Loading...
HomeMy WebLinkAbout066-250-011066-250-0 1 99_p MALLOPIy, Bryan &22�, Woodbttry, paradise Contr. OwnerF;ne,i New Single Family NOTES RESIDENTIAL C----- - .-- __ --- — 066-250-011 99-1813 PERMIT NO. _. MALLOREY, Bryan (s2S Woodbt-ry, Paradise Contr: Owner New Single Family aCo c 3 SPECIAL CONDITIONS SRA FLOOD CERTIFICATE REQ. FIRE SPRINKLERS REQ. SPECIAL INSPECTION ITEMS VERIFY USE PERMIT CONDITIONS SUB -STANDARD HOUSING LETTER CHECKED BY 56 r OFFICE COPY Address a GAS Meter B Date ELEC IC 4 Meter By Dr� Iii � _ --_ — .- • - - --- - -- JOB FINALED (Date) t Signature t1 t ti i e -1 A RESIDENTIAL C----- - .-- __ --- — 066-250-011 99-1813 PERMIT NO. _. MALLOREY, Bryan (s2S Woodbt-ry, Paradise Contr: Owner New Single Family aCo c 3 SPECIAL CONDITIONS SRA FLOOD CERTIFICATE REQ. FIRE SPRINKLERS REQ. SPECIAL INSPECTION ITEMS VERIFY USE PERMIT CONDITIONS SUB -STANDARD HOUSING LETTER CHECKED BY 56 r OFFICE COPY Address a GAS Meter B Date ELEC IC 4 Meter By Dr� Iii � _ --_ — .- • - - --- - -- JOB FINALED (Date) t Signature t1 t ✓ = OK 0 = Not OK - = Not Applicable * = Not Ready '• - - MOBILE HOMES Date MOBILE HOME UTILITIES (Plans) OK except #'s 2. 1. Zoning Requirements -Setbacks -Easements 3. 2. Soils; Special MH Support Sketch 4. 3. Sewer; Location -Test -Fall -C/O -Concrete 5. 4. Water; Location -Test -Easement Needed (Sketch) 6. 5. Electricity; Location-Clearances-Grnd-/ /Amp -Concrete 7. 6. Gas; location -Test -Wrap;-/ • /" L'ft. / P Nat. or / /"L"ft./ PLPG 8. 7. Well Clearance & Disconnect 8. Utility Clearance Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date MOBILE HOME INSTALLATION (Plans) OK except #'s 1. Zoning Requirements -Setbacks -Easements 2. Footings; Size -Spacing -Marriage Line 3. Gas; MH Test -Demand -Valve -Connector 4. Electricity; MH Test -Crossovers -Breakers -Clearances 5. Drain; MH Test -Fall -Flex Connector 6. Water; MH Test -Regulator -Connector 7. Water and Sewer Connected -C/O to Grade -HD Approval 8. Gas and Electricity Tagged 9. Tie Downs -Type -Installation Cert. 10. Exits; Insp.-Sketch 11. Cert. of Occupancy 12. Permanent Foundation Only; License Decal Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 MISCELLANEOUS Date DECKS, COVERS, CARPORTS GARAGES (Plans) OK except #'s 1. Zoning Requirements -Setbacks -Easements 2. Footings; Soils -Size -Depth -Spacing -Connectors -Steel 3. Decks; Girders and/or Joists -Decking -Bracing -Stairs -Rails 4. A Wood Awn.; Posts-Beams-Rftrs.-Connectors Shthg.-Frg-Bracing 5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures 6. Carports; Windows -Doors 7. Electric 8. Frmg.; Sills-Anchors-Studs-Rftrs-Trusses 9. Siding; Nailing -Veneer -Stucco -Mesh r 10. Roof; Shthg-Roofing 11. Ext.; Steps -Doors -Landings 12. Braced Wall Panels Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date FINAL (Plans) OK except #'s t 1. Setbacks -Easements 2. Soils; Compaction -Structure Stability r 3. Pool Structure; Steel -Connections -Thickness Dead Men -Lining 4. Elec.; Receptacles and Lighting, Distance-GFI 5. Elec.; Pool Lighting; 15 Volts-GFI 6. Elec.; Enclosures; Conduit Entries -Terminals -Listed 7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater 8. Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg. Boxes- Enclosures- Panelboards-Ins. to Main in Conduit 9. Health Department Approval 10. Plumb.; Cir. Test -Water Supply Test 11. Light Niche Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 V= OK 0 = Not OK - = Not Read able RESIDENTIAL = Not Ready Date Underfloor (Plans) OK except #'s 1 oni -Setbacks-Easements-Flood-Slope Main; Soils-Elec. Grnd.-/ /" Fig. Depth 3. Ftg., Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth 4. Ftg., Porches & Decks; Soils -Steel-/ P Ftg.'Depth 5. Stemwalls, Main; Steel-Blockouts-Wrapped 6. Stemwalls, Garage; Steel-Blockouts-Wrapped 6a. Hold Downs and Special Anchors (Single & Duplex) Date FRAMING (Continued) 6. Harmers -Post CaDS-Anchors-Connectors 7. Slab, Steel -Wrapped 8. Pie!5. Fireplace Ftg.-Steel 5f V.; Fall -Fitting -Test -2 Way C/O -Sewer Test 5 . Pipe; Size Anchors - Yard Gas Piping; Size Test ater Pipe; Test -Anchors -Regulator -Service Test 12. Pectric Underground t_,-6 Plenums & Ducts; Clearance -Material -Support -Ins. ceders -Sills -Anchor Bolts-Joists-Vents-Crippies 15. Access & Ventilation 16. Insulation Date Card Date Card B-1 DaA Card B-1 Date Card B-1 Date MBING (Permit) OK except #'s er Htr.; Vent -Access -Combustion Air Baffle er Pipe; Test & Anchor -Nail Protection D.W.V.; Test Fittings & Anchor -Nail Protection 20. Shower Pan; Test, First Floor -Tub Access 21. Test ub & Shower, Second Floor -Tub Access as Pipe; Sixe & Anchors Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date ELECTRICAL (Permit) OK except #'s L3!FixturF; & Transformer Clearance -Ins. Protection & Switches at Doors & No. of Conductors 2,6/11oniWInstalled Close to Edge of Studs & C.J. ?Z,-lFqyW Ground made up w/Mach Fasteners -Bond Gas & Water 28--2—Appliance Circuits in Kitchen & Conductor Size GFI 29. Subfeed Wire Size / / ga. Cu or AI-A.C. Wire Size / / ga Cu or Al 30. Range Circle/ / ga Cu or Al -Oven Circ. / / ga Cu or At Insulated Neutral p Yes ❑ No 41!Service-Riser Conductors & Ground Main Disconnect 32 qv4. Clearances Panels-Motors-Mech. Equip. 3A&D es Closet Light -Shower Light -Spa Light Smoke Detector Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date MEC.0,41CAL (Permit) OK except #'s Ducts Insulation & Support Vent Fan, Exhaust above insulation 37. Condensate Drain & Overflow, Size & Grade 38. F ace -Vent Access -Comb. Air -Return Air Vent 115 outlet Attic Access & Platform if Furnace in Attic Date Card B-1 Date Card B-1 Date Card B-1 Date Card B-1 Date AMING (Permit) OK except #'s 4 S ro er Materials & Anchors 4 W Studs -Nailing Spacing & Braces -Plates -Sound . B Ing Walls over Girders & Floor Nailing 43'.'Dj,aft Stop in Walls (rat proof) 4 . F' a Stops, Furred Ceilings -Stairs -Chasers -Tubs 45. Headers & Beams -Size & Bearing 4,�' Cyng. Joist-Rftr. Ties- Purlin-Roff Brac.-Truss-Shting.-Rfna. Fir face Ties or Type A Flue -Fireplace Throat Clearance 4 . AttiwAccess: Size & Romex Protection -Draft StoD-Ins. Baffles 5VBdryr'Windows or Exiting Doors -Sill Ht. & Dimensions 51 ge Fire Protection Framing 5 operty Line Firewall & Openings 5f E61 -Doors -One 3' -Check Garage 3rd Story, 2 Exits 5 . Si s; Width -Headroom -Rise -Run -Landing -Fire Protection 5 - PI "d on Roof Overhang -Attic Vents -Rafter Outriggers and B-1 Siding -Nailing Veneer .5Z._Sta far -sh-Drip Screed -Fd. Vents-Underflr. Access ,98 IaZgArea-Gly s Protection -Skylights -Plastic. I ] SD hn %A/�Ilc �ilinn_Rnlfc / •" ///G 4/77 XU 60. BraairTMrior/Extefia^all Panels P//9/C4; ­4�'1 Date Card B Date Card B-1 Date 1,41Z Card -1 Date Card B-1 Date 1L (Plans) OK except #'s Steps - Door & Sidelight Protection -Landings moke Detector 5. Furnace Vents -clearance -Comb, Air -Connector - I arage; Above Floor -Ducts -Mach. Protection . Xedroom Exiting GF Bath Fixtures & Tub Access -Spa W—Ejec. Trim & Subpanel, Breaker Sizes & Labels St rs & Rails . emplace or Stove, Clearance -Hearth Eloz. Outlets at Wood Panel, Int. & Ext. Kit. Fix-. & Appliance; Ground -Air Gap -Cooking Clearance E)ec. Outlets & Receptacles at Kit. Counter age Fire Door, Swing -Landing -Closure A,E. Duct in Garage -Damper Wtr. Htr.; Vents -Clearance -Comb. Air Connector-P.R.V. iriza'rage; Above Floor -Meeh. Protection PI , Elec. & Mech. Equip. Listed for Location El . Receptacles in Garage (F.F.I.)