easements
2. Footings; SizeSpacng-Marriage Line
Date
3. Gas; MH Test )emand-Value-Connector
Date
4. Electricity; MH Test -Crossovers -Breakers -Clearances
Date
5. Drain; MH Test -Fall -Flex Connector
6. Water; MH Test -Regulator -Connector
7. Water and Sewer Connected -C/0 to Grade -HD Approval
8. Gas and Electricity Tagged
9. Tie Downs -Type -Installation Cert.
10. Exits; Insp.-Sketch
11. Cert of Occupancy
12. Permanent Foundation Only: License Decal
8. Elec.;•Grounding; Equip. w/S Circulating Equip.-Pool•Lghtg.
Boxes-Enclosures-Panelboards4ns. to Main in Conduit
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
'MISCELLANEOUS
Date DECKS, CQVERSi CARPORTS, GARAGES (Plans) OK except #'s
t. Zoning RequirgmentsSetbacks-Easements
2. Footings; Soits-Size-Dep"pacng-ConnectorsSteel
3. Docks; Girders and/orJoists-DeckirTg-BracingStairs-Rails
.-4. Wood Awn.; Posts-Beams-Rftrs.-Connectors
Shthg.-R!B,Bracing - '
5. Alum. Awn.;.Columns-ConnectionsSplice-0ecal-Enclosures
6. Carports; Windows -Doors
7. Electric
8. Fnng.;Sils-AnciwrsS.tuds-Rffrs-Trusses
9. Sidirtg; Miling-VenewStucco-Mesh
10. Roof; Shthg-Roofing
11. Ext.; Steps -Doors -Lendings
12. Braced Wall,Panels
Date
Card B-1 Date Card B-1
Date
-Card B-1 Date Card B-1
Date
POOLS-(PIan OK except #'s
1. Setbacks -Easements
2: Soils; Compaction -Structure Stability
3. Pool -Structure; Steel -Connections -Thickness
Dead Men -Lining: _
4. Elec,; Receptacles and lighting, Distance-GFI
5. Elec.; Pool'Lighting; 15Vohs-GFl
6. Elec.; Enclosures; Conduit Entries-Terminals-Usted
7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater
8. Elec.;•Grounding; Equip. w/S Circulating Equip.-Pool•Lghtg.
Boxes-Enclosures-Panelboards4ns. to Main in Conduit
9. Health Department Approval
10. Plumb.; Cir. Test -Water Supply Test
11. Light Niche
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
✓ = OK
0 NotbK- RESIDENTIAL
- = Not Applicable
= Not Ready
Date D FLOOR (Plans) OK except #'s
gSetbacks-Easments-FloodSlope
Ftg., Main; Soils-Elec. Gmd.-/• Ftg. Depth
3. Ftg. Garage; Soils-Steel-Elec. Gmd/ p Ftg. Depth
4. Ftgq. P rches & Decks; SoilsSteel-/ N Fig. Depth
emwalls, Main; Steel-Blockouts-Wrapped
6. Stemwalls, Garage; Steel-Blockouts-Wrapped
6a. Hold Downs and Special Anchors .
. Slab, Steel -Wrapped
8. Piers -Fireplace Ftg.-Steel
g -Test -2 Way C/0 -Sewer Test
iie Anchors - Yard Gas Piping; Size Test
Test-Anchors-RegulatorService Test
12. Electric Underground
--1a-Bierwms & Ducts; Clearance -Material -Support -Ins.
14. Girders -Sills -Anchor Bolts-Joists-Vents-Crippies
15. Access & Ventilation
16. Insulation
Date Card B-1 Date Card B-1
Date's -r Card B-1 Date Card B-1
Date PLUMBING Permit OK except #'s
1 . ter Htr.; V -A ombustion Ai B
1 ater P!M, ch all Pro o
WV. e n chor ail ProtecU
20. Shower Pan; est, First oor--Tub ccess
21. Test ub & Shower, Second Floor -Tub Access
as Pipe; Sixe & Anchors
Date Card B-1 _ Date Card B-1
Date Card B-1 Date Card B-1
Date ELECTRICAL (Permit) OK except #'s
g" Transformer Clearance -Ins. Protection
..,Receptacles Spacing -Lights & Switches at Doors
oxes & No. of Conductors Stapled
mex Installed Close to Edge of Studs & C.J.
quip. Ground made up w/Mech Fastners-Bond Gas & Water
pliance Circuts in Kitchen & Conductor Size GFI
❑e Size / / ga. Cu or AI-A.C!Wire Size / / ga Cu or AI
! ga Cu or AI -Ovens uc. / / ga Cu or AI
Neutral I] Yes IIX
Wme-32: Eauip. Clearances Panels -Motors -Meeh. EDuio.
Z!Clothes Closet Light -Shower Light -Spa Light
gPlm-le Detector
Date i Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date MECHANICAL (Permit) OK except #'s
35. A.0 cts'lnsulation & Support
ent dn, Exhaust above insulation
V. C ndensate Drain & Overflow, Size & Grade
)OFFurnance-Vent Access -Comb. Air -Return Air Vent 115 outlet
Attic Access & Platform if Furnace in Attic
Date -X6 --q S Card B-1 ifJ5 Date Card B-1
Date Card B-1 X&7 Date Card B-1
Date ^AMING (Plans) OK except #'s
.sits Proper Materials & Anchors
s Studs -Nailing Spacing & Braces -Plates -Sound
Bearing Walls over Girders & Floor Nailing
43 D op in Walls (rat proof)
"r ps, Furred Ceilings -Stairs -Chasers -Tubs
iC eaders & Beams -Size & Bearing
(Single & Duplex)
Date FRAMING (Continued)
46. gers-Post Caps -Anchors -Connectors
Cling. Joist Rftr Ties-Purlin-roll Brac.-Truss-Shting.-Rfng.
at clearance
EPJ i -; HAss; ss; Size & Romex Protection -Draft Stop -Ins. Baffles
Bdrm. Windows or Exiting Doors -Sill Hgt. & Dimensions
5
a penings
- t . Ext. rs-One 3 -Check Garage 3rd Story, 2 Exits
Plywood on Roof Overhang -Attic Vents -Rafter Outriggers
jOeSiding-Nailing Veneer
en s- s
Glazing Area -Glass Protection -Skylights -Plastic
ce Interior / Exterior Wall Panels
1. Insul ' n -Walls -Ceilings "
nfiltration-Walls-Windows
Date ).� Card B-�Jj Date - Card B-1
Date 1,1YO Card B-1 90 Date Card B-1
Date FINAL (Plans) OK except #'s
-. xt Steps -Door & Sidelight Protection -Landings
moke Detector
clearance -Comb, Air-Conector-
I arage; Above Floor -Ducts -Meeh. Protection
_tfiC Bee reom Exiting
WI-G.F.I. & Bath Fixtures & Tub Access -Spa
nel, Breaker Sizes & Labels
ai s -
Clearance -Hearth
44 -•frets at Wood Panel, Int. & Ext.
. pliance; Ground. -Air Gap -Cooking Clearance
u s e ticales at Kit. Counter
e Fire Door; Swing -Landing -Closure
A.C. Duct in Garage -Damper
:Clearance -Comb. Air Connector-P.R.V.
Ingamg2-AS�ve Floor -Meth. Protection
Iff-Plb., Elec. & Mech. Equip. Listed for Location
-7&-f1§U.-RFM1pbcles in Garage (G.F.I.)-Romex Protection
nsulation Foam -Looked in Attic
rai FrDeck Construction -Post Caps
&Uefdn. VBents & Crawl Hole Door Drainage & Wood -Earth
Clearance Looked under FloorY s
82� Following Instld./Drive 0 Yes @,Ko/Walks 0 Yes 0 No/Planters Q Yes 0 No
ow - finish
Bissermect, Electrical -Plumbing
Vents Above Roof, Plbg-Appliance-Fireplace-Clearance to Openings
nnect, Electrical, Plumbing
„87-'Ex"r Elec. Trim, G.F.I. Receptacle -Underground
4B"entilation Throuaht House
-8T JGKss Protection
. Corrections from Previous Inspections
• 0+. G TTemtot2t€rs Tamed, Gas -Electric
Connected -C/0 to Grade -HD Approval
Compliance Certificate -Other
Date and B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Comments at Final:
a.,
-- —,.. COUNTY OF BUTTE
_ BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT_SERVICES =_
411 Main Stil •Chico, CA • (530i8'91-2751
7 County. Center Drive • Oro v.Ile, CA • (530) 538-7541 rt`
f w
CORRECTION NOTICE
7 II � � ,• � 7 57
OWNER PERMIT NO. i
A routine in ection indicates that the following violations of butte county Ordinances exist at the
above a ress and should be corrected. Please` notice this office when correction of work is
comp ed. If you have any questions pertaining to this matter, or need additional explanation,
pie" econtact this office immediately,
HtV 10/V2
COUNTY OF BUTTE
BUILDING DIVISION
T 'DEPARTMENT OF DEVELOPMENT SERVICES
4401, Main Street, Chico, CA - (916) 891-2751.
