Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
030-350-076
' � ` / ^ ' 30-35-76 922"26 7-9BiPEM' -------------- 030-350-076 9,1 CONVERSE, Paul 1436 olive Grove �r—ovi--,-ie .Complete BP.#92-2079/SF 030-350- �ERMIT#95-2656 1436 Olive-Grov-6 Lfi., b. � U]0' �CLARK, WANDA, 1436 OLIVE _ CONT: lQ{llROOFING |�� U RE ROOF �i 030-350-076 02-019,Q — CLARK, MICHAEL HNALE 1436 OLIVE GROVE, YUZ CONT: DODDS CONS STANDBY GENERA TOR ^ - -. | ' + ^ | � | - " . 030-350- .y^, .. ��G�.-. • 076 02-0198 CLARK, MICHAEL 1436 OLIVE GROVE, OROVILLE CONT: DODDS CONST STAND BY GENERATOR f OFFICE COPY Address GAS Meter By Da ELECTRIC Meter' y 1 0 COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION ' 7 County Center Drive • Oroville, California 95965 • Telephone (530) 538-7541 PERMIT NO. (Rev. 12/96) APPLICATION AND PERMIT 02-0198 ASSESSORPARCEL NUMBER �AA ^�^ ^�� ZONING BUILDING PERMIT °` ilkell L CLARK TS"j N• 643 SO. FT. OCC. BUILDING VALUATION OwWgILIb+= GROVE Lid, OROVILLE 95965 CO1MJ5JyJS`At0NST TI'P1972 CONXJ TMfAILI�7'REgANGOR 95914 DD CONSTRUCTION LENDER Fireplace LENDER'S MAIUNG ADDRESS Total Valuation $ ARCHITECT OR ENGINEER LICENSE NO. Film Fee $ 20.00 Permit Fee $ ARCHITECT OR ENGINEERS MAILING ADDRESS Plan Checking Fee $ BUILgIryc nRE,t �VE GROVE LN � OROVILLE 1143300 IIJJ Energy Plan Checking Fee $ $ PERMIT FEE S LOT NO. SUBDIVISIONS NAME PARCEL MAP PLUMBING PERMIT Filing Fee 20.00 Each Trap 7.0023.00 USEOFSTRUCTURE SF 0L Duplex ❑ Mobilehome ❑ Other SPECIFY Solar or heat um water heater Water piping 15.00 Each gas water heater or vent 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities 0 Installation ❑ Other ❑ Describe Work: STAND BY GENERATOR Gas piping system 1 - 5 outlets 15.00 • 00 Building sewer 15.00 Mobile Home I S I G I W 920.00 PERMIT FEE S 5• ELECTRICAL PERMIT Fling Fee 20.00 Main Service A OR LESS 23.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license iS ip full force and effect. ++' License Class L � Lic. No. OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason Main Service 2 TO 46. 00 E0 CCU000A NEW CONST. DWEWNG OCCUP. OR ADONS. ( a ACC. BLnS. S° so 3.50 FT ,,0µq°�IpT MULTI -OUTLET @7.50 POWAPPARATUS SINGERLE Olm-ET CIR . a Ex. Occup. OUTLET OR FDRURES zo @ ,.00 SAL. @ .50 Ex. Occup. onx�LEED�A = ) AE 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring23.00 • PERMIT FEE S WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ❑ 1 have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier MECHANICAL PERMIT Fling Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FEE $ Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) not employ any person any manner so as to become subject to workers' compensation laws o Zalifornia; anq agree that if I should become subject to the workers:.cor�pens or}/provi`sions of section 3700 of the Labor Code, I shall forthwith c`oiFply ittr'those ovisions. _ . _ Date Signature of Applicant"®❑' Owner ❑ tractor .(214,Agent An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee I $ occ CONST. TYPE EE $ 78100 HAZ. D. FEES IMP FLOOD COF PARCEL PD MD IS E This permit is hereby issued under of the Butte County Code and/or indicated ab ve for which fees have B y r _1 PERMIT XPIRES ON the applicable provisions Resolutions to do work been paid. Date r - �� G ate Receipt No. '� �• WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT COUNTY OF BUTTE BUILDING DIVISION A DEPARTMENT OF DEVELOPMENT SERVICES 411 Main Street 9 Chico, CA * (530) 891-2751 F- 7 County Center Drive - Oroville, CA (530) 538-7541 CORRECTION NOTICE" "7 OWNER PERMIT NO. A routine inspection indicates that the following violations of butte county Ordinances exist at the above address and should be corrected. Please notice this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, please contact this office immediately. 7- 0 `7 Data REV 10/92 COUNTY OF BUTTE BUILDING DIVISION =' DEPARTMENT OF DEVELOPMENT SERVICES 411 Main Street • Chico, CA • (530) 891-2751 7 County Center D:'ive • Oroville, CA • (530)'538-7541 CORRECTION NOTICE rix .4 OWNER PERMIT NO. y A routine inspection indicates that the 'ollowing violations of butte county Ordinances exist at the above address and should be corrected. Please notice this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, . please con t this office immediately_ �-�7 . /y .T S X Date i �O -Z— 'Inspecto REV 10/92 COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 County Center Drive • Oroville, California 95965 • Telephone (530) 538-7541 PERMIT NO. (Rev. 12/96) APPLICATION AND PERMIT 02-0198 ASSESSOR PARCEL NUMBER 030-350-076 ZONING BUILDING PERMIT OWftCHAEL CLARK T VS643 SO. FT. OCC. BUILDING VALUATION OWNFA 9"6ffT GROVE LN, OROVILLE 95965 cOT63'd7 nONST TESEp Z N 197 2 5� CO ffT1g6 I LU / DRE$$ANGOR 95914 jj CONSTRUCTION LENDER Fireplace LENDER'S MAILING ADDRESS Total Valuation $ ARCHITECT OR ENGINEER LICENSE NO. Filing Fee $ 20.00 Permit Fee $ ARCHITECT OR ENGINEERS MAILING ADDRESS Plan Checking Fee $ BUILQING&RE�LIVE GROVE LN, OROVILLE 11 ((�F Energy Plan Checking Fee $ $ PERMIT FEE S LOT NO. SUBDIVISIONS NAME PARCEL MAP PLUMBING PERMIT Filing Fee 20.00 USEOFSTRUCTURE SF l Duplex ❑ Mobilehome ❑ Other SPECIFY Each Trap 7.00 Solar or heat pump water heater 23.00 Water piping 15.00 Each gas water heater or vent 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities IX Installation ❑ Other ❑ Describe Work: STAND BY GENERATOR Gas piping system 1- 5 outlets 15.00 Building sewer 15.00 Mobile Home I S I G I W @20.00 PERMIT FEE S 35. 0 ELECTRICAL PERMIT Filing Fee 20.00 "OOVMain Service zo.A OR LEOR SS 23.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is,0 fuj�force and effect.��f�f License Class Lic. No. / %�j 4 T/ O� OWN WILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason Main Service 200A TO IDDOA 46.00 NEW CONST. DWELLING OCCUP. OR ADONIS. ( a ACC. S. SO 3.5¢s. rpAEDSIOT. MULTI -OUTLET 97,50 POWER APPARATUS a SINGLE OUTLET CSI R. Ex. Occup. OUTLET OR FD(TURES 20 @ 100 BAL @ 50 Ex. Occup. DuTEIFrs Aa DD °� 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wirina 23.00 23.00 PERMIT FEE $ 43.00 WORKERS' COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ❑ 1 have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier MECHANICAL PERMIT Fling Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FEE $ Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) I certify that in the performance of the work for which this permit is issued, I shall not employ any person ' any manner so as to become subject to workers' compensation laws o a' orni agree that if I should become subject to the worker ' o ens o pro s' sof section 3700 of the Labor Code, I shall forth h ply i CIS S. _ Date / ��-_ ature of Applica Owner ❑ ctor �CAgent An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee $ Occ CONST. TYPE TOTAL FEE $ 78!00 =.AES IMP FLOOD CDF PARCEL PD HD ISSUE X This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work indicated a ve for which fees have been paid. 1 , P� B Date 1 Q'� PERMIT XPIRES N "an I Dere ReceiptNo. 343116$7$.00 WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT AT z 8000/10000 Watt .� Backup System withAutomatic Power Transfer Switch For Models 1461-2 and 1535-1 Manual No. 189142 Revision 1 (12/04/2001) Visit our Generac website: www.generac-portables.com NOT INTENDED FOR USE AS PRIMARY POWER IN PLACE OF UTILITY OR IN LIFE-SUPPORT APPLICATIONS. Briggs & Stratton Power Products Backup Power System Installation Manual TABLE OF CONTENTS TABLE OF CONTENTS ......................... 2 EQUIPMENT DESCRIPTION ..................... 2 CUSTOMER RESPONSIBILITIES ................... 2 INSTALLER RESPONSIBILITIES ................... 2 SAFETY RULES................................3 INSTALLATION PROCEDURES ................... 4 Unpacking Precautions ....................... 4 Delivery Inspection ......................... 4 Shipment Contents ......................... 4 Required Tools/Equipment ..................... 4 Backup Power System Location ................ 4 Fuel and Electrical Inlet Dimensions ............. 5 Lifting the Generator ........................ 5 Access Doors ............. .................6 Automatic Power Transfer Switch Mounting Dimensions ........................7 THE GASEOUS FUEL SYSTEM .................... 7 Fuel Consumption .......................... 9 Fuel Pipe Sizing ............................ 9 ESSENTIAL CIRCUIT ISOLATION ................ 10 TRANSFER SWITCH AND SUB -PANEL ........... I I Generator AC Connection System ............ Power Wiring Interconnections ............... 12 Grounding the System ...................... 13 Control Circuit Interconnections .............. 13 System Control Panel ...................... 13 BEFORE INITIAL ENGINE STARTUP .............. 14 Engine Oil...............................14 Battery Connection ........................14 Fuel Supply System ......................... 14 INITIAL START-UP (NO LOAD) ................. 14 Electrical Checks .......................... 15 GENERATORTESTS UNDER LOAD .............. 15 AUTOMATIC OPERATION SEQUENCE ........... 16 Checking Automatic Operation ............... 17 SETTING EXERCISETIMER ..................... 17 RECONFIGURING THE FUEL SYSTEM ............ 18 Engine Adjustment ......................... 18 POST INSTALLATION INSPECTION .............. 19 REFERENCES................................19 Standards Index ...........................19 Fuel Comparison Chart ..................... 20 Size of Propane Tank Required at Various Temperatures When Kept at Least Half Full .......... 20 2 EQUIPMENT DESCRIPTION This system consists of an engine driven AC generator designed to supply backup electrical power for operating compatible electrical loads through the automatic power transfer switch supplied. This manual contains installation, startup and adjustment instructions for backup power systems that operates 120 and/or 240 Volt, single phase, 60Hz devices. Model 1461 will provide a total of 10,000 watts (10 kW) of power, drawing up to 83.3 Amps at 120 Volts or 41.7 Amps at 240 Volts. Model 1535 will provide a total of 8,000 watts (8.0 kV) of power, drawing up to 66.7 Amps at 120 Volts or 33.3 Amps at 240Volts.A separate owner's manual (part number 186012) contains specifications, operating and maintenance instructions for these models. Every effort has been expended to make sure that the information in this manual is both accurate and current. However, the manufacturer reserves the right to change, alter or otherwise improve the system at any time without prior notice. ACAUTIONI Do Not tamper with engine governed speed. High operating speeds are dangerous and increase the risk of personal injury or damage to equipment. CUSTOMER RESPONSIBILITIES - Read and follow the instructions given in the Owner's Manual, especially the section regarding selecting essential circuits. - Follow a regular schedule in maintaining, caring for and using your backup power system, as specified in the Owner's Manual. INSTALLER RESPONSIBILITIES • Read and observe the safety rules. • Read and follow the instructions given in this Installation manual. • Employ good workmanship techniques to ensure a long lasting and trouble-free backup power installation. Briggs & Stratton Power Products Backup Power System IT Installation Manual SAFETY RULES' This system was designed and manufactured for specific applications. Do Not attempt to modify the unit or use it for any application it was not designed for. If you have any questions about your generator's application, ask your dealer or consult the factory. Dangerous electrical voltages are produced that can cause a fatal electrical shock. Avoid contact with bare wires, terminals and connections at all times while the unit is running. Ensure that all the appropriate covers, guards and barriers are in place before operating the system. The manufacturer could not possibly anticipate every circumstance that might involve a hazard. For that reason warnings in the manual and warnings on tags or decals affixed to the unit are not alllncusive. If you intend to handle, operate or service.the unit by a procedure or method not specifically recommended by the manufacturer, first make sure that such a procedure or method will not render this equipment unsafe or pose a threat to you and others. A Only qualified electricians and gaseous fuel technicians should attempt installation of this system, which must strictly comply with applicable codes, standards and regulations. ACAUTIONI Despite the safe design of the Backup Power System, operating this equipment imprudently, neglecting its maintenance or being careless can cause possible injury or death. Permit only responsible and capable persons to operate and/or maintain this equipment. . ACAUTION! After the installation of your Backup Power System is complete, the generator may crank and start without warning any time there is a power failure. To prevent possible injury, always set the AUTO/OFF/MANUAL switch to OFF AND remove the 15 Amp fuse BEFORE working on the equipment If you must work around a unit while it is operating, stand on an insulated dry surface to reduce shock hazard. • Do Not handle any kind of electrical device while standing in water.Avoid electrical devices while barefoot or while hands or feet are wet. • In case of an accident caused by electrical shock, immediately shut down the source of electrical power. If this is not possible, attempt to free the victim from the live conductor. Avoid direct contact with the victim. • Use a non -conducting implement, such as a rope or board, to free the victim from the live conductor. If the victim is unconscious, apply first aid and get immediate medical help. • Your Backup Power System is powered by liquid propane (LP) or natural gas, both of which are extremely Explosive! Do Not smoke around the generator.Wipe up any oil spills immediately. Ensure that no combustible materials are left in the generator compartment. Keep the area surrounding the generator clean and free of debris. • Install the fuel supply system according to applicable fuel - gas codes. Before placing the Backup Power System into service, the fuel system lines must be properly purged and leak tested. After the system is installed, you should inspect the fuel system periodically. No leakage is permitted. • Adequate, unobstructed flow of cooling and ventilating air is critical to correct generator operation. Do Not alter the installation or permit even partial blockage of ventilation provisions, as this can seriously affect safe operation of the generator. • Remain alert at all times while working on this equipment. Never work on the equipment when you are physically or mentally fatigued. • Before performing any maintenance on the generator, disconnect the cable indicated by a NEGATIVE, NEG or (-) first.When finished, reconnect that cable last • Do Not use the generator or any of its parts as a step. Stepping on the unit can stress and break parts.This may result in dangerous operating conditions from leaking exhaust gases, fuel leakage, oil leakage, etc.. ®This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death. 