-Romex Protection In ulation-Foam-Looked in Attic 81r—GjArd Rails & Deck Construction -Post Caps Fdn. VBents & Crawl Hole Door Drainage & Wood -Earth ,teegrance Looked under Floor 0 Yes Following Instld./Drive ❑ Yes Q No/Walks 0 Yes 0 No/Planters ❑ Yes J No .95-'SiG 1a Brown -Finish 88- A. . Unit Disconnect, Electrical -Plumbing Ven s Above Roof, Plbg-Appliance-Fireplace-Clearance to Openings er Well, Disconnect, Electrical, Plumbing E�rior Elec. Trim, G.F.I. Receptacle -Underground Veadlallon Throuahout House from Previous Gas -Electric B£ W r & Sewer Connected -C/O to Grade -HD Approval lVgaarmy Compliance Certificate -Other Certificates Address Posted Comments at Final: Date rd B-1 Date Card B-1 Date and B-1 Date Card B-1 Date and B- Date Card B-1 Comments at Final: COUNTY OF BUTTE BUILDING DIVISION, DEPARTMENT OF DEVELOPMENT SERVICES 411 Main Street • Chico, CA • (530) 891-2751 7 County Center Drive • Oroville, CA • (530)'538-7541 CORRECTION NOTICE NO. A routine inspection indicates that the following violations of butte county Ordinances exist at the above address and should be corrected. Please notice this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, please contact^ office immediately. N } COUNTY OF BUTTE BUILDING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 411 Main Street • Chico, CA • (530) 891-2751 7 County Center Drive • Oroville, CA • (530)'538-7541 A CORRECTION NOTICE OWNER A routine inspection indicates that the following violations of butte county Ordinances exist at the above address and should be corrected. Please notice this office when correction of work is completed. If you have any questions pertaining to this matter, or need additional explanation, please contact this office immediately. 12/22/99 00:08 FAX 530 891 8560 LOERKE INSUL. CO LOERKE INSULATION CO., INC. Z01 INSULATION CERTIFICATE 6225 cvod013WLY NumberDESCRIPTION OF INSTALLATION 1. ROOF Material _ __ . _--_ _ Brand Name Thickness (inches) _ — _ Thermal Resistance (R— 'Value)-2. CEILING Batt or Blanket Type—Flbe�rolass�Batts _ . _ Brand Name Johns Manville Thickness (inches) _ _ _ Thermal Resistance (R -Value) Loose Fill Type Fiberglass Brand Name Johns Manville Contractorls min. installed weight/ft sq. o. 6 4'1 Ib. Minimum Thickness 13 inches. Manufacturer's installed weight per square foot to achieve Thermal Resistance (R Value) R. 30. 3. EXTERIOR WALL Material Fiberglass Batts Thickness (inches) 3 i 4. RAISED FLOOR Material _,Fibs lass Batts__ Thickness (inches) t'v 4L 5. SLAB FLOOR / PERIMETER Material— Thickness Perimeter Insulation Depth (Inches___.:.. . S. FOUNDATION WALL Material Thickness (inches___.— Brand Name Johns Manville Thermal Resistance (R -Value) R 13 Brand Name _. Johns Manville Thermal Resistance (R -Value) 1R-19 Brand Name Thermal Resistance (R -Value) Brand Name Thermal Resistance (R -Value).,, DECLARATION I hereby certify that the above insulation was installed in the building at the above location in conformance with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) as indicated on the Certificate of compliance, where applicable. C.L.#499150A!1 11211 49 LOERKE INSULATION CO., INC. t—Te-- ignatu Sate _15i5Ainn ractor(Co. ams r General Contractor (Co. Name) Or Omer Item #8 ignature; Dais —Tlem� Signature, 6a�ev 16sta in u6cont � cor . ams e General Contractor (Co. ams) Or r --- —Installing Suticoniractor (Co. f�fame r General Contractor (Co. Name) Or Owner COUNTY OF BUTTE -DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING DIVISION 7 County Center Drive Oroville, California 95965 •Telephone (530) 538-7541��✓ PER IT NO. +(Rev.12/96) APPLICATION AND PERMIT ASSESSOR PARCEL NUMBER 066-250-011 ZONING RT 1 BUILDING PERMIT OWNER BRYAN MALLOREY TEZS / 3NE1355 SO. FT. OCC. BUILDING VALUATION . OWNERS MAILING ADDRESS 6122 DANA CIRCLE, MAGALIA 95954 440 U 7,920.00 CONTRACTOR'S NAME OWNER TELEPHONE 122 C 1,586.00 1200 0 840.00 CONTRACTORS MAILING ADDRESS CONSTRUCTION LENDER Fireplace A 1,500.00 LENDER'S MAILING ADDRESS Total Valuation $ 99 650.00 ARCHITECT OR ENGINEER LICENSE NO. Filing Fee $ 20.00 Fee $ 639.90 ARCHITECT OR ENGINEERS MAIUNG ADDRESSPermit Dr. Plan Checking Fee $ BUILDINGADDRESS^ 'o - Energy Plan Checking Fee $ $ PERMIT FEE $ LAT NO. SUBDNLS IONS NAME PARCEL MAP PLUMBING PERMIT Fling Fee 20.00 USEOFSTRUCTURE SF JP Duplex ❑ Mobilehome ❑ Other SPECIFY Each Trap 91 7.00 72.00 Solar or heat pump water heater 23.00 Water piping 15.00 15.00 Each gas water heater or vent 15.00 15.00 TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ Installation ❑ Other ❑ Describe Work: NEW SINGLE FAMILY DWELLING 3 BED 2 BATH WITH ATTACHED GARAGE Gas piping system 1 - 5 outlets 15.00 1 5 -on Building sewer 15.00 1 9 -on Mobile Home I S I G I W @20.00 PERMIT FEE S ELECTRICAL PERMIT Fling Fee 20.00 RLES Main Service A OR LESS 23.00 23,00 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full f0 a and effect. �J License Class Lic. No. 4!j;9 d - / 15 P -a OWNER -BUILDER DECLARATION 1 hereby affirm under penalty of perjury that I am exempt from the Contractors License Law for the following reason: ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. ❑ 1 am exempt under Sec. Business and Professions Code for this reason Main Service 200A TO 1000A 46.00 NEW CONST. DWELLING OCCUP. OR ADDNS. ( a ACC. BLDS. SO 3.50FT_ 79-30 NOµq�ID MULTI -OUTLET @7,50 POWER APPARATUS SINGLE oLlRFT CIR. OUTLET OR FIXTURES Ex. Occup.sr� 20 Q 1.00 @ .50 Ex. Occup. DFlxLrTL rsR� OR, 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 PERMIT FEE $ WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of work for which this permitis issued. My workers' cotripensat insur nce carrier and policy number are: Carrier I Policy Number 11 (The above sections nee not be completed if fhe permit is for work of a valuation of one hundred dollars ($100) or less.) ❑ 1 certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of section 3700 of the Labor Code, I shall forthwith comply with those provisions. X SLI Date _ Ig Signature of Applic ❑Owner ❑ Co for ❑Agent An OSHA permit is re4Girad for excavations over 60" deep and demolition or construction of structures over 3 stories in hei t. MECHANICAL PERMIT Fling Fee 20.00 Heating 25.00 25.00 Cooling 25.00 25.00 Hood 6.50 6.50 Ventilation 2 4.50 9.00 PERMIT FEI: $ 85.50 Mobile Home Installation Fee $ Energy Inspection Fee $ 46.00 Occ corsT. TYPE TR3 VN,OT FEE $ HAZ. D. IMP FLoO CDF PARC HD UE This permit is hereby issued under the of the Butte County Code and/or indicated above for which fees have By PERMIT EXPIRES ON applicable provisions Resolutions to do work been paid. De ReceiptNo. S o WHITE-D.D.S.-B.D. CANARY -ASSESSOR PINIffISISPECTOR G DENROD-APPLICANT COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 County Center Drive - Oroville, California 95965 - Telephone (530) 538-7541 PERMIT NC (Rev. 12/196) I APPLICATION AND PERMIT - ASSESSOR PARCEL NUMBER / ! I ZONN BUILDING PERMIT OWNER SO. FT. OCC. BUILDING VALUATION OWNLEAs w a-3 90 s /I� /� /1 , CONiMCTOR9� Try -ES ��� 'I `-+ -60 CONTRACTOR'S MAULING ADDRESS O 10 CONSTRUCTION LENDER LENDER'S MAILING ADDRESS LFi,,EpIc, D Total Valuation $ ARCNrtEcr OR ENGINffET1 LICENSE NO' Flin Fee S 20.00 ARCMTECT OR ENGINEER'S "AILING ADDRESSPermit Fee P���u euaDwGADDREss Plan CheckingFee $ �PS9. „ o Energy Plan Checking Fee SUBDIVISION'S NAME USEOFSTRUCTURE SF.X Duplex ❑ Mobilehome ❑ Other ePecsv TYPE OF WORK New ❑ Addition ❑ Remodel ❑ Utilities ❑ installation ❑ Other ❑ Describe Work: 3� ` S PERMIT FEE $ PLUMBING PERMIT Each Trap Solar or heat pump water heater Water piping Each gas water heater or vent Gas piping system 1 - 5 outlets Building sewer Mobile Home I S I G W Fling Fee 20.00 7.00 23.00 15.00 15.00 15.00 j05, 15.00 PUm- (9?20.00 Fling Fee PERMIT FEE ELECTRICAL PERMIT Main Service ( -0°" OR LESS zooA oR u ss Main Service. ( 200A TO 1000A ) NEW CONST. OR ADONS. DNELUNG OCCUP. A AfY` R1 ne Fling Fee 20.00 7.00 23.00 15.00 15.00 15.00 j05, 15.00 PUm- (9?20.00 Fling Fee 20.00 23.00 5.00 46.00 23.00 3.5, ¢FT L3 @7.50 23.00 Ex. Occup. oURET OR FUTURES w a ''°° SAL .SO AWLNSEx. Occup. oLmEis FS.D.OEA 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wirinq 23.00 PERMIT FEE _ ,-j U MECHANICAL PERMIT Filing Fee 20.00 Heating ZS.6O Z5,UD Cooling 2S OU ZS Grp Hood 6.50 &1.030 PERMIT FEt S 5 • 5 U Mobile Home Installation Fee $ Energy Inspection Fee S r 713 C\N�T. 