7 Cofunty Center Drive, Oroville, CA - (916) 538-7541
fA
OWNER PERMIT NO.
J.
A routine inspection indicates that the following violations of Butte County Ordinances exist at
the above address and C6uld be corrected. Please notify this office when correction of work
is completed. If you have any questions pertaining to this matter, or need additional explanation,
Date
REV 10/92
Inspector
'
..
.�
Date
REV 10/92
Inspector
L. ,...i • .... ...xJ`L. -tip: tincr�+'�`5�'f4a't."`�:j �;-s�.;:;.�3•.: i,;,rip�3�m
`t COUNTY OF BUTTE
BUILDING DIVISION
DESARTMENT OF DEVELOPMENT SERVICES
411 Main Street, Chico, CA - (916) 891-2751•
7 County Center Drive, Oroville, CA - (916) 538-7541
r
r
CORRECTION NOTICE
mrarA AVANUM
OWNER f PERMIT Nd.
:E
1�-
A routine inspection indicates that the following violations of Butte County Ordinances exist at
the above address and should be corrected. Please notify this office when correction of work
is completed. If you have any questions pertaining to this matter, or need additional explanation,
F please contact this office immediately.
er
t,
a d
Date Inspector
REV 10/94/-
A
_ COUNTY OF BUTTE
11�11 ' BUILDINGDIVISION
�66A' RTMENT OF DEVELOPMENT SERVICES
411 Main Street, Chico, CA - (916) 891-2751
7 County Center Drive, Oroville, CA - (916) 538-7541
CORRECTION NOTICE
r
VGrq
OWNER PERMIT NO.
A routine inspectio .ndicates that the following violations of Butte County Ordinances exist at
the above addre and should be corrected. Please notify this office when correction of work
is completed. you have any questions pertaining to this matter, or need additional explanation,
please cc ct this office immediately.
11.01
7f
Date
REV 10/92
Inspector
�r ..�-':r�a.'r.r::,._':"�..��,.�.ii'..r�x�'�fio�a.-,s v'a� �.��,,..v. ��:,.�.:'Ke-^-.,,.cam..-V -��,r•.. �r...w w^'.,,,�u4,',�
COUNTY OF BUTTE
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
g "411 Main Street, Chico, CA - (916) 891-2751•
7 County Center Drive, Oroville, CA - (916) 538-7541
a
CORRECTION NOTICE
S 7� -7
;a OWNER PERMIT NO.
p<x A routine inspection indicates that the following violations of Butte County Ordinances exist at
the above address and should be corrected. Please notify this office when correction of work
is completed. If you have any questions pertaining to this matter, or need additional explanation,
g please contact this office immediately.
i^
4'X
w
r
LL
it • �'
�x L
yr
'T
'Sa
TI,
t! i
ay
m.'
k:.
§� Date �D
f� 9 Inspector C
REV 10!92
Insulation Certificate
BUILDING OWNER: 7 C 07-rl C'�' `
BUILDING LOCATION • [ (0
Description of Installation
BUILDING PERMIT
ROOFc—�
Material Brand Name
Thickness (inches) Thermal Resistance (R -Value)
CEILING
Batt or Blanket Type�� �A T 1"7 S Brand Name
Thickness (inches)a— Thermal Resistance. (R -Value) R
Loose Fill Type Brand Name
Contractor's minimum installed weight/& lb Minimum thickness inches
Manufacturer's installed weight per square foot to acheive Thermal Resistance (R -Value)
EXTERIOR WALL
rc 'IN
Material Brand NameC
Thickness (inches) Thermal Resistance (R -Value)
RAISED FLOOR
Material Brand Name
Thickness (inches) Thermal Resistance (R -Value)
C�SLAB FLOOR
Material Brand Name
Thickness (inches) Thermal Resistance (R -Value)
Width (inches)
r
FOUNDATION WALL
Ilrand Name
Material
Thickness (inches)
^",ermal Resistance (R -Value)
Declaration
I hereby ce ' y that the above insulation was installed in the building at the above location in conformance with
the cutrep't�ilding Energy Effi 'ency :der)
dards for new residential buildings contained in Title 24 of the
California A inistrative Co e.
f License Number
General Con actor (B , // %/
�/ ' i Y
S ignantre and Title Date
Sub Contractor (Insulation Installer)
Signature and Title
License Number
Date
THIS CERTIFICATE MUST -BE PROVIDED TO THE BUILDING DEPAR'T'MENT PRIOR TO FINAL INSPECTION
APPROVAL AND A COPY SHALL BE POSTED WITHIN THE BUILDING.
JANUARY 1993
COUNTY OF BUTTE- DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
" • 7 County Center Drive - Oroville, California 95965 - Telephone (916) 538-7541 PERMITNo.
(Rev.12/96) APPLICATION AND PERMIT 07— Q J
ASSESSOR PARCEL NUMBER 030-080-022
�
ZONING
AR
BUILDING PERMIT
OWNER
SCOTT OLRY
TELEPHONE
SO. FT. OCC. BUILDING VALUATION
OWNERS MAILING ADDRESS 171 NORTH KAREN AVE CLOVIS, 93612
FqT 1,000.00
CONTRACTOR'S NAME OWNER
TELEPHONE
' ^a
's
CONTRACTORS MAILING ADDRESS
CONSTRUCTION LENDER
LENDER'S MAILING ADDRESS
'
Fireplace
Total Valuation $
ARCHITECT OR ENGINEER
LICENSE NO.
—Filing Fee $ 20.00
Permit Fee $ 258.50
ARCHITECT OR ENGINEERS MAILING ADDRESS
Plan Checking Fee $ 168-00
BUILDING ADDRESS
1682 SWEEM ST
Energy Plan Checking Fee $ 0
OROVILLE
$
PERMIT FEE $ 469.50
LOT NO.
SUBDNISIONS NAME
PARCEL MAP
PLUMBING PERMIT Filing Fee 20.00
USEOFSTRUCTURE
SF R Duplex ❑ Mobilehome ❑ Other
SPECIFY
Each Trap 31 7.00 21.00
Solar or heat pump water heater 1 23.00
Water piping 1 15.00
Each as water heater or vent 15.00 15.00
TYPE OF WORK
New ❑ Addition III Remodel ❑ Utilities ❑ Installation ❑ Other ❑
Describe Work: 2 BEDROOM & CONV LAUNDRY TO BATH
Gas piping system 1 - 5 outlets 15.00
Building sewer 15.00
Mobile Home S G W 920.00
PERMIT FEE $56.0
ELECTRICAL PERMIT Fling Fee 20.00
Main Service 20.AORLE. 23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.P
License Class Llc. No.
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
❑ I, as owner of the property, or my employees with wages as their sole compensation,
Will do the work, and the structure is not intended or offered for sale.
I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
❑ 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service TO 46.00
ccu000A
NEW CONST. DWELLING OCCUP. SO
DWE200ALLING
OR ADD S. ( a ACc. sLs. 3.50F .
NON•RES DT NEW CONS.MULCTI-OCU MM
LET @7.50
OWER APPARATUS
8 SINGLE OUTLET CIR.
20 00
Ex. Occup. OUTLET OR FIXTURES BAS @';50
Ex. Occup. ouTLEEDTs RESIo.OEn 5.00
Temporary Service 23.00
Mobile Home Facilities 20.00
Misc. Wirin 23.00
PERMIT FEE _ rR 71;
WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
❑. 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by 'section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
❑ I have and will maintain workers' compensation insurance, as required by Section
3700 of the Labor Code, for the performance of work for which this permit is issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
)� f one hundred dollars ($100) or less.)
