HomeMy WebLinkAbout047-530-004oo� I
6q 1
47-53-4
SCOTT & DENISE WHITING
S/S Shorthorn Dr 5p' W Simmental r
lot 4.2, Chico
Contr: Western SSerkrA�rajCbms truct on C
Permit1/Ql33-83B$,E'M'(new single f;mi�'c
Y)
047-530-004 01-1999
NELSON, MARK & KIM
4251 SHORTHORN DR. CHI 0
CONT: NEIL COLLINS 1111,0;t
ADDITION OF FAMILY 7OMt
647-530-004 01-2394
NELSON, MARK
4251 SHORTHORN, CHICO
CONT: -NEIL COLLINS
REROOF & ROU�-94-OUNT-SJOLA
-IN
047-530:�004 02-1185
NELSON, MAR.K
4251 SHORTHORN DR., CHICO
�CONT: , NEALCOLLINS Jv
'ADDITION & REMODEL
�047-530-004 0:
NELSON, MARK
4251 -SHORT -HORN, CHICO
CONT: OWNER (�IN
YNSTALL SUB PANEL
m
047-S
owl
047 -530 -004 -
NELSON, MARK
.4251 SI4ORTHORN,.CHICO
CONT: OWNER
INSTALL S'U'B PANEL
00,
4ft
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive - Ciroville, California 95965 * Telephone (530) 538-7541 PERMIT NO.
07.,.,
(Rev. 12/96) APPLICATION AND PERMIT 0 (y
ASSESSOR PARCEL NUMBER OL11 .93'5 0 .00 (4
1 ZONING
BUILDINGPERMIT
OWNER ISO" I jol
I Wo
MNE 101
00
SQ. FT. OCC. BUILDING VALUATION
OWN7�n k ;�DRE)S 49:)h . 1) Ch 0) W3
CONTRACT)pr
TELEPHONE
CONTRACTOWS MAJUNG ADDRESS
CONSTRUCTION LENDER
Fireplace
LENDER'S MAJUNG ADDRESS
Total Valuation $
ARCHITECT OR ENGINEER
LICENSE NO.
Filing Fee
20.00
Permit Fee
$
ARCHITECT OR ENGINEERS MAIUNG ADDRESS
Plan Checking Fee
$
BUiLDINGADDRESS q-1,151 'Shorhoyn 01 f(9 �575
Energy Plan Checking Fee
$
PERMIT FEE
$
LOT NO.
SU8DNtSiOWS NAME
PARCEL MAP
PLUMBING PERMIT
Filing Fee 20.00
USEOFSTRUCTURE
SF 0 Duplex 0 Mobilehome 0 Other
SPECIFY
Each Trap
1 7.00
-
Solar or heat pump water heater
23.00
Water piping
15.00
Each gas water heater or vent
15.00.
TYPE OF WORK
New 0 Addition 0 Remodel 0 Utilities 0 Installation 0 Other 0
Describe Work:
—Gas piping system I - 5 outlets
15.00
Building sewer
15,19 . 0
Mobile Home I S I G I W
926"0 P
PERMIT FEE
$
V
ELECTRICAL PERMIT
Filing Fee 20-00
Main Service '...v OoR. '..,ss
23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.
License Class Lic. No.
OWNER -BUILDER DECLARATION
1 hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason: r.
El"I" 1, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
0 1, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
0 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO 1000A
46.00
NEW CONST. DW
OR ADDNS. .%IN0 ffUP.
ACC S.
0.
3.5,s
FT.
0
=ESIDT
@7.50
OWELR *AP= US
PSIN. E . CIR.
Ex. Occup. OUTLET OR FIXTURES
20 @ 1.00
BAL @ .50
Ex. Occup. ..F"ED A
5.00
Temporary Service
23.001
Mobile Home Facilities
20.00
Misc. Wiring
23.00
PERMIT FEE
LJ L)U
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:
0 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
0 1 have and will maintain workers' compensation Insurance, as required by Section
3700 of the Labor Code, forthe performanceof work for which this permitis issued.
My workers' compensation insurance carrier and policy number are:
Carrier
MECHANICAL PERMIT
Filing Fee 20.00
Heating
Cooling
Hood
6.50
Ventilation
PERMIT FEIE
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
of one hundred dollars ($100) or less.)
EI I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
4g,e Date
X I . - - .-- -.— — . ,
Signiitur of Applicant - 0 Owner O'Contractor 0 AgenF_
An OSHA permit is required for excavations over 60" deep and demolition or construction
of structures over 3 stories in height.
;eq— ;:ik
Mobile Home Installation Fee
$
Energy Inspection Fee $
Occ
CONST. TYPE
TOTALFEE$ 9 >
HAZ.
I D. FEES IMP
I FLOOD
I CDF
PARCEL
po'
HD
ISSUE
This permit is hereby issued under
of the Butte County Code and/or
indicate_d above for� s have
By
- ZF
PERMIT EXPIVEIS ON
I
the applicable provisions
Resolutions to do work
been paid.
Date 0
t U e- o
(Da to)
ReceiptNo. :v �:I—IVZW L4 LA -)
WHITE-D.D.S.-B.D. -CANARY-ASSE.SSOR PINK -INSPECTOR GOLDENROD -APPLICANT
COUNTY OF BUTTE
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES;,
411 Main Street - Chico, CA - (530) 891-2751 1
7 Cobnly Center Drive * Oroville, CA - (530) 538-7541
CORRECTION NOTICE
AIA -so v-) 0 (0 Z,
OWNER PERMIT NO.
A routine inspe'ctiodicates that the following violations of - butte county Ordinances exist at the
above address d should be corrected. Please notice this office when correction of work is
completed. you have any questions pertaining to th need additional explanation,
p p WKX 's 'c'
lease tact this office i
le�
-4(
r -r 10/
KP Aff 1X0 I c -/J/ I" X
-AL
/7111
Datex-v— Inspector
REV 10/92
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive Oroville, California 95965 * Telephone (530) 538-75AI- PERMIT NO.
(Rev. 12/96) AP . P . LICATIONANDPERMIT (f�- _03
ASSESSOR PARCEL NUMBER 0 L11 .9515 C)o L/
ZONING
BUILDINGPERMIT
OWNER
4;E 01
SO. Fr. OCC. BUILDING VALUATION
OWNER27�U
,7,FSEJS
CONTRAC�
TELEPHONE
CONTRACTOWS MAILING ADDRESS
CONSTRUCTION LENDER
LENDER'S MAJUNG ADDRESS
Fireplace
Total Valuation
ARCHITECT OR ENGINEER
LICENSS NU.
Filing Fee
20.00
Permit Fee
ARCHITECT OR ENGINEEWS MAILING ADDRESS
Plan Checking Fee
BUILDING ADDRESS 01 ITV
Energy Plan Checking Fee
_T�
PERMIT FEE
$
LOT NO.
SUBDrVISIOWS NAME
MAP
PLUMBING PERMIT
Filing Fee 20.00
USEOFSTRUCTURE
SF 0 Duplex 0 Mobileho I me 0 Other SPECIFY
Each Trap
7.00
Solar or heat pump water heater
23.00
Water piping
15.00
---
Each gas water heater or vent
15.00
TYPE OF WORK
New 0 Addition 0 Remodel 0 Ulilities 0 Installation 0 Other 0
Describe Work:
GK�2 �AALA
Gas piping system I - 5 outlets
-
00
Building sewer
—15.
15.00
Mobile Home I S I G 1
(9?20.00
PERMIT FEE
$
ELECTRICAL PERMIT
Filing Feel 20.00
600V 0" LE
:SS
Main Service .A OR LESS
23.001
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.
License Class Lic. No.
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
LaViar the following reason:
(9 .1, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
,0 1, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
0 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO I OOOA J
46.00
NEW CONST. DW
,"NO UP-
OR ADDNS. S.
ACC. ��
sa
3.50FT.
NEW CONST. ET
NONRESID. MzLCT.10.UTL.
97.50
OWER AP=TU
IPSIN.. 0 SIR.
Ex. Occup. OUTLET OR FD(TURES
20 @ 1.00
BAL 0 .50
OFIXED APPLNS OR
Ex. Occup. UTLETS Ek
5.001
Temporary Service
23.00
Mobile Home Facilities
20.00
Misc. Wirino
23.00
PERMIT FEt-
$
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:
0 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
0 1 have and will maintain workers' compensation Insurance, as required by Section
3700 of the Labor Code, for the performance of work for which this permit is issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
of one hundred dollars ($100) or less.)
21*11, certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
X Date T 03
Sign -61L!4 of Applicant - 0 Owner D-Coniaci®r 0 Agerif"
An OSHA permit is required for excavations over 60" deep and demolition or construction
of structures over 3 stories in height.
MECHANICAL PERMIT
Filing Fee 20.00
Heating
Cooling
Hood
6.5
Ventilation
PERMIT FEIE $
Mobile Home Installation Fee $
Energy Inspection Fee $
occ
CONST. TYPE
TOTAL FEE $ UX-)
IMP
I FLOOD
I CDF
PARCEL
PD
I D
This permit is hereby issued under
of the Butte County Code and/or
indic Itabove f es have
F
By )n
PERM'IT EXPIWS ON
I
the applicable provisions
Resolutions to do work
been paid.
Date 0
Li
ReceiptNo. 50 777ULT -5 - Lu
WHITE-D.D.S.-B.D. -CANARY-ASSMSOR PINK -INSPECTOR GOLDEN ROD -APPLICANT
'fin
Dec 17 02 11:38a
P -
I - OW-NER-.BUILDER VERIFICATION I
Attention Property Owner:
An "owner-buildee' building permit bas been applied for in your name and bearing Your signature.
Please complete and return this information at your earliest opportunity to avoid unnecessazy delay
in processing and issuing your building permit. No building permit will be issued until this
verification is received.
Af_�l personally plan to provide the or labor and materials for construction of the proposed
properlyimp vement: YES Noo
I HAVE 71EL&VE NOT 0 signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction:
NAME: -
ADDRESS: —CITY:
PHONE: CONTRACTOR'S LICENSE NO.
4. 1 plan to provide portions of this work, but I have hired the following person to coordinate,
supervise, and provide the major work:
MIKE:—
ADDRESS:' CITY:
PHONE: CONTRACTOR'S LICENSE NO.
5. 1 will provide some of the work but I have contracted (hired) the -followmg Persons to provide
the work indicated:
NAMM ADDRESS PHONE TYPE OF woRK
SIGNED:
PROPERTY0WNFR,-)<:37-"
DATE:
AIO TE.- This Own er-Builder Verirication is required by Section 19831 and 1.9832 of the
California Health and Safety Code. TIzis verif,"cation must be completed and
returned to our office before we are permitted to issue the permit.
OVER
Dec 17 02 11:37a
P. 1
Dear Property Owner:
An application for a building permit has been submitted in your name listing yourself as the' builder of
property improvements specified.
For your protection, you should be aware that as "owner -builder" yon are the responsible party of record
on such a permit Building permits are not required to be signed by property owners unless they are personally
performing their own work. If your work is being performed by someone other than yoursel4 you may prov=t
yourself from possible liability -if that person applies for the proper permit in his or her name.; ' -
Contractors are required by law to be licensed and bonded by the State of California and to have a
business license from the city or county. They am also required by law to 'put their license number on all permits
for which they apply.
If you plan to do your own work with the exception of various trades that you plan to subcontract� you
should be aware of the following information for your benefit and protection:
0 If you employ or otherwise engage any persons other than your immediate funily. and the work (including
materials 'and other costs) is $300 or more fbr the entire prqject� and such persons are not'licensed as
contractors or subcontractors, then you may be an employer.
0 If you are an employer. you must register with the State and Federal Governments as an employer and you are
subject to several obligations including state and federal income tax withholding, federal social security taxes,
workers compensation insurance, disability insurance costs, and unemployment compensation contributions.
0 There may be financial risks fbr you if you do not carry out these obligations, and these risks are, especially
serious with respect to worker's compensationiinmirazice.
0 For more specific information about your obligations under Federal Law, contract the� Internal Revenue
Service (and. if you wish, the U.S. Small Business Administmdon). For more specific informat'ion about your
obligations under Staite Law. contact the Department of Benefit Payments and the Division of industrial
Accidents.
if the articture is intended for sale, property owners who are not licensed contractors are allowed to
perform their work personally or through their own employees, without a licensed contractor or stg=ntractor, only
under limited conditions.
A ftequent practice of unlicensed persons professing to be contractors is to secure an
building permit erroneously implying that the property owner is providing his or her own labor and material
personally. Building permits are not required to be signed by property owners unless they are perfbrming their own
work personally.
Information 'about licensed contractors may be obtained by contracting the Contractors State License
Board in your community or at 1020 N Stree4 Sacramento, CA. 95814.
Please complete the 'X)wner Builder Verification" on the reverse side of this fbrin so that we ca'n confirm
tha you are aware of these matters. The building permit will not be issued until the verification is returned.
S�inaxel
Michadl. C. Vieffia, C.B.O. ,
Manager, Building b#ecLn"
NOTE: This Owner -Builder Information is required by Section 19830 of the California Hz�lth and Safety Code.
OVER
NOTES RESIDENTIAL
1047-530-004 C�eF2-1185
PERMIT NO,NELSON, MARK
4251 SHORTHORN DR., CHICO
ctv" &eve, CONT: NEAL COLLINS
ADDITION & REMODEL
&�cc"L
I -
11
i
SPECIAL CONDITIONS
CHECKED
, /", m B Y
SRA
— FLOOD CERTIFICATE REQ.
— FIRE SPRINKLERS REQ.
— SPECIAL INSPECTION ITEMS
VERIFY
USE PERMIT CONDITIONS
SUB -STANDARD HOUSING LETTER
q14_L
JOB FINALED (Date)
Signature-
V= OK
0 - Not OK
Not Applicable MOBILE HOMES
Not Ready'
Date MOBILE HOME UTILITIES (Plans) OK except It's
1 . Zoning Requirements -Setbacks- Easements
2. SoIls; Special MH Support Sketch
3. Sewer; Location -Test -Fall -C/0 -Concrete
4. Water; Localion-Test- Easement Needed (Sketch)
5. Electricity; Location-Clearances-Grnd-/ /Amp -Concrete
6. Gas; Location -Test -Wrap;-/ /" L 'ft.
P Nat. or/ /"L"ft./ PLPG
j
7.
Well Clearance & Discohnect
Date
8.
Utility Clearance
2.
Footings; Soils- S ize- Depth- S pacing -Con nectors- Steel
3.
Decks; Girders and/or Joists-Decking-Bracing-Slairs- Rails
Date
Wood Awn.; Posts- Beams- Rftrs. -Connectors
Shlhg.-Frg-Bracing
Card B-1 Date Card B-1
Date
Alum. Awn.; Colu mns-Connections- S plice- Decal- Enclosures
Card B-1 Date Card B-1
Date
MOBILE HOME INSTALLATION (Plans) OK except #'s
1 .
Zoning Require me nts-Setbacks- Easements
2.
Footings; Size- Spacing -Marriage Line
3.
Gas; MH Test -Demand -Valve -Connector
4.
Electricity; MH Test -Crossovers -Breakers -Clearances
5.
Drain; MH Test -Fall -Flex Connector
6.
Water; MH Test- Regu lator-Connector
7.
Water and Sewer Connected -C/O to Grade -HD Approval
Date
8.
Gas and Electricity Tagged
Date
9.
Tie Downs -Type -Installation Cert.
Date
10.
Exits; Insp.-Sketch
11.
Cert. of Occupancy
12.
Permanent Foundation Only; License Decal
3.
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
Date
4.
Card B-1 Date Card B-1
Date
5.
Card B-1 Date Card B-1
j
MISCELLANEOUS
Date
DECKS, COVERS, CARPORTS GARAGES (Plans) OK except It's
1. Zoning Requirements-Selbacks-Easements
2.
Footings; Soils- S ize- Depth- S pacing -Con nectors- Steel
3.
Decks; Girders and/or Joists-Decking-Bracing-Slairs- Rails
4.
Wood Awn.; Posts- Beams- Rftrs. -Connectors
Shlhg.-Frg-Bracing
5.
Alum. Awn.; Colu mns-Connections- S plice- Decal- Enclosures
6.
Carports; Windows -Doors
7.
Electric
8.
Frmg.; S i Ils-Anchors- Studs- Rttrs-Trusses
9.
Siding; Nailing-Vene er-Stucco- Mesh
10.
Roof; Shlhg-Roofing
11.
Ext.; Steps -Doors -Landings
12.
Braced Wall Panels
Date
Card B -A Date Card B -IN v- r
Date
Card B-1 Date Card B-1
Date
FINAL (Plans) OK except #'s
1
. Setbacks- Ease menis
2.
Soils; Compaction -Structure Stability
3.
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
4.
Elec.; Receptacles and Lighting, Distance-GFI
5.
Elec.; Pool Lighting; 15 Volts-GFI
6.
Elec.; Enclosures; Conduit Entries -Terminals -Listed
7.
Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater
8.
Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg.
Boxes- Enclosure s- Panelbo'ards- Ins. to Main in Conduit
9.
Health Department Approval
10.
Plumb.; Cir. Tesl-Waler Supply Test
0
11.
Light Niche
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
V= OK
0 = Not OK
- = Not Applicable
= Not Ready RESIDENTIAL (Single & Duplex)
Date UyAerfloor (Plans) OK except #'s
11 ,Z'o n i r%gS etbacks- Easements- Flood -Slope
Main; Soils-Elec. Grnd.-/42/" Ftg. Depth
3. Ftg., Garage: Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth
4. Ftg., Porches & Decks; Soils -Steel-/ r Ftg. Depth
5. Sternwalls, Main; Steel- Blockouts-Wrapped
6. Stemwalls, Garage; Steel- Blockouts-Wrapped
6a. Hold Downs and Special Anchors
41. Walls Studs -Nailing Spacing & Braces- P lales-Sou nd
42. Bearing Walls over Girders & Floor Nailing
43. Draft Stop in Walls (rat proof)
44. Fire Stops, Furred Ce i li ngs- Stairs- Chase rs-Tubs
45. Headers & Beams -Size & Bearing
Date
7.
Slab, Steel -Wrapped
Hangers -Post Caps -Anchors -Connectors
8.
Piers -Fireplace Ftg.-Steel
48.
Fireplace Ties or Type A Fl ue- Fireplace Throat Clearance
D W V, Fall- Fitting -Test -2 Way C/0 -Sewer Test
Attic Access; Size & Romex Protection- Draft Stop -Ins. Baffles
10.
UF, Gas Pipe; Size Anchors - Yard Gas Piping; Size Test
11.
Water Pipe; Test -Anchors -Regulator -Service Test
12.
Electric Underground
13.
Plenumj,&�cts; Clearance.Materi'al-S�Wport-ins.
o�- 14.
Giee'rs-Sills-Anchor Bolts-Jots�ents-CripR�§�
15.
Access & Ventilation
16.
Insulation
Date 4Z
74 3,
Card B-1 Date Card B-1
Date
Date Card B-1
Date
PLUMBING (Permit) OK except #'s
17.
Water Htr.; Vent -Access -Combustion Air Baffle
18.
Water Pipe; Test & Anchor -Nail Protection
19.
D.W.V.; Test Fittings & Anchor -Nail Protection
20.
Shower Pan; Test, First Floor -Tub Access
21.
Test Tub & Shower, Second Floor -Tub Access
22.
Gas Pipe; Sixe & Anchors
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
ELECTRICAL (Permit) OK except #'s
23.
Fixture & Transformer Clearance -Ins. Protection
24.
Elec. Receptacles Spacing -Lights & Switches at Doors
25.
Size Boxes & No. of Conductors Stapled
26.
Romex Installed Close to Edge of Studs & C.J.
27.
Equip. Ground made up w/Mech Fasteners -Bond Gas & Water
28.
2 Appliance Circuits in Kitchen & Conductor Size GFI
29.
Subfeed Wire Size / ga. Cu or M-A.C. Wire Size / I ga Cu or AJ
30.
Range Circle / ga Cu or Al -Oven Circ. / / ga Cu or Al
Insulated Neutral Q Yes C) No
31.
Service -Riser Conductors & Ground Main Disconnect
32.
Equip. Clearances Panels-Motors-Mech. Equip.
33.
Clothes Closet Light -Shower Lighl-Spa Light
34.
Smoke Detector
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
MECHANICAL (Permit) OK except ff's
35.
A.C. Ducts Insulation & Support
36.
Vent Fan, Exhaust above insulation
37.
Condensate Drain & Overflow, Size & Grade
38.
Furnace-Veni Access -Comb. Air -Return Air Vent 115 outlet
39.
Attic Access & Platform if Furnace in Attic
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
FRAMING (Permit) OK except #'s
40.
Sits Proper Materials & Anchors
41. Walls Studs -Nailing Spacing & Braces- P lales-Sou nd
42. Bearing Walls over Girders & Floor Nailing
43. Draft Stop in Walls (rat proof)
44. Fire Stops, Furred Ce i li ngs- Stairs- Chase rs-Tubs
45. Headers & Beams -Size & Bearing
Date
FRAMING (Continued)
46.
Hangers -Post Caps -Anchors -Connectors
47.
Cling. Joist-Rftr. Ties- Pu rlin- Roff Brac.,,Truss-Shting.-Rfng.
48.
Fireplace Ties or Type A Fl ue- Fireplace Throat Clearance
49.
Attic Access; Size & Romex Protection- Draft Stop -Ins. Baffles
50.
Bdrm. Windows or Exiting Doors -Sill Ht. & Dimensions
51. Garage Fire Protection Framing
52. Property Line Firewall & Openin%
53. Ext. Doors -One 3' -Check Garage �rd Story, 2 Exits
54. Stairs; Width -Head room- Rise- Run -Landing- Fire Protection
55. Plywood on Root Overhang -Attic Vents -Rafter Outriggers
56. Siding -Nailing Veneer
57. Stucco Mesh -Drip Screed -Fd. Vents-Underflr. Access
58. Glazing Area -Glass Protection -Skylights- Plastic
59. Shear Walls; Nailing -Bolts
60. Brace Interior/Exterior Wall Panels
61. Insulation -Walls -Ceilings
62. Infiltration -Walls -Windows
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date FINAL (Plans) OK except #'s
j y;K)ESteps- Door & Sidelight Protection- Landings
0 Smoke Detector
07-PUrnace Vents -clearance- Comb, Air -Connector -
In Garage; Above Floor- D ucts-Mech. Protection
,66_4�mftoom Exiting
qW,9-'� F 1. & Bath Fixtures & Tub Access -Spa
00-Efec. Trim & Subpanel, Breaker Sizes & Labels
69--etairs & Rails
or Stove, C learance- Hearth
J ep
7eE1_4c. Outlets at Wood Panel, Int. & Ext.
7401�. Fixt. & Appliance; Ground -Air Gap -Cooking Clearance
.03"'Elec. Outlets & Receptacles at Kit. Counter
-"-Gcage Fire Door; Swing- Landing-Clos u re
,Z& *.,6 -Duct in Garage -Damper
Wtr. Htr.; Vents -C lea rance-Comb. Air Connector-P.R.V.
�i Garage; Above Floor-Mech. Protection
Plb., Elec. & Mech. Equip. Listed for Location
-TB��Elec. Receptacles in Garage (F.F.I.)-Romex Protection
1-7� �.ulation-Foam-Looked in Attic
180-duard Rails & Deck Construction -Post Caps
-8T.-Fdn. VBents & Crawl Hole Door Drainage & Wood -Earth
Clearance Looked under Floor Q Yes
(18�2Fo Zowing Instid./Drive �j Yes :) NoMalks :1 Yes :1 No/Planters :1 Yes :1 No
-.68. 6 ucco Brown -Finish
_-8A-A-.C. Unit Disconnect, Electrical- PI umbi ng
_25"'Vents Above Roof, Pibg-Appliance-Fireplace-Clearance to Openings
96--Wa-ter Well, Disconnect, Electrical, Plumbing
-091. Exlerior Elec. Trim, G.F.I. Receptacle- U nde rg round
28/Vpntilation Throughout House
8 'V
Glass Protection
91,00'Corrections from Previous Inspections
--4+-'G-as Test -Meters Tagged, Gas -Electric
-92-Water & Sewer Connected -C/O to Gracle-HD Approval
r4o'Energy Compliance Certificate -Other Certificates
19r -Address Posted
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Comments at Final:
COUNTY OF BUTTE
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
411 Main Street - Chico, CA - (530) 891-2751
7 County Center Drive - Ciroville, CA - (530) 538-7541
CORRECTION NOTICE
OWNER PERMIT NO.
A routine inspection indicates that the following violations of butte county Ordinances exist at the
above address and should be corrected. Please notice this office when correction of work is
c ompleted. It you have any questions pertaining to this matter, or need additional explanation,
please contact this office immediately.
-j
F r—j'a I
Date Inspector
REV 10/92
�OUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive - OrOville, California 95965 * Telephone (530) 538-7-541 od
_/ PWIT NO.
(Rev. 12/96) APPLICATION AND PERMIT IK5:
U
ASSb4JP
;ibNING
SR -1
BUILDINGPERMIT
0 NER
W MSON, WRK
TELEPHONE
898-9094
SO. Fr. OCC. BUILDING VALUATION
25 R 1 350.00
I
OWN
,V_ffUNG ADDRESS
SHORTHOM DR., CHIOD, CA 95973 —
15,000. 0
CONTRACTOR'S NAME
NFAL COLUNS -
TELEPHONE
1384_1697
-Cont
CONTRACTOWS MAIUNG ADDRESS
26405 WILSON ST., LOS MOLIMS, CA 96055
CONSTRUCTION LENDER
Fireplace
LENDER'S MAJUNG ADDRESS
Total Valuation 1$ 16350.00
ARCHITECT OR ENGINEER
—Filing Fee $
20.00
Permit Fee $
180-00
ARCHITECT OR ENGINEER'S MAILING ADDRESS
Plan Checking Fee $
BU1142ffRE% ORTHORN DR. moo
Energy Plan Checking Fee $
PERMIT FEE $
LOT NO.
SUBDIVISIONS NAME
II
PARCEL MAP
PLUMBING PERMIT
Filing Fee 20.00
USEOFSTRUCTURE
SF 0 Duplex 0 Mobilehome 0 Other SPECIFY
—Each Trap
7.00 1400
Solar or heat pump water heater
23.00
Water piping
15.00 1 5 - 00
Each gas Water heater or vent
15.00
TYPE OF WORK
New 0 Addition 0 Remodel 13 Utilities 0 Installation 0 Other 0
Describe Work: —ADDITION & REMDEL
Gas piping system 1 - 5 outlets
15.00
Building sewer
15.00
A
Mobile Home I S I G WT-*
@20.00
PERMIT FEE$
z,.c) nn
ELECTRICAL PERMIT
-
Filing Fee 20.00
( 600V OR LE::
Main Service .0A OR LE
23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.
License Class Lic. No.
OWNER -BUILDER DECLARATI'ON
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
0 1, -as owner of the property, or my employees with wages as their sole compensation,
ill do the work, and the structure is not intended or offered for sale.
Welw-lls owner of the property, am exclusively contracting with licensed contractors
to construct the project.
0 1 am exempt under Sec. Business and Professions Code for this
reason
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:
0 1 have and will maintain a certificate of consent to self -insure -for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
0 1 have and will maintain workers' compensation insurance, as required by Section
3700 ofthe Labor Code, forthe performance of work for which this permitis issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Main Service 200A TO 1000A
46.00
NEW CONST DW
,��NG ffUP.
OR ADDNS. C
so
3.50FT.*
NEW UONS LT'_O
.R.IDT =11 NNIS )
97.50
OWE.RAPIR.ATUS
( PSIN. . C.. )
Ex. Occup. ( ounEr OR FWURES )
-
20 @ 1.00
BAL @ .50
..MED APIP
Ex. Occup. ("a. 02
.) E.
5.00.
Temporary Service
23.001
Mobile Home Facilities
20.001
Misc. Wiring
23 '0023.00
I
PERMIT FEE $
43.00
MECHANICAL PERMIT
Filing Fee 20.00
Heating
Cooling
Hood
6.50
Ventilation
PERMIT FEt $
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
of one hundred dollars ($100) or less.)
0 1 certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
ate , , 0
D 5;;2-
Sig ature of Apolicarit7 IT Owner 0 Contractor 0 Agen F
t
An OSHA permit is required for excavations over 60" deep and demolition or construction
of structures over 3 stories in height.
Mobile Home Installation Fee s
Energy Inspection Fee 1$46.00
Occ
R3
CONST. TYPE
TYPE OM� FEE $
W- A78. 00
I.A2?1%�f Fy CDFA PARCEA
I I ���
This permit is hereby issued under the applicable provisions
of the Qutte Cou andlor Resolutions to do work
J _ n� S h
in ' ated o JodNefee ave been paid.
CAR;; D t 6"Al-n,
PERMIT EXPIRES ON -b 7�tt 7J
I �Datef I
ReceiptNo. 353476 $220.00
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDEN ROD -APPLICANT
NO
-4
COUNTY OF BUTTE -DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING DIVISION
v
7 County Center Drive, Oroville, CA - 95965 Phone (530)53 8-7541 Fax (530)53 8-2140
.41,
DUIDx4y,r A DD It- A'IPT111%J n Ar A curipr
OWNER.., ASSE�SOR PARCEL NUMBERsn,_64,-7 -
Proposed Building Use: Counter Technician. Date:
�11 �boxes - d —R m ®rOd NA in order to apply.
!PA MUST be checke 0
Items required in order to apply for a permi
1. Plot plans, 3 or 4 sets, signed by the preparer of the plans.
Complete plans, 3 or 4 sets, signed by the preparer of the plans.
Engineered plans, 3 or 4 sets, with wet signature on plans AND 2 sets of stamped and signed calculations.
&4. Engineered truss details and layouts in duplicate'. No faxes!
Ej 5. Energy compliance design and supporting documentation in duplicate.
0 -'6. Manufactured homes: (A) Data sheets and installation instructions, (B) Marriage line information, (C) Floor Plan, (D) Tie down -or
foundation plans, all in duplicate.