'E TOTAL FEE $ �Z. D. FEES I IMP FL°O l COfi�p[gQ�L This permit is hereby issued under the applicable provisions of the Butte County Code and%or Resolutions to do work indicated above for which fees have been paid. By PERMIT EXPIRES ON Date "'i , $ ,1, r a t. tiers . tL 'i t# :?i :.t?,}! k "•"s:�-�..'�q;%^,;.��—w+ow, r s _- . rq,�� y �t TrI COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SEkvICES - BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, ;CALIFORNIA 95965 - #LEPHONE (530) 538-7541 'i PERMIT APPLICATION DATA SHEET OWNER: ASSESSOR PARCEL NUMBER: f/ 2 — a " Proposed Building Use: Building Inspector: / /,y Date: g- _" f S At time of permit application, I,was advised the following data must be submitted prior to permit processing and/or issuance: L Date Received By ❑ 1. All items have been submitted -------------------------------------------------------------------------------------- 02. Plot plans, 3/4 sets, signed by the preparer of plans. ------------------------------------------------------------ 63. Complete plans, 3/4 sets, signed by the preparer of plans. ----------------------------------------------------- 04. Engineered plans, 3/4 sets, with wet signature on plans. All engineering must be shown on plans. -------- ❑ 5. Engineered truss jdetails and layout in duplicate (required prior to plan review) No faxes! ------------------ 06. Energy Design Compliance and supporting documentation. ---------------------------------------------------- ❑ 7. Statement of Intent for Non -Heated and A/C Buildings.--------------------------------------------------------- ❑ 8. Hazardous Material Form.------------------------------------------------------------------------------------------ ❑9. nfactured Home data and installation instructions including Tie Down Specifications.------------------ PT0- - of $ Cy -4 .�n - ----------------------------------------- pact fees as shown on the attached schedule. -------------------------------------------`----- r-------- QJCalifornia Department of Forestry plan approval/fees. �- ❑ 13,,,Flood elevation certificate. ---------------------------------------------------------------------------------------- 4. Sanitation and plot plan approval 6A6 Iealth-Department --------------------------------------------� — ❑ 15. City of Chico plumbing permit.----------------------------------------------------------------------------------- ❑ 16. Plot plan and business license approval from the City of Biggs. -------------------- ❑ 17. Planning approval for (A) Use: (B) Parking: ❑ 18."tact Land Development about ❑ Improvements, ❑ Drainage, ❑ Legal Parcel .------- 9. ------------------ O Encroachment Permit for driveway (construction approval prior to occupancy). ��---------------- ❑20. =inspection for required Request to Building Inspector on (Date) actor's license information. (Number, Name Style, Classification). ------------------------------------ bVf2o. Workers' Compensation carrier and policy number.----------------------------------------------------------- ❑23.Owner-Builder Verification (Given to owner ❑, Mailed to owner ❑). ❑ 24etI of signature authorization. ------------------------------------------ V\ 5. Recorded copy of Agricultural Acknowledgment Statement. ----------- 026. Letter of intent on building use. ------------ ❑27. Manufactured Home utility clearance. ------------' ❑28. Existing violations and/or expired permits. ------- 0 29. ------❑29. 0433 A, ❑Grant Deed, ❑ M.H. Title, ❑ Check 030. Other: When you issue the permit, process as follows ❑ Mail to owe A-ElTelephone ��3, f 33 b and hold for pickup Copy of Haz-Mat form sent ❑ Health Department, ❑ Fire Copy of plans sent ❑ Health Department, ❑ Fire Departn C.D $ ----------- 9-7- f.. G er,�❑yMail to contractor. office. ❑ Deliver with inspector. y' Applicant: Date: D 7 oent, ❑Air ollution Date: By: ther: �/ Date: By: 1. Index permit application for the above items numbered: // ❑, Plan Check List 2. Additional items required: Contractor, designer, owner, was advised of the above required data by o phone, ❑ mail, ❑ Building Division counter, by Date: Contractor, designer, owner, was advised of the above required data by ❑ phone, ❑ mail, o Building Division counter, by Date: Contractor, designer, owner, was advised of the above required data by ❑. phone, ❑ mail, ❑ Building Division counter, by Date: Contractor, designer, owner, was advised of the above required data by ❑ phone, ❑ mail, ❑ Building Division counter, by Date - Plans reviewed by: Date: Plans approved by: Date: Sets of plans on hold in ❑ Plan Cabinet, 11A.P. folder. Note transfer by: Date: c•,.....:,..._ n._a�t-- r��__• _ • _ .. _. COUNTY OF BUTTE DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 COUNTY CENTER DRIVE, OROVILLE CA 95965 TELEPHONE (916) 538-7541 SCHEDULE OF FEES DUE OWNER V PROPOSED BUILDING USE t Z11. a, DING PERMIT FEES ® Balance Due ................ $ -- Additional Fees Due ........... $ -- Additional Fees Due ........... $ _k< evised Plan Checking Fee ....... $ (� • 2. SC OL DISTRICT FEES aid at District Office) 3. SHERIFF FEES (paid at Building Division) Residential ........ x $360.00 = $ 0.06 Units Commercial (sq.ft.)... x $0.03 = $ Sq.Ft. 4. URBAN AREA FEES (paid at Building Division) Residential (per unit) . x - _ $ #Units Amt. Commercial (sq.ft.) .. x =$ Sq. Ft. Amt. 5. RECREATION DISTRICT FEES (paid at District Office) 6. THERMALITO DRAINAGE DISTRICT FEES $5 .00 (paid at Building Division) 7. SRA FIRE INSPECTION AND PLAN CHECK a43 /F3 $89.00 (paid at Building Division) 8. WATER TENDER FEES (Battalion # ) $200.00 (paid at Building Division) 9. CSA 87 'TRAFFIC FEE $2500.00 (paid at Building Division) 10. OTHER A. P. #_(7(D(ri a50"01 DATE 8" 5—Q q RECEIPT # DATE REC 4-7 f At time of permit application, I was advised the above fees are required to be paid prior to issuance of the building permit. These fees may be changed during the plan checking process. ''APPLICANT U174"ao' DATE Pursuant to Government Code Section 66020, you are hereby notified that items 2,3,4,5,6,8,9, and 10 above may have been imposed on your project. You have 90 days from the date of approval of the project or from the imposition of the above mentioned items during which you may protest. The requirements for a protest are specified in Government Code Section 66020(a). Original -Building Div. 2nd Copy - Applicant 3rd Copy - Owner (Rev. 2/97) TO: FROM: SUBJECT: Building Department Environmental Health Sanitation Clearance E.H. USE ONLY Plot Wan Attached `ew Floor Wan Attached I Sent to 8.0.E 134 uz, Aa &enc,s WtnJL�6MA U -/?,. C - zso -Cie d IF Owner Location AP# Plan Approved for: Sewage Disposal Water Supply: Public JC— Private Well Clearance for 3b dwelling. Other Hold final for: Final clearance O.K. for: NOTE: -/7- 99 Environmental Health Specialist Date 8/96 -92 ["T ,grpti •r 3030 wenwed Ld DECK1 0 0 IsIxre MASTER 8DRM CLOT G¢u LPANG ITI 1 Y IR4 BAT NOOK r 103 i LAUNDRY (IM -9 3Ir X 14 -AtAM ..... . --- ---- - 2GARAGE 21'8x 194 1117 —CLOSET........... .... ... ....... V HALL ITS . 