HomeMy WebLinkAbout071-370-022
School District
A.P. Number •
Property Owner
Property Location/Address
Subdivision
BUTTE, COUNTY SCHOOMIMPACT FEE CERTIFICATION FORM
(One form per Building)
r V t Building Department No.
50--junsdiction:
CityjCounty
I �
/ A n
Residential Development
No of Living Mobile Home
Units Installation
�cial/Industrial FI
New Addition
Department Representative
Lot No.
...................................................................................................................
Sq. Footage
Addition/ 'Supplemental to
Conversion Permit #
'(No foundation inspection):
......................... :..................................................................................
......
Sq. Footage
tnoor runs reviewea Dy bcnooi vistnct versonneo
District Identification No. .020065
�64Y) int chool District certifies that��eX� t
(Applicant)
' n
pi _ 532-----' M
v1 bb0
(Group R)
(Including Exterior
ofed reas)
Date
(City)
has complied with the requirements of Resolution No.
represer jng 11 —702 square feet.
,State,
t0s�9c�
AB 211 926
(Phone Number)
(Zip Code)
tent of $ �� • I `'
S
►rv�z--�` • "-,3bUA-2, /9Y/2J o
t Representative ) Date
. Remarks:
Notice: You may protest the imposition of the fees identified above by submitting a written protest "to the District, in compliance with
Government Code Section 66020(a), within 90 days from the date fees are paid. Failure to submit a timely written protest will prohibit
you from challenging the imposition of the fees in any court action.
If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is
notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA),
this project may be subject to additional school fees to fully mitigate its impact on the school district's schools.
White (applicant), Yellow (building department), Pink (school district) feeform.xls (10/98)dmm
e
OWNER -BUILDER VERIFICATION
Attention Property Owner:
An "owner -builder" building permit has been applied for in your name and bearing your signature.
Please complete and return this information at your earliest opportunity to avoid unnecessary delay
in processing and issuing your building permit. No building permit will be issued until this
verification is received.
1. I personally plan to provide the major labor and materials for construction of the proposed
property ' provet : YES NO13
2. I HAVERmenHAVE NOT 0 signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the propor
A construction:
NAME: !Sffsg
ADDRESS- C
PHONE: CONTRACTOR'S LICENSE NO.
4. I plan to provide portions of this work, but I have hired the following person to coordinate,
supervise, and provide the major work:
NAME: 1
ADDRESS: / CITY:
PHONE: CONTRACTOR'S LICENSE NO.
5. I will provide some of the work but I have contracted (hired) the following persons to provide
the work indicated:
NAME ADDRESS PHONE TYPE OF WORK
SIGNED:
PROPERTYOWNER:
SOCIAL SECURITY NUi ER:
DATE:
NOTE: This Owner -Builder Verification is required by Section 19831 and 19832 of the
California Health and Safety Code. This verification must be completed and
returned to our office before we are permitted to issue the permit
CsIII�
RAVISIONS By
111, A TA 11!=0
CQACH I KANI
4/12/49, LP
CAtjgpNUC00t;CrJA0QATmOKTfftZ2Jl AND 1UJLQ 1"4 arrmN.
FATE
X 3- ATE
... J
04/14/00 YW.1
SZ13MX PICkS
III IFOURVATIPAON
- DS
OuTumt
OF NOBILZ
caim *1
.71
1-' .7
7
I* CCN$WnW WrM S;= LVS LOAA WOW tAiA AM SWUM ZAMIF PA
POSTING 61001A Poor." U4611A
WA� 41 w TH11 DOW LOAN IML LW.A a"
I r iX"AU;Bp=p*"2UA9WXJlMW*WMp(A$PKVV
�mmNa
3/V THREADED 3/16* PLATE LEGS ROD 7 Yp or 4
4. AIL KCIMAUTO$gKPOMSYMKLMWUMMUMSMCXMMWa- FOOT" AU
0 ML "Aam AND 4"J" K CWATM V=,.L0CAL'WL
5/161 PLATE 0980= fm low m TM411A
5/9, X 1 1/4,
I I JOLT
WITH HODENE9 VAS"Elt
sn"CONFORMITOASIUA36F *XKS1 &MINIM
SE-ISMIC PIER Not to'-SC:ale 1'. UWA. = VA§MAIW jajM_iNo J* AW $MVWAMM.
