HomeMy WebLinkAbout066-250-011066-250-0 1 99_p
MALLOPIy, Bryan
&22�, Woodbttry, paradise
Contr. OwnerF;ne,i
New Single Family
NOTES
RESIDENTIAL
C----- - .-- __ --- —
066-250-011 99-1813
PERMIT NO. _. MALLOREY, Bryan
(s2S Woodbt-ry, Paradise
Contr: Owner
New Single Family
aCo c 3
SPECIAL CONDITIONS
SRA
FLOOD CERTIFICATE REQ.
FIRE SPRINKLERS REQ.
SPECIAL INSPECTION ITEMS
VERIFY
USE PERMIT CONDITIONS
SUB -STANDARD HOUSING LETTER
CHECKED
BY
56
r
OFFICE COPY
Address
a
GAS
Meter B Date
ELEC IC
4 Meter By Dr�
Iii � _ --_ — .- • - - --- - --
JOB FINALED (Date)
t Signature
t1
t
ti
i
e
-1
A
RESIDENTIAL
C----- - .-- __ --- —
066-250-011 99-1813
PERMIT NO. _. MALLOREY, Bryan
(s2S Woodbt-ry, Paradise
Contr: Owner
New Single Family
aCo c 3
SPECIAL CONDITIONS
SRA
FLOOD CERTIFICATE REQ.
FIRE SPRINKLERS REQ.
SPECIAL INSPECTION ITEMS
VERIFY
USE PERMIT CONDITIONS
SUB -STANDARD HOUSING LETTER
CHECKED
BY
56
r
OFFICE COPY
Address
a
GAS
Meter B Date
ELEC IC
4 Meter By Dr�
Iii � _ --_ — .- • - - --- - --
JOB FINALED (Date)
t Signature
t1
t
✓ = OK
0 = Not OK
- = Not Applicable
* = Not Ready '•
- - MOBILE HOMES
Date MOBILE HOME UTILITIES (Plans) OK except #'s
2.
1. Zoning Requirements -Setbacks -Easements
3.
2. Soils; Special MH Support Sketch
4.
3. Sewer; Location -Test -Fall -C/O -Concrete
5.
4. Water; Location -Test -Easement Needed (Sketch)
6.
5. Electricity; Location-Clearances-Grnd-/ /Amp -Concrete
7.
6. Gas; location -Test -Wrap;-/ • /" L'ft.
/ P Nat. or / /"L"ft./ PLPG
8.
7. Well Clearance & Disconnect
8. Utility Clearance
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date MOBILE HOME INSTALLATION (Plans) OK except #'s
1.
Zoning Requirements -Setbacks -Easements
2.
Footings; Size -Spacing -Marriage Line
3.
Gas; MH Test -Demand -Valve -Connector
4.
Electricity; MH Test -Crossovers -Breakers -Clearances
5.
Drain; MH Test -Fall -Flex Connector
6.
Water; MH Test -Regulator -Connector
7.
Water and Sewer Connected -C/O to Grade -HD Approval
8.
Gas and Electricity Tagged
9.
Tie Downs -Type -Installation Cert.
10.
Exits; Insp.-Sketch
11.
Cert. of Occupancy
12.
Permanent Foundation Only; License Decal
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
MISCELLANEOUS
Date DECKS, COVERS, CARPORTS GARAGES (Plans) OK except #'s
1.
Zoning Requirements -Setbacks -Easements
2.
Footings; Soils -Size -Depth -Spacing -Connectors -Steel
3.
Decks; Girders and/or Joists -Decking -Bracing -Stairs -Rails
4.
A
Wood Awn.; Posts-Beams-Rftrs.-Connectors
Shthg.-Frg-Bracing
5.
Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures
6.
Carports; Windows -Doors
7.
Electric
8.
Frmg.; Sills-Anchors-Studs-Rftrs-Trusses
9.
Siding; Nailing -Veneer -Stucco -Mesh r
10.
Roof; Shthg-Roofing
11.
Ext.; Steps -Doors -Landings
12.
Braced Wall Panels
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
Date
FINAL (Plans) OK except #'s t
1.
Setbacks -Easements
2.
Soils; Compaction -Structure Stability
r
3.
Pool Structure; Steel -Connections -Thickness
Dead Men -Lining
4.
Elec.; Receptacles and Lighting, Distance-GFI
5.
Elec.; Pool Lighting; 15 Volts-GFI
6.
Elec.; Enclosures; Conduit Entries -Terminals -Listed
7.
Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater
8.
Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg.
Boxes- Enclosures- Panelboards-Ins. to Main in Conduit
9.
Health Department Approval
10.
Plumb.; Cir. Test -Water Supply Test
11.
Light Niche
Date
Card B-1 Date Card B-1
Date
Card B-1 Date Card B-1
V= OK
0 = Not OK
- = Not Read able RESIDENTIAL
= Not Ready
Date Underfloor (Plans) OK except #'s
1 oni -Setbacks-Easements-Flood-Slope
Main; Soils-Elec. Grnd.-/ /" Fig. Depth
3. Ftg., Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth
4. Ftg., Porches & Decks; Soils -Steel-/ P Ftg.'Depth
5. Stemwalls, Main; Steel-Blockouts-Wrapped
6. Stemwalls, Garage; Steel-Blockouts-Wrapped
6a. Hold Downs and Special Anchors
(Single & Duplex)
Date FRAMING (Continued)
6. Harmers -Post CaDS-Anchors-Connectors
7.
Slab, Steel -Wrapped
8.
Pie!5. Fireplace Ftg.-Steel
5f
V.; Fall -Fitting -Test -2 Way C/O -Sewer Test
5 .
Pipe; Size Anchors - Yard Gas Piping; Size Test
ater Pipe; Test -Anchors -Regulator -Service Test
12.
Pectric Underground
t_,-6
Plenums & Ducts; Clearance -Material -Support -Ins.
ceders -Sills -Anchor Bolts-Joists-Vents-Crippies
15.
Access & Ventilation
16.
Insulation
Date
Card Date Card B-1
DaA
Card B-1 Date Card B-1
Date
MBING (Permit) OK except #'s
er Htr.; Vent -Access -Combustion Air Baffle
er Pipe; Test & Anchor -Nail Protection
D.W.V.; Test Fittings & Anchor -Nail Protection
20. Shower Pan; Test, First Floor -Tub Access
21. Test ub & Shower, Second Floor -Tub Access
as Pipe; Sixe & Anchors
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date ELECTRICAL (Permit) OK except #'s
L3!FixturF; & Transformer Clearance -Ins. Protection
& Switches at Doors
& No. of Conductors
2,6/11oniWInstalled Close to Edge of Studs & C.J.
?Z,-lFqyW Ground made up w/Mach Fasteners -Bond Gas & Water
28--2—Appliance Circuits in Kitchen & Conductor Size GFI
29. Subfeed Wire Size / / ga. Cu or AI-A.C. Wire Size / / ga Cu or Al
30. Range Circle/ / ga Cu or Al -Oven Circ. / / ga Cu or At
Insulated Neutral p Yes ❑ No
41!Service-Riser Conductors & Ground Main Disconnect
32 qv4. Clearances Panels-Motors-Mech. Equip.
3A&D es Closet Light -Shower Light -Spa Light
Smoke Detector
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date MEC.0,41CAL (Permit) OK except #'s
Ducts Insulation & Support
Vent Fan, Exhaust above insulation
37. Condensate Drain & Overflow, Size & Grade
38. F ace -Vent Access -Comb. Air -Return Air Vent 115 outlet
Attic Access & Platform if Furnace in Attic
Date Card B-1 Date Card B-1
Date Card B-1 Date Card B-1
Date AMING (Permit) OK except #'s
4 S ro er Materials & Anchors
4 W Studs -Nailing Spacing & Braces -Plates -Sound
. B Ing Walls over Girders & Floor Nailing
43'.'Dj,aft Stop in Walls (rat proof)
4 . F' a Stops, Furred Ceilings -Stairs -Chasers -Tubs
45. Headers & Beams -Size & Bearing
4,�' Cyng. Joist-Rftr. Ties- Purlin-Roff Brac.-Truss-Shting.-Rfna.
Fir face Ties or Type A Flue -Fireplace Throat Clearance
4 . AttiwAccess: Size & Romex Protection -Draft StoD-Ins. Baffles
5VBdryr'Windows or Exiting Doors -Sill Ht. & Dimensions
51
ge Fire Protection Framing
5
operty Line Firewall & Openings
5f
E61 -Doors -One 3' -Check Garage 3rd Story, 2 Exits
5 .
Si s; Width -Headroom -Rise -Run -Landing -Fire Protection
5 - PI "d on Roof Overhang -Attic Vents -Rafter Outriggers
and B-1
Siding -Nailing Veneer
.5Z._Sta
far -sh-Drip Screed -Fd. Vents-Underflr. Access
,98
IaZgArea-Gly s Protection -Skylights -Plastic.