I certify that in the performance of the work for which this permit is issued, I shall
of employ any person in any manner so as to become subject to workers'
compensation laws of California, and'agree that if 1 should become subject to the
wor �§, compens 'on pro ' ions of section 3700 of the Labor Code, I shall
f hwlth comply w t hose r 'ions.
X _ Date la�—�L_
Sig tur p ica t - 0 er ❑ Contr ctor ❑ Agent
An OSHA permit is required for excavations ova 60" deep and demolition or construction
of structures over 3 stories in height.
MECHANICAL PERMIT Fling Fee 20.00
Heating 60,tie 0 --lay.
Cooling1'16 ,
Hood 6.50
Ventilation 4.50
PERMIT FEE $
Mobile Home Installation Fee $
Energy Inspection Fee $ 46.00
5
CONST. PE
TOTAL F $
HAZ.
D. E IMP
F
CDF
—
PARCEL
y
Po
D ISS
This permit is hereby issued under the applicable provisions
of the Butte County Code and/or Resolutions to do work
indicated above for which fees have been paid.
e
,(�
Date �1-
PERMIT EXPIRES ON
Da
ReceiptNo. 224686 — 271.00 — —
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PI 1<4 SP T e GOLDENROD -APPLICANT
L7
�_,,
, ,� ���:.,�.,�.�„�,�, •rr�'m,.ys�.3r.�; -Za\i. �a—,rwa,ficLi.,,a�„`•�;,iu.y�t„�,�>rN....,,�atr•n.r�=�re�;:,:..r.,�;,�er�t;�;ti•xr�r���x:tai;r!:�A.�>1;1+r+^°ro,.-t� . ""x"�'""!*°•a�:ti,��"i,:�.i, �;*,
.''3,11IJ
4 ��..•yt .,ya H.1 ,
I
_..
.. ��/. �
.r - ..•. ,. w.... .r .. ..a._.+11oK..�rvt�dl�rr...w� . .
.. .. . .aw -
s .w.� .. ... .. ...M� ria. 0.. .
i
t.
._-J.�.._i ,,r�"
1�•J�f�F �wi .L -7•Y,}
.. ,r
.. T .. _.
!
fit
Aw
1 Ru fw gar—J
'
i
1 �
,•''�"�
;' t•I r Si'\i 'jl �.trj.! j
' .+ r
� r -3i: .. i ; t ,
,rW Low _
1
n. int Yp* t
'•
r v}�E.: 1h c
y
� •1,.
y,
.� •. ill . `.>� I - ., L �r K � ,e
1 �
� qi. °[+, \' � 5 �- /
i
��.
di . • a �
� J`: U�, , {rJv •I i
j
• -i,) w fir(;.,_. . "Ea . �� t.
�1'�•1".
s
..,
s1j. r nh.. �.),Ci; .. ,•
}
i ,\�,
t}�•�./�
a
`
/ ,, •
.i}'w7 i..{ fin,. ^,
`I
,
TA
E. ELOPMENTSERVICES - BUILDING DIVISION
COUNTY OF BUTTE - DEPARTMENT.0,T\D
7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA95965 -TELEPHONE (916) 538-7541 0
PERMIT APPLICATION DATA SHEET
OWNERI ✓A. No... a`�
Proposed Building Use Building Inspector Date ' O� i
At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance:
DATE RECEIVED BY
1, All items,pq been submitted . ................... ................. .
Plot plansW4 s s, signed by preparer of plans. ...........................//1 -PS-9-7
3. Complete plans, 4 sets, signed by preparer of plans . ..................... ��°7 C=
4. Engineered plans and calcs, 3/4 sets, with wet signature on plans . .............
5. Hazardous Material Form. (
6: Energy Design Compliance and supporting documentation . .................. /
7. Statement of Intent for Non -Heated and A/C Buildings . ......................
8." Engineered truss details and layout in duplicate ('required prior to plan check). ....
9. Mobilehom d a d nufa turer',stallation instructions, 2 sets. .......... .
10. Fees of $ p�..•....... _ I. _
11: Impact fees as shown on attached schedule.`` .... O .ZO
..............A.
12.` California Department of Forestry plan approval/fees.......................
13. Flood elevation letter (100 year floo�alifornia Engineer. . .
14. Sanitation and plot plan approval �I II�� Health Department . ............
15. City of Chico plumbing permit . .........................................
16. Plot plan and business license approval from City of Biggs/Gridley.
17. Planning approval for (A) Use: (B) Parking: ....... 1:.,
18. Contact Land Development.about (A) Improvements (B) Drainage. .......... .
19. Driveway permit (construction approval required prior to occupancy). ... .
20. Pre -inspection for required. .. o e�i,d e'.1. spector
(Date)
21. Contractor's license information. (No., Name Style, Classification) . ..............
22. Certificate of Workmans Compensation Insurance . ..........................
23. Owner -Builder Verification (Given to owner , Mail to owner _ ) ............
24. Recorded copy of Agricultural Acknowledgement Statement . ..................
25. Letter of signature authorization . .........................................
26. Copy of recorded deed of parcel creation and 60 right of way to a public road. .... .
27. Letter of intent on building use. X.........................................
28. Mobilehome utility clearance. ......................................... .
29. Documentation of legal access . ......................
30. Documentation of 50% subdivision developed or (A) Road. improvements -completed
and (B) Parcel meets zoning area and frontage requirements : .............. .
31: Existing violations/expired permits . .......................................
32. Plan check list . .............................................. .
33.
34.
Whery�ou issue the permit, process as follows: Mai to ow!l Mail to contractor.
W _ Telephon o _ anted Tor pickup at BVI offd Deliver with inspector.
Other
Parcel Creation 534 2 7 1 r �
Acreage ` Applicant Date V V
Copy of Haz-Mat form sent Health Dept. Fire Dept. Air Pollution D .•
Copy of plans sent Health Dept. Fire Dept. Other L e ,r By
The following data must be submitted prior to per i 'ssuance., (Qircje new item not checked ab v
1. Index permit for above items No.
2. Additional items required:
Contractor, design r, owner, as advised of above required data byp hone _ ail"' Count r by _'Da
Contractor, designe , er, was advised of above required data by _phone _,mail Counte y _ D to
Plans checked by Date Plans approved by o�\ ate /%- 7
Sets of plans on hold in File cabinet 9 AP folder
Copy - Department of Public Works
V {
n
a BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
School District. Building Department No.
A.P. Number l ,` In _ o7o—�(� jurisdiction: City 6Z County
Property Owner
dentific
treet Address)
(City)
has complied with the
(Floor Plans reviewed
980048
School JD'
rict
l 1..
representing '
School District Representative
School District
certifies
Ro fed Areas)
/V
Date
\ (Phone Nu
(State) (Zip Code)
of -Resolution No. D by payment of $
Osquare feet. 11AB 2926 �1
Paid by Check # Remarks:
1IFULL MITIGATION S
Notice: You may protest the imposition of the fees identified above by submitti 'g a written protest to the District, in compliance with
Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) feeform.xls (2/97)dmm
Property Location/Address
(-
Subdivision
Lot No.
Residential Development
�Sq. Footage
-No of Living
Mobile Home
Addition
(Group R)
Units
Installation
Commercial/Industrial L
Sq. Footage
New
Addition
(Including Exterior
dentific
treet Address)
(City)
has complied with the
(Floor Plans reviewed
980048
School JD'
rict
l 1..
representing '
School District Representative
School District
certifies
Ro fed Areas)
/V
Date
\ (Phone Nu
(State) (Zip Code)
of -Resolution No. D by payment of $
Osquare feet. 11AB 2926 �1
Paid by Check # Remarks:
1IFULL MITIGATION S
Notice: You may protest the imposition of the fees identified above by submitti 'g a written protest to the District, in compliance with
Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) feeform.xls (2/97)dmm
RESIDENTIAL PLAN CHECKING GUIDE
SINGLE FAMILY, DUPLEX AND MISCELLANEOUS ONLY
OWNER: BUILDINGPERNUTNUMBER:
PLAN CHECKER. e��W 10 A. P. NUMBER:
GENERAL:
Zoning requirements: (side yards and number of permitted living units).
