Loading...
HomeMy WebLinkAbout079-080-048AIR ?,9 3 f, to A —ftw I �il-t...db Ak MARTIN !LtE 1!7 N s 0 0 4 1 I -P 65 77. y:..: Ile R E S 17 ! 036-80-0-p48 - -- -. MARTIN, FRIEDA 93-1116 BPEM &,j HART DR, OROVILLE NEW SF OFFICE COPY ? Address ' GAS Meter By-4zDates/� Z ELECTRIC Meter By Date l 4 OFFICE COPY Address i GAS rater By Hata — E Meterter By By i JOB FINALED (Date) �J Signature ,x V=OK O = Not OK Not = Not Rpipdyable MOBILE HOMES Date/Initials MOBILE HOME UTILITIES (Plans) OK except #'a 1. Zoning Requirements -Setbacks -Easements 2. Soils; Special MH Support Sketch 3. Sewer; Location -Teat -Fall -C/O Concrete 4. Water; Location -Teat -Easement Needed (Sketch) S. Electricity; Location-Clearencea-Grnd-/ /Amp -Concrete 6. Gas; Location -Teat -Wrap: / /" L"ft. / /"Net. or/ /'L"ft./ /"LPG 7. Well Clearance & Disconnect 8. Utility Clearance Date/Initials MOBILE HOME INSTALLATION (Plans) OK except #'s 1 1. Zoning Requirements -Setbacks Easements 2. Footings; Size -Spacing -Marriage Line 3.. Gas; MH Test -Demand -Valve -Connector 4. Electricity; MH Test -Crossovers -Breakers -Clearances S. Drain; MH Test -Fall -Flex Connector 6. Water; MH Test -Regulator -Connector 7. Water and Sewer Connected -C/O to Grade -HD Approval 8. Gas and Electricity Tagged 9. Exits; Insp.-Sketch 10. Cert. of Occupancy MISCELLANEOUS Date/Initial DECKS, COVERS, CARPORTS, GARAGES, (Plans)OK except #'s 1. Zoning Requirements -Setbacks -Easements e . . 2. Footings; Soils -Size -Depth -Spacing -Connectors -Steel 3. Decks; Griders and/or Joists -Decking -Bracing -Stairs -Rails 4. Wood Awn.; Posts-Beams-Rftrs -Connectors Shthg: Rfg.-Bracing 5. Alum. Awn.; Columna -Connections -Splice -Decal -Enclosures 6. Carports; Windows -Doors 7. Electric 8. Frmg; Sils-Anchors-Studs-Rftrs-Trusses 9. Siding; Nailing -Veneer -Stucco -Mesh r 10. Roof; Shthg-Roofing 11. Ext.; Steps -Doors -Landings Date/Initials POOLS (Plans) OK except #'a 1. Setbacks -Easements 2. Soils; Compaction -Structure Stability 3. Pool Structure; Steel -Connections -Thickness Dead Men -Lining 4. Elec.; Receptacles and Lighting, Distances-GFI 5. Elec.; Pool Lighting; 15 volts-GFI 6. Elec.; Enclosures; Conduit Entries -Terminals -Listed 7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater 8. Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg. Boxes-Enclosures-Panelboards-Ins. to Mein in Conduit 9. Health Department Approval 10. Plumb.; Cir. Test -Water Supply Test V=OK O=Not OK - = Not Applicable Not Ready RESIDENTIAL ' = Date/In' 'als UND LOOK Plans OK except #'s Zoni ng -Setbacks -Easements -Flood -Slope g., Main; Soils-Elec. Grnd ' Ftg. Depth g., Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth I-XlrPorches & Decks; Soils -Steel-/ /Ftg. Depth --s-5fie5twalis, Main; steel -Bloc kouts-Wrapped Arliernwalls, Garage; Steel-Blockouts-Wrapped and Special Anchors 6. . Pi ireplace Ftg.-Steel /JQJ D.W.V.; Fall -Fitting -Test -2 Way C/O -Sewer Test 10 UF. Gas Pipe; Size -Anchors - yard gas piping: size -test 11. Water Pipe; Test -Anchor -Regulator -Service Test 12. Electric; Underground 13. Plenums & Ducts; Clearance -Material -Support -Ins. 14. Girders -Sills -Anchor Bolts -Joists -Vents -Cripples 15. Access & Ventilation 16. Insulation Date/Initials PLUMBING Permit OK except #'s tf Water Htr.; Vent -Access -Combustion Air -Baffle JY r Pipe; Test & Anchor -Nail Protection V.; Test -Fittings & Anchor-Naii Protection ower Pan; Test, First Floor -Tub Access 20. W Tub & Shower, Second Floor -Tub Access 1. Gas Pipe; Size & Anchors Date/initials ELECTRICAL (Permit) OK except #'s 22. ,Fixture & Transformer Clearance -Ins. Protection W. Elec. Receptacles Spacing -Lights & Switches at Doors ' 2 ize Boxes & No. of Conductors -Stapled Rocpex Installed Close to Edge of Studs & C.J. 2Seorqujp. Ground made up w/Mach. Fastners-Bond Gas & Water 2 Appliance Circuts in Kitchen & Conductor Size/GFI �28�t3a�bfead-Wf Size / / ga. Cu or AI-A.C. Wire Size / / ga. CAI ,P.'Range Circ. / / ga. Cu or AI -Oven Circ. / / ga. Cu or Al. I sulated Neutral ❑ Yes ❑ No r3 .Service -Riser Conductors & Ground -Main Disconnect ip. Clearances Panels -Motors -Mach. Equip. CI es Closet Light -Shower Light -Spa Light moke Detector Date/Initials MECHANICAL (Permit) OK except #'s 34. A.G"Ducts Insulation & Support 35. Van; Exhaust above insulation w"Cog.densate Drain & Overflow; Size & Grade u nance-Vent; Access -Comb. Air -Return Air Vent -115 outlet Attic Access & Platform if Furnance in Attic J Date/Initials FRAMING (Plans) OK exceot #'s Material & Anchors nd baring Walls over Girders & Floor Nailing . Draft Stop in Walls (rat proof) ire Stops; Furred Ceilings -Stairs -Chases -Tub 4. Headers & Beam -Size & Bearing Single & Duplex) Date/Initials FRAMING (Continued) 4 Hangers -Post Caps -Anchors -Connectors -4&"C-Ing. Joist-Rftr. ties-Purlin-roof Brac-Truss-Shthng.-Rfng. Fir9place Ties or Type A Flue -Fireplace Throat clearance 40-'AtticAccess; Size & Romex Protection -Draft Stop -Ins. Baffles d indows or Exiting Doors -Sill Hgt. & Dimensions Ge Fire Protection Framing 5 r perty Line Firewall & Openings E oors-One 3' -Check Garage -3rd Story, 2 Exits St ' idth-Headroom-Rise-Run-Landing-Fire Protection pl ood.on Roof Overhang -Attic Vents -Rafter Outriggers S' g -Nailing Veneer ' Z I'swW. St o Mesh -Drip Screed -Fd. Vents-Underflr. Access r. . Blazing Area -Glass Protection -Skylights -Plastic Shw Walls: Nailina-Bolts it 60. Infiltration -Wells -Windows Date/Initials FINAL (Plans) OK except #'s xt. Steps -Door & Sidelight Protection -Landings 6 oke etector urnace; Vents -Clearance -Comb. Air -Connector - In e; Above Floor -Ducts -Mach. Protection e r M^ Exiting Of-G.F.I. & Bath Fixtures & Tub Access -Spa Trim & Subpanel; Breaker Sizes & Labels Staff ails 69 -Fireplace or Stove; Clearances -Hearth lec. Outlets at Wood Panel; Int. & Ext. 7 . it.Fixt. & Appliance; Grnd.-Air Gap -Cooking Clearance 11. Elec. Outlets & Receptacles at Kit. Counter ?f' -Ga -rage Fire Door; Swing -Landing -Closer 1?e-A-C. Duct in Garage -Damper Y�r. Htr.; Vents -Clearance -Comb. Air-Connector-P.R.V. In Garage; Above Floor -Mach. Protection ?57Pf6:, Elec. & Mach. Equip. Listed for Location re -EM -c. Receptacles in Garage; (G.F.I.)