Loading...
HomeMy WebLinkAbout064-040-013�\�'�1 � � � - � F �,� � � ,, .. .. • - i � � � f � � .. pp f TI �\�'�1 r LESS THAN 3 ACRE CONVERSION EXEMPTION FOR ADMIN. USE ONLY STATE OF CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION NOTICE OF TIMBER OPERATIONS THAT ARE EXEMPT FROM CONVERSION AND TIMBER HARVESTING PLAN REQUIREMENTS RM -73(1104.1 a) (9/99) Ex. # Date of Date Accepted VALID FOR ONE YEAR FROM DATE OF RECEIPT BY CIDIF TIMBER OPERATIONS CANNOT START UNTIL VALID COPY Date Expires OF A NOTICE OF ACCEPTANCE IS RECEIVED FROM CDF The Director of the Department of Forestry and Fire Protection is hereby notified of timber operations under the requirements of 14 CCR 1104.1(a). Harvesting of trees which is a single conversion to a non-tim growing use of timberland of less than three acres. (See 14 CCR 1104,11(a) for a description of the conditions on the conduct this type of timber operation, and additional information that is required to be submitted.) Complete Items 1. through 8. onb pages of this notice. : 1 . I TIMBER OWNER(S) OF RECORD: Name Gene Jefferry Rolls Address PO B�x 432 City Forest Ranch State CA Zir) 95942 Phone (530)343-7341 SIGNATURE Date t TIMBER TAX EXEMPTION: Timber owners owe timber yield tax when they harvest trees unless the harvest is exempt (Revende and Taxation Code sec. 38116)._Some small or low value harvests may be exempt from timber yield tax: Timber removed from I a operation whose value does not exceed $3,000 within a quarter, according to BOE Harvest Value Schedules, Rule 1024. If you believe your harvest may qualify for this exemption, please complete items A and B below. For timber yield tax information I or for further assistance with these questions call the state Board of Equalization, 1-800-400-7115, or write: Timber Tax Section, MIC: 60, State Board of Equalization, P.O. Box 942879, Sacramento, California 94279-0060; or contact the BOE Web Page on the Internet at A. Circle the option that most closely estimates the total volume for this harvest, in thousands of board feet (mbf - Net Scribner short log):Under 8 mbf 8-15 mbf 16-25 mbf Over 25 mbf B. Estimate what percentage of timber to be removed during this harvest will be: Redwood %; Ponderosa pinelSugar %; Douglas -fir %; Fir %; Port -Orford Cedar—%; Cedar (IC, WRC)_ %; Other, c�;�nifer_ %; dt-her, hardwood—%. TIMBERLAND OWNER(S) OF RECORD: Name AL RYDELL Address- PO BOX 1705 city MAGALIA state CA —Zip 95954 Phone (530)872-2422 I certify, under penalty of perjury, that this is a one-Ume conversion to a non -timberland use, that there is a "bona ride intent'[14 CCR 1100 (b)] to convert to Yard and Home Site, and that i have mailed a letter of notio intent to harvest timber, prepared by the Registered Professional Forester, to all adjacent landowners within feet of the boundaries of the eKemption. SIGNATURE Date 3. LICENSED TIMBER OPERATOR(S): Name Gene Jefferry Rolls Lic. No. A7332 Address. PO Box 432 City Forest Ranch State - CA Zip 95942 Phone (530)343-7341 SIGNATURE Date 4. Designate the legal land description of the location of timberland conversion. A map showing the location of the timberland conversion MUST be attached. The map must show the ownership boundaries, the location of the timber operation, boundarie the conversion, location and classification of all watercourses, and landing locations. Section Township Range Base & Meridian County Acreage to be Converted Assess Parcel, mber 23 23N. 3E MDB&M BUTTE .25ac W06 Pagel. NOTE:This'form has two pages. Continue on and complete Page 2. Read the instructions before attempting to coml of of LESS THAN THREE ACRE CONVERSION EXEMPTION, Page 2. 5. The following are limitations or requirements for timber operations conducted under a Less Than Three Acre Conversion Exemption (Notice, Notice of Conversion Exemption, Conversion Exemption): A. Timber operations shall comply with all other applicable provisions of the Forest Practice Act and regulations, county general plans, zoning ordinances, and any implementing ordinances; copies of the state rules and regulations may be found on CDF's Web Page on the Internet at hftp://www.fire.ca.gov. B. All timber operations shall be complete within one year from the date of acceptance by the Director. C. All conversion activities shall be complete within two years from the date of acceptance by the Director unless by local jurisdiction. Failure to complete the conversion requires compliance with stocking standards and stocking report i requirements of the Act and board regulations. D. The timber operator shall remove or dispose of all slash or woody debris in accordance with 14 CCR 1104.1 (a) (2) (D). Th I e timberland owner may assume responsibility for the slash treatment, provided the landowner acknowledges in writing to the Director such responsibility at the time of submission of this notice. The specific requirements shall be included with the acknowledgment. ces required E. Timber operations shall not be conducted during the winter period unless a winter operation plan or in lieu practi by Forest Practice regulations are specified within (attached to) this Notice. F. No timber operations are allowed within a Watercourse and Lake Protection Zone unless specifically approved by local permit(e.g. county, city). G. No timber operations shall be conducted until the Director's notice of acceptance is received and a valid copy of this Notic,e and the Director's acceptance shall be kept on site during timber operations. H. No sites of rare, threatened or endangered plants or animals or species of special concern shall be disturbed�, threatened lor damaged. I 1. No timber operations are allowed on significant historical or archeological sites. J. Within one month of the completion of timber operations, including slash disposal, the timberland owner shall submit a W rk Completion Report to the Director. 