3 Igin Briggs &Stratton Power Products Backup Power System A Installation Manual B INSTALLATION PROCEDURES Unpacking Precautions The unit is shipped bolted to its mounting pad, ready for hookup. Use care to avoid damage from dropping, bumping, collision, etc. Store and unpack carton with the proper side up, as noted on the shipping carton. Delivery Inspection After removing the carton, carefully inspect the Backup Generator and Automatic Power Transfer Switch components for any damage that may have occurred during shipment IMPORTANT: If loss or damage is noted at time of delivery, have the person(s) making delivery note all damage on the freight bill and affix his signature under the consignor's memo of loss or damage. If loss or damage is noted after delivery, separate the damaged materials and contact the carrier for claim procedures. Missing or damaged parts are not warranted. Shipment Contents The Backup Power System is supplied with: • Backup Power generator • Pre -attached mounting pad • Automatic PowerTransfer switch • One 18" flexible hook-up pipe • Installation manual • Owner's manual • Installation checklist • Three access door keys • Four lifting hole plugs • Oil fill spout • Touch-up paint • One spare ISA fuse Required Tools/Equipment • Two 40" to 48" lengths of 1" OD pipe (NOT conduit) • Hole punches for 16ga steel • Torque screwdriver, 5 to 50 inch -pound range 4 Backup Power System Location aTO THE INSTALLER: Consult with the owners 4 and convey any technical considerations that might affect their wishes, before applying these general guidelines. Generator Clearances The generator enclosure must be a minimum of 3 fL (92 cm) from combustible material (NFPA 37). Leave at least 3 ft. (92 cm) all around the enclosure for access to the inside of the enclosure (NEC Art 110-26a,Art. 110-26b). The unit's exhaust port must be at least 5 ft (152 cm) from any building opening (window, door, vent etc.), and the exhaust must not be able to accumulate in any occupied area (Figure 1). Figure I Backup Power System Clearances 19 Exhaust -- Port �� : Exhaust port must be - 5 ft 152 cm minimum distance from building ZJ openings General Location Guidelines • Install the unit outdoors ONLY. NO MODIFICATIONS WILL ALLOW INSIDE INSTALLATION! Place the unit in a prepared location that is flat and has provisions for water drainage. • Install the unit where air inlet and outlet openings will not become obstructed by leaves, grass, snow, etc. If prevailing winds will cause blowing or drifting, you may need to construct a windbreak to protect the unit, • In locations where strong winds blow from one direction, face the generator air inlet openings into the prevailing winds, if possible. Briggs & Stratton Power Products Backup Power System Installation Manual A B • Install the generator as close as possible to the Automatic Power Transfer System to reduce the length of wiring and conduit • Install the generator as close as possible to the fuel, supply to reduce length of pipes. ACAUTION! Laws or local codes may regulate the distance to the fuel supply. The Backup Power System is shipped already attached to its mounting pad. Unless mandated by local code, no concrete slab is required. If mandated by local code, detach the unit from its supplied base. Construct a concrete slab at least 3 inches thick and 6 inches longer and wider than the unit Attach unit to slab with 1/4" diameter (minimum) masonry anchor bolts long enough to retain the unit Fuel and Electrical Inlet Dimensions Figure 2, below, depicts the physical location of the fuel piping connector.Also shown is the recommended location for punching holes for attaching the power and signal conduits. Lifting the Generator The generator weighs more than 375 pounds. Proper tools, equipment and qualified personnel should be used in all phases of handling and moving the unit. CAUTION! Do Not lift unit by roof as damage to unit will occur. To lift the generator manually, two 4ft lengths of i " pipe (supplied by the installer) are required. Insert pipes through the lifting holes located near the unit's base, as shown in Figure 3 (next page). ACAUTIONI The unit may shift on the lifting pipes during movement, which may cause an injury.. AWARNINGI If liking or hoisting equipment is used, be careful not to touch any overhead power lines. 5 Briggs & Stratton Power Products Backup Power System A Installation Manual B It " c To lift �. Insert pipe here Installer -supplied pipe You may also lift the unit using a "hook and hoist' method attached to the lifting pipes, provided that you use a spreader bar to ensure that the chains or cables dear the generator's roof. Retouch any chipped paint with supplied touch-up paint After paint is dry, fill the lifting holes with the supplied chassis plugs after the unit is in place. /access Doors The Backup Power System comes equipped with an enclosure that has four access doors.As shown in Figure 4, below, the doors are named for a significant component located behind them.Also shown is the units dimensions. Starting with the side that has the factory welded gaseous fuel connection and proceeding clockwise, the doors are named: • Oil Service door • Air Intake door • Control Panel door • Battery door Each unit is equipped with three identical circular keys. These keys fit the locks that secure the oil service and control panel doors. To remove an access door: 1. Insert a key into the lock of the access door you wish to remove and turn one quarter turn clockwise. NOTE: The key is retained in the lock when the locks are open. 2. Grasp the door's lift handle and pull the door upwards until the security pins are free of the engagement holes in the lower base. —C=======3_ 6 - Briggs & Stratton Power Products Backup Power System Installation Manual A B 3. With the security pins free, pull the lift handle outward • (away) from the unit while pulling the door down and out of the upper door channel.The door will come free of the generator enclosure. The Battery door and the Air Intake door do not have locks or lift handles.They are opened in the same manner, lifting on the louvers instead of a lift handle. However, you must remove the door lock screw, found directly above the center of the door. Replace the screw whenever the access door is installed. AWARNINGl.Burn Hazard! The exhaust port can reach a temperature of 600° F during use and ` remains hot after shutdown. Carelessness could cause severe burns. To install an access door: I. Support the door by grasping the lift handle or lower. Guide the top of the door into the upper channel of. the generator enclosure. 2. Lift the door up into its upper mounting channel until the security pins clear the sill of the enclosure. , 3. Push the lower half of the door into the door recess until it is flush with the sides. 4. Seat the door by pushing it down until the rubber coated security pins engage and the door rests on the mounting sill. S. If installing a lockable door, turn the key one quarter turn counterclockwise. Remove and secure the key. Check to ensure that all the rubber and foam vibration dampers remain in place.This will minimize vibration noise. ACAUTION! Observe that the 15 Amp fuse has been removed from the control panel for shipping. Do Not install this fuse until all plumbing and wiring has been completed and inspected. Failure to install the fuse as described on page 14 could cause the engine to start Automatic Power Transfer Switch Mounting Dimensions Figure S depicts the physical size and mounting hole locations of the NEMA automatic transfer switch enclosure.This enclosure is suitable for indoor or outdoor use. Figure 5 —Autornatic Power Transfer Switch Dimensions 10" 7.09 ' 13.94" 11.02., I 14.96" ,_ ---J Mounting Dimensions Enclosure Dimensions The transfer switch enclosure is commonly secured through the predrilled holes, as shown. However, other mounting holes can be made by removing the switch component mounting plate and drilling new holes. THE GASEOUS FUEL SYSTEM AWARNING! Gaseous fuels, such as LP and natural gas, are highly volatile and their vapors are Explosive. LP gas is heavier than air and will settle in low areas. Natural gas is lighter than air and will collect in high areas. Even the slightest spark can ignite these fuels and cause an explosion. The information provided below is to assist gaseous fuel system technicians in planning installations. In no way should this information be interpreted to conflict with applicable fuel gas codes. Consult with your local fuel supplier or Fire Marshall if questions or problems arise. TO THE INSTALLER: Consult with the Backup Power System owner(s) and convey any technical considerations that might affect their installation plans, before applying these general guidelines. The following general rules apply to piping used in gaseous fuel systems: • The piping should be of a material that conforms to NFPA and local codes, rigidly mounted and protected against vibration. –umommons• 7 Briggs &Stratton Power Produce Backup Power System 0A Installation Manual B • Install flexible gaseous pipe (supplied) between the Backup Power System Fuel Inlet port and rigid piping. • Piping must be of the correct size to maintain the required supply pressures and volume flow under varying conditions. • Use an approved pipe sealant or joint compound on all threaded fittings to reduce the possibility of leakage. • Installed piping must be properly purged and leak tested, in accordance with applicable codes and standards. Consider the following factors when planning to install the fuel supply system: The Backup Power System engine is fitted with a fuel carburetion system that meets the specifications of the California Air Resources Board for "tamper -proof ' dual fuel systems.The unit will run on natural gas or liquefied propane_ • A minimum of one manual shutoff valve should be placed in-line and located outside the building to facilitate servicing the generator. • Natural gas fuel supply pressure at the generator's fuel inlet port should be between 5 to 7 inches of water (in. W.C.) at full load. LP fuel supply pressure should be I I to 14 inches of water (in.W.C.) at full load. The Backup Power System unit has been factory set to run on natural gas. If you need to change the primary fuel from natural gas to LP gas, the unit will need to be reconfigured, as described on page 18. It is recommended that the fuel connection incorporate the following components: • A manual fuel shut-off valve located in the interior of the building. • A manual fuel shut-off valve located outside the building, just before the generator unit. • The termination of hard piping should include a sediment trap. • A manometer port should be provided. 8 The manometer port permits temporary installation of a manometer (Figure 6), to ensure that the engine receives the correct fuel pressure to operate efficiently throughout its operating range. When the initial test runs are completed, the manometer is removed and the port is plugged.A typical final fuel connection assembly is shown in Figure 7. From Fuel Supply Line ! To Backup Power System Briggs & Stratton Power Products Backup Power System Installation Manual A B Fuel Consumption Fuel Pipe Sizing See Figure 8 for fuel supply requirements at half and full Figures 9 and 10 provide the maximum capacity of pipe in load for both natural gas and LP vapor. cubic feet of gas per hour for gas pressures of 0.5 psi or Model Nawral Gasp LP Vapor'* 112 Load Full Load 112 Load Full Load 1461-0, 1461-1 100.6 177.9 1.1614221 2.1 5178.24 1535-0 79.7. 140.0 1.07138.94 1-56156.77 less and a pressure drop of 0.3 in. water column. Specific gravity of gas is shown.This information is based on data found in Chapter 9 of NFPA Publication 54. Listed values compensate for a nominal amount of restriction from bends, fittings, etc. If an unusual number of fittings, bends, or other restrictions are used, please refer to NFPA Publication 54. rigtre- .0 rll- NPT IOft UAS 15ft Q11G) Pipe 20ft Size - Gas Flow Cham iR cubic feet per hour 30ft 0ft 70ft 80ft 90ft IOOft %" 168 146 115 93 63 59 55 51 48 3/" 346 293 240 192 32 120 M274 113 106 99 1" 653 549 446 360 50 230 211 197 187 Natural Gas (sg=0.65) 139 129 Model 1461-2 requires 177.9 CFH at"Full Load" Model 1535-1 requires 140.0 CFH at"Full Load" Liquefied Petroleum (LP) (sg=1.50) Model 1461-2 requires 78.24 CFH at"Full Load" Model 1535-1 requires 56.77 CFH at "Full Load" 711, IOft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 1111 .80ft 90ft IOOft 110 96 76 61 52 46 42 38 36 33 32 277 192 158 126 107 95 87 79 74 69 65 428 360. 