-Romex Protection T7--trisulation-Foam-Looked in Attic ❑ Yes ua & Deck Construction -Post Caps ens Crawl Hole Door-Drainagge & Wood -Earth Clearance Looked under Floor ❑ Yes 8O.-Faf wing instld.; Drive ZVe—s ❑ No; Walks 0-7e—s ❑ No; Planters ❑ Yes ❑ No 6& --Stucco; Brown -Finish C nit; Disconnect, Electr lambing (• ants Above Roof; Plbg. n Fireplace. -Clearance to 94 -Water Well; Disconnect, Electrical, Plumbing Exterior Elec. Trim; G.F.I. Receptacle -Underground e6-d91li a on Throughout House W. CorrecYons from Previous Inspections Gas T -Meters Tagged; Gas -Electric Igg er & Sewer Connected -C/O to Grade -HD Approval 41' -)Energy compliance Certificate -Other Certificates Comments at Flnal: Installation Certificate: Residential CF -6R BUILDING OWNER: f � �""� � `J BUILDING PEFJIIT BUILDING LOCATION: An installation certificate is required to be posted at the building site orior to the issuance of the occupancy permit. This form may be used to meet these requirements. All appliance categories listed below are the actual equipment installed. Note that the efficiency and type of the aopiiance installed must be eourvalent or better than the aopfiance specified on the Certificate of Compliance (CF -1 R). This certificate (or its equivalent) shall be prepared and signed by the person(s) assuming overall responsibility for the appliance installation. I, the undersigned, verify that the equipment listed in the category above my signature is the actual equipment installed and that the equipment meets or exceeds the requirements of the Appliance Efficiency Standards. In addition, I have verified that the equipment is equivalent to or more efficient than the equipment specified on the Certificate of Compliance submitted to demonstrate compliance with the Energy Efficiency Standards for residential buildings. HVAC SYSTEMS Note: Hydronic boiler information is entered here. Other hydronic or combined hydronic equipment is listed under Water Heating Systems. Heating Equip. CEC Certtfled Type (fumace, Manuf. Make & heat pump. etc.) Model Number w fives- "IR 14 ni Tank Factor or Capacity Recovery -4T 07 A* storage gas. etc.) IVfit M G 2 Cooling EgL!p. Type (air Gond., heat sumo. etc.) CEC Cartffled Compreszor knit' Manuf. Make & Model Number Ril.46 RKi4 036 —1 P:::r Actual Distribution Efficiency Type and (AFUE. etc.) Location Duct or Heating Load Heating Piping Before Over- Equipment R -Value Sizing (Stuh) Caoactty (E �0 A-rrje -1—f-, *z Actual Distribution Duct or Efficiency Type and Piping (SEER) Location R-Vaiuf I /acne, b�, 10/ rya.7 The building design heat loss and design heat gain rate have been determined using a method specified in Section 150(h) of the Energy Efficiency Standards, and are two of the criteria used for equipment sizing and selection. �� y/ `�, T ,1,11- �`% � 9� fi/�� P %lr3x-� y✓�].r,�i w Signature Date HVAC Subontractor (Co. Name) or General Contractor or Owner WATER HEATING SYSTEMS 1. For small gas storage iratea inputs 75.000 Etwhr7, electric resistance and heat pump water heaters, list Energy Factor. For large gas storage water heaters iratea input >75.000 l?twhri, list Rated Inout. Recovery Efficiency and Standby Lcss. For Instantaneous gas water heaters, list Rated Input and Recovery Efficiency. For instantaneous electric water heaters, list Rated Inout. FAUCETS & SHOWER HEADS All faucets ana snowerneads installed are iisted in the Commission's Directory of Canriied Faucets and Showerneaas. pursuant :o Title 24. Pan 6. Subc^doter 2, .Section 111. Sionature Date ?lumping Suocontractor (Co. Name? or General Contractor or Owner THIS CERTIFICATE MUST BE PROVIDED TO TIS BUILDING DEPART[�Nr-PRIOR-TO-FINAI'INS_PE_CTI .APPROVAL AN -D j\ (oP-y SIiALL--BE POSTED WITHIN THE BUILDING._ JANUARY 1993 Energy' External Water Heating System Type CEC Carttf led Manuf. Make & Rated' input (kW Tank Factor or Capacity Recovery Tank Standby' Insulation storage gas. etc.) Model Number or Stun) (oil ons) Efficiency Loss l a) R -Value n�C)- ✓PQ 407 m� 1. For small gas storage iratea inputs 75.000 Etwhr7, electric resistance and heat pump water heaters, list Energy Factor. For large gas storage water heaters iratea input >75.000 l?twhri, list Rated Inout. Recovery Efficiency and Standby Lcss. For Instantaneous gas water heaters, list Rated Input and Recovery Efficiency. For instantaneous electric water heaters, list Rated Inout. FAUCETS & SHOWER HEADS All faucets ana snowerneads installed are iisted in the Commission's Directory of Canriied Faucets and Showerneaas. pursuant :o Title 24. Pan 6. Subc^doter 2, .Section 111. Sionature Date ?lumping Suocontractor (Co. Name? or General Contractor or Owner THIS CERTIFICATE MUST BE PROVIDED TO TIS BUILDING DEPART[�Nr-PRIOR-TO-FINAI'INS_PE_CTI .APPROVAL AN -D j\ (oP-y SIiALL--BE POSTED WITHIN THE BUILDING._ JANUARY 1993 11 Insulationtertificate /) . Number and Sueet . City County Subdivision Lot Number Description of Installation ROOF MatcrL-d Thickness (inches) Brand Name Thermal Resistance (R -Value) CEILING BauorBlanketType Fiberglass Brand Name Certainteed Thickness (inches) /z Thermal Resistance (R -Value) Loose Fill Type trat erm Brand Name Certainteed Contractor's minimum installed weight/ft lb Minimum thickness inches c Manufactumr's installed �O weight per square foot to acheive'Ihermal Resistance (R -Value) EXTERIORWALL Mate --*Fiberglass Brand Name Certainteed Thickness (inches) ' s;� Thermal Resistance (R -Value) RAISED FLOOR . Material Fiberglass Brand Name Certainteed Thickness (inches) Thermal Resistance (R -Value) SLAB FLOOR Material Brand Name Thickness (inches) Thermal Resistance (R -Value) Width (inches) FOUNDATION WALL Material Fiberglass Brand Name Certainteed Thickness (inches) Thermal Resistance (R -Value) . Declaration I hereby certify that the above insulation was installed in the building at the above location in conformance with the current Building Energy Efficiency Standards for new residential buildings contained in Title 24 of the California Administrative Code. General Contractor (Builder) License Number Signature and Title Date Hawkins Industries Inc./Shasta Insul. 