CY sK wSim Acdow" To Awl "%cpvATlot*
C.P. SEISMIC P1ER#1 PATENT PENDING L.- gulcrwm: rx
L VLATI& ANTU AK
AMA397.
8L ANCIM 111101M
NOTE- SOURS '. US MS-AIJU A40 -MM A323
W11111SAW NOV COW =AWN LOW CAMM WUDAXZ
180 IN -POUNDS IS EQUIVALENT ict, t5 rT-P"Ds -AU1111TALCOMPONVITS DAMLMINO NASUS & SCR9WS = 02 To n ntOTECTM COATM
29 A7
s. Tla "MT MUM= UL" " C"no WfTH SM"M WKIIAMS E6140 OIL
El
A"ROVO tQLVALJM AND SHALLW LAM AND I.A311111M By CUMM TUTM AND CONRLTM 2 - 3/8' x V BOLTS 1uv MM VW To FOUDWIM 11.0AM,
FIELD DRILL HOLES
OPTION OF 1ATUALA t70i Iii: MAX
4 #14 TEX STS COACH C b6 _1I11111TIC-A1.: 13W lk MAX
OR J SEAM C04UMM WrMinwnvoft4ALOK
.7. THIS FM"ATMV 11M. KAOW
x 'Cammm
1/4'x2'xV
Ep T T /A/' PLATE
ANGLE 3' WIDE' KMBI De"WTOKO"MCMEIN A FAIlLy tZVU81717 WITH NO VQSTW SM.
ED Lij Impot"UTM
mosims. w aTnxmwrocct= ma TO MIX101141411s Nam 2.
roum"nom
PAN 0 MV"ACn= "OWSS SH" U
.111. M AREAS Wan NrkRbCML atnAMW PL) CAW - r
4 - 112' f1pom IT Ame "Ato][111juy AFM= TILL 1.11111111 Of TKI,
Scismic RKADXWM WON -DJt VX4= LW* OR
T DOLTS PIER MAMNACTURM WOUL
to. TMSYSTMIS . ADAPTANS 1rdtTANDARD H0LWW MAWNRY IILOCK FIE".
or 1010101.9
COACH Q '"
L
TYPICAL BEAM,
DOUBLE WIDE TYPICAL SINGLE WIDE -TYPICA
4" FQUN Lp NO=.
CONNECTIONS
20'. 24'. 24' OR 28,
FOUNDATION 1a na"'Irwow
rMj0UWnW FAD ON AnM N AP112"TCONCIIIE111 .0
PLAN PLAN Not to scaie� V0UKQ4T= PAD MAY W UM AN ALTUMATIL
DOUBLE WIDE MOBILE COACH -,-.SINGLE-WIDE MOBILE COACH- - ---- --
Scale: 1" .10' seatill. 1* - 101'
go DVEIV$IZE f[P C"""M
PAM
q9;< cook COMER 80Kit
C,
MORE THAN TRIPLE WIDE UNITS. SUBMIT STANDARC PIER 104TING SPACING FN AT3111 DAM8111111M AM MAMIFACTURID11Y STANJTZ WZKW CONCOM
PER HOWLS !r%,ME MANUFACTUR9R*S
LAYOUT TO THARP A ASSOC. FOR APPROVAL INSTALLATION MANUAL
UMPADOK=rAnWWMBZMPONnUSTRAT7=L=40MUMWN(WTUtADU
STANDARD PMR & FOOTING SPACING
PER MOBILE HOME MANUFACTURZRI
HALF Of THI PADS IN A
INSTALLATION MANUAL
wH&n mW COMM 19%= W NOTATJOK NO MORE THAN
OpipaW 0F7V1 PADS ARS PARAUX8,70
1 1.44,101101— TRAV111111221iJIMICAN 119MAMIDWATT991LOR
13' 24* M COACH PLUL
4.
nw=N1S-QA3". mile
36 112'
QUO
vr i 1 34 rt""
&Wt 1. - MA)MwRJM LZNM1i OF 04MA *V6 COACH $111 MY.
#W ow
t 3.5' f 2. MA=M1jMT11OVWU1KSW=CQACff-7#MT.
4x4-4#4 WVf_1
L I PW P= ON" WIZIB COACH
b. 10RST 11MV=1111ILKW1101SCOACH118
a
PRECAST CONCRETE.