3'5() -T Map" RY -0 '5'x4'8 KIT DNNG818'8x11'7'3 10, — — — — — — — — — — — -- BEDROOM BEDROOM ITIOx 100 PW Al;� if k — J & Mh. ?w 2r panelm, nXJ 1.4 6F= 3WO C Swed P-0 LLL SM I I (D PB�e PORCH —7 E: 1/4"=1 FOOT LMNG AREA W. FL twq t.Environmen tal HealthButte County Environmental Health AUG - 5 1999 1-7 - 90 Chico, Calitomia. ------ Date --- - Signature a 411 , CD� Z c,7 IIN m I rxID 0 FTI ro I 1 CO O ® Q DR i VEU;AY� W:�J ! � 00:J p 9LI aa. APPROVED Butte County Environmental Health Environmental Health AUG - 51999 ---- /7-99 Date Chico, California Signature rar...-...r.n..+•Y•nr'"r+a.^+er.+«-*we.ti..ay.-rYrt,,flJ7lafT±���r,�5t•`v.:Tw'�`r•?�'�v�'r'er;•�'l:k�'nf"r`�'bYl'�y'r.j�ssew•r�..�.;rn.-,f,,�ti��iS~r'7. «'y.tx�'i�ft;i�i� School District A.P. Number Property Owner Property Location/Address Subdivision BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One form per Building) Building Department No, County ^r Residential Development Sof Living Mobile Home Units Installation Commercial/Industrial O New Addition Building Department Representative Lot No ................................................ 0 U ........................: Sq. Footage Yf Addition/ 'Supplemental to (Group R) Conversion Permit # '(No foundation inspection); (Floor Plans reviewed by School District Identification No. e� /3/ School District certifies that 0" 2- e6— - (Street Address) (City) has complied with the requirements of Resolution No. representing /lQ square feet. r chool District Representative (State) Sq. Footage (Including Exterior Roofed Areas) r Date (Applicant) eQ73 (Phone Number) (Zip Code) by payment of $ - 3/ 39 4 AB 2926 S FULL MITIGATION E 3 Da e Jq%Paid by Check It � Remarks:// l� (�� t_!/� i r Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with Government Code Section 66020(x), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit you from challenging the imposition of the fees in any court action. If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency,that this project is being reviewed under.the California Environmental Quality Act (CEQA). this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White (applicant), Yellow. (building department), Pink (school district) feeform.xls (10/98)dmm BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One form per Building) School District A.P. Number Jurisdiction: City Property Owner Property Location/Address Subdivision BuildinglDepartment No. 1 7<,ICounty Lot No. ...........................................................................:...................................... Residential Development Sq. Footage No of Living Mobile Home Addition/ *Supplemental to (Group R) Units Installation Conversion Permit # '(No foundation inspection): Commercial/Industrial New Addition Building District Identification No. (Street Address) ntative trtoor rians reviewea oy ncnooi uistnct versonneo School District certifies that (City) has complied with the requirements of Resolution No. representing School District Representative square feet. Paid by Check It Remarks: ) Sq. Footage (Including Exterior Roofed Areas) !?-3-'?Z!?-3-'?ZdA Date (Applicant) (Phone Number) (State) (Zip Code) by payment of $ AB 2926 $ FULL MITIGATION $ Date Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit you from challenging the imposition of the fees in any court action. If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency,that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White (applicant), Yellow (building department), Pink (school district) I feeform.xts (10/98)dmm k 4k .e;yt `� • � .%rwr ,6 ; �7^A�•yr•, r7�v+'„*�'}+.•rrvr•.�+-.ir.s�s+'.,�,t..�.`4d►�: T: �f+:we�-. BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One form per Building) { �S School District A.P. Number Jurisdiction: City Property Owner Property Location/Address Subdivision Residential Development U No of Living Mobile Home Units Installation woo Building Department No. _a. County Lot No. ...........................................................................:....................................... Sq. Footage / Addition/ 'Supplemental to (Group R) Conversion Permit # '(Nb foundation inspection)' Commercial/Industrial Sq. Footage New Addition (Including Exterior Roofed Areas) Building Departmen epresentative Date moor runs revieweo oy acnooi Lnstnct rersonneil District Identification No. School District certifies that (Street Address) (City) has complied with the requirements of Resolution No. representing School District Representative Paid by Check # square feet. Remarks: (Applicant) (Phone Number) (State) (Zip Code) by payment of $ AB 2926 S FULL MITIGATION $ Date Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit you from challenging the imposition of the fees in any court action. If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under tthe California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White (applicant), Yellow (building department), Pink (school district) ieeform.xis Ito/seldmm E ) 11 v • fi BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One form per Building) School District(,/ S Building Department No. A.P. Number i - Jurisdiction: City I X (County Property Owner Property Location/Address Subdivision i w00 c� Lot No. Residential Development l l ...........................................................................:....................................... S Foota e q• 9 No of Living Mobile Home Addition/ 'Supplemental to (Group R) Units Installation Conversion Permit # ' '(No foundation inspection); Commercial/Industrial O O ' New Addition Building (Moor mans reviewed oy Jchooi Uistnct District Identification No. 4 School District certifies that (Street Address) A I (City) (State) has complied with the requirements of Resolution No. representing School District Representative Paid by Check # square feet. Remarks: Sq. Footage (Including Exterior Roofed Areas) Date (Applicant) (Phone Number) (Zip Code) by payment of $ AB 2926 $ FULL MITIGATION $ Date Notice: You may protest the imposition of the fees identified above by submitting a written protest to the District, in compliance with Government Code Section 66020(x), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit you from challenging the imposition of the fees in any court action. If, subsequent to the.School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency,that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White (applicant), Yellow (building department), Pink (school district) r feeform.As (10/98)dmm AND WHEN RMCORDED MAIL TO. BITI m cotmw. BUILDING DIVISION 7 COUNTY CENTER DRIVE OROVMLL CA99965 COPY of Document Recorded 07 -Sep -1999 1999-0038309 Has not been compared with original BUTTE COUNTY RECORDER AGRICMTORAL STATEMENT OF ACMOWLZDGMMT FOR RESIDENTIAL DEVELOPMf= Section 26-8 of the Butte County Cade regnirehd this acknowledgment to be recorded prior to issuance of a btuildmg permit: The property dumbed herein is adjacent to land or included within an area zoned for apicult<ral purposes, and residents of this property may be subject to inconvematc= or discomfort from the use of agricultural chemicals, mchhdi& but not Ihnited to herbicides, pesticides, and fertilizers; and from the pursuit of agricultural operations hchang, but non limited to Mddvation, plows* sPmy n& Pruning and hvvmtivg whiff occasiatnaily geoerata duet, smoke, Iro* and odor. Butte Courcy has established aricuit ual purposes and residents within said zones and an adjacent property should be prepared to accept such inooavehiehce or discomfort from normal, necessary farm operations. All that real property situate in the County of Butte, State of California, described as follows: LOT 304, AS SHOWN ON THAT CBRTAIN MAP WTITLED e COUMRY CLUB