0 T. Metal buildings: (A) Metal Building Plans, (B) Foundation plans and calculations in triplicate, (C) Elevation views in triplicate.
(D) Floor plans in triplicate. All of these must be stamped and wet -signed by the engineer.
Items required for initial plan review. If checked items have not been received, plan review cannot proceed. The permit will be
indexed and returned to the plan review line-up when required items are received.
Date Received By
Flood Elevation Certificate, wet -stamped and signed, in duplicate ................................
/VC�9. Plot plan and business license approval from the City of Biggs ....................................
0 10. Letter of intent for non-residential buildings .........................................................
0 11. Detached Accessory Building Form filled out by the owner .....................................
0 12. Hazardous Material Form ...............................................................................
0 13. Other V
Rem ining items needed to issue the permit. (May require additional plan review upon receipt of the following iteM,§?T*
Fees as'shown on the attached Schedule of Fees Due Sheet .......................................
Statement of Intent for Non -heated and A/C Buildings ................................. on
)V S t
1 6. Sanitation and plot plan approval from the Environmental Health Departmen in (01 C)2>—
i;t� C
0 17. City of Chico Plumbing permit ........................... ..
. * N . .. .............
,- *1 c C
nn'
I I - C
8. California Department of Forestry plan appr ��4paid. Sent y:
0 19. Pla ing approval for (A) Use: OK (B)Parking: (C) ar el h k: S—) -6— OIL
0 20. Contact Land Development about 0 Improvements, 0 Drainage ...............................
0 21. Encroachment Permit for driveway from the Public Works Dept. (construction approval prior to occupancy).
Pre n n euired ................
-1 spectio for a o.rn) .....................
C Ic ti
X2 ontra s I icense information. (Number, Name Style Class1f
c or'
24 Wo ker pensation arrie and 0 icy Number . . ........... .......................
- Ow r r s om C r . P I . ....
0 r V rific t Iv to ow r, OM i to
25. ne -Builde e . a ion 0 G en ne a e� owner ...............
0 26. Letter of Signature authorization ........................ ...........................................
.0 27. Recorded copy of Agricultural Acknowledgment Statement ....................................
0 28. Manufactured home utility clearance ...............................................................
0 29.,,,Visting violations and/or expired permits .........................................................
0_ 30 F-1 irant Deed, Q.M.Ij. Title/Statemeni of Facts, Q Letter from kegal Owner, 0 Check to H.C.D
.., O_jP -
issued Telephone
and hold for pickup.
I have been informed of the above items and requirements for obtaining a building permit.
Applicant: Date:
,!�Z C>1
1. Index permit application for the above items numbered: ( P
2. Additional items required
Contractor, designer, owner, was advised of the above data by
Contractor, designer, owner, was advised of the above data by
Plans reviewed by: Date:
Structural reviewed by: Date:
Note transfer by: Date:
Plan Check Letter
• phone, 0 r
�Kil, CT counter, by _Date:
• phone, [Yrnall, 0 counte� , by Date:
Plans approved by: �Date:
Structural approved by: Date:
Yellow: Building Division
E.H. USE ONLY
P102 Plan Allechad
r 'Iooy F%n Attacha
Sent to G.D.
TO: Building Department
FROM: Environmental Health
SUBJECT: Sanitation Clearance
Owner Location AP#
Plan Aporoved for: Sewage Disposal Water Supply: Public Private Well -X
Clearance for --4welrmg. Other
Hold final for:
Final clearance O.K. for:
NOTE:
— � --, 2, 0; � � �, C/"/ (�-# I / 62-s-222--'
Environmental Health Specialist
8/96
6-3-,!�Q-
Date
School District
A.P. Nu mber o
Property Owner
Property Location/Address
Subdivision
- V f -, - U -P- �
BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
Building Department No.
County
Lot No.
............ ...........................................................................
Residential Development
Sq. Footage
No of Living Mobile Home
*Supplemental to (Group R)
Units Installation Conversion
Permit #
*(No foundation inspection):
..................................................................................................................
Commercial/Industrial F-1
Sq. Footage
(including Exterior
Roofed Areas)
G
Date
(Floor Plans reviewed by School District Personnel)
District Identification No.
Ouv) School District cerbfies that
-rApplicarnt)
(Street Address)
Icity)
has complied with the requirements of Resolubon No.
representing sq uare feet.
School District Representative
Paid b - y Check # AJ fi Remarks:
(Phone Number)
(State) (Zip Code)
14 -7 by payment of $
IAB 2926 $
FULL MITIGATION $
Date
Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with
.Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) feeformAs (10/98)dmm
COUNTY OF BUTTE
DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE (530) 538-7541
i — SCHEDULE OF FEES DUE
OWNER 1 c:21-) y
:PROP "SED BUILDING USE
UILDING PERMIT FEES
Balance Due ....................... $
Additional Fees Due ................. $
dditional Fees Due ................. $
Add'
M
vised Plan Checking Fee ..... $
xV-,
S C�D
;2. S OOL DISTRICT FEES
A A
. _ (p I
aid at District Office) (Available after- Plan Chec VR t
SHERIFF FEES (paid at Building Division)
Residential ...................... _x $360.00 = $
Units
Commercial (sq. ft.) ............... - x $0.03 = $
Sq. ft.
4. URBAN AREA FEES (paid at Building Division)
Residential ................... -x-=$
# Units Amt.
Commercial (sq. ft.) ............ -x-=$
Sq. ft. Amt.
5. RECREATIONAL DISTRICT FEES
(paid at District Office) (Available after Plan Check)
6 THERMALITO DRAINAGE DISTRICT FEES
$5 10.00 (paid at Building Division)'
SRA FEkE INSPECTION AND PLAN CHECK
$89.00 (paid at Building Division)
8. WATER TENDER FEES (BatWion #
$200.00 (paid at Building Division)
9. CSA 87 TRAFFIC FEE
$2500.00 (paid at Building Division)
10. OTHER
A.P. #
DATE
RECEIPT # DATE REC.
C, I Is 0
M110
WA
30- 1
0
At time of permit appl * ication, I was advised the above fees are required to be paid prior to issuance of the building perrnit. These fees
may be changed during the plan checking process.
APPLICANT DATE L(D
Pursuant to Government Code Section 66020, you are hereby notified that items 2, 3, 4, 5, 6, 7, 8, 9, and 10 above may have been
imposed on your project. You have 90 days from the date of approval of the project or from the imposition of the above mentioned
items during which you may protest. The requirements for a protest are specified in Govemment Code Section 66020(a).
Original - Buiding Div. 2nd Copy - Applicant 3rd Copy - Owner ' (Rev. 6100)
er
r
AATA XAA A, ecch
VerticalTechnology
Engina.m.ring
383 Rio Lindo Ave #200, Chico, CA 95926
Ph. (530) 899-8716 Fax (530) 899-1102
Email MDHPE@cs.com
Structural Calculation's
Clie, nt: Tom Norlie
Project: Nelson Kitchen Remodel
Location: 4251 Shorthorn Drive, Chico, CA
T I
OUWY
I TTIE C
Nd C
SUILUNG, DEPARTMLN
APPROYFaD
//0 7 'P Z
Attention: This engineer is not responsible for on site ins eci n to assure compliance with the
standards, sizes, materials, or workmanship specified herein. T is engineer is not responsible for any
structural element or system not specifically noted in this set of specifications unless authorized in
writing by this engineer. Workmanship is to be of the highest quality and in all cases follow accepted
construction practice, the latest edition of the Unform Building Code, and local building department
standards.
at.,/ e- VIAI 6 4-NF)':=7- Cln,'O )-"
I I "ROJECT VERTECHENGINEERING PAG E
.ENGINEER DATE
DESIGN OF 00)
-lu
-4:
ol
—7
Beam
Sizer besign Program
VerTech Engineering
Project:
Date: 4/26/2002
Location: Window Header
C1 Valley Beam
Slope of roof
12 :12 Select Beam Width
r15�i:nn,
Dead Load
16 psf
0 Ro'u6id_q_e'�ber
Live Load
16 psf
DF -L #2 Dimensional
I
Q Horiz. Member
TULL Defl. Criteria (U)
240v 360 Fb'
1170 psi
Length of Beam
Fv'
154 psi
Width tributary to beam:
8.5 ft
Unbraced Length
1 ft Height Required
C9 in7
CID 1.25 CF
1.30 A Req'd
10 in A 2
CM 1.00 Cv
1.00 S Req'd
21 in A 3
Ct 1.00 Cfu
1.00 .1 Req'd
32 in A 4
Cf 1.00 Cr
1.00 Controlling Design
Bending
CH 1.00 Cc
1.00
CL 1.00
Fbe= 58403
le= 2.1
RB= .3.5, Fb*=
1463
Total Uniform Load
328 plf
Mmax
2011 ft -lb
Vmax
986 lb Shear at d from face?
El Req'd
51 *JOA6 #-in A 2
I
Beam
Sizer Design Program
VerTech Engineering
Project:
Date: 4/26/2002
Location: Rafter
Valley Beam
Slope of roof
12 :12 Select Beam Width
Dead Load
16 psf
0 lkound-M&�t�r
Live Load
16 psf
FDF -L #2 Dimensional
El Horiz. Member
TULL Defl. Criteria (U)
240 360 Fb�
990 psi
Length of Beam
1-3-ft� Fv'
129 psi
Width tributary to beam:
Unbraced Length
1 ft Height Required
CID 1.25 CF
1.10 A Req'd
5 in A 2
CM 1.00 CV`
1.00 S Req'd
20 in A 3
Ct 1.00 Cfu
1.00 1 Req'd
95 in A 4
-Cf 1.00 Cr
1.00 Controlling Design Deflection
CH 1.00 Cc
1.00
CL 0.99
Fbe= 6978
le= 2.1
RB= 10.0 Fb*= 1238
Total Uniform Load
77 plf
Mmax
1632 ft -lb
Vmax
443 lb 21 Shear at d from face?
El Req'd
153 *JOA 6 #-in A 2
I
V3,01,143
IUUI 6. Z AVW
41100H IiJUOLUMIAU3
well
A
.4
Abandoned System —
Eidsting System —
New Une —
J. ,
Mark & Kim Nelson
4251 Shorthorn Dr.
CHOD CA 95973
(5m) 6&iiM
APN 047-530-004
Lot is: 13,11'vvida
32V deep
iln 1�
Scale 1W
J. ,
Telephone outlet
9
000A.-d�rl-T 011ycV.-r.
I S -r' . C
qp4
P5
ISWI
L-77-7--4
Dw
>
'�_O 11
5:3L
6 -
Environmental Health
MAY 2'9 2002
Chico, CA
IwM
IL
V
9
000A.-d�rl-T 011ycV.-r.
I S -r' . C
qp4
P5
ISWI
L-77-7--4
Dw
>
'�_O 11
5:3L
6 -
Environmental Health
MAY 2'9 2002
Chico, CA
IwM
IL
NOTES nESIDENTIAL
PERMIT NO.
: 0/ 10 C"
(76_41-_5�0_004
NIELSON, WIRK 0
4251 SHORT14ORN C141C
CONT-- NEIL COLLINS 4T SOLA
REROOF 8,, ROOF MO'R-
�;ssLA-�- �o - -oz
Jt
SPECIAL CONDITIONS
CHECKED
BY
SRA
FLOOD CERTIFICATE REQ.
FIRE SPRINKLERS REQ.
SPECIAL INSPECTION ITEMS
VERIFY
USE PERMIT CONDITIONS
SUB -STANDARD HOUSING LETTER
LU
T
o')_
JOB FINALED (Date)
Signature
V= OK
1-1.
a = Not OK
2.
= Not Applicable MOBILE HOMES
= Not Ready,
Gas; MH Test -Demand -Valve -Connector
Date
MOBILE HOME UTILITIES (Plans) OK except Ws
5.
1. Zoning Require ments-Selbacks- Easements
6.
2. Soils; Special MH Support Sketch
7.
3. Sewer; Location -Test -Fall -C/0 -Concrete
4. Water; Location -Test- Easement Needed (Sketch)
5. Electricity; Location-Clearances-Grnd-/ /Amp -Concrete
6. Gas; Location -Test -Wrap;-/ L 'ft.
PNat. or/ /"L"ft./ PLPG
7. Well Clearance & Disconnect
8. Utility Clearance
Date Card B-1 Date -Card B-1
Date Card B-1 Date Card B-1
Date MOBILE HOME INSTALLATION (Plans) OK except Vs
1-1.
Zoning Requirements-Setbacks-Easeme6ts. r
2.
Footings; Size- Spacin g- Marriage Line
3.
Gas; MH Test -Demand -Valve -Connector
4.
Electricity; MH Test -Crossovers -Breakers -Clearances
5.
Drain; MH Test -Fall -Flex Connector
6.
Water; MH Test- Regulator -Con nector
7.
Water and Sewer Connected -C/O to Grade -HD Approval
8.
Gas and Electricity Tagged
9.
Tie Downs -Type -installation Cert.
10.
Exits; Insp.-Sketch
11.
Cart. of Occupancy
12.
Permanent Foundation OnIv: License Decal
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
MISCELLANEOUS
Date DECKS, COVERS, CARPORTS GARAGES (Plans) OK except #'s
1 . Zoning Requirements -Setbacks- Easements
2. Footings; Soils-Size-Depth-Spacing-Connectors-SteeI
3. Decks; Girders and/or Joists- Decki ng-Bracing-Stai rs- Rails
4. Wood Awn.; Posts- Beams- Rftrs. -Connectors
Shthg.-Frg-Bracing
5. Alum. Awn.; Columns -Connections -S plice- Decal- Enclosures
2.
6.
Carports; Windows -Doors
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
7.
Electric
5.
8.
Frmg.; Sills-Anchors-Studs-Rftrs-Trusses
Elec.; Enclosures; Conduit Entries -Terminals- Listed
9.
Siding; Na iling-Veneer- Stucco- Mesh
8.
10.
Roof; Shthg-Rooting
Health Department Approval
11.
Ext.; Sle ps- Doors- Landings
11.
12.
Braced Wall Panels
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
FINAL (Plans) OK except #'s
1.
Setbacks- Easements -
2.
Soils; Compaction -Structure Stability
3.
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
4.
Elec.; Receptacles and Lighting, Distance-GFI
5.
Elec.; Pool Lighting; 15 Volts-GFI
6.
Elec.; Enclosures; Conduit Entries -Terminals- Listed
7.
Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater
8.
Elec.: Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg.
Boxes- Enclosures- Panelboards- Ins. to Main in Conduit
9.
Health Department Approval
10.
Plumb.; Cir. Test -Water Supply Test
11.
Light Niche
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
V = OK
0 = Not OK
- = Not Applicable
* = Not Ready RESIDENTIAL (Single & Duplex)
Date 4 Underfloor (Plans) OK except #'s I Date
FRAMING (Continued
V. ;fning - Setbacks- Ease menls -Flood -Slope Kr Hangers -
%2" Ftg., Main; Soils-EleE._Co �-j /" Ftg. P__Z��h
3. Ftg., Gar ��-Is_Steel-Elec. Grnd.-/ /- F)g. Depth
4. Ft orches & Decks; Soils -Steel-/ /" Ffg. Depth
. Sternwalls, Main; Steel-Blockouts-Wrapped
6. Stemwalls, Garage; Steel-Blockouts-Wrapped
t/ Hold Downs and Special Anchors
7. Slab, Steel -Wrapped
8. tiers -Fireplace Ftq.-Steel
_____W'D.W.V.; Fall- Fitting -Test -2 Way C/O�st
-i�r j6F, Gas Pipe; Size Anchors - Yard Gas Piping)Size Test
Ne Water Pipe; Test -Anchors- Reg u lator- Service Y16st
QI-Electric Underground Z
44-94enums & Ducts; Clearance-Materi �Zupport-lns.
Prders- ills -Anchor Bolts-Jois!�4ents-Crippies
K -Cess & Ventilation
V.O'Insulation
Datek(j LS UlCardB-1 V4 A) Date Card B-1
Date Card V, Date Card B-1
Date KUMBING (Permit) OK except #'s
;._"Ater Htr.; Veni-Access-Combustion Air Baffle
14bater Pipe; Test & Anchor -Nail Protection
W D.W.V.; Test Fittings & Anchor -Nail Protection
1V7 Shower Pan; Test, First Floor -Tub Access
2r.- Test Tub & Shower, Second Floor -Tub Access
-22-.Gas Pipe; Sixe & Anchors
Datel Mu . q I Card B-1 &- U" Date Card B-1
Date' ( 2 , ����Dat. Card B-1
Date YCECTRICAL (Permit) OK exceR_t__#'_-_____1
2e 2�ture & Transformer Clearance -Ins. Protection
� �.Iec. Receptacles Spacina-Liqhts & Switches at Doors
2T.,6ize Boxes & No. of Conductors Stapled
;K/Ornex Installed Close to Edge of Studs & C.J.
2�.' Equip. Ground made up w/Mech Fasteners-, B6nd Gas & Water
24. ;,�Ppiiance Circuits in Kitchen & Conductor Size GFI
��Subfeed Wire Size?-Lga. %M
"eA.C. Wire Size / / ga Cu or Al
30. Range Circle/ ga Cubr Al -Oven Circ. / / ga Cu or Al
Insulated Neutral JEJ Yes EJ No
&r -Service- Riser Conductors & Ground Main Disconnect
-3t-, Equip. Clearances Panels-Motors-Mech. Equip.
ee'.--Clothei Closet Light -Shower Light -Spa Light
a4 -_Smoke Detector
Date Card B-1 r �%j , Date Card B-1
Date Card B-1 Date Card B-1
Date MECHANICAL (Permit) OK except #'s
tti A*t. Ducts Insulation & Support
SeVent Fan, Exhaust above insulation
-&r-Condensate Drain & Overflow, Size & Grade
- ccess-Comb. Atg�l Air Vent 115 outlet
39- Attic Access & Platform if Furnace inAc
Date( V U X Card B-1 V I _Pd[e Card B-1
Date Card B-1 I-,' Date Card B-1
Date /FRAMI��ermit) OK except #'s
4t', -,its PrWfr Materials & Anchors
4<,WqjeS_b,ds-N.iIing Spacing & Braces- Plates -Sound
ing Walls over Girders & Floor Nailing
!�X_r-ft Stop in Walls (rat proof)
Qre Stops, Furred Ceilings -Stairs -Chasers -Tubs
.Z
A14' Headem & Reams -Size & Bearing
tt��. Joist-Rttr. Ties- Purlin- Roff Brac.-Truss-Shting.-Rfng.
�Xpiace Ties or Type A Flue- Fireplace Throat Clearance
42 -*"Attic Access; Size & Romex Protection- Draft Stop -Ins. Baffles
%. Bdrm. Windows or Exiting Doors -Sill Ht. & Dimensions
5+- Garage Fire Protection Framing
,St.- Froperty Line
12r"Ext. Doors -One X -Check Garage)rd Story, 2 Exits
04-_-Slairs; Width- Headroo m- RiseOun-Landi no- Fire Protection
65.
Yywood on Roof Oyj0rXng Attic Vents -Rafter Outriggers
M."
Siding-NailingV9'n'eer
rip Screed -Fd. Vents-Underflr. Access
lazing Ar a -Glass Protection -Skylights -Plastic
59.
��r Walls; Nailing -Bolts
j 0j,r_,4'-
%w5irac
or;
lor wall Panels
7,
Insulation -Walls -Ceilings
62.
Infiltralion-Walls-Windows
a
Datel(,30,01
CardB-le
= (I , Date Card B-1
Date
Card B-1 Date Card B-1
Date
FINAL (Plans) OK except #'s
63.
Ext. Steps -Door & Sidelight Protection -Landings
64.
Smoke Detector
65.
Furnace Vents -clearance -Comb, Air -Connector -
In Garage; Above Floor-Ducts-Mech. Protection
66.
Bedroom Exiting
67.
G.F. I. & Bath Fixtures & Tub Access -Spa
68.
Elec. Trim & Subpanel, Breaker Sizes & Labels
69.
Stairs & Rails
70.
Fireplace or Stove, Clearance- Hearth
71.
Elec. Outlets at Wood Panel, Int. & Ext.
72.
Kit. Fixt. & Appliance; Ground -Air Gap -Cooking Clearance
73.
Elec. Outlets & Receptacles at Kit. Counter
74.
Garage Fire Door; Swing- Landing-Closu re
75.
A.C. Duct in Garage -Damper
76.
Wtr. Htr.; Vents -C lea rance-Comb. Air Connector- P.R. V.
in Garage; Above Floor-Mech. Protection
77.
Plb., Elec. & Mech. Equip. Listed for Location
78.
Elec. Receptacles in Garage (F.F.I.)-Romex Protection
79.
Insulation -Foam -Looked in Attic
80.
Guard Rails & Deck Construction- Post Caps
81.
Fdn. VBents & Crawl Hole Door Drainage & Wood -Earth
Clearance Looked under Floor C) Yes
82.
Following InstId./Drive,:j Yes :1 No/Walks Q Yes Z) No/Planters Yes No
83.
Stucco Brown -Finish
84.
A.C. Unit Disconnect, Electrical- Plumbing
85.
Vents Above Roof, Plbg-Appliance-Fireplace-Clearance to Openings
86.
Water Well, Disconnect, Electrical, Plumbing
87.
Exterior Elec. Trim, G.F.I. Receptacle -U nderg round
88.
Ventilation Throughout House
89.
Glass Protection
90.
Corrections from Previous Inspections
91.
Gas Test -Meters Tagged, Gas -Electric
92.
Water & Sewer Connected -C/O to Grade -HD Approval
93.
Energy Compliance Certificate -Other Certificates
94.
Address Posted
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Comments at Final:
�i
COUNTY OF BUTTE - DEPARTMENIAMWEVEIL&MENT SERVICES - BUILDING DIVISION
,-J
7 County Center Drive - Orovilfe, Cailifornia 95965 * Telephone (530) 538-7541 PERMIT NO.
(Rev. 12/96) APPLICATIPMAND PERMIT 01-2394
ASSESSOR PARCE_ NUMBER
047-530-004
OWNER
MARK NELSON
7ELEPHONE
898-9094
BUILDING PERMIT
SQ. FT. OCC. BUILDING VALUATION
36 460— 2 160.00
WNT
OWNEWS MAILING ADDRESS
4251 SHORTHORN DR, CHICO 95973
CONTRACTOR'S MAME
NEIL COLLINS 777
NE
— - - - - -
-
COWRACTOWS MAILING ADDRESS
. 26405 WILSON ST, LOS MOLINAS 96055
CONSTRUCTION LENDER
Fireplace
LENDER*S MAILING ADDRESS
Total Valuation $ A r -r-()
1?
ARCHITECT OR ENGINEER
LICENSE No.
Filing Fee 11--
20.00
Permit Fee
$ 72.00
ARCHITECT OR ENGINEEWS MAILING ADDRESS
Plan Checking Fee
54.00
BUILDINGADDRESS
4_25,1 SHORTHORN DR, CHICO 95973
Energy Plan Checking Fee
$
PERMIT FEE
$ 1
LOT NO.
SUBDIVISION'S NAME
PARCEL MAP
PLUMBING PERMIT
Filing Fee 20.00
USEOFSTRUCTURE
SF OX Duplex 0 Mobilehome 0 Other
SPECIFY
Each Trap
7.00
Solar or heat pump water heater
23.00
Water piping
15.00
Each gas water heater or vent
15.00
TYPE OF WORK
New 0 Addition 0 Remodel 0 Utilities 0 Installation 0 Other [R
Describe Work: REROOF & ROOF MOUNTED SOLAR UNIT
Gas piping system 1 - 5 outlets
15.00
Building sewer
15.00
Mobile Home Is
@20.00
PERMIT FEE
ELECTRICAL PERMIT
Filing Fee 1 20.00
Main Service ' DR
23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.
License Class Lic. No.
OWNE—R-BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law fo e following reason:
la�s owner of the property, or my employees with wages as their sole compensaton,
* 11 do the work, and the structure is not intended or offered for sale.
w"
ff-11, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
0 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO 1000A
46.00
NEW CONST P.
OR ADDNS. DWT�ffiffsu
so.
3.50FT.
NEW CONST
NON-RESIO. tu, LTH' 0
(97.50
'POWER APPARATUS
NQUE OUTLET CIR.
Ex. Occup. CUTLET OR FixrURES
20 @ 1.00
BAL 9 .50
Ex. Occup.. O.FIXEDAPPUNS 0�11.
5.00
Temporary Service
23.00
-Mobile Home Facilities
20.00
Misc. Wiring
23.002 .00
I
PERMIT FEE
$ A3. 00
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:
0 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
0 1 have and will maintain workers' compensation Insurance, as required by Section
3700 of the Labor Code, forthe performance of workforwhich this permitis Issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
e-l"cf one hundred dollars ($100) or less.)
ertify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
00,
X 12 Y-0 0/1
'e� � " Date
Signature of Applicant - WOwner 13 Contractor 0 Agent
An OSHA permit is required for excavations over 60" deep and demolition or construction
of structures over 3 stories in height.
MECHANICAL PERMIT
Filing Fee 20.00
Heating
Cooling
—
Hood 6.50
Ventilation
PERMIT FEIE $
Mobile Home Installation Fee $
Energy Inspection Fee $
occ
CONST. TYPE
TOTALFEE$ 189.00
HAZ.
IMP
I FLOOD
I CDF
PARCEL
PO
I
H-
[
ISSUE
_tt
This permit is hereby issued under
of the Butte County Code and/or
indicated above for which fees have
By
PERMIT EXPIRES ON
I
the applicable provisions
Resolutions to do work
been paid.
Date
(Date)
ReceiptNo 332250/$189.00
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINK -INSPECTOR GOLDEN ROD -APPLICANT
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 COUNT'� CENTER DRIVE - OROVILLE, CALEFORNIA 95965 - TELEPHONE (530) 538-7541
PE"IT "PLICA TION DA TA SHEET
OWNEi:AA,fC_,
ASSESSOR PARCEL NUMBER: 617 -
Proposed Building Usefikk ydf4l,. f?y5l(-W( Building Inspector: Date:
At time of permit application, I was a6ised the fol[lowing data must be submitted p-rior to permit ssmg and/or issuance:
06ce
Date Received By
1. All iiems have been submifted --------------------------------------------------------------------------------------
0O2 plans, 3/4 sets, signed by the preparer of plans - ------------------------------------------------------------
C Co �'lete plans, 3/4 sets, signed by the preparer of plans. 444 ---- i;-ai4:.d - - -----
loom" p js
4. Engineered plans, 3/4 sets, with wet signature on plans. All engineering must be shown on plans - --------
0 5. Engineered truss details and layout in duplicate (required prior to plan review) No faxes! ------------------
06. Energy Design Compliance and supporting documentation - ----------------------------------------------------
El 7. Statement of Intent. for Non -Heated and A/C Buildings - ---------------------------------------------------------
118. Hazardous Material Form - ------------------------------------------------------------------------------------------
119. Manufactured Home data and installation instructions including Tie Down Specifications -------------------
0 10. Fees of $ -------------------------------------------------------------------------------------
0 11. Impact fees as shown on the attached schedule - -----------------------------------------------------------------
0 12. California Department of Forestry plan approval/fees - --------------
ele a n ce ca e --- -----------------
'i rtfi * ---- ------ Health Dep
an
v 0
tatlon and plot PI approval
C ty of Chico plumbing permit . . .........................
0 16. Plot plan and business license approval from the City of Biggs. ---
1117. Planning approval for (A) Use: _ (B) Parking:
El 18. Contact Land Development about 11 Improvements, 0 Drainage, 0 Legal Parcel.
i4;.
0 19. Encroachment Permit for driveway (construction approval prior to occupancy).
E120. Pre -inspection for
required. Request to Budding Inspector on
E] 2 1. Contractor's license information. (Number, Name Style, Classification).
C,122. Workers' Compensatiodcarrier and policy number - -----------------------
0 23. Owner -Builder Verification (Given -to owner 11, Mailed to owner EI).
024. Letter of signature authorization - --------------------------------------------
1125. Recorded copy of Agricultural Acknowledgment Statement.
026. Letter of intent on building use - ---------------------------------
El 27. Manufactured Home utility clearance - -------- ------------------
028. Existing violations,.,and/or expired permits - --------------------
029. 0433 A, []Grant Deed, 0 M.H. Title, El Check to H.C.D $
03.0. Other:
(Date)
you issue the permit, process as follows 11 Mail to owner, ElMail to co�tractor.
00
20,111ephone?1_67— '?aF and hold for pickup atA��_ ffice. 0 Deliver with inspectQr.
oo,
Applican * . �1
Copy 4 Haz-Mat fo:ri�n-sientQHealth Department, 11 Fire Department,, 11 Air Pollution Date: By:
Copy of plans sent 0 Health Dep-a—Ftinent, 0 Fire Department, 0 Other: Date:
1. Index permit application for the above ite;nNsumbered: El Plan Check List
2. Additional items required: N-1
Contractor, designer, owner, was advised of the above required data by ffpl�bne:o mail,[] Buildirig`l�vision counter, by tAVDate: 07t4f?
Contractor, designer, owner, was advised of the above required data by 11 phone, 13 mail, 13 Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by o phone, 0 mail, 0 Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by 0 phone, 0 mail, o Bdil n counter, by DaV
Plans reviewed by: Date: Plans appr6ed 1�: Date A/w
Sets of plans on hold in ci Plan Cabinet, 0 A.P. folder. Note transfer by: Date:
V�11--l'— , j:f.
O.B.- I
-it
OWNER-BUILDER VERIFICATIO
Attention Property Owner:
An "owner -builder" building permit has been applied for in your name and bewimig your signature.
Please complete and return this information at your earliest opportunity to avoid unne ' cessary delay
in processing and issuing your building permit. No building permit will be issued until this
verification is received.
1. 1 personally plan to provide the major labor and materials for construction of the proposed
property impr vement: YES §*' NO R"
2. * I HAVE TIHAVE NOT 0 signed an app . lication for a building permit for the proposed work.