4. K* rU" 11010111COACH11111, mumsma PIAQWVff FAnW M MOWN Of THII ==A WM MIMS
FOUNDATION PAD COACK
SCALE- V - 1.5' 3. FOR MY COMM S= 0=1111 THAM AS 00" ON n= MAN Olt REFUMCW ASOM THS PIRK AND PAD
LAYOUT M"UUVOnVIDAND AMWMBYDONALD ILT"V&AMOCIATU
•
3/4' PLYWUOD SHEXIS I= dam
SCRrVED IUGEIHER WITm
1. BPACM SHOWN ON TAN IKM All FIX COACHES WTM to M AND 13 RMCII KAMM OR I BCH PAW
112'. FHVS
PLYWOOD
2. AM MU I INCH WAM IS NOT TO CANTUM MONS THAN 6.6 rUT ON SACH VW OF UNIT
AND AWAfnMCW2MMWMU CAIN WT =0 T.
wlt Ls f OR i NWFOUNDATION 1YM
M= AM &Affff C*D& SXWN
p 1/2' CIL 111 101
APPROVED
1FA*x04'xJ/4 Na. San
K.YWOOD SUR=TO ColuzcTiON's 140im
~V&DO1l3IV'TAUTHOR=O
%CMFROM RAMROVIAkY Cm
mu"411m or.
Afttllftm�a tv&m r Auto
am dfcd&ma
ELEVATION
NOT TO SCALE
bm C
_111040 aAMARLIS
ALTERNA VE PLYWOOD
FOUNDATION PAD am -
PATENT 00 .5,59-5366
SCIAL FV=15' ?-ZlbHnANwW&pw_z6.6 4 RENEWAL OF
. a
STATE SUBMITTAL 30-5F
MAX TUK HEIGHT BOLTS
8, SW307 Tuat
x
T
14' LONG IUK 2' DIA
4'- 3/1111 SID PIPE
ml
ml
ICJ
17.1 x
KLYS 0 3/14* PLATE
I IWTEfI
TO too CLAN!'
I* CCN$WnW WrM S;= LVS LOAA WOW tAiA AM SWUM ZAMIF PA
POSTING 61001A Poor." U4611A
WA� 41 w TH11 DOW LOAN IML LW.A a"
I r iX"AU;Bp=p*"2UA9WXJlMW*WMp(A$PKVV
�mmNa
3/V THREADED 3/16* PLATE LEGS ROD 7 Yp or 4
4. AIL KCIMAUTO$gKPOMSYMKLMWUMMUMSMCXMMWa- FOOT" AU
0 ML "Aam AND 4"J" K CWATM V=,.L0CAL'WL
5/161 PLATE 0980= fm low m TM411A
5/9, X 1 1/4,
I I JOLT
WITH HODENE9 VAS"Elt
sn"CONFORMITOASIUA36F *XKS1 &MINIM
SE-ISMIC PIER Not to'-SC:ale 1'. UWA. = VA§MAIW jajM_iNo J* AW $MVWAMM.
CY sK wSim Acdow" To Awl "%cpvATlot*
C.P. SEISMIC P1ER#1 PATENT PENDING L.- gulcrwm: rx
L VLATI& ANTU AK
AMA397.
8L ANCIM 111101M
NOTE- SOURS '. US MS-AIJU A40 -MM A323
W11111SAW NOV COW =AWN LOW CAMM WUDAXZ
180 IN -POUNDS IS EQUIVALENT ict, t5 rT-P"Ds -AU1111TALCOMPONVITS DAMLMINO NASUS & SCR9WS = 02 To n ntOTECTM COATM
29 A7
s. Tla "MT MUM= UL" " C"no WfTH SM"M WKIIAMS E6140 OIL
El
A"ROVO tQLVALJM AND SHALLW LAM AND I.A311111M By CUMM TUTM AND CONRLTM 2 - 3/8' x V BOLTS 1uv MM VW To FOUDWIM 11.0AM,
FIELD DRILL HOLES
OPTION OF 1ATUALA t70i Iii: MAX
4 #14 TEX STS COACH C b6 _1I11111TIC-A1.: 13W lk MAX
OR J SEAM C04UMM WrMinwnvoft4ALOK
.7. THIS FM"ATMV 11M. KAOW
x 'Cammm
1/4'x2'xV
Ep T T /A/' PLATE
ANGLE 3' WIDE' KMBI De"WTOKO"MCMEIN A FAIlLy tZVU81717 WITH NO VQSTW SM.
