HomeMy WebLinkAbout039-270-10039-27-100
LARRY LAMBERT F4700,AJ
NW cor Perkins & Front 8t, ton
Permit#813-84B,P,E,M(new single family)
0
too
000079 -gam
l !PERMIT NO. H13 -84B, P, E,M
PERMIT EXPIRES�� �/v
OWNER
LARRY LAMBERT
Nwner
O CONTR.
I �-
(� ASSESSOR PARCEL 39-27.-100
LOCATION pr�� Perkins. f �-�-� ��, Dayton
a
0
Temp. Power Pole_
Called PG&E
Temp. Elec. Service
Cal lei
Temp. Gas
Cal lei
JOB FINA
Sinnat_._
J = OK
0 = Not OK
- = Not Applicable
* = Not Ready
MOBILEHOMES
MISCELLANEOUS
Date
MOBILEHOME UTILITIES (Plans) OK except k's
1. Zoning Requirements -Setbacks -Easements
2. Soils; Special MH Support -Sketch
Date
DECKS, COVERS, CARPORTS, ETC. (Plans) OK except N's
1, Zoning Requirements -Setbacks -Easements
2. Footings; Size -Depth -Spacing -Connectors
3. Sewer; Location -Test -Fall -C/0 -Concrete
_
3. Decks; Girders and/or Joists -Decking -Bracing -Stairs -Rails
4. Water; Location -Test -Easement Needed (Sketch)
_
4. Wood Awn.; Posts-Beams-Rftrs.-Connec.-Shthg.-Rfg.-Bracing_
5. Electricity; Location-Clearances-Grnd.-/ / Amp -Concrete
5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures
6. Gas; Location -Test -Wrap:/ /"L" ft./ /"Nat. or/ /"L" it./ /" LPG
7. Utility Clearance
6. Carports; Windows -Doors
7. Elec.
Card -BI
Date Card -BI Date
Card -BI
Date Card -BI Date
Card -BI
Date
Date Card -BI Date
MOBILEHOME INSTALLATION (Plans) OK except N's
Card -BI
Date
Date Card -BI Date _
POOLS (Plans) OK except N's
1, Zoning Requirements -Setbacks -Easements
1. Setbacks -Easements
2. Footings; Size -Spacing -Marriage Line
2. Soils; Compaction -Structure Stability
3. Gas; MH Test -Demand -Valve -Connector
3. Pool Structure: Steel -Connections -Thickness -Dead Men -Lining
4. Electricity; MH Test -Crossovers -Breakers -Clearances
4, Elec.; Receptacles and Lighting; Distances-GFI
5. Drain; MH Test -Fall -Flex Connector
5. Elec.; Pool Lighting; 15 volts-GFI
6. Water; MH Test -Regulator -Connector
6. Elec.: Enclosures; Conduit Entries -Terminals -Listed
7. Water and Sewer Connected -C/0 to Grade -HD Approval
7. Elec.; Bonding; Metal w/5' -Circulating Equipment -Heater ^
8. Gas and Electricity Tagged
8. Elec.; Grounding; Equip. w/5' -Circulating Equip. -Pool Lghtg.
Boxes -Enclosures -Panel boards -Ins. to Main in Conduit
9. Exits; Insp.-Sketch
10. Cert. of Occupancy
9. Health Department Approval
10. Plumb; Cir. Test -Water Supply Test
Card B -I
Date Card -BI Date
Card -BI
Date Card -BI Date
Card B-1
Date Card -BI Date
Card -BI
Date Card -BI Date
V = OK
0 = Not OY,'
= Not Applicable
= Not Ready, RESIDENTIAL i�9 Duplex)
Sin le and Du l
1F- j .
Date
U DE OOR Plans OK except#'s
Date
FRAMING (Continued)
1 ning requirements-Set%c asements
Oe Property Line Firewall & Openings
tg., Main; Soils -Steel- le nd.- / /" Ftg. Depth
&, xt. Doors -One 3' -Check Garage -3rd story, 2 exits
Ftg/Garage; Soils -Steel- / /" Ftg. Depth
--VStairs; Width -Headroom -Rise -Run -Landing -Fire Protection
tg., Porches & Decks; Soils -Steel- / /''_FtLqo De th
5b -.Plywood on Roof Overhang -Attic Vents -Rafter Outriggers ;
W. St walls, Main; Steel-Blockouts-Wrapp
$2. -Siding -Nailing -Veneer
to walls, Garage; Steel-Blockouts-Wrappe -Slab Y_59
-Stucco Mesh -Drip Screed-Fdn. Vents-Underflr. Access
eel
-SA.-blazing Area -Glass Protection -Skylights -Plastic
-
D.W.V.: Fall -Fittings -Test 2 way C er esi5_.Shear
Walls; Nailing -Bolts
9. Gas Pipe; Size -Anchors
-rp,d ; ¢y
10. Water Pipe; Test -Anchors -Regulator -Service Test
57.Z�Q�'-rej-
11. Electric; Underground
12. Plenums & Ducts; Clearance -Material -Support -Ins.
13. Girders -Sills -Anchor Bolts-Joists-Vents-CripplesCard-BI
Date '*'Card -BI Date
_'62:2412����
Card -BI
Date Card -BI Date
Card -BI
Date Card -BI Date
Card -BI
Date Card -BI Date
Date
FINAL (Plans) OK except #'s
Card -BI Date Card -BI Date
Date
PLUMBING (Permit) OK except #'s
1�01' ,Fxt. Steps -Door & Sidelight Protection -Landings
. Smoke Detector
_=
14. nt-Access-Combustion Air
urnace; Vents-Clearance-Comb..Air-Connector-
In Garage; Above Floor -Ducts -Meth. Protection
ter Pipe; T t & Anchors -Nail Protection
�5 D•W.V.; -F gs & Anchors -Nail Protection
edroom Exiting
_
rT7-'57ower Pan; Test, First Floor -Tub Access
48 -Test Tub & Shower, 2nd Floor -Tub Access
.l. & Bath Fixtures & Tub Access -
(AElec. Trim & Subpanel; Breaker Sizes -Labels
i
-49_ -'Gas Pipe; Size & Anchors
.G2 --Stairs & Rails
43yFireplace or Stove; Clearances -Hearth
-
A4 E ec. Outlets at Wood Panel; Int. & Ext.