3. 1 have contracted with the following person (firm) to provide the proposed construction:
NAME: ffe,*1 eoll,'oq
ADDRESS: D-005 -Y'4wt CITY: t"
PHONE: q16 T)�y 41(7? —CONTRACTOR'S LICENSE NO. 2 0�?
4. 1 plan to provide portions of this work, but I have hired the following person to coordinate,
supervise, and provide the major work:
)V
NAME:
ADDRESS: 5447C
CITY:
PHONE:
CONTRACTOR'S LICENSE NO.
5. 1 will provide some of the work but I have contracted (hired) the following persons to provide
the work indicated:
NAME ADDRESS PHONE TYPE OF WORK
lVe,� eal,,4x Alof AO.SV
Ale,?
&s,-/--- -ro
SIGNED:
PROPERTYOWNER:_�2-
SOCIAL SECURITY NUMBER:
DATE: 1? TeR
jVOTE.- This Owner -Builder Veriji-cation is required by Section 19831 and 19832 of the
California Health and Safety Code. This verification must be -completed and
returned to our office before we are permitted to issue the permit.
OV`ER
O.B.- I
I OWNER BUILDER INFORMATION I
Dear Property Owner:
An application for a building permit has been submitted in your name listing yourself as the builder of property
improvements specified.
For your protection, you should be aware that as "owner-buildee, you are the responsible party of record on such
a permit. Building permits are not required to be signed by property owners unless they are personally performing their
own work. If your work is being pe�fbrmed by someone other than yourself, you may protect yourself from possible
liability if that person applies for the proper permit in his or her name.
Contractors are required by law to be licensed and bonded by the State of California and to have a business
license from the city or county. They are also required by law to put their license number on all permits for which they
apply.
If you plan to do your own work, with the exception of various trades that you plan to subcontract, you should
be aware of the following information for your benefit and protection:
If you employ or otherwise engage any persons other than your,immediate family, and the work (including materials
and other costs) is $300 or more for the entire project, and'such persons are not I licensed as contractors or
subcontractors. then you may be an employer.
If you are an employer, you must register with the State and Federal Goverriments as an employer and you are
subject to several obligations including *state and federal income tax withholding, federal social security taxes,
workers compensation insurance, disability insurance costs, and unemployment compensation contributions.
There may be financial risks for you if you do not carry out these obligations, and these risks are especially serious
with respect to worker's compensation insurance.
For more specific information about your obligations under Federal Law, contract the Internal Revenue Service (and,
if you wish, the U.S. Small Business Administration). For more specific information about your obligations under
State Law, contact the Department of Benefit Payments and the Division -of Industrial Accidents.
If the structure is intended for sale, property owners who are not licensed contractors are allowed to perform their
work personally or through their own employees, without a licensed contractor or subcontractor, only under limited
conditions.
A frequent practice of unlicensed persons professing to be contractors is to secure an "owner builder". building
permit, errogeously impjying that the property owner is providing his or her own labor and material personally. Building
permits are not required to be signed by property owners unless they are performing their own work personally.
Information about licensed contractors may be obtained by contracting the Contractors State License Board in your
community or at'1020 N Street, Sacramento, CA. 95814.
Please complete the "Owner Builder Verification" on the reverse side of this form so that we can confirm that you
are aware of these matters. The building permit will not be issued until the verification is returned.
0
+ i rely,
Micel C. Vidira, C.B.O.-
P
9
_ sn
M ger. �BtuildAingInspeCction
NO TE. . Tit is 0 w n er- B u ilder Info rm a tio n is req u lred by Se ctio n 19 83 0 of th e Califo rn la Health an d Safety Co de.
OVER
LOERKE INSULATION CO., INC.
INSULATION CERTIFICATE
A
EJ9 Ile- &cc
Number and %,greet
COUDW u-6aivision Lot Number
DESCRIPTION OF INSTALLATION
1. R06F
Material
Thickness (inches)
2. CEILING
Baft or Blanket Typ ffieMlass Raft
Thickness,(inchesda----,---) &I
L.6ose Fill Type Fiberglass
Contractorls min. installed weighM sq. lb.
Brand Name
Thermal Resistance (R -Value)
Brand Name Johns Manville
Thermal Resistance (R -Value)
Brand Name - Johns Manville
Minimum Thickness inches.
Manufacturees installed Weight per square foot to achieve Thermal Resistance (R Value)
3. EXTERIOR WALL
Material FiheMlass Batts
Thickness (inches) -6..
4. RAISED FLOOR
Brand Name Johns Manville
Thermal Resistance (R-VaIueLRjq--
Material Fibemlan EMU
Brand Name Johns Manville o.,
ThIcImess (inch Thermal Resistance (R -Value) k-jq
5. SLAB FLOOR / PERIMETER
Material —
Thickness *
Perimeter Insulation Depth Qnches)-
6. FOUNDATION WALL
Material
Thickness (inches)_
DECLARATION
Brand Name
Thermal Resistance (R -Value)
Brand Name
Thermal Resisdance (R -Value.)
I hereby certify that the above insulation was installed In the building at the above location in conformance
with the current Ene Effin Standards fbr reel
.4ential buildings (T
..* 24,Part 6, California Code of
Regulations) as indi= oncitehne%erfificate of compliance, where applicable.
C.L.#499150 LOERKE INSULATION CO., INC.
igm-Ri- gnatu Install' 8 ibcontractor (Co. Name) Or
7 rate General"MIZor (Co. Name) Or OWner
Signature, Date
Sig -nature, Date
Installing Subcol cto� (CO. Namq) Or
General contractor (Co. Name) Or owner
Installing Subcontractor (Co. Name) - Or
General Contractor (Co. Name) Or Owner
NOTES
RESIDENTIAL
047-530-004 01-1999
NELSON, MARK & KIM (!!�Z
4251 SHORTHORN DR. CFHCO
CONT: NEIL COLLINS
k ADDITION OF FAMILY ROOM
SPECIAL CONDITIONS
C ECK
I H BY ED
SRA
FLOOD CERTIFICATE REQ.
FIRE SPRINKLERS REQ.
SPECIAL INSPECTION ITEMS
VERIFY
USE PERMIT CONDITIONS
SUB -STANDARD HOUSING LETTER
JOB FINALED (Date)
Signature
V= OK
0 = Not OK'
- = Not Applicable
'* = Not Ready
MOBILE HOMES
Date
MOBILE HOME UTILITIES (Plans) OK except #'s
Zoning Requirements-Setbacks-Easemenis
1.
Zoning Requiremenis-Setbacks- Easements
Footings; Soils-Size-Depth-Spacing-Connectors-SteeI
2.
Soils; Special MH Support Sketch
Decks; Girders and/or Joists- Decking- Bracing -Stairs- Rails
3.
Sewer; Location -Test -Fall -C/0 -Concrete
Wood Awn.; Posts- Beams- Rftrs. -Connectors
Shthg.-Frg-Bracing
4.
Water; Location -Test- Easement Needed (Sketch)
Alum. Awn.; Columns -Connections- S plice- Decal- Enclosures
5.
Electricity; Location-Clearances-Grnd-/ '/Amp -Concrete
Carports; Windows -Doors
6.
Gas; Location -Test -Wrap;-/ L 'ft.
P Nat. or /"L"ft./ PLPG
Electric
7.
Well Clearance & Disconnect
Frmg.; Sills-Anchors-Studs-Rftrs-Trusses
8.
Utility Clearance
Siding; Naili ng -Veneer -Stucco- Mesh
10.
Roof; Shthg-Roofing
11.
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
MOBILE HOME INSTALLATION (Plans) OK except #'s
I .
Zoning Requirements -Setbacks- Easements'
2.
Footings; Size -Spacing -Marriage Line
3.
Gas; MH Test -Demand -Valve -Connector
1.
4.
Electricity; MH Test -Crossovers -Breakers -Clearances
2.
5.
Drain; MH Test -Fall -Flex Connector
3.
6.
Water; MH Test -Regulator -Connector
4.
7.
Water and Sewer Connected -C/O to Grade -HD Approval
5.
8.
Gas and Electricity Tagged
6.
9.
Tie Downs -Type -installation Cert.
7.
10.
Exits; Insp.-Sketch
8.
11.
Cert. of Occupancy
9.
12.
Permanent Foundation Only; License Decal
10.
Plumb.; Cir. Test -Water Supply Test
Date
Light Niche
Card B-1 Date Card B-1
Date
Card B-1 Dale Card B-1
Date
MISCELLANEOUS
Date
DECKS, COVERS, CARPORTS GARAGES (Plans) OK except #'s
1 .
Zoning Requirements-Setbacks-Easemenis
2.
Footings; Soils-Size-Depth-Spacing-Connectors-SteeI
3.
Decks; Girders and/or Joists- Decking- Bracing -Stairs- Rails
4.
Wood Awn.; Posts- Beams- Rftrs. -Connectors
Shthg.-Frg-Bracing
5.
Alum. Awn.; Columns -Connections- S plice- Decal- Enclosures
6.
Carports; Windows -Doors
7.
Electric
8.
Frmg.; Sills-Anchors-Studs-Rftrs-Trusses
9.
Siding; Naili ng -Veneer -Stucco- Mesh
10.
Roof; Shthg-Roofing
11.
Ext.; Steps- Doors- Landings
12.
Braced Wall Panels
Date
Card B-1 Date Card B-1
Da -.e
Card B-1 Date Card B-1
Date
FINAL (Plans) OK except #'s
1.
Setbacks- Easements
2.
Soils; Compaction -Structure Stability
3.
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
4.
Elec.; Receptacles and Lighting, Distance-GF1
5.
Elec.; Pool Lighting; 15 Volts-GFI
6.
Elec.; Enclosures; Conduit Entries -Terminals -Listed
7.
Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater
8.
Elec.; Grounding; Equip. w/5'Circulating Equip. -Pool Lghtg.
Boxes-Enclosures-Panelboards-ins. to Main in Conduit
9.
Health Department Approval
10.
Plumb.; Cir. Test -Water Supply Test
11.
Light Niche
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
V = OK
0 = Not OK
- = Not Applicable
* = Not Ready RESIDENTIAL (Single & Duplex)
Date U,�Aerfloor (Plans) OK except #'s
7_Z'on i 0- Setback s- Ease ments- Flood -Slope
,Aain; Soils-Elec. Grncl.-/,07�/" Ftg. Depth
I X9, , Garage; Soils-Steel-Elec. Grnd.-/ P' Ftg. Depth
-!:efg ., Porches & Decks; Soils -Steel-/ F Ftg. Depth
voff�7,'/ 5,._XtegwV'aIIs, Main; Steel-Blockouts-Wrapped
1W N 6a-'Rold Downs and Special Anchors
- _8,.�i&-Fireolace Fto.-Steel A00��A_ 6-47 4-/<_->,)
(0,75, bi (_ , a , LA.W.V.; Fall- Fitting -Test -2 Way �/O-Sewer Test
Gas Pipe; Size Anchors - Yard Gas Piping; Size Test
%1#.*'0`Water Pipe; Test- Anchors- Reg ulato r- Service Test
4,4 Electric Underground
+9- ��Wnums & Ducts; Clearance -Material -Support- Ins.
1 . irders- ills -Anchor Bolts -Joists- Vent s- C ripp ies
15. hcaess & Ventilation
ithnsuiation
-f?/ Card B-1 ,00' Date Card B-1
Date &k7
Date ' '_ ' Card B-1 Date Card B-1
Date /PLUMBING (Permit) OK except #'s
L?'. yWlater Ht .; Vent -Access -Combustion Air Baffle
OAter Pipe; Test & Anchor -Nail Protection
(i4D.W.V.; Test Fittings.� Anchor -Nail Protection
460, Shower Pan; Test, First Floor -Tub Access
th4- Test Tub & Shower, Second Floor -Tub Access
-27. Gas Pipe: Sixe & Anchors
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date ,kLECTRICAL (Permit) OK except #'s
2TZixture & Transformer Clearance -Ins. Protection
JIeO&Iec. Receptacles Spacing -Lights & Switches at Doors
L<A ize Box s & No. of Conductors Stapled
M.0e4ornex Installed Close to Edge of Studs & C.J.
Eouio. Ground made up w/Mech Fasteners -Bond Gas & Water
±t4ppliance Circuits in Kitchen & Conductor Size GFI
2460' Subfeed Wire SizV- L/ g;?CTor AI-A.C. Wire Size / / ga Cu or At
-Se- Range Circle/ / ga Cu or Al -Oven Circ. / / ga Cu or At
Insulated Neutral Q Yes Cl No
Service -Riser Conductors & Ground Main Disconnect
0?- Equip. Clearances Panels-Motors-Mech. Equip.
-00- Clothes Closet Light -Shower Light -Spa Light
a4- Smoke Detector
Card B-1 9�':E Dale Card B-1
Date Card B-1 Date Card B-1
Date MECHANICAL (Permit) OK except #'s
4�5-k.C. Ducts Insulation & Support
V Vent Fan, Exhaust above insulation
-911. Condensate Drain & Overflow, Size & Grade
"- Furnace -Vent Access -Comb. Air -Return Air Vent 115 outlet
3T' Attic Access & Platform if Furnace in Attic
Date( 1 10, fj% Card B-1 (Z: IT, Date Card B-1
Date Card B-1 Date Card B-1
Date FRAMING (Permit) OK except #'s
4 . 6iIIS Proper Materials & Anchors
W)Nalls Studs -Nailing Spacing & Brace s- Plates- Sound
earing Walls over Girders & Floor Nailing
R!aft Stop in Walls (rat proof)
(44. R(re Stops, Furred Ceilings -Stairs -Chasers -Tubs
4V Headers & Beams -Size & Bearing
Date 4 FRAMING (Continued)
4V Hangers -Post C aps- Anchors -Connectors
T7- Cling. Joist-Rftr. Ties- Purlin-Roff Brac.-Truss-Shting.-Rfng.
41�'.- f-leplace Ties or Type A Flue -Fireplace Throat Clearance
4Q/Attic Access, Size & Romex Protection- Draft Stop -Ins. Baffles
111- Bdrm. Windows or Exiling Doors -Sill Ht. & Dimensions
t1r- Garage Fire Protection Framing
±!:.Zroperty Line Firewall & Openings
�'f Ext. Doors -One 3' -Check Garage 3rd Story, 2 Exits
m5*,.,4tairs; Width- Headroom- Rise - Run- Landing- Fire Protection
V Plywood on Roof Overhang -Attic Vents -Rafter Outriggers
4
Se Sidina-Nailina Veneer
+—IStucco Mesh -Drip Screed -Fd. Vents-Underfir. Access
W Glazing Area -Glass Protection- S kylig hts- Plastic
!�Q�_hear Walls; Nailing -Bolts
I'll 01 f' , (K Kace Interior/Exterior Wall Panels
2. 01 d;o.00'lnsulation-Walls-Ceilings
62. 1 nfi It ratio n- Wal Is -Windows
Ea I =e, 01 CardB-1 Date Card B-1
Date Card B-1 Date Card B-1
Date
_L1bh*t (Plans) OK except #'s
6
—Ext. Steps -Door & Sidelight Protection- Landings
6Z:;_<S�Mtector
Oe�urnace
Venis-clearance-Comb, Air -Connector -
In G4LagerAbove Floor- Ducts- Mech. Protection
m Exiting
glo.o_G.J,;��ath
Fixtures & Tub Access -Spa
R<�Pler
Trim & Rubpanel, Breaker Sizes & Labels
69-915
rj_,&.R ails
70-44;9a,&.s�,
�-
7 1_'E
72-14
i. F wt. nce; roun &--net-
-115.
7
7
Elec. & Mech. Equip. Listed for Location
jM 7s7n_U3`ra`g_e7M
7Z_4mriTiatiop:
Eoam- Looked in Aule.-
80,AhTa'_,d_
Rails,& Deck-Qe"Vrr-ucfion- Post Caps
8*,-F6-n`VBents
& Crawl Hole Door Drainage & Wood -Earth
Clearance Looked under Flu� 4a �es
82.
Followin2jtasUd-tMe 3-VOT-j'-No/Walks :) Yes :) No/Planters :j Yes Me -
8 &.--5Tuc
c_2_qLowm�f` i n i s h
ad-K.—C
Unit Discann. ect. Elecirical-Plumbino
8?--E_xtq
pa?'Elec. Trim, C-P.T.-Receptacle- U nderg round
861*lentil��hroughout House
89-'Tlass Prq�tion
9&-115-or—rections from Previous Inspections
9j.. G@g T-t-h4at-g 7,99- 1- M6@4rq@ S
19 er & Se er Connected -C/O to Grade -HD Approval
t'0 �:� Energy Compliance Certificate-Other_(;_<C-tes
Posted
Datel __rLq�_OX Card B-kJL3 Date Card B-1
Date- Card B-1 Date Card B-1
Date Card B-1 Date Card B -I
Comments at Final:
CIAINTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive -iio,Oroville, California 95965 9 Telephone (530) 538-7541 NO.
(Rev. 12/96 APPLICATION AND PERMIT -
ZONING
SR %)e-
BUILDINGPERMIT
OWNER
NELSON1 MARK & Kim
TELEPHONE
898;-90Q4
SO. Fr. OCC. BUILDING VALUATION
420 R 22680.00
OWNEWS MXUNG ADDRESS
4251 SHORTHORN DR. =CO. CA 95973
72 C
CONTRAC ORS NAME
NEIL T C ' OLLINS
TELEPHONE
1865-4W2
-9-%.00
81 0 %7.W
277 0 1939.00
COWRACTOWS MAILING ADDRESS
26405 WILSON ST..U)S MOUNOSO CA 96055
CONSTRUCTION LENDER
Fireplace
LENDER'S MAILING ADDRESS
Total Valuation 26.122.50
ARCHITECT OR ENGINEER
LICENSE No.
Filing Fee $ - 20.00
Permit Fee $ 265.00
ARCHITECT OR ENGINEER'S MAILING ADDRESS
Plan Checking Fee $ 172.25
BUILDING DDRESS
4251 A SHORTHORN DR, CHI -�A 95973
Energy Plan Checking Fee $ 23.00
$
PERMIT FEE 460.25
LOT NO.
SUBDIVISIONS NAME
PARCEL W�F�
PLUMBING PERMIT Filing Fee 20.00
UiEOFSTRUCTURE
.SF. [K Duplex 0 Mobilehome 0 Other
SPECIFY
Each Trap 41 7-00 28.00
Solar or heat pump water heater 23.00
Water piping .15-00 15.00
Each gas water heater or vent 15.00
TYPE OF WORK
New 0 Addition V Remodel 0 Utilities 0 Installation 0 Other 0
Describe work: ADDITION FAMMY ROOM
Gas piping system 1 5 outlets 15.00
Building sewer 15.00 15.00
Mobile Home W @?20.00
PERMIT FEE 78.00
ELECTRICAL PERMIT Filing Feel 20.00
600V OR LE::
Main Service .A OR LE 23.00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under. penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division'3 of the Business and Professions Code,
and my license ii� in full force and effect.
License Class Lic. No.
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
0 1, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
1 as owner of the property, am exclusively contracting with licensed contractors
io construct the project.
I am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO 1000A 46.00
NEW CONST. DWELLING OCC
-OR ADDNS. Sup 3.54". 14.70
CONS T'_OUTLET @7.50
=RESIDT BI=1J.RCU'.
OWER AP= U
PSIN.LE 0 C SIR.
20 @ 1.00
Ex. Occu OUTLET OR FDcruREs
O.FMEDAPPLNS OR
Ex. Occup.. (..16.) EA. 5.00 7
Temporary Service 23.00
-Mobile Home Facilities 20.00
-Misc. Wiring 23.00
PERMIT FEE $ 34.70
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:.
0. 1 have and will maintain a certificate of consent to self -insure for workers,
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
13 1 have and will maintain workers' compensation insurance, as required by Section
3700 of the Labor Code, for the performance of workforwhich this permit isissued.
My workers' compensation insurance carrier and policy number are:
Carrier
MECHANICAL PERMIT Filing Fee 20.00
Heating r 15.00
Cooling L 15,00
Hood 6.50
Ventilation
PERMIT FEt s 50.00
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
of one hundred dollars ($100) or less.)
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers',
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
X Date Of
Signature of Applicant - G1. Owner -0 Contractor 0 Agent
An OSHA permit is required for excavations over 60" deep and clem6lition or construction
of structures over 3 stories in height. r.-
Mobile Home Installation Fee $
Energy Inspection e6 $ 46.00
cc
le 3
CONST. TYPE
VN TOTAL FEE $ 668, 95
HAZ.
I D. FEES IMP
I FLOOD
X
CDF
I X
PARCEL
X
I PO
X
I HD
Y
ISSUE
X
This permit is hereby issued under the applicable provisions
of the Butte County Code and/or Resolutions to do work
indicated above for which fees have been paid.
By �Date 14V
PERMIT EXPIRES ON
I (Da to)
ReceiptNo. 71 veqo�P 65Q 90 4 _1 _S A IF 25
/ PINK-IN51PECTOR GOLDENROD -A
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PPLICANT
CIJUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive * Oro�ill'd-,California 95965 * Telephone (530) 538-754 NO.
(Rev. 12/96) APPLICATION AND PERMIT - h) - dw
ER
541LOM-2-664
ZONING
SR $,a -I
BUILDINGPERMIT
OWNER
NaSON, MARK & KIM
TELEPHONE
898-9094
SO. FT. OCC. BUILDING VALUATION
420 R 22680.00
OWNERS MAIUNG ADDRESS
4251 SHORTHORN DR. CHICO, CA 95973
72 C 936.00
CONTRACTORS NAME
NEIL COLLINS
TELEPHONE
1865-4002
81 0 567.00
277 0 1913R.00
CONTRACTORS MAIUNG ADDRESS
26405 WILSON ST. LOS MOLINOS, CA 96055
CONSTRUCTION LENDER
Fireplace
LENDERS MAJUNG ADDRESS
Total Valuation is 26,122.50
ARCHITECT OR ENGINEER
UCENSE NO.
Filing Fee
$ 20.00
Permit Fee
$ 265.00
ARCHITECT OR ENGINEERS MAILING ADDRESS
Plan Checking Fee
$ 172-25
BUILDINGAIDDRESS
4251 SHORTHORN DR. CHICO, CA 95973
Energy Plan Checking Fee
$ 23.00
$
PERMIT FEE
$ 460 25
LOT NO.
SUBDIVISIONS NAME
1PARCEL MAP
PLUMBING PERMIT
Filing Fee 20.00
USEOFSTRUCTURE
SF EX Duplex 13 Mobilehome 0 Other
SPECIFY
Each Trap
4 7-0028.00
Solar or heat pump water heater
23.00
Water piping
15-00 15.00
Each gas water heater or vent
15.00
TYPE OF WORK
New 13 Addition)(] Remodel 13 Utilities 13 Installation 13 Other 13
Describe Work: -MDITION FAMILY R -00M
Gas piping system I - 5 outlets
15.00
Building sewer
15.00115.00
Mobile Home I s TWFw--F-'
11�,Lo�
PERMIT FEE
78.00
ELECTRICAL PERMIT
I Filing Feel 20.00
600V OR LESS
Main Service .A OR LESS
23.00
LICENSED CONTRACTOR'S DECLARATION
1 hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full force and effect.
Licen'se Class Lic. No.
OWNER-BUILDE R DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
0 1, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
1, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
0 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO 1000A
46.00
NEW CONST. DWELUNG OCCUR
OR ADDNS. & ACC. UDS.
so 14.70
3.50FT.
NEW CONST' ULT.1 OUT.LET
..ESID t. . U.T.
@7.50
WER AP= U
( .10M. 0 C SIR. )
Ex. Occu . ( OUTLET OR FixrURES )
'o "00
BAL .50
( ..FIXED APPLNS OR
Ex. Occup.. k
5.00
Temporary Service
23.00
Mobile Home Facilities
20.00
Misc. Wiring
23.00
PERMIT FEE
34.70
WORKERS' COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury one of the following declarations:
0 1 have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
0 1 have and will maintain workers' compensation Insurance, as required by Section
3700 of the Labor Code, forthe performance of workforwhich this permit is issued.
My workers' compensation insurance carrier and policy number are:
Carrier
Policy Number
(The above sections need not be completed if the permit is for work of a valuation
of one hundred dollars ($100) or less.)
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
X Date
Signature of Applicant - fit Owner 0 Contractor 0 Agent el
An OSHA permit is required for excavations over 60" deep and demolition or construction
of structures over 3 stories in height.
MECHANICAL PERMIT
Filing Fee 20.00
Heating r - -^ 15.00
cooling L--SftIT 1 J. UkJ
- 15.00
Hood 6.50
Ventilation
PERMIT FEt s 50.00
Mobile Home Installation Fee $
Energy Inspection Fee $ - 46.00
Occ
R 3
CONST . TYPE
VN TOTALFEE$ 668.95
- -
HAZ.
1 1). FEES, IMP I
_J X
FLOOD
I COF
X
PARCEL
X
I PO
X
I HD
X
ISSUE
X
This permit is hereby issued under
of the Butte County Code and/or
indicated above for which fees have
By
P RMIT EXPIRES ON
the applicable provisions
Resolutions to do work
been paid.
Date 4001
Receipt No 3 31SOT (059 100 1__>1 -3 Q) S 6 2 c-;
WHITE-D.D.S.-B.D. CANARY-ASSESSOY PINK -INSPECTOR GOLDENROD. =
F
k;UUM-Y OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
I - 7 County Center Drive - orovil'Ie. California 95965 - Telephone (530) 538-754 ERMIT NO.
Rev. 12/96), . \.� IV 'J'J 1, 4
APPLICATION AND PERMIT
rA�S E96OR PARCEL NUMER ZONING
B UU 11
01"NE. WING PERMIT
IER T
L
DING PERMI
CC
OWNERV MOULING 107 SO. FT. OCC.
BUILDING VALUATION
aI cowrPo=oirs mum
11-Z T
r1ON9rRVCr10N LENDER
OR ENGINEER
ON CHONEERV MAJUNG ADDRESS
LOT"O. ou"Nsions
E ---'= ki TAU CYURL
SF A, Duplex o Mobllehome 0 Other
TYPE OF WORK
Now E3 Addition Remodel E3 Utilities E3 InstallaYon El Other E3
Describe Work:
*PERMrr FEE PAX0
SRA
SHERIFF
OTHER
AMOVNT RECEZVED
E
) -'V0 -F6 C
0, DO
100
*RECEIPT NVMBER
TO k KM INTO COMPVTER
?)
Fire lace I
$ 129-100
ELECT L PERMIT
Total Valuation
20.00
Main Service ( =
Filing Fog
-" LE -'-s
23.00
Permit Fee -2! 55.
—46.00—
20.00
/1"
Plan Checking Fee 1717.2
S
NONACSID. MULTi-ouTLET
@7.50
Energy Plan Checking Fee
POWER APPAPAtua
a SINGLE 0 CJP
L
--- PERMIT FEE
$
Ex. Occup. F D A OR
PLUMBING PERMIT
Filing Fee
20.
Each Trap
Temporary Service
7.00
0 -)R -
Solar or heat pump water heater
23.00
2.3. o U,
Mobile Home Facilitie
Water elping
15.00
20.00
Each gas water heater or vent
Msc. Wiring
15.00
Gas pleing, system I - 5 outlets
23.00
15.00
W001
PERMIT FEE
Buildina sewer
15.00
Filing Fee
Mobile Home W
Tw —*
7G 71
Heating
20.0
PERMIT FEE
$ 129-100
ELECT L PERMIT
Filing Fee
20.00
Main Service ( =
-" LE -'-s
23.00
200A TO I DWA
—46.00—
NEW CONST
L;=MainService
OR ADDms., DW o0cup,
AM. Flint
3. 5c FsTo.-
NONACSID. MULTi-ouTLET
@7.50
POWER APPAPAtua
a SINGLE 0 CJP
L
OCCUP. OLITLET OR FarrUREii
TFIXE 711P.
---
W —@, 00
Ex. Occup. F D A OR
SAL 0 so
oVrLErss [RESID.) FAA
Es
5.00
Temporary Service
23.00
Mobile Home Facilitie
S
20.00
Msc. Wiring
23.00
PERMIT FEE
$
MECHANICAL PERMIT
Filing Fee
20.00
Heating
Cooling
Hood
6.50
PERMIT FEP-- S —!;-o 0 C
Mobile Home Installation Fee S
nspection Fee
00;7�gy-YYE TdTAL FE
c
This permit is h 'reby Issued under the applicable pr ions
of the
Butte Mrity Code and/or Resolutions to doov'ewo,k
indicated above for which fees have been paid.
By —
PERMIT EXPIRES ON
Date
C1,0UNTY OF BUTTE - DEPARTMENT OF'DEVELOPMENT SERVICES - BUILDING DIVISION
7 COUNTY CENTER DRIVE OROViLLE, CALEFORNIA 95965 - TELEPHONE (530) 538-7541
PE"IT A'PPLICA TION DA TA SHEET
OWNER: ASSESSOR PARCEL NUMBER: (D 4/ 1- 530 - 00 V
Proposed Building Use: a&-,(jh'nn SF" Building Inspector: 0
AZ Date:
At time of permit application, I was advised the foHowing data must be submitted prior to permit processing andVor issuance:
Date Re&ived By
El 1. All lierns have been submitted --------------------------------------------------------------------------------------
Plot plans, 3/4 sets, signed by the preparer of plans - ----------------------------------------------------
Complete plans, 3/4 sets, signed by the preparer of plans - ---------------- ----------------------------
- -f4. Engineered plans, 3/4 sets, with wet signature on plans. All engineering must be shown on plans.
T
Engineered truss details and layout in duplicate (required prior to plan review) No faxes! ---------
Energy Design Compliance and supporting documentation - -------------------------------------------
0 7. Statement of Intent. for Non -Heated and A/C Buildings - ------------------------------------------------
0 8. H&z-,frdous Material Form.
Pj;S,1act$ur n clions mc Tie Down Specifications
of.............................