I ] SD
hn %A/�Ilc �ilinn_Rnlfc / •"
///G 4/77 XU 60. BraairTMrior/Extefia^all Panels P//9/C4; 4�'1
Date Card B Date Card B-1
Date 1,41Z Card -1 Date Card B-1
Date 1L (Plans) OK except #'s
Steps - Door & Sidelight Protection -Landings
moke Detector
5. Furnace Vents -clearance -Comb, Air -Connector -
I arage; Above Floor -Ducts -Mach. Protection
. Xedroom Exiting
GF
Bath Fixtures & Tub Access -Spa
W—Ejec. Trim & Subpanel, Breaker Sizes & Labels
St rs & Rails
. emplace or Stove, Clearance -Hearth
Eloz. Outlets at Wood Panel, Int. & Ext.
Kit. Fix-. & Appliance; Ground -Air Gap -Cooking Clearance
E)ec. Outlets & Receptacles at Kit. Counter
age Fire Door, Swing -Landing -Closure
A,E. Duct in Garage -Damper
Wtr. Htr.; Vents -Clearance -Comb. Air Connector-P.R.V.
iriza'rage; Above Floor -Meeh. Protection
PI , Elec. & Mech. Equip. Listed for Location
El . Receptacles in Garage (F.F.I.)-Romex Protection
In ulation-Foam-Looked in Attic
81r—GjArd Rails & Deck Construction -Post Caps
Fdn. VBents & Crawl Hole Door Drainage & Wood -Earth
,teegrance Looked under Floor 0 Yes
Following Instld./Drive ❑ Yes Q No/Walks 0 Yes 0 No/Planters ❑ Yes J No
.95-'SiG 1a Brown -Finish
88- A. . Unit Disconnect, Electrical -Plumbing
Ven s Above Roof, Plbg-Appliance-Fireplace-Clearance to Openings
er Well, Disconnect, Electrical, Plumbing
E�rior Elec. Trim, G.F.I. Receptacle -Underground
Veadlallon Throuahout House
from Previous
Gas -Electric
B£ W r & Sewer Connected -C/O to Grade -HD Approval
lVgaarmy Compliance Certificate -Other Certificates
Address Posted
Comments at Final:
Date
rd B-1
Date
Card B-1
Date
and B-1
Date
Card B-1
Date
and B-
Date
Card B-1
Comments at Final:
COUNTY OF BUTTE
BUILDING DIVISION,
DEPARTMENT OF DEVELOPMENT SERVICES
411 Main Street • Chico, CA • (530) 891-2751
7 County Center Drive • Oroville, CA • (530)'538-7541
CORRECTION NOTICE
NO.
A routine inspection indicates that the following violations of butte county Ordinances exist at the
above address and should be corrected. Please notice this office when correction of work is
completed. If you have any questions pertaining to this matter, or need additional explanation,
please contact^ office immediately.
N
}
COUNTY OF BUTTE
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
411 Main Street • Chico, CA • (530) 891-2751
7 County Center Drive • Oroville, CA • (530)'538-7541
A CORRECTION NOTICE
OWNER
A routine inspection indicates that the following violations of butte county Ordinances exist at the
above address and should be corrected. Please notice this office when correction of work is
completed. If you have any questions pertaining to this matter, or need additional explanation,
please contact this office immediately.
12/22/99 00:08 FAX 530 891 8560 LOERKE INSUL. CO
LOERKE INSULATION CO., INC.
Z01
INSULATION CERTIFICATE
6225 cvod013WLY
NumberDESCRIPTION OF INSTALLATION
1. ROOF
Material _ __ . _--_ _ Brand Name
Thickness (inches) _ — _ Thermal Resistance (R—
'Value)-2. CEILING
Batt or Blanket Type—Flbe�rolass�Batts _ . _ Brand Name Johns Manville
Thickness (inches) _ _ _ Thermal Resistance (R -Value)
Loose Fill Type Fiberglass Brand Name Johns Manville
Contractorls min. installed weight/ft sq. o. 6 4'1 Ib. Minimum Thickness 13 inches.
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R Value) R. 30.
3. EXTERIOR WALL
Material Fiberglass Batts
Thickness (inches) 3 i
4. RAISED FLOOR
Material _,Fibs lass Batts__
Thickness (inches) t'v 4L
5. SLAB FLOOR / PERIMETER
Material—
Thickness
Perimeter Insulation Depth (Inches___.:.. .
S. FOUNDATION WALL
Material
Thickness (inches___.—
Brand Name Johns Manville
Thermal Resistance (R -Value) R 13
Brand Name _. Johns Manville
Thermal Resistance (R -Value) 1R-19
Brand Name
Thermal Resistance (R -Value)
Brand Name
Thermal Resistance (R -Value).,,
DECLARATION
I hereby certify that the above insulation was installed in the building at the above location in conformance
with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of
Regulations) as indicated on the Certificate of compliance, where applicable.
C.L.#499150A!1 11211 49 LOERKE INSULATION CO., INC.
t—Te-- ignatu Sate _15i5Ainn ractor(Co. ams r
General Contractor (Co. Name) Or Omer
Item #8 ignature; Dais
—Tlem� Signature, 6a�ev
16sta in u6cont � cor . ams e
General Contractor (Co. ams) Or r
--- —Installing Suticoniractor (Co. f�fame r
General Contractor (Co. Name) Or Owner
COUNTY OF BUTTE -DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING DIVISION
7 County Center Drive Oroville, California 95965 •Telephone (530) 538-7541��✓ PER IT NO.
+(Rev.12/96) APPLICATION AND PERMIT
ASSESSOR PARCEL NUMBER 066-250-011
ZONING RT 1
BUILDING PERMIT
OWNER BRYAN MALLOREY
TEZS / 3NE1355
SO. FT. OCC. BUILDING VALUATION
. OWNERS MAILING ADDRESS 6122 DANA CIRCLE, MAGALIA 95954
440 U
7,920.00
CONTRACTOR'S NAME OWNER
TELEPHONE
122 C
1,586.00
1200 0
840.00
CONTRACTORS MAILING ADDRESS
CONSTRUCTION LENDER
Fireplace A
1,500.00
LENDER'S MAILING ADDRESS
Total Valuation $
99 650.00
ARCHITECT OR ENGINEER
LICENSE NO.
Filing Fee
$ 20.00
Fee
$ 639.90
ARCHITECT OR ENGINEERS MAIUNG ADDRESSPermit
Dr.
Plan Checking Fee
$
BUILDINGADDRESS^
'o -
Energy Plan Checking Fee
$
$
PERMIT FEE
$
LAT NO.
SUBDNLS IONS NAME
PARCEL MAP
PLUMBING PERMIT
Fling Fee 20.00
USEOFSTRUCTURE
SF JP Duplex ❑ Mobilehome ❑ Other
SPECIFY
Each Trap
91 7.00 72.00
Solar or heat pump water heater
23.00
Water piping
15.00 15.00
Each gas water heater or vent
15.00 15.00
TYPE OF WORK
New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑
Describe Work: NEW SINGLE FAMILY DWELLING
3 BED 2 BATH WITH ATTACHED GARAGE
Gas piping system 1 - 5 outlets
15.00 1 5 -on
Building sewer
15.00 1 9 -on
Mobile Home I S I G I W
@20.00
PERMIT FEE
S
ELECTRICAL PERMIT
Fling Fee 20.00
RLES
Main Service A OR LESS
23.00 23,00
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my license is in full f0 a and effect. �J
License Class Lic. No. 4!j;9 d - / 15 P -a
OWNER -BUILDER DECLARATION
1 hereby affirm under penalty of perjury that I am exempt from the Contractors License
Law for the following reason:
❑ I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale.
❑ I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project.
❑ 1 am exempt under Sec. Business and Professions Code for this
reason
Main Service 200A TO 1000A
46.00
NEW CONST. DWELLING OCCUP.
OR ADDNS. ( a ACC. BLDS.
SO
3.50FT_ 79-30
NOµq�ID MULTI -OUTLET
@7,50
POWER APPARATUS
SINGLE oLlRFT CIR.
OUTLET OR FIXTURES
Ex. Occup.sr�
20 Q 1.00
@ .50
Ex. Occup. DFlxLrTL rsR� OR,
5.00
Temporary Service
23.00
Mobile Home Facilities
20.00
Misc. Wiring
23.00
PERMIT FEE
$
WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
1 have and will maintain workers' compensation insurance, as required by Section
3700 of the Labor Code, for the performance of work for which this permitis issued.
My workers' cotripensat insur nce carrier and policy number are:
Carrier I
Policy Number 11
(The above sections nee not be completed if fhe permit is for work of a valuation
of one hundred dollars ($100) or less.)