Card -BI Date Zf Card -BI Date
Kit. Fixt. & Appliance; Grnd.-Air Gap-Cookin Clearance
Card -BI
/ Date Card -BI Date
@6r"rzlec. Outlets & Receptacles at Kit. Counter
Date
ELE RICAL Permit OK except #'s
,Z; --Garage Fire Door; Swing -Landing -Closer
�-- A.C. Duct in Garage -Damper
Fixture &Transformer Clearance -Ins. Protection
I9lPltr. Htr.; Vents-Clearance-Comb.'Air-Connector-P.R.V.-
In Garage; Above Floor -Meth. Protection
_
- Elec. Receptacles Spacing -Lights &Switches at Doors
0j/nb., Elec. & Mech. Equip. Listed for Location
ize Boxes & No. of Conductors -Stapled
U.-Elec. Receptacles in Garage; (G.F.I.)-Romex Protec.
Romex Installed Close to Edge of Studs & C.J.
quip. Ground made up w/Mech. Fasteners -Bond Gas &Water
sulation-Foam-Looked in Attic s
_
. 2 Appliance Circuits in Kitchen &Conductor Size
'78r8uard Rails & Deck Construction -Post Caps
-
-2C--,'aubfeed Wire Size /. / ga. Cu or AI-A.C. Wire Size / / ga. Cu or Al
—15T' -Range
n. Vents & Crawl Hole Door -Drainage & Wood -Earth Clearance
Looked under Floor ❑ Yes
Circ. / / ga: Cu or I -Oven Circ. / / ga. Cu or Al,
Insulated Neutral ❑Yes o T -
75. Following instld.: Drive ❑ No; Walks s ❑ No;
Planters ED Yes
28. Service -Riser Conductors & Ground - Main Di Disconnect
ta-'sfucco; Brown -Finish
2% -"'Equip. Clearances; Panels-Motors-Mech. Equip.
.C. Unit; Disconnect-Clrnces-Brkr. & Cond. Size -115V Outlet
---
Clothes Closet Light -Shower Light _
i ents Above Roof; Plbg.-Appliance-Firepl.-Clearance to Opngs.
-
Water Well; Disconnect, Electrical, Plumbing
%
. Exterior Elec. Trim; G.F.I. Receptacle -Underground
Card B -I
Card B -I
Card -BI Date
Date Card -BI Date
---Ventilation throughout House
J2 -Glass Protection
Date
MECHANICAL(Permit) OK except #'s
_
Corrections from Previous Inspections
as Test -Meters Tagged; Gas -Electric
. A_C. Ducts; Insulation & Support
Water & Sewer Connected -C/O to Grade -HD Approval
'72" Vent Fan; Exhaust above Insulation
86. Energy Compliance Certificate -Other Certificates
_
�ndensate Drain _& Ovenlow, Size & Grade
v
-9d: Furnace -Vent; Access -Comb. Air -Return Air Vent -115V outlet
-86, Attic Access & Platform if Furnace in Attic
Card BI
_
JDate (plL�/ Card -BI _ Date
Card -BI
Date t! Card -BI Date
Card -BI
Date Card -BI Date
Card -BI
Date Card -BI Date
Card -BI
Date Card -BI Date
Comments at Final:
t
Date FRAMING Plans) OK except #'s
_WS ills; Proper Material & Anchors
_
_-raft
a;"eo'�WWa-llls; Studs -Nailing, Spacing_ & Bracing -Plates -Sound
uyitsearing Walls over Girders &Floor Nailing
Stop -in-Walls (rat proof)
-6B�'
`
Fa�ire Stops; Furred Ceilings -Stairs -Chases -Tub
4p_iheader & Beam -Size & Bearing
angers -Post Caps -Anchors -Con ntorsda--
-ec
Cing. Joist-Rftr. Ties-Purlin-Roof Brac.-Truss-Shthng.-Rfng.
Fireplace Ties or Type A Flue -Fireplace Throat
- -
-
tilt Access: Size & Romex Protection -Draft Stop -Ins. Baffles
4GG_
rm.Windows or Exiting Doors -Sill Hgt. & Dimensions__--_- -
arage Fire Protection Framing
(NOTE: An entry must be made each time you visit job site)
,,,A ;R Y CERTIFICATION
ION
DESCRIPTION OF
ROOF
Material
Thickness (inches
EXTERIOR WALL
Material .0
Thickness(inches
CEILING
Batt or Blanket Type
Thickness(inches)
Loose Fill Type 7 `
Minimum Thi cknesi(Inc s) U z✓
Area covered (ft.. ) p
FLOOR, ELEVATED
Materiai' •
Thickness(inches)
FLOOR, SLAB
Material
Thickness(inches)
Width(inches)
FOUNDATION WALL
Material
Thickness(inches)
A. P. No.
INSULATION
Brand Name
Thermal Resistance (R Value)_
Brand Name CLC ,C
Thermal Resistpnce(R Value),
Brand Name
Thermal ResAtance(R Value).
Brand Name ---'
Number of Bags Wt. per bag lb.
Thermal Resists ce(R Value)—
Brand Name
Thermal Resistance(R Value)_______
Brand Name
Thermal Resistance(R Value)
and Name
Thermal
Resistance(R Value)__
I hereby certify that the abo a insula tion was installed in the above building
in confonce with
�Statt o Californ� Energy Requirements.
11
H W I S TION 378407
R STATE CONTRACTOR'S LICE E NO.
ju �t_FSTALLATION APPLICATOR DAT
I hereby certify the above insulation and -all required items as shown on the
Building Department approved plans and attachments have been installed as
required by the State of California Energy Requirements.
All equipment; devices and materials are of the quality prescribed or are
specifically approved by the State of California.