41*��pact fees as shown on the attache�, schedule. --------------------------
2. California Department of Forestry plan approval/fees. ---------------------------
0 13. Flood elevation certificate - -------
�Q 4. Sanitation and plot plan approval
7 UA blux
Health Department.
El 15 1 of Chico plumbing permit - ------------------------------------
�_�. tot plan and business license approval from the City of Biggs.
?7. Planning approval for (A) Use: . q�!s )-.-, _ (B) Parking:.
0 18. Contact Land Development about El Improvements, El DrainaglZ,5-�gal Parcel.
0 19. Encroachment Permit for driveway (construction approval prior to occupancy). --
El 20. Pre -inspection for
required. Request to Budding Inspector on
021. Contractor's license information. (Number, Name Style, Classification). L --------
022. Workers' Compensation carrier and policy number - -----------------------------------------------------
E123. Owner -Builder Verification (Given to owner El, Mailed to owner 11) - -------------------------------
E124. Letter of signature authorization - --------------------------------------------------------------------------
025. Recorded copy of Agricultural Acknowledgment Statement - -------------------------------------------
026. Letter of intent on building use - -----------------------------------------------------------------------------
027. Manufactured Home utility clearance - ---------------------------------------------------------------------
El 2 8. Existing violations and/or expired permits - ---------------------------------------------------------------
029. 11433 A, dGrant Deed, 0 M.H. Title, El Check to H.C.D $ - --------
E130. Other:
8-7 �)_ 0 1 _17;2�
It
_--,% - .3,
(Date)
When you issue the ermi Irocess as follows El Mail to owner, EIM *1 t tr tor.
&1P t - Al �.o con, ac
Aelephone 0 and hold for pickup at Q-�Nl office� El Deliver with inspector.
I /_� A o/ %
Apphc'ant: Date:
Copy of Haz-Mat form sent 11 Health Department, 0 Fire Department, 13 Air Pollution Date: By:
Copy of plans sent 0 Health Department, 0 Fire Department ther: Date: By
1. Index permit application for the above iteffis numbei RT I 15*flan Check List
2. Additional items required: N
Contractor, designer, owner, was advised of the above required data by 11 phone, 11 mail; 0 Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by o phone, 11 mail, o Building Division counter" by Date:
Contractor, designer, owner, was advised of the above required data by 11 phone, 13 mail, 13 Building Division counter, by Date:
Contractor, designer, owner, was advised of the ab
re25r%data by 0 phone, []'mail, 13 Building Division counter, by Date:
Plans reviewed by: mrl Date: PP5' 9-01 Plans appir�edby: YKC, _D_ait�79 --ZZ 0 1
Sets of plans on hold *in 1:1 Plan Cabinet, 0 A.P. folder., Note transfer by: Date:
Yellow Copy - Department of Development Services, Building Division.
COUNTY OF BUTTE
DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE (530) 538-7541
OWNER SCHEDULE OF FEES DUE
PROPOSED BUILDING USE
�d Ar
1. BUILDING PERMIT FEES
--Balance Due ................................... ..... . ......... ..
--Additional Fees Due ............................................ $
--Additional Fees Due ............................................ $
--Revised Plan Checking Fee ................................. $
t
2. SCHOOL DIS TRICT FEES
(paid at District Office) V
3. SHERIFF FEES (paid at Building Division)
Residential .................................... — x $360.00 = $
Units
Commercial, (sq. ft.) ...................... — x $0.03 = $
Sq. ft.
4. URBAN AREA FEES
Residential ............................ — x = $
# Units Amt.
Commercial (Sq. ft.) .... ........ —X—=$
Sq. ft. Amt.
5. RECREATION DISTRICT FEES
6. THERMALITO DRAINAGE DISTRICT FEES
$510.00 (paid at Building Division)
7. SRA FIRE INSPECTION AND PLAN CHECK
1§2.09 �paid at Building Division)
8. WATER TENDER FEES (Battalion
$200.00 (paid at Building Division)
9. CSA 87 TRAFFIC FEE
$2500.00 (paid at Building Division)
10. OTHER
A.P. # 0 9 -7 - 53i�9 -00
DATE 9--- / R —v /
RECEIPT #
3 3 / kO,3
DATE REC.
R-,/ 3 -C) �
At time of permit application, I was advised the above fees are required to be paid prior to issuance of the building permit. These fees
may be changed during the plan checking process.
APPLICANT DATE 0
Pursuant to Government Code Section 66020, you are hereby notified that items 2, 3, 4, 5, 6, 7, 8, 9, and 10 above may have been
impos6d on your project. You have 90 days from the date of approval of the project or from the imposition of the above mentioned
items during which you may protest. The requirements for a protest are specified in Government Code Section 66020(a).
Original - Building Div. 2nd Copy - Applicant .3rd Copy - Owner (Rev. 6/00)
4
School District
A.P. Number
Property Owner
4
BtfftE COUNTY -SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
0 Building Department No.
55o, -Coq Jurisdiction: city cou*nty
Property Location/Address 1 C) r -t- v v,� Y --
Subdivision Lot No.
Residental Development
4pogo, iving Mobile Horne
,� r1t
6n-fts installation
ComMercial/Inclustrial
New Addition
Building Department Representative
........................ I ..........................................................................................
Sq. Footage
Addifibri/ *Supplemental to
(Group R)
Conversion Permit #
*(No foundation inspection
...................................
............ ............ ...........................................
s reviewed bv School
District Identification No.
S2) �.Schooi District certifies that
Personnel)
Sq. Footage i
(including Exterior
Roofed Areas)
(ID 2-.0
Date
(City)
(State) (Zip Code)
has complied with the requirements of Resolution No. --7 i� by payment of
f
representing
:7 0=4 square feet. AB 2926 $
LFULL MITIGATION $
School District RepreientaVve 4:z�
Date If
Paid by Check # Remarks:
'to- rf
Notice: You may protest the imposition of the fee�s identified above by submitting,a written protest to the District, in compliance with
Government Code Section 66020(a), within 90 days. from the date fees are'paid. Fail re to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning -Agency that this prdject is being reviewed under the California 'Environmental Quality Act JCEQA),
this project may be subject to additional school feei to fully mit:19ate its impact an the school district's schools.
White (applicant), Yellow (building depart 0, Pink (school district) feeform.xis (10198)dmm
AiPPLICANT:
OWNEM:
PERWr
A. P. #:
WORK DESCRI
DATE
117 f Cl
(01 — I cl q C)
g:)4 -7 -!530 —CDOC4
[ON:.,
DESCRIPIM OF STEP
CA� -�-o —
rcLtlt
u (59A
��f-CA :5 �OK
IMA
I :11io
A %
'� �no C�Cov-s
a"(4 - Ct
Lzz
NO seq
R MMA��
TO: Building Department Aom
FROM: Environmental Health
SUBJECT: Sanitation Clearance
E.H. USE ONLY
,-,�Plot Plan Attach.d�-�
Floor Plan AnaSILed
sa�vtp 8.1).
A/eko'lh '4251 V.Ve�qlyn
Owner Location AP#
Plan Approved for: Sewage Disposal _2e Water Supply: Public Private Well --V—,
Clearance for . Other —6ae-3r-1 /160M.
Hold final for:
Final clearance O.K. for:
NOTE:
C, 21LA��Zd krri /
Environmental Health Specialist Date
8/96
�.Mark, &Kim Nelson
4251 Shorthorn Dr.
Chico,, CA 95973
1
Scale 1" 30'
APN 047 530-004
Environmental Vioalth
AUG 2 7 2001
Chico, Calitornia
APPROVED
KAY
—�' �-!adfth
.. ... .....
HAF
ise
Q1 133 1:�
lit
ZI
Wk
OF BUTTE.............
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
411 Main Street * Chico, CA* (530) 891-2751
7 County Center Drive 9 Oroville, CA - (530) 538-7541
CORRECTION NOTICE
.""4
A
O_WN�R_ PERMI� NO.
� ;a
1
A routine inspection indicates that the following violations of butte county Ordinances exist at the
7s n S'ou
above addre' d h ld be corrected. Please notice this office when correction of work is
I.
completec , Y:u have any questions pertaining to this matter, or need additional explanation,
A�'
please coi Nfict this office immediatelv.
A
Date Inspector
REV 10/92
7,
COUNTY OF BUTttl I I I
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES,
411 Main Street e Chico, C��-(530) 891-2751
7 County Center Drive o Clrovift-, CA - (530) 538-7541
CORRECTION NOTICE'
ANWIR PERO NO.
A routine inspection indicates that the following violations of butte county Ordinances exist at the
above address and should be corrected. Please notice this office when cofrection of work is
completed. If you have any questions pertaining to this matter, or need addition�l explanation,
Aplee co�ntact this office immediately. -i
00 c L^ %=N r
L L
14
�5L
Date 4—(
REV 10/92
*Q( Inspector
" . - 'k . , ,
Department of Development Services
.Building bivision
7 County Center Drive
Oroville, CA 95965
(530) 538-7541 (530) 538-2140 FAX
Residential Construction Requirements
HAPORTANT
This set of plans and specifications MUST be kept on the job site at all times and it is unlawful to make
any changes or alterations on same without written permission from the Building Division, County of
Butte.
All materials and workmanship shall be in accordance with recognized good practices and of a quality
prescribed for the specific use in the 1998 California Building Code (1997 U.B.C.), 1998 California'
Plumbing Code (1997 U.P. C.), 1998 California Mechanical Code (1997 U.M. C.), and the 1998 California
Electrical Code (19'96 N.E.C.)
The following items are separated into two categories (general and specific). The "general" items are for
your reference and are not specifically called out on the plans by the plans examiner. These items MUST
be complied with, if applicable, and it is the builder's responsibility to comply. The "specific" items have
l5een keyed to the plans. If an item is inadvertently left out or missed, it does not relieve the builder of any
responsibility for code requirements, general or specific'.
GENERAL REQUIREMENTS
Guest rooms and habitable rooms shall have natural light equal to 10% of the floor area and natural ventilation equal to 5%
of the floor area (Sec. 1203, U.B.C.)
Provide required room dimensions and ceiling height. (Sec. 310.6, U.B.C.)
Provide lights, switches, and receptacles for maintenance of mechanical equipment. (Sec.306, U.M.C.)
Approved vent and adequate combustion air for gas water heater and/or furnace. (Ch. 7& Ch. 8, U.M.C.)
Provide minimum one 3'-0" exterior door. (Sec. 1003.3.1.3,U.B.C.)
Provide adequate clearance and type A flue for fireplace/woodstove.
All stairways to comply with U.B.C. section 1003.3, for rise, nin, headroom, width, landings and handrails.
Hallways to be minimum 36" wide (U.B.C. 1004.3.3.2).
Underfloor access and ventilation per Sec.2306.3 & 2306.7, U.B.C.
Attic access and ventilation (UBC section 1505).
Provide approved flashing at all exterior openings.
Provide 18" platform for appliances/equipment in garage capable of producing a flame, spark or glow.
Provide protection of appliances in garage from vehicular damage.
Closet lights per N.E.C. Article 410-8.
Provide certificates of conformance for all glu-lam beams.
Provide approved spark arrester at all chimneys/type "A" flues.
• Provide Y2"x 10" anchor bolts @ 6' o.c. max. and . within 12" of all joints. Provide 2"x 2"x 3/16" steel plate washer @ each
bolt. (Sec. 1806.6, U.B.C.)
• Foundations with sternwalls shall be provided with a minimum of one number 4 bar at the top of the wall and one number
4 bar at the bottom of the footing. (Sec. 1806.7. 1, U.B. Q
• Slabs -on -ground with turned -down footings shall have a minimum of one number 4 bar at the top and bottom (Section
1806.7.2, U.B.C.)
• Guardrails to have minimum 36" high top rail, with intermediate rails spaced that a 4" sphere cannot pass through (Sec.
509, U.B.C.)
Pagel of2 Owners Name: ��50tl
Building Permit Number:
Plans Examiner: Martha Christy
Veneer per Ch. 14, U.B.C.
Exterior plaster — weep screeds (U.B.C. section 2506.5').
Skylights per Sec. 2409 & 2603.7,-U.B.C.
Protect plastic foam insulation per Sec. 2602.4, U.B.C.
Ground fault protection shall be required in all bathrooms, garag I e, kitchen, wet bar, and exterior receptacles (NEC 210).
Electrical, mechanical', and plumbing construction (not plan reviewed) shall comply with the current editions of the
National Electrical Code, Uniform Mechanical Code and Uniform Plumbing Code.
Minimum water closet clearances of 15" from its center to sidewall and 24" front clearance (U.P.C. 408.6).
Minimum shower compartment size of 1024 sq. in. & 30" circle (U.P.C. 412.7).
Provide plumbing fixtures, water closet clearances and shower sizes per U.P.C.
SPECIFIC REQUIREMENTS
.1. Provide safety glazing in all hazardous locations (U.B.C. section 2406).
2. Garage firewall separation — required on garage side, including supporting wafts and posts (U.B.C. section 302.4 exception
#3).
3. Install smoke detector's as per the' requirements of U.B.C. section 310.9. 1.
4. Special roof covering required, class B minimum.
5. Provide 2 sepa�ate exits from the third story (U.B.C. section 1004.2.3.2 exception #4).
6. Every bedroom shall have at least one operable window or door. Windows shall have a minimum net clear openable area
of 5.7 square feet. Additionally, the wi ' ndow shall have a minimum net clear openable height of 24" and a minimum net
clear openable width of 20". The window sill height shall not be more than 44" above the -floor (U.B.C. 310.4).
COLOR CODE USED ON PLANS
Blue = Engineering Pink = Firewall
Green = Braced wall panels Yellow = Important
COMPLY WITH ITEMS INDICATED BELOW
Your parcel lies within a designated 100 -year flood plain. Finish floor, electrical, H.V.A.C. equipment and services
shall be a minimum of one foot above the elevation shown on the attached Flood Elevation Certificate. A Post F7ood
Elevation Certirwate )vill also he required
Note:. We will normally accept the following as compliance with the flood elevation requirements:
1. Building is anchored to concrete sternwall system with conventional anchor bolts.
2. Building plate on top of sternwall to be one foot or more above the 100 -year flood elevation. (Plate height less than 24"
above grade, or engineered design required).
3. Electrical, heating, ventilation, plumbing and air conditioning equipment and facilities located above the plate.
4. At least 2 openings in exterior walls, located on opposite or adjacent walls with a total net area of not less than I square
inch for every square foot of enclosed area.
5. The bottom of the openings shall be no higher than I foot above grade.
6. The openings may be screened or covered with other devices that will permit automatic entry and exit of floodwater.
Fire sprinklers are required in this structure.
This parcel is located within the California Department of Forestry and Fire Protection area. Compliance with the
attached CDF fire safe requirements will be necessary. .
All structures and eqw* ment including overhangs shall be clear of all easements.
A setback ofdb ;,Wrn the side and �Q 'from the rear property lines and 20 feet (25 feet if Federal Aid Route)
from the edge of the right of way shall be clear of structures and equipment except for a 2 foot overhang.
Expansive soil may be enco"tered on this site. This condition may require the foundation to be designed by a
California registered engineer or licensed architect.
Page 2 of 2 Owners Nam e:
Building Permit Number:
Plans Examiner: Martha Christy
0
I r,
CERTIFICATE OF.COMPLIANCE: RESIDENTIAL., Page 1 CF -1R
Project Title .......... The Nelson'Addition Date..08/03/01 12:49:33
Prolect Address 4251
Chico *v6.01*
Documentation Author... ' Marty Runnells
Energy Calculation Services
1907 Mangrove Avenue, Suite E
Chico, CA 95926
530-894-8466
Climate Zone ........... 11
Buij-Gtinj Permit
t5 - cq5- (91
Plan Che / Date
Field Check/ Date'
Compliance Method ...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM CF -1R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
Component
Type
GENERAL INFORMATION
Conditioned -Floor Area .....
Building Type ..............
Construction Type .; ........
Building Front Orientation.
Number of -Dwelling Units ...
Number of Stories ..........
Floor Construction Type ....
Glazing Percentage .........
Average Glazing U -factor ...
Average Glazing SHGC .......
Average Ceiling Height .....
420 sf
Single Family Detached
Addition Alone
Front Facing 180 deg (S)
0.25
1
Raised Floor
22.4 *-. of floor area
0.54 Btu/hr-sf-F
0.65
9.9 ft
BUILDING SHELL INSULATION
Frame Cavity Sheathing Total Assembly
Type R -value R -value R -value U -factor Location/Comments
Wall n/a R-13 R-n/a
Roof n/a R-38 R-n/a
Floor n/a R-19 R-n/a
Orientation
R-13 0.088 PLAN FRONT, LEFT
BACK, RIGHT
R-38 0.025 TO ATTIC, VAULTED
R-19 0.037 RAISED FLOOR
FENESTRATION
Area U_ Interior
(sf) Factor SHGC Shading
Over -
Exterior hang/
Shading Fins
Door
Front
(S) -60.0 0.550
0.650 Standard
Standard
Yes
Window
Back
(N) o6.0 0.520
0.6SO Standard
Standard
None
Window
Back
(N) -4.0 0.520
0.6SO Standard
Standard
None
Window
Right
0.520
0.650 Standard
Standard
None
Window
Right
0.520
0.650 Standard
Standard
None
HVAC SYSTEMS
Refrigerant
Tested ACCA
Equipment
Minimum Charge and
Duct Duct
Duct Manual
Thermostat
Type
Efficiency
Airflow
Location R -value
Leakage D
Type
RoomHP 6.60 HSPF n/a None
ACSplit 10.00 SEER No None
R-n/a n/a n/a Setback
R-n/a n/a dU p,,L!�aWa..,p�jbjack
N_ .- .
?I, -
MUM -WING ENEPARTMOo,
f P
-k JROVE
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R
Project Title .......... The Nelson Addition Date..08/03/01 12:49:33
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM CF -1R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
REMARKS
For ease of plan check, the Front of the building is determined
by Plan Front, and does not necessarily contain the entry door.
this in no way alters the actual orientation of any opaque or
non-opaque surface.
TXV and Duct Pressure testing are not required. They model the
standard in these calculations as the existing system
will be extended to serve the addition.
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section,
DESIGNER or OWNER
Name .... Thomas W. Norlie Name....
Company. Architect Company.
Address. 569 E. 18th Street Address.
Chico, VA. 95928
Phone �530_8 2g6(:�,—�'P'hyne ...
License.
Signed.. 0)�3-�(Signed. .
teT–
ENFORCEMENT AGENCY
Name ...
Title. .
Agency.
Phone ...
Signed.
(date
DOCUMENTATION AUTHOR
Marty Runnells
Energy Calculation Services
1907 Mangrove Avenue, Suite E
Chico, CA 95926
530-894-8466
W, f0 _-, � �z� A I
AJ ITE CQUmy
MG DEPARIV. Ep,
'__ r%.O%
APPMUVEm
_1
MANDATORY MEASURES CHECKLIST:`RESi1DENTIkL Page 1 MF -1R
Project Title .......... The Nelson Addition Date..08/03/01 12:49:33
D-rn�o=t-t- AArl-r,=aa AOC�l
Chico *v6. 01*
Documentation Author ... Marty Runnells Building Permit #
Energy Calculation Services
1907 Mangrove Avenue,. Suite E Plan Check / Date
Chico, CA 95926
530-894-8466 Field Check/ Date
Climate Zone ........... 11 - I
Compliance Method ...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM MF -1R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. Items marked with an
asterisk (*) may be superseded by more stringent compliance requirements listed
on the Certificate of Compliance. When this checklist is incorporated into the
permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether
they are shown elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
Design- Enforce-
er ment
*150(a): Minimum R-19 ceiling insulation.
150(b): Loose fill insulation manufacturer's labeled R -Value.
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls).
*150(d): Minimum R-13 raised floor insulation in framed floors.
150(l): Slab edge insulation - water absorption rate no greater
than 0.30-., water vapor transmission rate no greater than 2.0
perm/inch.
118: Insulation specified or installed meets insulation quality
standards. Indicate type and form.
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints
and penetrations caulked*and sealed.
150(g): Vapor barriers mandatory in Climate Zones 14 and 16
only.
150(f): Special infiltration barrier installed to comply with
Sec. 151 meets Commission quality standards.
150(e): Installation of Fireplaces, Decorative Gas Appliances
AtIA
6M
WMA,
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilots allowed. ai rm/cew
?kjPWING DEPAWTV-P
MANDATORY MEASURES
CHECKLIST:`RESibENTIAL
Page 2
MF -1R
Project Title .......... The Nelson Addition
Date..08/03/01
12:49:33
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM MF -1R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
Design- Enforce-
er ment
110-113: HVAC equipment, water'heaters, showerheads and
faucets certified by the Commission.
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA.
150(i): Setback thermostat on all applicable heating and/or
cooling systems. V/
150(j): Pipe and Tank insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -
recirculating systems, insulated (R-4 or greater).
3. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping insulated in recirculating
sections of hot water system.
5. Cooling system piping below 55 degrees insulated.
6. Piping insulated between heating source and indirect
hot water tank.
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and in-
sulated, to meet the requirements of the 1998 CMC sectons
601, 603, and 604, and standard 6-3; ducts insulated to a
minimum installed level of R-4.2 or enclosed entirely
in conditioned space. Openings shall be sealed
with mastic, tape, aerosol sealant, or other duct -closure
system that meets the applicable requirements of UL181,
UL181A, or UL181B. If mastic or tape is used to seal openings
greater than 1/4 inch, the combination of mastic and either mesh
or tape shall be used. Building cavities shall not be used for
conveying conditioned air. Joints and seams of duct systems and
their components shall not be sealed with cloth back rubber
addhesive duct tapes unless such tape is used in combination with
mastic and drawbands.
2. Exhaust fan systems have backdraft or automatic dampers.
3. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers. alA
114: Pool and Spa Heating Systems and Equipment
1. System is certified with 78% thermal efficiency, on-off
switch, weatherproof operating instructions, no electric
resistance heating and no pilot light.
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation uw7 *n-,
pump time switch. om
115: Gas-fired central furnaces, pool heaters, spa heaters,,o,r
t. Al F -11V
household cooking appliances have no continuously burning, RMNG DEM. 10,�
'WPR 0%:Er%
if Ly
MANDATORY MEASURES
CHECKLIST: RESIDENTIAL
Page 3
MF -1R
Project Title ........... The Nelson Addition
Date..08/03/01
12:49:33
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM MF -1R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
pilot light (Exception: Non -electrical cooking appliances
with pilot,< 150 Btu/hr).
LIGHTING MEASURES
Design- Enforce-
er ment
150(k)l: Luminaires for general lighting in kitchens shall
have lamps with an efficacy of 40 lumens/watt or greater
for general lighting in'kitchens. This general lighting
-shall be controlled by a switch on a readily accessible
lighting control panel at an entrance to the kitchen.
150(k)2: Rooms with a shower or bathtub must have either at
least one luminaire with lamps with an efficacy of 40
lumens/watt or greater switched at the entrance to the
room or one of the alternatives to this requirement
allowed in Sec. 150(k)2.; and recessed ceiling fixtures
are IC (insulation cover) approved.
Ali TW111; co, U AiO * 10
TY."40,21 DEPARPAR'
COMPUTER METHOD SUMMARY Page 1 C -2R
Project Title .......... The Nelson Addition Date..08/03/01 12:49:33
Project Address ........ 4251 Shorthorn
Chico *v6.01*
Documentation Author ... Marty-.Runnells Building Permit #
Energy Calculation Services
1907 Mangrove Avenue, Suite E Plan Check / Date
Chico, CA 95926
530-894-8466 Field Check/ Date
Climate Zone ........... 11
Compliance Method ....... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM C -2R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
MICROPAS6 ENERGY USE SUMMARY
Energy Use
(kBtu/sf-yr)
Space Heating ...........
Space Cooling ..........
Standard
Proposed
Compliance
Design
Design
Margin
20.02
18.37
1.65
16.52
17.99
-1.47
Total 36.54 36.36 0.18
*** Water Heating not calculated ***
GENERAL INFOP14ATION
Conditioned Floor Area .....
Building Type ..............
Construction Type .........
Building Front Orientation.
Number of Dwelling Units ...
Number of Building Stories.
Weather Data Type ..........
Floor Construction Type ....
Number''of Building Zones ...
Conditioned Volume .........
Slab -On -Grade Area .........
Glazing Percentage .........
Average Glazing U -factor ...
Average Glazing SHGC .......
Average Ceiling Height .....
Floor.
Area Volume
Zone Type (sf) (cf)
420 sf
Single Family Detached
Addition Alone
Front Facing 180 deg (S)
0.25
1
ReducedYear
Raised Floor
1
4172 cf
0 sf
2 -2.4
. of floor area
0.54 Btu/hr-sf-F
0.65
9.9 ft
BUILDING ZONE INFORMATION
# of
Dwell Cond- 'Thermostat
Units itioned Type
HOUSE I
Residence 420 4172 0.25 Yes Setback
Vent
Vent
Air
Height
Area
Leakage
(ft)
(sf)
Credit
2.0 Standard No
�,_�OMW V
"q.,LDING DEPAH -i V1. E ro.
P4_
COMPUTER METHOD SUMMARY Page 2 C -2R
Project Title .......... The Nelson Aaaitlnn r) = i- � r) 0 / f) -1 / n -1 1 A n - -) -)
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM C -2R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
OPAQUE SURFACES
Orientation
HOUSE - New
1 Door
2 Window
3 -Window
4 Window
5 Window
Surface
FENESTRATION SURFACES
Area U_ Act Exterior Shade Interior Shade
(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
Front
(S)
Area
U_
Insul
Act
Standard/0.76
Solar
Form 3
Location/
Surface
(sf)
factor
R-val
Azm
Tilt
Gains
Reference
Comments
HOUSE New
0.650' 0
90
Standard/0.76
Standard/0.68
Right
(E)
12.0
0.520
1
Wall
197
0.088
13'
180
90
Yes
None
PLAN FRONT
2
Wall
107
0.088
13
270
90
Yes
None
LEFT
3
wall
239
0.088
13
0
90
Yes
None
BACK
4
Wall
136
0.088
13'
90
90
Yes
None
RIGHT
5
Roof
60
0.025
38
n/a
0
Yes
None
TO ATTIC
6
Roof
404
0.025
38
180
29
Yes
None
VAULTED
7
Floor
420
0.037
19
n/a
0
No
None
RAISED FLOOR
Orientation
HOUSE - New
1 Door
2 Window
3 -Window
4 Window
5 Window
Surface
FENESTRATION SURFACES
Area U_ Act Exterior Shade Interior Shade
(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
Front
(S)
60.0
0.550
0.650 180
90
Standard/0.76
'Standard/0.68
Back
(N)
n/a
0.520
0.650 0
90
Standard/0.76
Standard/0.68
Back
(N)
.6.0
4.0
0.520
0.650' 0
90
Standard/0.76
Standard/0.68
Right
(E)
12.0
0.520
0.650 90
90
Standard/0.76
Standard/0.68
Right
(E)
12.0
0.520
0.650 90
90
Standard/0.76
Standard/0.68
OVERHANGS AND SIDE FINS
—Window—
—
Overhang—
—Left Fin—
—Right Fin—
Area
Left
Rght
(sf)
Wdth
Hgth
Dpth
Hght Ext
Ext
Ext Dpth Hght
Ext Dpth Hght
HOUSE - New
1 Door 60.0 n/a 6.67 7 0 n/a n/a n/a n/a n/a n/a n/a n/a
Syst ' em
Type
HOUSE
RoomHP
ACSplit
HVAC SYSTEMS
. Refrigerant
Minimum Charge and Duct
Efficiency Airflow Location
6.60 HSPF n/a None
10.00 SEER No None
REMARKS
For ease of plan check, the Front of the building is determined
by Plan Front, and does not necessarily contain the entry door.
this in no way alters the actual orientation of any opaque or
non-opaque surface.
TXV and Duct Pressure testing are not required. They model t "iell rTE COUW
standard in these calculations
ehe � ""WNG DEPM I MEN?
A ROVEX.V1
r'p n
Tested
ACCA
Duct
Duct
Manual Duct
R -value
Leakage
D Eff
R-n/a
n/a
n/a 1.000
R-n/a
n/a
n/a 1.000
For ease of plan check, the Front of the building is determined
by Plan Front, and does not necessarily contain the entry door.
this in no way alters the actual orientation of any opaque or
non-opaque surface.
TXV and Duct Pressure testing are not required. They model t "iell rTE COUW
standard in these calculations
ehe � ""WNG DEPM I MEN?
A ROVEX.V1
r'p n
COMPUTER METHOD SUMMARY Page 3 C -2R
D -r r -N -; = - i- Ir 4 1- 1 - rrj__ T�T_! -3 -3 1 . - - I - - I
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -FORM C -2R
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
REMARKS
I
I , -M
NJ I Ce,
a D, E: P,4. R.
PPRO
HVAC SIZING Page 1 HVAC
Project Title .......... The Nelson Addition Date..08/03/01 12:49:33
Pro�ect Adrl----- AOql
Chico *v6.01*
Documentation Author ... Marty Runnells
Energy Calculation Services
1907 Mangrove Avenue, Suite E
Chico, CA 95926
530-894-8466
Climate Zone ........... 11
Compliance Method ...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -HVAC SIZING
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
GENERAL INFORMATION
Floor Area .................
420 sf
Building
mit #
Plan
Check / Date -
Field
Check/ Date
Compliance Method ...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-01291ADD Wth-CTZ11S92 Program -HVAC SIZING
User#-MP1333 User -Energy Calculation Servic Run -420 SF Addition
GENERAL INFORMATION
Floor Area .................
420 sf
Volume .....................
4172 cf
Front Orientation ..........
Front Facing
180 deg (S)
Sizing Location .............
CHICO EXP STA
Latitude ..........
39.7 degrees
:****—.,
Winter Outside Design ......
27 F
Winter Inside Design .......
70 F
Summer Outside Design ......
102 F
Summer Inside Design .......
78 F
Summer Range ...............
37 F
Interior Shading Used .......
Yes
Exterior Shading Used ......
Yes
Overhang Shading Used ......