650722 Yr on Inumber ��MOMZ `— .staller) // 4 .3 Signatwe and Title Due t COUNTY OF BUTTE BUILDING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 1469 Humboldt Road, Chico, CA - (916) 891-2751 7 County Center Drive, Oroville, CA -.(916) 538-7541 747 Elliott Road, Paradise, CA - (916) 872-6307 CORRECTION NOTICE OWNEFt PERMIT NO. A routine inspection indicates that the following violations of.'Butte County Ordinances exist at the above address and should be corrected. Please notify this office when correction of work is conp1leted. ffyou have any questions pertaining to this matter, or need additional explanation, pie contact ,*& office immediately. Date 1,0 S Inspector REV 110W COUNTY OF BUTTE BUILDING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 1469 Humboldt Road, Chico, CA - (916) 891-2751 7 County Center Drive, Oroville, CA - (916)�538-7541 747 Elliott Road, Paradise, CA - (916) 872-6307 CORRECTION NOTICE. OW.NER PER1.111 A routine inspection indicates that the following violations of Butte County Ordinanceseiist at the above address and a uld be corrected. Please notify this office wt4ri corre� ction of work is completed. If you ve any questions pertaining to this matter, or need additional explanation, Z* Please ontact a office immediately. d�0,la eA ':n� A t Gn Z/ 0/k Date Inspaqtor REV 101W ;Z - s )JUN 22t'01 14 07 PGL BLDG. PROD, SAC. i4' P.4/5 IV W AAA certilicate Certificate N? 18804 THE UNDERSIGNED MANUFACTURER HEREBY CERnFIES that the structural wood products idecttified below and rnarked with a collective mark of American Wood Systems (AWS) were man- ufactured in accordance with the Specifications indicated below. IR -ANSI Standard A190.14983, for Structural Glued Laminated Timber D i I Q I I Job Name Pfd. BLDG PRD�JCI a Job Localion . ACRAMWM CA i Customer's Order No. 301-30723 Date—_1-11-13 Mfgr's Order No. 7693-C F LOAM Em J0J= Signature Title OUALITY CONTROL Company ROSBORO LUMBER Co. SPRINGFIELD OREMON Address date IT IS HEREBY.C.ERTIFIED that the structural glued laminated timber production of the above-named manufacturer which carries a collective mark of American Wood Systems (AWS) is subject to regular audit by -American Wood Systems, such audit consisting of the inspection with reasonable frequency of the manufacturing process, with adequate sampling to verify the quality of glulam construction and the adequacy of glue bond. SEAL _ Michael a O'Halloran 6 ref Executive V:-; a President Ilk HIND AMERICAN WOOD SYSTEMS -- A RELATED CORPORATION OF AMERIC;aN PLYWOOD ASSnhlr-.- JUN 22 '01 14:07 PGL BLDG. PROD, SAC. t P.5/5 ROSBORO L"B"ER COMPANY 00, Box 20 i Sp(Ingfiaid. OR 97477 PHONE: (5943) 74&4411 i FAX: (503) 72"919 %!32#50 C ..o 'r: 9'50 3 % Y 0 44 "�;o i o 'niP Via 1'kUi*':'( t. t Le "111I I, BY 0 T i-: ii., titstillit its will ill iii litii 1W it sti filismil iislit lotiti it Is list I $$its m itssittt1 ORD SHP PROT SPC ST LINEAL RATE EXTEND MARK # QTY OTY WIDTH DEPTH P2ET IN TRACT _ECT CIE GR COMB. FEET ILINFT PRICE 6-109 4 4 0.3-1/8 x 09 60 02 1 D V4 240OF 240 ot-ile x 10-1/2 60 02 0 ............ S-312 8 03-i/9 1 12 60 02 D V4 2400E Wo. a a, 03-1;8 1 1341]2 60 02 I 0 V4 240OF 480 8 8 63-1/8 x 15 60 02 I D V4".2400F 400 5=310 4 118'~1 16-1/2 6002 1 D W -27400F 240 -2- '-1/3 X 21 60 02 D V4 2490E 1.20 i 5,24i 2'- D V4 .60 0 2 t4• 2 2 r:6-314 1 115 60 02 ".0 66-314 X16-1/2 -60 02 I D V4 2400; 240 1 S-622 2 2 06-5/4 X 22-112 6--') 02 VY 5-81.8 2 2 09-314 X 18 60 02 I J V4 240OF 120 1 • TOTAL 641APPED FOOTAF: 27238 TOTAL DELIV LESS D;SC0 NET ANT om,AmmowmalwiEw j iNvWe TERMS AND CONDITIONS k4ii iuOiiwi a iffaiali c6ducliopi i M 4i4nall bel* 64 r 30RO Aiwocitgioit iumi to ip* on Claims 4 WOO& wif & MaAui=um. CUSTOMER'S ORDER IS SUBJECT Oim dui a6oeynVs will bi "iiid i Gaivle; ihwoa of 11%4 por month (18% per annum). TO ALL OP THE TERMS AND CONDITIONS STATED HEREIN. with the calw6w 91 impounts duo hariuncier, imiuciina oil court costs and attorney's WA lr4urred it ibe taw *,4 and on any sma iN jj6 Q0jjjCW, m - mwnlr4 this on* will tars piece hi wim C&Idy. 0mocon, %%&M in tirmi bo lwnd.6tween lhia icknmwlo rrtanl ane custoi6i Purchase crow. LN* wasww,4Wpmbnt W" pfamationow in all caw& 1 �"JUN 22,'01.14:06 PGL BLDG. PROD, SAC. P.2i5 AAA' we FIA '%7 V Certincate of Confonnance cenificaie N® 118 8 4 9 - THE UNDERSIGNED MANUFACTURER HEREBY CIl;MIFIES that the structural wood products identified below and marked with a collective mark of American Wood Systems (AWS) were man- ufactured in accordance with the specifications indicated below. KK ANSI Standard A190. 1 -Ma for Structural Glued Laminated Timber E Fol Job Maine PGL ELDr, PRODUGiS ,lob 1 ocatlon Cad Cuetomer's Order-ko, 301"30980 Date 64-93 Mfgt'e Order No. 7741-C PW. WAbb kqA JCUh , ~" Signitur8' QUALITY CONTROL Company R088OR0 LUMBER CO Address SPRINGFIELD, OREGON Date 6-1.4-93 IT tS HEREBY CER'T'IFIED that the structural glued laminated timber production of the above-named manufactuier which carries a collective mark of American Wood Systems (AWS) is subject to regular audit by American Wood Systems, such audit consisting of the inspection with reasonable frequency of the manufacturing process, with adequate sampling to verify the quality of glulam construction and the adequacy of glue bond. - GI&Ante Mich O'Halloran Exect. }+resident AMERICAN WOOD SYSTEMS "- A RELATED CORPORATION OF AMERICAN PLYWOOD P. .:''JUN 22 '01 14:06 PGL -BLDG. PROD, SAC. ROSBORO. Ct*j3,E'R.00MPANY Ra Bok 20'i Springfielti. 6A 0477 Pk6NF-, (sw') 748.8411FAX: (503) 7268916 lws"Yl: CE" 0 397220 rwsikmd i3LL6LA'M' F-Rbt-0-:T'S P.3/5 JOti 14 7741 99E;0 KA. BL,DQ ShII-0 TO F:'GL- F4..DO) Ba)� "'O:�850 P.JJi bOX 292850 SAC RANE7-KTO CA 95829 SACRAMENTO- CA 95529 iA V 0 i ce" 1),'.A 'L (-.;- 6/1,4/9.3 i kli 0 Via l*FWCK ROL'ttI6 CUS',T0PW,7-.' TRUCK Tc--rms 2% 25 DAYS, Nl*--'-t' 750 Feight Chgs PY OTI.