F IRMJKAME/OWNER lease print) STAYI�•-`CONTRACTOR'S LICENSE NO.
SZGNA GENERAL CONTRACTOR OWNER DATE
THIS CERTIFICATE MUST BE ON FILE WITH THE.bUILDING DEPARTMENT PRIOR TO FINAL
INSPECTION APPROVAL AND A COPY SHALL BE PO$TED WITHIN THE BUILDING.
January 1984
COUNTY OF BUTTE
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico - Phone: 891-2751
7 County Center Drive, Oroville — Phone: 5344541
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
I .-3 - �- --/•
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office i
when correction of work is completed. If you have any question pertaining to this
muter, or need additional explanation, please contact th�t�s office immediately.
EM
Inspector Da
COUNTY OF BUTTE
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico — Phone: 891-2751
7 County Center Drive, Oroville — Phone: X34-4541
Skyway and Elliott Road, Paradise— Phone: 872-2961, Ext. 57
CORRECTION NOTICE
OWNER PERMIT NO.
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. If you have any question pertaining to this
Inspector—.-- Date
�KJ
Ty
Inter-DepartmehiiI.-Memorandu
TO:
FROM:
I
SUBJECT: 4491- I 4U4 69441&
DATE: -7,. 0 3 r 7-/e o
5�wH
a
COUNTY OF BUTTE - DEPARTWENT OF PUBLIC WORKS
7 County Center Drive - Oroville, California 95965 - Telephone 916/534-4541
APPLICATION AND PERMIT
PERMIT"NO.
Ry
ASSESSOR PARCEL NUMBER ZONIN _
(^j(^f
BUILDING PERMIT
OWNER TELEPHONNE
z � �rL
S(�. FT. OCC, BUILDING VALUA.
N
o
OWNER'S MAILING ADDRESS
CO TRACTOR'S NAME
TELEPHONE
LCV
CONT CTOR'S MAILING ADDRESS
Fireplace
CONSTRUCTION LENDER
UNKNOWN
Total Valuation $ s�f
Filing Fee $
10.00
LENDER'S MAILING ADDRESS
Permit Fee $
Z.SS
ARCHITECT OR ENGINEER
LICENSE NO.
Plan Checking Fee
ap
Penalty
ARCHITECT OR ENGINEER'S MAILING ADDRESS
Permit fee $
®�
BUILDING ADDRESS r
PLUMBING PERMIT Filing Fee
10.00
Each Trap 2.00
Solar Water HPatari�T� 20.00
-2 6,
y4 Q
Water piping 5.00
^--/ ee
LOT Qa SUBDIVISION NAME
3
PARCEL MAP
Each qas water heater or vent 5.00
Gas piping system 1 - 5 outlets 5.00
USE OF STRUCTURE
SOK Duplex ❑ Mobi lehome ❑ Other
SPECIFY
Building sewer 5.00
Mobile Home S G W 10-00ea
TYPE OF WORK
New Addition❑ Remodel❑ Utilities [:1 Installation❑ Other❑
Describe work: —
Permit Fee $
`
Contractor
ELECTRICAL PERMIT Filing Fee
10.00
Main service 10ov OR LESS 10.00
100 AMP OR LESS
101 D6
--�'J
Main service EA. ADD'L 100 AMP 2.50
IZI�jj50
OR ADDNS. ACC. BLDGS.0;rgk 2'/20sq ft
J,.9�
CONTRACTORS LICENSE LAW
I declar under penalty of perjury (check one):
I am licensed under provisions of Chapt. 9, Div. 3 of the Business
and Professio s Code and my license is in full force and effect.
License No.�`�� Y3 Classification IF I
❑ I, as the owner, or my employees with wages as their sole compen-
sation, will do the work,and the structure is not intended or offered
for sale. (Sec. 7044)
❑ I, as the owner, am exclusively contracting with licensed contract-
ors. (Sec. 7044)
❑ I am exempt under Sec. , Business and Professions Code
for this reason
NoN.RESID R BRANCH CIRCUITS) 2.50 ea
NEW CONSTR.POWER APPARATUS &'
NON-RESID. %SINGLE OUTLET CIR.
EX. OCCUp(OUTLETS OR FIXTURES BA 50
FIXED APPLNS. OR
EX. Occup. OUTLETS (RESID.) EA.) 2.00
Temporary service 10.00
Mobile Home Facilities 15.00
Mist. Wiring 15.00
Permit Fee $
,
Contractor
WORKMEN'S COMPENSATION INSURANCE
I declare under penalty of perjury (check one):
❑ The permit is for $100.00 (valuation) or less.
have placed on file with the County of Butte Building Department
a Certificate of Workmen's Compensation Insurance or a Certificate
of Consent to Self -Insure.
I shall not employ any person in any manner so as to become subject
to the W. C. laws of California.
Notice to Applicant: If after making this statement, should you become subject
to the W. C. provisions of the Labor Code, you must forthwith comply with such
provisions or this permit shall be deemed revoked.
MECHANICAL PERMIT Filing Fee
10.00
Heating
U
Cooling
6, 06
Hood 3.00
-Z, �D
Ventilation
Permit Fee $
,CrO
Contractor
I certify that I have read this application and state that the above information
is correct. I agree to comply to all County Ordinances and State Laws relating
to building construction, and hereby authorize representatives of the Countyot
Butte to enter upon the above-mentioned property for inspection purposes.
I also agree to save, indemnify and keep harmless the County of Butte against
all liab' ' ie6 judgment , costs, and expenses which may in any way accrue
agai said ou in ce a granting of this permit.
X 3„it��/
Date
Signature o p Cant – Owner R?" Contractor IJtJ Agent ❑
An OSHAt mit is required for excavations over 5'0" deep and demolition or construct-
ion of strures 3 stories in height.
Mobile Home Installation Fee $
TOTAL PERMIT FEE
1� P. GRouP
�
_PE DACONST.
�.
PARCE PD
sgu
This permit is hereby issued under the applicable provi-
sions of the Butte County Code and/or resolutions to do
work indicated above for which fees have been paid.