Valuation.
Plans signed by designer.
Proper description of work on application.
Existing violations on property.
Items on data sheet, (Impact Fees, Environmental Health, Developer Fees, etc.).
Recorded notice of violation.
PLOT PLAN:
r.Flood
omplete parcel size and dimensions.
etbacks, side yards, easements, etc.
ther buildings or structures.
rading, fills and/or drainage.
hazard.
pecial conditions on creation map (Noise, SA.A., Fire Sp iriklers, Water Tender, Trees, etc.).
.A.U. & F.A.S. road setback.
uilding or utilities across lot lines (Record form).
Complete to scale plan with dimensions.
Required windows for light and ventilation (Section 1203).
Required windows for second exit (Section 316.4).
Skylights (Section 2409 & 2603.7).
Glazing in Hazardous Locations (Section 2406).
Required room sizes, ceiling heights (Section 310.6).
G.F.C.I. in baths, garage, kitchen, wet bar and exterior outlets (N.E.C. 210).
Lights, switches, receptacles, and exterior receptacles for maintenance of mechanical equipment.
Location of water heaters, heating and cooling equipment, other electrical or gas equipment.
Garage firewall, door size and closer (Section 302.4).
Minimum of one TO" exterior door (Section 1004.6).
Fireplace and wood stove location, alcoves and clearance.
Smoke detectors (Section 310.9.1).
Plumbing fixtures, water closet clearances and shower size.
7URAL DETAILS:
Conventional Construction - Unusually Shaped Buildings (Section 2326.5.4).
Standard bracing or engineered design (Section 2326.11.3).
Clerestory requiring balloon framing and/or engineering.
Three story building requiring engineered calculations and plans.
Foundation plan complete enough to construct building.
Floor construction details complete enough to construct building.
Elevations and wall construction details complete enough to construct building.
Roof construction details complete enough to construct building.
Rafter ties or bearing ridge beam.
Fireplace construction details and calc. if necessary.
Garage door and/or porch header sizes.
Stud heights.
Adobe soils - special foundation design.
Retaining wails requiring design.
Special Inspection requirements.
Header size.
June 1997
3.2
Stairway details: landings, rise and run, head clearance, handrails (Section 1006).
Guardrail details (Section 509).
Brick or stone veneer (Section 1403).
Exterior plaster - weep screeds (Section 2506).
Proper roof pitch for roof covering (Section 1501).
Roof.covering type - (fire hazard).
Foam insulation - protection.
36" halls and stairways.
Living area over garage - complete 1 -hour separation required on garage side including supporting walls and posts.
Two exits on three - story dwellings (Section 1003).
Under: oor access and ventilation (Section 2317.7).
Attic access and ventilation (Section 1505).
Combustion air for fuel burning appliances - L.P.G. requirements.
Noise requirements on duplexes.
Energy design.
Flashing at all exterior openings.'
C.D.F. responsible. area requirements.
Automatic Fire Sprinkler Systems (Section 310.10)
For Inspection Jacket: --
Flood Hazard/Elevation Certificate
SRA Requirements
Special Inspection Requirements
Automatic Fire Sprinklers .
June 1997 3.2
t
- 9A
TABLE OF CONTENTS TOC
Project Title.......... Addition for Olry Date........ 10/10/97
Project Address........ 1682 Sweem St. *******
Oroville *v4.51* 17 - 4R /
Documentation Author... Neal Kuopus ******* Building Permit
Calctech GAS
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check Date
Climate Zone. ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp,•Inc.
MICROPAS4 x4.51 File-OLRY3EAD Wth7CTZ11S92 Program -TOC
User#-MP1320 User-Calctech Run -Existing & Addition
TABLE OF CONTENTS
Report Page
FORM
CF -1R................
1
FORM
MF -1R ................
4
FORM
C -2R ................
6
FORM•C-3R
.................
9
HVAC
SIZING ...............
13
COUNTY
�4
BUIG- I a de'EPA! +T ECH,
CERTIFICATE OF COMPLIANCE: RESIDENTIAL • Page 1 CF -1R
Project Title.......... Addition for Olry Date........ 10/10/97
*******
Project Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check/ Date
Climate Zone.. ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc,.
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM CF -1R
User#-MP1320 User-Calctech Run -Existing & Addition
GENERAL INFORMATION
Conditioned Floor Area..... 1041 sf
Building
Type ..............
Single Family Detached
Construction
Type .........
Existing Plus Addition
Building
Front Orientation.
Front Facing 270 deg (W)
Number of
Dwelling Units...
1
Number of
Stories..........
1
Floor Construction
Type....
Raised Floor
Glazing
Percentage.........
9 % of floor area
Average
Glazing U -value....
0.75 Btu/hr-sf-F
BUILDING
SHELL INSULATION
Component
Frame
Cavity Sheathing Insul Assembly
Type
Type
R -value R -value R -value U -value Location/Comments
Floor
Wood
R-0 R-0
R-0 0.096 TO CRAWLSPACE
Wall
Wood
R-13 R-0
R-13 0.077 FRONT, RIGHT, BACK
LEFT
Door
n/a
R-0 R-n/a
R-0 0.330 FRONT ENTRY
LEFT DOOR
Wall
Wood
R-13 R-0
R-13 0.085 TO HWH CLOS.
Roof
Wood
R-19 R-19
R-38 0.025 FLAT CEILING
S1abEdge
n/a
R-0 R-n/a
R-0 0.550 SLAB EDGE
SlabEdge
n/a
R-0 R-n/a
R-0 0.720 SLAB EDGE
FENESTRATION
# of
Interior Over -
Area U- Pan-
Shading/ Exterior hang/
Framing
Orientation
(sf) Value es
Description Shading Fins
Type
Window
Front (W)
32.0 0.750 2
Drapes.Std None Yes
Metal
Window
Right (S)
25.0 0.750 2
Drapes.Std None None
Metal
Window
Back (E)
16.0 0.750 2
Drapes.Std None None
Metal
Window
Left (N)
16.0 0.750 2
Drapes.Std None Yes
Metal
Window
Left (N)
4.5 0.750 2
Drapes.Std None .None
Metal
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL
Page 2
CF -1R
Project Title.......... Addition for Olry
Date........
10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZllS92 Program -FORM CF -1R
User#-MP1320 User-Calctech Run -Existing & Addition
THERMAL MASS
Area Thickness
Type Exposed (sf) (in) Location/Comments
S1abOnGrade Yes 18 3.5 Exposed
S1abOnGrade No 423 3.5 Covered
HVAC SYSTEMS
Minimum Duct Duct Thermostat
Equipment Type Efficiency Location R -value Type
Furnace 0.730 AFUE None R-0 Setback
Evaporative 11.00 SEER None R-0 Setback
WATER HEATING SYSTEMS
Number Tank
External
in Energy Size
Insulation
Tank Type Heater Type Distribution Type System Factor (gal)
R -value
Storage Gas Standard 1 0.62 EF 40
R-0
SPECIAL FEATURES/REMARKS
No ductwork at Existing & Addition
R-0 Existing floor insulation per Form 3
Slab -on -Grade Addition floor construction
R-13 Existing & Addition wall insulation per Form 3s
R-38 Existing & Addition ceiling insulation per Form 3
Glazing U -values per MFR'S. NFRC Testing & Certification
Alum. frame dual -pane clear glazing req'd. at Existing & Addition
FAN.WALL.73: 0.73 AFUE wall furnace to replace existing unit
EVAP.00OL: 3.2 x 1041=3331.2 cfm. min. cooler req'd.
EVAP.COOL: provide continuous ridge/gable vents per CEC req'ts.
HWH: A.O.SMITH FGR -40 or equal req'd.
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL •
Page 3
CF -1R
Project Title.......... Addition for Olry
Date........
10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM CF -1R
User#-MP1320 User-Calctech Run -Existing & Addition
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features/
Remarks section.
DESIGNER or OWNER
Name.... Scott Olry
Company. Owner
Address. 839 Thermolito Ave.
Oroville, CA 95965
Phone... (916) 589-1909
License.
Signed..