❑ 1 certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to workers'
compensation laws of California, and agree that if I should become subject to the
workers' compensation provisions of section 3700 of the Labor Code, I shall
forthwith comply with those provisions.
X SLI Date _ Ig
Signature of Applic ❑Owner ❑ Co for ❑Agent
An OSHA permit is re4Girad for excavations over 60" deep and demolition or construction
of structures over 3 stories in hei t.
MECHANICAL PERMIT
Fling Fee 20.00
Heating
25.00 25.00
Cooling 25.00 25.00
Hood 6.50 6.50
Ventilation
2 4.50 9.00
PERMIT FEI: $ 85.50
Mobile Home Installation Fee $
Energy Inspection Fee $ 46.00
Occ
corsT. TYPE
TR3 VN,OT FEE $
HAZ. D. IMP FLoO CDF PARC HD UE
This permit is hereby issued under the
of the Butte County Code and/or
indicated above for which fees have
By
PERMIT EXPIRES ON
applicable provisions
Resolutions to do work
been paid.
De
ReceiptNo. S o
WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINIffISISPECTOR G DENROD-APPLICANT
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 County Center Drive - Oroville, California 95965 - Telephone (530) 538-7541 PERMIT NC
(Rev. 12/196) I APPLICATION AND PERMIT -
ASSESSOR PARCEL NUMBER / ! I ZONN
BUILDING PERMIT
OWNER SO. FT. OCC. BUILDING VALUATION
OWNLEAs w a-3 90
s
/I� /� /1 ,
CONiMCTOR9� Try
-ES ��� 'I `-+ -60
CONTRACTOR'S MAULING ADDRESS O 10
CONSTRUCTION LENDER
LENDER'S MAILING ADDRESS LFi,,EpIc, D
Total Valuation $
ARCNrtEcr OR ENGINffET1 LICENSE NO' Flin Fee S 20.00
ARCMTECT OR ENGINEER'S "AILING ADDRESSPermit Fee
P���u
euaDwGADDREss Plan CheckingFee $
�PS9.
„ o
Energy Plan Checking Fee
SUBDIVISION'S NAME
USEOFSTRUCTURE
SF.X Duplex ❑ Mobilehome ❑ Other
ePecsv
TYPE OF WORK
New ❑ Addition ❑ Remodel ❑ Utilities ❑ installation ❑ Other ❑
Describe Work: 3� `
S
PERMIT FEE $
PLUMBING PERMIT
Each Trap
Solar or heat pump water heater
Water piping
Each gas water heater or vent
Gas piping system 1 - 5 outlets
Building sewer
Mobile Home I S I G W
Fling Fee 20.00
7.00
23.00
15.00
15.00
15.00 j05,
15.00
PUm-
(9?20.00
Fling Fee
PERMIT FEE
ELECTRICAL PERMIT
Main Service (
-0°" OR LESS
zooA oR u ss
Main Service. (
200A TO 1000A )
NEW CONST.
OR ADONS.
DNELUNG OCCUP.
A AfY` R1 ne
Fling Fee 20.00
7.00
23.00
15.00
15.00
15.00 j05,
15.00
PUm-
(9?20.00
Fling Fee
20.00
23.00
5.00
46.00
23.00
3.5,
¢FT
L3
@7.50
23.00
Ex. Occup. oURET OR FUTURES
w a ''°°
SAL .SO
AWLNSEx. Occup. oLmEis FS.D.OEA
5.00
Temporary Service
23.00
Mobile Home Facilities
20.00
Misc. Wirinq
23.00
PERMIT FEE _ ,-j U
MECHANICAL PERMIT Filing Fee 20.00
Heating ZS.6O Z5,UD
Cooling 2S OU ZS Grp
Hood 6.50 &1.030
PERMIT FEt S 5 • 5 U
Mobile Home Installation Fee $
Energy Inspection Fee S r
713 C\N�T. 'E TOTAL FEE $
�Z. D. FEES I IMP FL°O l COfi�p[gQ�L
This permit is hereby issued under the applicable provisions
of the Butte County Code and%or Resolutions to do work
indicated above for which fees have been paid.
By
PERMIT EXPIRES ON
Date
"'i , $ ,1,
r a t. tiers . tL 'i t# :?i :.t?,}! k "•"s:�-�..'�q;%^,;.��—w+ow, r s _- . rq,�� y �t TrI
COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SEkvICES - BUILDING DIVISION
7 COUNTY CENTER DRIVE - OROVILLE, ;CALIFORNIA 95965 - #LEPHONE (530) 538-7541
'i
PERMIT APPLICATION DATA SHEET
OWNER: ASSESSOR PARCEL NUMBER: f/ 2 — a "
Proposed Building Use: Building Inspector: / /,y Date: g- _" f S
At time of permit application, I,was advised the following data must be submitted prior to permit processing and/or issuance:
L Date Received By
❑ 1. All items have been submitted --------------------------------------------------------------------------------------
02. Plot plans, 3/4 sets, signed by the preparer of plans. ------------------------------------------------------------
63. Complete plans, 3/4 sets, signed by the preparer of plans. -----------------------------------------------------
04. Engineered plans, 3/4 sets, with wet signature on plans. All engineering must be shown on plans. --------
❑ 5. Engineered truss jdetails and layout in duplicate (required prior to plan review) No faxes! ------------------
06. Energy Design Compliance and supporting documentation. ----------------------------------------------------
❑ 7. Statement of Intent for Non -Heated and A/C Buildings.---------------------------------------------------------
❑ 8. Hazardous Material Form.------------------------------------------------------------------------------------------
❑9. nfactured Home data and installation instructions including Tie Down Specifications.------------------
PT0- - of $ Cy -4 .�n -
-----------------------------------------
pact fees as shown on the attached schedule. -------------------------------------------`----- r-------- QJCalifornia Department of Forestry plan approval/fees. �-
❑ 13,,,Flood elevation certificate. ----------------------------------------------------------------------------------------
4. Sanitation and plot plan approval 6A6 Iealth-Department --------------------------------------------� —
❑ 15. City of Chico plumbing permit.-----------------------------------------------------------------------------------
❑ 16. Plot plan and business license approval from the City of Biggs. --------------------
❑ 17. Planning approval for (A) Use: (B) Parking:
❑ 18."tact Land Development about ❑ Improvements, ❑ Drainage, ❑ Legal Parcel .-------
9. ------------------
O Encroachment Permit for driveway (construction approval prior to occupancy). ��----------------
❑20. =inspection for required Request to Building Inspector on (Date)
actor's license information. (Number, Name Style, Classification). ------------------------------------
bVf2o. Workers' Compensation carrier and policy number.-----------------------------------------------------------
❑23.Owner-Builder Verification (Given to owner ❑, Mailed to owner ❑).
❑ 24etI of signature authorization. ------------------------------------------
V\ 5. Recorded copy of Agricultural Acknowledgment Statement. -----------
026. Letter of intent on building use. ------------
❑27. Manufactured Home utility clearance. ------------'
❑28. Existing violations and/or expired permits. -------
0 29.
------❑29. 0433 A, ❑Grant Deed, ❑ M.H. Title, ❑ Check
030. Other:
When you issue the permit, process as follows ❑ Mail to owe
A-ElTelephone ��3, f 33 b
and hold for pickup
Copy of Haz-Mat form sent ❑ Health Department, ❑ Fire
Copy of plans sent ❑ Health Department, ❑ Fire Departn
C.D $
----------- 9-7- f.. G
er,�❑yMail to contractor.
office. ❑ Deliver with inspector.
y' Applicant: Date: D 7
oent, ❑Air ollution Date: By:
ther: �/ Date: By:
1. Index permit application for the above items numbered: // ❑, Plan Check List
2. Additional items required:
Contractor, designer, owner, was advised of the above required data by o phone, ❑ mail, ❑ Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by ❑ phone, ❑ mail, o Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by ❑. phone, ❑ mail, ❑ Building Division counter, by Date:
Contractor, designer, owner, was advised of the above required data by ❑ phone, ❑ mail, ❑ Building Division counter, by Date -
Plans reviewed by: Date: Plans approved by: Date:
Sets of plans on hold in ❑ Plan Cabinet, 11A.P. folder. Note transfer by: Date:
c•,.....:,..._ n._a�t-- r��__• _ • _ .. _.
COUNTY OF BUTTE
DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION
7 COUNTY CENTER DRIVE, OROVILLE CA 95965 TELEPHONE (916) 538-7541
SCHEDULE OF FEES DUE
OWNER
V
PROPOSED BUILDING USE t
Z11. a, DING PERMIT FEES ®
Balance Due ................ $
-- Additional Fees Due ........... $
-- Additional Fees Due ........... $
_k<
evised Plan Checking Fee ....... $
(� •
2. SC OL DISTRICT FEES
aid at District Office)
3. SHERIFF FEES (paid at Building Division)
Residential ........ x $360.00 = $ 0.06
Units
Commercial (sq.ft.)... x $0.03 = $
Sq.Ft.