DIRECTOR OF PUBLIC WORKS
B- Date q—//rte ;�
�46
PE IT EXPIRES Date— —,pp
jover
Receipt No. ) � 7t
WHITE-D.P.W., YELLOW -ASSESSOR. PINK -INSPECTOR, GOLDENROD -APPLICANT
ocrMD'AL AL�rt�7c
DUNV
rt r 1`
MAP
CL
FEE
S`}--
8350
Return to DPW AGRICULTURAL STATEMENT OF ACKNOWLEDGEMENT
FOR RESIDENTIAL DEVELOPMENT
Section 26-8.1 of the Butte County Code.requires this.acknowledge.men.t
be recorded prior.to issuance of a building permit.
The, property described herein is adjacent. to land or included
within an area zoned for agricultural purposes, and residents of this
property may be subject to inconveniences or discomfort arising from
the. use of agricultural chemicals, including, but not limited to herbicides, pesticides,
and fertilizers;. and from the pursuit of agricultural operations including, but'not limited
to cultivation, plowing, spraying, pruning,, and harvesting which occasionally generate dust,.
smoke, noise, and odor. Butte County has established agricultural zones. which have as a
priority use for productive agricultural purposes., and residents within said zones and on
adjacent property should be prepared to accept such inconvenience or disconform from normal,
necessary farm.operations..
All that real property.situate in the County of Butte, State of California, describe.d.'
as follows:
,3jmoi17/
3i o17-
31 c2 - i o .
Date: March 21, 1984
PROP OtdNERS • -
'/r
6_7'ti'•11;N
State of California ) On this the 21st day of March 1984 , before
SS. me, the undersigned Notary Public, personally appeared
County of Butte )
LARRY J. LAMBERT - - - - - - - - - - - - - - -
LUCY A- PERSNALL a
f_ NOTARY PuaL":.-CALIFORNIA a
BU118 CoUmty 11
i My Commis61on txpfrue Jan. 2,1988 a
e
!�eas�e�we�aa€�osdaeats�ao®neMmwaom;
Present'.A.P. No.
/77 Personally known to me. LY1 Proved to me on the basis
of satisfactory evidence.
to be the person(s) whose name(s) is- sub.scribed to
the within instrument and acknowledged that he
executed the same for the.purposes therein contained.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
r Notary Public
LUCY A... PERSHALL
w
DESCRIPTION:
All that -'certain real property situate in the County -of Butte, State of
California, described as follows:
D AOP`CI T._.
Lot 106, 107in Block 19 of DAYTON, as the same appears 'on the Official Map
on file in the. Office of the Recorder of the County. of 'Butte, State 'of
California.
EXCEPTING THEREFROM all oil, gas, minerals and other hydrocarbon substances
as.reserved in the Deed from Darrell C. McEnespy, et ux, recorded December
7, 1978, in Book 2351 of Official Records, at Page. 138.
The surface rights.'have been.released and surrendered for a distance of 300
feet in depth as- contained in Deed recorded May 17,. 1979, in Book 2400 of
Official Records, at Page 452, and released to a depth of 500 feet in Deed
recorded November 23, 1979, in Book 246.5 of Official Records, at Page
312.
DESCRIPTION:
All that certain real property situate in the County of Butte, State of
Cal,iforni.a, described as follows:
PARCEL I:
Lot101, llfin Block 18 of DAYTON, as the same .appears on the Official Map
on file in the Office of the Recorder'of the County of Butte., State of
California.
EXCEPTING THEREFROM all oil, gas, minerals and other hydrocarbon substances
as reserved in the Deed from Darrell C. McEnespy, et ux, recorded December
7,-1978, in Book 2351 of Official Records, at Page 138.
The surface rights have been released and surrendered for a distance of 300
feet in depth as contained in Deed recorded May 17, 1979, in Book 2400 of
Official *Records , at Page 452, and released to a depth of 500 feet in Deed
recorded November 23, 1979, in Book 2465' of Official Records, at Page
312.
DESCRIPTION:
All that certain real property situate in the County of Butte,. State of
California, described as follows:
PARCEL I:
82 & 83
Lot80,81,/in Block 14 of DAYTON, as the same appears on the Official Map
on file in the Office of the Recorder of the County of Butte, State of
California.
EXCEPTING THEREFROM all oil, gas, minerals.and other hydrocarbon substances
as reser-ved in the Deed from Darrell C. McEnespy, et ux, recorded December
7, 1978,- in Book'2351 of Official Records, at Page 138.
The surface rights have been released and surrendered for a distance of 300
feet in depth as contained in Deed recorded May 17, 1979, in Book 2400 of
Official *Records, at Page 452, and released to a depth of 500 feet in Deed
recorded November 23, 1979, in Book 2465 of Official Records, at Page
312.
GLAZING PLAN TAKEOFF SHEET
3-5 North Glazing
QUANTITY SIZE .AREA
0 (SQ.FT.)
(a) Z x 492 nos -
(b) �— x m w 7'L =
(c) �_ x 41-c3a 2 ._ --
(e) X,
Total North Glazing = (SQ.FT.)
(a+b+c+d+e)
TOTAL
NORTH TOTAL BLDG CONVERSION TOTAL %
GLAZING FLOOR AREA FACTOR NORTH GLAZING
c 331 x 100 = 3.51
SQ.FT. SQ.FT.
3-7 South Glazing
QUANT TY osi E A (SQ.FT.)
(a) x 9. = Z
(b) x S�- ICO =
(d) x =
(e) x =
'.'Total South Glazing = _ Q.FT.)
(a+b+c4d+e)
TOTAL
SOUTH
TOTAL BLDG
GLAZING
FLOOR AREA
GLAZING
FLOOR AREA FACTOR
SQ'.FT.
SQ.FT.
CONVERSION TOTAL %
FACTOR SOUTH
CGLAZING
X 100 = �I
FOR M
3-6 East Glazing
QUANTITY SIZE -ABEA (SQ.FT.)
(a) L x
(b) x =
(c) X =
(d) x =
(e) x =
Total East Glazing = (SQ.FT.)