293 236 202 180 164 151 139 129 123 Liquefied Petroleum (LP) (sg=1.50) Model 1461-2 requires 78.24 CFH at"Full Load" Model 1535-1 requires 56.77 CFH at "Full Load" 9 VVI. Briggs & Stratton Power Products Backup Power System A Installation Manual B ESSENTIAL CIRCUIT ISOLATION Essential electrical loads are loads that will be powered by the Backup Power System. Essential loads are grouped together and wired into a separate sub -panel, named herein as the "Essential Circuit Sub -Panel". ACAUTION! This Backup Power System MUST be installed as described herein. FWETO THE INSTALLER Consult with Backup , Power System owner(s) to discuss their "Selection of Essential Circuits", described in the owner's manual. Ensure that the total of the selected load circuits fed by this sub -panel are within the generators rated capacity. The following requirements apply to this type of isolation system: • The Automatic Transfer Switch is installed between the main distribution panel and the essential circuit sub - panel. • The Automatic Transfer Switch has a load rating of SOAmps.This is the maximum load rating of the Essential Circuit Sub -Panel. All wiring must conform to the National Electrical Code, and all state and local codes. The illustration in Figure 1 1 depicts the Backup Power System and assumes the utility is supplying 120/24OVolt, single-phase electrical service. To Utility Power Watt Meter _ ------------- Main Distribution Panel To Range 240V i To Water Heater To Air Conditioner (240V) i To Other Circuits (120V) --------------- r----------- Automatic Transfer Switch (in normal position) To Beacon Backup Power System —i•J ------ ------,Q-- Essential Circuit Subpanel 240V To Well Pump To Refrigerator 120V To Sump Pump , To Lights 120V To Furnace Blower Neutral '--------------- ' 1110000mum- 10 Briggs &Stratton Power Products Backup Power S em �i Installation Manual A B TRANSFER SWITCH AND. SUB -PANEL The Automatic Transfer Switch supplied with the Backup Power System is enclosed in a NEMA Type 4 enclosure suitable for indoor and outdoor use. Guidelines for mounting the Automatic Transfer Switch include: • Install the. switch on a firm, sturdy supporting structure. • To prevent switch distortion, level the switch if necessary. This can be done by placing washers between the switch enclosure and the mounting surface. • Never install the switch where water or any corrosive substance might drip onto the enclosure. • Protect the switch at all times against excessive moisture, dust, dirt, lint, construction grit and corrosive vapors. The typical Automatic Power Transfer Switch and the sub - panel box are depicted in Figure 12. It is best if they are mounted inside near the main distribution panel, as shown. Discuss layout suggestions/changes with the owner before beginning the system installation process. ACAUTION! Automatic Transfer Switch is to be wired to the Briggs and Stratton Home Standby Generator sets ONLY and cannot be used with other generators. Generator AC Connection System A single-phase, three -wire AC connection system is used in the Backup Power System. The stator assembly consists of a pair of stationary windings with two leads brought out of each winding.The two windings are connected together in series, resulting in a fixed 240 Volt AC, 60Hz output Stator output leads I I and 44 are the two "hot" leads; the junction of leads 22 and 33 forms the neutral lead, as shown schematically and as wiring diagram in Figure 13.A complete schematic and wiring diagram can be found in the owner's manual. Neutral 33 F 2 33 22 c � c S 120V 3 Circuit 120V 44 II Breaker I I ----o 0 44 _� v 240V Y/ Neutral II AA 0� i Circuit Breaker ! To Earth Ground I To Transfer Switch �-� Briggs & Stratton Power Products Backup Power System A Installation Manual B Power Wiring Interconnections. 2. All wiring must be the proper size, properly supported, of approved insulative qualities, and protected by NEC 3. approved conduit. Use flexible conduit between the enclosure and any rigid conduit 4. ACAUTIONI Per NEC code, power voltage leads must be run in separate conduit from low voltage 5 transfer switch "signal" leads. Complete the following connections between the 6 generator, transfer switch, sub -panel, and main distribution 7. panel (Figure 14). I. Connect utility power supply leads from a two pole breaker installed in the main distribution panel to transfer switch terminals marked "UTILITY 8' CONNECTION". Use 50 Amp circuit breaker for Model 1461, 35 Amp for Model 1535. Ensure breaker is turned OFF. Connect utility neutral to the transfer switch "NEUTRAL" lug and sub -panel "Neutral" lug. Connect utility ground to the transfer switch "GND" lug and sub -panel "Ground" lug. Connect generator power supply leads from the generator's circuit breaker to transfer switch terminals marked "GENERATOR CONNECTION". Connect generator Neutral to the transfer switch NEUTRAL lug. Connect generator GND to transfer switch GND lug. Connect leads from the transfer switch terminals marked "LOAD CONNECTION" to the sub -panel power bus lugs. Torque all wire connections/fasteners to values recommended in Figure 15. Main Distribution Panel Essential Circuit Sub -panel Backup 'Power Rear of N—�-- Neutral Ground Neutral Bus � System Control Bus Bus I Generator Panel Generator l ? f~I t j E! Neutral is Ground _ White wire i— --- r :^• Bus I - L j j` '''�`' - Load„ Generator i JL i ----- ! Connection ! Connection t !j I i Wire Nut UtilityQ- s Connection A -- Neutral lug I GND lug —ip e ooe� /� � I / "/ I' j Dual Pole I / E / !; - Breaker Control Signal Automatic PowerTransfer Switch Connections -91111� 12 Briggs & Stratton Power Products Backup Power System Installation Manual A B Figure 15 — Recomm�ended Torque Values CONNECTIONS- -0 Tor ue Value' In Main Distribution Panel: Minimum Maximum Refer to panel manufacturer specs In Transfer Switch: UTILITY CONNECTION lu 35 in -Ib 45 in -Ib GENERATOR CONNECTION lugs 35 in -Ib 45 in -Ib LINE CONNECTION lugs 35 in -Ib 45 in -Ib NEUTRAL lug 35 in -Ib 45 in -Ib GND lug 45 in -Ib 50 in -Ib Barrier terminal strip screws 8 in -Ib 13 in -Ib In Generator Housing- ousin Dual Dual Pole Breaker screws 35 in -Ib --4S—:,n---Ib GND lug screw 35 in -Ib: 45 in -Ib Barrier terminal strip screws 8 in -Ib 13 in -Ib In Sub -panel Distribution box Refer to panel manufacturerspecs Grounding the System. Installer -supplied minimum 10 AWG stranded copper wire is. connected to the generator housing GND lug and routed through conduit to the Automatic Transfer Switch's GND lug. Continue the I OAWG wire through conduit to the grounding lug in the sub -panel and to the main distribution panel ground bus.Torque all wire connections/Fasteners to values recommended in Figure IS. Generator grounding rod is used ONLY if required by local code. Control Circuit Interconnections Control circuit interconnections consist of "Utility" and "Load" leads, plus leads "15","205", and "206".These seven signal leads must be routed in conduit that is separate from the AC power leads. Control lead functions are briefly described as follows: r "Utility I" and "Utility 2" deliver utility power to the generator's circuit board. • "Load I " and "Load 2" are used to operate the exercise timer on the generator's circuit board. • Leads "15","205", and "206" supply control signals to the Automatic Transfer Switch. Using installer -supplied minimum 14 AWG stranded copper wire, connect each control circuit terminal in the generator to its corresponding terminal in the Automatic Transfer Switch.Torque all wire connections/fasteners to values recommended in Figure IS. 13 System Control Panel Figure 16 depicts the Backup Power System control panel located inside the generator housing. Brief descriptions of the controls used during installation follow. More information may be found in the Owner's Manual. Figure 16 — Backup Power System Control Panel Circuit Set Exercise �;— Breaker I'=";i( II Switch \Diagnostic �• I r- I'� LED Hour Meter: AUTO/OFF/ MANUAL 15 Amp I�� C; ��.� 11 Switch Fuse i AUTO/OFF/MANUAL Switch The most important control on the generator is the "AUTO/OFF/MANUAL" switch.This three -position device will be referred to herein as "AUTO/OFF/MANUAL", and is used as follows: "AUTO" position is the normal operating position. If a utility power outage is sensed, the system will start the generator, let it reach operating temperature, then connect generator power to the sub-panel.When utility power is restored, the system reconnects utility power to the sub -panel, lets the engine 'cool down', shuts off the generator, and waits for the next utility power outage. "OFF" position turns off a running generator and takes the system out of the Automatic operation mode. "MANUAL" position starts the engine but does not disconnect utility power from the sub -panel. It is used for maintenance or diagnostic functions. Briggs & Stratton Power Products Backup Power System A Installation Manual B 15 Amp Fuse The Backup Power System DC control circuit is protected from overload by a 15 Amp fuse mounted on the generator's control panel.The fuse is wired in series with the battery output lead to the control panel (see Figure 16). If the fuse has'blown' (melted open) or was removed, the engine cannot crank or start. Replace the fuse using ONLY an identical BUS AGC I SA fuse. One spare fuse is supplied with the unit BEFORE INITIAL ENGINE STARTUP Engine Oil The generator's engine is shipped from the factory full of oil and should'be ready to run. However, check oil level and ensure that engine is serviced as described in the Owner's Manual. CAUTIONI Any attempt to crank or start the engine before it has been properly serviced with the recommended oil will result in an engine failure that is not covered under warranty. Oil Considerations Your Backup Power System is equipped with an engine that has completed the traditional "break-in" process.The engine should only be filled with synthetic oil (SAE SW -30, API SJ or later).This permits 'standby' operation in the widest range of temperature and climate variations. NOTE: The use of synthetic oil does not alter the required oil change intervals recommended in the Owner's Manual. Battery Connection The Backup Power System is supplied with a 12 Volt DC 18 Amp -Hour battery. It is a sealed, lead -acid rechargeable battery. It is installed in the unit and the battery cables are connected at the factory.The unit's IS Amp fuse, which isolates the battery and prevents the unit from starting, has been removed for shipping. If it is necessary to connect the battery, proceed as follows: I. Set the generator's "AUTO/OFF/MANUAL" switch to OFF. 2. Turn OFF the main distribution panel circuit breaker supplying utility power to the Automatic Power Transfer System. ACAUTIONI The generator can crank and start when the battery cable contacts the battery terminal if the "AUTO/OFF/MANUAL'', switch isnot set to its OFF position. 3. Using supplied hardware, connect the red battery lead to the battery positive terminal (indicated by. POSITIVE, POS, or (+). 4. Repeat step 3 (above) to connect the negative battery cable.You may need to clip a cable tie to place the negative wire. Ensure hardware on both positive and negative battery terminals is secure. NOTE: With the battery installed and utility power available to the Automatic Transfer Switch, the battery receives a trickle charge whenever the engine is not running.The trickle charge only prevents self -discharge and cannot be used to recharge a battery that is completely discharged. Fuel Supply System Ensure that all fuel pipe connections are tight, secure and without leaks. - NOTE: In the absence of local purging and'leak test, standards, NFPA No. 54 may be used as a guide. (See "Standards Index" at the end of this manual). Ensure that all gas line shutoff valves are OPEN and that adequate fuel pressure is available. INITIAL START.UP,.(NO LOAD) Begin testing the system without any elects ca6--ads connected, as follows: I. Set the AUTO/OFF/MANUAL switch to OFF. 2. Set the generator's main circuit breaker to its OFF (open) position. 3. Install the 15 Amp fuse in the control panel. 4. Set the AUTO/OFF/MANUAL switch to MANUAL. NOTE: When the Backup Power System is started for the very first time, it will require that air in the gaseous fuel lines be purged.This may take a few minutes. -000now- 14 Briggs & Stratton Power Products Backup Power System Installation Manual B 5. Use short starting cycles (15 sec. per min.) to reduce heat on the starter. 6_ Repeat process until lines are purged of air and engine starts. 7. Listen for unusual noises, vibration or other indications of abnormal operation. Check for oil leaks, evidence of overheating eic. while the unit runs. Electrical Checks With the AUTO/OFF/MANUAL switch set to OFF: I. Turn ON the main distribution panel circuit breaker that supplies utility power to the Automatic Transfer Switch. AWARNING! The Automatic Transfer Switch is now electrically "HOT." Contact with "HOT' parts will result in extremely hazardous and possibly fatal electrical shock. Proceed with caution.- 2. 3. 4. 5. Use an accurate AC voltmeter to check utility power voltage across "UTILITY CONNECTION" lugs in the Automatic Transfer Switch (see Interconnection Diagram on page 12). Nominal line -to -line voltage should be 240Vo1a. Check utility power between one of the UTILITY CONNECTION lugs and the neutral lug, then between the other UTILITY CONNECTION lugs and the neutral lug. Nominal line -to -neutral voltage should be 120 Volts. When certain that utility voltage is as specified above, turn OFF the main distribution panel circuit breaker that supplies utility power to the Automatic Transfer Switch. Set the generators main circuit breaker to the OFF position. Initial tests will be conducted at "no-load" condition. ' 6. Set the AUTO/OFF/MANUAL switch to MANUAL The engine should crank and start- 7. tart7. Let the engine warm up for about five minutes to allow internal temperatures to stabilize.Then, set the generator's main circuit breaker to its ON (or closed) position. AWARNING! Proceed with caution. Generator output voltage is now supplied to the Automatic Transfer Switch. Contact with "HOT' Automatic Transfer Switch parts will result in dangerous and possibly fatal electrical shock. 