-iME, 05-118 i 19-1/2 ii Oi' 1 4 L .94 240OF 11. boii T" -.A'- WPM F k z 26268 107A� I ALI LESS DISCI AST toER AoKNOIAI CGM&T I IkWiCt TERMS AND CONDITIONS ROSBORO 0646 Ati*041i ru6 to i" s; clsimi iO ovido, " I iti:qfWuri CiATOMER'S ORD6 IS liwwrct pisg dui icowris win t)j j"jiw j iwvlco awo of 1%% Iiii month (18% ;�6 annum)- TO ALL OF -THE TERMS AND 1--silr I Lumbir Comping 16i all "6�s iricufmd in daAAMuoh cokornois STATED mEnEw. r,:- whit the tbgecdon -ilopllwwutu due ba(sunder, inctuding all court gcsw and wtornoy'* toes ificuffad a " trW Ww4 end on a,* app af. Ai ijkloin ivoiiiAlng this QIOW VAII iliki ilici In l" C-06* OTOon.- 4FW watgmd� porches/ rx inkoo prwodonoa If, all can& ORD SHP PUT sn 9T UVA RATE EITW Wi i iTV OY HiDTH KPTH FEET lk FW N en ...fm 14. 8N, 5-312 1 41' 051/$/I 1 12 4042 -A 8-515 a I. Witt I 4. win i is -ib 0i fa ,S-slox 4, 4 05-4/8 1 15 50 00 24ww 5-516 12 12 05-1/8 1 16-V2 60'62 1 V4 .2w v4l.5 I 1 09-3/4 1 15 60'02 I is d4 Z404F b0 YT 1-5-1-5k 0 a oi-ita I it 02 Z 1 V4 240OF 352 1' 05-118 i 19-1/2 ii Oi' 1 4 L .94 240OF 11. boii T" -.A'- WPM F k z 26268 107A� I ALI LESS DISCI AST toER AoKNOIAI CGM&T I IkWiCt TERMS AND CONDITIONS ROSBORO 0646 Ati*041i ru6 to i" s; clsimi iO ovido, " I iti:qfWuri CiATOMER'S ORD6 IS liwwrct pisg dui icowris win t)j j"jiw j iwvlco awo of 1%% Iiii month (18% ;�6 annum)- TO ALL OF -THE TERMS AND 1--silr I Lumbir Comping 16i all "6�s iricufmd in daAAMuoh cokornois STATED mEnEw. r,:- whit the tbgecdon -ilopllwwutu due ba(sunder, inctuding all court gcsw and wtornoy'* toes ificuffad a " trW Ww4 end on a,* app af. Ai ijkloin ivoiiiAlng this QIOW VAII iliki ilici In l" C-06* OTOon.- 4FW watgmd� porches/ rx inkoo prwodonoa If, all can& V JN:22�01W14 06"0DL DG. PROD,. SAC. r • ,P:2/5 AA *'too A C&tincate of Confonnance w { certificate? 188 49 - - -;THE. UNDERSIGNED MANUFACTURER HEREBY CERtIFIES that the structural wood products 'identified below and marked with a collective marYk tit -American Wood Systems (AWS) were man - in accordance with' the specifications indicated below. XX ANSI Standard A1901-1983, for Structural Glued Laminated Timber ,lob Name PM _ELM FWDI —I -S y: _ .Job Location SA!' M4MIn rA Customer's Order No. 3111"�"80 Date b"$W93N1tgr's Order No, 7741-C -- PF LOADED END J0I1M Signature _ _'7itte QUALITY CONTROL ROSSORO LUMBER 0), �SPRINGFIELD, companyOREGON Address Dace 6-1.4-93 ' IT' IS HEREBY CERTIFIED that the structural glued laminated timber production of the above-named `manufacturer which carries a collective mark' of American Wood Systems (AWS) is subject to regular s audit by American Wood Systems, such audit consisting'of the inspection with reasonable frequency of the manufacturing process, with adequate`sampling to verify the quality of gluiam construction and the adequacy of glue bond. 6 _ Not W4 0 01 S V y Michael R. O'Halloran ' �r Executive Vice President AMERICAN WOOD SYSTEMS — A RELATED COAPORATION OF AMERICAN PLYWOOD ASSOCIATION ----------- a u77 It PGL BLDG. .PROD, SAC. � ;� ,• P. 3/5 ROSBORO-.LUMBER- COMPANY Y Pm SW 2010 $WingUd. OR 97477 3. PHONE: (503) 746.8411. + FAX: (503) 7268919 {yBORO (3L..(J1-AM F'iti0DU`T a JU0 99i ;G. f'iii.' NL,13�1a F'}y �DCII)lJC:TS--ar^,MAN'...)ATI Shl. p F'GL..' FAL..lri�:�ii ;j'rpOD'�U`CTS—Sr)CRArIEi`i'-f (:) i-'.l�-_ •L C, i�..7i� V , ` ,;(3. BOX 2 A.1.850 SACRAC17N'TO CA 95829 - sr�CrtiA1�lFhtiq CSA 95929 :lati.v )iii 1)rc•I'cc es 1.4%93rin:� • Te 2% 25 I56iY,.�S .. � , 70 C r_c ->,t F. f.) . 44 "0j.',-30%,0 VJ-,l TRUCK F:OUte' CUST0VW'l7: TRUCK "reight Chgs BY 0T;-'1E:KE "' ••r fit t•ttit s:usttlsuasusaaaamaiaissa:aaia::t:aura:s:atssttatatatass:itassss:as:ssa:stat:sasaseassastsssa:est:siesta:t::as:ea:s • DAD SHP PUT SPC 8T 1IVA RATE EITEJID �I1 u I IiTY ilTY YIATR DEPTH FW IN FM -Pei -tit- 0 lL, .::� 93-I18 t 12 ' 60,42 � I• • ; • 1.53 a will JI t.. ���. ' ��'� 1 � x � . p� ::L. � �:�• -315 T: -A_ s>•:??EA FOOTir6: 4 0-1/=1. t5 -i0.Ox`' �i � `�;� � �� :.CSS >31SC0� b:ET RMT I DEA ACKNOWLEDGMENT / INVOICE TEAMS AND CONWVONS , PW wo Wppw 4N trout deductions with onainal hoii0it bills. ROSB®R® �.A4iP01Qiom rut" to it" on CI4Un4 d wade, taw ,& amu itoum S -511R 4 4 05-1/8.1 X13 50 Ofl I Q . 4t4 240�ii 20 . with Cls COU&CIWA of Ultunta due haratlnder, Induding all court Costs mid ano,nel/e foes inGurfed as Vie %(W level od on any appeal: I''C.)I�;i ...1'�1 •i' All Kaation oonewning this order will tako plow In Lana County, 0r800n• 5-316 12 12 05-11811 16-112 -:60,02�,: I'-;'•a,,ur . M 24QOi ' 791D 5.815 1 •1 •08-3/4 1 15 • 60 02 I D V4 240OF 40 11 1-5158 3 8`05-1/8 1.15 44 02.. 1 1 V4 240OF 352 9 I-S.IIR 2 .2 05-1/8 1 19•-11/2- 44 02. c 1 L V4 2400E ae 11 fttttitlauttttitttuttiattlttittmits 111t2EltttttaISMI0It$list$11101 Hit t I0 lit 91111ttttttttttit 41111111 . -- • T: -A_ s>•:??EA FOOTir6: 26268 IOTAS I - :.CSS >31SC0� b:ET RMT I DEA ACKNOWLEDGMENT / INVOICE TEAMS AND CONWVONS , PW wo Wppw 4N trout deductions with onainal hoii0it bills. ROSB®R® �.A4iP01Qiom rut" to it" on CI4Un4 d wade, taw ,& amu itoum CUSTOMERS ORDER is SUEMEOrt �- PaM due accounts will be assasi&W a sehvlce cnwpa of 1-%% pat month 116% par annum). TO ALL OF THE 'PERMS AND I 1,:.1. ; (l:.3 F I' Fuatww agreaa to Indamnity Rowwo lumbar Company tw alt expanooa incuttod in cenneouen CONDITIONS STATED HEREIN.r) '••, 1." ct; with Cls COU&CIWA of Ultunta due haratlnder, Induding all court Costs mid ano,nel/e foes inGurfed as Vie %(W level od on any appeal: I''C.)I�;i ...1'�1 •i' All Kaation oonewning this order will tako plow In Lana County, 0r800n• Should tncrxgWAMioa In lama be found 4oriyeea IN& m*rkwlodgnwnt and wsianw putohaae otdal. fhb acknorAodamoK tabs pmcedenco to 42 cede. . JUN '!2a '01«114 07FPGL'BLDG. PROD, SIC. P.4/5 AM J4 34 ' VFX coitill, c ide of G�otce • . - Certificate N • 18'804 4 THE UNDERSIGNEb MANUFACTUREi I HEREBY CERTIFIES that the structural wood product identified belOw-and.rnarked with a collective mark of American Wood 'Systems (AWS) were mans '# ufactured'iri accordance with the specifications indicated below. ( ;ANS1 Standard A190.1--•1983: for Structural Glued Laminated Timber .• 4 Job Name Ptd. BLDG pRfjDUCTS Job•Location SACRAMFMM Custoiner's Order No. 304-39723 Date 5-1793 rvttgr's Order No. _ 7693-C y Signature Title _—QUALITY CONTROL company ROSSORO LUMBER Co.' 