6. 1, declare as the authorized designee of Butte County that this conversion exemption is in conformance with all county regulatory requirements, including public notice. (if the county has authorized a designee this item MUST be completed. If it has not, see item 7.) SIGNATURE Date 7. Registered Professional Forester preparing Notice: Name Randolph Vasquez Number 1884 Address 1600 Feather River Blvd Suite B city Oroville — State CA zip 95965 Phone (53011534-5229 1 certify that I, or my supervised des5—nee: PreI3a—red —this Notice of Conversion Exemption Timber Operations; visited the site flagged the boundaries of the conversion exemption, applicable WLPZs and equipment limitation zones,, prepared a notice according to 14 CCR 1104. 1(a)(3) to be mailed by the landowner and that a copy of the notice was posted and dated on the ownership, visible to the public, at least 5 days prior to the postmark date of submission of the Notice of Conversion Exempti and that if the County Board of Supervisors has not designated a representative authorized to sign in Item 6., that I, or my supervised designee, contacted the county and the Notice is in conformance with county regulations. SIGNATURE of RPF 8. NOTICE SUBMITTER(S):, Name Gene Jefferry Rolls Address PO Box 432 City Forest Ranch —State CA Zip 95942 Phone (530)343-7341 Submitter must be either 1, 2, or 3 above, and mu'st sign. SIGNATURE Date FILE THIS NOTICE WITH THE NEAREST CDF OFFICE BELOW FOR THE COUNTY IN WHICH THE OPERATION WILL OCCUR: Humboldt, Del Norte, Mendocino, Sonoma, Marin, Lake, Napa, Colusa, Solano, Alameda, 135 Ridgway Avenu�! San Mateo, Santa Cruz, Santa Clara, Contra Costa, and western Trinity Counties. => Santa Rosa, CA 954 i 01 Siskiyou, Modoc, Shasta, eastern Trinity, Lassen, Tehama, Glenn, Butte, Sutter, Plumas, => 6105 Airport Road Yuba, Sierra, Nevada, and Placer Counties. => Redding, CA 960021 El Dorado, Amador, Alpine, Calaveras, Tuolumne, Mariposa, Merced, Madera, Fresno, Tulare, => 1234 East Shaw Avenue Kern, Stanislaus, San Benito, Monterey, King, San Joaquin and Sacramento Counties. => Fresno, CA 93710 1 Ventura, Los Angeles, San Bernadino, Orange, Riverside, Inyo, Morio, San Diego and => 2524 Mulberry Street I Imperial Counties. , => Riverside, CA 92501 ! 2 WINTER OPERATIONS Bridgeport Circle less than 3 acre conversion For Timber operations occurring within the Winter Season the following plan shall be used; The in -lieu option as allowed in 14 CCR 914 (934, 954).7 14 CCR 934.7je) 1) Tractor yarding, or the use of tractors for constructing layouts, firebreaks or other tractor roads shall be done only during dry, rainless periods where soils are not saturated. 2) Installation of drainage facilities and structures, is required from October 15 to May I on all 1 constructed skid traHs and tractor roads prior to sunset if the National Weather Service forecast i I s a "chance" (�O% or more) of rain within the next 24 hours The provisions of this subsection do not apply to mechanical site preparation. w' 3) During inter operations after rains, road use shall be suspended until the running surface has stabilized by freezing or drying. Hauling operations to cease when surface material must be shaped to develop a driveable! medium. No hauling, road construction, or maintenance shall occur when road surface is saturated as defined in CCR 895.1. Emergency road maintenance conducted to alleviate erosion problems does not fall under this limitation'. * Erosion control structures will be maintained in working condition during wet weather road us I e at any time of the year. NOTE: "Winter period" means the period between November 15 and April 1, except as noted under special County Rules at Title 14 CCR 925.1, 926.18, 927.1, and 965.5 (a) except as otherwise provided in the rules: (1) All waterbreaks shall be installed no later than the beginning of the winter period of the current year of timber operations. (2) Installation of drainage facilities and structure's is required from October 15 to November 15 and April I to May I on all constructed skid trails anii tractor roads prior'to sunset if the National Weather Service forecast is a "chance" (30% or more)iof rain within the next 24 hours. i it J., -T811K 11 A if 1 4 IV011 t 'A 'T z) A". 4M .:,A camp JA I%% J, I IL_ PN! r�. W�. Cory e Ste Ifer Ine� -WAY yv�-,or 14 2i�d A F kani x -vx: A 6 \V1 \A, N Uf S I F/ 7' A L k, fi (ADMM BY PN'U-1 r". All 22 22,11, 1723 1 (.A J r , . 1) 1. i , I'/. N A, -24, 4, J AU pz i- uNIA-SHEW + -4 7 J, AN At! UU to C, it �St� I Lr� Ix I '01 IVA, 27' an It -,A K, SCALE 1:24000 0 1; 1 MILES A 4 1 fliP;, 0 22 ---j 1000 YARDS F-- 0 1 KILOMETER 16' E Name: PARADISE EAST Location: 10 0619168 E 4410670 N Date: 3/27/2006 Caption: Rydel Covversion Scale: 1 inch equals 2000 feet Bridgeport Cricle Magalia Sec 23 T23N R3E Copyright (C) 2002, Maptech, Inc a I :4 r Pq oz lo OE� Its.. 4S 51 Zb It It eb rt, Fol) r Pq oz lo OE� Its.. 51 I V Rydel Conversion Plat Map AP 064-04-013 I