8. Connect an accurate AC voltmeter and a frequency meter to check generator output across "GENERATOR CONNECTION" lugs in the Automatic Transfer Switch (see Interconnection Diagram on page 12). Voltage should be 239-245 Volts, frequency should be 62.0 - 62.5 Hz. NOTE: If either parameter is outside these ranges, perform the Engine Adjustments described on page 18. Check generator output between one of the GENERATOR CONNECTION lugs and the neutral lug, then between the other GENERATOR CONNECTION lug and the neutral lug. In both cases, voltage reading should be between 121-126Volts. 10. Set the generator's main circuit breaker to OFF. Let the engine run at "no-load" for five minutes to stabilize internal engine/generator temperatures. 11. Set the AUTO/OFF/MANUAL switch to OFF. Engine should shut down. IMPORTANT: Do Not proceed until you are certain that generator AC voltage and frequency are correct and within the stated Iimits.To obtain the proper generator frequency, see Engine Adjustments on page 18. Briggs & Stratton Power Products Backup Power System A Installation Manual B AUTOMATIC OPERATION SEQUENCE The generator's control panel houses a logic control circuit board.This control board constantly monitors utility power source voltage. Should that voltage drop below a preset level, control board action will signal the engine to crank and start.After the engine starts, the control board signals the transfer switch to activate and connect sub -panel load circuits to the backup power supply. When utility source voltage is restored above a preset voltage level, the control board signals the transfer switch to transfer loads back to the power supply.After retransfer, the engine is signaled to shut down. The actual system operation is not adjustable and is sequenced by sensors and timers on the control board, as follows: Utility Voltage Dropout Sensor • This sensor monitors utility source voltage. • If utility source voltage drops below about 60 percent of the nominal supply voltage, the sensor energizes a 6 -second timer.The timer is used to'sense' brown -outs. • Once the timer has expired, the engine will crank and start. Engine Warm-up Time Delay This mechanism lets the engine warm up for about 15 seconds before the load is transferred to the Backup Power System. Backup Voltage Sensor This sensor monitors generator AC output voltage.When the voltage has reached 50 percent of the nominal rated voltage, transfer to the backup generator can occur. Utility Voltage Pickup Sensor This sensor monitors utility power supply voltage.When that voltage is restored above 80 percent of the nominal source voltage, a retransfer time delay starts timing.' 16 Retransfer Time Delay • This timer runs for about 6 • At the end of a 6 -second delay, circuit board action de - energizes the generator relay in the. -,transfer switch. • Retransfer to utility power source theri: occurs. Engine Cool -down Timer " • When the load is transferred back to.the utility.power source, the engine cool -down timer starts timing.. • The timer will run for about one minute, then the generator will shut down. Briggs & Stratton Power Products Backup Power Systeme Installation Manual A B Checking Automatic Operation- , To check the system for proper automatic operation; ` proceed as follows: I. Check that AUTO/OFF/MANUAL is set to OFF. 2. Apply utility power to the Automatic Transfer Switch by turning ON the main distribution panel circuit breaker. 3. Set the AUTO/OFF/MANUAL switch to AUTO.The Automatic Power System is now ready for automatic operation. 4. Turn OFF the main distribution panel circuit breaker sending power to the automatic transfer switch. The engine will crank and start once the utility voltage drops out and the sensor has timed out. After starting, the Automatic Power Transfer System will transfer essential circuit sub -panel loads to the generator. Let the system go through its entire automatic operation sequence. S. With the generator output supplying its loads, turn ON the main distribution panel circuit breaker that supplies utility power to the Automatic Power Transfer Switch. 6. After about 6 seconds, the automatic transfer switch will transfer loads back to the utility power. 7. About one minute after re -transfer, the engine will shut down. This completes the test procedures for the automatic operation of the Backup Power System. SETTING EXERCISE TIMER The Backup Power System is equipped with an exercise timer that will start and exercise the system once every seven days. During this exercise period, the unit runs for approximately 12 minutes and then shuts down. Electrical load transfer DOES NOT occur during the exercise cycle (unless an utility power outage occurs). A switch on the control panel is labeled "Set Exercise" (see Figure 16).The specific day and the specific time of day this switch is pressed is programmed into the control board memory.This date and time is then used to automatically initiate the system exercise cycle. To perform the Set Exercise procedure: I. Choose the day and time you want your backup power system to exercise. 2. On that day and time, set the AUTO/OFF/MANUAL switch to OFF. 3. Press and hold down the "Set Exercise" switch.The Diagnostic LED blinks. 4. Hold the switch down until the Diagnostic LED stops blinking. Release the Set Exercise switch. S. Set the AUTO/OFF/MANUAL switch to AUTO. "Set Exercise' is complete. For example, if you press the "Set Exercise' switch on Sunday morning at 10:00 AM, the unit will run an exercise cycle the following Sunday at 10:00 AM. NOTE: "Set Exercise' will only work if the unit is in the Automatic mode and this exact procedure is followed.The exerciser does not need to be re -set if the IS Amp fuse is removed or changed.The exerciser will need to be re -set if the 12 Volt DC battery is disconnected. If you want to change the day and time the unit exercises, simply perform the "Set Exercise" procedure at the exact weekday and time you want it to take place. _1� 17 Briggs & Stratton Power Products Backup Power System A Installation Manual B RECONFIGURING THE FUEL SYSTEM The engine of your Backup Power System is factory calibrated to run on natural gas (NG). It may also be operated on liquefied petroleum (LP).There is no additional hardware/equipment required to switch between either fuel. However, LP fuel inlet pressure must be between l I and 14 inches water column. To reconfigure the fuel system for LP use: • Set the AUTO/OFF/MANUAL switch to OFF. • Set the generator's main circuit breaker OFF. • Remove the 15 Amp fuse. • Activate the fuel transfer solenoid as follows: I. Remove the "Oil Service" access panel. 2. Connect the two -pin electrical connector shown in Figure 17. Use the short adapter cable, if supplied. Push two connectors together 3. Reinstall the "Oil Service" access panel. • Reinstall the IS Amp fuse. • Set the generator's main circuit breaker ON. • Set the AUTO/OFF/MANUAL switch to AUTO. The system is now ready to operate automatically using LP fuel.With a fixed main jet for LP gas, there is no need to perform any engine adjustments for LP operation. 18 Engine Adjustment It is commonly known that there are regional variances in the combustibility of natural gas. Each BPS unit is adjusted at the factory for correct NG operation. If the generator output voltage or frequency measured during initial Electrical Check (paragraph #8 on page 1 S) is outside the listed ranges, the combustibility of the gas supplied at the installation site may be substantially different To adjust the engine for this different fuel, proceed as follows. I. Remove the Air Intake access door. 2. Remove the three MS sheet metal screws that hold the control panel wiring cover to the air intake guard (Figure 18). 3. Remove the six (MS) sheet metal screws that hold the air intake guard to the engine impeller panel. 4. An access hole is visible above the engine impeller panel (see Figure 18). It will be covered with a plug. Remove the plug to gain access to the adjustment screw. NOTE: The mixture adjustment screw is the brass slotted screw in the center of the aluminum boss directly visible in the access hole. Briggs & Stratton Power Products Backup Power System Installation Manual A B 5. Connect an accurate frequency meter to the load side of the main circuit breaker (on the back of the control panel). 6. Ensure that the 15 Amp fuse is installed. 7. Set the generator's main circuit breaker ON. 8. Set the AUTO/OFF/MANUAL switch to MANUAL. When the engine starts, allow it to warm up for two minutes. 9. When the engine speed has stabilized, slowly rotate . the adjustment screw clockwise and/or counterclockwise until the maximum (peak) frequency is reached. Normal operating frequency is 62.0 to 62.5 Hz. Reinstall the access hole plug. 10. Set the AUTO/OFF/MANUAL switch to OFF. 11. After the engine has halted, reinstall the air intake guard. 12. Reinstall the control panel wiring cover to the air intake guard. 13. Reinstall the battery/air intake access panel. 14. Set the AUTO/OFF/MANUAL switch to AUTO. POST INSTALLATION INSPECTION Before placing the Backup Power System into service, inspectthe entire installation carefully. Ensure that any scratches or broken paint on the inside or outside of the enclosure are touched up with the supplied paint Complete the:"Installation Checklist" as you make the inspection. Ensure all items have been filled-in and all signatures have been obtained. Instruct the owner to mail the white copy to: Generac Portable Products Warranty Registration P. O. Box 239 Jefferson, Wl 53549 19 REFERENCES Standards Index In the absence of pertinent standards, codes, regulations, or laws, the published information listed below may prove useful when installing this equipment • NFPA No. 54, National Fuel Gas Code, available from the National Fire Protection Association, I Batterymarch Park, Quincy, MA 02269-9101; (617) 770-3000; Fax (617) 770-0700; online at www.nfpa.org.. • NFPA No. 30, Flammable and Combustible Liquids Code, obtainable from NFPA, above. • NFPA No. 37, Stationary Combustion Engines and Gas Turbines, obtainable from NFPA, above. • NFPA No. 58,American National Standard for Storage and Handling of Liquefied Petroleum Gas, obtainable from NFPA, above. • NFPA No. 70, NFPA Handbook of National Electric Code, obtainable from NFPA, above. • NFPA No. 76A, Essential Electrical Systems for Health Care Facilities, obtainable from NFPA, above. • Article X, National Building Code, available from the American Insurance Association, 1 130 Connecticut Ave, NW, Suite I000,Washington, DC 20036; (202) 828-7100; Fax (202) 293-1219; online at www.aCiadc.org. • Agricultural Wiring Handbook, obtainable from the Food and Energy Council , 909 University Avenue, Columbia, MO 65201; (573) 875-7155; online at www.nfec.orglelectiicaWring.htm. • ASAE EP -3634, Installation and Maintenance of Farm Backup Electrical Systems, available from the American Society of Agricultural Engineers, 2950 Niles Road, St Joseph, MI, 49085-9659; (616) 429-0300; Fax (616) 429-0385; online at www.asae.org. k. s ®' Briggs & Stratton Power Products Backup Power System A Installation Manual B Fuel Comparison Chart Physical Properties Butane Propane Natural Gas Normal Atmospheric State Gas Gas Gas Boiling Point (in "F): 115 115 115 Initial 32 -44 -259 End 32 -44 -259 Heating Value: 500 1000 1500 BTU per gallon (Net LHV*) 94,670 83,340 63,310 BTU per Gallon (Gross*j 102,032 91,547 2500 Cubic Feet Gas 3,264 2,516 1,000 Densi 31.26 36.39 57.75 Weightt 4.81 4.24 2.65 Octane Number: 2500 4000 5000 Research 94 110+ 110+ Motor 90 97 LHV (Low Heat Value) is the more realistic rating. Gross Heat Value does not consider heat lost in the form of water during combustion. Density is given in "Cubic Feet of Gas per Gallon of Liquid". t Weight is given in "Pounds per Gallon of Liquid". Size of Propane Tank Required at Various Temperatures When Kept at Least Half Full Given the gas withdrawal rate and the lowest average winter temperature, an ins eller can specify the required LP storage tank size: Withdrawal Rate 3rF 20°F 10°F 0°F -10°F -30"F -40°F 50 CFH 115 115 115 2SO 250 400 600 100 CFH 250 250 250 400 500 1000 1500 150 CFH 300 400 500 S00 1000 1500 2500 200 CFH 400 500 750 1000 1200 2000 2500 300 CFH 750 1000 1500 2000 2500 4000 5000 20 m RESIR�ENTIAL 95-0723 30-35-76'�--- 92-2079 BPEM CONVERSE, Paul 1436 Olive Grove -Ln, Oroville new sf n%� 0 r'4 �J�Y s� . I- I OFFICE COPY— — — —1 Address GAS Meter By y- ELECT 1 � Meter By Date JOB FINALED (Dat el Signature y COUNTY OF BUTTE ' BUILDING DIVISION s DEPARTMENT OF DEVELOPMENT. SERVIC S 1469 Humboldt Road, Chico, CA - (916 89,1,-2x7,51. �Y 7 County Center Drive, Oroville, CA - (916) U3.8 -W54 747 Elliott Road, Paradise, CA - (916) 872-630 CORRECTION NOTICE OWNER PERMIT NO. A routine inspection indicates that the following violations of Butte County Ordinances exist at the above address and should be corrected. Please notify this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, please contact this office immediately. 