'SPRINGFIELD, OREGON Address ..� _----•----_—, Date �4 IT, IS HERESY.CERTII=IED that the structural glued laminated timber production of the above-named manufacturer which carries a collective mark of American Wood Systems (AWS) is subject to regular audit by..American Wood Systems, such audit consisti of the man ufactt,ring' ng of the inspection with reasonable frequency Process, with adequate sampling to verify the quality of glulam construction and the adequacy.of glue bond. ,�''�e% t _ SESL - by _ Michael R. O'Halloran ' alloran ° �- ,,. • Executive Vice president A$k 11�G AMERICAN WOOD SYSTEMS A RELATER CORPORATION OF AMFtICAN PLYWOOD ASSQCIAT,ON ' ! , '� 11 "J> "` «q..yw— .r... ".. -..A ,�!`.�; ..�, �y�,Y'-.+rV.- • J- 10 -\ '1.' ^^. `•" A f X a.. . �' r� -•a ` JU� .2�C '01,714:07HPGL`.BLDG. PROD, QAC: h: ��� "_,� -P 5,5 sky ROSBORO L.TiMBER COMPANY P.O, Box 20 • Sptinglieid,'OR 97877 .� PHONE: (603) 746-8411 • FAX: (502) 728.8919 . w 4 g`.",Y) •ia"i�� uyta.. _ 1.;.. (�1�:.. i• ..i.,. 'Ilii .IAC'; f 'lr.r,t�L� �. 'rh', i.. C\; ,. �. �:.f`i I i1 ,�i..1 �l..J •�{ t) i''�::... .I:!L.. �d°., f''i'ti 1.1 t. _•!.. i i>-.. Ci!! l..•:'.,'`1::�. ,'�'t"1 t;t+;7( E Bcw*).AC KKc:K�6c)icW:>;:'Ktit:I::K�c�k><?dc��,M��>;�:;< _ )k>X *)i(*, %I<)i'::?F at: ;;(>;c lt: x)K .E19 V 0;p.'.. li 1"`. �.�i.t �F'ti h., �.��.) S f.i('IC k 1 I'4 tI�. 1� Ft1 4, t.. \ r� r' q h -t. C., g B r oTj-.it:,l 8'lltit110tiYttto-smlti'tt1l14ttiittitt$Itit itIMIIititIItI$IIIt$ItIIsmIitItI;l#tilftttltlUlt#itttitttlliitIlitt$131111M$it DRD SNP '. PROT SPC ST LINEAL RATE EXTEN6 KARX i 1#TY OTY WIDTR DEPTH FEET IA 'RACY -cCT CiE 6k CAMH. FET 1;.iRFT PK::E S-309 4 4 03-f!a X 09 6 02 S -31Q 8 6 03-118.1 101/2 60 02,_ S-312 8 8- 03-118 1 12 60 02 5-3:3 3 d 03-118 1 137112 60 02 5-315 8 9 0 -118 r'15 60 02 5=31a 4 :4-115 x 16 -ill 60 02 24t•.r7 12.1 I L V4 [4It6- 2. Lin X 21 60 02 5-524 2 'lit ' ` f 60 02 I D V4 240OF • � IP4--'74LYOr -- - D V4 240OF 240 4i O I 4 V4 2400E 486 1 D W 2400F 480 I D V4 200F 170 I D V4 24t•.r7 12.1 I L V4 [4It6- _?0 5-6.16 4 4 06-3/4 X. 16-1/2 60 02 I D 114 2400 2,r 1 5-622. 2 2. 06-3/4 X 22-112 65 02 2 V4 2400; S; -BA 2 2 OS -314 X 18 60 02 I J V4 24CGF titllttitliititt1111,E�ttitttitttEtit#iltt#itttt>li>vitttlt##tittltttlJl!#tittitltittltttttEttitltttttttitElitittl TCTAt SH;??cG FOOTAF: 21238 TOTAL DELIV LESS MCO NET ari, )EA'ACKN0iMl oGlAEmT f INVOICE TERMS AND. CONK)Mop S � pww ttupport ar tfelaid doGretbns win *60nal tre,gh! gird ROS1B®R® Assoc+ wo no" to apply on claims of Waft tally.& menutmuie. CUSTOMt:R'S ORDfR'IS SUBJECT . Pea du* aeeounta wilt a assessed a aen,tcr phage al 11A% of o+onih naafi pew annum), TO ALL OF THE TERMS'ANn Cuatorno.encs m indomnly Rosbom Lumow Company tar aU &kpencea incurrod in conne�uen + CONt71YlOtiS STATED HEREIN. 11h 0. eollaUi&n d arr,ounts duo hor•unwR Ineludinp all court wale and att_ orney's lase (neu,rod' r „ CI 1A#14ul.l 1&Yot and on any oMal, Aq klipst'" comm" IN$ ad&r will take ole-,& 1. Laiw C4uny. Orogori: % ' I"',;:I I''; i �., f'1, •I t3h UW W*0n*tAMCi•a In tarns be lound,belmmen Ihla wknowkwgmanl and eustansr'puychene Clow. ,hie Wknowsedwnenq takes pfeaedenoo- in as eases. F - COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS ERMIT N 7 County Center Drive - Oroville, California 95965 - Telephone: 916.538-7541 94-1116 APPLICATION ANb PERMIT ASSESSOR PARCEL NUMBER 036-800-048 ZONING AR BUILDING PERMIT OWNER FRIEDA MARTIN TELEPHONE 533-9323 SQ. FT. OCC. BUILDING VAL TIO 1700 R 91,800 OWNER'S MAILING ADDRESS 195 PARSON LN., OROVILLE CA 95966 618 M 11,124 CONTRACTOR'S NAME BUTTE LAND DEVELOPP'TENT TELEPHONE 217 C l O 2,821 CONTRACTOR'S MAILING ADDRESS SAME Fireplace "A" 1,500 CONSTRUCTION LENDER NONE UNKNOWN Total Valuation Is 107,245 Filing Fee $ 15.00 LENDER'S MAILING ADDRESS Permit Fee $ 625.50 ARCHITECT OR ENGINEER NONE LICENSE NO. Plan Checking Fee $ 312.75 Ener Plan Checking Energy g Fee $ 20.00 ARCHITECT OR ENGINEER'S MAILING ADDRESS Penalty $ BUILDING ADDRESS 65 HART DR., OROVILLE Permit fee $ 973.25 PLUMBING PERMIT Filing Fee 15.00 Each Trap 9 5.00 45.00 Solar or heat pump water heater 20.00 LOT NO. 41 SUBDIVISION NAME COPLEY ACRES UNIT 3, PHASE 3 PARCEL MAP 122-27/28 Water piping 7.00 7.00 Each qas water heater or vent 7.00 USE OF STRUCTURE SF ® Duplex❑ Mobilehome❑ Other SPECIFY Gas piping system 1 - 5 outlets 5.00 5.00 Building sewer 15.00 15.00 Mobile Home Is G W 615.00 TYPE OF WORK New �_, Addition t_J Remodei JJ! Utilities ❑ Installation❑ Other ❑ Describe work: 3BR _ Permit Fee $ 94.00 Contractor ELECTRICAL PERMIT Filing Fee 15.00 Main service 600V OR LESS 200A OR LESS 18.50 18.50 Main service 200A TO f000A> 37.50 CONTRACTORS LICENSE LAW 1 declare under penalty of perjury (check one): El am licensed under provisions of Chapt. 9, Div. 3 of the business and Professions Code and my license IS In full force and effect. License ,Jo. 3/ Q1 Classification Fl 1, as the owner, or my employees with wages as their sole compen- sation, will do the work,and the structure is not intended or offered for sale. (Sec. 7044) El I, as the owner, am exclusively contracting with licensed contract- ors. (Sec. 7044) ❑ I am exempt under Sec. , Business and Professions Code for this reason NEW CONST. / DWELLING OccuP.