Yes
Latent Load Fraction .......
0.20
HEATING AND COOLING
LOAD SUMMARY
Heating
Cooling
Description
(Btuh)
(Btuh)
Opaque Conduction and Solar ......
3733
1848
Glazing Conduction ...............
2179
1216
Glazing Solar ....................
n/a
1917
Infiltration ....... ..............
2638
867
Internal Gain .....................
n/a
0
Ducts............................
0
0
Sensible Load ....................
8551
5848
Latent Load ......................
n/a
1170
Minimum Total Load
8551
7017
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting.the HVAC equipment.
LONGFELLOW LUMBER CO.
• Quality Truss Design
• Roof & Floor Systems
(800) 678-0112
(530) 893-0112 9 FAX (530) 893-0140
89 Loren Avenue
Chico, CA 95928-7434
Cu'storne r:
Address: 'JIgarl-horly D/,-'
AP#:
I
INC*
Job No:. 16'e1'50w 1q" t- �- k/ 0.;1
Alpine Engineered Products, Inc.
Christian W. Chappell
8351 Rovana Circle
Sacramento, CA 95828-2522
(916) 387-0116
APPROVED INSPECTION AGENCY
Timber Products
P.O. Box 20455
Portland, OR 97220 Aipppo
(503) 254-0204 VF" nj
LONGFELLow LUMBER CO. INC.
Quality Truss Design - Roof & Floor Systems
(800) 678-0112
(530) 893-0112 - FAX (530) 893-0140
89 Loren Avenue
Chico, CA 95928-7434
Important Information for Users of 'Wood Trusses
Longfellow's goal is to supply superior quality trusses. Sensible truss designs, the best available lumber and exacting
workmanship are the key ingredients of o'
, yr quality control program. (Once trusses arrive at the job site, quality. control
becomes the responsibility of the builder.) For best results we suggest:
DO'S DON'Til
Q Do review your field copy of truss engineering for Important bracing, Do Not cut, notch or drill chords or webs of trusses.
. bearing and connection details. (Ex6eptions will be clearly marked on engineered drawings.)
I.J Do review the HIB -91 Summary Sheet's recommendations for
handling, installing and bracing of wood trusses.
C3 Po Install roof sheathing ASAP. Trusses hold their profiles best when
.1hey have been plumbed and braced with roof sheathing. Especially
19 hot weather, we recommend sheathing be applied over as much of
1he building as possible before installing outriggers and gable -end
siding.
El Do Inspect trusses for missing plates or broken lumber. Report
defects to Longfellow immediately.
C] Do secure tails with fascia board'. In recent years, the production of
lumber from second -growth timber has resulted 'in an increased
tendency for unrestrained tails to twist. We recommend a sub -fascia
be installed behind gutters.
C1 Do call Longfellow if you have questions or need additional
Information.
Q Do Not cut or remove plates.
Do Not overload single or groups of trusses with plywood, roofing,
tools or other construction materials.
Do Not make field repairs without written. approval from Longfellow
Lumber Co.
C3 Do Not load HVAC units, solar equipment,. fire sprinklers, etc. on
trusses unless truss engineering has been designed to
accomodate the specific point loads.
BEFOR * E INSTALLING:
Make certain truss sequences and
end -for -end orientation are correct:
I.
(NtL�jU/19-NtLZ)UN MarK & KlM/AUUI I LUN - A-1 5CM
TOP CHORD 2x6 OF -L SS
BOT CHORD 2X4 DF -L #1
WEBS 2x4 OF -L Standard
PLATES DESIGNED FOR GREEN LUMBER PER NDS -97 TABLE 7.3.3.
10 PSF BC LIVE LOAD PER UBC.
W5X4tm
I III Zo UVIU VKtrAKLu riturt Luriru I tn inru i kLun— a
ROOF OVERHANG SUPPORTS 2.00 PSF SOFFIT LOAD.
IN LIEU OF RIGID SHEATHING USE PURLINS TO BRACE TC @ 24.00" OC, BC @
72.00" OC.
DEFLECTION MEETS L/240.00 LIVE AND L/160.00 TOTAL LOAD.
W 4 X 4 ( F 1
1-0-0 1-0-0
—9-0-0 —9-0-0-
18-0-0 Over 2 Suppqrts
R=690 14=5.5"
R=690 W-5.5"
A,-8 - 0 - 0
—T
Cow
PPF*
VFW-.
1. y
PLT TYP. Wave TPI -95\R Design Criteria: TPI(ST )/UBC. 8. CA/ -/I/ -/-/-/F- Scale —.25"/Ft.
Longfellow Lumber
89 Laren Avenue, CWco CA 95978
ALPINE
—WARN I NG1;EF TRUSSES REOUIRE EXTREME CARE In FABRICATION. HANDLING. SHIPPI"G. INSTALLING AND
BRACING. ER TO MID -91 (HANDLING INSTALLING AND BRACING). PUBLISHED BY TPI (TRUSS PLATE
S
.11 TITUTE 583 ONOFRIO D .. ITE 1114'"ID'I SAFETY PRACTICES PRIOR TO
RF A IN 11 S FUNCT 0 RUN ESS 0 H R SO' I TO" ';RDT
PE 0 N Ii 7 E ED* I 14S LSU T , SE 11131.�4TED, "I CH SHALL HAVE PROPERLY ATTACHED
STRO CTUR AL PANELS. DOT -TOM CHORD SHALL HAVE A PROPERLY ATTACHED RIGID CEILING.
—IMPORTANT" U Rat SM A CO P, OF THI S DESIGN TO THE INSTALLATION CONTRACTOR. ALPINE ENGINEERED
F
PIT .. C TS INC - SIT ALL NOT 9 E RESPORS] 8 LE FOR ANY DEVIATION FROM THIS DESIGN: ANY FAILURE TO
t,
BUILD T4 TRUSSES III CONFORMANCE WITH TPI; OR FABRICATING. HANDLING. SHIPPING, INSTALLING AND
BRACING OF TRUSSES. TNT S OESIGI CONF OR. - T N APILKABLE PR.11 Sto OF NOS (NATIONAL DESIGN
FES
9
TC LL
TIC DL
BC DL
BC LL
16.0
12.0
7.0
0.0
PSF
PSF
PSF
PSIF
REF R427--48046
DATE 07119101
DRW CAUSR427 01200048
CA -ENG LVT/CWC
SP IF CA I SNED , H AMEN A N P P S C T N T . P
EC I NT 0" PUILI 0 T E IC IT FOREST' A 0 A ER AS 0 IA 10111)fSA D PI AL THE
S HAD D
CONNECT ARE E OF 2 CA AST14 A, 53 GR40 GALV. STEEL EXCEPT As NOTED. APPL ' ONRECTORS TO
TOT. LD.
35.0
PSF
SEQN - 43321
Alpine Engineered Products, Inc.
Sacramento, CA 95828
S I E LD E is M P.S I N CO IT 11 E CTCR , PER
EA CH FACE OF TRU S S. AND U ULE S OTH, RN S CAT D '" T" IESIG IT
DRAWINGS 160 A-1. THE SEAL ON THIS DRAWING I HDICAT, S ACCE P TAiCE OF POOFESSIONAL ENGINEERING
ESP09SIBILITY SOLELY FOR THE TRUSS COMP 0 RENT DESIGN SHOVII. T::EE SU KITY AND USEPOF T H I S
n HT 0 R a IL 0 E 0 1 1 OF. U:TAD
ROMPO E F R ANY PARTICULA IN ES HE E
ARSI/TPI 1-1995 SECTION 2. U DI G IS TH RESP IIS OIL TY T 8 LO G 0 IG A. R
C
C
DUR.FAC.
1.25
FROM ED
SPACING 24. 0
This safety alert symbol is used to attract your
Aattentionl PERSONAL SAFETY IS INVOLVEDI When
you see this symbol - BECOME ALERT - HEED ITS
MESSAGE.
JACAUTION: A CAUTION identifies safe operating
practices or indicates unsafe conditions that could
result in personal injury or damage to structures.
HIB -91 Summary Sheet
COMMENTARY and RECOMMENDATIONS for
HANDLING, INSTALLING & BRACING METAL
PLATE CONNECTED WOOD TRUSSES "'
Itis the responsibilityof the installer(builder, building contractor licensedcontractor,
erector or erection contractor) to Property receive, unload, store, handle. install and
brace metalplate connected woodtrusses toprotectlife andpmefty. The installer
must exercise the same high degreeof safety awareness as with any other structural
material. TPI does not intend these recommendations to be interpreted as superior
to the project Architect's or Engineer's design specification for handling, installing
and bracing wood trusses for a particular roof or floor. These recommendations are
based upon the collective experience of leading technical personnel in the wood
CAUTION: The builder, building contractor, licensed
contractor, erector orerection contractor is advised
Ato obtain and read the entire booklet "Commentary
and Recommendations for Handling, Installing &
Bracing Metal Plate Connected Wood Trusses, HIB -
91" from the Truss Plate Institute.
A19 It -DANGER: A DANGER d ' esignates a condition
where failure to follow instructions or heed wam-
ing will most likely result in serious personal
injury or death or damage to structures.
WARNING: A WARNING describes a condition
where failure to follow instructions could result in
severe personal injury or damage to structures.
�A
TRUSS- PLATE INSTITUTE
583 D'Onofrio Dr., Suite 200
Madison, Wisconsin 53719
(608) 833-5900
truss industry, but must, due to the nature of responsibilities involved, be
presented as a guide for the use of a qualified building designer or installer. Thus,
the Truss Plate Institute, Inc. expressly disclaims any responsibility for damages
arising from the use, application or reliance on the recommend ations and
information contained herein bybuilding designers, installers, and others. Copyright
@ by Truss Plate Institute, Inc. All rights reserved. This document or any part
thereof must not be reproduced in any form without written permission of the
publisher. Printed in the United States of America.
CAUTION: Alltemporary bracingshould be no less
than 2x4 grade marked lumber. All connections
Ashould be made with minimum of 2-16d nails. All
trusses assumed 2'on-center or less. All multi -ply
trusses should be connected together in accor-
dance with design drawings prior to installation.
k,,-i1-1RUSS'-STORAGE.
CAUTION: Trusses should not be
unloaded on rough terrain or un-
even surfaces which could cause
damage to the truss.
A& CAUTION: Trusses stored horizontally should be CAUTION: Trusses stored vertically should be
supported on blocking to prevent excessive lateral braced to prevent toppling or tipping.
bending and lessen moisture gain. 11A I
JAWARNING: Do not break banding until installation
begins. Care should be exercised in banding re -
moval to avoid shifting of individual trusses.
'JAWARNING: Do not lift bundled trusses by the
bands. Do not use damaged trusses.
DANGER: Do not store bundles upright unless
properly braced. Do notbreak bands until bundles
are placed in a stable horizontal position.
JADANGER: Walking on trusses which are lying flat
is extremely dangerous and should be strictly
prohibited.
Frame 1
;J 1
12"
. ...... ..... ..... . . ..
1
24"
1/2"
-C H
fl! T! .0 P . ....
N
3/4"
M NIMU
T E
IA BMC`
S
N
IT6H9i I
P CIN
... . ..
A u se
111russe
...........
I
............. . . . . ..... ... ..
F*
Up to 24'
30 2
81
17 12
Over 24� - 42'
3 ',* 12
7'
10 1 6
Over 42: - 54'
1 1112
1 6'
6 1 4
Over 5W
1 See a registered
professional engineer
DF - Douglas Fir -Larch SP - Southern Pine 01
HF - Hem -Fir SPF - Spruce -Pine -Fir 1� 0*
Diagonal brace
aisc required on
end verticals.
Top chorde that a re late ral' ,y braced ca n buck I e
togethera rd ca use col lapse if there is no d is go -
nal bracine. Diagonal bracing should be nailed
to the underside of the tor chord when purlins
a re attached to the to ps id e of the top chord. Or %/,, =4e
So
NQ�
PLUMS
12
All lateral braces
lapped at least 2
trusses.
Continuous Ton Chord
Lateral Brace
Required
10" or Gr(
Attachmi
Requirec
AWARNING: Failure to follow these recommendations could result in
severe personal injury or damage to trusses or buildings. A
BOW
Length
L(in)
t Lesser of
L/200 or 2"
L(in) - L(in)
T/41, Lesser of
L/200 or 2"
0
12"
1/4"
1
24"
1/2"
2'
36"
3/4"
3'
48"
V.
4'
60"
1-1/4"
5'
BOW
Length
L(in)
t Lesser of
L/200 or 2"
L(in) - L(in)
T/41, Lesser of
L/200 or 2"
0
Sol.
1 4..
4.2'
1001,
1 2'.
:1
8.3'
72" 1-1/2'. 6'
3/4"
12.5'
84" 1-3/4" 7'
96" 2" 81
Truss
I
108" 2" 91
Depth
D(in)
Lesser of
D/50 or 2"
t Y.
Maximum
Plumb
Misplacement
Line
OUT -OF -PLUMB INSTALLATION TOLERANCES.
BOW
Length
L(in)
t Lesser of
L/200 or 2"
L(in) - L(in)
T/41, Lesser of
L/200 or 2"
0
Sol.
1 4..
4.2'
1001,
1 2'.
:1
8.3'
150"
3/4"
12.5'
.. . ...... .
200"
11"
16.7'
250"
1-1/4"
20.8'
300"
1-1/2"
25.0'_
OUT -OF -PLANE INSTALLATION TOLERANCES.
DANGER: Under no circumstances should
WARNING: Do not cut trusses. construction loads of any description be placed
A A on unbraced trusses.
Frame 6
AWARNING: Do not attach cables, cha WARNING: Do not lift single trusses with spans
hoo ks to the web members. E11A grealer than 3(Y by the peak.
Tag
Line
/610 �-
460--1
or ess
/or less\
A i pproximately
A pproximatel�% Tag
1/2 truss length
1/2 truss length \ L Ine
Truss span3 less than 30'.
FL—iftil
Spreader Bar
Toe in ::�� Toe I
Nr,�JININ v-1 V71 V71 V71
Ppproximately
Lessthanorequal lo6o'
TiE g
U. -le
the truss top chord with a closed-loop
attachment utilizing materials such as
slings, chains, cables, nylon strapping,
etc. of sufficient strength to carry the
weight of the truss. Each truss should be
set in proper position per the building
designer's framing plan and held with
the lifting device until the ends of the
truss are securely fastened and tempo-
rary bracing Is installed.
Spreader Bar
Toe In Toe In
Approximately
Y. tD Y3 Iruss length Tag
Less than or equal to 60' Line
Strongbadk/
SpreaderBar
Tag
Line
Strongbact/
SpreaderB3r
At or aboue
mid-heighl
Tag
Line
k 10,
Apprtwimately
3/3 to 3/4 truss length
Greater than 60'
10, 1 10,
3,13 to 3/4 truss length
Greater than 60'
CAUTION: Temporary bracirg shown in this summary sheet is atequate for the Installation of
trusses with similar corfiguiations. Consult a registered professional engineer if a different
bracing arrangement is -desi,-ed. The engineer may design bracing in accordance with TPI's
Recomr-iended Design SpeciNcation for Temporaty Bracing of Uetal Plate Connected Wood
Trusses, D.EB-89, and in some cases determine that a wider spacing is possible.
Typical hoflzontaf tie member with
multiple sUkes (HT)
Frame 2
�Ilrjss of braced
'oulp of trusses
(EEO
DF - Douglas Fir -Larch SP - Southern Pine
HF - Hem -Fir SPF - Spruce -Pine -Fir
I
1b
C,
\Ibc
L The end
diagonal brace
lor cantilevered
Vusses must be
placed on vertical
webs in line with
The support.
Continuous
....... . ..........
Required
Top chords that are laterally braced can buckle
ONALTj
togetherand cause collapse if there is no diago-
WHOM
10"
A Nd: Q.
S N
V
ij! ii:i:ii:iiiiiiiiji:::iliii:liiii:l.:::::I:i:i:li:::
I
Q NG
P
: ill :::Zi
ss
to the underside of the top chord when purfine
. . . ....
. . . . .....
.... ....
..
F
Up to 32,
30"
8;
16 10
Over 32' - 48'
42"
6'
6 1 4
Over 48' - 60' 1
4 '. 1
5' 1
4 1 2
Over 6G' I
See a registered professional engineer
DF - Douglas Fir -Larch SP - Southern Pine
HF - Hem -Fir SPF - Spruce -Pine -Fir
I
1b
C,
\Ibc
L The end
diagonal brace
lor cantilevered
Vusses must be
placed on vertical
webs in line with
The support.
All lateral
braces lapped
at least two
—trusses.
als I for
End di.g�o�nWessLqrytia
stability and must be duplma"
both ends of the truss syslem.
=450
Attachmer
---A Required
201(oig
101-rL., — '_O�)
�rL:8`ses �,__S)
SbF Q Z' 0.
01' SS
slt 01
A WARNING: Failure to follow these recommendations could result In
I severe personal injury or damage to trusses or buildings. A
Top chords that are laterally braced can buckle
togetherand =ause collapse ifthere in no diago-
nal bracing. Oiagonal bracing should be nailed
to the undereide of the top chord when purlins
are attached to the topside of the top chord.
All lateral
braces lapped7-
a t two
It least two
t! ss
usses.
End diagonals ard-esz�Mtiaffor
stability and must be dt.101-1caw-
both ends of the truss system.
30, M
IS
=450
Fra e 5
3011 or
greater
Continuous
Top Chord
Lateral Brace
Required
10' or Greater
Attachment
Required -
Trusses must have lum-
ber oriented in the hori-
zontal direction to use
this brace spacing.
Continuous
....... . ..........
Required
Top chords that are laterally braced can buckle
togetherand cause collapse if there is no diago-
10"
nal bracing. Diagonal bracing should be nailed
to the underside of the top chord when purfine
are attached to the topside of the top chord.
All lateral
braces lapped
at least two
—trusses.
als I for
End di.g�o�nWessLqrytia
stability and must be duplma"
both ends of the truss syslem.
=450
Attachmer
---A Required
201(oig
101-rL., — '_O�)
�rL:8`ses �,__S)
SbF Q Z' 0.
01' SS
slt 01
A WARNING: Failure to follow these recommendations could result In
I severe personal injury or damage to trusses or buildings. A
Top chords that are laterally braced can buckle
togetherand =ause collapse ifthere in no diago-
nal bracing. Oiagonal bracing should be nailed
to the undereide of the top chord when purlins
are attached to the topside of the top chord.
All lateral
braces lapped7-
a t two
It least two
t! ss
usses.
End diagonals ard-esz�Mtiaffor
stability and must be dt.101-1caw-
both ends of the truss system.
30, M
IS
=450
Fra e 5
3011 or
greater
Continuous
Top Chord
Lateral Brace
Required
10' or Greater
Attachment
Required -
Trusses must have lum-
ber oriented in the hori-
zontal direction to use
this brace spacing.
12
___1 4 or greater
1<
A
Top chords that are laterally 3racad can buckle
togetherand cause collapse iftheTe isno diago-
nalbracing. Diagonal bracing sh �uld be nailed
to the underside of the top ctord when purlins
are attached to the topside of the top chord.
DF - Douglas Fir -Larch SP - Southern Pine
HF - Hem -Fir
SPF - Spruce -Pine -Fir
SPF - Spruce -Pine -Fir
Nflo:iIiiiiiiiii . . ....
All lateral braces
Lateral Brace
lapped at least 2
Required
trusses.
MR. CHO
trusses.
10' or Greater
. . ....... . ..... .
I RAU E
I
4
Attachment
. . ...
.... . B1
90A ClNdtl L
MM
. ........ .
. . . . ........ .
... so 0:.:.:. FMF!ii�!
Up to 32'
4/12
a,
20
Over 32' - 48'
4/12
6'
10 7
Over 48'-60' 1
4/12
1 5'
6 4—
Over 60' 1
See a registered professional engineer
DF - Douglas Fir -Larch SP - Southern Pine
HF - Hem -Fir
SPF - Spruce -Pine -Fir
SPF - Spruce -Pine -Fir
Continuous Top Chord
All lateral braces
Lateral Brace
lapped at least 2
Required
trusses.
trusses.
10' or Greater
4
Attachment
Attachment
Required
%eO
AWARNING: Failure to follow these rezommendations could result In
severe personal injury or damage t -o trusses or buildings. A
Up to 28' 1 25 1 7' 17 12
Over 28'- 42' 3.0 6' 9 6
Over 42'- 60' 3.0 1 51 5 3
Over 60' 1 See a registered professional engineer
DF - Douglas Fir -Larch
SP - Southern Pine
F - Hem -Fir
SPF - Spruce -Pine -Fir
Continuous Top Chord
Lateral Brac'V
e
e
All lateral braces
REquired
lapped at least 2
trusses.
10" or Greater
4
Attachment
Required _
0
05-2 A'
Ism- I, IM
C
.1 Top chords that are laterally braced can buckle
e togetherand causecollapse ifthere isnodiago-
net bracing. Diagonal bracing should be nailed
C,
to the underside of the top chord when purlins
X are attached to the topside of the top chord.
ISS9 S.1 T.5%
Frame 3
12
4 or greater
DF - Douglas Fir -Larch
HF - Hem -Fir
Bottom chord diagonal bracing repeated
at each end of the building and at same
spacing as top chord diagonal bracing.
SP - Southern Pine
SPF - Spruce-Pine�Flr
All lateral braces
lapped at leasi 2
trusses.
AWARNING: Failure to follow these recommendations could result in
severe personal injury or damage to trusses or buildings. A
Cross bracing repeated
at each end of the
building and at 20'
Intervals.
Mark& Kim Nelson.
I
1 14251 Shorthorn Dr,
Chico,, CA 95973
Scale 1" = 30'
APN 047 530-004
rff
, O -L, rov
Top view of existing roof
LI
Mark & Kim Nelson Scale: 1/32 : 1
4251 Shorthorn Dr.
Chico, CA 95973
(530)�898-909-i
Existing vent. To be
relocated 15' to left on
another roof section
................................................
Weight Dimensions lbs Unit aty Total lbs
Solar panels 481/4 x 961/4 113-131 lbs/panel 2 226-262
Area of installation = 8'- 6" x 8' - 0" = 68ft2
Min weight per square foot 226lbs 68ft2 3.32lbs/ft2
Max weight per square foot 262lbs 68ft2 3.85lbs/ft2
28'
01 a ZIR4
bUTTE CMI.:�,V,,.
WILDING DEPARTDA Moy'
r%
L J,
8
Top view of PV installation
I
N
This section to be re -roofed
with 40 -yr composition shingle
roofing over 15/32" OSB.
Chimney and
flashing
a;
14
&I
18'-9"
18"
28' E f%rta
DEPARTPVIO.ff
4-PPjj(A%n
Mark & Kim Nelson
Scale: 1/32 1 This desig`ni9'fn46ndesdo keep the panels as low as
4251 Shorthorn Dr.
possible, thus reducing wind load.
Chico, CA 95973 The panels are drawn as if they are flat on the roof.
(53(;) 898-9094
Side view of panel installation
Facing West
Maximum shadow on Use a single piece of
winter solstice at 63.5 0 steel to increase strength
The angle above the deck is 8.750
6" standoff recommended by
manufacturer for leaves to blow through
Attach flat bat (golng Into page) at 3 locations
per rafter (2" x 10") at all crossing rafters
(spaced every Z) with 31/2 x 1A lag bolts.
Item
Dimensions
lbs/ft
Unit
aty
Total lbs
Angle iron
1 x 1 x 1/8
0.800
4'- 10"
16
61.87
Angle iron
11/2 x 11/2 x 1/8
1.230
12'- 3"
5
75.34
Channel
11/2 x 3/4 x 1/8
1.170
1' - 0"
16
18.72
Bar
2 x 3/16
1.275
18'- 9"
3
71.72
Solar panels
56.1 " x 25.7" x 2"
26.2 lbs/panel
16
419.2
646.9
Area of installation = 18'- 9" x 12'- 3" = 229.69ft2
Weight per square foot = 646.9lbs / 229.69ft2 = 2.82[bS/ft2
Mark & Kim Nelson Scale: 1/32 : 1
4251 Shorthorn Dr.
Chico,.CA 95973
(E-30) 898-9094
Because we don't want the panels to protrude above the peak of
the roof, the panels will remain in a fixed position at the optimum
Summer position.
The locations of the panels strike a balance between having a
safe walkway around the panels and not allowing the top of the
panels to protrude above the peak of the roof.
ISUTTE fcv^jq�-
DEPARTAQ*
APPRO
VED
j
Supporting foundation plan
/Attach to solar panel at 0
three points using 1/4"
'i
stainless steel bolts with
washers.
1 " x 1 " angle iron ) /0
0
5 @ 11/2 x 11/2 x 1/8" angle iron ) _
3 @ 2" x 3/16" flat bar
Mark & Kim Nelson
4251 Shorthorn Dr.
Chico, CA 95973
(530) 898-9094
11/2 " X 3/4 " U
channel
3/8" stainless
steel bolts with
washers.
The heaviest grade steel 3/8" is attached to
the trusses for extra strength.
The lightest grade steel 1/8" is used for the
frame supports to reduce the weight.
Attach 2" x 3/16" flat bar to 2" x 10" trusses
with 1/4" x 31/2" stainless steel
lag bolts at each rafter (every 2').
ot drawn to scale
Two 1 " x 1 " x 1/8 angle
iron supports are
attached to the base at
10 locations.
Attach 11/2" X 11/2" X 1/8" angle
iron to flat bar with 3/8" stainless
steel pan head bolt and nut.
OSP
Ro
A
Angle iron is screwed to OSB
sheathing every 2' with 1 " roofing
screws and weatherproofed.
Final support installation
Mark & Kim Nelson
,4251 Shorthorn Dr.
Chico, CA 95973
(530) b98-9094'
Not drawn to scale
Sun Tie T11 Inverter
ST1000, ST1500, ST2000 and ST2500
Installation and Operator's Manual
@2000 Xantrex/Trace Engineering
"Apr i' rjr :P?F.X
Smart Choice For Power
975-0003-01-02 Rev. A 11 /00
Sun Tie Inverter
ST1000, ST1500, ST2000 and ST2500
Table of Contents
Section Description Page
1.0 INTRODUCTION ..................................................................................... I
StandardFeatures ........................................................................... I
2.0 INSTALLATION ....................................................................................... 2
Pre -installation ................................................................................
2
ToolsRequired ..........................................................................
2
Hardware/Materials Required ..................................................
2
ACConnections ........................................................................
2
DC Connections ........................................................................
3
ST1500 and ST2500 ............................................................ 3
ST1000 and ST2500 ............................................................ 4
Grounding................................................................................. 5
ACGrounding ..................................................................... 5
DCGrounding ..................................................................... 5
PVArrays ...................................................................................
5
AC Circuit Breakers .................................................................. 6
WireRouting ............................................................................. 6
Mounting........................................................................................... 7
Wiring............................................................................................
11
DCWiring ................................................................................
11
PVArray ....................................................................................
11
ST1500 and ST2500 DC Wiring .......................................
11
PV Array ConduitlWire Run .............................................
11
ST1000 and ST2000 DC Wiring .......................................
13
PV Array Conduit/Wire Run .............................................
13
ACWiring ................................................................................
14
Lightning Protection ...............................................................
17
3.0 OPERATION ......................................................................................... 18
Start-up Procedure ........................................................................ 18
RequiredEquipment ............................................................... 18
AC Utility Voltage Check ........................................................ 18
Solar Array DC Voltage Check ............................................... 19
OperationalTest ...................................................................... 20
4.0 TROUBLESHOOTING .......................................................................... 24
5.0 SPECIFICATIONS ................................................................................. 27
6.0 SERVICE INFORMATION ..................................................................... 28
7.0 WARRANTY .......................................................................................... 29
@2000 XantrexfTrace Engineering
Disclaimer of Liability
Since the use of this manual and the conditions or methods.of installation, operation, use and
maintenance of the unit are beyond the control of XantrexfTrace, the company does not assume
responsibility and expressly disclaims liability for loss, damage, or expense arising out of or any way
connected with such installation, operation, use, or maintenance.
@2000 XantrexrTrace Engineering
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important safety instructions that should be followed during the installation
and maintenance of this product.
To reduce the risk of electrical shock, and to ensure the safe installation and operation. of this
product, the following safety symbols have been placed throughout this manual to indicate
dangerous conditions and important safety instructions.
WARNING - A dangerous voltage or condition exists in this area.
A\ Use extreme caution when performing these tasks.
AVERTISSEIVIENT - Une tension ou condition dangereuse existe dans cette zone.
Faire preuve d'extr6me prudence lors de la r6alisation de ces t8ches.
CAUTION - This procedure is critical to the safe installation or operation of the unit. Follow these
instructions closely.
ATTENTION - Cette proc(?dure est essentielle �t l'installation ou l'utilisation
de I'unit6 en toute s6curit6. Suivre ces instructions de pres.
F:W' NOTE - This statement is important. Follow instructions closely.
NOTE - Cette d6claration est importante. Suivre les instructions de p - ros.
All electrical work must be done in accordance with local and national electrical codes
Before installing or using this device, read all instructions and cautionary markings located in
(or on) the manual, the ST and the PV array.
Do not expose this unit to rain, snow or liquids of any type without the rain/weather shield
hood installed (optional on some models).
To reduce the chance of short-circuits when installing or working with the inverter or the PV
array, use insulated tools.
Remove all jewelry such as rings, bracelets, necklaces, etc., prior to installing this system.
This will greatly reduce the chance of accidental exposure to live circuits.
The ST unit contains more than one live circuit (PV array and AC line). Power may be present
at more than one source even when the circuit breakers are off.
This product contains no user serviceable parts. Return the unit to a Trace Authorized Service
Center for maintenance.
Wiring to the utility should only be done after receiving prior approval from the utility company
'and performed only by a qualified electrician.
Completely cover the surface of all PV arrays with an opaque (dark) material BEFORE wiring
them. PV arrays produce electrical energy when exposed to light, and could create a
hazardous condition.