1 Date Inspector REV 10/ COUNTY OF BUTTE BUILDING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 1469 Humboldt Road, Chico, CA - (916) 891-2751 7 County Center Drive, Oroville, CA - (916) 538=7541 _747 Elliott Roai, Paradise, CA - (916) 872-6307 << CORRECTION NOTICE cmj L� r1` SZ- ,2D7 Z OWNER PERMIT NO. A routine inspection indicates that the following violations of Butte County Ordinances exist at the above address and should be corrected. Please notify this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, please co tac this office immediately. /7--- z--- -�-o -2,5 W-106 Date i 3 61W Inspector REV 10192 �= OK O=Not OK ' NotReadyable RESIDENTIAL (Single Date UND FLOOR (Plans) OK except a's Dat_ Zon i ng -Setbacks -Ease ments-Flood-Slope Ftg., Main; Soils-Elec. Grnd.0 Ftg. Depth ------ �Ci�, Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth ---- 4. Ftg., Porches & Decks; Soils -Steel-/ /Ftg. Depth --- 5. Stemwalls, Main; Steel-Blockouts-Wrapped ----- 6. Stemwalls, Garage; Steel-Blockouts-Wrapped 6a. Hold Downs and Special Anchors 7. Slab; Steel -Wrapped _ D.W.V.; Fall -Fitting -Test -2 Way C/O -Sewer 10. UF. Gas Pipe; Size -Anchors - yard gas piping: size til- '% "07�I 11. Water Pipe; Test -Anchor -Regulator -Service Test 12. Electric; Underground 13. Pienums & Ducts; Clearance -Material -Support -Ins. 14. Girders -Sills -Anchor Bolts -Joists -Vents -Cripples 15. Access & Ventilation 1 .Insulation Date ��Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date PLU iNG (Permit),OK except a's ----- —Wa er Htr.: Vent -Access -Combustion Air -Baffle — ------------ t<7_Wa r Pipe: Test & Anchor -Nail Protection D.W.V.; Test -Fittings & Anchor -Nail Protection ------------------- — ------------------ _ 19. Shower Pan; Test. First Floor -Tub Access --- 20. Tet Tub & Shower. Second Floor -Tub Access - ---- - - - -------------- --Gas Pipe: Size & Anchors Date Card B-1 ---- Date — Card B-1 ---------------------=--- ---------------- Date Card B-1 Date Card B-1 Date ELECTRICAL ICAL (Permit) OK except #'s Transformer Clearance -Ins. -Protection --- — — .Receptacles -Spacing -Lights & Switches at Doors ----------- Si oxes & N_o of Conductors -Stapled Romex Installed Close to Edge of Studs & C.J. 6. Equip Ground made up w/Met . Fastners-Bon Water --- -- -- ------------- . 2 Appl ce Circuts in Kitchen & Conductor Size!GFI --- --------------------`------------------------------- 22. Subfeed Wire Sizer ga. Cu or AI-A.C. Wire Size / i ga. Cu or At 29. Range Circ ! ga Cu or AI -Oven Circ. / / ga. Cu or Al. Insulated Neutral ❑ Yes ❑ No 3-0. _Service -Riser Conductors & Ground -Main Disconnect ----------------------- ------------ -- — --------------------------_- 1. uiP Clearances Panels-Motors-Mech. E ui Clot es Closet Light -Shower Light -Spa Light ------------- ----- - ----------------------------------------------------- ------- - moke Detector _ ------------------------------------------------DateCardB ------------_�----------- Date Card ------- --- ----------------------------------------------------------------- Date Card B-1 Date Card B-1 Date MEC ANICAL (Permit) Ok except k's ------------------- . A.C. Ducts Insulation & Support -------------------------------------------------------------- e an: Exhaust above insulation V ------- ----- Con mate Drain &Overflow: Size &Grade &Overflow: --- --Gra - - ---- - ----- ---------- ra _& -=- - ------ ---- 7 urna ce-Vent: Access -Comb. Air -Return Air Vent -115 outlet itArtc --------- -- - -------------------------------- -- -- -- Access & Platform if Furnance in Attic ----------------------------------------------------- ---------------•-------------------------------------------------------------------- Date Card 8-1 _____-------Card-------------------Date------------- Date Card B-1 Date Card B-1 Date FRAMI (Plans) OK except #'s 30_S_1ijroper Material & Anchors - -- -- - sStuds-Nailing, Spacing & Bracing -Plates -Sound -------------- - -- - - - -- -- -- B ing Walls over Girders & Floor Nailing ----------------•---------------------------------------------------- ------------- -- Stop in Walls (rat proof) 4 it to s: Furred Ceilings -Stairs -Chases -Tub ------------------ eaders & Beam -Size & Bearing & Duplex) _6R(_AMING (Continued) Wngers-Post Caps -Anchors -Connectors Cing. Joist-Rftr. ties-Purlin—roof Brac-Truss-S>tt1'ng.-Rfng. Ties or Type A Flue -Fireplace TVat clearance ,ss; Size & Romex Protection -Draft Stop -Ins. Baffles idows or Exiting Doors -Sill Hgt. & Dimensions —1,9' Ga a Fire Protection Framing Pr rty Line Firewall & Openings 5rExt. Doors -One 3' -Check Garage -3rd Story, 2 Exits — 53_Stt�_Width-Headroom -Rise-Run-Landing-Fire Protection od on Roof Overhang -Attic Vents -Rafter Outriggers ailing Veneer - -r(5-S�Mesh-Drip Screed -Fd. Vents-Underflr. Access 87' GI 'ng Area -Glass Protection -Skylights -Plastic --------------- -------- 5 Sh alts: Nailing -Bolts ------------- ----------- Insulation-Walls-Ceilings 60. Infiltration -Walls -Windows Dat rd Date _ Card B-1 Date (s Card B-1 Date Card B-1 Date FINA fans) OK except a's !l . E. teps-Door & Sidelight Protection -Landings ---- -----L2 Sm Detector 4 -furnace: Vents -Clearance -Comb. Air-Connector- �ln_Garage: Above Floor -Ducts -Meth. Protection Bedro_om Exiting // & Bath Fixtures & Tub Access -Spa `56.EI rim & Subpanel: Breaker Sizes & Labels ----------------- ------------ S Rails - - - - ./pl a or Stove:_ Clearances -Hearth J IIE e utlets at Wood Panel: Int. & Ext. Kit.Fixt & Appliance: Grnd.-Air Gap -Cooking Clearance --- _ _ E/le�.putlets & Receptacles at Kit. Counter i2'_Gar a Fire Door Swing -Landing -Closer - - ct in Garage -Damper 76itlUtr. Htr Vents -Clearance -Comb. Air-Connector-P.R.V. In G rage: Above Floor-Mech. Protection ------- --_ c. & Mech Equip. Listed for Location lec. Receptacles in Garage: (G.F.I.)-Romex Protection Z�:7-. nsulation-Foam-Looked in Attic ❑ Yes - - 7 uard.ils Ra&Deck Construction -Post Caps dn. Vents & Crawl Hole Door -Drainage & Wood -Earth Clearance Looked -under Floor ❑ Yes 80 Following instld.: Drive 6; es ❑ No: Walks 'Yes ❑ No; Planters ❑ Yes - ❑ No ......... ^Qt-3T��o: Brown -Finish IEW�A.CC Unit', Disconnect. Electrical, Plumbing aeVents Above Roof: Plbg.-Appliance-Fireplace.-Clearance to Openings � ter Well: Disconnect, Electrical, Plumbing -- Q5 Ex er'or Elec. Trim: G.F.I. Receptacle -Underground AV'Vent Throughout House .....------ - ----- — lass Protection orrecti rom Previous Inspections --------- - - - - ----- ------------------------------------------ L� 7 est -Meters Tagged: Gas -Electric -at & Sewer Connected -C/O to Grade -HD Approval nergy Compliance Certificate: Other Certificates Dat - - - - — -- Card B- � Date— Card B-1 Date - Card _1 — - — Date Card B-1 Date Card B-1 Date Card B-1 Comments at Final_ V=OK + O = Not bKNot = Not Readyable MOBILE HOMES Date MOBILE HOME UTILITIES (Plans) OK except #'s 1. Zoning Requirements -Setbacks -Easements 2. Soils; Special MH Support Sketch 3. Sewer; Location -Test -Fall -C/O Concrete 4. Water; Location -Test -Easement Needed (Sketch) 5. Electricity; Location-Clearences-Grnd-/ /Amp -Concrete 6. Gas; Location -Test -Wrap: / P L" ft. / /"Nat. or/ /"L"ft./ /"LPG 7. Well Clearance & Disconnect 8. Utility Clearance Date _ Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date MOBILE HOME INSTALLATION (Plans) OK except #'s 1. Zoning Requirements -Setbacks Easements 2. Footings; Size -Spacing -Marriage Line 3. Gas; MH Test -Demand -Valve -Connector 4. Electricity; MH Test -Crossovers -Breakers -Clearances 5. Drain; MH Test -Fall -Flex Connector 6. Water; MH Test -Regulator -Connector 7. Water and Sewer Connected -C/O to Grade -HD Approval 8. Gas and Electricity Tagged 9. Exits; Insp.-Sketch 10. Cert. of Occupancy Date Card B-1 Date Card _B - Date Card B-1 Date Card B-1 MISCELLANEOUS Date A294MVERS, CARPORTS, GARAGES, (Plans)OK except #'s /1,26ning Requirements -Setbacks -Easements gs; Soils -Size -Depth -Spacing -Connectors -Steel 3. Decks; Griders and/or Joists -Decking -Bracing -Stairs -Rails 4. Wood Awn.; Posts-Beams-Rftrs.-Connectors Shthg.-Rfg.-Bracing 5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures 6. Carports; Windows -Doors 7. Electric 8. Frmg; Sils-Anchors-Studs-Rftrs-Trusses 9. Siding; Nailing -Veneer -Stucco -Mesh 10. Roof; Shthg-Roofing 11. Ext.; Steps -Doors -Landings Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date POOLS (Plans) OK except #'s 1. Setbacks -Easements 2. Soils; Compaction -Structure Stability 3. Pool Structure; Steel -Connections -Thickness Dead Men -Lining 4. Elec.; Receptacles and Lighting, Distances-GFI 5. Elec.; Pool Lighting; 15 volts-GFI 6. Elec.;Enclosures; Conduit Entries -Terminals -Listed 7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater 8. Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg. _ Boxes-Enclosures-Panelboards-Ins. to Main in Conduit 9. Health Department Approval 10. Plumb.; Cir. Test -Water Supply Test Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 i COUNTY OF BUTTE- DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVIS 7 County Center Drive - Oroville,:C,.5difo;nia' 95965 - Telephone (916) 538-754 PERMIT NO. APPLICATION AND PERMIT 57' ASSESSOR PARCEL NUMBER 030-350-076 ZONING ARI BUILD G PERMIT OWNERe—.7> v ✓�� TELEPHONE SO. FT. OCC. BUILDING VALUATION OWNERt MAILING ADDRESS 11 TOWNVIEW DR ST 40,000.00 CONTRACTOR'S NAME r PAUL E CONVERSE JR TELEPHONE SA24E CONTRACTORS MAILING ADDRESS ' Fireplace CONSTRUCTION LENDER UNKNOWN Total Valuation Is 4O 000.00 LENDER'S MAILING ADDRESS Filing Fee $ 20,00 Permit Fee $ 349.50 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ Energy Plan Checking Fee $ ARCHITECT OR ENGINEERS MAILING ADDRESS Penalty $ BUILDINGADDRESS 1436 OLIVE GROVEPLUMBINGPERMIT PERMITFEE $ 369.50 OROVILLE Filing Fee 20.00 Each Trap 7.00 LOT NO. SUBDIVISION'S NAME PARCEL MAP Solar Or heat pump water heater 23.00 USEOFSTRUCTURE SF IN Duplex ❑ Mobilehome ❑ Other SPECIFY Water piping 15.00 Each gas water heater or vent 15.00 Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑ Describe Work: _ P�i�'1wTT To mmuo.TE #92-9p79 Mobile Home S G W @20.00 PERMITg FEE Contractor ELECTRICAL PERMIT Filinq Fee 20:00 Main Service E00V OR LESS ( 200A OR LESS ) 23.00 Main Service ( 200A TO 1000A ) 46.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. License Class Lic. No. OWNER -BUILDER DECLARATION 1 hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason WORKERS' COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. r I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' compensation insurance arrier and policy number are: Carrier e �yH Y � NEW CONST. DWELLING OCCUP.SO. OR ADDNS. ( a ACC. BLDS. ) 3.59 FT. NEW CONST. MULTI -OUTLET NON-RESID. ( BRANCH CIRCUITS ) 97.50 POWER APPARATUS ) ( 8 NGLE OUTLET CIA. Ex. Occup. (OUTLET OR FD(TURES) 20 Q 1.00 BAL 30 Ex. Occup. OUTLEEDTSPaESID.)ea ( ) 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 PERMITFEE $ Contractor MECHANICAL PERMIT Filing Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMITFEE $ Contractor Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of section 3700 of the Labor Code, I shall f h comply wit hose provisions. ,/ Date —-75�_ Ignature of Applicant - ❑ Owner ❑ ontractor ❑ Agent T An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Mobile Home Installation Fee Is Energy Inspection Fee Is OCC CONST. TYPE TOTAL FEE $ 369.50 HA2. 1 D. FEES I IMP I FLOOD I CDF PARCEL I PD HD ISSUE This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work kindicated abo a for which f have been paid. ate 7 RMITEXPIRESON (D e) Receipt No. 176166 WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS 7 County Center Drive - Orovill%-Califofnia 95965 - Telephone: 916.538-7541 APPLICATION AND PERMIT PERMIT NO. ASSESSOR PARCEL NUMBER ZONING BUILDING PERMI. OWNER PAUL CONVERSE JR. TELEPHONE 1589-1718 SO. FT. OCC. BUILDING V AT10N 1342 R 72 468 OWNER'S MAILING ADDRESS - 11 TOWN VIEW OROVILLE 484 M 8,712 ' CONTRACTOR'S NAME OWNFR TELEPHONE 220 C 2,860 CONTRACTOR'S MAILING ADDRESS Fireplace CONSTRUCTION LENDER UNKNOWN Total Valuation Is 84 040.00 LENDER'S MAILING ADDRESS Filing Fee $ 15,00 Permit Fee $ 530.00 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ 265.00 ARCHITECT OR ENGINEER'S MAILING ADDRESS Energy Plan Checking Fee $ 00.00 Penalty $ BUILDING ADDRESS 1436 OLIVE GROVE LANE OROVILLE Permit fee $ 800.00 PLUMBING PERMIT Filing Fee 15.00 Each Trap 8 5.00 40.00 Solar or heat pump water heater 20.00 LOT NO. 2 SUBDIVISION NAME PARCEL MAP 41-31 Water piping 7.00 Each qas water heater or vent 7.00 USE OF STRUCTURE SF ® Duplex❑ Mobilehome❑ Other SPECT FY Gas piping system 1 - 5 outlets 5.001 s no Building sewer 15.00 Mobile Home S G W @ 15.00 TYPE OF WORK New.rAddition ❑ Remodel ❑ Utilities ❑ Installation❑ Other El Describe work: _ 3 BDRM MASTER #01-91 Permit Fee $ Contractor ELECTRICAL PERMIT Filing Fee 15.00 Main service 200A OR LESS 18.50 18.50 CONTRACTORS LICENSE LAW I declare under penalty of perjury (check one): ❑ I am licensed under provisions of Chapt. 9, Div. 3 of the Business and Professions Code and my license is in full force and effect. ` License No. S� / � Classification � Fl 1, as the owner,'or my employees with wages as their sole compen- sation, will do the work,and the structure is not intended or offered for sale. (Sec. 7044) ❑ I, as the owner, am exclusively contracting with licensed contract- ors. (Sec. 7044) ❑ I am exempt under Sec. , Business and Professions Code for this reason Main service 200ATO1000A, 37.50 NEW CONST. / DWELLING OCCUPM OR AODNS. 