ESTATES UNIT NO. 4 ' PARADISE P� . WHICH l4AP ii�8 I>!i TtitB OFFICE OF THE RECORDER OF THE COUNTY OF BUTTB, STATE OF C ALIPOP ON OCTOBER 27, 1971, IN BOOK 38 OF MAPS, AT PA=(S) 69, 70v 71, 72 AbM 73. Date (�J — �. PROPERTY OWNERS: state of Cafffomk County of Butte On September 3, 199%dereme, S.A. Shepherd,Notary Public** _.penunak appewmd ryan W. "Mallory** oa>namaRv lmuwn to=( or pored to men the barb e(satbfaetohy evidetloe) to be the peson(e) whose n=W(s) hire sabWQwd to lbs w NWn h asomeat and adtnowldged to we that befebdibey esecoW the same in bh&erltbsir audwrblad capadty(loo. and that by bis/hertthdr signs Wo) = the instremetht, the penes) or the entity upon bend[ of wbkb the persons) acted, eaeented the instrameuht. WTrNLSS my S.A. SHEPHERD $lpata>K o. Comm. #1209591 NOTARY PUBLIC CALIFORNIA BUTTE COUNTY Comm. EVIr" An. 3t. 2003 A.P. # LAND DEVELOPMENT OROVILLE / BUILDING /" -PERMIT CLEARANCE OWNERS NAME (- PRI LAST NAME FIRST ADDRESS/LOCA Building Parmk No. NUMBER O`0(0 COUNTY ZONING DESIGNATION:! FLOOD MAP: FLOOD ZONE: APPROVED: CONDITIONALLY APPROVED: V RESOLVE PROBLEMS PRIOR TO APPROVAL - DEED INFORMATION: PARCEL CREATION BY DEEDS OR MAP Ll y.,: DATE OF -CREATION: DEED REFERENCE: - LEGAL ACCESS PROVIDED: YES NO "`LEGAL ACCESS REQUJREO' YES`., 01 . COMPLIES WITH COUNTY STANDARDS FOR DEED CREATION: YES NO COMMENTS/CONDITIONS: MAP INFORMATION: j; �CIVN%%2j� Oz Viaon DATE OF RECORDING: Z% 2 % LOT BOOK % S PAGE �7 COMPLIANCE WITH OLD SU (VISION LOT ORDINANCE REQUIRED? (MAP RECORDED PRIOR TO BOOK17 OF MAPS AT PAGE 23): YES NO. IF YES, MARK APPROPRIATE ITEMS) BELOW: A. Construct road to B. Meet parcel size required by zone. C. Meet current E.H.D. requirements. CHECK SPECIAL CONDITIONS WHICH APPLY TO MAP: at ►► FEES TO BE PAID TO THE BUILDING MWON UNLESS OTHERWISE NO'k, - TED. Maintain a 50 ft. building setback from centerline of road. —2. Maintain a ft. building setback from right-of-way/centerline —3. Comply with Zoning code for building setback from road. —4. Maintain a 100 ft. leachfield setback from all ebsting wells. 5. Maintain a R leachfield setback from —6. Pay water tender fees in the amount of $ to Battalion Number of the Butte County Fire Department. ."X7. Meet the Fire Safe Regulations of Butte County and P.R.C. 4290. —8. Conned to a public water supply. —9. Conned to a public sewer system. —10. Automatic fire suppression sprinkler systems shall be installed in all residential structures in accordance with the National Fire Protection Association Standard for the installation of sprinkler systems in one and two family dwellings and mobile homes, NFPA Standard 13D, unless a pressurized community water system, with hydrants that meet Fire Department specifications, serves the parcel. _ 11. Pay T.D.D. (Thermalito Drainage Distrid) fee in the amount of S —12. Meet the requirements of the Department of Fish and Game for the preservation of oak trees. (See phone number below) —13. Obtain approval from the Department of Fish and Game for vegetation removal. Contact Fish & Game at 916-355-7010. _ 14. A traffic mitigation fee for each new or additional living unit shall be paid. Pay the amount of $ _ as stated in the Oroville Area Traffic Mitigation Fee Agreement. Payment to be marls to Me Planning Division. —15. All new residential buildings WW be oonslruded to comply with the requirements of the Uniform Building Code for seismic safety. Mobile homes shall be constructed on a permanent foundation system which complies with the Seismic Zone 3 requirements of the Uniform Building Code. —16. Deer Mitigation fees are to be paid, if such fees have been adopted by the Butte County Board of Supervisors. X 17. Pay school impact mitigation fees. X 18. A development impact fee for sheriff fadlities Shan be paid pursuant to the provisions of Chapter 3, Article it of the Butte County Code. _ 19. Wood Stoves and fkepiaoe kaelts,#W-be EEA approved and designed to meet;the emission requirements of. the; CaHbmia Clean Air M'of 1988 as amended. —20. If any cultural resources are en66urtened-d&#4 ground distrirbing adlvities, alfwork shah Cease in the area of the W -pending examinatkm of the site by a professional archaeologist This person would then be able to assess the site significance. and suggest appropriate mitigation measur - 21. 22. 23. 24. 25. 26. ,�i(j il`l 3116 , 6w90�n� LD 6/98 FORMS\BLDG PERMIT CLEARANCE RESIDEivTIAL PLAN CHECKING GUIDE i SINGLE FAMILY, DUPLEX AND MISCELLANEOUS, ONLY,,. OWNER: BUIL& GP ~ER PLAN CHECKER: A.P.NUMBER: GENERAL: Zoning requirements: (side yards and number of permitted living units). Valuation. Plans signed by designer. , _ Proper description of work on application. , Existing violations on property. Items on data sheet, (Impact Fees, Environmental Health, Developer Fees, etc.). Recorded notice of violation. Complete parcel size and dimensions. Setbacks, side yards, easements, etc. Other buildings or structures. +'- • `.. ��. Grading, fills and/or drainage. Flood hazard. :r<. Special conditions on creation map (Noise, SA.A., Fire Sprinklers, Water Tender; Trees, etc.). ' F.A.U. & F.A.S. road setback. Building or utilities across lot lines (Record form). Complete to scale plan with dimensions. a 7� Required windows for light and ventilation (Section 1203). \��G Required windows for second exit (Section 310.4). Skylights (Section 2409 & 2603.7). Glazing in Hazardous Locations (Section 2406). Required room sizes, ceiling heights (Section 310.6). G.F.C.I. in baths, garage, kitchen, wet bar and exterior outlets (N.E.C. 210). Lights, switches, receptacles, and exterior receptacles for maintenance of mechanical equipment. Location of water heaters, heating and cooling equipment, other electrical or gas equipment. Garage firewall, door size and closer (Section 302.4). Minimum of one 3'0" exterior door (Section 1004.6). Fireplace and wood stove location, alcoves and clearance. Smoke detectors (Section 310.9.1). Plumbing fixtures, water closet clearances and shower size. Conventional Construction - Unusually Shaped Buildings (Section 2326.5.4). Standard bracing or engineered design (Section 2326.11.3). Clerestory requiring balloon framing and/or engineering. Three story building requiring engineered calculations and plans. Foundation plan complete enough to construct building. Floor construction details complete enough to construct building. Elevations and wall construction details complete enough to construct building. Roof construction details complete enough to construct building. Rafter ties or bearing ridge beam. Fireplace construction details and Calc. if necessary. Garage door and/or porch header sizes. Stud heights. Adobe soils - special foundation design. Retaining walls requiring design. Special Inspection requirements. Header size. June 1997 3,2 LANEOUS ITEMS TO LOQ OUT.FOR: Stairway details: landings, ria., and run, head clearance, handrails (Section 100o,. Guardrail details (Section 509). - Brick or stone veneer (Section 1403). Exterior plaster - weep screeds (Section 2506). Proper roof pitch for roof covering (Section 1501). • Roof covering type - (fire hazard). Foam insulation - protection. 36" halls and stairways - - - Living area over garage - complete 1 -hour separation required on garage side including supporting walls and posts. Two exits on three - story dwellings (Section 1003). Underfloor access and ventilation (Section 2317.7). Attic access and ventilation (Section 1505). Combustion air for fuel burning appliances - L.P.G. requirements. Noise requirements on duplexes. Energy design. Flashing at all exterior openings. C.D.F. responsible area requirements. . Automatic Fire Sprinkler Systems (Section 310.10) For Inspection Jacket: .'