4. URBAN AREA FEES (paid at Building Division)
Residential (per unit) . x - _ $
#Units Amt.
Commercial (sq.ft.) .. x =$
Sq. Ft. Amt.
5. RECREATION DISTRICT FEES (paid at District Office)
6. THERMALITO DRAINAGE DISTRICT FEES
$5 .00 (paid at Building Division)
7. SRA FIRE INSPECTION AND PLAN CHECK a43 /F3
$89.00 (paid at Building Division)
8. WATER TENDER FEES (Battalion # )
$200.00 (paid at Building Division)
9. CSA 87 'TRAFFIC FEE $2500.00 (paid at Building Division)
10. OTHER
A. P. #_(7(D(ri a50"01
DATE 8" 5—Q q
RECEIPT # DATE REC
4-7 f
At time of permit application, I was advised the above fees are required to be paid prior to issuance of the building permit.
These fees may be changed during the plan checking process.
''APPLICANT U174"ao' DATE
Pursuant to Government Code Section 66020, you are hereby notified that items 2,3,4,5,6,8,9, and 10 above may have been imposed on your
project. You have 90 days from the date of approval of the project or from the imposition of the above mentioned items during which you may
protest. The requirements for a protest are specified in Government Code Section 66020(a).
Original -Building Div. 2nd Copy - Applicant 3rd Copy - Owner (Rev. 2/97)
TO:
FROM:
SUBJECT:
Building Department
Environmental Health
Sanitation Clearance
E.H. USE ONLY
Plot Wan Attached `ew
Floor Wan Attached
I
Sent to 8.0.E
134 uz, Aa &enc,s WtnJL�6MA U -/?,. C - zso -Cie d
IF Owner Location AP#
Plan Approved for: Sewage Disposal Water Supply: Public JC— Private Well
Clearance for 3b dwelling. Other
Hold final for:
Final clearance O.K. for:
NOTE:
-/7- 99
Environmental Health Specialist Date
8/96
-92
["T
,grpti •r 3030 wenwed
Ld
DECK1
0 0 IsIxre
MASTER 8DRM CLOT G¢u
LPANG
ITI 1 Y IR4
BAT
NOOK
r 103
i LAUNDRY (IM -9 3Ir X 14 -AtAM
..... . --- ---- -
2GARAGE
21'8x 194
1117 —CLOSET........... .... ... .......
V HALL
ITS . 3'5() -T
Map"
RY -0
'5'x4'8 KIT
DNNG818'8x11'7'3
10,
— — — — — — — — — — — --
BEDROOM
BEDROOM
ITIOx 100 PW Al;�
if k — J & Mh. ?w
2r
panelm,
nXJ 1.4
6F=
3WO C Swed P-0
LLL SM
I I (D
PB�e
PORCH
—7
E: 1/4"=1 FOOT LMNG AREA
W.
FL twq t.Environmen
tal HealthButte County
Environmental Health
AUG - 5 1999 1-7 - 90
Chico, Calitomia. ------ Date --- -
Signature
a 411
,
CD� Z
c,7
IIN
m
I
rxID
0 FTI
ro
I 1
CO
O
® Q DR i VEU;AY�
W:�J ! �
00:J p 9LI
aa.
APPROVED
Butte County
Environmental Health Environmental Health
AUG - 51999 ---- /7-99
Date
Chico, California
Signature
rar...-...r.n..+•Y•nr'"r+a.^+er.+«-*we.ti..ay.-rYrt,,flJ7lafT±���r,�5t•`v.:Tw'�`r•?�'�v�'r'er;•�'l:k�'nf"r`�'bYl'�y'r.j�ssew•r�..�.;rn.-,f,,�ti��iS~r'7. «'y.tx�'i�ft;i�i�
School District
A.P. Number
Property Owner
Property Location/Address
Subdivision
BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
Building Department No,
County
^r
Residential Development
Sof Living Mobile Home
Units Installation
Commercial/Industrial O
New Addition
Building Department Representative
Lot No
................................................
0 U ........................: Sq. Footage Yf
Addition/ 'Supplemental to (Group R)
Conversion Permit #
'(No foundation inspection);
(Floor Plans reviewed by School District
Identification No. e� /3/
School District certifies that
0" 2- e6— -
(Street Address)
(City)
has complied with the requirements of Resolution No.
representing /lQ square feet.
r
chool District Representative
(State)
Sq. Footage
(Including Exterior
Roofed Areas)
r
Date
(Applicant)
eQ73
(Phone Number)
(Zip Code)
by payment of $ - 3/ 39 4
AB 2926 S
FULL MITIGATION E
3
Da e
Jq%Paid by Check It � Remarks:// l� (�� t_!/�
i
r
Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with
Government Code Section 66020(x), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency,that this project is being reviewed under.the California Environmental Quality Act (CEQA).
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow. (building department), Pink (school district) feeform.xls (10/98)dmm
BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
School District
A.P. Number Jurisdiction: City
Property Owner
Property Location/Address
Subdivision
BuildinglDepartment No.
1 7<,ICounty
Lot No.
...........................................................................:......................................
Residential Development Sq. Footage
No of Living Mobile Home Addition/ *Supplemental to (Group R)
Units Installation Conversion Permit #
'(No foundation inspection):
Commercial/Industrial
New Addition
Building
District Identification No.
(Street Address)
ntative
trtoor rians reviewea oy ncnooi uistnct versonneo
School District certifies that
(City)
has complied with the requirements of Resolution No.
representing
School District Representative
square feet.
Paid by Check It Remarks:
)
Sq. Footage
(Including Exterior
Roofed Areas)
!?-3-'?Z!?-3-'?ZdA
Date
(Applicant)
(Phone Number)
(State) (Zip Code)
by payment of $
AB 2926 $
FULL MITIGATION $
Date
Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with
Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency,that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) I feeform.xts (10/98)dmm
k
4k
.e;yt `� • � .%rwr ,6 ; �7^A�•yr•, r7�v+'„*�'}+.•rrvr•.�+-.ir.s�s+'.,�,t..�.`4d►�: T: �f+:we�-.
BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
{ �S
School District
A.P. Number Jurisdiction: City
Property Owner
Property Location/Address
Subdivision
Residential Development U
No of Living Mobile Home
Units Installation
woo
Building Department No.
_a.
County
Lot No.
...........................................................................:.......................................
Sq. Footage /
Addition/ 'Supplemental to (Group R)
Conversion Permit #
'(Nb foundation inspection)'
Commercial/Industrial Sq. Footage
New Addition (Including Exterior
Roofed Areas)
Building Departmen epresentative Date
moor runs revieweo oy acnooi Lnstnct rersonneil
District Identification No.
School District certifies that
(Street Address)
(City)
has complied with the requirements of Resolution No.
representing
School District Representative
Paid by Check #
square feet.
Remarks:
(Applicant)
(Phone Number)
(State) (Zip Code)
by payment of $
AB 2926 S
FULL MITIGATION $
Date
Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with
Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency that this project is being reviewed under tthe California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) ieeform.xis Ito/seldmm
E )
11
v • fi
BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM
(One form per Building)
School District(,/ S Building Department No.
A.P. Number i - Jurisdiction: City I X (County
Property Owner
Property Location/Address
Subdivision
i w00 c�
Lot No.
Residential Development l l
...........................................................................:.......................................
S Foota e
q• 9
No of Living
Mobile Home
Addition/
'Supplemental to
(Group R)
Units
Installation
Conversion
Permit #
'
'(No foundation inspection);
Commercial/Industrial O O
' New Addition
Building
(Moor mans reviewed oy Jchooi Uistnct
District Identification No.
4
School District certifies that
(Street Address)
A
I
(City) (State)
has complied with the requirements of Resolution No.
representing
School District Representative
Paid by Check #
square feet.
Remarks:
Sq. Footage
(Including Exterior
Roofed Areas)
Date
(Applicant)
(Phone Number)
(Zip Code)
by payment of $
AB 2926 $
FULL MITIGATION $
Date
Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with
Government Code Section 66020(x), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the.School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency,that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) r feeform.As (10/98)dmm
AND WHEN RMCORDED MAIL TO.