1 ACC. BLOGS. // 3.60 sq.ft. 6 ,QQ NEW CONSTR. ULT I -OUTLET NON -REST BRANCH CIRCUITS) @ 5.00 POWER APPARATUS & (SINGLE OUTLET CIR. ) Ex. Occup(OUTLETS OR FIXTURES 20 764 FIXED APPLNS. OR Ex. Occup. OUTLETS (R ESI D.1 EA.) 3.00 Temporary service 15.00 Mobile Home Facilities 15.00 Misc. Wiring 15.00 Permit Fee $ 97.50 - WORKMEN'S COMPENSATION INSURANCE I declare under penalty of perjury (check one): ❑ The permit is for $100.00 (valuation) or less. I have placed on file with the County of Butte Building Department a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -Insure. ❑ I shall not employ any person in any manner so as to become subject to the W. C. laws of California. Notice to Applicant: If after making this statement, should you become subject to the W. C. provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. Contractor MECHANICAL PERMIT Filing Fee 15.00 Heating 9.00 i Coolin 9 .00 Hood 6.50 6.50 Ventilation Permit it Fee $ 39.50 Contractor i I certify that I have read this application and state that the above information is correct. I agree to comply to all County Ordinances and State Laws relating to building construction, and hereby authorize representatives of the Countyot Butte to enter upon the above-mentioned property for inspection purposes. I also agree to save, indemnify and keep harmless the County of Butte against all liabilities, judgments, costs, and expenses which may in any way accrue Cou Jin equence of the granting of this permit. X sires_ -`6� �y Date Signature of Applicant - Owner ❑ Contractor EJAgent ❑ An OSHA ion of structures tover 39 stories ineheigfattions over 5'0" a p7ai d demolition or construct- gr Mobile Home Installation Fee $ Energy Inspection Fee $ occ CONST TYPE TOTAL FEE $ 1116.00 HA2 �' OFEE IMP r FLOOD COF PAREl� 7agalns This permit is ereby issued under the sions of the Butte County Code and/or work ind' at ab a for which fees OR F P BLIC BY PE IT EXPIR SDate appli ab a provi- resolutions to do have been paid. WORKS f� �j Date 1��it- Receipt No. 117153 PC FEE 342.75 WHITE-D.P.W.. YELLOW-ASS!SSOR. PINK -INSPECTOR. G LDENROD-APPLICANT Owner: Permit No ENERGY C E;R T I•F ICAT ION 1436 Olive Grove, Oroville, Ca. LOCATION A.P. No. DESCRIPTION OF INSULATION ROOF Material Thickness(inches) EXTERIOR WALL Material FIBERGLASS BATTS Thickness(inches) CEILING Batt or Blanket Type Thickness(inches) Loose Fill Type FIBERGLASS Minimum Thicknesi(Inclies) 16" Area covered(ft. ) 1480 FLOOR, ELEVATED " Material Thickness( -inches) FLOOR, SLAB Material Thickness(inches) W idth(inches) FOUNDATION WALL Material Thickness(inches) Brand Name, Thermal Brand Name Thermal Resistance (R Value) SCHULLER INT. Resistance(R Value) Rf3 Brand Name Thermal Resistance(R Value) Brand Name SCHULLER INT. Number of Bags 45 Wt. per bag 27 lb. Thermal Resistance(R Value) R38 Brand Name Thermal Resistance(R Value) Brand Name Thermal Resistance(R Value) Brand Name Thermal Resistance(R Value) I hereby certify that the above insulation was installed in the above building in conformance with the State of California Energy Requirements. LOERKE INSULATION CO., INC. 499150 NAME/O R STATE CONTRACTORS LICENSE NO. C G(J G✓ January 4, 1996 SIG TURE OF INSTAL LA ON APPLICATOR DATE I hereby certify the above insulation and all required items as shown on the Building Department approved plans and attachments have been installed as required by the State of California Energy Requirements. All equipment, devices and materials are of the quality prescribed or are specifically approved by the State of California. FIRM OWNER Please print GNATURE (iPI-NERAL CONI' TOR OWNER -©9 F/ 2 STATE CONTRAC TOR'S LICENSE NO. DATE THIS CERTIFICATE MUST BE ON FILE WITH THE BUILDING DEPARTMENT PRIOR TO FINAL INSPECTION APPROVAL AND A COPY SHALL BE POSTED WITHIN THE BUILDING. January 1984 -mid`Fin++'rls�r��L�ra.�'�'�•rc�-.�r�� ,T�+�. .',. .�,�':+.�iK.c .��, �. COUNTY -OF BUTTE�,�, + PARTMENT OF PUBLIC_WO� BUILDING DIVISION �7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE (916) 538-7541 PERMIT APPLICATION DATA SHEET OWNER pct cj A. P. No. 030-35-0 -076 Proposed Building Use cJ F. Building Inspector Date 6 - / 6 Z At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED BY 1, All items have been submitted. ........• ............:.................. . 2. Plot plans, 3/4 sets, signed by preparer of plans . ............. :............ 3. Complete plans, 3/4 sets, signed by preparer of plans . ..................... . 4. Engineered pons and calcs, 3/4 sets, with wet signature on plans . ............. 5. Hazardous Material Form . ............................................ 6. Energy Design Compliance and supporting documentation . ................. . 7. Statement of Intent for Non -Heated and A/C Buildings. . 8. Engineered truss details and layout in duplicate (required prior to plan check). ... Z 9. Mobilehom to anufacturer's in to a ion in ctions, 2 sets. ....... . 10. Fees of ' ..... . 11. Impact fees as shown on attached schedule ..U'U�O NICs 12. California Department of Forestry plan approval/fees. ........... . Flood elevation letter (100 year flood by Grp ngineer. . 1 Sanitation anc plot plan approval "" Ffealth Departme 15. City of Chico plumbing permit. ...: ............................ ...... 16. Plot plan and business license approval from City of Biggs/Gridley. ............. 17. Planning approval for (A) Use: (B) Parking: . ........ 18. Contact Land Development about (A) Improvements (B) Drainage . ........... . /--19. Driveway permit (construction approval required prior to occupancy). .. .. .... oud einec20. Pre -inspection for required. BspZZ (Dale) 21. Contractor's license information. (No., Name Style, Classification) . .............. 22. Certificate of Workmans Compensation Insurance . .......................... 23. Owner -Builder Verification (Given to owner , Mail to owner ). .......... . 24. Recorded cop/ of Agricultural Acknowledgement Statement . .................. 25. Letter of signature authorization . ....................................... . 26. Copy of recorded deed of parcel creation and 60 right of way to a public road. .... . 27. Letter of intent -on building use . ......................................... 28. Mobilehome utility clearance . .......................................... 29. Documentation of legal access . ........................................ 30. Documentation of 50% subdivision developed or (A) Road improvements completed and (B) Paecel meets zoning area and frontage requirements . ............... 31. Existing violations/expired permits . ............................... :...... 32. P an the list;..... _ SIO.......... When you issue the pety�it ss as follows: Mail to oWrier. Mail to contractor. l/ Telephone��j`?- and hold for pickup at 0K_C5- office. Deliver with inspector. Other Parcel Creation Acreage Applicant Date Copy of Haz-Mat form sent Health Dept. Fire Dept. Air Pollution Date Copy of plans sent Heath Dept. Fire Dept. Other Date By The following data must be submitted priorermit issua(Ci 1. Index permit for above items No. o Lnc : 2. Additional items required: Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter by _ Date Contra of�fjj, er, owner, was advised of above required d to by _ phone _ mail Counter b Date Plans 12 ed y Date �e 'a Plans approved by Date Sets of plans on hold in File cabinet/ AP folder,�� j Copy - Department of Public Worbs %G� / zj :�Z_ ��i,�� COUNTY OF BUTTE - DEPARTMENT;OF'PUBLIC WORKS - BUILDING DIVISION 7 COUNTY CENTER DRIVE = OROVILLE, CALIFORNIA 95965 - TELEPHONE (916)5387541 OWNER PO 1 (6)'7 (fie 1/5 J (-, A.P. NO. 70 -�IS-o — 07h PROPOSED BUILDING USE DATE REC. # DATE REC 1. School Distric Fees QKO() 2(paid at District Office) a3 Q ., Sheriff Fees (paid at Building Department) 00 Residential ........... unit amt. Commercial(per sq.ft.) X _$ sq.ft. amt. 3. Urban Area Fees ^ (paid at Building Department Residential (per unit) �_X� sZ700 ,j # units amt. Commerical(per sq.ft.) X =$ sq.ft. amt. 4. Recreation District Fees (paid at District Office) .......................... 5. Drainage District Fees Z-/ (Contact Land Development) ,,,,,,,,,,,;7�..., 6. Other 7. Other At time of permit application, I was advised the above fees are required to be paid prior to issuance of the permit. APPLICANT DATE Ret ;u 5( to DPW AGRICULTURAL STATEMENT OF ACKNOWLEDGE= FOR RESIDENTIAL, DEVELOPMENT Section 26-8.1 of the Butte County Code" requires this acknowledgement be recorded prior to issuance of a building permit. The property described herein is adjacent �PTEP ,.: FOR. RECORDING to land or included within an area zoned AT BA01 A for agricultural purposes, and residents of this property may be subject to incon- veniences or discomfort arising from the use of agricultural chemicals, including, but not limited to herbicides, pesticides, / and fertilizers; and from the pursuit of agricultural operations including, but not limited to cultivation, plowing, spraying, pruning, and harvesting .which occasionally generate dust, smoke, noise, and odor. Butte County has established agricul- tural zones which have as a priority use for productive agricultural purposes, and residents within said zones and on adjacent .property should be prepared to accept such inconvenience or discomfort from normal, necessary farm operations. All that real property. situate in the County of Butte, State of California, described as follows: See attached sheet. Date: ,G - State of 6/,' 1. County of ,&71� ) PROPERTY OUNERS : On this the day day of ,—FYIA/ , 19_�L, before me, the SS. undersigned Notary Public, personally appeared OFFICIAL SEAL > DOROTHY E COMBS :; Personally known 2� NOTARY PUBLIC - CALIFORIMA to me. 0 Proved to me on the basis of satisfactory evidence. BUTTE'COUNTY to be the person(s) whose name(s) My comm. expires 10Y 25, 1993 :,subscribed to the within instrument and acknowledged that Y �" executed the same for the purposes therein contained. IN WITNESS WHEREOF, I hereunto set my hand and official seal. Present A. P. No. �� �bSL% -z)%4 I Ile j � ; / f 4 Mary Public ,� ,CvF5cc 6pl Order No. 40914 PC DESCRIPTION All that certain real property situate in the County of Butte, State of California, described as follows: PARCEL A: Parcel 4, as shown on that certain Parcel Map of a portion of Lots 3, 4, 7 and 8 of Block 97 of Thermalito, which map was filed in the office of the Recorder of the County of Butte,'State of Cali- fornia, on February 24, 1972 in Book 41 of Parcel Maps, at page 31. RESERVING THEREFROM a non-exclusive right of way.for road and public utility purposes over the Westerly 30-.;00 feet as shown on h said map. PARCEL. B : NON-EXCLUSIVE right of way for road and public utility purposes over the following described parcel of land: COMMENCING at the Southeast corner of Lot 8 in said Block 97; thence West along the South line of Lots 8 and 7 a distance of 268.51 feet to the true point of beginning for the parcel of land herein described; thence from said point of beginning on a curve concave to the right, having a radius of 20_feet through a central angle of 89° 58' 00" an arc distance of 31.40 feet; thence North a distance of 444.01 feet to the northerly line of the above described parcel map; thence West and parallel with the South line of Lot 4, a distance of 60.0 feet; thence South a distance of 443.99 feet to the beginning of a curve concave to the right, having a radius of 20 feet, through a central angle of 90° .20' 00" an arc distance of 31.43 feet to the South line of said Lot 7; thence East along the South line of Lot 7, a distance of 100.0 feet to the point of beginning. EXCEPTING any portion of said easement lying within the parcel of land first described hereinabove. i7' � �.. OFFICIAL RECEIPT COUNTY OF BUTTE DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT SECTION RECEIPT 12986 ISSUED BY CONVERSE CONSTRUCTION 811 TOWN VIEW DR. 1 6 5 7 Z i OROVILLE, CA 95966 1 0 0 t � 90 PAY -7477/3211 c� — I�19 _._. ._....n c� ,m LL Z TO THE Jmr ORDER OF_���� �Ou, cwi>°a�> ��`� G. `"`` DOLLARS CQOJY THIS CHECK IS DELIVERED IN CONNECTION WITH THE FOLLOWING ACCOUNT Or 0;05r Lidv0ai (n111NOU lie 00 L6 5 711' I: 3 2 i l 7 4 7 701:0 3 500 900 1 4 2 2011' Imp OATH RHCHIPT NO. TOTAL RHC HIV BD THNTATIVH MAPB 6R15 CNHCN $ INBPHCT 8TRH6T 610 N8 PUBLIC DOCUM BNTS COMP- LIANCB PIRG MYO RA NT OTN HR APPLICANT RECEIVED FROM OFFICIAL RECEIPT COUNTY OF BUTTE DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT SECTION RECEIPT 12986 ISSUED BY CONVERSE CONSTRUCTION 811 TOWN VIEW DR. 1 6 5 7 Z i OROVILLE, CA 95966 1 0 0 t � 90 PAY -7477/3211 c� — I�19 _._. ._....n c� ,m LL Z TO THE Jmr ORDER OF_���� �Ou, cwi>°a�> ��`� G. `"`` DOLLARS CQOJY THIS CHECK IS DELIVERED IN CONNECTION WITH THE FOLLOWING ACCOUNT Or 0;05r Lidv0ai (n111NOU lie 00 L6 5 711' I: 3 2 i l 7 4 7 701:0 3 500 900 1 4 2 2011' „�y� y�+(�^”yy_ts�e•ntrw^+'.-r^-.—....��.-.-...:;�,� �•sS°1w71�6f,�'Y'�►s!`!?lir'R:Y�`"^c_'�""."'""""""i'svpf*r'lil%"`�.'"'"°`^R•"'"`..^"'ti"''7^7pr"'°r"y�Y'��;^t:"`�F ' f7 i. b 3 0-3s� 0_7( be� 4 Y - BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One Form Per Building) r y.. School District `"• �_Q _ �-{ _I_ —_ _ _ Building Department No, A.P. Number -30-- 35:='( Jurisdiction (—_J City [ County or x Property Owner_ c`' ,w Property Location/Address _ �y,3 _-._—Q,�L�_ rem e zze } , ---- Subdivison ----------------- ----- L'ot No. Residential Development�� (1 Sq. Footage / 3 4/.I_ No.of Living MHI Addition (Group R) Units Commercial/Industrial Sq. Footage New Addition (Including Exterior Roofed Areas) k Building Department'Representative Date t. (Floor Plans reviewed by School District Personnel) i District Identification No. —School District certifies that�L (Applicant) Q L/ Street Address ==4 �( ) (Phone Number) (City) (State) (Zip Code) has complied with the requirements of Resolution No. — L(1��•� by payment of $ , representing _ — _ square feet. School District Representative Date Paid by Check Number ��✓ Remarks: Bank Number J �- Paid by Cash `--- - y-- If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.! White (applicant), Yellow (building department), Pink (school district) �; feeformmkl (4/92) - .. . .. ,— ,-. ,, THERMALITURRIGAtION DISTRICT 410 GRAAIR,AVE'NUE OROVILLE° CALIFORNIA 95965 TELEPHONE 5:.3-0740 CSA 26 SEWER SERVICE APPLICATION AND CONNECTION PERMIT Service Address: Owner's Name: Date: Address: Acct. No: A. P. No.: Phone: No. Units: Applicant/Agent: Agents Proof: Address: Fees: Phone: Application $ Arrearage Preliminary Review By: Date: CSA 26 Remarks: SC -OR 1st mo. S.C. ' Other t Total Fees yt Collected By: Date: Field Review By: Date: Remarks: MONTHLY SERVICE CHARGES WILL COMMENCE AUTOMATICALLY UPON: ❑ Date of TID approval of completed building sewer (early connection). ❑ 30 days after date above, or on date of D.P.W. approval.of completed building sewer, which ever comes first ("existing construction", prior to Mar. 5, 1974). ❑ 180 days after date above, or on date of D.P.W. approval of completed building sewer, which ever comes first ("new construction", after Mar. 5, 1974). DISTRIBUTION: WHITE - TID, YELLOW -APPLICANT, PINK -DPW, GOLDENROD -DPW to TID RESIDENTIAL PLAN- CHECKING GUIDE 8/91 (S.F., DU2L$.Y_ & MISC. ONLY) ^ , i� Bldg. Permit # JVIsr OWNER G©NV�'V-�" . 