SAVE THESE INSTRUCTIONS
@2000 Xantrex/Trace Engineering iii
gr-cF' NOTE: This is a one line drawing intended as a system overview only. System grounding and other
electrical details are not included.
iv @2000 Xantrex/Trace Engineering
1.0 INTRODUCTION
The Trace Sun Tie (ST) solar power conversion center is designed to convert a home or
business into a "dreen" power generating station. The ST unit converts solar electric (PV) power into
utility grade electricity which can be used by the home, or sold to the power company. Installing an
ST unit is as simple as mounting it to the wall and connecting a DC source (PV array), and the AC
output to the utility.
Standard Features
All -in -one Design
All necessary DC input and AC output connections, disconnects and circuit breakers are housed
within the ST's easily installed, compact enclosure. A built-in LCD panel provides easy -to -read
system status and daily cumulative energy production information.
Uses Most Types of PV Technology
The ST is designed to take advantage of most types of solar electric technologies. The inverter
allows up to 120 VDC open circuit PV modules to be used so both crystalline and thin film PV
modules can be used.
Maximum Power Point Tracking
The inverter performs a "power sweep" every minute adjusting array voltage and current,
maximizing PV power generation. Maximum Power Point Tracking (MPPT) ensures the system
produces as much AC power as possible under any light condition.
High Efficiency and Long Life
The high frequency, solid-state design of the ST inverter is extremely efficient. When array
output is over 500 watts, the inversion process is over 90% efficient (with a peak efficiency of 94%).
The ST inverter has a design. life of over twenty years.
Expandable
ST in ' verters may be connected in a parallel configuration for increasing net metering capacity.
The modular expandability of the ST Series allows for system growth.
UL Listed
The ST has complete on -board islanding protection and meets safety operating standards and
code requirements world wide. In North America, it is UL listed (UL 1741 -First Edition) and cUL listed
to CSA C22.2 No. 107.1-95 ' ' NEC 690 building code requirements for PV may be met with the
optional ground fault protection (PVGFP).
Options
These features are included on some models:
PV array combiner board with six 20 amp max. protected inputs
PV array Ground Fault Protection PVGFP
@2000 XantrexrTrace Engineedng
2.0 INSTALLATION
Pre -installation
Before installing the Trace ST unit, read all instructions and cautionary markings located in
this manual, on the PV array and on the main service panel.
F:w- NOTE: The Trace ST weighs approximately 35 pounds (depending upon configuration and model).
Always use proper lifting techniques during installation to prevent personal injury.
Mounting:
The Trace ST unit can be mounted outdoors with the optional Rain Shield (STRS).
Tools required:
Phillips screw drivers
level
slotted screw drivers
wire strippers
open-end wrenches
torque wrench
socket wrench and fittings
electrical tape
multimeter (true rms)
pencil
frequency counter (optional)
utility knife
Hardware/Materials required:
wood screws and washers (supplied)
conduit and appropriate fittings
anchors for screws (material dependent)
AC Connections:
The inverter's AC output breakers accept wire sizes from #6-14 AWG Refer to the table
below for minimum recommended wire size.
97�1
Table 1
Recommended Minimum AC Wire Sizes
F:T' NOTE: These are the minimum recommended wire sizes in conduit. Installing a large number of
wires in conduit or enclosed locations may require larger wire sizes. Consult your local/national
electrical code for more information.
2 @2000 XantrexfTrace Engineering
2.0 INSTALLATION
Pre -installation (continued)
DC Connections:
ST1500 and ST2500
DC connections are made on the combiner board for models ST1500 and ST2500. The
combiner board accepts wire sizes from #6-14 AWG. Refer to the table below for minimum
recommended wire sizes.
DC Amps
NEC Amp
(Amps x 156%)
Minimum Wire Size for Specified
0-25 Ft 25-50 Ft
One Way One Way
Distance
50-100 Ft
One Way
1.0
1.6
14 AWG
14 AWG
14 AWG
3.0
4.7
14 AWG
12 AWG
10AWG
5.0
7.8
12 AWG
10 AWG
6 AWG
7.0
10.9
12 AWG
8 AWG
6 AWG
9.0
14.0
10 AWG
8 AWG
Not Recommended
11.0
17.2
10 AWG
6 AWG
Not Recommended
97S4)WIM
Table 2
Recommended Minimum DC Wire Sizes
FW' NOTE: These are the minimum recommended wire sizes. Installing a large number of wires in
conduit or enclosed locations may require larger wire sizes. Consult your local/national electrical
code for more information. -
PV array wiring
(note polarity)
DC conduit wiring
(from solar arrays)
Figure I
Combiner Board Indicating DC PV Array Wire Connection Points
F:T' NOTE: The National Electrical Code (NEC) places restrictions on minimum DC wire bending radius.
A #6 AWG wire is the largest that may be used on the ST1 500 and ST2500 inverters.
@2000 XantrexfTrace Engineerind
2.0 INSTALLATION
Pre -installation (continued)
DC Connections:
ST1000 and ST2000
DC connections are made at the 100 amp DC circuit breaker and the DC negative terminal
block for models ST1000 and ST2000. Refer to the table below for minimum recommended wire
sizes.
Table 3
Recommended Minimum DC Wire Sizes
F:T1 *NOTE: The National Electrical Code (NEC) places restrictions on minimum DC wire bending radius.
If the enclosure's side is used for routing the wires to the DC terminals, then the wires must be bent
to make the appropriate connections. A#3AWG wire is the larges that maybe used on the ST1000
and ST2000 inverters if the side panel is used. Side knockouts are NOT provided on the unit.
PV array Negative Wring
Figure 2
DC PV Array Wire Connection Points
(with no combiner board)
f array Positive Wring
4 02000 Xantrex/Trace Engineering
Minimum
Wire Size for Specified
Distance
DC Amps
NEC Amp
(from PV array)
(Amps x 156%)
0-25 Ft
25-50 Ft One Way
50-100 Ft
One Way
One Way
10
15.6
10 AWG
6 AWG
4 AWG
15
23.4
8 AWG
4 AWG
*2 AWG
20
31.2
6 AWG
4 AWG
*1 AWG
30
46.8
4 AWG
*2 AWG
Not Recommended
40
62.4
4 AWG
-1 AWG
Not Recommended
60
93.6
*2 AWG
Not Recommended
Not Recommended
Table 3
Recommended Minimum DC Wire Sizes
F:T1 *NOTE: The National Electrical Code (NEC) places restrictions on minimum DC wire bending radius.
If the enclosure's side is used for routing the wires to the DC terminals, then the wires must be bent
to make the appropriate connections. A#3AWG wire is the larges that maybe used on the ST1000
and ST2000 inverters if the side panel is used. Side knockouts are NOT provided on the unit.
PV array Negative Wring
Figure 2
DC PV Array Wire Connection Points
(with no combiner board)
f array Positive Wring
4 02000 Xantrex/Trace Engineering
2.0 INSTALLATION
Pre -installation (continued)
Grounding:
AC Grounding
The Trace ST unit should be connected to a grounded, permanent wiring system.
DC Grounding
The negative PV conductor should be bonded to the grounding system at only one point in the
system. The size for the conductor is usually based on the size of the largest conductor in the DC
system. Negative/ground bonding is accomplished by factory wired PVGFP breakers (when this
option is installed) or a factory installed grounding block (when PVGFP is not installed).
PV Arrays:
The ST unit is optimized to work with 4 -each, 12 volt nominal crystalline PV modules in series
(48 VDC nominal), or various combinations of amorphous, thin film PV modules. Ensure the PV
array used in the system operates within the MPPT operational window.
The solar array connected to the ST Series inverter should have a minimum of 50 volts DC
open -circuit in full sunlight conditions. Crystalline solar arrays configured for 48 volts DC nominal will
have a open -circuit voltage in the area of 84 volts DC in full sunlight. The maximum peak power
tracking (MPPT) software controls the output of the solar modules, under loaded conditions, in the
42-85 volts DC range (full inverter output power occurs between 52-85 VDC). Other array voltage
will either not operate the inverter or will not allow maximum harvest of the sun's energy.
WARNING: WHENEVER A PV ARRAY IS EXPOSED TO SUNLIGHT, A SHOCK HAZARD EXISTS
AT THE OUTPUT CABLES OR EXPOSED TERMINALS. TO REDUCE THE RISK OF SHOCK
DURING INSTALLATION, COVER THE ARRAY WITH AN OPAQUE (DARK) MATERIAL BEFORE
MAKING ANY CONNECTIONS.
ST1000 and ST2000 Models ST1500 and ST2500 Models
Ground Bar Location
(connect to solid earth ground)
Figure 3
Ground Bar Location
@2000 XantrexfTrace Engineering
2.0 INSTALLATION
AC Circuit Breakers:
The main service panel must dedicate a 15 amp minimum, double pole breaker (120/240 volts
AC) to operate the ST unit.
Wire Routing:
Determine all wire routes both to -and from the Sun Tie. Possible routing considerations include:
. AC input wiring from the main service panel to the ST
DC input wiring from the PV array to the ST
DC ground from the PV array to an external ground rod
All wiring and installation methods should conform to applicable electrical and building codes.
Pre -plan the wire and conduit runs. The DC terminal blocks accept up to a #6 AWG wire
(ST1 500 and ST2500) and #2 AWG* wire (ST1 000 and ST2000); the AC circuit disconnects
accept cable sizes up to #6 AWG.
For maximum safety, run AC and DC wires/cables in (separate) conduits.
F:Z�' *NOTE: #2 AWG -wire can only be used if the bottom knockouts are used. If punching side walls for
wire routing, the largest wire for acceptable wire bend radius is #3 AWG maximum.
WARNING: CHECK FOR EXISTING ELECTRICAL OR PLUMBING PRIOR TO DRILLING HOLES
IN THE WALLS1
6 @2000 Xantrex/Trace Engineering
2.0 INSTALLATION
Mounting:
The ST unit must be mounted to a flat, vertical surface such as wallboard or wood siding.
Installation onto wallboard or concrete requires the use of anchors to properly hold the screws.
Outdoor installation requires the use of the optional rain shield (STRS) to prevent water from enter-
ing the unit.
WARNING: DO NOT INSTALL THE SUN TIE UNIT OUTDOORS WITHOUT THE RAIN SHIELD
HOOD. WATER ENTERING THE UNIT COULD CAUSE A DANGEROUS CONDITION AND
CAUSE THE UNIT TO FAIL. FAILURE DUE TO IMPROPER INSTALLATION WILL VOID THE
WARRANTY.
Procedure
WARNING: BEFORE DRILLING HOLES TO MOUNT THE SUN TIE, ENSURE THERE ARE NO
ELECTRICAL WIRES OR PLUMBING IN THIS AREA. SINCE THIS UNIT IS INSTALLED CLOSE
TO THE UTILITY ENTRANCE OR METER, THERE MAY BE A HIGH CONCENTRATION OF
ELECTRICAL WIRES IN THE AREA.
1. Locate the area where the ST is to be installed. It should be as close to the utility service panel as
possible. The bottom of the unit must be at least 36 inches from the floor or ground when
mounted.
2. Using a level, place the mounting bracket up to the wall (in a horizontal position) and mark the
area for the three screws (Figure 4A). To achieve the 36 inch height from the bottom of the ST
unit to the ground, mount the bracket 70 inches from the ground.
3. If required, remove the bracket and drill the holes using a #10 (0.193 inch diameter) drill bit. Drill
appropriately sized holes for anchors when installing on non -wood surfaces.
4. Mount the bracket to the wall using the screws and washers provided. If mounting to other than a
wood wall or surface, use appropriate screws and anchors if required.
5. Place the Sun Tie's rear lip, located on the back top of the enclosure, over the bracket and
ensure it is seated properly (Figure 413).
6. Remove the lower external cover to access the internal circuit breaker panel by removing the
screw on each side of the cover (Figure 5).
7. Remove the internal breaker panel by removing the screws in the breakers and two screws from
the underside of the unit, then lifting until the lower locking tabs are free, then gently pull the inner
cover outward (Figure 6). Save the screws for reinstallation.
8. After the unit is correctly seated on the upper bracket, locate the two screw holes in the bottom
(back) area of the enclosure and mark these locations on the wall (Figures 413 and 7A). Remove
the ST (if required).
9. Drill two pilot holes (as above, if required).
10. Reinstall the ST, to the bracket and secure the bottom of the unit with the wood screws and
washers provided (or appropriate screws and anchors for non -wood surfaces) and tighten
(Figures 413 and 7A).
F�Tl NOTE: Mounting hardware for surfaces other than wood is not supplied.
@2000 Xantrex/Trace Engineering 7
2.0 INSTALLATION
Mounting: (continued)
Sun Tie back view
Screw
holes
4068-EOO-001
9 - 41/64"
- 13/16!'.
Enclosure
mounted on wall
bracket 26 - 21/32"
4068-EOO-002
Figure 4A
Bracket Mounting
19/61f,
Slide ST enclosure lip onto bracket
Figure 4B
Enclosure Mounting
8 @2000 Xantrex/Trace Engineering
Upper cover
Remove screws
(one on each side)
External breaker cover
(remove during installation)
Remove scri
from tab
Locking tabs
2.0 INSTALLATION
Figure 5
Outer Cover Components
Figure 6
Inner Breaker Cover
Remove breaker screws
Lift up and pull forward to
remove
@2000 XantrexfTrace Engineering 9
2.0 INSTALLATION
PV Combiner Bo,,
(included on sorr
models)
NOTE: The interne
Combiner Board is
available on all mc
Internal mounting
holes
DC Conduit
AC Conduit
Figure 7A
Mounting Holes and AC DC Conduit in Customer Access Area
11-13164*
9-15/32*
5-1/64"
3-11/32. 2-1/16' Lightning Arrestor
D/
27/32'
I I . I
P- 61/64" rl*-
-4 2-13132'
-4 3-5/32"
-4 -3-23W
Figure 713
Conduit Hole Locations
10
----oi 61/64* i
2-13/32'
3-5132'
I 23132m
@2000 XantrextTrace Engineering
2.0 INSTALLATION
Wiring:
DC Wiring
The combiner board (included on some models) in the ST accepts up to six individual PV array
circuits (positive and negative wires). Each circuit on the combiner board contains a fuse to protect
against over -current. Always replace this fuse with one of the same type and rating (GBB, 20 amp
maximum, ceramic type, 0.25" x 1.25").
unit.
The combiner board PV array input connection block is located in the lower section of the ST
ST1500 and ST2500 DC Wiring (Refer to Figures 8 and 9)
PV Array ConduitfWire Run
1. Install the DC conduit from the PV arrays to the bottom of the ST unit, via one of the knockout
holes (Figures 7A and 713).
2. Route the wires from the PV array(s) through conduit and into the lower section of the ST
enclosure (Figure 9). ,
NOTE: If more than one PV array is used, label the wire pairs (positive and negative) appropriately
(i.e., PV 1, PV 2, etc.).
3. Connect the positive (+) wire from the #1 array to the terminal strip labeled PV INPUT 1
POSITIVE terminal. Check that the wire is in the proper location and tighten the screw.
4. Connect the negative (—) wires from the PV array to the PV INPUT 1 NEGATIVE terminal.
Check that the wire is in the proper location and tighten the screw.
5. Repeat this procedure for each PV array circuit, connecting the #2 PV Positive wire to the
terminal labeled PV INPUT 2 POSITIVE, etc.
FT' NOTE: The solar arrays do not have to connect in the order marked on the board (this is just for
reference). All solar array positives on the combiner board are joined together AFTER the fuse.
Solar in
Solar ir
Solar ir
Solar ir
Solar i
4
Solar in
Solar DC terminal block Solar DC Fuses
Combiner board
Figure 8
ST1500 and ST2500 Electrical Component Location
@2000 Xantrex/Trace Engineering
7P(ganged)
ip DC breaker
FP(ganged)
) DC breaker
�olar array
np DC breaker
L1
np AC breaker
(ganged)
L2
-np AC breaker
(ganged)
2 breaker
: connection
I breaker
connection
unding
lock
2.0 INSTALLATION
Wiring: (continued)
PV array wiring
(note polarity)
DC conduit wiring
(from solar arrays)
Figure 9
PV Array DC Connection Points (ST1500 and ST2500)
6. Repeat this procedure for each PV array circuit, connecting the #2 PV Negative wire to the
terminal labeled PV INPUT 2 NEGATIVE, etc.
F§21 NOTE: The solar arrays do not have to connect in the order marked on the board (this is just for
reference). All solar array negatives on the combiner board are electrically tied together.
7. Torque wires according to the following table.
Wire Size
Torque (in -lb)
14 -10 AWG
35
8 AWG
40
4 - 6 AWG
45
2 - 1/0 AWG
50
975 -000 -OW
Table 4
Wire Torque Values
12 @2000 Xantrex/Trace Engineering
2.0 INSTALLATION
Wiring: (continued)
ST1000 and ST2000 DC Wiring (Refer to Figure 10)
PV Array Conduit/Wire Run
1. Install the DC conduit from the PV arrays to the bottom of the ST unit, via one of the knockout
holes.
2. Route the wires from the PV array through conduit and into the lower section of the ST
enclosure.
3. Connect the positive(+) wire from the array to the 100 amp DC CIRCUIT BREAKER's lower
terminal. Check that the wire is in the proper location and tighten the screw (Figure 10).
4. Connect the negative (—) wire from the PV array to the DC NEGATIVE TERMINAL's lower
connection. Check that the wire is in'the proper location and tighten the screw (Figure 10).
5. Torque all wires according to Table 4 (previous page).
Use knockouts in lower
section of ST for installing
conduit and routing wires
PVArray DC Negative PVArray DC Positive
(-) Wire (+) Wire
Figure 10
PV Array DC Connection Points (ST1000 and ST2000)
@2000 XantrexrTrace Engineering 13
2.0 INSTALLATION
Wiring: (continued)
AC Wiring
AC HOT wiring is connected to the ST unit's L1 and L2 breakers, the ground wire connects to
the GROUND bar. All AC wiring is located in the lower section of the ST unit.
AWARNING: AC UTILITY WIRING TO THE ST UNIT IS PERFORMED DIRECTLY AT THE MAIN
\ BREAKER PANEL. THIS SHOULD BE DONE ONLY BYA QUALIFIED UTILITY INSTALLER OR
ELECTRICIAN WITH PRIOR UTILITY COMPANY APPROVAL.
ur NOTE: The ST unit can be connected to a single bidirectional meter, or to dual meters, where one
meter indicates power used the second meter indicates power sold (power supplied back to the
utility). The installer and utility must determine the proper components to install.
AWARNING: BEFORE WIRING THE ST UNIT, ENSURE THE MAIN 1201240 VOLT BREAKER IN
\ THE MAIN UTILITY BREAKER BOX IS SWITCHED OFF. SWITCH THIS BREAKER TO ON ONLY
AFTER ALL WIRING IS COMPLETED AS INSTRUCTED IN THE PROCEDURES.
1. Run conduit from the main utility breaker panel to the lower section of the ST unit. Run the
two HOT wires (L1 and L2) and ground through the conduit and into the ST unit's lower
section.
2. Install a dual 15 amp, ganged circuit breaker in the main utility breaker panel.
3. Connect the Ll HOT wire (black) from the 15 amp, double -pole breaker installed in the main
breaker panel, to the breaker labeled Ll in the ST unit. Refer to Figure 11A for ST1 500 and
ST2500, or Figure 11B for ST1000 and ST2000 models.
I
4. Connect the L2 HOT wire (red) from the remaining 15 amp, double -pole breaker installed in
the main breaker panel, to the breaker labeled L2 in the ST unit.
5. Connect the ground wire (green or bare copper) from the GROUND bar in the main breaker
panel, to the GROUND bar in the lower section of the ST unit.
6. Ensure all connections are correctly wired and properly torqued.
7. Torque wires according to the following table.
9754)003-D-DO3
Table 5
Wire Torque Values
14 @2000 XantrexfTrace Engineering
2.0 INSTALLATION
Ll
Him, ml Q-2 I
IL 19 m 1 1 240 VAC
L2
. .......... ... . ilo
fJ GROUND bar
V
AC conduit and wiring
WiML—i
Figure 11A
240 V AC Connection Points (ST1500 and ST2500)
Figure AB
240 V AC Connection Point.3 (ST1000 and ST2000)
@2000 XantrexrTrace Engineering
Ll
10 VAC
L2
IND bar
15
2
M
CD
U3
Breakers J—r
_6 �,— =n
MAIN SERVICE PAN
NOTES:
INSTALLER CONNECTIONS REQUIRED AT POINTS (A) AND (B) TO
THE INVERTER ENCLOSURE.
THE UTILITY METER MUST BE A BI-DIRECTIONAL METER.
OBTAIN UTILITY COMPANY APPROVAL BEFORE INSTALLING.
PVGFP AND COMBINER BOARD MAY NOT BE PRESENT ON SOME
MODELS.
PV ARRAY
ST UNIT
S sov
OV
LIGHTNING
BREAKERS (OPTION)
ARRESTOR
20 A
(OPTION)
I +
ISA
+
LI
20 A
f"
tr2�OA
15 A
20 AL
L2 INVERTER
Breakers J—r
_6 �,— =n
MAIN SERVICE PAN
NOTES:
INSTALLER CONNECTIONS REQUIRED AT POINTS (A) AND (B) TO
THE INVERTER ENCLOSURE.
THE UTILITY METER MUST BE A BI-DIRECTIONAL METER.
OBTAIN UTILITY COMPANY APPROVAL BEFORE INSTALLING.
PVGFP AND COMBINER BOARD MAY NOT BE PRESENT ON SOME
MODELS.
PV ARRAY
ST UNIT
UTILITY
ILITY METE GRID Extra Ground Rod
Only Required on
Long Runs > I OD
feet (30 rn).
Figure 12
Simplified Electrical Wiring Diagram (Typical for ST1500 and ST2500)
976-SO04M
Cn
--1
0
z
PV COMBINER BOARD
PV GROUND FAULT
BREAKERS (OPTION)
20 A
100A 100 A
I +
20A
+
20 A
f"
tr2�OA
1AL
20 AL
UTILITY
ILITY METE GRID Extra Ground Rod
Only Required on
Long Runs > I OD
feet (30 rn).
Figure 12
Simplified Electrical Wiring Diagram (Typical for ST1500 and ST2500)
976-SO04M
Cn
--1
0
z
2.0 INSTALLATION
Lightning Protection
To protect the equipment from lightning damage, a single point grounding system should be
used. In this system, all ground lines terminate at the same point. This point normally is the main
utility ground installed by the utility company to provide a ground for the house wiring. This
ground usually consists of a copper rod driven 6 to 8 feet into the earth. Ground roof mounted
solar array frames directly to the external utility ground rod (Figure 13A).
If the solar array is located a considerable distance from the ST unit, then an additional ground
rod must be installed close to the solar array for the most reliable lightning protection (Figure
13B). The grounded frame of the solar array provides a direct route to dissipate lightning Strikes
via the close ground rod. Tie this ground rod to the main utility ground rod via a heavy gauge
(#8-6 AWG) bare copper wire which can be buried underground. Tieing these grounds together
constitutes a single point ground and provides the best protection from lightning damage. Ref6r
also to the NEC for specific grounding requirements.
Solar
Array
al Main Utility Utility
ST Unit Breaker Panel Meter
Ground
AC Wiring AC
Ground AC Wiring to
Bar Wiring Utility
DC Wiring Bonded Neutral Wire
Utility Ground
Wire
Array Ground Wire
Utility
Ground
R . d
957-FOOW
Figure 13A
Typical Roof Mount Installation Grounding
Buried Copp. Wire
Array Ground Rod Utility Ground Rod
Figure 13B
Long Distance Grounding
@2000 Xantrexrrrace Engineering 17
100 feet (30
Main Utility Utility
ST Unit
Breaker Panel Meter
Solar
at'
Array
Ground
AC W1d.g Bar AC
Ground
AC Wiring tD
Bar
Wiring Utility
DCWking
4r
Ground
Bonded Neutral Wire
Frarnato
Arre
Array Ground Wia
Pole
Ar'-
Utility G=nd
4.
ir!
Buried Copp. Wire
Array Ground Rod Utility Ground Rod
Figure 13B
Long Distance Grounding
@2000 Xantrexrrrace Engineering 17
3.0 OPERATION
Start-up Procedure
Required Equipment
True rms reading AC voltmeter (or true rms multimeter)
DC voltmeter (or multimeter)
Frequency counter (optional)
F:T' NOTE: Before applying power to the ST unit, ensure all AC and DC wiring is correct.
AC Utility Voltage Check (Figure 14)
1. Switch ON the MAIN 240 V breakers in the main breaker service panel.
2. Ensure all circuit breakers located in the ST unit are in the OFF (down) position.
3. Switch ON the ganged 15 amp ST circuit breakers located in the main breaker service
panel. This applies the utility supplied 240 volts AC to the ST unit.
4. Using a true rms AC voltmeter, measure the AC open circuit utility voltage between L1
and L2. Ensure this voltage is approximately 240 volts AC. The inverter operates with a
line -to -line voltage (L1 to L2) ranging from 211-264 volts AC.
975 -U00 -001a
Figure 14
Utility 240 Volts AC Test
18 @2000 Xantrexfrrace Engineering
j I I I
0
Start-up Procedure (continued)
3.0 OPERATION
Solar Array DC Voltage Check (Figure 15A for ST1 500 and ST2500, Figure 15B for ST1 000
and ST2000 models)
1. Uncover the solar arrays and expose them to full sunlight. This test can not be done
during dark or stor�ny weather where the available sunlight may not be intense enough to
produce the required output voltage.
2. Measure the solar.array open circuit DC voltage across the DC positive (+) and negative
(-) terminals. This voltage must be greater than 50 volts DC for 5 minutes minimum to
start the inverter.
NOTE: Some thin film modules (amorphous) may produce an open circuit voltages 100-120 volts.
Crystalline solar modules will produce open circuit voltages at 75-85 volts (four modules wired in
series). An open circuit voltage 50 volts or greater is required for 5 minutes to start the inverter. The
5 -minute time delay is required by safety standards.
TO
NEGATIVE
TERMINAL 976-U00-002.
Figure 15A
Solar Array DC Voltage Test (STI 500 and ST2500)
CONNECT
POSITIVE (+) 975-UOO-MB
TERMINAL
Figure 15B
Solar Array DC Voltage Test (ST1 000 and ST2000)
@2000 Xantrex/Trace Engineering
19
I I It
3.0 OPERATION
Start-up Procedure (continued)
Operational Test
1. Switch ON the double pole 15 amp AC circuit breakers located in the ST unit. These
breakers provide the ST produced power to the utility and provides the necessary utility
voltage and frequency to the inverter (the inverter will not produce an AC output if utility
voltage is not present on its output). Refer to Figure 16, item 1.
2. Switch ON the 100 amp DC circuit breaker located in the ST unit. This breaker supplies
the DC power from the PV array to the ST unit. Refer to Figure 16, item 2.
3. Switch the 1 and 100 amp (ganged) PVGFP breakers to ON (if installed). These breakers
open when 1 amp or greater is detected in the DC negative to ground line; indicating a
ground fault condition. Refer to Figure 16, item 3.
4. The inverter's Liquid Crystal Display (LCD) displays the product name, software revision,
Trace Engineering name, and finally the operational values during this sequence. During
the 5 -minute timer, AC voltage, frequency, and DC voltage appear on the display (Figure
17).
Figure 16
Turn -On Sequence
20 @2000 XantrextTrace Engineering
Start-up Procedure (continued)
AC Voltage Frequency SolarArray Voltage
2
m- —
4 6
0 T -C
VA 60 4. 76 VDC
L5,00W
20500 W 5009 Wh
W
�500�Wlj
Current Power Total Daily Power
Produced Produced
Figure 17
LCD Location and Indications
3.0 OPERATION
5. View the LCD status meter and monitor the DC voltage: (Figure 17)
The inverter quickly scales up the DC solar array voltage and attempts to locate the
array's maximum power point. The DC voltage continues to increase until the CPU
detects that the maximum power point was passed.
DC voltage will be scaled down and begin increasing again to find the maximum
power point. This routine may continue several times until the maximum power point
is found. At this point the inverter will lock on to the array voltage and begin to sell the
maximum amount of power possible under the conditions. This algorithm, known as
maximum power point tracking (MPPT), operates an efficient "power sweep" once
each minute throughout the day.
Ensure the inverter begins searching for an operational DC voltage upon start-up.
After completion of the 5 minute wait protection timer, the �T begins selling power
indicated in the Waft (W) and advancing Waft -hour (Wh) meters located on the LCID
display.
@2000 XantrexfTrace Engineering
21
I I 1 0
3.0 OPERATION
Start-up Procedure (continued)
6. Replace the circuit breaker panel (Figure 18).
Install the circuit breaker (inner) panel by sliding it in-place under the top cover and fitting
its two locking tabs into the slots on the bottom of the ST unit.
Reinstall the two screws located on the bottom of the unit.
Reinstall the screws on the front of the panel that secure it to the circuit breaker.
Replace screws in the
circuit breakers
Replace screws into the tabs
Figure 18
Replace Circuit Breaker Cover and Screws
7. Replace the external cover. (Figure 19).
Position the external cover in place and install a screw in each side.
FW' NOTE: A hole at the bottom front of this cover and the main chassis allow for installing a lock to
prevent tampering or unauthorized access to the unit.
i IN
Replace screw
(one on each side)
Lock Hole
zz,-
Figure 19
Replace Outer Cover and Screws
22 @2000 XantrextTrace Engineering
1 11 4
Start-up Procedure (continued)
8. Install rain shield hood if located outdoors (Figure 20).
Install the rain shield onto the ST enclosure.
. Secure it with the four screws provided (two each side).
Rain Shield
@2000 XantrexrTrace Engineering
Figure 20
Replace Outer Cover and Screws
3.0 OPERATION
Install screws (2 each side)
23
4.0 TROUBLESHOOTING
Troubleshooting
To aid in troubleshooting the ST units, there are two LEDs located on the CPU board accessible
after removing the upper cover panel. The LEDs light to indicate the inverters status as per the
Troubleshooting table on page 26. The upper cover should be removed only for viewing the inverter
status LEDs as dangerous voltages exist in this area. Wait five minutes after disconnecting the
inverter before removing the panel to allow the components to discharge. DO NOT REMOVE THIS
COVER FOR ANY OTHER PURPOSE.