BITI m cotmw. BUILDING DIVISION
7 COUNTY CENTER DRIVE
OROVMLL CA99965
COPY of Document Recorded
07 -Sep -1999 1999-0038309
Has not been compared with
original
BUTTE COUNTY RECORDER
AGRICMTORAL STATEMENT OF ACMOWLZDGMMT
FOR RESIDENTIAL DEVELOPMf=
Section 26-8 of the Butte County Cade regnirehd this acknowledgment to be recorded prior to issuance of a btuildmg permit: The
property dumbed herein is adjacent to land or included within an area zoned for apicult<ral purposes, and residents of this
property may be subject to inconvematc= or discomfort from the use of agricultural chemicals, mchhdi& but not Ihnited to
herbicides, pesticides, and fertilizers; and from the pursuit of agricultural operations hchang, but non limited to Mddvation,
plows* sPmy n& Pruning and hvvmtivg whiff occasiatnaily geoerata duet, smoke, Iro* and odor. Butte Courcy has established
aricuit ual purposes and residents within said zones and an adjacent property should be prepared to accept such inooavehiehce
or discomfort from normal, necessary farm operations.
All that real property situate in the County of Butte, State of California, described as follows:
LOT 304, AS SHOWN ON THAT CBRTAIN MAP WTITLED e
COUMRY CLUB ESTATES UNIT NO. 4 ' PARADISE P�
. WHICH l4AP ii�8 I>!i TtitB
OFFICE OF THE RECORDER OF THE COUNTY OF BUTTB, STATE OF C ALIPOP
ON OCTOBER 27, 1971, IN BOOK 38 OF MAPS, AT PA=(S) 69, 70v 71, 72
AbM 73.
Date (�J — �. PROPERTY OWNERS:
state of Cafffomk
County of Butte
On September 3, 199%dereme, S.A. Shepherd,Notary Public**
_.penunak appewmd ryan W. "Mallory** oa>namaRv
lmuwn to=( or pored to men the barb e(satbfaetohy evidetloe) to be the peson(e) whose n=W(s) hire sabWQwd to lbs w NWn
h asomeat and adtnowldged to we that befebdibey esecoW the same in bh&erltbsir audwrblad capadty(loo. and that by
bis/hertthdr signs Wo) = the instremetht, the penes) or the entity upon bend[ of wbkb the persons) acted, eaeented the
instrameuht.
WTrNLSS my
S.A. SHEPHERD
$lpata>K o.
Comm. #1209591
NOTARY PUBLIC CALIFORNIA
BUTTE COUNTY Comm. EVIr" An. 3t. 2003
A.P. #
LAND DEVELOPMENT
OROVILLE /
BUILDING /" -PERMIT CLEARANCE
OWNERS
NAME (-
PRI LAST NAME FIRST
ADDRESS/LOCA
Building Parmk No.
NUMBER O`0(0
COUNTY ZONING
DESIGNATION:! FLOOD MAP: FLOOD ZONE:
APPROVED: CONDITIONALLY APPROVED: V RESOLVE PROBLEMS PRIOR TO APPROVAL -
DEED INFORMATION:
PARCEL CREATION BY DEEDS OR MAP Ll
y.,:
DATE OF -CREATION: DEED REFERENCE: -
LEGAL ACCESS PROVIDED: YES NO "`LEGAL ACCESS REQUJREO' YES`., 01 .
COMPLIES WITH COUNTY STANDARDS FOR DEED CREATION: YES NO
COMMENTS/CONDITIONS:
MAP INFORMATION: j; �CIVN%%2j� Oz Viaon
DATE OF RECORDING: Z% 2 % LOT BOOK % S PAGE �7
COMPLIANCE WITH OLD SU (VISION LOT ORDINANCE REQUIRED? (MAP RECORDED PRIOR TO BOOK17 OF MAPS AT
PAGE 23): YES NO. IF YES, MARK APPROPRIATE ITEMS) BELOW:
A. Construct road to
B. Meet parcel size required by zone. C. Meet current E.H.D. requirements.
CHECK SPECIAL CONDITIONS WHICH APPLY TO MAP: at ►► FEES TO BE PAID TO THE BUILDING MWON UNLESS OTHERWISE NO'k, - TED.
Maintain a 50 ft. building setback from centerline of road.
—2. Maintain a ft. building setback from right-of-way/centerline
—3. Comply with Zoning code for building setback from road.
—4. Maintain a 100 ft. leachfield setback from all ebsting wells.
5. Maintain a R leachfield setback from
—6. Pay water tender fees in the amount of $ to Battalion Number of the Butte County Fire Department.
."X7. Meet the Fire Safe Regulations of Butte County and P.R.C. 4290.
—8. Conned to a public water supply.
—9. Conned to a public sewer system.
—10. Automatic fire suppression sprinkler systems shall be installed in all residential structures in accordance with the National Fire
Protection Association Standard for the installation of sprinkler systems in one and two family dwellings and mobile homes, NFPA
Standard 13D, unless a pressurized community water system, with hydrants that meet Fire Department specifications, serves the
parcel.
_ 11. Pay T.D.D. (Thermalito Drainage Distrid) fee in the amount of S
—12. Meet the requirements of the Department of Fish and Game for the preservation of oak trees. (See phone number below)
—13. Obtain approval from the Department of Fish and Game for vegetation removal. Contact Fish & Game at 916-355-7010.
_ 14. A traffic mitigation fee for each new or additional living unit shall be paid. Pay the amount of $ _ as stated in the
Oroville Area Traffic Mitigation Fee Agreement. Payment to be marls to Me Planning Division.
—15. All new residential buildings WW be oonslruded to comply with the requirements of the Uniform Building Code for seismic safety.
Mobile homes shall be constructed on a permanent foundation system which complies with the Seismic Zone 3 requirements of
the Uniform Building Code.
—16. Deer Mitigation fees are to be paid, if such fees have been adopted by the Butte County Board of Supervisors.
X 17. Pay school impact mitigation fees.
X 18. A development impact fee for sheriff fadlities Shan be paid pursuant to the provisions of Chapter 3, Article it of the Butte County
Code.
_ 19. Wood Stoves and fkepiaoe kaelts,#W-be EEA approved and designed to meet;the emission requirements of. the; CaHbmia
Clean Air M'of 1988 as amended.
—20. If any cultural resources are en66urtened-d ground distrirbing adlvities, alfwork shah Cease in the area of the W -pending
examinatkm of the site by a professional archaeologist This person would then be able to assess the site significance. and
suggest appropriate mitigation measur -
21.
22.
23.
24.
25.
26.
,�i(j il`l
3116
,
6w90�n�
LD 6/98
FORMS\BLDG PERMIT CLEARANCE
RESIDEivTIAL PLAN CHECKING GUIDE i
SINGLE FAMILY, DUPLEX AND MISCELLANEOUS, ONLY,,.
OWNER: BUIL& GP ~ER
PLAN CHECKER: A.P.NUMBER:
GENERAL:
Zoning requirements: (side yards and number of permitted living units).
Valuation.
Plans signed by designer. ,
_ Proper description of work on application. ,
Existing violations on property.
Items on data sheet, (Impact Fees, Environmental Health, Developer Fees, etc.).
Recorded notice of violation.
Complete parcel size and dimensions.
Setbacks, side yards, easements, etc.
Other buildings or structures. +'- • `.. ��.
Grading, fills and/or drainage.
Flood hazard. :r<.
Special conditions on creation map (Noise, SA.A., Fire Sprinklers, Water Tender; Trees, etc.). '
F.A.U. & F.A.S. road setback.
Building or utilities across lot lines (Record form).
Complete to scale plan with dimensions. a 7�
Required windows for light and ventilation (Section 1203). \��G
Required windows for second exit (Section 310.4).
Skylights (Section 2409 & 2603.7).
Glazing in Hazardous Locations (Section 2406).
Required room sizes, ceiling heights (Section 310.6).
G.F.C.I. in baths, garage, kitchen, wet bar and exterior outlets (N.E.C. 210).
Lights, switches, receptacles, and exterior receptacles for maintenance of mechanical equipment.
Location of water heaters, heating and cooling equipment, other electrical or gas equipment.
Garage firewall, door size and closer (Section 302.4).
Minimum of one 3'0" exterior door (Section 1004.6).
Fireplace and wood stove location, alcoves and clearance.
Smoke detectors (Section 310.9.1).
Plumbing fixtures, water closet clearances and shower size.
Conventional Construction - Unusually Shaped Buildings (Section 2326.5.4).
Standard bracing or engineered design (Section 2326.11.3).
Clerestory requiring balloon framing and/or engineering.
Three story building requiring engineered calculations and plans.
Foundation plan complete enough to construct building.
Floor construction details complete enough to construct building.
Elevations and wall construction details complete enough to construct building.
Roof construction details complete enough to construct building.
Rafter ties or bearing ridge beam.
Fireplace construction details and Calc. if necessary.
Garage door and/or porch header sizes.
Stud heights.
Adobe soils - special foundation design.
Retaining walls requiring design.
Special Inspection requirements.
Header size.
June 1997 3,2
LANEOUS ITEMS TO LOQ OUT.FOR:
Stairway details: landings, ria., and run, head clearance, handrails (Section 100o,.
Guardrail details (Section 509). -
Brick or stone veneer (Section 1403).
Exterior plaster - weep screeds (Section 2506).
Proper roof pitch for roof covering (Section 1501). •
Roof covering type - (fire hazard).
Foam insulation - protection.
36" halls and stairways - - -
Living area over garage - complete 1 -hour separation required on garage side including supporting walls and posts.
Two exits on three - story dwellings (Section 1003).
Underfloor access and ventilation (Section 2317.7).
Attic access and ventilation (Section 1505).
Combustion air for fuel burning appliances - L.P.G. requirements.
Noise requirements on duplexes.
Energy design.
Flashing at all exterior openings.
C.D.F. responsible area requirements. .
Automatic Fire Sprinkler Systems (Section 310.10)
For Inspection Jacket: .'_
Flood Hazard/Elevation Certificate _ ,
SRA Requirements
Special Inspection Requirements
Automatic Fire Sprinklers
June 1997
3.2
t"
r
TABLE OF CONTENTS TOC
Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
Project Address WOODBURY DR AP4&66 2 *******
........ MAGALIA *v5.00*
Documentation Author... ROBERT MANGRUM ******* Bujlding e i
Paradise Mechanical �o
5655 Almond Street Plan Check / Date
Paradise, CA 95969
530-877-8882 Field Check/ Date
Climate Zone.. .. ..... it
Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc.
MICROPASS v5.00 File-MALLORYI Wth-CTZllS92 Program -TOC
User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24
TABLE OF CONTENTS
Report Page
FORM
CF -1R ................
1
FORM
MF -1R.................
4
FORM
C -2R ......... .......
7
HVAC
SIZING ...............
10
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R
Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
Project Address WOODBURY DR AP 6 *****
••••••-• # 6-25-11 **
MAGALIA *v5.00*
Documentation Author._.. ROBERT MANGRUM ******* Building Permit #
Paradise Mechanical
5655 Almond Street Plan Check / Date
Paradise, CA 95969
530-877-8882 Field Check/ Date
Climate Zone. .. .... 11
Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc.
MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM CF -1R'
User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24
GENERAL INFORMATION
Conditioned Floor Area....: 1626 sf
Building Type.............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Front Facing 147 deg (SE)
Number of Dwelling Units... '1
Number of Stories.. ...... 1
Floor Construction Type.... Raised Floor
Glazing Percentage......... 11 0 of floor area
Average Glazing U -value.... 0.51 Btu/hr-sf-F
Average Glazing SHGC....... 0.61
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
R -value
R -value R -value U -value
Location/Comments
Wall
Wood
R-13
R-0
R-13 0.088
FRONT WALL, LEFT
WALL
BACK WALL, RIGHT
WALL
Door
None
R-0
R-0
R-0 01.330
GARAGE WALL
FRONT DOOR
Roof
Wood
R-11
R-19
R-30 0.031
GARAGE DOOR,
ATTIC
Floor
Wood
R-19
R-0
R-19 0.037
FLOOR
FENESTRATION
Over-
Orientation
Area
(sf)
U-
Value
Interior
SHGC Shading
Exterior
Shading
hang/
Fins
Window
Front (SE)
9.0
'
0.510
0.610 Standard
Standard
Yes
Window
Front (SE)
25.0
0.510
0.610 Standard
Standard
Yes
Window
Front (SE)
20.0
0.510
0.610 Standard
Standard
Yes
Window
Front (SE)
20.0
0.510'
0.610 Standard
Standard
Yes
Window
Back (NW)
24.0
0.510
0.610 Standard
Standard
Yes
Window
Back (NW)
9.0
0.510
0.610 Standard
Standard
Yes
Window
Back (NW)
24.0
0.510
0.610 Standard
Standard
Yes
Window
Back (NW).
33.0
0.510
0.610 Standard
Standard
Yes
Window
Right (NE)
15.0
0.510
0.610 Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R
Project Title ....... ... WOODBURY PROJECT Date__0R/n2/q9 )�•na•rA
MICROPAS5.v5.00
File-MALLORYI
Wth-CTZ11S92
Program -FORM CF -1R
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
Equipment Type
Furnace
ACPackage
Tank Type
Storage
HVAC SYSTEMS
Minimum
Duct
Duct Tested Duct RCCA
Thermostat
Efficiency
Location
R -value Leakage Manual
D Type
0.800 AFUE
Crawlspace
R-4.2 No No
Setback
10.00 SEER
Crawlspace
R-4.2 No No
Setback
WATER HEATING SYSTEMS
Number Tank
in Energy Size
Heater Type Distribution Type System. Factor (gal)
Gas Standard' 1 0.62 40
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented.on the plans,
*** installed to manufacturer and CEC specifications, and
*** verified during plan check and field inspection.
This building incorporates a Housewrap/Air Infiltration Retarder.
This building incorporates non-standard Duct Location.
REMARKS
External
Insulation
R -.value
R- n/a
***
***
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1k
Project Title.......... WOODBURY PROJECT Date__nR/n2/Aca ��•na•�a
MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM CF -1R
User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24
,COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regrulations to
implement them. This certificate has been signed by the, individual' with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
Name.... BRYAN MALLORY
Company. BRYAN MALLORY CONST.
Address. 6122 DANA CIRCLE
MAGALIA, CA
Phone.... (530) 521-3623
License. 7 It Z.
Signed..
(date)
ENFORCEMENT AGENCY
Name....
Title...
Agency..-
Phone...
Signed..
(date)
DOCUMENTATION.AUTHOR
Name.... ROBERT MANGRUM
Company. Paradise Mechanical
Address. 5655 Almond Street
Paradise, CA 95969
Phone... 530-8 7-8882
Signed.,.
dat
MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 4 MF -1R
Project. Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
Project Address........ WOODBURY DR AF#66-25-11 *******
MAGALIA . *v5.00*
Documentation Author... ROBERT MANGRUM ******* Building Permit #
Paradise Mechanical
5655 Almond Street Plan Check / Date
Paradise, CA 95969
530-877-8882 Field Check/ Date
Climate Zone.. li
Compliance Method...... MICROPAS5 v5..00 for 1999 Standards by Enercomn. Inc_
MICROPAS5 v5.00
File-MALLORYI
Wth-CTZ11S92
Program -FORM MF -1R*
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless -of the compliance approach used. Items marked with an
asterisk (*) may be superseded by more stringent compliance requirements listed
on the Certificate of Compliance. When this checklist is incorporated into the
permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether
they are shown elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
*150(a): Minimum R-19 ceiling insulation.
150(b): Loose fill insulation manufacturers labeled R -Value.
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -value in metal frame walls (does not apply
*
to exterior, mass walls) .
Design Enforce-
er/ ment
✓ 0
150(d): Minimum R-13 raised floor insulation in framed floors.
150(i): Slab edge insulation - water absorption rate no greater
than 0.3W, water vapor transmission rate no greater than 2.0
perm/inch.
118: Insulation specified or installed meets CEC quality
standards. Indicate type and form.
116-17: Fenestration Products, Exterior Doors and Infiltration/
exfiltration controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage.
2. Fenestration -products (except field fabricated) have
label with certified U -value, certified solar heat gain
coefficient, and infiltration certification.
3. .Exterior doors and windows weatherstripped; all joints
and penetrations caulked and sealed.
150(8): Vapor barriers mandatory in Climate Zones 14 and 16
only.
150(f): Special infiltration barrier installed to comply with
Sec. 151 meets Commission quality standards.
150(e):'Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning.gas pilots allowed.
MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page.5 MF -1R
Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
MICROPAS5 v5.00
File-MALLORYI
Wth-CTZ11S92
Program -FORM MF -1R
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
Design- Enforce-
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Commission.
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA.
150(i): Setback thermostat on all applicable heating and/or
cooling systems.
150(j): Pipe and Tank insulation
1. Storage gas water heaters rated with an Energy Factor of
less than 0.58 must be externally wrapped with insulation
having an installed thermal resistance of R-12. or greater.
2. First 5 feet of.pipes closest to water heater tank, non -
recirculating systems, insulated (R-4 or greater).
3. Back-up tanks -for solar systems, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping -insulated in recirculating
sections of hot water system.
5. Cooling system piping below 55 degrees insulated.
6. Piping insulated between heating source and indirect
hot water tank.
*150(m): Ducts and Fans
1. All ducts and plenums constructed, installed, in-
sulated, fastened, and sealed to comply with the ICBO
1997 UMC sections 601 and 603; ducts insulated to a
minimum installed R-4.2 or ducts enclosed entirely
within conditioned space. Openings shall be sealed
.with mastic, tape, aerosol sealant or other duct closure
system that meets the applicable requirements of UL181,
UL181A, or UL181B and other applicable specified tests
for longevity given in Sec. 150(m).
2: Exhaust fan systems have backdraft or automatic dampers.
3. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers.
114: Pool and Spa Heating Systems and Equipment
1. System is certified with 78% thermal efficiency, on-off
switch, weatherproof operating instructions, no electric
resistance heating and no pilot light.
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch. I
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non_electrical cooking appliances
with pilot < 150 Btu/hr).
f
0
LI/
'MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 6 MF -1R
project Title.......... WOODBURY PROJRrT n>ro nQ/nom/nn �.
MICROPASS v5.00
File-MALLORYI
Wth-CTZi1S92
Program -FORM MF -1R
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
LIGHTING MEASURES
150(k)1: Luminaires for general lighting in.kitchens.shall
have lamps with an efficacy of 40 lumens/watt or greater
for general lighting in kitchens. This general lighting
shall be controlled by.a switch on a readily accessible
lighting control panel at an entrance.to the kitchen.
150(k)2: Rooms with. a shower or bathtub must either have at
least one luminaire with lamps with an efficacy of 40
lumens/watt or greater switched at the entrance to the
room or.one of the -alternatives to this requirement
allowed in Sec. 150(k)2.;- and recessed ceiling fixtures
are. IC.(insulation cover) approved.
Design- Enforce-
er ment
f
COMPUTER METHOD SUMMARY Page 7 C -2R
Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
Project Address WOODBURY DR AP#66 2 *******
........ - 5-11
MAGALIA *v5.00*
Documentation Author....ROBERT MANGRUM ******* Building Permit #
Paradise Mechanical
5655 Almond Street Plan Check / Date
Paradise, CA 95969
530-877-8882 Field Check/ Date
Climate Zone. ..... 11
Compliance Method...... MICROPAS5 v5.00 for 1999. Standards by Enercomu. Inc.
MICROPAS5 v5.00
File-MALLORYI
Wth-CTZ11S92
Program -FORM C -2R."
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
Zone Type
HOUSE
Residence
MICROPAS5'ENERGY USE SUMMARY
Energy Use
Standard
(kBtu/sf-yr)
Design
Space Heating..... ... •
14.82
Space Cooling..........
16.33
Water Heating..........
14.92
Proposed
Design
13.70
10.87
12.51
Total 46.07 37.08
Compliance
Margin
1.12
5.46
2.41
*** Building complies with Computer Performance ***
GENERAL INFORMATION
-Conditioned'Floor Area.,...
Building Type ..............
Construction Type ...
Building Front Orientation.
Number of Dwelling Units...
Number of Building Stories.
Weather Data Type... .....
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area ....... -.'.
Glazing Percentage. .......
Average Glazing U -value....
Average Glazing SHGC. ....
Average Ceiling Height.....
1626 sf
Single Family Detached
New
Front Facing 147 deg (SE)
1 _
1
ReducedYear
Raised Floor
1
13624 cf
0 sf
11 % of floor area
0.51 Btu/hr-sf-F'
0.61
8.4 ft
BUILDING ZONE INFORMATION
Floor
# of
Vent
Vent
Air
Area Volume
Dwell Cond- Thermostat
Height
Area
Leakage
(sf) (cf)
Units itioned Type
(ft)
(sf)
Credit
1626 13624
1.00 Yes . Setback
2.0
Standard
Housewrap
COMPUTER METHOD SUMMARY Page 8 C -2R
Project Title.......... WOODBURY PROJECT
Date..08/02/99 22:04:54
MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM C -2R
User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24
OPAQUE SURFACES
Area U- Insul Act Solar Form 3 Location/
Surface (sf) value R-val Azm Tilt Gains Reference Comments
HOUSE
1 Wall 354 0.088 13 147 90 Yes W.13.2X4.16 FRONT WALL
2 Wall 256 0.088.13 237 90 Yes W.13.2X4.16 LEFT WALL
3 Wall 358 0.088 1.3 327 90 Yes W.13.2X4.16 BACK WALL
4 Wall 81 0.088 13 57 90 Yes W.13.2X4.16 RIGHT WALL
5 Wall 142 0.088 13 57 90 No W.13.2X4.16 GARAGE WALL
6 Door: 20 0.330 0 147 90 Yes None FRONT DOOR
7 Door 18 .0.330 0 57 90 No None GARAGE DOOR
8 Roof 1284 .0.031 30 n/a 0 Yes R.30.2X4.24 ATTIC
9 Roof 256 0.031 30 147 14 Yes R.30.2X4.24 ATTIC
10 Floor 1626 0.037 19 n/a 0 No FC.19.2X8.16 FLOOR
FENESTRATION SURFACES
Area U- Act Exterior Shade Interior Shade
Orientation (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC
HOUSE
1 Window Front (SE) 9.0 0.5100:610 147 90 Standard/0.76 Standard/0.68
2 Window Front (SE) 25.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68
3 Window Front (SE) 20.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68
4 Window Front (SE) 20.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68
5 Window Back (NW) 24.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68
6 Window Back (NW) 9.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68
7 Window Back (NW) 24.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68
8 Window Back (NW) 33.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68
9 Window Right (NE) 15.0 0.510 0.610 57 90 Standard/0.76 Standard/0.68
Area
Surface. .(sf)
HOUSE
OVERHANGS AND SIDE FINS
1
Window
9.0
2
Window
25.0
3
Window
20.0
4
Window
20.0
5
Window
24.0
6
Window
9.0
7
Window
24.0
8
Window
33.0
OVERHANGS AND SIDE FINS
Window-
-Overhang
Left Fin
Right
Fin -
Wdth
Hgth
Dpth
Hght
Left
Ext
Rght
Ext
Ext
Dpth
Hght
Ext
Dpth
Hght
3.0
5.0._
""4.0
3.0
5.0
2.0
8.0
0.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5.0
5.0
4.0
2.0
2.0
0.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a.
n/a
n/a
n/a
n/a
6.0
3.0
4.0
3.0
2.0
2.0
0.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6.0
4.0
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5.0
6.6
2.0
0.0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
COMPUTER METHOD SUMMARY Page 9 C -2R
Project Title........:. WOODBURY PROJECT Harp na/n,)ioa 77.nn.cA
MICROPAS5 v5.00 -File-MALLORYI Wth-CTZ11S92 Program -FORM C -2R
User##-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24
HVAC SYSTEMS
Minimum Duct
System Type Efficiency Location
HOUSE
Furnace. 0.800 AFUE Crawlspace
ACPackage 10.00 SEER Crawlspace
Tank Type
1 Storage
13
'Duct, Tested Duct ACCA Duct
R -value Leakage Manual D Eff
R-4.2. No No 0.743
R-4.2 No No 0.674
WATER'HEATING SYSTEMS
Number Tank External
in Energy Size Insulation
Heater Type Distribution Type System Factor (gal) R -value.
Gas Standard 1 0.62 40 R- n/a
SPECIAL FEATURES AND MODELING ASSUMPTIONS
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. *.**
This building incorporates.a Housewrap/Air Infiltration Retarder.
This building incorporates non-standard Duct Location.
REMARKS
is
HVAC SIZING Page 10 HVAC
'Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54
Project.Address........ WOODBURY DR AP#66-25-11 *******
MAGALIA *v5.00*
Documentation Author... ROBERT MANGRUM ******* Building Permit—W
Paradise rJechanical
5655 Almond Street Plan Check / Date
Paradise, CA 95969
530-877-8882 Field Check/ Date
Climate Zone. .. ..... 11 -
Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc.
MICROPAS5 v5.00
File-MALLORYI
Wth-CTZ11S92
Program -HVAC SIZING
User#-MP1342
User -Paradise
Mechanical
Run -MALLORY TITLE 24
GENERAL INFORMATION
Floor Area ................. 1626.sf
Volume..*'*'*
olume....... ............ 13624 cf
Front Orientation.......... Front Facing 147 deg (SE)
Sizing Location............ PARADISE
Latitude............ ..... 39.8 degrees
Winter Outside Design...... 30 F
Winter Inside Design....... 70 F
Summer Outside Design...... 99 F
Summer Inside Design....... 78 F
Summer Range. .. .... 34 F
Interior Shading Used...... Yes
Exterior Shading Used...... Yes
Overhang Shading Used...... Yes
Latent Load Fraction....... 0:20
HEATING AND COOLING LOAD SUMMARY
Latent Load ...................... n/a 3110
Minimum Total Load 22457 18658
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outdoor design temperatures, coil sizing, availability of
equipment, oversizing safety margin, etc.,,must also be considered. It is
the HVAC designer's responsibility to consider all factors when selecting.
the HVAC equipment.
Heating
Cooling
Description
(Btuh)
.(Btuh)
Opaque.Conduction and Solar......
9015
4049
Glazing Conduction......... .....
3652
1917
Glazing Solar. ....................
Infiltration
n/a
4404
.....................
Internal Gain
.7749
2338
....................
n/a
2100
Ducts ............................
2042
740
Sensible Load .................... .
22457
15548
Latent Load ...................... n/a 3110
Minimum Total Load 22457 18658
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outdoor design temperatures, coil sizing, availability of
equipment, oversizing safety margin, etc.,,must also be considered. It is
the HVAC designer's responsibility to consider all factors when selecting.
the HVAC equipment.
BUILDING PERMIT
SITE PLAN CHECKLIST
APN: Building Permit No.: 8 �'
Proposed Use: SFD O MHO Res. Accessory O ,. Ag. Bldg. O Commercial O Lidustrial O
Other:
Zone District: (R General Plan: L 2
The Proposed Use Is: '
Permitted: Not Permitted: Requires a Use Per mit:
Requires a Minor Use Permit: Requires an Administrative Permit:
Accessory Bldg. Use:
l_9 1 _._.
Parcel Created By Map? No: Yes. Book/Page
Map Conditions? No: Yes: , See reverse side
Use Permit:
Variance: Dev. Agreement:
Applicable Setback
Zoning Code
Streets & Hwy.
Fire-revention
Subdivision Map
Front
2C) P/C..
Side
Side, street
--------
Rear
Height
----
Parcel in Land Conservation Agreement? No: —�< Yes: , Check Use
Parcel in North Chico Specific Plan? No7G Yes: , Check NCSP Zoning
Parcel in Floodplain? No: --C Yes: , Zone: Panel No.: D $ 031CO C-.,
Parcel in Enterprise Zone? Nb:-->--'— Yes: , Check Use
Commercial/Industrial Uses
Parking Requirements: OK as shown Other.
Landscaping Requirements: OK as shown Other
Comments:
1JEyy "V , T SSTr AC-r�
Reviewed By:
kLi
Date: 2�--) )—,=J)
GEECK SPECIAL CONDMONSIM • MSI / gg pAlp /TgE gU1Lp1jVG► // ►�
UNLESS / . i ?A/ /
—1. Submit a plan of the existing on-site mature trees, located in the proposed for building and driveway area prior to grading or
vegetation removal. Minimize the removal of mature trees, where possible. A mature tree shall be defined as a tree with a
trunk measuring 4 inches in diameter, 4 feet from ground level. Mature trees removed shall be replaced by planting
replacement trees of equal number and not less than _ gallon size. t
_2. Prior to the commencement of grading and/or construction activity, all individual or groups of oak trees which are to be
retained as part of the project, shall be fully protected through the use of root protection zones (RPZ). During construction,
RPZs shall be established using protective fencing enclosing an area with a radius 1.5 times the distance from the trunk to the
dripline. Within this protective buffer, no grading, trenching, fill, or vegetation alteration of any kind shall be allowed. "Mm
RPZs shall be maintained after the completion of constriction in order to continue to protect the oak trees, but the &=ing shall
be removed.
_3. Fencing for areas other than residential areas shall be limited to a maximum of 5 wire strands. The lower strand shall be at _
least 16" above the ground and the upper strand shall be no higher than 48" above the ground. –
_4. Pay the required CSA 87 Traffic and Drainage Mitigation fee of $2,500.
_5. Prior to any clearing, grading and/or construction in a Federal or State identified 100 year floodplain and/or streambed the
following entitilements trust be obtained: a California Fish and Game 1604 Streambed Alteration permit and an Army Corps
404 permit or exemption certificate.
_6. Pay the current West Chico Fire Station Fee of $75.
—7. Pay water tender fees in the amount of $200 to Battalion Number of the Butte County Fire Department.
—8. Automatic fire suppression sprinkler systems shall be installed in all residential structures in accordance with the National Fire
Protection Association Standard for the installation of sprinkler systems in one and two family dwellings and mobile homes,
NFPA Standard 13D, unless a pressurized community water system, with hydrants that meet Fire Department specifications,
serves the parcel.
—9. Obtain approval from the Department of Fish and Game for vegetation removal. Contact Fish tit: Game at 916-355-7010.
—10. A traffic mitigation fee for each new or additional living unit shall be paid. Pay the amount of $750 as stated in the Oroville
Area Traffic Mitigation Fee Agreement. Payment to be made to dw Planning Division.
11. Provide information showing that proposed construction will mitigate exterior sound levels to a 45 dB interior level.
—12.
—13.
14
K:\BIDGCH4.FR.\4
N
I
0
1I
' I
I
I
i;
I I
, I
t• I I
t
I.�
, II
I
,y,yff
I
1
I I
CDF FIRS SAFE REQUIRDMENTS
�.,
At
ir
AP#I PEFRMIT# Y�tME
Under authority of PRC14290,y"the following checked items are required
,!
b I
Y the ButtelCounty Fire Department and are made a pa rt;of this permit.
t !;
t'hes'e requirements are minimums and will be superseded by Mitte'County
local regulations which equal or exceed 'these standards. Field`'`'
;inspections will be made by the Ejutte County Building Ioartment for
i!
compliance.
] 1272.00 ,Maintenance of ,Defensible, S ace. To ensure continued'.,,',
p
maintenance of proper,ti,esin conformance with these
fief,•
standards and measures and' to assure continued avail
ability,; access and utilization of the defensible space
provided for'' j;j'JILthese standards, annua'1 maintenance
must' be, ;;providefor by the land owner.
3�
I.
DrivewavStandards
Q2 Su.face: A'11 dr-iveway-surface's-=and structures =(bridges.; - -
1273.07 cuinerts and !otherp:rteaant structures which supple-
1'
meritt'he roadwaybed cr shoulders') sha17. provide unob-
•�
structed access to "�;onventional drive vehicles, nclud-,,4,
ing sedans and fire apparatus weighing up to 40,000
pounds
s�
[ 1273` . 03 Cr��'�� e . Not to exceed 16 ` ercent unless aved'
j �1 p p
I,
1-273 04 Driveway Radius
r [ p 1. No roadway shall have a horizontal inside radius`"of
than 50 fleet'
s'
curvatt,xre of es and, additional sur-
face width of ' 4 f eet shall 'be added tol curares of 50 -
1.00 ;flet "radius; 2� feet to thas'e from 100-200 "feet.
2. The length of uertical curves in roadways exclusive
of gutters, ditches and drainage structures designed
ao hold cir divert'. water shall be not less than 100
feet
12173'".'b s, Turnarounds . If'requ red, will have a-,minimum turning
l
radius_ of 40 fee from the center of the roaa,,
�s
1273 AS Turnouts. Shall be a minimum of l 10 feet wide and 30
feet long with a minimum'25 f.oc;t taper on !each end.%
[ 1270.10 Width. All driveways sh'al1 provide a minmum`r10 foot
traflf is lane and unobstructed 'vertical» clearance lof 1.5
I feet alone its entire length:.
I =si °.
Page I1 0
Yt
I I
I I i I
I
I
_ r
2 ,
1�
PERMIT , NAl
1273 10'' Driveways exceeding 150 feet in len th but
ut
less than 800 feet in length, shall prov�dE a turnout
near .the midpoint of the driveway. Where aldr`vewayl
exceeds` �
800..feet, turnouts shall be provided 'no mores
than 400feet apart-.
i
27
1 _3 .,:10 Turn � • I
a�r A turnaround shall be at all
j
,prov�.ded
building' sites on driveways ovar 300 feeit in length and
shall bewithin 5Q .feet of the builldin�g.
IV;1273
rf
,11 Gates
fi.
I I
1. Gate entrances shall be at leasttwo feet wider than
r
;the 'roadway it 'sprues':.
77 ,,
2. The gates must be located at least 30 feet from 1, the
roadwa and shal'1 open y p_ to allow a, vehicle to' stop
`
without obstructing traffic on that roadway.
I
Whelre a one-way .road with a single traffic lane
providesi entrance, a 50 foot turning radius shall'be
I
I
Fuel Modification,.
v`
1276:01 Setback for S,trucrure Defensible Space'.
All parcels 1 acre acid larger shall provide a mini-
.,"
mum '10 foot setback for buildings and accNss.ory
buildings £r,im 411property lines :and•/or the center
of the road.
f
f]
2. For parcels less than 1.`acre, local jurisdiction
shall provide for the same practical effect. See
1
ether Requirements below.
1276:02 Disposal` of Vegetation and Fuels: Disposal, including
F
chipping,' burying, burning or removal to a landfill site
alpproved b.y the local jurisdiction, of flammable
'
vlegetation and fuels caused by site; development and
construction, road and drivewayconstruction and fuel
{s
modif,icatioi sfhall ba completed prior to co ---l- t- of
•
read construction ,r' fi_�al inspection of a building
�
perm
_ it
i5
S
1
I,
I
f
Page 2 o3
I
I
I
L,