01-6? I A.P. # 3o -?-5--7e,- GENERAL Plan Checker Zoningrequirements: q uirem ents: (sideyards and number of permitted living units). aluation. �czQ6L-rE� ans signed by designer. Proper description of work on application. sting violations on property. Items on data sheet. (W.C., fees, Health, Developer'Fees, License law, etc). �7. recorded notice of violation. •' PLOTPLAN 5,,_��__I?lete parcel size and dimensions. 2. backs, sideyards, easements, etc. Ybuildings or structures. 4. rading, fills, drainage. �. Flood hazard. Special conditions. -on creation map, (noise, CDF, fire sprinklers, non-comb- ustible, and foundations). FAU & FAS road setback. Building or utilities across lot lines (Record form). FLOOR PLAN ��i. Com lete to scale plan with dimensions. equired windows for light and ventilation (Sec. 1205). -Required windows for second exit Sec. 1204). _ y fights (Chapter 34 & Sec. 5207). ) n -impact glass (Sec.. 5406). R_e�* red room sizes, ceiling heignts (Sec. '1207). 7. GF n baths, garage, kitchen, and exterior outlets (Article. 8 Light fixtures, switches, receptacles, and exterior receptacles ce of mechanical equi- ocations of water heater n e other or gas equipment. 1 Garage firewall, door size, and closer (Sec. 503(d)(3)). 1 t - 310" exterior exit door (sec. 3304 M. eplace and wood stove location, alcoves, and clearance. moke detectors (Sec. 1210). 1 Plumbing fixtures, water closet clearances and shower size. 210-8). 'for main - electrical STRUCTURAL DETAILS 1 Standard bracing or engineered design (Table 25V) al shape, size, or split level house requiring lateral design. story requiring balloon framing and/or engineering. ory building requiring engineered calculations and plans. Fo dation plan complete enough to construct building. or construction details complete enough to construct building. /Elevations and wall construction details complete enough to construct building Roof construction details complete enough to construct building. fireplace construction details and calcs if necessary. 10' Rafter ties or'bear' g ridge beam. 01 Garage o 12e'�5`tud heights. _ e soils - special foundation design. 1 Retaining walls requiring design. 15. Special Inspection required. V 8/91 RESIDENTIAL• PLAN.CHECKING GUIDE MISCELLANEOUS ITEMS TO LOOK OUT FOR airway details: landings, rise and run, head clearance, handrails (Sec. 3306). ail details (Sec. 1711 & 3306(j). r stone veneer (Chapter 30). rlor plaster - weep screeds (Sec. 4706). Proper roof pitch for roof convering (Chapter 32). , .6--Romf covering type - (fire hazard). insulation - protection. & 36" halls and stairways. 191—.--L' in area over garage - complete 1 -hour separation required on garage side i "udi supporting walls and posts, etc. - iits on three-story dwellings (sec. 3303 & see Mezannines - 1716). 14! Attic access and ventilation (Sec. 3205). 14. oor access and ventilation (Sec. 2516). lel.- C ustion air for fuel burning appliances - L.P.G. requirements. oise requirements on duplexes. ".Flashing ergy design. at all exterior openings. EDF responsible area requirements. `����i111 •' ', �, jam— -ice - � / is 7--22-9 Z (:91 c Iv - 12 /Z-. X i NSfL�/} IU 6Ath V COUNTY OF BUTTE- DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 County Center Drive - Oroville, California 95965 - Telephone (916) 538-754 PERMIT NO. APPLICATION AND PERMIT -� 226a% ASSESSOR PARCEL NUMBER 030-350-076 ARS ZONING BUILDING PERMIT � OWNEPAUL CONVERSE, JR. 5899 1718 SO. FT. OCC. BUILDING VA ATION OWNER'S MAILING ADDRESS 11 TO?' -INVIEW DR OROVILLE, 95965 2.2b ' ' UU CONTRACTOR'S NAME TELEPHONE CONTRACTORS MAILING ADDRESS Fireplace 3,50'0.00 CONSTRUCTION LENDER UNI(JOWN Total Valuation Is e LENDER'S MAIUNG ADDRESS Filing Fee $ 20,00 Permit Fee $ 126.00 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ 81.90 ARCHITECT OR ENGINEERS MAILING ADDRESS Energy Plan Checking Fee $ 23.00 Penalty $ BUILDING ADDRESS (fie' PERMITFEE $ (( PLUMBINGPERMIT Fling Fee 20.00 Each Trap 7.00 7.00 LOT NO. SUBDIVISIONS NAME PARCEL 'AP Solar or heat pump water heater 23.00 USE OF STRUCTURE SF CK Duplex ❑ Mobilehome ❑ Other SPECIFY Water piping 15.00 Each gas water heater or vent 15.00 Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 TYPE OF WORK New ❑ Addition )k Remodel ❑ Utilities ❑ Installation ❑ Other Describe Work: ADDITION Mobile Home ISI GI W @20.00 PERMITFEE g Contractor ELECTRICAL PERMIT Filinq Fee 20:00 Main Serviceeoov R LEs ( zooA ooR LEsss ) 23.00 Main Service ( 200A TO I000A ) 46.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencin g ) with Section 7000 of Division 3 of the Business and Professions Code, and my license is in full force and effect. License Class Lic. No. �0 �! d� DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason NEW CONST. DWELLING OCCUR OR ADDNS. ( & ACC. BLDS. ) SO, 0 3.5Q SO NEW CONST./ MULTI.OUTLET NON•RESID. \ BRANCH CIRCUITS ) 97.50 // POER APPARATUS l &SINWGLE OUTLET CIR. ) Ex. Occup. (OUTLET OR FIXTURES) 2(a+•� BAL SO FIXED (PLNS. OR EX. Occup. OUTLETS EA 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 PERMITFEE $ 26.40 Contractor WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers'c m ensation insurance carnet and policy number are: Carrier -57Wk–e Fup7gy, MECHANICAL PERMIT Filing Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMITFEE $ Contractor Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of section 3700 of the Labor Code, I shall fo I comp) with a provisions. / v X �! __ Date — /0 _ Signature of Applicant - AL Owner ❑ ntracto� ❑ Agent An OSHA permit is required for excavati s over 60" deep and demolition or construction of structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee $ 46.00 occ CONST. TYPE TOTAL FEE $ 350.30 HA2. .� I D. FEE IMP FLOOD CDF PARCEL PO HD .–� ISSU This permit is hereby issued under the of the Butte County Code and/or indicated above for which fees have BY PERMITEXPIRESON applicable provisions Resolutions to do work been paid. Gl r D •✓ (po{e Receipt No. 186209 WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT CQUNTYOF BUTTE -DEPARTMENT OFDEVELOPMENT SERVICES -BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA95965 -TELEPHONE (916) 538-7541 PERMIT APPLICATION DATA SHEET OWNER C AJ -e r S A. P. No. O 3 D — Z 50 "' D7io Proposed Building Use , i 1 oma✓ Building Inspector Date 10—,,7-L/— y''S At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED BY 1. All items have been submitted . ....................................... . 2. Plot plans, 3/4`sets, signed by preparer of plans . .......................... 3. Complete plans, 3/4 sets, signed by preparer of plans . ..................... . 4. Engineered plans and; calcs, 3/4 sets, with wet signature on plans . .............. 5. Hazardous Material Form . ............................................ . 6. Energy Design Compliance and supporting documentation . .................. J. Statement of Intent for Non -Heated and A/C Buildings . ...................... 8. Engineered trussi details and layout in duplicate (required prior to plan check). .... 9. Mobilehome data and manufacturer's installation instructions, 2 sets . .... ....... . Feesof $ r .......................................... 1 Impact fees as shown . .5c-INo.al . �y s.+...p,v ��.. ....... California Department of Forestry plan approval/fees. ....................... . 13. Flood elevation letter (100 year flood) by California Engineer . ................. . 14. Sanitation and plot plan approval Health Department . ............ t 15. City of Chico plumbing permit.....................................0.... . 16. Plot plan and business license approval from City of Biggs/Gridleyr ....... f . 17. Planning approval for (A) Use: (B) Parking: 18. Contact Land Development about (A) Improvements (B) Drainage. .... I. ... . 19. Driveway permit (construction approval required prior to occupancy). ..... ! . 20. Pre -inspection for 1' Pre -Inspection request p required. . . to Building Inspector (Date) 21. Contractor's license information. (No., Name Style, Classification) . ....... ..... . 22. Certificate of Workmans Compensation Insurance .......... ............. :.... . 23. Owner -Builder Verification (Given to owner , Mail to ownerj__j ............ 24. Recorded copy of Agricultural Acknowledgement Statement . .................. 25. Letter of signature authorization . ....................................... . 26. Copley of recorded deed of parcel creation and 60 right of way to a public road. ..... 27. LeAF16Uintent on building use.......:�........................... . 28. MobilehomeAutility clearance . ......................................... . 29. Documentation of legal access . ..................... :.................. 30. Documentation of 50% subdivision developed or (A) Road improvements completed and (B) Parcel meets zoning area and frontage requirements . ................ Existing violation endperms. .xis WG ... FSOr .......... Plan check list . ..................................................... 34. When you issue the permit, process as follows: Mail to owner. Mail to contractor. Telephone S?j J) / and hold for pickup at _ 0 roy i (I office. Deliver with inspector. \ Other Parcel Creation Acreage Applicant Date ��—'�f!` f'S► Copy of Haz-Mat form sent _ Health Dept. Fire Dept. _ Copy of plans sent Health Dept. Fire Dept. Other The following data must be submitted prior 1. Index permit for above items No. 2. Additional items required: Ex L_5 Air Pollution Date Date issuance: (Circle new item not checked above). _ BY Contractor, designer, caner was advisecf'of above required data by phone _ mail Counter by _(3� Date /I Contractor, designer, owner, was advised of above required data by 'phone _mail Counter by _Date Plans checked by Date Plans approved` by �;1, rJS Date (I 7'�Is P Sets of plans on hold in File cabinet AP folder Copy - Department of Public Works 'F. •" sre S i.. _f .Cn• 1 T ,LU.� �' n. - �lA ri[ Yds t A� COUNTY OF BUTTE DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 COUNTY CENTER DRIVE, OROVILLE CA 95965 TELEPHONE (916) 538-7541 OWNER ��.r� �o/V u --C/, S A.P. #e30 350--876 PROPOSED BUILDING USE�✓ S cv rt -l� DATE Z(2y- % S REC. # DATE REC jz&1. SCHOOL DISTRICT FEES 0 FO V (paid at District Office) lU a S 2. SHERIFF FEES (paid at Building Division) Residential...... x =$ unit amt. Commercial (sq.ft.). x =$ 3. URBAN AREA FEES (paid at Building Division) Residential (per unit). x =$ #units amt. Commercial (sq.ft.). x =$ sq.ft. amt. 4. RECREATION DISTRICT FEES (paid at District Office) 5. THERMALITO DRAINAGE DISTRICT FEES $400.00 (paid at Building Division) 6. SRA FIRE INSPECTION AND PLAN CHECK $89.00 (paid at Building Division) 7. WATER TENDER FEES (BATTALION # ) $200.00 (paid at Building Division) 8. CSA 87 TRAFFIC FEE $2500.00 (paid at Building Division) 9. OTHER At time of permit application, I was advised the above fees are required to be paid prior to issuance of the permit. APPLICANT DATE COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING DIVISION 7 County Center Drive - Oroville, California 95965 - Telephone (916) 538-7541 APPLICATION AND PERMIT PERMIT NO. ASSESSORP CEL NUMBER �Q rQ� / (� ZONING BUILDINGPERMIT OWNER TELEPHONE SO. FT. OCC. BUILDING VALUATION OWN MAIUtgLADDRESS F bt�) Qr Oro e sal CONTRACTOR'S NAME TELEPHONE CONTRACTOR'S MAILING ADDRESS Fireplace .3 5 C-0 o -Q CONSTRUCTION LENDER UNIDJOWN Total Valuation 1$ 109 _? Z. Fling Fee $ 20.00 LENDER'S MAILING ADDRESS Permit Fee $ 9_0 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ 211170 . Energy Plan Checking Fee $ 5, 0-0 ARCHITECT OR ENGINEER'S MAILING ADDRESS Penalty $ BUILDINGADDRESS PERMITFEE $ 3.50 r TD PLUMBING PERMIT Fling Fee 20.00 Each Trap ( 7.00 '2D V LAT NO. SUBDIVISIONS NAME PARCEL MAP Solar or heat pump water heater 23.00 Water piping 15.00 USEOFSTRUCTURE SF ❑ Duplex ❑ Mobilehome ❑ Other -• " SPECIFY Each gas water heater or vent 15.00 Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑ Describe Work: Mobile Home S G W 920.00 PERMITFEE _ Contractor ELECTRICAL PERMIT Filina Fee 20:00 Main Service8000 OR LESS ( 200A OR LESS ) 23.00 Main Service ( 200A TO IQeoA 46.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in II force and effect. License Class Lic. No. �C� �� OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason NEW CONST. DWELLING OCCUR OR ( a ACC. BLAS. ) SO. 3.SQ FT. CNS. NEW CONST. MULTI.OUTLEi NON -REBID. ( BRANCH CIRCUrTS ) 97.50 ( 8 SINGLSINGL APPARATUS ) E OUTLET CIR EX. Occup. ( OUTLET OR FIXTURES) 20 @ I•00 SAL '° Ex. Occup. (ouT�rs LAEsio.