&11 OR ADDNS. l ACC. SLOGS, L 18 3.64 q.ft. 81.10 NEW CONSTR ULTI.OUT LET NON-RESID BRANCH CIRCITS @ 5.00 POWER APPARATUS 6 (SINGLE OUTLET CIR. Ex. Occup( OUTLETS OR FIXTURES 20 760 IAL- 4R,9 Ex. Occup. OUTLETS FIXED PLNS R RESID )EA.) I 3.00 Temporary service 15.00 Mobile Home Facilities 15.00 Mibi- Wiring 15.00 Permit Fee $ 114.60 Contractor - WORKMEN'S COMPENSATION INSURANCE I declare under penalty of perjury (check one): ❑ The permit is for $100.00 (valuation) or less. I have placed on file with the County of Butte Building Department a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -Insure. ❑ I shall not employ any person in any manner so as to become subject to the W. C. laws of California. Notice to Applicant: If after making this statement, should you become subject to the W. C. provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. MECHANICAL PERMIT FiIingFee 15.00 Heating FORCED AIR 9.00 Cooling 31 9.00 Hood 6.50 Ventilation Permit Fee $ 3 .50 Contractor I certify that I have read this application and state that the above information is correct. I agree to comply to all County Ordinances and State Laws relating to building construction, and hereby authorize representatives of the Countyot Butte to enter upon the above-mentioned property for inspection purposes. I also agree to save, indemnify and keep harmless the County of Butte against all liabilities, judgments, costs, and expenses which may in any way accrue against -said ,C-ounntty/jin consequence of the granting of this permit. X �'�r 0 `A41 Date 4/26/93 si nature of Applicant - Owner g pp ❑ Contractor ❑ Agent ❑ An OSHA ion of structuresover3gstor�esoinehe�ght Ions over 5'0" deep and demolition or construct- Mobile Home Installation Fee S Energy Inspection Fee $ 40.00 occR-3 CONVTYPE �Vl 1vI TOTAL FEES 1261.35 HAz - DFEES X IMP X FLoQD X CDF - PAyCEL X Pp X F X Iss�E X This permit is hereby issued under the sions of the Butte County Code and/or work indicated above for which fees D OF PUBLIC By PERMIT EXPIRES Date applicable provi- resolutions to do have been paid. WORKS Date Receipt No. 140552 WHITE-D.P.W., YELLOW -ASSESSOR, PINK -INSPECTOR, GOLDENROD -APPLICANT !�r OUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS 7 County Center Drive - Oroville, California 95965 - Telephone: 916."538-7541 God APPLICATION AND PERMIT PERMIT I. ASSESSOR PARCEL NUMBER /� O - ZONIN oo - d A oWrTELEPHONE 1-rtS / R �,n 5<<-9 OWNER'S LING ADORES$ 19 S �O I 9 S c CON AC TOR'S NAME BUILDING PERMIT SO. FT. OCC. BUILDING VALUATION 1 POO �o ! A? TELEPHONE CO RACTOR'S MAILING ADDRESS C VRUCTION LENDER UNKNOWN Fireplace '� ` Total Valuation Is LENDER'S MAILING ADDRESS Filing Fee ARC ITECT OR ENGINEER Permit Fee Ke--- LICENSE No. Plan Checking Fee ARCHITECT OR ENGINEER'S MAILING ADDRESS BUILDING,ADDRESS Energy Plan Checking Fee $0 Penalty $ A LJr c u Permit fee $ ' PLUMBING PERMIT Filing Fee 15.00 Each Trap 5.001 4S.0 LOT NO. SUB�VISIQN NAME �LjPARCEL MAP ,`_/ I/Kn I/, C V� s V`nI f, Solar or heat pump water heater 20.00 Water piping 7.00 Each qas water heater or vent 7.00 Gas piping system 1 - 5 outlets 5.00 USE OF STRUCTURE SF� Duplex❑ Mobilehome❑ Other Building sewer 15.00 SPECIFY Mobile Home S I G I W @ 15.00 TYPE OF WORK New C4 Addition ❑ RemodelIlities ❑ Installation ❑ Other ❑ Permit Fee $ 0.l Describe work: 7 Contractor ELECTRICAL PERMIT Filing Fee 15.00 Main service 200V OR LESS 00A OR LESS 18.50 CONTRACTORS LICENSE LAW I declare under pe a ty of perjury (check one): ❑ 1 am licensed under provisions of Chapt. 9, Div. 3 of the Business and Professions Code and my license is in full force and effect. License No.G 7 Classification ❑ I, as the owner, or my employees with wages as their sole compen- sation, will do the work,and the structure is not intended or offered for sale. (Sec. 7044) Main service 200ATOI000AI 37.50 NEW CONST. /DWELLING OCCUP. OR ADONS. 1 ACC. BLDGS. 3.64 sq.ft. NEW CONSTR.ULTI.OUTLET NON•RESID BRANCH CIRC ITS @ 5.00 (POWER APPARATUS e� SINGLE CIR. Ex. Occu c p�OUTLETS OR FIXTURES zo 76 EFIXED APPLES. OR - X. OCCUp. OUTLETS (RESI D.1 EA.) I 3.00 Temporary service 15.00 .--- ❑ I, as the owner, am exclusively contracting with licensed contract- ors. (Sec. 7044) ❑ I am exempt under Sec. , Business and Professions Code Mobile Home Facilities 15.00 Misc. Wiring 15.00 - I for h s reason-- ---- Permit Fee $ F, WORKMEN'S COMPENSATION INSURANCE I declare u penalty of perjury (check one)- ❑ The permit is for $100.00 (valuation) or less. I have placed on file with the County of Butte Building Department a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -Insure. ❑ I shall not employ any person in any manner so as to become subject to the W. C. laws of California. Notice to Applicant: If after making this statement, should you become subject to the W. C. provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. Contractor MECHANICAL PERMIT FiIingFee 1 15.00 Heating Cooling — Hood 6.50 Ventilation — Permit Fee $ Contractor I certify that I have read this application and state that the above information Mobile Home Installation Fee $ is correct. I agree to comply to all County Ordinances and State Laws relating to building construction, and hereby authorize representatives of the Countyot Energy Inspection Fee $ klLo Butte to enter upon the above-mentioned property for inspection purposes.coNSTjjv9E I also agree to save, indemnity and keep harmless the County of Butte against -� 'v TOTAL F E $ i all liabilities, judgments, costs, and expenses which may in any way accrue HAz 0FEES IMP FLOO cDF PARCbC P ' IssuE gainst said County in consequence of the granting of this permit. eV/ �( /�/u•�,s— COUNTY OF s permit is hereby Date BUILDING D PT p y issued under the applicable provi- Signature of Applicant _ Owner L7 Contractor ❑ Agent ❑ �p ppRp � Bions of the Butte County Code and/or resolutions to do An OSHA permit is required for excavations over 5'0" deep and demolitior9``b4 �'anstru�t• �rk indicated above for which fees have been paid. ion of structures over 3 storiesinheight. DIRECTOR OF PUBLIC WORKS Receipt No. - / J III By Date I .,... _�.. .... _ PERMIT EXPIRES naro CS.OUNTYOF BUTTE - DEPARTMENTOF DEVEL-OPMENTSERVICES -BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE (916) 538-7541 PERMIT APPLICATION DATASHEET OWNER w^ BEd6 P No.1 Proposed Building Use �° u Building Inspector Date r%6o .) P At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED BY 1. All items have been submitted.. ......... -1 2. Plot plans, 3/4 sets, signed by preparer of plans . .......................... 3. Complete plans, 3/4 sets, signed by preparer of plans. ' .4. Engineered plans and calcs, 3/4 sets,. with wet signature on plans...; f. -n ........ 5.. Hazardous Material Form . ............................................. 6. Energy Design Compliance and supporting documentation . .................. 7. Statement of Intent for Non -Heated and A/C Buildings. 8. Engineered truss details and layout in duplicate (required prior to plan check). ... . Mobilehome data and manufacturer's installation instructions, 2 sets. ........... 4 0. Fees of $ .......................................... mpact fees as shown on attached schedule . ............................... 12. alifornia Department of Forestry plan approval/fees. ....................... . 13. Flood elevation letter (100 year flood b alifQ nia Engineer. ................... 14. Sanitation and plot plan approvaHealth Department . ............ 15. City of Chico plumbing permit . ........................................ . 16. Plot plan and business license approval from City of Biggs/Gridley. 17. Planning approval for (A) Use: (B) Parking: . ......... 18. Contact Land Development about (A) Improvements (B) Drainage. .......... . oeg v19. Driveway permit (construction approval required prior to occupancy). .. .. .. . �' Preanspedion requeV Pre -inspection for required. .. to Building Inspector (Date) 1. Contractor's license information. (No., Name Style, Classification) . ........... . Certificate of Workmans Compensation Insurance . ........................b -7)4 ==3 23. Owner -Builder Verification (Given to owner Mail to owner _). ..... .. .// i24. Recorded copy of Agricultural Acknowledgement'Statement. 25. Letter of signature authorization ....................... . t 26. Copy of recorded deed of parcel creation and 60 right of way to a public road. .... . a 27. Letter of intent on building use. .................................... 28. Mobilehome utility clearance . ....................................:.... . 29. Documentation of legal access . ..................... :.................. 30. Documentation of 50% subdivision developed or (A) Road improvements completed . and (B) Parcel meets zoning area and frontage requirements . ................ 31. Existing violations/expired permits . ...................................... 32. Plan check list . ..................................................... 33. 34. When you issue the permit, process as follows: Mail to owner. --�� Mail to contractor. ' V Telephone _ ,� nd hold for pickup at /� �� i� } _office. Deliver with inspector. Other v Parcel Creation Acreage Applicant Date Copy of Haz-Mat form sent Health Dept. Fire Dept. Air Pollution Date Copy of plans sent Health Dept. Fire Dept. Other Date By The following data must be submitted 1. Index permit for above items No. _ 2. Additional items required: new item not checked above). Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter by _ Date Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter by Date Plans checked by Date Plans approved byDate Sets of plans on hold in File cabinet AP folder M b S 45, Copy - Department of Public Works"�a COUNTY OF BUTTE - DEPARTMENT OF PUBLIC WORKS - BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE (916)5387541 OWNER// / g l^ 1 Y1 A. P. NO . 016 - ff oo- 0 P� PROPOSED BUILDING USE V-. S2 DATE 12-4 - 6 /9.3 / REC. # DATE REC 1. School District Fees (paid at District Office) ,,,,;..... Sheriff Fees (paid at Building Department) Residential ............ /_X L5��a =$ (9&0t 5s 41 h6 .3 unit amt. Commercial(per sq.ft.) X =$ sq.ft. amt. 3. Urban Area Fees (paid at Building Department Residential (per unit) X _$ # units amt. Commerical(per sq.ft.) X =$ sq.ft. amt. 4. Recreation District Fees (paid at District Office) .......................... 5. Drainage District Fees (Contact Land Development) ......................... 6. Other 7. Other At time of permit application, I was advised the above fees are required to be paid prior to issuance of the permit. APPLICANT "�' DATE ;.-rw-• — � t N� ��d'�'dMdtft" tip ��� 1 . `�;`r't'��-`'�f�'�3�F�d y�lQ,ut+ �k?r•.. BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One Form Per Buildingi School District:" 4 l.J �O I� Me--~ n �0 ✓' A.P. Number 031—FOOi Q 1/ Jurisdiction 0 I Property Owner Er 441 G Ina G r (' / n Property Location/Address Subdivison Residential Development Commercial/Industrial V No. of Living Units Building Department No. City LJK J County r O7A i,-, I �t / ,'t Lot No. - Sq. Footage /DO MHI Addition (Group R) 0 Sq. Footage New Addition (Including Exterior {• Roofed Areas) Building Depa enYRepre'sentatiye- Date (Floor Plans reviewed by School District Personnel) District Identification No. --62 V10 ,t�XA�C�ic.C�School District certifies that; (Applicant) xt ,(Street Address) ; (Phone Number) t (City) (State) c� has complied with the requirements of Resolution No. representing % DU' square feet. School Distfi6fRepre:sentative i a by payment of Date ... r Paid by Check Number. , Remarks: Bank Number - / Paid by Cash i t, If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA), this project may be subject to aauniunM scnuur lees to runt muiUMe ns rmPUCL On Me scnu White (applicant), Yellow (building department), Pink (school district) J 6 1. feeform.wkl (4/92) . A PERMIT NO: 48-93 Lake Oroville Area Public Utility District 1960 Erin street OROVILLE, CALIFORNIA 95966 533-2000 DISTRICT APPROVAL AND VERIFICATION OF INSPECTION BUILDING SEWERS This verification form must be submitted to the.Butte County. Department of Public Works Building Department prior to issuance of a building or occupancy permit, whichever is applicable. Prior to final approval by Butte County of a Building or an Occupancy Permit, a copy of this verification form, signed off by Lake Oroville Area Public Utility District, must be submitted to Butte County. Date: June 15, 1993 Applicant: Frieda E. Hart Martin (Butte Land Development) Applicant Address: 195 Parson Lane, Oroville, CA 95966 Applicant Phone No.: 533-9323 Property Location (s): A. P. No. (s): 65 Hart Dr:. Oroville. CA 95966 —Copley Acres Subdivision Unit 3 Phase III Lot 41 Fees due: $350-00 LOAPUD Connection Fee and $900.00 SC -OR Regional Facility Charge totaling $1250.00 Application for service approved: l/ f LAKE LE AREA PUBLIC UTILITY DISTRICT Inspection(s) made and successful test(s) observed: Location: MI - Date: Lake Oroville Area Public Utility District release to close permit: Date: By: RESIDENTIAL PLAN CHECKING GUIDE 8/91 ( S . F . , DUPLEX- & MISC . ONLY) Bldg. Permit # OWNER -/N A.P. # 3l0- 80- 8 GENERAL Plan Checker 14: E�ning requirements: (sideyards and number of permitted living units). 