(a+b+c+d+e)
TOTAL
EAST
TOTAL BLDG CONVERSION
TOTAL %
GLAZING
FLOOR AREA FACTOR
EAST GLAZING
.
1134 X 100
=
SQ.FT.
SQ.FT.
3-9 Skylights
QUANTITY SIZE AREA (SQ.FT.)
(a) x =
(b) x =
(c) X =
Total Skylights = (SQ.FT.)
(a+b+c)
TOTAL
SKYLIGHT TOTAL BLDG CONVERSION TOTAL %
GLAZING FLOOR AREA FACTOR SKYLIGHT GLAZING
X, 100 = '/,
SQ.FT. SQ.FT.
OWNER 00-4 L ��
PERMIT NO.
7/83
3-8 West Glazing
QUANTITY GaI E� a AJJEA
(SQ.FT.)
(a) �— x _
(b) x =
(c) x =
(d) x =
(e) x =
Total West Glazing (SQ.FT.)
(a+b+c+d+e)
TOTAL
WEST
GLAZING
SQ.FT.
TOTAL BLDG
FLOOR AREA
Ux
CONVERSION TOTAL %
FACTOR WEST GLAZING
100 = 2.• 9
14VI's56
GLAZING DIRECTION LOCATER
Draw locater line perpendicular to plane of glazing. Overlay
intersection point with center point of circle.' Turn circle so
North arrows are parellel with plan North arrow. Locater line
then indicates facing direction.
1
Table 3-3a. Ceiling Insulation
Points
I R -Value of Insulation I Points I
I I i
I 22 I -2 I
I 30 I 0 I
I 49 i +4 1
I I I
Table 3-4a. Wall Insulation Pointe
I R -Value of Insulation 1 Pointe I
1 I I
I 19 I i
30 i +3
3-5. Norih-4aclng Glazing P
I Glazing Type
Total
Z of
Floor
Ates
0.1- 1.2 1
1.3- 2.3 I
2.4- 3.6 I
3.1- 4.8 I
4.9- 6.1
6.2- 7.3 I
7.4- 8.2 1
8.3- 9.7 I
9.8-10.8 I
10.9-12.0 I
12.1-13.2 I
13.3-14.5 I
14.6-15.3 I
20. SOLAR WITH GAS BACKUP (HW)
21.'S'ViETCOLECTP.IC (HW)
(oma Xi'd11iC to100110100 •
Table 3-6. East -Fact
ITEMS SHOWN - ZERO PO
1 1 Glazing Type I
....-., . ..ua,
U I U-
c.
t i
,
OWNER thaw'
POINTS
PERMIT NO.
ASSIGNED
ACTUAL
�s
1.
SLAB - INSULATION
NONE
I +4
2.
RAISED FLOOR - R-19
I +2 I
•19+ i
3.
CEILING - R-30
,9►•30
0
4.
WALL - R-19�-
I -4
1 -3 I
5.
NORTH GLAZING
- 2.4-3.6e`
-12
6.
EAST GLAZING
- 2.5-3.6! J JL
I -10
7.
SOUTH GLAZING
- 1.6-3.6% &0
0
S.
WEST GLAZING
- 2.9-3.6%
0
9.
SKYLIGHT
- 0-1.37
I . -18
10.
SHADING (Exclude Overhang)
1 -20
1 -17 I
.37-.57
EAST
- .67-.82
am ,
I -13
SOUTH
- .19-.42
i .1 I .8 11.8 1 3.2 1 4.0
I -10 1
WEST
- .13-.36
�
0-.12
.SKYLIGHT
- .37-.57 ��►
���
11.
HORIZONTAL SOUTH OVERHANG
2' Z
O
12.
I -LOVABLE INSULATION
- NONE
111.3-12.7 1
13.
INFILTRATION (Standard=0)(Tight=+12)
-15 1
1
14.
THERMAL MASS
SF
I -19
15.
GAS FURNACE (SE)
71-767
I -18 I
16.
HEAT PUIiP (EER)
7.5-7.9%
+3
17.
DUAL PACK (SE, SEER)
8,0-8.3/71-76%
-24
13.
ACTIVE SOLAR 60% IIIN (NONE)
9.6-10.1 1
19.
ZONALLY CONTROLLED
ELECTRIC
Table 3-3a. Ceiling Insulation
Points
I R -Value of Insulation I Points I
I I i
I 22 I -2 I
I 30 I 0 I
I 49 i +4 1
I I I
Table 3-4a. Wall Insulation Pointe
I R -Value of Insulation 1 Pointe I
1 I I
I 19 I i
30 i +3
3-5. Norih-4aclng Glazing P
I Glazing Type
Total
Z of
Floor
Ates
0.1- 1.2 1
1.3- 2.3 I
2.4- 3.6 I
3.1- 4.8 I
4.9- 6.1
6.2- 7.3 I
7.4- 8.2 1
8.3- 9.7 I
9.8-10.8 I
10.9-12.0 I
12.1-13.2 I
13.3-14.5 I
14.6-15.3 I
20. SOLAR WITH GAS BACKUP (HW)
21.'S'ViETCOLECTP.IC (HW)
(oma Xi'd11iC to100110100 •
Table 3-6. East -Fact
ITEMS SHOWN - ZERO PO
1 1 Glazing Type I
....-., . ..ua,
U I U-
I arpa,
10-
0.66
10.42- 10.41
1.10
10.65
I down
+4
1 +4
+4
+4
+4
I +4
+1
I +2
I +2 I
•19+ i
0
I 0
-4
I -2
I -1 I
-7
I -4
1 -3 I
-9
I -6
I -5 I
-12
i -8
I -7 I
-14
I -10
I -8 I
-17
I -12
1 -10 I
-19
I -14
I -12 I
-22
I -16
I -13 I
-24
I . -18
I -15 I
-27
1 -20
1 -17 I
-able 3-1. Slab Floor Points
I Insula- I R -Value of Insulstion I
I ttun I
I depth, --r
Inches i 0-2 i J-4 j 5-6 i' 7+
0-111-5 1-5 1-5 1-5
12 - 15 I -5 1 -3 I -2 1 -1
16 - 19 I -5 j -2 I -1 10
20 + I -5 1 -1 1 0 1 +1
7/7/83
e 3-2. Raised
Floor Points
R -Value of 1
I 2 of I Sngl,
Insulation I
Points
below 3 1
-12
3-4 I
-8
5-7 1
-6
8- 12 (
-4'
13 - 18 1
r2
•19+ i
0
I 0
I 0 1
Table 3-7. South -Facing Glazing Pts Table 3-10. Shading Coefficient Points
T_
I I Glazing Type I I SC by I
I Total I
I '- Floor Area
1
I 2 of I Sngl,
Dbl,
Trp1,
I Floor l (U -
I (U -
I (U - I
Area 11.10)
10.65)
1 0.41)1
I I oints I oints
I ointsl
o +3
I up to 1.5 I +2
+3
I +2
+9
I +2 I
I 1.6- 3.6 I -1
I 0
I 0 1
3.7•- 5.2 I -4
I -2
I -2 I
I 5.3- 6.5 I -6
I -4
I -3 I
I 6.6- 7.7 I -9
( -6
I -5 I
I 7.8- 8.9 I -11
I -8
( -7 I
9.0-10.0 1 -13
1 -10
-9
110.1-11.5 I -17
I -13
.I
I -11 I
111.6-13.0 I -21
I =16
I -14 I
13.1-14.5 I -25
I -19
I -16 I
14.6-16.0 I -28
I -22
I -'.9
Table 3-8. West -Facing Clazin Pts.