Remove the Rain Shield (if installed) by removing the two screws (from each side) securing it
to the housing (Figure 21). Set the screws aside in a safe place.
Remove the upper external panel by removing the four screws located on the front of the
panel (Figure 21). Set the screws aside in a safe place.
Locate the red and green LEDs on the CPU board (see Figure 22).
Refer to the Troubleshooting table (on page 26) for the LED status indications.
Remove screws
(2 each side)
Remove screws
(4 total)
Figure 21
Rain Shield and Upper Panel Removal
24 @2000 Xantrexfrrace Engineering
CPU Board
4.0 TROUBLESHOOTING
Figure 22
CPU Board and LED Location
@2000 Xantre)rJTrace Engineering
25
. 11 0
4.0 TROUBLESHOOTING
Problem
Cause
Remedy
Inverter CPU does not illuminate the red or green
PVGFP, AC or DC breakers are switched
Turn ON breakers in the sequence described in the
LEDs and does not operate in sufficient sunlight
OFF.
operating section.
No AC grid or DC array voltage is presenL
Check AC connections and ensure 240 VAC is
present at the inverters AC disconnect. Check DC
connections and ensure 50-125 VDC is present on
the inverter's disconnect.
20 amp fuse on combiner board are
Install combiner board fuses. Check PV array for
missing or open.
short circuits or improper si2ing for the 20 amp
fuse.
The inverter CPU only illuminates the red LED.
The inverter does not recognize any AC
Ensure the inverter AC disconnect is switched ON.
The green LED never illuminates in a flashing or
input signal.
Check the AC voltage at the inverter and ensure AC
solid mode.
voltage is present. Check source of the AC voltage.
Inverter does not recognize the appropriate
Check the DC voltage on the positive and negative
DC signal.
input terminals. The DC voltage must be 50 volts or
greater open circuit to initiate inverter operation.
Check for incorrectly wired PV arrays or try again
on a day with brighter suntight intensity.
The inverter illuminates the red LED upon startup
The inverter recognizes the AC grid is
Check the AC voltage and frequency with a
and goes into a flashing green mode. The flashing
present, but grid voltage or frequency are
multimeter/frequency meter. Wait for grid power to
green LED ronbrKies for over 5 minutes and
riot within the appropriate tolerances.
return to acceptable voltage arid/or frequency. Notify
never illuminates solid.
the utility comparry that the voltage of frequency is
outside of the appropriate boundries.
The inverter CPU illuminates a solid green LED
The inverter recognizes this AC grid and DC
Check the DC input voltage at this inverter's positive
momervtarily� then flashes a red LED.
array witages and attempts to start selling
arid negative input terminals. The PV array is riot
power. The PV panels are not producing
producing enough power. Wait for sunlight intensity
sufficient power for the inverter to operate at
to increase and ensure -the panels produce
a stable DC voltage.
sufficient voltage for inverter initialization.
100 amp DC breaker trips.
Current from the array exceeds the DC input
Check array size and ensure the DC input does riot
breaker rating.
exceed the breaker rating.
A lightning strike lit near the PV arTay,
Check lightning arrestor, breakers, panels, diodes,
DC wire insulation and other components for
damage. Replace arry damaged components arid
reset the breaker.
Open 20 amp combiner board fuse(s).
A short to ground exists in the DC array
Check all DC array wiring for improperwiring or
wiring.
exposed wires.
Array is producing current in excess of the
Check array size and ensure the DC input current
fuse rating.
does riot exceed the fuse rating.
PVGFP breaker trips.
A ground fault exists in the DC array wiring.
Check all PV array wiring for improper wiring,
exposed wires, or short circuits.
975-0003-0-001
26 @2000 XantrexfTrace Engineering
t I 1 0
5.0 SPECIFICATIONS
MODEL
ST1000 ST1500 ST2000
ST2500
AC voltage -nominal
L
240 VAC
Maximum power point tracking
voltage range
42-85 VOC
Minimum Input DC voltage
(for full rated AC output)
52 VDC (typicalty four nominal 12 VDC PV modules, In sedes)
Minimum wake-up DC Input
voltage
50 VDC
Absolute Maximum PV open
circuit voltage
125 VDC
AC voltage-mintmax
211-264 VAC
AC output characteristics
Current source
Nonimal frequency
60 Hz
Frequency window-mlnlmax
59.3160.5 Flz Default
Continuous ac output @ 25 *C
1.0 k VA IS k VA
2.0 k VA
2.5 k VA
Efficiency -peak
92%
94%
AC output waveform
Sinewave, high frequency PWM controlled
Total harmonic distortion
Less than 5% at rated power per IEEE 929 and UL 1741
AC disconnect
Double -pole 15 amp. 240 VAC branch drcdted rated breaker
DC disconnect
Single -pole 100 amp dc rated circuit breaker
Islanding protection
Overhinder AC voltage and frequency deteclJon plus active Islanding detectiormeets IEEE 929 and UL 17,11requirements
User display
Backlight alphanumeric LCD display -AC amps, AC volts_ DC volts, AC frequency Output power (W) and (Wh) produced.
Specified temperature range
-38-113 'F (-39-45 'C)
Enclosure Type
Outdoor, rainproof. powder o0ated aluminum enclosure, fully screened
Dimensions (inverter only)
13.25*W x 33.25'H x 5.3"D (33.8 cm W x 83.1 cm H x 13.25 . cm D)
Dimensions (shipping)
11 75"W x 37.75"H x 9.5'D (39A cm W x 94.4 cm H x 23.8 cm D)
Weight (inverter only)
35 lb. (15.9 kg)
Weight (shipping)
40 lb. (18 kill
Mounting
Vertical wag mount only
Listings
UL listed to UL1741, 1 st edition and cUL listed to CSA C22.2 No. 107.1-95
STANDARD FEATURES AND OPTIONS
PV ground and fault protection
system
Standard
Standard
PV combiner board with 6
fused Inputs. 20 amps
maximum per Input
Standard
Standard
Surge arrestor -Combined
ACIDC protection
Standard
Standard
Standard
Standard
Rain Shield (STRS) Protective
rain shield (required for
outdoor Installation)
Opflonal
OplJonal
I
Optional
Optional
I
Spednmgom sd*d to changs withod wtim.
SpWfl.Uo. @ 25 T.
@2000 Xantrex/Trace Engineering
27
0, . 1 4
6.0 SERVICE INFORMATION
Trace Engineering makes every effort to ensure your unit fully meets your independent powering
needs.
If your product needs repair, contact our Service department at: (360) 435-8826 to obtain an
RMA# and shipping information; or fax this page with the following information to: (360) 474-0616.
Please provide:
ST Model:
Serial Number:
Purchase Date:
Dealer/Installer:
Phone: (
Country:
Problem:
Include a telephone number where you can be reached during business hours and a complete
return shipping address (P.O. Box numbers are not acceptable).
Name:
Address:
City:
State / Province:
Zip / Postal Code:
Phone: (
Country:
28 @2000 XantrexrTrace Engineering
f , 'i "
7.0 WARRANTY
Limited Warranty
Xantrex/Trace Engineering warrants its power products against defects in materials and
workmanship for a period of two (2) years from the date of purchase, established by proof of
purchase or formal warranty registration, and extends this warranty to all purchasers or owners of
the product during the warranty period. Trace does not warrant its products from any and all
defects:
• arising out of material or workmanship not provided by Xantrex/Trace Engineering or its
Authorized Service Centers;
• when the product is installed or exposed to an unsuitable environment as evidenced by
generalized corrosion or biological infestation;
resulting from abnormal use of the product, alteration, or use in violation of the instructions;
in components, parts, or products expressly warranted by another manufacturer.
Xantrex/Trace Engineering agrees to supply all parts and labor to repair or replace defects
covered by this warranty with parts or products of original or improved design at the company's
option. Xantrex/Trace Engineering also reserves the right to improve the design of its products
without obligation to modify or upgrade those previously manufacture ' d. Defective products must be
returned to Xantrex/Trace Engineering or its Authorized Service Center in the original packaging or
equivalent. The cost of transportation and insurance on. items returned for service is the
responsibility of the customer. Return transportation (UPS Ground or equivalent) as well as
insurance on all repaired items is paid by Xantrex/Trace Engineering.
All remedies and the measure of damages are limited to the above. XantrextTrace Engineering
shall in no event be liable for consequential, incidental, contingent, or special damages, even if
Xantrex/Trace Engineering has been advised of the possibility of such damages. Any and all other
warranties, expressed or implied, arising by law, course of dealing, course of performance, usage of
trade or otherwise, including, but not limited to, implied warranties of merchantability and fitness for
a particular purpose, are limited in duration for a period of two (2) years from the original date of
purchase.
ome states or counties do not allow limitations on the term of an implied warranty, or the
exclusion or limitation of incidental or consequential damage, which means the limitations and
exclusions of this warranty may not apply to you. Even though this warranty gives you specific legal
rights, you may also have other rights which vary from state to state.
AMMj&jjT,P3IjPY5916 - 195th Street N.E., Arlington, WA 98223 Phone: (360) 435-8826 Fax: (360) 435-2229
Smart Choice For Power visit our website at. www. traceengineering. com
@2000 XantrexfTrace Engineering
29
I
jr,A A ALMIW 5916 - 195th Stl..t N.E . Adngt.., WA 98223 Ph.n.. (360) 435-8826 Fall. (360) 435-2229
...am Vol
Smart Choice For Power visit our website at www.traceengineefing.com
Certified PV Modules
Page 1 of 7
cALIFORNIA ENERGY COMMISSION
hornepcuge links bookstore glossory contcict ius search
buy -down
List of Certified Photovoltaic Modules
California Energy Commission
Emerging Technologies Buy -Down Program
Information As Of: 8/24/2001
Mfr Name
JASE America
Module Model Description
Number
ASE -1 00-ATF/1 7-34 JF1 OOW/1 7V EFG Module, framed
F —
FASE-300-DGF/17-
285W/1 7V EFG Module, framed :J
CEC PTC
Watt
Rating
1ASE Americas, Inc. 11285
ASE Americas, Inc. 1300
ASE-300-DGF/17-
�31
F3OOW/17V EFG Module, framed
ASE America
ASE-300-DGF/17-
�3'15
315W/17V EFG Module, framed
IF -
ASE America
S'
A E-300-DGF/50- IF
[260
267OW/50V EFG Module, framed
ASE America
S'
[A E-300-DGF/50-
285
1F2857W/50V EFG Module, framed
ASE America
S'
E-300-DGF/50-
r3O 0
I 30OW/50V EFG Module, framed
F
lAstroPower, I
JAP-100
IF16ow single Crystal Module (was AP -1006)
lAstroPower, I
FAP -1006
I F 0-0 W—Single Crystal Module
88.91
lAstroPower, I
JAP-110
ingle Crystal Module (was AP-
lAstroPower, Inc.
IJAP-1106
111 OW Single Crystal Module
lAstroPower, 1n7c7___7jAP-120
I F12OW Single Crystal Module (was AP -1206)
_______]jAP-1206
lAstroPower, Inc.
1120W Single Crystal Module
lAstroPower, ln�c.�JAP-6105
165W Single Crystal Module
F_Ye�s
lAstroPower, I
JAP-65 1165W
Single Crystal Module (was AP -6105)
lAstroPower, Inc. =]IAP
-7105
175W Single Crystal Module
lAstroPower, Inc.
JAP-75
P75W Single Crystal Module (was AP -7
lAstroPower, I
APX-75
F
75W APex Module
F
lAstroPower, I
JAPX-80
1�80WAPex Module
lAstroPower, I
FAPX-90 -]F90W
APex Module
lAstroPower, Inc.
JILAP-425 �1425W
Single Crystal Large Area Panel, frarneless
lAstroPower, Inc.
JILAP-440 ---- ]1440W
Single Crystal Large Area Panel, frameles-S-1
lAstroPower, Inc. __�JLAP-460
�1460W
Single Crystal Large Area Panel, frameless
lAstroPower, Inc.
IILAP-480 =�1480W
Single Crystal Large Area Panel, frarneless
http://www.consumerenergycenter.org/buydown/certified_pvmodules.html 9/24/2001
a
4 --Certified PV Modules
Page 4 of 7
38.411 Ye
22.2]
2479
26-7]
44.4]
49- 8]
53.41
91.21
98.41
Evergreen Solar IJEC-47
1147W Cedar Line module
Evergreen So
I EC -51 F51 w cedar Line module
Evergreen So
FEC -55 JF55w cedar Line module
Evergreen So
I EC -94 194W Cedar Line module
Evergreen So
FES -11 12
F112W String Ribbon poly -Si AC Module (with Trac
IMS100)
Evergreen So
1124OW
ES -240
F
String Ribbon poly -Si AC Module (with AES
I MI -250)
First Solar, L
FS -50 IF50W/65V Thin Film CdTe laminate
F
First Solar, L
FFS-50C
50W/65V Thin Film CdTe laminate w/ C -channel
mounting rails
First Solar, L
FS -50Z
F
50W/65V Thin Film CdTe laminate w/ Z-chamq
mounting rails
I Ky6c—era A-mdrica�
IrKC 120--1 F12OW Hijti Effi c-ie-ficy- Multicrystal.PV Md'd
F Yes]
L --------- i
I Kyocera Ame
[KC60 JF66w
Frigh Efficiency Multicrystal PV Module
I Kyocera Ame
FZ71
1 rv.,80
h Efficiency Multicrystal PV Module
Matrix Solar/ �otowa�UJPW1000-100
F1OOW Large Scale Dual Voltage multi -Si Module
Matrix Solar/Photowatt
IFPW1000-105 IF105W
Large Scale Dual Voltage multi -Si
Matrix Solar/
I PW1 000-90 lFgo—wLargescaie Dual 'Voltage multi -Si Module
Matrix Solar/Photowatt
FPW1 000-95 IF95W Erge Scale Dual Voltage multi -Si Module
I Matrix Solar/PhotowaItj
PW750-70 F70W Large Scale multi -Si Module
I Matrix Solar/P:h:o:to7w7a7tt 7]
PW750-75 rge Scale multi -Si Module
IMatrixSolar/ �otowa�ttjl?W750-80
---]180W Large Scale multi -Si Module
Midway Labs, Inc.
JIMLB3416-115 IF1 1 5W Concentrator (335x) Module
Photovoltaics
International,
FsunFocus166
F166W Linear Concentrator Module
I Powerlight C
IPL -AP -130 11 130W PowerGuard Roof Tile (Astropower AP -11 30)
-------IIPL-ASE-100
I Powerlight Corp.
F100w PowerGuard Roof Tile (ASE Americas)
I Powerlight Corp.
IIPL-BP-2150S IF15OW PowerGuard Roof Tile (BP Solar)
Powerlight Corp.
IIPL-BP-TF-80 F80W PowerGuard Roof Tile (BP Solar)
Powerlight Corp.
IFPL-FS-415-A IF50W PowerGuard Roof Tile (First Solar)
I Powerlight C
IPL -MST -43 �143W PowerGuard Roof Tile (Solarex a -Si)
I Poweriight Corp.
IIPL-MSX-120 IF12OW PowerGuard Roof Tile (Solarex poly -Si)
I Powerlight Corp.
i[P-L-SP-135 F135W PowerGuard Roof Tile (Siemens)
I Powerlight C
I PL -SP -11 50-C�j 150W PowerGuard Roof Tile (Siemens)
aj
http://www.consumerenergycenter.org[buydown/certified—pvmodules.html 9/24/2001
- California Certified Inverters
Page 2 of 3
ITrace Engineering JUX612SB 11sinewave inverter w/stby baft. chgr. 11 6001
92.01 Yes
RE24- 4.5kW 24Vdc 120/24OVac, grid interactive or
lVanner Inc. 1450ODGT listandalone, True sinewave inverter
Xantrex 1OkW, 240Vac split -phase, utility interactive
Technology, I FB;1 0240 inverter
IXantrex F1.5 k_VA, 12Vdc, 120Vac, stand alone, modified
Technology, Inc. ][DR1512 [sine wave inverter
IXantrex F1.5_k_VA, 24Vdc, 120Vac, stand alone, modified
Technology, I FDR 152 4 Isine wave inverter
iXantrex ]ff2:4_kVA,
Technology, I IDR2412
12Vdc, 120Vac, stand alone, modified
Isine wave inverter
IXantrex
Technology, I [DR2424
F2:4_kVA, 24Vdc, 120Vac, stand alone, modified
Isine wave inverter fl
Xantrex
Technology, I DR3624
I F
ff3.-6kVA, 24Vdc, 120Vac, stand alone, modified
Isine wave inverter
IXantrex —
Technology, I FPV- 10208 ]Fl7OkW
208Vac/3phase Utility Interactiv
IXantrex
Technology, Inc. IFPV-15208
F15kW 208Vac/3phase Utility Interactive Inverter
iXantrex
Technology, Inc. I[PV-20208
F2OkW 208Vac/3phase Utility Interactive Inverter
iXantrex
Technology, 1
F_ ]F5kW,
Py -5208
208Vac/3 phase, photovoltaic utility
linteractive inverter
Xantrex
ITechnology, I
Fs, 000 ,
1.OkVIA, 42-85Vdc, 240Vac, grid tie, sine w
IF TV9
linverter
IXantrex
Technology, I
IST1 500
1.5kVA, 42-85Vdc, 240Vac, grid tie, sine wave
inverter
Y
IXantrex
Technology, I
FsT2000
Iff2.OkVAA, 42-85Vdc, 240Vac, grid tie, sine
linverter
IXantrex
Technology, I
]ff2.5kVAA,
IdT2500
42-85Vdc, 240Vac, grid ti,e, sine wave
linverter
Xantrex
ITechnology, I
[SW4024 ]F
4.0 MA, 24Vdc, 120Vac, grid tie with battery
[backup, sine wave inverter I
IXantrex
Technology, I
FsW4048
1,44.0 7kVa,, 48Vdc, 120Vac, grid tie with battery
lbackup, sine wave inverter
PXantrex
echnology, Inc.
]F5.T57kVA,
IISW5548
48Vdc, 120Vac, grid tie with battery
lbackup, sine wave inverter
(1) Recent production of these inverters may not have a UL Listing Mark, which means they have not passed the UL1741
Standard Test Procedure that incorporates the July 2000 Revisions. This may affect grid interconnection requirements
imposed by utilities.
N Lists of Eli- . ble uipment
For Questions About the Buydown Program contact:
California Energy Commission
Emerging Renewables Buydown Program
1516 Ninth Street. MS -45
Sacramento, CA 95814
Phone: 1-800-555-7794 (in Calif.) or 916-654-4058 (outside Calif.)
E-mail: renewable@ener state.ca.us
http://www.consumerenergycenter.orgibuydown/certified—inverters.htm] 9/24/2001
California Certified Inverters Page I of 3
CALIFORNIA ENERGY COMMISSION
hamepage Iiinks bookstore 91o=ry contact tis search
buy -down
List of Certified Inverters
California Energy Commission
Emerging Renewables Buydown Program
Updated: September 6,2001
Mtr Name
inverter Model Description
No
Power
Rating
Advanced Energy,
IIGC-1000
P
Istandalone
Inc.
GC -1000 Grid Interactive Inverter
1006
Bergey Wind
lCo.
Advanced Energy,
�JUVA,
48Vdc, 120Vac, Grid -Tied, Battery Ba�_kqp
Inc.
MM -3000 IlSinewave
Inverter
ISMA America IFSWR250OU
Advanced Energy,
IlSinewave
RVA, 48Vdc, 120Vac, Grid -Tied, Battery Backup
Yesl
ISMA
Inc.
MM -5000
Inverter
5000
America
1connected, with display
2kW Solar Pump Controller, single phase,
ITrace
Aerovironment Inc.
USPC2000-1ph
standalone 1
2200
Engine
11USPC2000-
linverter
12 2kW Solar Pump Controller, three ph��
-
F
Yes
ITrace
Aerovironment Inc.
philsion
dEl
cione
220]OF
97-ol
Y els
lAerovironmen
FuSPC5000-1
F5-5kW Solar P ump Controller, single phase,
lAerovironment Inc, I
P
Istandalone
Yes
http://www.consumerenergycenter.org/buydown/certified—inverters.html 9/24/2001
Solar Pump Controller, three phase,
lAerovironment Inc, I
00-3ph
115.5kW
standalone
Yes
Bergey Wind
lCo.
IF!
10kW, 240Vac split -phase, utility interactive
Gr
,dtek 10
linverter
ISMA America IFSWR250OU
112.5kW Sunny Boy String Inverter, grid connected
F_ _2500�
Yesl
ISMA
SWR250OU-
ISBD
2.5kW Sunn Boy String Inverter, grid
F
America
1connected, with display
ITrace
P27.5k_VA. 12V dc, 120Vac, stand alone, sine wave
Engine
PFS2512AE
linverter
Yes
ITrace
[PS2524AE
F.5 kVA. 24V
I [i2 dc, 120Vac, stand alone, sine wave
Engine
[inverter
ITrace
F2.5 kV
.5 kVA, 12Vdc, 120Vac, grid tie with battery
Engine
SFW2512
lbackup, sine wave inverter
kr,�ce
4.60 7kVA, 48Vdc, 240Vac, grid tie with battery
Engine
SW4048U
lbackup, sine wave inverter
iTrace
F
[E5T 7kVA, 4 8 V dc, 240Vac, grid tie with battery
Engine
5548U
SW7
.
lbackup, sine wave inverter
Yes (1)1
iTrace
Fuxi
F1.1 kVA, 12Vdc, 120Vac, stand alone, modified
Engine
12
Isinewave inverter
iTrace
I=
12Vdc, 120Vac, stand alone, mod.
Engine
]F1_.1kVA,
1 12SB
Isinewave inverter w/stby baft. chgr.
ITrace
[UX1412
F1.4 kVA, 12Vdc, 120Vac, stand alone, modified
Engine
Isinewave inverter
ITrace ]JUX
F1 .4 kVA, 12Vdc, 120Vac, stand alone, mod.
Engineering
1 412SB
Isinewave inverter w/stby baft. chgr.
ITrace
F6.6 k7VA, 12Vdc, 120Vac, stand alone, modified
Engine
UFX612
Isinewave inverter
Yes
I IF-
110.6 kVA, 12Vdc, 120Vac, stand alone, mod.
http://www.consumerenergycenter.org/buydown/certified—inverters.html 9/24/2001
Sent By: BUTTE CO ENVIRONMENTALHEALTH;
Mark & Kim Nelson
4251- Shorthorn Dr.
Chico,,, CA 95973
le 11' = 30'
APN 047 530-004
x
Environmental HMO
AU6 2 7 200
chico, Calitomia
530 895 6512; ,Seo -,21-01 10:51AM; Page 3/4
Sent By: BUTTE CO ENVIRONMENTALHEALTH; 530 895 6512;
Sep -21-01 10:51AM; Page 4/4
Her
IV
r
r_
- - 7mr-!r,�
AN
kA
6,
TrIXU
77
0
i Z-4919 k� -- , yt�x
loll
77Li
l..EW- fixture type'. size eXaCt location
haust fan to be as directed B.O.
V.
SnVironmentOl "esgh
A,06 16 10
CwIr Aoff�a
00,
� �11�6 A -A 4U10
Am, ff 411,4
I
PERMIT NO. 2133 -83B -,PE k
4
PERMIT EXPIRES
OWNER - SCOTT & DENISE WHITING
CONTR. Western Sierra Construction, Chico
ASSESSOR PARCEL 47-5274
LOCATION - S/S Shorthorn'Dr, 50'W Simmental Di
...lot 4.' Chico
OFFIC OPY
V
Address
GAS
Meter By ate --
ELECT
Meter B D at
Temp. Power Pole
Called PG&E
f4
Elec. Sdirvice
Called PG&E
Temp. Gas Service
CalledPG&E
JOB FINALED (Date)
Signature
A�
Temp. Power Pole
Called PG&E
f4
Elec. Sdirvice
Called PG&E
Temp. Gas Service
CalledPG&E
JOB FINALED (Date)
Signature
OK
0 = Not OK
- = Not Applicable MOBILEHOMES-
* = Not Ready
MISCELLANEOUS
Da te
MOBILEHOME UTILITIES (Plans) OK except #'s
Date
DECKS, COVERS, CARPORTS, ETC. (Plans) OK except #'s
1. Zoning Req u i rement s-Setbac ks- Easements
1. Zoning Requirements -Setbacks -Easements
2. Soils; Special �H Support -Sketch _'
3. Sjwer; Locatioh-Test-Fall-C/0-Concrete
2. Footings; Size-Depth-Spacing-Conneclors
3. Decks; Girders and/or Joists -Decking -Bracing -Stairs -Rails
4. Water; Loc at i on- Test- Easement Needed (Sketch)
4. Wood Awn.; Posts-Beams-Rftrs.-Connec.-Shthg.-Rfg.-Bracing
5. Electricity; Location-Clearances-Grnd.-/ / Amp-Corfcrete
5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures
6. Gas; Location -Test -Wrap: /"L"ft./ /" Nat. or/ --/'!L"ft./ P, LPG
7. Uti I ity Clearance
6. Carports; Windows -Doors
7. Elec.
Card -BI .
Date Card -Bl Date
Card -BI
Date Card -131 Date
Card -BI
Date Card -Bl Date
Card -131
Date Card -131 Date
Date
MOBILEHOME INSTALLATION (Plan�s) OK except #'s
1. Zoning Requirements -Setbacks -Easements
Date
POOLS (Plans) OK except #'s
1. Setbac ks- Easements
2. Footings; Size -Spacing -Marriage Line
2. Soils; Compact i on-Struc ture Stability
3. Gas; MH Test -Demand -Valve -Connector
3. Pool Structure; Steel -Connections -Thickness -Dead Men -Lining
4. Electricity; MH Test -Crossovers -Breakers -Clearances,
4. Elec.; Receptacles and Lighting; Distances-GF1
5. Drain; MH Test-17all-Flex Connector
5. Elec.; Pool Lighting; 15 volts-GF1
6. Water; MH Test -Regulator -Connector
6. Elec.; Enclosures; Conduit Entries -Terminals -Listed
7. Water and Sewer Connected -C/0 to Grade -HD Approval
7. Elec.; Bonding; Metal w/5' -Circulating Equipment -Heater
8. Gas and Electricity Tagged
8. Elec.; Grounding; Equip. w/5', -Circulating Equip. -Pool Lghig.
Boxes -Enc losures- Pane Iboards- Ins. to Main-imConduit
9. Exits; Insp.-Sketch
10. Cert. of Occupancy
9. Health Department Approval
10. Plumb; Cir, Test -Water Supply Test
Card B-1
Date Card -BI Date
Card -131
Date Card -Bi Date
Card B-1
Date Card -BI Date
Card -Bl
Date Card -81 Date
V = OK
0 = %Oe
- = 1�ot Applicable
= Not Ready
RESIDENTIAL (Single and Duplex)
Date UNDER -FLOOR (PW's) OK except #'s
Date
FRAMING (Continued)
Sin ents-Sr4tdcks-E*,<e,, 0;*
_ing requirem _ _ a
41elf I g,,,_ Mai n;gWs- Sk-t+- E I ed_jWhd.=_1 /0 /'' Ftg. Depth
'". F. . wa44-",LM.ings
40r,"5_t. Doors-Oa&-@1'--ChecWaPMjr-8F4 64@&j,.2 exits
3Z-+'rg.. Gsi;ne; SoWa-"S+"I- Ftg. Depth
4,0_ ww- airs; �e
4AFtg,Porches & Decks; Soils -Steel- Ftg. Depth
� Qw - _1!�ers
4a!qr1r ---an Rookouafhang-)Qt�it�aftekO
mwalls, Main;
Ils, Garage; &Wol-BlqMkio�ts-Wrappet:14�
�J
iding-Nailing-Veneer
AUK
qz:Q� H-Prl, %'^AIs 41adaWL-ALcess
iers
az_ing Area -Glass Protect i on-Skyl i ghts- P last ic
V.: Fall -Fittings -Test -2 way C/04eZwe*r�e
W9 I IT: ling Bolts
&GOP Rips. Sim '11chors
%!�ater Pipe: T&IT--Anikofs-Regulato
5-7, Ziis_ W_ a *f I!%-- W &I 15
und
lenums & Ducts; Clearance-Materie
'4aa' �
�.rders-sms-Anchor Boits-ioists-vents-crip-pTes
Card -BI
Date,0,,Zje> Card -BI 19 Date/ Ll
X'-ve- /
Card -BI
Card -BI Date
Dat2o�
^,-4 e2
Card -61
AQ Dat�74Dj% _VZ Card -BI Date
Card -BI Date 3 Card -BI Date
Date
FINAL (Plans) OK except #'s
Card -13 Date��_;rkn Card -BI Date
Da/1, ��U�MB_ ermit) OK except #'s
I (P
Steps -Door & Sidelight Protection -Landings
�,7,7
4?' §pde Detector
. —
Furnace; VeMs_CIZ;?h'ce Be br Am --trMWcTbr—
I _n.Gerage-"4beve-PtoUr-Ducts-Mech. Protection
ale, Hi., *eM-AcqjCC%s--1�rn Air
�A�efat r �Pp,; Te5L& Anchors -Nail PjqjWion
V.: Tgsm�Fttngs &4ae-hors-Nailf
gb0o'Bedroom Exiting
,ygattion
est, Fir
�01' er Pn T st FIoaQQLULAccess-vf-4�,c/,
.1. �� Fixtures & Tub Access
GP�Tes<j�K Shower, 2nd.F4for-TuUf4 �ss
'r,
Subpanel; Breaker Sizes -Labels
Anchors
Ral"ireplace or Stove; Clearances -Hearth
6ke-Elec Outlets at Wood Panel; Int. & Ext.