(date)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
DOCUMENTATION AUTHOR
Name.... Neal Kuopus
Company. Calctech
Address. 1835 South Villa Ave
Palermo, CA 95968
Phone... 916-534-5066
Signed.. -Idk .Q, T
(dam
MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 4 MF -1R
Project Title.......... Addition for Olry Date........ 10/10/97
Proiect Address........ 1682 Sweem St. *******
Documentation Author...
Climate Zone. .....
Compliance Method......
Oroville *v4.51*
Neal Kuopus *******
Calctech
1835 South Villa Ave
Palermo, CA 95968
916-534-5066
11
Building Permit
Plan Check Date
Field Check Date
MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM MF -1R
User#-MP1320 User-Calctech Run -Existing & Addition
Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. Items marked with an
asterisk (*) may be superseded by more stringent compliance requirements listed
on the Certificate of Compliance. When this checklist is incorporated into the
permit documents, the features noted shall be considered by all parties as
binding minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
Design- Enforce-
er ment
*150(a): Minimum R-19 ceiling insulation.
150(b): Loose fill insulation manufacturers labeled R -Value.
*150(c): Minimum R-13 wall insulation in framed walls
(does not apply to exterior mass walls).
R-13
*150(d): Minimum R-13 raised floor insulation in framed floors;
minimum R-8 in concrete raised floors.
150(i): Slab edge insulation - water absorption rate no greater
than 0.3%, water vapor transmission rate no greater than 2.0
-0b
perm/inch.
118: Insulation specified or installed meets CEC quality
standards. Indicate type and form.
IK -
116 -17: Fenestration Products, Exterior Doors and Infiltration/
exfiltration controls
a. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage.
b. Manufactured fenestration products have label with
certified U -value, and infiltration certification.
c. Exterior doors and windows weatherstripped; all joints
.
and penetrations caulked and sealed
1500-ng): Vapor barriers mandatory in Climate Zones 14 and 16
Y•
�A
150(f): Special infiltration'barrier installed to comply with
Sec. 151 meets CEC quality standards.
150(e): Installation of Fireplaces, Decorative Gas Appliances
and gas logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No.continuous burning gas pilots allowed.
���
MANDATORY MEASURES
CHECKLIST: RESIDENTIAL
Page 5
MF -1R
Project Title.......... Addition for Olry
Date........
10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM MF -1R
User#-MP1320 User-Calctech Run -Existing & Addition
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
Design- Enforce-
er ment
110-13: HVAC equipment, water heaters, showerheads and faucets
certified by the CEC.
WIL
150(h): Heating and/or cooling loads calculated in accordance
^^^
with ASHRAE, SMACNA or ACCA.
150(1): Setback thermostat on all applicable heating systems.l�
150(j): Pipe and Tank insulation
1. Indirect hot water tanks (e.g., unfired storage tanks or
backup solar hot water tanks) have insulation blanket (R-12
or greater) or combined interior/exterior insulation (R-16
or greater).
2. First 5 feet of pipes closest to water heater tank, non -
recirculating systems, insulated (R-4 or greater).
3. All buried or exposed piping insulated in recirculating
sections of hot water system.
4. Cooling system piping below 55 degrees insulated.
5. Piping insulated between heating source and indirect
hot water tank.
l'I�IL
*150(m): Ducts and Fans
1. Ducts constructed, installed and sealed to comply with UMC
sections 601 and 603; ducts insulated to a minimum
installed value of R-4.2 or ducts enclosed entirely within
conditioned space.
2. Exhaust fan systems have backdraft or automatic dampers.
3. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated.dampers.�
114: Pool and Spa Heating Systems and Equipment
1. System is certified with 78% thermal efficiency, on-off
switch, weatherproof operating instructions, no electric
resistance heating and no pilot light.
2. System installed with:
a. At least 36 inches pipe between filter and heater for
future solar heating.
b. Cover for outdoor pools or outdoor spa.
3. Pool system has directional inlets and a circulation
�^1
pump time switch.J�
115: Gas-fired central furnace, pool heater, spa heater or
household cooking appliance have no continuously burning
pilot light (Exception: Non -electrical cooking appliance
with pilot < 150 Btu/hr.) .
LIGHTING MEASURES
Design- Enforce-
er ment
150(k): 40 lumens/watt or greater for general lighting in
kitchens and rooms with water closets; and recessed ceiling
fixtures IC (insulation cover) approved.
COMPUTER METHOD SUMMARY Page 6 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
Project Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check/ Date
Climate Zone. ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM C -2R
User#-MP1320 User-Calctech Run -Existing & Addition
MICROPAS4
ENERGY USE
SUMMARY
Special
Energy Use
Standard
Proposed
Compliance
(kBtu/sf-yr)
Design
Design
Margin
Space Heating..........
14.96
13.27
1.69
Space Cooling..........
16.00
10.19
5.81
Water Heating..........
18.30
16.97
1.33
Total
49.26
40.43
8.83
*** Building complies
with Computer Performance ***
GENERAL INFORMATION
Conditioned Floor Area.....
Building Type ..............
Construction Type .........
Building Front Orientation.
Number of Dwelling Units...
Number of Building Stories.
Weather Data Type..........
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Footprint Area .............
Ground Floor Area..........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -value....
Average Ceiling Height.....
1041 sf
Single Family Detached
Existing Plus Addition
Front Facing 270 deg (W)
1
1
ReducedYear
Raised Floor
1
8328 cf
1041 sf
1041 sf
441 sf
9 % of floor area
0.75 Btu/hr-sf-F
8 ft
BUILDING ZONE INFORMATION
Floor
# of
Vent
Special
Area
Volume Dwell Cond- Thermostat
Height
Vent Area
Zone Type (sf)
(cf) Units itioned Type
(ft)
(sf)
HOUSE
Residence 1041
8328 1.00 Yes Setback
2.0
n/a
COMPUTER METHOD SUMMARY Page 7 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZllS92 Program -FORM C -2R
User#-MP1320 User-Calctech Run -Existing & Addition
Surface
OPAQUE SURFACES
Area U- Insul Act Solar Form 3 Location/
(sf) value R-val Azm Tilt Gains Reference Comments
HOUSE - Existing
0
1
Floor
600
HOUSE - New
TO CRAWLSPACE
2
Wall
188
3
Door
20
4
Wall
231
5
Wall
72
6
Wall
224
7
Wall
242
8
Door
18
9
Roof
1041
Surface
HOUSE - New
10 S1abEdge
11 S1abEdge
Surface
HOUSE - New
1 Window
2 Window
3 Window
4 Window
5 Window
Surface
HOUSE - New
1. Window
4 Window
0.096
0
n/a
0
No
FC.0.2X6.16
TO CRAWLSPACE
0.077
13
270
90
Yes
DWS13.2X4.16
FRONT
0.330
0
270
90
Yes
None
FRONT ENTRY
0.077
13
180
90
Yes
DWS13.2X4.16
RIGHT
0.085
13
180
90
No
GW.13.2X4.16
TO HWH CLOS.
