Loading...
HomeMy WebLinkAbout040-140-079SWIMMING POOL EQUIPMENT ELEVATION CERTIFICATE O.M.B. No. 3067-0�7 FEDERAL EMERGENCY MANAGEMENT AGENCY Expires July 31, 1999 NATIONAL FLOOD INSURANCE PROGRAM ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to pro- vide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR). You are not required to respond to this collection of information unless a valid OMB control number is displayed in the upper right corner of this form. Instructions for completing this form can be found on the following pages. SECTION A PROPERTY INFORMATION FOR, INSURANCE COMPANY USE BUILDING OWNER'S NAME LESTER & LISA CALVERT POLICY NUMBER STREET ADDRESS (Including Apt., Unit, Suite and/or Bldg. Number) OR P.O. ROUTE AND BOX NUMBER 9761 Lo t.'t Road COMPANY NAIC NUMBER OTHER DESCRIPTION (Lot and Block Numbers, etc.) CITY Durham STATE ZIP CODE CA 95938 SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION Provide the following from the proper FiRM (See Instructions): 1. COMMUNITY NUMBER 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE 060017 520 C 6/08/98 AE 6. BASE FLOOD ELEVATION (in AO Zones, use depth) 170.8 t. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): ® NGVD `29,' ❑ Other (describe on back) 8. For Zones A or V, where no BFE is provided on the FiRM, and the community has established a BFE for this building site, indicate the community's BFE: L I I I I (. ❑ feet NGVD (or other FIRM datum—see Section B, Item 7) SECTION C BUILDING ELEVATION INFORMATION 1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best describes the subject building's reference level R_ 2(a). FIRM Zones Al -A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation of L I It 17I feet. NGVD (or other FIRM datum -see Section B, Item - (b). FIRM Zones V1 430, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the selected diagram, is at an elevation of I I I I I I ,❑ feet NGVD (or other FIRM datum—see Section B, Item 7). (c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is (_I J .❑ feet above ❑ .or below ❑ (check one) the highest grade adjacent to the building. (d). FIRM Zone AO. The floor used as the reference level from the selected diagram is ❑J.❑ feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference level) elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No E] Unknown 3. Indicate the elevation datum system used in determining the above reference level elevations: ❑ NGVD '29 ❑ Other (describe under Comments on Page 2). (NOTE: if the elevation datum used in measuring the elevations is different than that used on the FIRM [see Section B, Item 7], then convert the elevations to the datum system used on the FIRM and show the conversion equation under Comments on Page 2.) 4. Elevation reference mark used appears on FIRM: ,K Yes El No (See Instructions on Page 4) 5 The reference level elevation is based on: ❑ actual construction X construction drawings (NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which case this certificate will only be valid for the building during the course of construction. A ;Dost -construction Elevation Certificate will be required once construction is complete.) 6. The elevation of the lowest grade immediately adjacent to the building is: L .lam��II Section B, Item 7). feet NGVD (or other FIRM datum see SECTION D COMMUNITY INFORMATION 1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1 is not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest floor" as defined by the ordinance is: 1 I I 1 1 I.❑ feet NGVD (or other FIRM datum—see Section B, Item 7). 2. Date of the start of construction or substantial improvement FEMA Form 81-31, MAR 97 REPLACES ALL PREVIOUS EDITIONS SEE REVERSE SIDE FOR CONTINUATiONV SECTION E CERTIFICATION This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation information when the elevation information for Zones Al -A30, AE, AH, A (with BFE),V1—V30,VE, and V (with BFE) is required. Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the certification. In the case of Zones AO and A (without a FEMA or community issued BFE), a building official, a property owner, or an owner's representative may also sign the certification. Reference level diagrams 6, 7 and 8 - Distinguishing Features -if the certifier is unable to certify to breakaway/non-breakaway wall, enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered. I certify that the information in Sections B and C on this certificate represents my best efforts to interpret the data available. I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. CERTIFIER'S NAME LICENSE NUMBER (or Affix Seal) C.W.BACHMAN nr•ILI uI cof% HILI professional engr coMPANYtWtHMAN & ASSOCIATES ADDRESS CITY l STATE ZIP 13647 Garner Lane Chico CA 95373 SIGNATOR DATE PHONE 5/05/00 342-4136 Copies should be made of this Certificate for: 1) community official, 2) insurance agent/company, and 3) building owner. COMMENTS: CIVIV F CONS ON WITH ON PILES, SLAB BASEMENT PIERS, OR COLUMNS ZONES ZONES ZONES ZONES ZONES REFEREFERENCE RENCE BASE LEVEL REFERENCE LEVEL . FLOOD 'LEVEL ELEVATION BASE BASE FLOOD ADJACENTREFERENCE FLOOD GRADE ""'" LEVEL ELEVATION ELEVATION REFERENCE ADJACENT 16 3 r ws ADJACENT:;'. GRADE ' The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones. Elevations for all A Zones should be measured at the top of the reference level floor. Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. r CIVIV F CONS ON WITH ON PILES, SLAB BASEMENT PIERS, OR COLUMNS ZONES ZONES ZONES ZONES ZONES REFEREFERENCE RENCE BASE LEVEL REFERENCE LEVEL . FLOOD 'LEVEL ELEVATION BASE BASE FLOOD ADJACENTREFERENCE FLOOD GRADE ""'" LEVEL ELEVATION ELEVATION REFERENCE ADJACENT LEVEL GRADE - ws ADJACENT:;'. GRADE ' The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones. Elevations for all A Zones should be measured at the top of the reference level floor. Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. r Page 2 I ire Department of Development Services Building Division 7 County Center Drive Oroville, CA 95965 (530) 538-7541 (530) 538-2140 FAX Residential Construction Requirements IMPORTANT This set of plans and specifications MUST be kept on the job site at all times and it is unlawful to make any changes or alterations on same without written permission from the Building Division, County of Butte. All materials and workmanship shall be in accordance with recognized good practices and of a quality prescribed for the specific use in the 1998 California Building Code (1997 U.B.C.), 1998 California Plumbing Code (1997 U.P.C.), 1998 California Mechanical Code (1997 U.M.C.), and the 1998 California Electrical Code (1996 N.E.C.) COMPLY WITH ITEMS INDICATED BELOW Your parcel lies within a designated 100 -year flood plain. Finish floor, electrical, H.V.A.C. equipment and services shall be a minimum of one foot above the elevation shown on the attached Flood Elevation Certificate. A Post Flood Elevation Certificate will also be required Note: We will normally accept the following as compliance with the flood elevation requirements: 1. Building is anchored to concrete stemwall system with conventional anchor bolts. 2. Building plate on top of stemwall to be one foot or more above the 100 -year flood elevation. (Plate height less than 24" above grade, or engineered design required). 3. Electrical, heating, ventilation, plumbing and air conditioning equipment and facilities located above the plate. 4. At least 2 openings in exterior walls, located on opposite or adjacent walls with a total net area of not less than 1 square inch for every square foot of enclosed area. 5. The bottom of the openings shall be no higher than 1 foot above grade. 6. The openings may be screened or covered with other devices that will permit automatic entry and exit of floodwater. All structures and equipment including overhangs shall be clear of all easements. A setback of 30' from the side and 30' from the rear property lines and 20 feet (25 feet if Federal Aid Route) from the edge of the right of way shall be clear of structures and equipment except for a 2 foot overhang. Expansive soil may be encountered on this site. This condition may require the foundation to be designed by a California registered engineer or licensed architect. Page 1 of 1 Owners Name: Lester Calvert Building Permit Number: 00-0904 Plans Examiner: Glenn Gibbons