Card -BI Dat6( "_-Z-10 Card -Bl_ Date
4WO*Kit. Fixt. & Appliance; Grnd.-Air Gap -Cooking Clearanc�e
Card -BI DatVA e4-_Pj Card -BI Date
46"Elec. Outlets & Receptacles at Kit. Counter
04-tarage Fire Door; Swing -Landing -C loser
Date ELECTRLC-AL (Permit) OK except #'s
Duct in Garage -Damper -pip
2bf"r-jxmwo-&-i-r6ns#epwe��-Ins. Protection
tr. Htr.; V u .... c
I iar Nb loor-Mech. Protection
21,,�ec. Receptacles Spacing -Lights & SVitclm
joe-at Doors
Plh., Elec. & Mech. Equip. Listed for Location
22-IM7'e-Boxes & No. of Conductors-Staalet.0-
AK- EleS_��ceptacles in Garage; (G.F.L.)-Romex Protec.
U_..-R_Vhex Installed ClaLe, to Edge of Studs & C.J.
eu w -Bfdrd ;;�� & W&6?--
2Se-J'Appliance Circuits in Kitchen & Conductor S!;,e
n u lat ion-F49aw- Looked in Attic ZEJ-'W�S
j'k,0Gpi;krd Rails & Deck Construct ion -Post Caps
i'j9_G-bb4r Ak�re size //0/ ga. Cu ap-Al
?ko.�_Fdn. Vents & Crawl Hole Door -Drainage & Wood -Earth Clearance
Looked under Floor GI -fes
a�,,Range Circ. 16 / ga. Cu or Al -Oven Circ. ga. Cu or A[,
Insulated Neutral FJ�Ws DNo
Servicq�-is"awd,,-Aami,& G46mtK-�ain Disconnect
Ilowing instId.: Drive E] Yes
Planters 0Yes 4N<o Walks E]Yes e*o;
- Brown
_Z&_Stgpe16' -Fini;p,<
uip. Clearances; Bamels-Ua4ers-MechAEAKA17--
C. UniV15jA_Wfr -Clfrrces-Brar��dlrnd. Size -1155 et
w?t
�9�-�othes Closet Light-S4*wa6Ljgbt
--tao-Vents Abo-vFeRoof; Plbg.-Appliance-Firepi.-Clearance to Opngs.
Card B-1. --Date __&ard-6F ---Date
Card B -I Dat Card -BI Date
Date MECHA 04CAL (Permit) OK except #'s
74), Water Well; Disconnect, Electrical, Plumbing
eq
8ae-exterior Elec. Trim; G.F.I. Receptacle-Un6ogfo-und
P�ntilation throughout House
Gla oteStion
r P
88UL-CorV.Ln , fr . revious Inspections --JV-7
- Zas Test -Meters Tagged; Gas-ElecthC ' I
Insulation & Support
32:o0l� I F Exhaust above Insul
- . �n ation
3 3L_@T1on`de n sate Drain & Overilow; Size & Grade
74e'P;m� -UG"i Aee�GwAl-�ir-Returs-"r-vent-ili��et
& a Furnace in Attic
_Vater & Sewer Connected -C/O to Grade -HD Approval
Energy Compliance Certificate -Other Certificates
C__ D . Iye 431 Date
ard-BI Date/,8_gj1472 Card -BI Date
Card -BI
Date Card -BI r4o Date 7-e 7-4-41
Card -8 1
rAl,) DatVr�, jt y Card -BI Date
Card -BI
Dat!�_ Card -BI Date
Date (PLans) OK except #'s
Comments at Final:
2=2;.Proper ate��iLl & Anchors
J�� J!"jis. S aiiLag-Spac
'3j,.,15earing Walls over - G - irders - & Floor Nailing -
aft Stop in Walls (rat proof)
ire Stops: Furred Ceilings-Stairs7Chases-Tub
41 er & Beam -Size & a
ngers. o Anchors- on
L)� 74- ist ftr i P
--ire or e
ttic cess. . _& omex rotection-Draft Stop-&
4 . or _.-Windo-ws or Exiting-D'oors--Sill Hgt.—& D—im—ens—ions
arage Fire Protection Framing
(NOTE: Anentrymust be made each time youvisit jobsite)
January 26,19�4
Dear �irs,
We, S�6.ott and Denise Whiting residing and owner of a residential
home at 4251 Shorthorn Drive,release Butte Uounty of any liabilities
if' anyone should get hurt due to the steps being 1/2 inch higher
then code,in this house. We will accept the responsibilities of
any accident due to the -difference in the step hieght.*
Sincerely,
t
vv
I e
C5
6/c,
COUNTY OF BUTTE
-DEPARTMENT OF PUBILI� WORKS
196 Memorial Way, Chico — Phone: 890-2751
7 County Center Drive, Oroville — Phone: 534-4541
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
I - 1,111.7-7
A routine Inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. It you have any question pertaining to this
att r or need additional explanation, please contact this office Immediately.
A/F4 /I -)I C/
FA
':�/.Z/415 1,7
X!�� 11 A/1 /1/7�' f
-7 -C
-2.1,
A/
G 151QIV�
Inspector
D ate
,I
COUNTY OF BUTTE
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico — Phone: 891-2751
7 County Center Drive, Oroville — Phone: 534-4541
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
tL -, La -
OWNER I HERMIT NO.
A routine inspection indicateg that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. It you have any question pertaining to this
atter ;"Pf need additional explanaLtion, please contact this office immediately.
I
Inspector---., Date
COUNTY OF BUTTE
-DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico — Phone: 891-2751
7 County Center Drive, Oroville — Phone: 534-45"41
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
-F/ 7"7— J 3
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. If -you have any question pertaining to this
,<tte�,r need additional / explanation, please contact this office immediately.
-e) -, If 0 -
/a skrr' ;r Ae-'e
)OA X/-""ro A)
Inspector Date—zo
no
COUNTY OF BUTTE I
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico – Phone: 891-2751
7 County Center Drive, Oroville – Phone: �34-4541.
Skyway and Elliott Road, Paradise – Phone: 872-2961, Ext. 57
CORRECTION NOTICE
z Z- -P
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. It you have any question pertaining to this
�atte�e or need additional explanation, please contact this office immediately.
y- r A Aj!y
y– 6f 4 Irf 9.
-7– r
v / �., rl F Y-- Al o-4 f 7
Inspector— .,- Date z I/ 'J' '7
zd4 1 /17Z
COUNTY OF BUTTE
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico – Phone: 891-2751
7 County Center Drive, Oroville – Phone: 5344541
Skyway and Elliott Road, Paradise – Phone: 872-2961, Ext. 57
CORRECTION NOTICE
,/ 3 ?-,F 5
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. It you have any question pertaining.to this
matter, or need additional explanation, please contact this office immediately.
'% –7-- . -, A �'4 j /; j-4
41
6 OF too/
5 �7C�
�'a�t
14 11.r xw 'j '0"
'sj
//I(/ A/6
15'
Inspector— .- — Date. //) - ) /– E -�
COUNTY�OF BUTTE 3
D9PARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico — Phone: 891-2751 13
7 County Center Drive, Oroville — Phone: 534-4541'
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
OWNER PERM11
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. If you have any question pertaining to this
matter, or need additional explanation, please contact this office immediately.
;;" 01e -
0"'L/ aw -r a -l" -, C/ '/v
Y 2 Ylo 6& ;�' 0'Ou 4;^elu
4"
7
16
%-',f , f' -A" - -- %.
Inspector— Date
COUNTY
DEPARTMENT OF PUBLIC WORKS
196 Memorial Way, Chico — Phone: 891 ' -2751
7 County Center Drive, Oroville — Phone: 534-4541
Skyway and Elliott Road, Paradise — Phone: 872-2961, Ext. 57
CORRECTION NOTICE
,7 Ij,7 -
PERMIT
A routine inspection indicates that the following violations of County Ordinance
exist at the above address and should be corrected. Please notify this office
when correction of work is completed. If you have any question pertaining to this
matter, or need additional explanation, please contact this office lmmediatelv.
Inspector Date
COUNTY OF BUTTE - DEPARTMIENT OF PUBLIC WORKS
7 County Center Drive - Oroville, Caiifornia 95965 - Telephone 916/534-4541
APPLICATION AND PERMIT
PERMIT NO.
ss —14
ASSESSOR PARCEL NUM
7_53_qR
IONI.Q
_57/2-
BUILDING PERMI=T
OW ER
gFoT7 J D&MSE W91 77A)4
TELEPHONE
SO. FT. OCC.1 BUILDING VALUKTION
3/0,
OWN�ER'S MAILINGIADDRESS
606
60727 -co
11C0 TRACTOR.IS NAME
47ES7664V OlEeef�A
T��Jj H 0
_JSj�j
q00
9
CWACTOR' AIL NG ADDRESS
8;k 8 3;?,
Fireplace
C O'F�ON LENDER
7SAM X_ dvr-
WN
Total Valuation $
Filing Fee
$ 10.00
—
LENDER'S MAILING A7VP &14
Permit Fee
$ &10
ARCHITECT OR ENGINEER
LICENSE NO.
Plan Checking Fee
$ 0, 00
A75qG IF
$ 1.5� ft
ARCHITECT OR ENGFNEER'S MAILING ADDRESS
Permit fee
$ 50S_. 0o
BUIL9FI,NG AD!
ISAS rMAeT_14CWAJ P re, / VE 4pp, �570
PLUMBING PERMIT
FilingFee 10,00
S1""EAJ_1?9C
Each Trap 1
2.00
Solar Water Heater 1,E1.66r
20.00 10, o 0
Water piping
5.00 !!57.00
r
L 0 TZ�.
SUBDIVISION NAME X:
P;4AI014o 7_#VA106�-' 31
JPAF
.�FEL MAP
&5--Lq
Each qas water heater or vent
5.00
Gas piping system 1 - 5 outlets
5.00
USE OF STRUCTURE
SF[ff"'�'DuplexR MobilehomeM Other SPECIFY
Building sewer
5.00 -5-,cO
Mobile Home S I G I W
10.00 e
- I
TYPE OF WORK
New CT --"Addition [:1 Remode 1 [:1 Utilities D instaiiationE] OtherE]
Describe work:
Permit Fee
$
Contractor
ELECTRICAL PERMIT
FilingFee 10.00
Main service 600V OR LESS
100 AMP OR LESS
10.00 /0,cpa
Main service EA. ADD'L 100 AMP
2.50
NEW CONST. DWELLING 0,
OR AODNS. ( ACC. BLDGS.2�57p�,
21/20sq it
CONTRACTORS LICENSE LAW
Id I under penalty of perjury (check one):
VI am licensed under provisions of Chapt. 9, Div. 3 of the Business
and Professio is ?de, y license is in ;ull force an
r fd in d eAct.
License No. R 3 - Classif ication&J�/Vj-/W 6 t,4
El 1, as the owner, or my employees with wages as their sole compen-
sation, will do the work,and the structure is not intended or offered
for sale. (Sec. 7044)
I, as the owner, am exclusively contracting with licensed contract-
ors. (Sec. 7044)
I am exempt under Sec.—, Business and Professions Code
for this reason
NEW CONSTFI(MULT�I-11LITLE:1 TFS) __ 2.50 ea
ON.RES'D, BRANCH CIRCUI
NEW CONSTF;L I POWER APPARATUS
NON-RESID. I SINGLE OUTLET CIR.
Ex. OCCUP(OUTLETS OR FIXTURES 1.20050t
ALO 300
- E
FIXED APPLNS OR
Ex. Occup. OUTL TS (RESI*D.) EA.) 2.00
Temporary service 10.00
Mobile Home Facilities 15.00
Misc. Wiring 15.00
1
Permit Fee
$
Contractor
MECHANICAL PERMIT
Fi I ing Fee 10.00
WORKMEN'S COMPENSATION INSURANCE
I declare under penalty of perjury (check one):
F] The permit is for $100.00 (valuation) or less.
VI have placed on file with the County of Butte Building Department
a Certificate of Workmen's Compensation Insurance or a Certifi . cate
of Consent to Self -Insure.
I shall not employ any person in any manner so as to become subject
to the W. C. laws of California.
Notice to Applicant: If after making this statement, should you become subject
to the W. C. provisions of the Labor Code, you must forthwith comply with such
provisions or this permit shal I be deemed revoked.
Heating
14 C-:,-qr- PU&4 P
Cooling Yz- 7-
Hood
3.00 3,,00
Ventilation
_T
Permit Fee
$ 30,00 -
Contractor
I certify that I have read this application and state that the above information
is correct. I agree to comply to all County Ordinances and State Laws relating
to building construction, and hereby authorize representatives of the County ot
Butte to enter upon the above-mentioned property for inspection purposes.
1 also agree to save, indemnify and keep harmless the County of Butte against
all IiabjAifies,Adgff;entsy costs, and expenses which may in any way accrue
again rrid,,rit in nsequence of the granting of this permit.
e7
;S. Date
Signature ofApp I 'ica Owner El Contractor ED Age
o
of Z
An OSLHA�permit i required for excavations over 5'0" deep and demolition or construct-
ion of structures er 3 stories in height.
Mobile Home Installation Fee $
SP,
TOTAL PERMIT FEE s 171 �9 - 8jo
OCCUP, GROUP
4`3
I TYPE OIF CONST.
go
I "
ARC
1P
PD No
ss
This permit is hereby issued under
sions of the Butte County Code and/or
work indicated above for which
DIRE OR OF PUBLIC
By.
PEF
41T"EXPIRES Date—
the applicable provi-
resolutions to do
fees have been paid.
WORKS
Date If 43
Receipt No.— /9/0/6
WHITE-D.P.W., YELLOW-ASSFSSOR, PINK -INSPECTOR, GOLDEN ROD-APPL I CANT
Return to DPW AGRICULTURAL STAEMEh OF ACKNOWLEDGEMENT
FOR-RESIbENTIAL DEVELOPMENT
OFFICAL RECoFRDS
91iTTF COUNTY-Q_11�1;
Section 26-8.1of the Butte County Code requires this acknowledgement, .1 r I � 'F�';
be recorded prior to issuance of a building permit.
The property described herein is . adjacent to land or includedFu 4L I 'Z 2&31e�V. 3
within an area zoned for agricultural purposes, and residents of ELEAMOPM ul "j"'
this property may be subject to inconveniences or discomfort aris(LWK--8-ECGRDEi(
from the use of agricultural. chemicals, incltiding, but not limited to herbicides4WE
pesticides, and fertilizers; and from the pursuit of agricultural operations including,
but not limited to cultivation, plowing, spraying, pruning, and harvesting �7hich occa-
sionally generate dust, smoke, noise, and odor. Butte County has established agricul-
tural zones which have as a priority use for productive agricultural purposes, and
residents within said zones and on adjacent property should be prepared to accept such
inconvenience or discomfort from normal, necessary farm operations.
All that real property situate in the County of Butte, State of California,
described as follows:
Lot, 4 as shown on that certain Map entitled, "RANCHO DE THUNDER UNIT NO. 3",
which Map was reco�rded in the Office of the Recorder of the County of Butte,
State of California, on June 2, 1982, in Book 85 of Maps, at pages 64 and 65.
Subject to Covenants, Conditions and Restrictions recorded June 9, 1982, in
Book 2727 of Official Records,.at p�ge 265.
Date: July 12, 1983
Scott T. Whiting
0
n;& Nilting
State of On this the , 12th day of July 31 19 83
SS. before me, the undersigned Notary Public, personally
County of Butte appeared Scott T. Whiting and Denise L. Whiting,
M amorMe-wifflM -l-NWOM 4 @TM or." W-Welm dMIF-1 WWO WRO WiTaWWA we — i ra �-
known to me to be the person(s) whose name(s) are
subscribed to the within instrument and acknowledged
.ihat they executed the same for the purposes
therein contained.
" ....... IN WITNESS WHEREOF, I hereunto set my hand and official
DONALD DRWON
F�-;31-1C-CAL1F0RN1A seal.
NOTARY
Puite county
My Commission Expires Sept. 76 198 -
Notary Public
Present A.P. NO. 47-26-187 Donald Drivon
GLAZING'PDAN TAKEOFF SHEET
3-5 North Glazing
-QUANTITY SIZE AREA (SQ.FT.)
(a) x C20- vc)
(b) J x Zlo vo
(c) X 60 q -Q
(d) X 0 In
(e) x
Total North Glazing 67 (SQ.FT.)
(a+b+c-+d+e)
TOTAL
NORTH
TOTAL BLDG
GLAZING
FLOOR AREA
7 +
90 c. & - x
SQ. -FT.
SQ.FT.
CONVERSION TOTAL %
FACTOR NORTH GLAZING
100 = JK'A -.,—%
3-7 South Glazing
QUANTITY SIZE AREA (SQ.FT.)
(a) x a o 4�6 1716 �
(b) x A0-30 la -
(c) Q x " -0. 3 ro J.21
(d) x
(e) x
Total South Glazing Z.4��b i (SQ.FT.)
(a+b+c+d+e)
TOTAL
SOUTH TOTAL BLDG
GLAZING FLOOR AREA
x
SQ'.PT. SQ.FT.
CONVERSION TOTAL %
FACTOR SOUTH GLAZING
100 = (;, k %
3-9 Skylights
QUANTITY SIZE AREA (SQ.FT.)
(a) x
(b) x
(c) x
Total Skylights (SQ.FT.)
(a+b+c)
TOTAL
SKYLIGHT TOTAL BLDG
GLAZING FLOOR AREA
x
SQ.FT. SQ.FT.
CONVERSION TOTAL %
FACTOR SKYLIGHT GLAZING
100 %
is -9 -1? _-S . q7- S-1 -
3-6 East Glazing
QUANTITY. SIZE AREA (SQ.FT
(a) x
(b) x
(c) X.
(d) x
(e) x
Total East Glazing (SQ.m
(a+b+c+d4.e)
TOTAL
EAST TOTAL BLDG CONVERSION TOTAL %
GLAZING FLOOR AREA FACTOR EAST GLAZI1
C) x 100 0
SQ.FT. SQ.FT.
3-8 West Glazing
QUANTITY SIZE AREA (SQ.FT,
(a) x
(b) x
(c) x
(d) x
(e) x
Total West Glazing (SQ.
(a+b+c4.d+e)
TOTAL
WEST TOTAL BLDG CONVERSION TOTAL %
GLAZING FLOOR AREA FACTOR WEST GLAZIN(
'20 r, x 100
SQ.FT. SQ.FT.
� �-��5TA
C-71 r2 -j ---
60 -r
os,( C� VA )
3
33a
LDING NEAT LOSS -w
---------- ---------
IZING & SETBAC-K THERMOSTAT
(:1000 STUH)
TEMPERATURE, TOW
25 26 27 28 29
34.0
33.3
32.5
31. 7
31 0
71.5
70.5
69.6
68.6
67.6
35.5
34.7
33.9
33.1
32.4
74.8
73.7
72.7
71. 7
70.7
37.0
36.2
35.4
34.5
33.7
78.0
76.9
75.9
74.8
73.7
38.5
37.6
36.8
35.9
35. 1
81.3
80. 1
79.0
77.9
76.8
1 40.0
84.5
41. 5
87.7
43.0
91. 0
44.5
39. 1
83.3
40.6
86. 5
42.0
89.7
43.5
38.2
82.2
39.6
e5. 3
41.1
88.5
42.5
37.3
ei. 0
38.7
84. 1
40.1
87.2
41 5
36.4
79.9
37.8
82.9
39.2
86.0
�m
- c -,Ao I i
S.C,C,-
617 7 0
740
�ductor at 867 (30*C) ambient temperature and the ampacity shown in table. 11 other than
I exceeds 2% of unit total rated voltage. determine wire size from ampacity shown and the
iprovide low -ambient cooling operation down to 407. Single-phase units are designed for
t ARI rated cooling airflow. Air filter pressure drop should not exceed 0.08 in. wc for unit to
Optional
Optional
Optional
100Z
8 Ibs-4 oz
8 lbs -8 oz
3
3.67-4
4.67-5
:22
24x 22
24 x 28
14
4 & 14
3& 14
(6
1OX8
lox 10
50
1300
1535
5
0.15
0.15
4
624
737
8
406
479
WT
3/4MPT
M -- ---
3/4MPT-
'-3
10.57-4
14.26-5
0.44
24 x 63.44
30 x: 68.44
20
2& 20
2& 20
L
1
18
22
Standard
Standard
)nal
Optional I Standard I
Optional I Standard_
Standard
Standard
Standard
Standard
Standard
�ductor at 867 (30*C) ambient temperature and the ampacity shown in table. 11 other than
I exceeds 2% of unit total rated voltage. determine wire size from ampacity shown and the
iprovide low -ambient cooling operation down to 407. Single-phase units are designed for
t ARI rated cooling airflow. Air filter pressure drop should not exceed 0.08 in. wc for unit to
ht�- . I � I' ", . b a . -4 .
TABLE 2-53U11. ALTERNATIVE COMPONENT
PACKAGES FOR CLIMATE ZONE 11
Pacjage
Component
A
B
C
BUILDING ENVELOPE
Insulation Minimums
Ceiling
R 30
R 30
R 30
wall,
R 11 (R 5.0)
R 19 (R 5.5)
. R 11 (R 4.0)
Slab Floor Perimeter
R 7
R 7
Raised Floor
R 11
R 19
R 11
.Glazing
Maximum U Value
0.65
0.65
0.65
Maximum Total Area
no requirement
16.OZ
Maximum Total Nonsouth
Facing Area
9.6%
no requirementoe
no requirement
Minimum South Facing
Area
6.4%
no requirementp.,
no requirement
Shading
South Facing Glazing
optimum
optimum
0-timum
West:Facing Glazing
Thermal 4as6.
Continuous Infiltration
Barrier I
Electrical Outlet Plate,
Gaskets
SPACE CONDITIONING -SYSTEM
Heating System Type
Air -to -Air Heat
Exchanger
DOMESTIC WATER HEATING
SYSTEM TYPE
overhang or overhang or overhang or
0 ' 36 shading 0.36 shadingv" 0.36 shading
coefficient coefficient coefficient
0.36 shading 0.36 shading 0.36 shading
coefficient coefficient coefficient
required not required woo' not required
not required . not requl red 0o' not required
not required not required./ not required
gas or heat
gas or heat
pump pump
not required not required not required
gas, heat pump, solar with gas
or solar with t,.L �with backup heat
t
any type of any ype o
backup heat 'backup heat
1. The value in parentheses is the R -value for the'entire wall assembly if
the wall weight exceeds 40 pourLd.s per square foot. The insulation must
be integral with or installed on the outside of.the exterior mass. The
inEide surface of the thermal mass, including plaster or gypsum board -in
direct contact with ' the masonry wall. shall be exposed to the room air.
The exterior wall used to meet the R -value in parentheses cannot also be
used to meet the above thermal mass,requirement.
C-51 BRC
2-46
4
-11 E;'- N
Te
1. All constz-uction to meet latest requirements
of the Uniforin Building & Plumbing codes
and the National Electric code.
2. All employers working on this project shall
be responsible for compliance with Cal-Osha .0,it (L17 Vq 12. CID
requirements. N
q t4TCJ eo, - 117�
3. Designer is responsible for preparation of �Lu
01* -144 1,914�
minimum set of plans to be used to obtain
Building Permit only.
r co
4. Actual const. detail. equippent, & material A VIA, lb MATcll(6) ?-Xcp Top CHox-a
selection shall be as determined by Owner
and Contractor. 107. *2. x 4P t= ri- t e z�� P., t,
I W/ )"n L;,.I. Tr7 7 P,/C-
5. Smoke detector shall be furnished as C111b jqP-6- 61,&-
-A -4
directed by.Butte Co. or City of Chico
X I i I I 1 -1 1
TO i -A /1. r4 H
6. All lumber used shall be standard Gd. or t ...... Z==V
better 1200 psi) except: structural, CO
bill 1500 psi. CF)
axo4rUD4e to /r, OL -t-1 r,&)
7. The owner shall coordinate all structural,,
MW. p ele. & plumbing system. ......... 1b,
10 n* P 4 1c, 106 T-0 ot-rc-i+ (q)
8. Confim all dimensions & bldg. orientation
in ,Ueld. Dimensions are to face of stud. OVE 2-)c 69 D n., P,J
ok
Ti+" PrPF pi..
9. Cabinet detail & layout for const. as
directed B.O. IVV V
V
co 3:
ID. Interior finished vat ls as direc.
B.O.
F>AAL
n. All exterior doors to be weatherstripped. . �U
1-% wl 4r. 4 (204�r ro u
.. ....... ... ......
1; a. (2 ILE CASIr
----------
12. Sldg. glass -doors to be double glazeo.,
04,01Z7 I'M I rU; 61 C,
z W
I AA I L,
...... +1' 7,Q r>r,,
-0
ALL, WALL 7 T
4
:;BEATH E 0 W/ 0-7 F5
Ale) C4 P A Lj, 0, Ca L, 01C
Ix Cn 3: co
ELIO -
01�0 0
alto -oil I e? to -a 11 U;
01�
SO
In
CA? X + E tj r.,,.
"00�J &P Ole,
�J
2v*.;o 4M
I Health
Environ, nenta
AU6 16 2001
IL
Tull
LU
Chico
Calitomia
V
4
6,H
47777 77��
lalix
I - 1 1- 11 - � s �- 0
C7
ax 4P
t4
-4
kb
C, F -r -,J
1 C, CPO
4
i -J
%A
w4vexpl R E I F&O
U) kA
L
z (9)
(21 V�l
i "
(r, 1WO -7- -ip�
VA. Li, 6 Y" U0 IT*
T1-41)
E I ------- ...... . ...... ..
xov F 7- U. FrK-.e. IQ.
40 go
I - Q ea
L
7—
�4
�J'
D V.
rL1 r) 6 6
C- tic, VV
J
-1 r ---------
)CIO Pill I+P#&. WWWO
-4 1 e7T E Pl�
C-0
-0(7Yp TYI-- �2 .,e of �T
V4 Th 4 Arch ce
-4 r 1.6 0(VG;a- +
x
- --- W.A L,�
11L —4
T'JJ& P1 tjC,
TV. (P )c co
W/ Of tt
L
-.4
q t -0
eAl C702L
U Xto 0 t r)� I.,
A
............
x 4P
L
It
K - C)
_,L, EC
I C
Duplex Receptical @ + 8" Exhaust fan Elec. fixture type,. size & exact location
to be as directed'B.O.
vw. Duplex Fteceptical Water Proof em c, Ground Fault cir. as req d.
approved by owner prior to installation.
2. All outlets 4 switches to be located &
Light Fixture Ceillg mt.
Smoke detector
Duplex floor remptical V Telephlone * outlet 3. Spa, --i4 outlets & low voltage sys. shall
be -Ls dixec. B.O. (for example: Cable TV,
Light Fixture Wall mt. cable T.V. Sound sys., doorbeell/chimes, attic fan,
§) alarm Ws.," smoke detector.
Junction Box
Thermostat
4. Lite Fixture No Is & locations are
suggestions only. Confinfi W'.O.
) A
Switch @ +-�36-' unless noted IM main & subpanels (oonf. loca.)
switibli 3 -way
606
. ..... Exp. 12-31-01
Lo.
NO.C20
TnM TO WM M4 NORLIE. CA
DPMINGS FZKUNS
PUB1ffCffICN1 MROD=ICN OR PE -USE BY MY
is PFU1IBrTED-,-
V"j, 3N WWLE OR 3N PAW
T
ego& -
THE EIMPIRE COLL-ECFdR,1$C-R,1E
Models EMA,EMC, and EMB
EX
TRUD80 GLAW. 0 FRAME
SECURED S.Y'EASY-!OUT SCREWS
LOW IRON SOLA13 GLAZING
WITH EPPM RUBBER SEAL
SIDE EXIT
HEADER i,,�
I" I.D, Standard
GASKET AT
HEADER EXIT
W
ORBER PLATE—
ALLIMINUMe BOX —ABS
QNZE FINISH
DARKbR
EMA: ALLIMINUM SHEET COFAPRESSION BONDED
TO, WAT9R%VAYS BY HIGH PRESSURE RIVETING SYSTEM
AMC & EPAB'COPPARS.HEAT OVEN. SOLDERED
'POLYISO CYAN U RATE
FOAM BOTTOM &SIDIES, 'OPTIONAL
PROTECTIVE LOW -BINDER
M8TAL BACKING INSULATION
(OPTIONAL �ON
—ABSORBER. SURFACE— EMB:MODELS) —SIZVS�
EMA:.& EMC BLACK PAINT 3 x 8
EM
p BLACK CHROME x 8
4 x 10,
AMIDERTIFIED IAPMGAPPROVED
ABSOHBER A VV91GHT FLUID
d0SOFIBER
MODEL PLATE SURFACE BOX DIMEN I SION I S NETAPERTURE, DEPTH DRY WET CAPACITY,
EMA id CN"!k q Black Paint 36,341' x 98,2V 24,79 Lq..". 21.77 sq, ft, 1,60", 82 89 78 gallons
EMA4& Copper/Aluminum Block Paint 48.25!4 1k 98.25" z; 32.92 sq. ft. 29�69 " sq. ft, 3-50" 105 11 . 3 1.0 gallons
oppe
EMA410 C ��L�'�_Mlnum PAICkPaint 48.26" %1120.3W -,40.34 sq� ft, 3,500 128 138 1,2 gallons
E ac P Int 30,34" 01125" 24,79 sq, ft. 21' S 3.50'! 84 go __18 p Lionk
E W 3,50" 107 115 1.0gallons
MG All C per Black Paint 29.'69 s ,Lt�
EMC,410 sq, ft, 36�60 t ft 3,5W' 130 140 !,.2gallons
LCoRper ........... .Rlack Paint 48,25*'* 120.38"
All C?p r Black Chrome 36,34" x.98,25" a 24,79: sq, ft.
21,776 it, 98 .7 allons
�M Cop 48,2W' x 98,2V;- t32.92� sq 2 9, 6 Lsj, '(L' 3.50" 131
Black Chrome 122 1,0gallons
All C 40-34
EMB410 or, Black Chrome 48.25"-120.38- ft, �.f 1. 3,50". 150 0 1,2 allons