0.077
13
90
90
Yes
DWS13.2X4.16
BACK
0.077
13
0
90
Yes
DWS13.2X4.16
LEFT
0.330
0
0
90
Yes
None
LEFT DOOR
0.025
38
n/a
0
Yes
R.38.2X6.24
FLAT CEILING
PERIMETER
LOSSES
Left
Fin
Length F2 Insul Solar
(ft) Factor R-val Gains Location/Comments
4 0.550 R-0 No SLAB EDGE
62 0.720 R-0 No SLAB EDGE
FENESTRATION SURFACES
# of Vent
Area Pan- Frame Open
(sf) es Type Type
SC SC Interior
U- Act Glass Int Shading/
value Azm Tlt Only Shade Description
32.0
2
Metal
Slider
0.750
270
90
0.88
0.78
Drapes.Std
25.0
2
Metal
Slider
0.750
180
90
0.88
0.78
Drapes.Std
16.0
2
Metal
Slider
0.750
90
90
0.88
0.78
Drapes.Std
16.0
2
Metal
Slider
0.750
0
90
0.88
0.78
Drapes.Std
4.5
2
Metal
Slider
0.750
0
90
0.88
0.78
Drapes.Std
OVERHANGS AND SIDE
FINS
Window—
Overhang
Left
Fin
Right
Fin—
Area
Left
Rght
(sf)
Hght
Wdth
Dpth Hght
Ext
Ext
Ext
Dpth Hght Ext Dpth
Hght
32.0
4
4
1.2 0.9
n/a
n/a
n/a
n/a
n/a
n/a n/a
n/a
16.0
4
4
1.2 0.9
n/a
n/a
n/a
n/a
n/a
n/a n/a
n/a
COMPUTER METHOD SUMMARY Page 8 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4".51 File-OLRY3EAD Wth-CTZllS92 Program -FORM C -2R
User#-MP1320 User-Calctech Run -Existing & Addition
THERMAL MASS
Area Thick Heat Conduct- Surface
Mass Type (sf) (in) Cap ivity R -value
HOUSE - New
Location/Comments
1 S1abOnGrade 18 3.5 28.0 0.98 R-0.0 Exposed
2 S1abOnGrade 423 3.5 28.0 0.98 R-2.0 Covered
HVAC SYSTEMS
System Type
Minimum Duct Duct Duct
Efficiency Location R -value Efficiency
HOUSE
Furnace
0.730 AFUE None
R-0
1.000
Evaporative
11.00 SEER None
R-0
1.000
WATER HEATING SYSTEMS
Number
Tank
External
in
Energy
Size
Insulation
Tank Type Heater Type
Distribution Type
System
Factor
(gal)
R -value
1 Storage Gas
Standard
1
0.62
40
R-0
SPECIAL FEATURES/REMARKS
No ductwork at Existing & Addition
R-0 Existing floor insulation per Form 3
Slab -on -Grade Addition floor construction
R-13 Existing & Addition wall insulation per Form 3s
R-38 Existing & Addition ceiling insulation per Form 3
Glazing U -values per MFR'S. NFRC Testing & Certification
Alum. frame dual -pane clear glazing req'd. at Existing & Addition
FAN.WALL.73: 0.73 AFUE wall furnace to replace existing unit
EVAP.COOL: 3.2 x 1041=3331.2 cfm. min. cooler req'd.*
EVAP.COOL: provide continuous ridge/gable vents per CEC req'ts.
HWH: A.O.SMITH FGR -40 or equal req'd.
CONSTRUCTION ASSEMBLY Page 9 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZllS92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing & Addition
e
Sketch of Construction Assembly
Parallel Path Method
Reference Name FC.0.2X6.16
Description .... Floor Crwl R-0 2x6 16oc
Type Floor
R -Value ........ 0 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type ......... Wood
Description .. 2x6 fir
Spacing .... 16 inches on center
Framing Frac.. 0.10
LIST OF CONSTRUCTION COMPONENTS
Material
Name Description
0. FILM.EX Exterior air film: winter value
1. CRAWLSPACE Effective R -value of vented crawlspace
2c. RO.PLACEHOLD R-0 Place Holder
2f. FIR.2X6 2x6 fir
3. PLY.0.75 0.75 in plywood
4. CARPET Carpet & pad
I. FILM.IN.FLR Inside air film: heat flow down
Total Unadjusted R -Values
FRAMING ADJUSTMENT CALCULATION
Cavity
Framing
Cavity
Frame
R -Value
R -Value
0.17
0.17
6.00
6.00
0.00
--
--
5.45
0.93
0.93
2.08
2.08
0.92
0.92
10.10
15.55
Total
U -Value: (1 / 10.10�x 0.90) + (1 / 15.55 x 0.10) = 0.096 Btu/hr-sf-F
Total R -Value: 1 / 0.096* = 10.47 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 10 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program=FORM 3R
User#-MP1320 User-Calctech Run -Existing &Addition
Parallel Path Method
Reference Name . DWS13.2X4.16
Description .... Wall R-13 2x4 16oc
Type ........... Wall
R -Value ........ 13 Hr-sf-F/Btu
Framing
Material ..... FIR.2X4
Type ......... Wood
Description .. 2x4 fir
Spacing ...... 16 inches on center
Framing Frac... 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
PLY.0.63
0.625 in plywood
0.78
0.78
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3.
0.75PINE
0.75 in T&G Pine wall veneer
0.71
0.71
4c.
BATT.R13
R-13 batt insul (cavity = 3.5 in)
13.00
--
4f.
FIR.2X4
2x4 fir
--
3.46
5.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total Unadjusted R -Values
15.85
6.31
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing Total
U -Value: (1 / 15.85
x 0.85) + (1 / 6.31 x 0.15) = 0.077
Btu/hr-sf-F
Total R -Value:
1 / 0.077 = 12.92
hr-sf-F/Btu
F
CONSTRUCTION ASSEMBLY Page 11 3R
mifln Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZllS92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing & Addition
Parallel Path Method
Reference Name . GW.13.2X4.16
Description .... Wall R-13 2x4 16oc
Type ........... Wall
R -Value ........ 13 Hr-sf-F/Btu
Framing
Material ..... FIR.2X4
Type ......... Wood
Description .. 2x4 fir
Spacing ...... 16 inches on center
Framing Frac.. 0.15
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
GYP.0.63
0.625 in gypsum or plaster board
0.56
0.56
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c.
BATT.R13
R-13 batt insul (cavity = 3.5 in)
13.00
--
3f.
FIR.2X4
2x4 fir
--
3.46
4.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total Unadjusted R -Values 14.92
5.38.
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing
Total
U -Value: (1 / 14.92
x 0.85) + (1 / 5.38 x 0.15) =
0.085 Btu/hr-sf-F
Total R -Value:
1 / 0.085 =
11.79 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 12 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing & Addition
Parallel Path Method
Reference Name . R.38.2X6.24
Description .... Roof R-38 2x6 24oc
Type ........... Roof
R -Value ........ 38 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type ......... Wood
Description .. 2x6 fir
Spacing ...... 24 inches on center
Framing Frac.. 0.07
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1,.
SHNGL.ASPHLT
Asphalt shingle roofing
0.44
0.44
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3.
PLY.0.50
0.50 in plywood
0.62
0.62
4.
AIR.RF.3.50
3.5 in & greater air space: heat flow up
0.80
0.80
5.
BATT.RI9.0
R-19 batt insul (cavity > 5.5 in)
19.00
19.00
6c.
BATT.RI9.0
R-19 batt insul (cavity > 5.5 in)
19.00
--
6f.
FIR.2X6
2x6 fir
--
5.45
7.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.RF
Inside air film: heat flow straight up
0.61
0.61
Total Unadjusted R -Values
41.15
27.60
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing Total
U -Value: (1-/ 41.15 x 0.93) + (1 / 27.60 x 0.07) = 0.025
Btu/hr-sf-F
Total R -Value:
1 / 0.025 = 39.78
hr-sf-F/Btu
HVAC SIZING Page 13 HVAC
Project Title.......... Addition for Olry Date........ 10/10/97
*******
Project Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check Date
Climate Zone. ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EAD Wth-CTZ11S92 Program -HVAC SIZING
User#-MP1320 User-Calctech Run -Existing & Addition
GENERAL INFORMATION
FloorArea. ................
Volume.. ..... ............
Front Orientation..........
Sizing Location............
Latitude .......... ........
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
SummerRange ...............
Interior Shading Used......
Exterior Shading Used......
Overhang Shading Used......
Latent Load Fraction.......
Description
1041 sf
8328 cf
Front Facing
OROVILLE RS
39.5 degrees
30 F
70 F
104 F
78 F
37 F
No
No
No
0.20
HEATING AND COOLING LOAD SUMMARY
270 deg (W)
Heating Cooling
(Btuh) (Btuh)
Opaque Conduction and Solar...... 8695 3266
Glazing Conduction ............... 2805 1823
Glazing Solar .................... n/a 3534
Infiltration............ ....... 4737 1945
Internal Gain.................... n/a 2100
Ducts............................ 0 0
Sensible Load .................... 16237 12668
Latent Load ...................... n/a 2534
Minimum Total Load 16237 15202
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outdoor design temperatures, coil sizing, availability of
equipment, oversizing safety margin, etc., must also be -considered. .It is
the HVAC designer's responsibility to consider all factors when selecting
the HVAC equipment.