ED Lij Impot"UTM
mosims. w aTnxmwrocct= ma TO MIX101141411s Nam 2.
roum"nom
PAN 0 MV"ACn= "OWSS SH" U
.111. M AREAS Wan NrkRbCML atnAMW PL) CAW - r
4 - 112' f1pom IT Ame "Ato][111juy AFM= TILL 1.11111111 Of TKI,
Scismic RKADXWM WON -DJt VX4= LW* OR
T DOLTS PIER MAMNACTURM WOUL
to. TMSYSTMIS . ADAPTANS 1rdtTANDARD H0LWW MAWNRY IILOCK FIE".
or 1010101.9
COACH Q '"
L
TYPICAL BEAM,
DOUBLE WIDE TYPICAL SINGLE WIDE -TYPICA
4" FQUN Lp NO=.
CONNECTIONS
20'. 24'. 24' OR 28,
FOUNDATION 1a na"'Irwow
rMj0UWnW FAD ON AnM N AP112"TCONCIIIE111 .0
PLAN PLAN Not to scaie� V0UKQ4T= PAD MAY W UM AN ALTUMATIL
DOUBLE WIDE MOBILE COACH -,-.SINGLE-WIDE MOBILE COACH- - ---- --
Scale: 1" .10' seatill. 1* - 101'
go DVEIV$IZE f[P C"""M
PAM
q9;< cook COMER 80Kit
C,
MORE THAN TRIPLE WIDE UNITS. SUBMIT STANDARC PIER 104TING SPACING FN AT3111 DAM8111111M AM MAMIFACTURID11Y STANJTZ WZKW CONCOM
PER HOWLS !r%,ME MANUFACTUR9R*S
LAYOUT TO THARP A ASSOC. FOR APPROVAL INSTALLATION MANUAL
UMPADOK=rAnWWMBZMPONnUSTRAT7=L=40MUMWN(WTUtADU
STANDARD PMR & FOOTING SPACING
PER MOBILE HOME MANUFACTURZRI
HALF Of THI PADS IN A
INSTALLATION MANUAL
wH&n mW COMM 19%= W NOTATJOK NO MORE THAN
OpipaW 0F7V1 PADS ARS PARAUX8,70
1 1.44,101101— TRAV111111221iJIMICAN 119MAMIDWATT991LOR
13' 24* M COACH PLUL
4.
nw=N1S-QA3". mile
36 112'
QUO
vr i 1 34 rt""
&Wt 1. - MA)MwRJM LZNM1i OF 04MA *V6 COACH $111 MY.
#W ow
t 3.5' f 2. MA=M1jMT11OVWU1KSW=CQACff-7#MT.
4x4-4#4 WVf_1
L I PW P= ON" WIZIB COACH
b. 10RST 11MV=1111ILKW1101SCOACH118
a
PRECAST CONCRETE.
4. K* rU" 11010111COACH11111, mumsma PIAQWVff FAnW M MOWN Of THII ==A WM MIMS
FOUNDATION PAD COACK
SCALE- V - 1.5' 3. FOR MY COMM S= 0=1111 THAM AS 00" ON n= MAN Olt REFUMCW ASOM THS PIRK AND PAD
LAYOUT M"UUVOnVIDAND AMWMBYDONALD ILT"V&AMOCIATU
•
3/4' PLYWUOD SHEXIS I= dam
SCRrVED IUGEIHER WITm
1. BPACM SHOWN ON TAN IKM All FIX COACHES WTM to M AND 13 RMCII KAMM OR I BCH PAW
112'. FHVS
PLYWOOD
2. AM MU I INCH WAM IS NOT TO CANTUM MONS THAN 6.6 rUT ON SACH VW OF UNIT
AND AWAfnMCW2MMWMU CAIN WT =0 T.
wlt Ls f OR i NWFOUNDATION 1YM
M= AM &Affff C*D& SXWN
p 1/2' CIL 111 101
APPROVED
1FA*x04'xJ/4 Na. San
K.YWOOD SUR=TO ColuzcTiON's 140im
~V&DO1l3IV'TAUTHOR=O
%CMFROM RAMROVIAkY Cm
mu"411m or.
Afttllftm�a tv&m r Auto
am dfcd&ma
ELEVATION
NOT TO SCALE
bm C
_111040 aAMARLIS
ALTERNA VE PLYWOOD
FOUNDATION PAD am -
PATENT 00 .5,59-5366
SCIAL FV=15' ?-ZlbHnANwW&pw_z6.6 4 RENEWAL OF
. a
STATE SUBMITTAL 30-5F