Loading...
HomeMy WebLinkAbout047-330-037M.; ol I f iZ--D" __ IZ' L�Ilhbl-f ,I a ,IV i f iZ--D" __ t r. : t I Y: 'S B i NorthStar Engineering r Civil Engineers • Planners • Surveyors " April 24, 1989 County of Butte Building Department 7 County Center D�vve, z: Oroville, CA. 95965 Attn.4, 'Dave Re: Addition for Tomer Duerr 22 Raintree Lane, Chico - Gentlemen: Per the request of Mr. Mike hart, the contractor, I reviewed the construction of the existing concrete block wall: within the above referenced building addition, The wall in question was probably not: built: under permit~ but is proposed to be -included as in integral part of the completed structure. Because there are no records for the wall it. was not possible to tell. if any or all of the cells were grouted and 'if the wall had the structural integrity to support the loads that are proposed. It should be noted that the only loads in question are vertical. and there s'ho'uld not be any additional horizontal loads applied to the wall. pp On Friday, April 21., 1989, I inspected the wall in question and found that the contractor had bored numerous 'holes into the cells to verify if they were indeed grouted solid. The contractor found that some cells were grouted and. some cells were empty. The contractor a.ttempt.ed to grout the empty cells, but with, very little " success.. Upon my inspection, x found that there was a pattern to the grouted cells. Horizontal rows of cells at the top, at the middle, and at the bottom are grouted solid as well as vertical columns every four feet. .'herefore, ? k is my opinion khat the Wall is satisfactory and' their it is not necessary to grout any additional cells Please feel free to contact 'th.is office if you have any questions, or if you require additional information: Sincerely, A N4R"I'H9TAR ENGNEECtING �U e4l, No. C34257 Mark Adams RCE 34257 Exp. 9-30--91. 20 De, claration prive R Chico, CA 95926 OF cA (91 b) 893-1 600 ;br wt.