TABLE OF CONTENTS TOC
Project Title.......... Addition for Olry Date........ 10/10/97
*******
Pro3ect Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check Date
Climate Zone.. .... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -TOC
User#-MP1320 User-Calctech Run -Existing Residence
TABLE OF CONTENTS
Report
Page
FORM C -2R ................. 1
FORM C -3R ................. 4
ADDITIONS ................. 7
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
*******
Project Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check Date
Climate Zone. ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -FORM C -2R
User#-MP1320 User'Calctech Run -Existing Residence
MICROPAS4 ENERGY USE SUMMARY
Energy Use
(kBtu/sf-yr)
Space Heating..........
Space Cooling..........
Water Heating........
Total
Standard
Proposed
Compliance
Design
Design
Margin
11.98
73.14
-61.16
19.23
90.62
-71.39
28.18
31.73
-3.55
59.39 195.49 -136.10
*** Building does not comply with Computer Performance ***
GENERAL INFORMATION
Conditioned Floor Area.....
Building Type ..............
Construction Type .........
Building Front Orientation.
Number of Dwelling Units...
Number of Building Stories.
Weather Data Type..........
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Footprint Area .............
Ground Floor Area..........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing'U-value....
Average Ceiling Height.....
600 sf
Single Family Detached
Existing
Front Facing 270 deg (W)
1
1
ReducedYear
Raised Floor
1
4800 cf
600 sf
600 sf
0 sf
8.5 % of floor area
1.19 Btu/hr-sf-F
8 ft
BUILDING ZONE INFORMATION
Floor
# of
Vent
Special
Area
Volume Dwell Cond- Thermostat
Height
Vent Area
Zone Type (sf)
(cf) Units.itioned Type
(ft)
(sf)
HOUSE
Residence 600
4800 1.00 Yes NoSetback
2.0
n/a
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZllS92 Program -FORM C -2R
User#-MP1320 User-Calctech Run -Existing Residence
Surface
OPAQUE SURFACES
Area U-. Insul Act Solar Form 3 Location/
(sf) value R-val Azm Tilt Gains Reference Comments
HOUSE - Existing
0
1
Wall
194
2
Door
18
3
Wall
137
4
Wall
240
5
Wall
160
6
Floor
600
7
Roof
600
0.323
0
270
90
Yes
WS.0.2X4.24
FRONT
0.330
0
270
90
Yes
None
FRONT ENTRY
0.323
0
180
90
Yes
WS.0.2X4.24
RIGHT
0.323
0
90
90
Yes
WS.0.2X4.24
BACK
0.323
0
0
90
Yes
WS.0.2X4.24
LEFT
0.096
0
n/a
0
No
FC.0.2X6.16
TO CRAWLSPACE
0.304
0
n/a
0
Yes
R.0.2X6.24
FLAT CEILING
FENESTRATION
SURFACES
# of
Area Pan- Frame
Surface (sf) es Type
HOUSE - Existing
.1 Window 28.0 1 Wood
2 Window 23.0 1 Wood
Vent
Open
Type
Sc Sc Interior
U- Act Glass Int Shading/
value Azm Tlt Only Shade Description
Slider 1.190 270 90 1.00 0.88 Drapes.Std
Slider 1.190 180 90 1.00 0.88 Drapes.Std
OVERHANGS AND SIDE FINS
Window— Overhang Left.Fin Right Fin—
Area Left Rght
Surface ('sf) Hght Wdth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght
HOUSE - Existing
1 Window 28.0 4 3.5 1.2 0.9 n/a n/a n/a n/a_ n/a n/a n/a n/a
HVAC SYSTEMS
Minimum Duct Duct Duct
System Type Efficiency Location R -value Efficiency
HOUSE
Furnace 0.630 AFUE None R-2.1 1.000
ACSplit 8.00 SEER Attic R-2.1 0.740
WATER HEATING SYSTEMS
Number Tank External
in Energy Size Insulation
Tank Type Heater Type Distribution Type System Factor (gal) R -value
1 Storage Gas Standard 1 0.53 30 R-0
SPECIAL FEATURES/REMARKS
R-2.1 Existing duct insulation
R-0 Existing floor insulation per Form 3
R-0 Existing wall insulation per Form 3
R-0 Existing ceiling insulation per Form 3
r
COMPUTER METHOD SUMMARY Page 3 C -2R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -FORM C -2R
User#-MP1320 User-Calctech Run -Existing Residence
SPECIAL FEATURES/REMARKS
Glazing U -values per CEC TABLE 7-2 for pre -1978 construction
Existing wood frame single -pane clear glazing
WALL.FURN.63: 0.63 AFUE Existing wall furnace
E.AC.8.0: CEC MIN. REQUIREMENT
EX.HWH: EF value per CEC TABLE 3-2 for pre -1978 construction
R •
CONSTRUCTION ASSEMBLY Page 4 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing Residence
Parallel Path Method
Reference Name . WS.0.2X4.24
Description .... Wall R-0 2x4 24oc
Type ........... Wall
R -Value ........ 0 Hr-sf-F/Btu
Framing
Material ..... FIR.2X4
Type ......... Wood
Description .. 2x4 fir
Spacing ...... 24 inches on center
Framing Frac.. 0.12
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Total R -Value: 1 / 0.323 = 3.10 hr-sf-F/Btu
Material
Cavity
Frame.
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17
0.17
1.
0.75PINE
0.75 in T&G Pine wall veneer
0.71
0.71
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c.
AIR.WLL.3.50
3.5 in & greater air space: heat
sidewys 0.85
--
3f.
FIR.2X4
2x4 fir
--
3.46
4.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air film: heat sideways
0.68
0.68
Total Unadjusted
R -Values 2.92
5.53
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing
Total
U -Value: (1 / 2.92 x 0.88) + (1 / 5.53 x 0.12)
= 0.323 Btu/hr-sf-F
Total R -Value: 1 / 0.323 = 3.10 hr-sf-F/Btu
CONSTRUCTION ASSEMBLY Page 5 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing Residence
Parallel Path Method
Reference Name . FC.0.2X6.16
Description .... Floor Crwl R-0 2x6 16oc
Type ........... Floor
R -Value ........ 0 Hr=sf-F/Btu
Framing .
Material ..... FIR.2X6
Type ......... Wood
Description .. 2x6 fir
Spacing ...... 16 inches on center
Framing Frac.. 0.10
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
Name Description
0.
FILM.EX
Exterior air film: winter value ,
1.
CRAWLSPACE
Effective R -value of vented crawlspace
2c.
RO.PLACEHOLD
R-0 Place Holder
2f.
FIR.2X6
2x6 fir
3.
PLY.0.75
0.75 in plywood
4.
CARPET
Carpet & pad
I.
FILM.IN.FLR
Inside air film: heat flow down
Total Unadjusted R -Values
Cavity
R -Value
0.17
6.00
0.00
0.93
2.08
0.92
Frame
R -Value
0.17
6.00
5.45
0.93
2.08
0.92
10.10 15.55
FRAMING ADJUSTMENT CALCULATION
Cavity Framing Total
U -Value: -(1 / 10.10 x 0.90) + (1 /
Total R -Value:
15.55 x 0.10) = 0.096 Btu/hr-sf-F
1 / 0.096 = 10.47 hr-sf-F/Btu
I
CONSTRUCTION ASSEMBLY Page 6 3R
Project Title.......... Addition for Olry Date........ 10/10/97
MICROPAS4 v4.51 File-OLRY3EXI Wth-CTZ11S92 Program -FORM 3R
User#-MP1320 User-Calctech Run -Existing Residence
Parallel Path Method
Reference Name . R.0.2X6.24
Description .... Roof R-0. 2x6 24oc
Type Roof
R -Value ........ 0 Hr-sf-F/Btu
Framing
Material ..... FIR.2X6
Type ......... Wood
Description .. 2x6 fir'
Spacing ...... 24 inches on center
Framing Frac.. 0.07
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
U -Value: (1 / 3.15 x 0.93) + (1 /
7.80 x 0.07) = 0.304 Btu/hr-sf-F
Total R -Value: 1 / 0.304 = 3.29 hr-sf-F/Btu
Material
Cavity
Frame
Name
Description
R -Value
R -Value
0.
FILM.EX
Exterior air film: winter value
0.17-
0.17
1.
SHNGL.ASPHLT
Asphalt shingle roofing
0.44
0.44
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3.
PLY.0.50
0.50 in plywood
0.62
0.62
4c.