I I Glazing Type I
I Total 1 I
I Z of I Sngl, I Dbl, Trpl,
I Floor I (u- , I (U - I (U - I
I Area 11.10) 10.65) 10.41)1
I Ioints I oints I ointsl
o +s1 +g F +6
1 up to 1.3 I +5 I +6 I +6 I
1 1.4- 2.2 i +3 I +4 I +5 I
1 2.1- 2.8 I 0 1 +2 I +3 I
I 2.9- 3.6 1 -3 I 0 1 +1 1
I 3.7- 4.2 I -5 I -2 I 0 1
I 4.3- 5.0 I -8 I -4 I -2 I
I 5.1- 5.6 I -10 I -6 I -4
I 5.7- 6.2 I -13 I -8 I -6 I
I 6.3- 6.9 I -15 I -10 1 -7 I.
I 7.0- 7.6 I -18 I -12 I -9 I
7.7- 8.2 1 -20 I -14 I -11 I
I 8.3- 8.8 I -22 I -16 I -13
I 8.9- 9.5 I -25 I -18 I -15 1
9.6-10.1 I -27 -20 I -16 1
110.2-11.0 I -29 I -23 1 -17 I
111.1-11.8 i -35 I -26 I -21 1
111.9-12.7 I -38 I -29 I -24' I
112.8-13.5 I -42 1 -32 I -21 I
113.5-14.3 I -46 I -35 I -29 I
114.4-15.2 I -50 I -38 I -32 I
1 Orten-
I '- Floor Area
tation
Sngl,
I U- I
Dbl,
U -
I East
1
I
I -6
0-6.4 up
oil
I Floor I (U - I (U - I (U -
I Area 11. LO) 1 0.65).1 0.41)1
I Ioints I oints I ointsl
#q1011,41
4+ +tom
I +3 II +4
I
1
I 0 -.19
1 0 1 +1 I +2
I .20-.36
I 0 .I 0 I -1
( .37-.66
I 0 I 0 i 0
I .67-.82
I 0 I I -1
I .83 up
I 0 -1 I -2
I SouthI
O 6.4 19.0 19.6
I
I to I to to 1 to I up
-4 I
13.1 16 7.9 19.5 I
I 0 -.18
1 0 1 +1 I +2 I.++22 iT +3
i .19-.42
1 0 1 0 1 0 1 0 1 0
.43-.66
I O I -2 i 72 -3
p
,I
1 0 1 -2 -4 I -4 I -6
i -10
1 I 6.8- 7.7 I
-13
I -8
WestI
.1 1 3.2 16.4 19.0
5.7- 6.2 1
i to to to I to I up
I -14
1.5 I 3.1 6.3 i 7.9
0-.12
I 0 1 +1 I +3 l ;+6 I +7
.13-.36
I 0 1 0 1 0 1 0 1 0
.37-.57
I 0 1 -1 I -3 I 76 I -7
-21
-12 I -15
I -13
-6 -8 I -16
I I_
Skylight
i .1 I .8 11.8 1 3.2 1 4.0
I -10 1
I to I to I to Ito I to
7.0- 7.6 1
II.7 1_5 I 3.1 I 3.9 I 5.2
0-.12
1 0 1 +1 I +3 I +6 I +7
.13-.36
1 0 1 0 1 0 1 0 1 0
.37-.57
1 0 1 -1 I -3 I -6 I
.58-.82
I -1 I -3 I -6 I -12 I -,
.83 up
I -2 I -4 I -8 I -16
I I I I I
I I I I I Table 3-11. Horizontal South
Overhano. Points
Table 3-9. Skylio.ht Points I South Glazing
1 Length Out I Area, Z of Floor I
I I Glazing Type I I from Wall I I
I Total I I I it j-
-I Ttl I I
o a
Z of I Sngl, Dbl, Trpl,
I
-2
I Z of
I Floor
Sngl,
I U- I
Dbl,
U -
Trpl,
I D - I
1
I
I -6
1 0-6.3 I 6.4 up I
I I ' I
I Floor I (U - I (U - I (U -
I Area 11. LO) 1 0.65).1 0.41)1
I Ioints I oints I ointsl
#q1011,41
4+ +tom
I +3 II +4
I
1
I Area
1 11.10
10.66- 10.42-
10.65
I
10.41
I down I
1 0- 0.5
1 0.6 - 1.0
11.1 - 1.9
I 2.0 up
I
1 -2 -r
I -2 1 -3 I
I -1 i -2 I
I 0 I 0 I
I I I
1 up to 1.3 I
I 1.4- 2.2 I
-1 I
-3 I
0 1
-2 I
0 1
-1 I
i 1.4- 2.4 +1. I I +2
I
I 2.3- 2.8 1
-6 I
-4 I
-3
Table 3-12.
-10
Movable Insulation
1
-2
1 0
1 0
1
1 2.9- 3.6 I
-9
I -6
1 -5
1 1 3.7- 4.6 I
-5
1 - -2
I -1
I
I 3.7- 4.2 I
-11
I -8
1 -6
1 1 4.7- 5.5 I
-8
1 -4
( -3
I
I 4.3- 5.0 I
-14
i -10
1• -8
I I 5.7- 6.7 I
-10
I -6
I -5 i
I
5.1- 5.6 1
-16
I -12
i -10
1 I 6.8- 7.7 I
-13
I -8
I -7 I
I
5.7- 6.2 1
-19
I -14
I -12
I 1 7.8- 8.7 I
-15
I -10
I -8 (
1
6.3- 6.9 I
-21
I -16
I -13
1 I 8.8- 9.7 I
-1.7 I
-12
I -10 1
I
7.0- 7.6 1
-24
I -13
1 -15
i 9.8-11.2 I
-21
I.-15
I -13 1
1
7.7- 8.2 I
-26
I -20
I -17
111.3-12.7 1
-25 1
-18 •I
-15 1
1
8.3- 8.8 I
-28
I -22
I -19
( 12.8-14.0 I
-28
-21
I -18 I
I
8.9- 9.5 1
-31
I -24 I
-21
14.1-15.3 I
_)
-32 I
-24
I -20 I
I
9.6-10.1 1
-33
1 -26 (
-22
I Moveable Insulatlon'l
I Area, Z of Floor I Points
0- 5.5
I 0
5.6 - 11.5
I +2 1
11.6 - 17.5
( +4
17.6 - 23.5
i +6 1
>23.6+
I +8 I
Table 3-13. Inffltration Control
Fer.tores Points
T_ _...--.__TI
1 Control Features ! Points 1
! I !
I Standard ) 0
i I
9.9 air changes per hr
I Tight I +12
I I
10.6 air changes per hr 1
Table 3-15. Cas Furnace Without
_ Refrigeration Cool!r.g Points
t
! Seasonal Efficiency ! Points !
! (SE),
� I I
I 71 - 76 I 0 1
! 77 - 82 I +2 1
I 83 - 88 I +4 I
1 89 - 94 ! +6 I
! 95 up I +8 i
I I !
Table 3-16. Neat Puoo Points
T
I Energy Effieleney
I Points I
I Ratio
(EER)
! I
I 7.5 -
..9
! +3 I
1 S.0 -
8.3
i +6 I
I 8.4 -
3.7
I +9 !
! 8.8 -
9.1
I +12 !
I 9.2 -
9.6 !
+15 I
I 9.7 -
10.2 I
+18 I
! 10.3 -
10.8 1
+21 I
I 10.9 -
11.5 I
+24 !
! 11.5 -
12.3 I
+27 I
I 12.4 -
i
13.2 1
I
+30 I
!
Table 3-17. Cas Furnace With
Refriveration CoollnR Points
:Ref-Igeracionl Cas Furnace I
I Cooling 1 SE 11 1
1 -J77 -j83-189 95 1-
I 1 761 821 881 9+1 up I
I
I 8.0 - 8.3 I 01 +21 +41 +61 +8 1
1 8.4 - 8.7 1 +21 +41 +61 +31+10 1
1 8•8 - 9.1 1 +41 +il +C1+101+12 I
1 9.? - 9.7 1 +61 +81+101121+14 1
1 9.8 - 10.3 1 +31+10,1+121+141+16 I
1 10.4 - 10.9 1+10;+L21+1.1161+18 I
1 11.0 - 11.6 1+121+i41+161+181+20 1
1 1 ! I 1 1
7/7/83
TALE 3-14 (ADAPTED)
MASS
ZONE 11
iNTERJOR THERMAL MASS POINTS
AREA
SO. FT.
:D
,Do.
ISO
200
153
307
350
400
Soo
603
700
230
500
I,n00
1,;OU
1,200
1.JC0
1,00
1
2,300 I
2.500
J.'.00
3,500
'1.000
4,500
1,000
I A 8 C D A
2 2 2 2 2
4 4 4 2 2
6 6 6 4 4
B 8 6 ! 6
10 10 8 6 6
12 12 10 6 8
14 14 12 8 10
14 14 12 8 10
18 18 16 10 12
22 20 18 12 14
24 24 20 14 18
26 24 22 16 70
28 28 74 16 22
30 30 25 18 �7
32 32 28 20 24
34 32 30 22 26
34 34 32 22 28
3434 32 24 28
36 34 34 24 30
34
I
1,500
8 C
2 2
2 2
4 4
6 !
6 6
8 6
IG 8
10 8
12 10
14 12
16 171
16 16
20 18
20 20
24 22
26 22
26 24
28 26
30 26
34 32
D
0 1
2
2
2
4
4
6
6
6
8
10
10
12
14
14
16
16
18
18
22
A
2
2
2
!
6
6
6
8
10
12
14
14
16
1D
20
22
22
24
24
30
34
2,000
6 C D 1
-�--
2 2 0
2 2 2
2 2 2
4 • 2
6 4 2
6 6 4
6 6 4
8 6 4
10 8 6
12 10 6
14 11 0
14 12 0
16 14 10
16 16 10
20 18 10
20 18 12
22 20 12
24 20 1420
24 22 14 (22
30 26 18
34 30 22 I30
2,500 I 3.000
A B C D A B C 0
0 0 0 0 0 0 0 0
I 2 2 2 0 2 2 2 0
2 2 2 2 2 2 2 2
4 4 2 2 2 2 2 2
4 4 4 2 4 4 2 2
6 6 4 2 4 4 ! 2
6 6 6 2 6 4 4 2
6 6 4 4 6 - 6 4 2
R 8 6 4 6 6 6 4
10 10 8 6 8 8 6 4
10 10 10 6 10 10 8 6
12 10 10 6 10 10 8 6
14 14 12 8 12 12 10 6
14 14 12 8 12 11 13 6
16 16 14 8 14 }4 12 8
18 18 14 10 14 14 12 8
18 18 16 10 1,i 14 14 8
18 12 18 16 14 10
20 18 12 18 18 16 10 116
26 26 22 16 22 22 20 14 120
30 26 18 26 26 24 16
34 32 30 22 30 30 26 18
32 32 30 20
3,500
A 8 C D
`-r
0 O 0 0
2 2 0 0
2 2 2 ?
2 2 2 2
2 2 2 2
4 4 2 2
4 4 4 2
4 4 4 2
6 6 6 2
8 C 6 4
8 8 6 4
10 R 8 4
10 10 3 6
12 10 10 6
12 12 10 6
14 12 12 B I-
14 12 12 6
14 14 12 8
16 14 8
20 18 12
24 24 22• la
28 26 24 16 124
30 30 26 18 �28
32 32 30 20 130
A
0
2
2
2
2
2
4
4
6
6
I 8
^
8
I10
10
12
12
14
14
18
22
32
4,000
B C
0 D
2 0
2 2
2 2
2 2
2 2
4 2
4 4
5 4
6 6
6. 6
6 6
8 '8
10 8
10 10
12 106
12 10
14 12
14 12
18 16
22 i3
24 22
28 24
30 26
32 28
D A
00
0 2
0 2
2 I 2
2 2
2 2
2 I 4
2 I 4
4
4 1 6
4 ! 6
4 8
4 8
6 I 8
6 110
1J
6 12
8 2
a 117
10 1C
12 20
14 22
16 26
10 ?a
20 ! 30
I,$GO
6 "
0 0
2 0
? 2
2 2
Z 2
2 ?
4 2
4 1
4 4
6 4
A 5
6 6
8 6
8 C
10 9
10 8
10 10
12 1G
1: 10
16 }:
20 IS
27 20
24 2?
2b 24
30 26
--+---
0�
0:
OI
2
?
7I
2
2
2I
41
4I
4!
41
CI
6
G
t
61
GI
!: I
14
14i
It
lE j
0
0
2
2
2
?
4
6
6
6
8
!•?
1!1
10
10
;2
14
is
211
±a
25
ib
5_,000 V
0 0 0
0 0 0 1
1 2 0 1
?
7 2 ?
? ?
4 4
6 4 1,!
6 c 7.
5 6 4 .
8 6 r. ,
g 6 4 ;
e e
In 8 6
1D F. 6
13 11,ieo
12 1; o i
14 12 5 i
.; It o
._ 12 i
:4 20 Id
-.3 22 iF
A) I. J's" concrete Slab: HC•8.93; R•.29; Factor -7.3
2. 3 3/4" Thick Common Brick: IIC�7.125; R".13; Factor -7.3
8) 1. S§" Concrete Slab: NC"14.106; R".41B; Fictor"7.1
C) 1. 8" Solid Filled Block: '11C•20.63; 9-1.93; Factor -6.1
2. 8" Solid Filled Block With Both Sides Exposed To Conditioned Air.
NOTE: Use all square footage directly exposed to conditioned air
for Thermal Mass Area: HC•10.164; R-.96:; Factor -6.1
D) 1" Thick Concrete/Tile: KC -2.55; R-.083; Factor2-3.7
Table 3-19. Zonally Controlled
Electric Resistance
�Tce Heating Points
1 Points for this measure will I
1 be completed after the CEC !
I has approved an Alternative 1
1 Component Package foc Resistance I
! neat. 1
Table 3-15. Active Solar Space
Heating with Cas Points
1
Net Solar Fraction I Points I
I (NSF), % I I
I I I
I 0-6 I 0
I 7-14 I +2 I
I 15 - 23 I +4 I
I 24 - 30 1 +6 1
I 31 - 39 1 +8 I
I 40 - 47 I ; +10 1
1 48 - 55 I +12 I
56 - 63 I +14 I
I 64 - 71 1 +18 1
I 72 up ! +20 I
I I I
-s.t- v -,n _,__ --_
wood stove #33 points'(no back up)
Casablanca fan + 1 point
Multifamily ( er unitpoints)
Floor Area
Net Solar Fraction (NSF), Z
perunLt,
ft2.
1 CBS Only
I
I
1 Heat Pump (
I
!
0 I
i
I Solar with Electric 1
I
1
Resistance Onckup I
I
0.9
10-19
20-29
30-39
40-49
50-59
60-69
70--79
600-799
800-999
1,000-1,499
1,500-1,999
2.(',()0 and up
0
0
6
0
0
+3
+3
4.2
+1
+1
+7
+5
+4
1 +3
+2
+10
+8
+6
+4
+4
+14
+11
+8
+6
1 4-5
+17
+14
+IO
+7
+6
+21
+16
+12
+8
+7
+24
+19
+14
+10
+9
All others (per builainp pnints)
800-899
0
+5
+10
+14
+19
+24
+29
� +34
900-999
1,000-•1,199
0
0
+4
+4
+9
+7
+13
+11
+17
+15
+il
+19
+26
+22+26
+30
1,2001,499f)
1,500-1,999
2,000-2,'199
0
0
+3
+2
42
+6
+5
+3
+9
+7
+5
+12
+9
+7
+15
+12
+8
+18
+14
+10
+21
+It:
+I1
3,0G0 nr.d uo
0
+:
F]!
+4
+5
4.1!
+S
+10 _1
Table 3-21. Other Water Heating P[S.
T- _�_ I
I System Type I
i
Points I
I
I
1 CBS Only
I
I
1 Heat Pump (
I
!
0 I
i
I Solar with Electric 1
I
1
Resistance Onckup I
I
I MPettnL the Require- )
I
I ments iu Part 2 I
I
0 I
I
I Electric Resistance I
1
I
I 0^.19 i
-40 !