_ Flood Hazard/Elevation Certificate _ , SRA Requirements Special Inspection Requirements Automatic Fire Sprinklers June 1997 3.2 t" r TABLE OF CONTENTS TOC Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 Project Address WOODBURY DR AP4&66 2 ******* ........ MAGALIA *v5.00* Documentation Author... ROBERT MANGRUM ******* Bujlding e i Paradise Mechanical �o 5655 Almond Street Plan Check / Date Paradise, CA 95969 530-877-8882 Field Check/ Date Climate Zone.. .. ..... it Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc. MICROPASS v5.00 File-MALLORYI Wth-CTZllS92 Program -TOC User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 TABLE OF CONTENTS Report Page FORM CF -1R ................ 1 FORM MF -1R................. 4 FORM C -2R ......... ....... 7 HVAC SIZING ............... 10 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 Project Address WOODBURY DR AP 6 ***** ••••••-• # 6-25-11 ** MAGALIA *v5.00* Documentation Author._.. ROBERT MANGRUM ******* Building Permit # Paradise Mechanical 5655 Almond Street Plan Check / Date Paradise, CA 95969 530-877-8882 Field Check/ Date Climate Zone. .. .... 11 Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM CF -1R' User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 GENERAL INFORMATION Conditioned Floor Area....: 1626 sf Building Type.............. Single Family Detached Construction Type ......... New Building Front Orientation. Front Facing 147 deg (SE) Number of Dwelling Units... '1 Number of Stories.. ...... 1 Floor Construction Type.... Raised Floor Glazing Percentage......... 11 0 of floor area Average Glazing U -value.... 0.51 Btu/hr-sf-F Average Glazing SHGC....... 0.61 BUILDING SHELL INSULATION Component Frame Cavity Sheathing Total Assembly Type Type R -value R -value R -value U -value Location/Comments Wall Wood R-13 R-0 R-13 0.088 FRONT WALL, LEFT WALL BACK WALL, RIGHT WALL Door None R-0 R-0 R-0 01.330 GARAGE WALL FRONT DOOR Roof Wood R-11 R-19 R-30 0.031 GARAGE DOOR, ATTIC Floor Wood R-19 R-0 R-19 0.037 FLOOR FENESTRATION Over- Orientation Area (sf) U- Value Interior SHGC Shading Exterior Shading hang/ Fins Window Front (SE) 9.0 ' 0.510 0.610 Standard Standard Yes Window Front (SE) 25.0 0.510 0.610 Standard Standard Yes Window Front (SE) 20.0 0.510 0.610 Standard Standard Yes Window Front (SE) 20.0 0.510' 0.610 Standard Standard Yes Window Back (NW) 24.0 0.510 0.610 Standard Standard Yes Window Back (NW) 9.0 0.510 0.610 Standard Standard Yes Window Back (NW) 24.0 0.510 0.610 Standard Standard Yes Window Back (NW). 33.0 0.510 0.610 Standard Standard Yes Window Right (NE) 15.0 0.510 0.610 Standard Standard None CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title ....... ... WOODBURY PROJECT Date__0R/n2/q9 )�•na•rA MICROPAS5.v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM CF -1R User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 Equipment Type Furnace ACPackage Tank Type Storage HVAC SYSTEMS Minimum Duct Duct Tested Duct RCCA Thermostat Efficiency Location R -value Leakage Manual D Type 0.800 AFUE Crawlspace R-4.2 No No Setback 10.00 SEER Crawlspace R-4.2 No No Setback WATER HEATING SYSTEMS Number Tank in Energy Size Heater Type Distribution Type System. Factor (gal) Gas Standard' 1 0.62 40 SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented.on the plans, *** installed to manufacturer and CEC specifications, and *** verified during plan check and field inspection. This building incorporates a Housewrap/Air Infiltration Retarder. This building incorporates non-standard Duct Location. REMARKS External Insulation R -.value R- n/a *** *** CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1k Project Title.......... WOODBURY PROJECT Date__nR/n2/Aca ��•na•�a MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM CF -1R User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 ,COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regrulations to implement them. This certificate has been signed by the, individual' with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features Modeling Assumptions section. DESIGNER or OWNER Name.... BRYAN MALLORY Company. BRYAN MALLORY CONST. Address. 6122 DANA CIRCLE MAGALIA, CA Phone.... (530) 521-3623 License. 7 It Z. Signed.. (date) ENFORCEMENT AGENCY Name.... Title... Agency..- Phone... Signed.. (date) DOCUMENTATION.AUTHOR Name.... ROBERT MANGRUM Company. Paradise Mechanical Address. 5655 Almond Street Paradise, CA 95969 Phone... 530-8 7-8882 Signed.,. dat MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 4 MF -1R Project. Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 Project Address........ WOODBURY DR AF#66-25-11 ******* MAGALIA . *v5.00* Documentation Author... ROBERT MANGRUM ******* Building Permit # Paradise Mechanical 5655 Almond Street Plan Check / Date Paradise, CA 95969 530-877-8882 Field Check/ Date Climate Zone.. li Compliance Method...... MICROPAS5 v5..00 for 1999 Standards by Enercomn. Inc_ MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM MF -1R* User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 Note: Lowrise residential buildings subject to the Standards must contain these measures regardless -of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES *150(a): Minimum R-19 ceiling insulation. 150(b): Loose fill insulation manufacturers labeled R -Value. *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does not apply * to exterior, mass walls) . Design Enforce- er/ ment ✓ 0 150(d): Minimum R-13 raised floor insulation in framed floors. 150(i): Slab edge insulation - water absorption rate no greater than 0.3W, water vapor transmission rate no greater than 2.0 perm/inch. 118: Insulation specified or installed meets CEC quality standards. Indicate type and form. 116-17: Fenestration Products, Exterior Doors and Infiltration/ exfiltration controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration -products (except field fabricated) have label with certified U -value, certified solar heat gain coefficient, and infiltration certification. 3. .Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. 150(8): Vapor barriers mandatory in Climate Zones 14 and 16 only. 150(f): Special infiltration barrier installed to comply with Sec. 151 meets Commission quality standards. 150(e):'Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning.gas pilots allowed. MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page.5 MF -1R Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM MF -1R User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES Design- Enforce- er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. 150(i): Setback thermostat on all applicable heating and/or cooling systems. 150(j): Pipe and Tank insulation 1. Storage gas water heaters rated with an Energy Factor of less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12. or greater. 2. First 5 feet of.pipes closest to water heater tank, non - recirculating systems, insulated (R-4 or greater). 3. Back-up tanks -for solar systems, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined internal/external insulation. 4. All buried or exposed piping -insulated in recirculating sections of hot water system. 5. Cooling system piping below 55 degrees insulated. 6. Piping insulated between heating source and indirect hot water tank. *150(m): Ducts and Fans 1. All ducts and plenums constructed, installed, in- sulated, fastened, and sealed to comply with the ICBO 1997 UMC sections 601 and 603; ducts insulated to a minimum installed R-4.2 or ducts enclosed entirely within conditioned space. Openings shall be sealed .with mastic, tape, aerosol sealant or other duct closure system that meets the applicable requirements of UL181, UL181A, or UL181B and other applicable specified tests for longevity given in Sec. 150(m). 2: Exhaust fan systems have backdraft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 114: Pool and Spa Heating Systems and Equipment 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. I 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non_electrical cooking appliances with pilot < 150 Btu/hr). f 0 LI/ 'MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 6 MF -1R project Title.......... WOODBURY PROJRrT n>ro nQ/nom/nn �. MICROPASS v5.00 File-MALLORYI Wth-CTZi1S92 Program -FORM MF -1R User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 LIGHTING MEASURES 150(k)1: Luminaires for general lighting in.kitchens.shall have lamps with an efficacy of 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by.a switch on a readily accessible lighting control panel at an entrance.to the kitchen. 150(k)2: Rooms with. a shower or bathtub must either have at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or.one of the -alternatives to this requirement allowed in Sec. 150(k)2.;- and recessed ceiling fixtures are. IC.(insulation cover) approved. Design- Enforce- er ment f COMPUTER METHOD SUMMARY Page 7 C -2R Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 Project Address WOODBURY DR AP#66 2 ******* ........ - 5-11 MAGALIA *v5.00* Documentation Author....ROBERT MANGRUM ******* Building Permit # Paradise Mechanical 5655 Almond Street Plan Check / Date Paradise, CA 95969 530-877-8882 Field Check/ Date Climate Zone. ..... 11 Compliance Method...... MICROPAS5 v5.00 for 1999. Standards by Enercomu. Inc. MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM C -2R." User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 Zone Type HOUSE Residence MICROPAS5'ENERGY USE SUMMARY Energy Use Standard (kBtu/sf-yr) Design Space Heating..... ... • 14.82 Space Cooling.......... 16.33 Water Heating.......... 14.92 Proposed Design 13.70 10.87 12.51 Total 46.07 37.08 Compliance Margin 1.12 5.46 2.41 *** Building complies with Computer Performance *** GENERAL INFORMATION -Conditioned'Floor Area.,... Building Type .............. Construction Type ... Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type... ..... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area ....... -.'. Glazing Percentage. ....... Average Glazing U -value.... Average Glazing SHGC. .... Average Ceiling Height..... 1626 sf Single Family Detached New Front Facing 147 deg (SE) 1 _ 1 ReducedYear Raised Floor 1 13624 cf 0 sf 11 % of floor area 0.51 Btu/hr-sf-F' 0.61 8.4 ft BUILDING ZONE INFORMATION Floor # of Vent Vent Air Area Volume Dwell Cond- Thermostat Height Area Leakage (sf) (cf) Units itioned Type (ft) (sf) Credit 1626 13624 1.00 Yes . Setback 2.0 Standard Housewrap COMPUTER METHOD SUMMARY Page 8 C -2R Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -FORM C -2R User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-val Azm Tilt Gains Reference Comments HOUSE 1 Wall 354 0.088 13 147 90 Yes W.13.2X4.16 FRONT WALL 2 Wall 256 0.088.13 237 90 Yes W.13.2X4.16 LEFT WALL 3 Wall 358 0.088 1.3 327 90 Yes W.13.2X4.16 BACK WALL 4 Wall 81 0.088 13 57 90 Yes W.13.2X4.16 RIGHT WALL 5 Wall 142 0.088 13 57 90 No W.13.2X4.16 GARAGE WALL 6 Door: 20 0.330 0 147 90 Yes None FRONT DOOR 7 Door 18 .0.330 0 57 90 No None GARAGE DOOR 8 Roof 1284 .0.031 30 n/a 0 Yes R.30.2X4.24 ATTIC 9 Roof 256 0.031 30 147 14 Yes R.30.2X4.24 ATTIC 10 Floor 1626 0.037 19 n/a 0 No FC.19.2X8.16 FLOOR FENESTRATION SURFACES Area U- Act Exterior Shade Interior Shade Orientation (sf) Value SHGC Azm Tilt Type/SHGC Type/SHGC HOUSE 1 Window Front (SE) 9.0 0.5100:610 147 90 Standard/0.76 Standard/0.68 2 Window Front (SE) 25.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68 3 Window Front (SE) 20.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68 4 Window Front (SE) 20.0 0.510 0.610 147 90 Standard/0.76 Standard/0.68 5 Window Back (NW) 24.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68 6 Window Back (NW) 9.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68 7 Window Back (NW) 24.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68 8 Window Back (NW) 33.0 0.510 0.610 327 90 Standard/0.76 Standard/0.68 9 Window Right (NE) 15.0 0.510 0.610 57 90 Standard/0.76 Standard/0.68 Area Surface. .(sf) HOUSE OVERHANGS AND SIDE FINS 1 Window 9.0 2 Window 25.0 3 Window 20.0 4 Window 20.0 5 Window 24.0 6 Window 9.0 7 Window 24.0 8 Window 33.0 OVERHANGS AND SIDE FINS Window- -Overhang Left Fin Right Fin - Wdth Hgth Dpth Hght Left Ext Rght Ext Ext Dpth Hght Ext Dpth Hght 3.0 5.0._ ""4.0 3.0 5.0 2.0 8.0 0.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 5.0 5.0 4.0 2.0 2.0 0.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a. n/a n/a n/a n/a 6.0 3.0 4.0 3.0 2.0 2.0 0.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 6.0 4.0 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 5.0 6.6 2.0 0.0 n/a n/a n/a n/a n/a n/a n/a n/a COMPUTER METHOD SUMMARY Page 9 C -2R Project Title........:. WOODBURY PROJECT Harp na/n,)ioa 77.nn.cA MICROPAS5 v5.00 -File-MALLORYI Wth-CTZ11S92 Program -FORM C -2R User##-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 HVAC SYSTEMS Minimum Duct System Type Efficiency Location HOUSE Furnace. 0.800 AFUE Crawlspace ACPackage 10.00 SEER Crawlspace Tank Type 1 Storage 13 'Duct, Tested Duct ACCA Duct R -value Leakage Manual D Eff R-4.2. No No 0.743 R-4.2 No No 0.674 WATER'HEATING SYSTEMS Number Tank External in Energy Size Insulation Heater Type Distribution Type System Factor (gal) R -value. Gas Standard 1 0.62 40 R- n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *.** This building incorporates.a Housewrap/Air Infiltration Retarder. This building incorporates non-standard Duct Location. REMARKS is HVAC SIZING Page 10 HVAC 'Project Title.......... WOODBURY PROJECT Date..08/02/99 22:04:54 Project.Address........ WOODBURY DR AP#66-25-11 ******* MAGALIA *v5.00* Documentation Author... ROBERT MANGRUM ******* Building Permit—W Paradise rJechanical 5655 Almond Street Plan Check / Date Paradise, CA 95969 530-877-8882 Field Check/ Date Climate Zone. .. ..... 11 - Compliance Method...... MICROPAS5 v5.00 for 1999 Standards by Enercomp, Inc. MICROPAS5 v5.00 File-MALLORYI Wth-CTZ11S92 Program -HVAC SIZING User#-MP1342 User -Paradise Mechanical Run -MALLORY TITLE 24 GENERAL INFORMATION Floor Area ................. 1626.sf Volume..*'*'* olume....... ............ 13624 cf Front Orientation.......... Front Facing 147 deg (SE) Sizing Location............ PARADISE Latitude............ ..... 39.8 degrees Winter Outside Design...... 30 F Winter Inside Design....... 70 F Summer Outside Design...... 99 F Summer Inside Design....... 78 F Summer Range. .. .... 34 F Interior Shading Used...... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0:20 HEATING AND COOLING LOAD SUMMARY Latent Load ...................... n/a 3110 Minimum Total Load 22457 18658 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc.,,must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting. the HVAC equipment. Heating Cooling Description (Btuh) .(Btuh) Opaque.Conduction and Solar...... 9015 4049 Glazing Conduction......... ..... 3652 1917 Glazing Solar. .................... Infiltration n/a 4404 ..................... Internal Gain .7749 2338 .................... n/a 2100 Ducts ............................ 2042 740 Sensible Load .................... . 22457 15548 Latent Load ...................... n/a 3110 Minimum Total Load 22457 18658 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc.,,must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting. the HVAC equipment. BUILDING PERMIT SITE PLAN CHECKLIST APN: Building Permit No.: 8 �' Proposed Use: SFD O MHO Res. Accessory O ,. Ag. Bldg. O Commercial O Lidustrial O Other: Zone District: (R General Plan: L 2 The Proposed Use Is: ' Permitted: Not Permitted: Requires a Use Per mit: Requires a Minor Use Permit: Requires an Administrative Permit: Accessory Bldg. Use: l_9 1 _._. Parcel Created By Map? No: Yes. Book/Page Map Conditions? No: Yes: , See reverse side Use Permit: Variance: Dev. Agreement: Applicable Setback Zoning Code Streets & Hwy. Fire-revention Subdivision Map Front 2C) P/C.. Side Side, street -------- Rear Height ---- Parcel in Land Conservation Agreement? No: —�< Yes: , Check Use Parcel in North Chico Specific Plan? No7G Yes: , Check NCSP Zoning Parcel in Floodplain? No: --C Yes: , Zone: Panel No.: D $ 031CO C-., Parcel in Enterprise Zone? Nb:-->--'— Yes: , Check Use Commercial/Industrial Uses Parking Requirements: OK as shown Other. Landscaping Requirements: OK as shown Other Comments: 1JEyy "V , T SSTr AC-r� Reviewed By: kLi Date: 2�--) )—,=J) GEECK SPECIAL CONDMONSIM • MSI / gg pAlp /TgE gU1Lp1jVG► // ►� UNLESS / . i ?A/ / —1. Submit a plan of the existing on-site mature trees, located in the proposed for building and driveway area prior to grading or vegetation removal. Minimize the removal of mature trees, where possible. A mature tree shall be defined as a tree with a trunk measuring 4 inches in diameter, 4 feet from ground level. Mature trees removed shall be replaced by planting replacement trees of equal number and not less than _ gallon size. t _2. Prior to the commencement of grading and/or construction activity, all individual or groups of oak trees which are to be retained as part of the project, shall be fully protected through the use of root protection zones (RPZ). During construction, RPZs shall be established using protective fencing enclosing an area with a radius 1.5 times the distance from the trunk to the dripline. Within this protective buffer, no grading, trenching, fill, or vegetation alteration of any kind shall be allowed. "Mm RPZs shall be maintained after the completion of constriction in order to continue to protect the oak trees, but the &=ing shall be removed. _3. Fencing for areas other than residential areas shall be limited to a maximum of 5 wire strands. The lower strand shall be at _ least 16" above the ground and the upper strand shall be no higher than 48" above the ground. – _4. Pay the required CSA 87 Traffic and Drainage Mitigation fee of $2,500. _5. Prior to any clearing, grading and/or construction in a Federal or State identified 100 year floodplain and/or streambed the following entitilements trust be obtained: a California Fish and Game 1604 Streambed Alteration permit and an Army Corps 404 permit or exemption certificate. _6. Pay the current West Chico Fire Station Fee of $75. —7. Pay water tender fees in the amount of $200 to Battalion Number of the Butte County Fire Department. —8. Automatic fire suppression sprinkler systems shall be installed in all residential structures in accordance with the National Fire Protection Association Standard for the installation of sprinkler systems in one and two family dwellings and mobile homes, NFPA Standard 13D, unless a pressurized community water system, with hydrants that meet Fire Department specifications, serves the parcel. —9. Obtain approval from the Department of Fish and Game for vegetation removal. Contact Fish tit: Game at 916-355-7010. —10. A traffic mitigation fee for each new or additional living unit shall be paid. Pay the amount of $750 as stated in the Oroville Area Traffic Mitigation Fee Agreement. Payment to be made to dw Planning Division. 11. Provide information showing that proposed construction will mitigate exterior sound levels to a 45 dB interior level. —12. —13. 14 K:\BIDGCH4.FR.\4 N I 0 1I ' I I I i; I I , I t• I I t I.� , II I ,y,yff I 1 I I CDF FIRS SAFE REQUIRDMENTS �., At ir AP#I PEFRMIT# Y�tME Under authority of PRC14290,y"the following checked items are required ,! b I Y the ButtelCounty Fire Department and are made a pa rt;of this permit. t !; t'hes'e requirements are minimums and will be superseded by Mitte'County local regulations which equal or exceed 'these standards. Field`'`' ;inspections will be made by the Ejutte County Building Ioartment for i! compliance. ] 1272.00 ,Maintenance of ,Defensible, S ace. To ensure continued'.,,', p maintenance of proper,ti,esin conformance with these fief,• standards and measures and' to assure continued avail ability,; access and utilization of the defensible space provided for'' j;j'JILthese standards, annua'1 maintenance must' be, ;;providefor by the land owner. 3� I. DrivewavStandards Q2 Su.face: A'11 dr-iveway-surface's-=and structures =(bridges.; - - 1273.07 cuinerts and !otherp:rteaant structures which supple- 1' meritt'he roadwaybed cr shoulders') sha17. provide unob- •� structed access to "�;onventional drive vehicles, nclud-,,4, ing sedans and fire apparatus weighing up to 40,000 pounds s� [ 1273` . 03 Cr��'�� e . Not to exceed 16 ` ercent unless aved' j �1 p p I, 1-273 04 Driveway Radius r [ p 1. No roadway shall have a horizontal inside radius`"of than 50 fleet' s' curvatt,xre of es and, additional sur- face width of ' 4 f eet shall 'be added tol curares of 50 - 1.00 ;flet "radius; 2� feet to thas'e from 100-200 "feet. 2. The length of uertical curves in roadways exclusive of gutters, ditches and drainage structures designed ao hold cir divert'. water shall be not less than 100 feet 12173'".'b s, Turnarounds . If'requ red, will have a-,minimum turning l radius_ of 40 fee from the center of the roaa,, �s 1273 AS Turnouts. Shall be a minimum of l 10 feet wide and 30 feet long with a minimum'25 f.oc;t taper on !each end.% [ 1270.10 Width. All driveways sh'al1 provide a minmum`r10 foot traflf is lane and unobstructed 'vertical» clearance lof 1.5 I feet alone its entire length:. I =si °. Page I1 0 Yt I I I I i I I I _ r 2 , 1� PERMIT , NAl 1273 10'' Driveways exceeding 150 feet in len th but ut less than 800 feet in length, shall prov�dE a turnout near .the midpoint of the driveway. Where aldr`vewayl exceeds` � 800..feet, turnouts shall be provided 'no mores than 400feet apart-. i 27 1 _3 .,:10 Turn � • I a�r A turnaround shall be at all j ,prov�.ded building' sites on driveways ovar 300 feeit in length and shall bewithin 5Q .feet of the builldin�g. IV;1273 rf ,11 Gates fi. I I 1. Gate entrances shall be at leasttwo feet wider than r ;the 'roadway it 'sprues':. 77 ,, 2. The gates must be located at least 30 feet from 1, the roadwa and shal'1 open y p_ to allow a, vehicle to' stop ` without obstructing traffic on that roadway. I Whelre a one-way .road with a single traffic lane providesi entrance, a 50 foot turning radius shall'be I I Fuel Modification,. v` 1276:01 Setback for S,trucrure Defensible Space'. All parcels 1 acre acid larger shall provide a mini- .," mum '10 foot setback for buildings and accNss.ory buildings £r,im 411property lines :and•/or the center of the road. f f] 2. For parcels less than 1.`acre, local jurisdiction shall provide for the same practical effect. See 1 ether Requirements below. 1276:02 Disposal` of Vegetation and Fuels: Disposal, including F chipping,' burying, burning or removal to a landfill site alpproved b.y the local jurisdiction, of flammable ' vlegetation and fuels caused by site; development and construction, road and drivewayconstruction and fuel {s modif,icatioi sfhall ba completed prior to co ---l- t- of • read construction ,r' fi_�al inspection of a building � perm _ it i5 S 1 I, I f Page 2 o3 I I I L,