AIR.RF.3.50
3.5 in & greater air space: heat flow up
0.80
--
4f.
FIR.2X6
2x6 fir
--
5.45
6.
GYP.0.50
0.50 in gypsum or plaster board -
0.45
0.45
I.
FILM.IN.RF
Inside air film: heat flow straight up
0.61
0.61
Total Unadjusted R -Values
3.15
7.80
FRAMING ADJUSTMENT
CALCULATION
Cavity Framing
Total
U -Value: (1 / 3.15 x 0.93) + (1 /
7.80 x 0.07) = 0.304 Btu/hr-sf-F
Total R -Value: 1 / 0.304 = 3.29 hr-sf-F/Btu
ADDITION WORKSHEET Page 7 ADD
Project Title.......... Addition for Olry Date........ 10/10/97
*******
Project Address........ 1682 Sweem St.
Oroville *v4.51*
Documentation Author... Neal Kuopus ******* Building Permit
Calctech
1835 South Villa Ave Plan Check Date
Palermo, CA 95968
916-534-5066 Field Check/ Date
Climate Zone. / ..... 11
Compliance Method...... MICROPAS4 v4.51 for 1995 Standards by Enercomp, Inc.
MICROPAS4 v4.51 File-OLRY3EXI Program -ADDITIONS
User#-MP1320 User-Calctech Run -Existing & Addition
ADDITION WORKSHEET - COMPUTER PERFORMANCE
EXISTING
File Name .................. OLRY3EXI
Run Title. .............. Existing Residence
Conditioned Floor Area..... 600 sf
Standard Design Energy Use. 59.39 kBtu/sf-yr
Proposed Design Energy Use. 195.49 kBtu/sf-yr
NEW (EXISTING PLUS ADDITION)
File Name ..................
OLRY3EAD
Run Title. ...............
Existing & Addition
Conditioned Floor Area.....
1041 sf
Standard Design Energy Use.
49.26 kBtu/sf-yr
Proposed Design Energy Use.
40.43 kBtu/sf-yr
FLOOR AREA RATIO
Floor
Existing New
Area
Floor Area Floor Area
Ratio
600 / 1041
= 0.576
ADDITION DESIGN ENERGY USE FOR NEW (EXISTING PLUS ADDITION)
Floor
New Area Existing Existing Addition
Standard Ratio Proposed Standard Design
49.26 + 0.576 x ( 195.49 - 59.39) = 127.70
Note: If (Existing Proposed - Existing Standard) is
negative, this difference is set to zero.
Energy Use
(kBtu/sf-yr)
ADDITION ENERGY USE SUMMARY
Addition- Proposed Compliance
Design Design Margin
New .................... 127.70 40.43 87.27
*** Addition complies with Computer Performance ***
October 14, 1998
0
LAND, OF NATURAL WEALTH AND. BEAUTY
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397
TELEPHONE: (530) 538-7541
FAX: (530) 538-2140
Scott Olry RE: Building Permit # 97-2147
171 North Karen Avenue Expiration Date: 10/20/98
Clovis, CA 93612 A.p.# 030-080-022
With reference to the above subject, our records indicate that your building permit expires on the above
date and your permit falls into one of the categories marked below:. ,
[� Permit work started, but not completed. Permit may be renewed for 1/2 the original building
permit fee (plus a $20.00 filing fee). The renewal permit will extend the building permit for an
additional year from the original expiration date. Should you not renew your permit within 30
days of the expiration date, all work must cease until a new building permit has been issued. For
your convenience, we are enclosing a renewal application form and owner -builder form to be
completed and signed by you where indicated and returned .to this office together with the fee
shown. Please return all copies of the application form.
[ ] No inspections have been made on permit work.. Inspections are required to verify code
compliance. We are unable to renew a permit where the work has not been started and inspected
prior to permit expiration. After expiration of your permit, no work may be started until anew
permit has been issued.
[ ] A final inspection has not been made on permit work. Final inspection approval is required
before occupancy. Our field inspector has verified that the building is occupied. Occupancy
must cease until a final inspection can be made and final approval given. You have 30 days to
voluntarily cease occupancy or to present an acceptable plan for abatement or corrective actions
to be taken by you.
If our records are in error or should you have any questions concerning this matter, please contact the
Oroville office. .
Thank you for your prompt attention concerning this matter.
MCV:ahb
Attachments
Yours very truly,
L
—Mic el C. Vleira, C.B.O.
Manager, Building Inspection
Chico Office - 1469 Humboldt Rd/891-2751 Paradise Office - 747 Elliott Rd/872-6307
0
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive • Oroville, California 95965 • Telephone (530) 538-7541 PERMIT NO.
(Rev. 12/96) APPLICATION AND PERMIT
ASSESSOR PARCEL NUMBER O3O-OHO-O22
ZONIN°AR
BUILDING PERMIT
OWNER OLRY. Scott
TELEPHONE
SQ, FT, OCC. BUILDING VALUATION
. OWNER'S MAILING ADDRESS 171 North Karen .Ave., Clovis, CA. 93612
_
CONTRACTOR'S NAME Owner
TELEPHONE
CONTRACTORS MAILING ADDRESS
CONSTRUCTION LENDER
Fireplace
LENDER'S Ma UNG ADDRESS
Total Valuation $
ARCHITECT OR ENGINEER
LICENSE NO.
Filing Fee $
20.00
Permit Fee 1 Original $
129.25
ARCHITECT OR ENGINEERS MAILING ADDRESS
Plan Checking Fee $
BUILDING ADDRESS
162 Sweem_'-Street, Oroville
Energy Plan Checking Fee $
S
PERMIT FEE $
1 .25.
LOT NO.
SUBDIVISIONS NAME
PARCEL MAP
PLUMBING PERMIT
Fling Fee 20.00
USEOFSTRUCTURE
SF 6 Duplex ❑ Mobilehome ❑ Other
SPEC"
Each Tra
7.00 .
Solar or heat pump water heater
23.00
Water piping
15.00
Each as water heater or vent
15.00
TYPE OF WORK
New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑
Describe work: 2 'edroom & Conv..Laundry to path
Gas piping system 1 - 5 outlets
15.00
Building sewer
15.00
Mobile Home I S I G I W
@20.00
PERMIT FEE S
ELECTRICAL PERMIT
Fling Fee 20.00
Main Service s'. v� °oa 'r. s'
23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license Is in full force and effect
License Class Lic. No.
OWNER -BUILDER DECLARATION
affirm undo penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
❑ I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
❑ I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project
❑ 1 am exempt under Sec. Business and Professions Code for this
reason
WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
❑ 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
IPerformance of the work for which this permit Is issued.
❑ 1 have and will maintain workers' compensation Insurance, as required by Section
3700 of the Labor Code, for the performance of work for which this permit is issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Policy Number
(The above sections need not be completed if the permit Is for work of a valuation
of one hundred dollars ($100) or less.)
❑ 1 certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
X Date
Signature of Applicant - ❑ Owner ❑ Contractor ❑ Agent
HA permit is required for excavations over 5'0" deep and demolition or construction
of structures over 3 stories in height.
Mein Service YOGA TO 1000A 46.00
NEW CONST. DW{31llJfi OCCUP. S°
OR ADONS. ( a Acc, OCS. 3.5QFr;
RE°SID T. MULTI OUTLET ca 7.50
POwEA APPAMTUS
a SINGLE OUTLET C"L
20 ®t•L>D
Ex. Occup.OUTLET OR FDTTURES sAt o .50[hereby
Ex. Occup. O �°� �D°R 5.00
Temporary Service 23.00
Mobile Home Facilities 20.00
Misc. Wiring 23.00
PERMIT FEE S
MECHANICAL PERMIT Fling Fee 20.00
Heating
Cooling
Hood 6.50
Ventilation
PERMIT FEL: S
Mobile Home Installation Fee $
Energy Inspection Fee $
OCC
CONST TYPE
TOTAL FEES 149.25
HAz.
D FEES IMP
I FlAOD
COF
PARCEL
I PD
I HO
ISSUE
This permit is hereby issued under the applicable
of the Butte County Code and/or Resolutions
indicated above for which fees have been
By Date
PERMIT EXPIRES ON
provisions
to do work
paid.
to
ReceiptNo.
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT