HomeMy WebLinkAbout040-140-01840-14-18. 30-91
LASELL,.,Samuel
9050 Lasell Ln, Durham
Ap, Exemption Permit i
(tractors, implements, puultry f6o
�r a r�
� t � �
• - COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS
` 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE: (916) 538-7541
AGRICULTURAL BUILDING EXEMPTION PERMIT
PERMIT NO.
Agricultural building is defined as follows: Agricultural building is a structure designed and constructed to
house farm implements, hay, grain, poultry, livestock, or other horticulutral products. This structure shall not
be a place of human habitation or a place of employment where agricultural products are processed, treated,
or packaged, nor shall it be a place used by the public.
ASSESSOR PARCEL NO. p
0- '`/ O- O S -- 0 0
ZONING
OWNER
PHONE NO.
r
g \'Oa
OWNER'S ADDRESS
LOCATION OF BUILDING
USE OF BUILDING i 5��0
SIZE OF STRUCTURE v
2 x — C/ SQ. FT.
TYPE OF CONSTRUCTION:
WOOD FRAME—,X—STEEL CONCRETE OTHER (Specify)
TYPE OF SIDING
/"Va 0 J0
ROOF COVERING
Go /)1
FLOOR Y E
e0 04A:1
ESTIMATED COST OF CONSTRUCTION
3-5-0 0. d d
$
AG Buildings shall comply with the building front, side, and rear yard requirements of the applicable County
Ordinances ONT
.4 S
:a —
� y SIDES
REAR
AG Buildings shall be a minimum of five (5) feet from any septic tank or leach fields.
AG Buildings less than 1000 sq. ft. in floor area shall be located a minimum of 6 feet from a residence, 10 feet
frooma mobilehome, and 23 feet from a commercial building.
'/� -
%a �T ZP ''7 A. � ^.aW Lam" ° (� e- v G L n K CJ S- "~'� � . � C
AG Buildings greater than 1000 sq. ft. in floor area shall be located a minimum of 23 feet from a residence and
a mobilehome, and 40 feet from a commercial building.
I declare under penalty of perjury that the building will be used as stated above and the proposed use
conforms with the AG Building definition. If any change in use or occupancy of the building is made, I will
contact the Department of Public Works and will obtain any necessary permits, inspections, and approvals to
comply with the requirements in effect at that time and before occupancy.
Date _ q j Signature of Owner
Permit Fee - $25.00 The above described AG Building is exempt from a building permit.
Receipt No. -23-5-31
Director of Public Works
By Date �'
White - DPW, Yellow - Assessor, Pink - B. I., Goldenrod - Applicant
FLO D ARCEL
P.D. /
R00FJAG
I ISSUE
Director of Public Works
By Date �'
White - DPW, Yellow - Assessor, Pink - B. I., Goldenrod - Applicant
COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS - BUILDING DIVISION
7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE: 916/538-7541
PERMIT APPLICATION DATA SHEET
Permit No.
OWNER s�� PEI-G,A-5F�G L A. P. No.
Proposed Building Use 66491 Building Inspector Date 3
At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance:
DATE RECEIVED APPROVED
1. All items have been submitted . ....................................
- 2. Plot plans in duplicate/triplicate, signed by preparer of plans........
3. Complete plans in duplicate/triplicate, signed by preparer. of plans . .
- 4. Complete engineered plans and calcs, with wet signature on plans ..
5. Hazardous Material Form ......................................... .
- 6. Energy Design Compliance and supporting documentation .........
- 7. Statement of Intent for Non -Heated and AC Buildings ..............
- 8. Engineered truss details and layout in duplicate (required prior to plan check)
- 9. Mobilehome installation data including manufacturer's installation
instructions.......................................................
-10. Fees of $ ........................
_ 11. Chico Urban Area fees paid .......................................
_ 12. Park fees paid ....................................................
_ 13. School District fees paid ..............
14. Sanitation approval from Health Department
15. City of Chico plumbing permit .....................................
_ 16. Plot plan and business license approval from City of
(see City for other requirements)
_ 17. Planning approval for (A) Use: (B) Parking: ......
_ 18. Improvements may be required. Contact Land Development Section DPW
19. Driveway permit (construction approval required prior to occupancy)
_ 20. Pre -Inspection for required Pre-Inspec. request to
Building Inspector (Date)
_ 21. Contractor's license information (No., Name Style, Classifications ...
-22. Certificate of Workmans Compensation Insurance ..................
-23. Owner -Builder Verification (Given to owner ❑, Mail to.owner ❑) .....
-24. Recorded copy of Agricultural Acknowledgment Statement .........
-25. Letter of signature authorization ...................................
-26.
27.
When you issue the permit, process as follows: >e Mail to owner. Mail to contractor.
Telephone and hold for pickup at office. Deliver w/inspector.
Other n 11 ,
Applicant
Date _� _G —,F,/
Copy of Haz-Kot form sent Health Dept. (/Fire Dept. Air Pollution Date
Copy of plans sent Health Dept. Fire Dept. Other Date By
The following data must be submitted prior to permit issuance: (Circle new item not checked above).
1. Index permit for above items No.
2. Additional items required:
Contractor, designer, owner, was advised of above required data by_phone---nail—counter by .date
Contractor, designer, owner, was advised of above required data by—phone _maII—counter by date
Plans checked by Date Plans approved'by Date
Sets of plans on hold in File cabinet AP folder .
Copy—DPW
COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS
7 County Center Drive, Oroville, CA 95965 PHONE: 916-538-7541
Samuel M. Lasell IV
9050 Lasell Lane
Durham, CA 95938
With reference to the above subject:
/ / Attached is:
Application for permit
Building Plans
Engr. Calcs
Owner -Builder Verification Form
OTHER
/ / We need the following information:
DATE larch 7, 1991
agricultural building exemption permit
A.P. 0 040-140-018
Mobilehome Utilities Installation Sheet
Mobilehome Installation Information Sheet
Typical Plan Sheet
List of Codes Enforced
Permit application signed and completed where indicated with all copies returned.
Fees of $ payable to Butte County Treasurer.
Certificate of Workmen's Compensation Insurance or check exemption statement.
Contractor's License Law information or check exemption statement.
Complete plans in including plot plans.
Plot plans in
Structural details in
Complete plans and calcs in by registered engineer or architect.
Energy design including
Street and drainage improvement plan approval from Land Development Section (DPW).
sets of plans in accordance with the changes marked in red.
Sanitation approval from Butte County Health Department at:
196 Memorial Way, Chico
7 County Center Dr., Oroville
Skyway & Elliott Rd., Paradise
Planning approval from Butte County Planning Department, 7 County Center Drive,
Oroville, for
Completed Owner -Builder Verification form.
Recorded copy of deed showing
Recorded copy of agricultural acknowledgement statement.
/,)<7 OTHER Property shoim subject to innundation during 100 year flood on new FEMA maps
Finished flood elevation must be above the loo year flood level. Elevation
must be determined by a Registered Civil Fhgineer with a field reference
established and submitted to us for approval prior to construction and permit
issuance.
Should you have any questions concerning the above, please contact Jim Glander
of this office.
JFG/aj
Yours very truly,
William Cheff
Director of Public Works
J.F. Glander
Chief Building Inspector
COUNTY OF BUTTE �.
• Department of Public Works
l 7 County, Center Drive
• Oroville--=--534-4541
ELECTRICAL INFORMATION FOR DE -RATING MOBILEHOMES
Owner
Location
Mobilehome Installation Permit No
FILL IN INFORMATION FOR ITEMS 1 THRU 10 t t
Watts
1. Width x Box Length x 3
2. 2 Kitchen Appliance Circuits ................. = 3,000
3•: 'l Laundry Circuit ............................ = 1,500
4. Ovens
5. Cook Stove Top ..... _
6. Hot Water Heater .............. .. _
7. Dishwasher & Disposal =
8. Clothes Dryer ................................ _
9. Other (specify, i.e., motors, exhaust fans,
etc.) '
Sub -total - Watts .....
First 10,000 watts @ 100% ...........I .................. _ ' 10,000
.i
Remaining watts @�40% ....................... _
10. Air Conditioner watts @100%.. _ )
Largest • Demand
Central -Heat System watts @ 65%..-= )
TOTAL DEMAND WATTS REQUIRED
"Demand Watts Required" - 230 ......... .. AMPS
De -rate Mobilehome to ....................... AMPS
�I-e bu (l, o ! N G
w (7-C-4 t1J o s 1(,�
�Q
ve
Ule-L'i
S)D
YX(
C6, y
,� y GvbsS