°eA) 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 PERMITFEE _ O (o Lf -D Contractor WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' cc pensatiouranc carrier and policy number are: �f Carrier ,AAf n s117f Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to workers' compensation laws of California, and agree that if I should become subject to the worke ' ompensation provisions of n 3700 of the Labor Code, 1 shall f wit comply those provision 7,-_o d X li�`"� "� Date �� 'n %%5 Signature of Applicant - !k Owner Contractor ❑ Agent An OSHA permit is required for excavations over 50" deep and demolition or construction of structures over 3 in height. MECHANICAL PERMIT Filing Fee 20.00 9 Heating Cooling Hood 6.50 Ventilation PERMITFEE $ Contractor Mobile Home Installation Fee $ Energy Inspection Fee Is OCC CONST. TYPE TOTAL FEE $ 3 SDI �j 0 HAZ. D. FEES I IMP I FLOOD I CDF I PARCEL PO HD ISSUE This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work indicated above for which fees have been paid. By Date PERMITEXPIRESON (Date) (stories Receipt No. i 8 010 WHITE-D.D.S.-B.D. CANARY ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT BUTTE,COUNTY SCHOOLS.IMPACT FEE CERTIFICATION FORM - (One Form Per BuOding) School District 0- y UV; v I G (w Building Department No. A.P. Number D34.' 354' 07(o Jurisdiction: City County Property Owner p0. VT I ra wy< r 5 le Property Location/Address , Y 3 (m Q /; y t & ry v -e- d ro ; Subdivison Lot No. Residential Development Commercial/Industrial 0 0 �_. No. of Living MHI Units [g] Sq. Footage / F-2- - ;L15 Addition (Group R) New Addition (Floor Plans reviewed by School District Personnel) Sq. Footage (Including Exterior Roofed Areas) /D -.-y- 9-5 ate . ; School District RE Paid by Check # Bank Number, _ Paid by Cash Remarks: o Date �r It, subsequent to the School District Representative signing this Butte County Scb6ols Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White' (applicant.), Yellow (building department), Pink (school district) feeform.wkl („isa)dmm 3 a 0 0 J s ict Identificati No. 911V . RD c ool District certifies th `(Applicant) 4-1 (Street . re ) w (Phone Nu (City) (State) (Zip Code) has complied thexrequirements of Resolution No. / o� �1.L by payment of $ representing' 0pZ square feet. AB 2926 . ; School District RE Paid by Check # Bank Number, _ Paid by Cash Remarks: o Date �r It, subsequent to the School District Representative signing this Butte County Scb6ols Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White' (applicant.), Yellow (building department), Pink (school district) feeform.wkl („isa)dmm 3 Return to DPW AGRICULTURAL STATEMENT OF ACRNOTWLEDGD%MNT �,�, r.. ,. FOR RESIDENTIAL DEVELOPMENT Section 26-8.1 of the Butte County Code requires this acknowledgement be recorded prior to issuance of a building permit. The property described herein is adjacent I to land or included within an area zoned � 92-033051'1 7 G - 0,. 3 05 1 I for agricultural purposes, and residents I of this property may be subject to incon- Recorded I veniences or discomfort arising from the Official Records I use of agricultural chemicals, including, County of I but not limited to herbicides, pesticides, Butte I and fertilizers; and from the pursuit J. Grubbs I of agricultural operations including, ;Candace Recorder I but not limited to cultivation, plowing, 8:01am 23 -Jul -92 I spraying, pruning, and harvesting which 6 ti 92-33051 Rec Fee 8.00 Check 8.00 PUBL MP 2 occasionally generate dust, smoke, noise, and odor. Butte County has established agricul- tural zones which have as a priority use for productive agricultural purposes, and residents within said zones and on adjacent .property should be prepared to accept such inconvenience or discomfort from normal, necessary farm operations. All that real.pro.perty.- situate in the County of Butte, State of California, described as follows: See attached sheet. Date: State of 4!1/,• j County of ) ��e. ) PROPERTY OWNERS: v ('DAV ease, On this they day of 19_.?QL, before me, the SS. undersigned Notary Public, per onally appeared OFFICIAL SEAL Personally .known to me. Proved to me on the basis DOROTHY E COMBS 714 NOTARY PUBLIC '-CALIFORNIA of satisfactory evidence. 44 .•.�. BUTTE 'COUNTY � to be the person(s) whose name(s) m My comm; expires MAY 25, 1993 ?subscribed to the within instrument and acknowledged that executed the same for the purposes therein contained. IN WITNESS WHEREOF, I hereunto set my hand and official seal. Present A.P. No. tary Public r 5cc 6pl ,.' Order No. 40914 PC DESCRIPTION All that certain real property.situate in the County of Butte, State of California, described as follows: PARCEL A: Parcel 4, as shown on that certain Parcel Map of a portion of Lots 3, 4, 7 and 8 of Block 97 of Thermalito, which map was filed in the office of the Recorder of the County of Butte, State of Cali- fornia, on February 24, 1972 in Book 41 of Parcel Maps, at page 31 RESERVING THEREFROM a non-exclusive right of way for road and public utility purposes over the Westerly 30.00 feet as shown on said map. PARCEL B: NON-EXCLUSIVE right of way for road and public utility purposes over the following described parcel of land: COMMENCING at the Southeast corner of Lot 8 in said Block 97; thence West along the South line of Lots 8 and 7 a distance of 268.51 feet to the true point of beginning for the parcel of land here.in described; thence from said point of beginning on a curve concave to the right, having a radius of 20 feet through a central angle of 89° 58' 00" an arc distance of 31.40 fest; thence North a distance of 444.01 feet to the Northerly line of the above described parcel main; thence West and parallel with the South line of Lot 4, a distance of 60.0 feet; thence South a distance of 443.99 feet to the beginning of a curve concave to the right, having a radius of 20 feet, through a central angle of 90° 20' 00" an arc distance of 31.43 feet to the South line of said Lot 7; thence East along the South line of Lot 7, a distance of 100.0 feet to the point of beginning. EXCEPTI14G any portion of said easement lying within the parcel of land first described hereinabove. END OF .DoCUMENT i�'''�. ..,—.+,y,.rw w....,. . ...-.. .-.•,.i r �i:a>.:. _,. �•:.yv>.�. ,r�>...yyi `1„"�4xaV•YaT. �}n:;i�>iu[.ryty..s .^. .-. °��ai�TJR«i•i.`,y...�:41, Jir:;.y� ":.,?.:. rH. M.wLd��'Y'W' �i`�'�tirl`i�3!'��ayf 030-350-076 01-0727 CLARK, WANDA 1436 OLIVE GROVE LN OROVILLE 1 CONT: RRR ROOFING RE ROOF Os-aio5� F + COUNTY OF BUTTE DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 County Center Drive • Oroville, California 95965 • Telephone (530) 538-7541 + PERMIT NO. (Rev.12/96) APPLICATION AND PERMIT C ASSESSOR PARCEL NUMBEq ) 30�3�-, Q 0-916ZONING BUILDING PERMIT OWNER a YV TELEPHONE 3 SQ. FT. OCC. BUILDING VALUATION 07) OWNERS MAILING ADDRESSX00 ♦ (^� VV♦ V d•� CONTRACTOR'S NAME TELEPHONE CONTRACTORS MAILIN 9 ADDRESS syr • 4//7✓'1 CONSTRUCTION LENDER Fireplace LENDER'S MAILING ADDRESS Total Valuation $1 X001 00 ARCHITECT OR ENGINEER LICENSE NO. —Filing Fee $ 20.00 Permit Fee $ �•% ARCHITECT OR ENGINEERS MAILING ADDRESS Plan Checking Fee $ BUILDING ADDRESS i Ho Energy Plan Checking Fee $ $ �� ♦ PERMIT FEE $ .OZ) LOT NO. SUBDNISbNS NAME PARCEL MAP PLUMBING PERMIT Filing Fee 20.00 USEOFSTRUCTURE SF Duplex ❑ Mobilehome ❑ Other SPECIFY Each Trap 7.00 Solar or heat pump water heater 23.00 Water piping 15.00 Each gas water heater or vent 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑ Describe Work: 3 O Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 Home I S I G I W 920.00 —Mobile PERMIT FEE $ ELECTRICAL PERMIT Fee 20.00 RLEFling 800VMain Service zo.A OR LESS 23.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect.POWER License Class 7 Lic. No. -70 7 35 1 OWNER -BUILDER DECLARATION 1 hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure isnot intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason WORKERS' COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is Issued. ❑ 1 have and will maintain workers' compensation Insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' compensation inslance carrier and policy number are: Carrier VJJ,d 1A / �. Policy Number — rn (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to workers' compensation laws of California, and agree at if I should become subject to the worker ' compe &%tion—provisiions of section 3700 of the Labor Code, I shall ose provision fortfili com Wirj,,� /�' X Date t/ 65 Signatu „of Applicant ❑ Owner ❑ Contractor ❑ Agent An OSHA permit fs requ' ed for excavations over 5'0" deep and demolition or construction of structures ov r 3 toin height. Main Service 200A TO 1000A 46.00 NEW CONST. DWELLMIG OCCUP. SO OR ADONS. ( 8 ACCBRANCH. BLDS. 3.5¢F. NO alp, MULTI -OU @7,50 APPARATUS 8 SINGLE OUR ET CIR. j 20 .00 EX. Occup. OUTLEr OR FIXTURES BAL ®1.SO Ex. Occup. ourlEEis EM.OERA 5.00 R Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 PERMIT FEE _ MECHANICAL PERMIT Fling Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FETE $ Mobile Home Installation Fee $ Energy Inspection Fee $ c 3 YJ CONST -TYPE Vtk% TOTAL FEE $ ' (� HA2. D. ` IMP FLOOD CDF PARCEL pD HD ISSUE This permit is hereby issued under of the Butte County Code and/or indicate above for which fees have , By /� �t.C.Ci' '. PERMIT EXPIRES ON y the applicable provisions Resolutions to do work been paid. Date S C•/ - 7 . oz.,WHITE-D.D.S.-B.D. ReceiptNo. / V F9 3 CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD-APPLICANT(Date) , "COUNTY OF BUTTE -DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING DIVISION Q/-OV2,7 7 County Center Drive Oroville, California 95965 • Telephone (530) 538-7541 PERMIT NO. (Rev. 12/96) APPLICATION AND PERMIT 0- -� ASSESSOR PARCEL NUMB .-y ^35C) �J\ ZONING BUILDING PERMIT OWNER I •i Ty "D E SO. FT. OCC. BUILDING VALUATION OWNER'S MAIUNqI ADDRESSO I ° e � ^� � r ve-i CONTRACT R'S NA E TELEPHONE CONTRALTO S MAIU ADDRESSi 5?. -,2 -9 CONSTRUCTION LENDER LENDER'S MAILING ADDRESS Fireplace Total Valuation $ 1 OD ARCHITECT OR ENGINEER LICENSE NO. —Filing Fee $ 20.00 Permit Fee $41,0o ARCHITECT OR ENGINEERS MAILING ADDRESS Plan Checking Fee $ BUILDING ADDRESS o ° Grove Energy Plan Checking Fee $ v `SOV PERMIT FEE $160 LOT NO. NS NAME = PARCEL MAP PLUMBING PERMIT Fling Fee 20.00 USEOFSTRUCTURE SFDuplex ❑ Mobilehome ❑ Other SPECIFY Each Trap 7.00 Solar or heat pump water heater 23.00 Water piping 15.00 Each gas water heater or vent 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑ Describe Work: ®S �� Gas piping system 1 - 5 outlets 15.00 Building sewer . 15.00 Mobile Home I S I G I W @20.00 PERMIT FEE $ ELECTRICAL PERMIT Fling Fee 20.00 600VMain Service A OR LESS 23.00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is i full OfCe and effect.(POWER �' -1 3-518 q License Class Lic. No. - OWNER -BUILDER DECLARATION 1 hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason WORKERS' COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ❑ 1 have and will maintain workers' compensation Insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permit is issued. My workers' SSoim�Tpensation insyNance carrier and policy number are: Carrier //Iflii7ov& //Jj, Policy Number (The above sections need not be completed if the permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued. I shall not employ any person in any manner so as to become subject to workers' corrignsation laws of California,WJagree atrf 1 should become subject to the rovi i of se on 3700 of the Labor Code, I shall fo w' ce ion wor er cAant X _ Date V� Q Signatu Ap1007w ner ❑Contractor ❑Agent An OSHA permi excavations over 5'0"deep and demolition or constructionof structures ovs in height. Main Service TO 46.00so CCU000A NEW CONST. DWEWNG OCCUP. SO W:O OR ADDNS. ( 8 ACC. S.3.50M NEW CONST. MULTI -OUTLET NOµgESID. C @7.50 APPARATUS SINGLE OUTLET CIA. 20 '•0° Ex. Occup.ourLtTORFocruREs ° BAL @ .50 Ex. Occup. OF"„TAP �D °� 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wirina 23.00 PERMIT FEE $ MECHANICAL PERMIT Fling Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FEI= $ Mobile Home Installation Fee $ Energy Inspection Fee $ CC P, OOMT TYPE �r`lt TOTAL FEE $ , HAY T6. FEES IMP I FLOOD I CDF PARCEL PD HD ISSUE This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work indicate bove for which fees have been paid. By Date PERMIT EXPIRES ON _5__0z__ Dale ReceiptNo. IFY-5— WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT l THERMALITO IRRIGATION DISTRICT 410 GRAND AVENUE OROVF.LLE, CALIFORNIA 95965 TELEPHONE 533-0740 joq_a,o •L LI I%-� CSA 26 SEWER SERVICE APPLICATION AND CONNECTION PERMIT Service Address: 1 Owner's Name: - 1 <<:. i�lir�,�� s r �,i; �.� . �, �' e , _ . Date: 1 Address: 1Acct. No: 1 .�. , - _ , A.P. No.: - Phone: - 1 No. Units: el ii Applicant/Agent: Agents Proof: Address: Fees: Phone: Application $ Arrearage . Preliminary Review By. Date: CSA 26 Remarks: SC -OR 1st mo. S.C. Other X ` ` '— -�_ Total Fees '7 Collected By. ;;�/ �+-�';�'. r� %��,�;•,, Date: Field Review By:/.. f..%'%n S'%/; _ . _ Date: %' 7 — �'•2-- Remarks: _ d , MONTHLY SERVICE CHARGES WILL COMMENCE AUTOMATICALLY UPON: ❑ Date of TID approval of completed building sewer (early connection). ❑ 30 days after date above, or on date of D.P.W. approval of completed building sewer, which ever comes first ("existing construction", prior to Mar. 5, 1974). ❑ 180 days after date above, or on date of D.P.W. approval of completed building sewer, which ever comes first ("new const-uction", after Mar. 5, 1974). DISTRIBUTION: WHITE - TID, YELLOW - APPLICANT, PINK - DPW, GOLDENROD - DPW to TID 4 Planning Division J U N 2 5 1996 Orovilie, owitomia 7 2P 12 - i- O -r 2 z, pm 41--31 5; ripe ell, 9yAc - L Fly sof"/ N This- set of pims and speomeationg MMT be kept On the job at al! times and it is uni",All to make air cbange_,, or alt ,Sratic,na ante amme vplthout written PerMIM-fon froin the Np&rtment Of PubIllo. Warks, Country of Butte. jt,4cLvajNC, M S-rE SZ 92--ZO-7cf MMLDING DEPARTMENT APPROVED is 7 2P 12 - i- O -r 2 z, pm 41--31 5; ripe ell, 9yAc - L Fly sof"/ N This- set of pims and speomeationg MMT be kept On the job at al! times and it is uni",All to make air cbange_,, or alt ,Sratic,na ante amme vplthout written PerMIM-fon froin the Np&rtment Of PubIllo. Warks, Country of Butte. jt,4cLvajNC, M S-rE SZ 92--ZO-7cf MMLDING DEPARTMENT APPROVED