Loading...
HomeMy WebLinkAbout041-210-05241-21-52 105-90 WARREN, JAmes & Patricia s/s Hwy 149;, 1st drive W of ,Hwy 70 'Q A Ex t ' hay storage) t i COUNTY OF BUTTE - p EP RTMENT OF PUBLIC WORKS 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE: (916) 538-7541 AGRICULTURAL BUILDING EXEMPTION PERMIT PERMIT NO. ✓b5= 15�D Agricultural building is defined as follows: Agricultural building is a structure designed and constructed to house farm implements, hay, grain, poultry, livestock, or other horticulutral products. This structure shall not be a place of human habitation or a place of employment where agricultural products are processed, treated, or packaged, nor shall it be a place used by the public. ASSESSOR PARCEL NO. q/i�/ _ FLOOD ZONING ' 1 OWNER� pams_� rr�e ROOFING PHON NO. — 494 6 WNER'S ADDRESS v'O— 0 53q - Q /� L �o�S LOCATION OF BUILDI G I� S Y-) V I cwt l� USE OF BUILDING SIZE OF STRUCTURE k ('{ v 'X �O _ SQ. FT. TYPE OF CONSTRUCTION: WOOD FRAME 'STEEL CONCRETE OTHER (Specify) TYPE OF SIDING ROOF COVERI FLOOR TYPE ESTIMATED COST OF CONSTRUCTION $ 2. AG Buildings shall comply with the building front, side, and rear yard requirements of the applicable County Ordinances as follows: , S I S FRONT ^� SIDES S REAR AG Buildings shall be a minimum of five (5) feet from any septic tank or leach fields. AG Buildings less than 1000 sq. ft. in floor area shall be located a minimum of 6 feet from a residence, 10 feet from a mobilehome, and 23 feet from a commercial building. AG Buildings greater than 1000 sq. ft. in floor area shall be located a minimum of 23 feet from a residence and a mobilehome, and 40 feet from a commercial building. I declare under penalty of perjury that the building will be used as stated above and the proposed use conforms with the AG Building definition. If any change in use or occupancy of the building is made, I will contact the Department of Public Works and will obtain any necessary permits, inspections, and approvals to comply with the requirements in effect at that time and before occupancy. Date�� f -1 � D Signature of Owner lLid i WA— Permit Fee - $25.00 The above described G Building is exempt from a building permit. "Ieceipt No.l�.if�) 0 White - DPW, Yellow - Assessor, Pink - B. I., Goldenrod - Applicant Director of Public Wor i By #e FLOOD PARC P.D. ROOFING ISS I Director of Public Wor i By #e J4 COUNTY OF BUTTE - DEPARTIINT'QF PUBLIC WORKS - BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE: 916/538-7541 PERMIT APPLICATION DATA SHEET Permit No. OWNER 1 A. . No. �— Proposed Building Use a -e Building Inspector Date i ir At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED APPROVED 1. All items have been submitted . .................................... 2. Plot plans in duplicate/triplicate, signed by preparer of plans ........ 3. Complete plans in duplicate/triplicate, signed by preparer of plans .. 4. Complete engineered plans and calcs, with wet signature on plans .. 5. Hazardous Material Form .......................................... 6. Energy Design Compliance and supporting documentation ......... 7. Statement of Intent for Non -Heated and AC Buildings .............. 8. Engineered truss details and layout in duplicate (required prior to plan check) 9. Mobilehome installation data including manufacturer's installation instructions....................................................... 10. Fees of $ ........................ 11. Chico Urban Area fees paid ....................................... 12. Park fees paid .................................................... 13. School District fees paid .............. 14. Sanitation approval from Health Department 15. City of Chico plumbing permit ..................................... 16. Plot plan and business license approval from City of (see City for other requirements) 17. Planning approval for (A) Use: (B) Parking: ...... 18. Improvements may be required. Contact Land Development Section DPW 19. Driveway permit (construction approval required prior to occupancy) 20. Pre -Inspection for required Pre-Inspec.request to Building Inspector (Date) 21. Contractor's license information (No., Name Style, Classifications ... 22. Certificate of Workmans Compensation Insurance .................. 23. Owner -Builder Verification (Given to owner ❑, Mail to owner ❑) ..... 24. Recorded copy of Agricultural Acknowledgment Statement ......... 25. Letter of signature authorization ................................... 26. 27. Whpou issue the r It, rocess as follows: Mail owner. Mail to contractor. v Telephon , W % and hold for pickup at 6� office. Deliver w/inspector. Other Y7.7–� Applicant Date Copy of Haz-Mat form sent Health Dept.. Fire Dept. Air Pollution Date Copy of plans sent _Health Dept. Fire Dept. Other Date By The following data must be submitted prior to permit issuance: (Circle new item not checked above). 1. Index permit for above items No. 2. Additional items required: Contractor, designer, owner, was advised of above required data by_phone---jnail_counter by ..date Contractor, designer, owner, was advised of above required data by—phone —ma II—counter by date Plans checked by Date Plans approved by Date Copy—DPW Sets of plans on hold in File cabinet AP folder