2. Valuation. n 1/ ins signed by designer. w. Proper description of work on application. ---Existing violations on property. 6. Items on data sheet. (W.C., fees, Health, Developer Fees, License law, etc). ecorded notice of violation. PLOT PLAN 1�! Complete parcel size and dimensions. 2�tbacks, sideyards, easements, etc. ;tether buildings or structures. .ading, fills, drainage. Flood hazard. a conditions on creation map, wsz-i-ble, and foundations). FAU & S road setback. (noise, CDF, fire sprinklers, non-comb- uilding or utilities across lot lines (Record form). FLOOR P omplete to scale plan with dimensions. �uired windows for light and ventilation (Sec. 1205). 3� Required windows for second exit (Sec. 1204). -4-r yrights (Chapter 34 & Sec. 5207). t�impact glass (Sec. 5406)_ red room sizes, ceiling heights (Sec. 1207). fi GFCIs in baths, garage, kitchen,, and exterior outlets (Article 210-8). ures, switches, -receptacles, and exterior receptacles for main- anc 'of mechanical equipment. Loc io of water heater, heating and cooling equipment, other electrical equipment.. 1 a firewall, door size, and closer (Sec. 503(d)(3)). 1 1 - '0" exter'or exit door (sec. 3304 (f). Vep ace and wood stove location, alcoves, and clearance. .moke detectors (Sec. 12:0). ubing fixtures, water closet clearances and shower size. STRUCTURAL DETAILS Standard bracing or engineered design (Table 25V) usual shape, size, or split level house requiring lateral design. -3--le'Perestory requiring balloon framing and/or engineering. —"'r j ree story building requiring engineered calculations and plans. 1l/ Foundation plan complete enough to construct building. -. oor construction details complete enough to construct building. 7. Elevations and wall construction details complete enough to construct building Roof construction details complete enough to construct building. ce construction details and calcs if necessary. rter ties or bearing ridge beam. arage door or porch header sizes. ud heights. 1Adobe soils - special foundation design. 1 Retaining walls requiring design. 5. Special Inspection required. 0 RESIDENTIAL PLAN,CHECKING GUIDE 8/91 MISCELLANEOUS ITEMS TO LOOK OUT FOR tairway details: landings, rise and run, head clearance, handrails (Sec. 3306). rai - details (Sec. 1711 & 3306(j). s one veneer (Chapter 30). �for plaster - weep screeds (Sec. 4706). r roof pitch for roof convering (Chapter 32). oof - ring type - (fire hazard). insulation - protection. 36" halls and stairways. 9• Living area over garage - complete 1 -hour separation required on garage side incl' importing walls and posts, etc. w� exi on three-story dwellings (sec. 3303 & see Mezannines - 1716). V.d�erfloor ccess and ventilation (Sec. 3205). 1 access and ventilation (Sec. 2516). 1bustion air for fuel burning appliances - L.P.G. requirements. +4 'requirements on duplexes. 1 F,ne-f-gy design. lb-.-Flashine at all exterior openings. F responsible area requirements. /> xjz C�.�.4 T,� . t_� C' !z� PLF 350 • P 3L-7S- c!) e7sc!) t 3Lo-7SS-x S,ZS -}- 1S16y,1D.S t (o(v0 }0 "13�ZS//(� = Z- `674-. -31 V16 AP . _ 2,j 00 • • ICBG Evaluation A subsid' ccorp ation of the IntE EVALUATIWREPORT Copyright © 1990 ICBG Evaluation Service, Inc. Filing Category: DESI rIND LOAD CRITERIA FOR L BUILDING SYSTEMS METAL BMOHIO UFACTURERS ASSO 1230 KEI CLEV 115-2180 I. Subject: Design W d Load Crite ' or Metal Building Systems. II. Description: A. General: The design wind load criteria are intended only for enclosed light metal building systems with roofs satisfying all of the following conditions: 1. Flat, single sloped or gable -shaped profiles. 2. Mean roof height does not exceed 60 feet. 3. Eave hei t exceed the least, horizont I dimension. De ' procedures ar set forth in Sectio of the 1981 E ion of the e al Building Systems nual. 8.1989 Supplement to the .: This report is unaffected by the Sup- plement. �tH-E�►+d Submitte etailding Syste s Manual 1 Edit and various wind study reports on low-rise buildin a submitted. • Cie 1n. ationallconfeunce of Buildin Officials o.4018 )er. 1990 Findi s IV. F' dings: That Se tion 4 of a Metal BuildinV- 10- so 'lion's Design Win Criteria for Meta, 81 Edition, is an alternate to wind load requiremform Building Code, under the following conditi o1. The building profile complies with Part 11 o 2. The MBMA design criteria are applicable only to enclosed build ings, which are defined as structure ' no more than 30 r - cent of any one side open. Noni act-resi tant glazing sh I be considered an opening. 3. Win on open build' gs;.hall be deter fined in a cordance h the Un' orm Buil ' g Code. A copy of the enced Metal Building Systems Manual is in cluded with plans, calculations and specifications that must be submitted to the buildinLinum or approval. 5. Load combinations, oveoments on t ndations a importance factors compe code. 6. The 111 of steel o nts comply with Chap - 7 or 28 of the code. is report is subject to re-examination in two years. G� S 3' I oz, ore C9 o w ,iosa o Zoo ' 41 I cys' • • • • • • C r Mandatory Measures Checklist: Residential MF -1 R NOTE: Lownse residential buildings subject to the Standards must contain these measures regardless of the campi?ance approach used. Items marked with an asterisk (-) may be supersed9d by more stringent compliance requirentbnfs listed on the Certificate of Compliance. When this checklist is incorporated intS the permit documents, the features noted shall be considered by all parties as binding minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION I DESIGNER I ENFORCEMENT I Building Envelope Measures • §150(a): Minimum R-19 ceiling insulation. §150(b): Loose fill insulation manufacturer's labeled R -Value. • §150(c): Minimum R-13 wall insulation in Named walls (does not apply to exterior mass walls). • §150(d): Minimum R.13 raised floor insulation in framed floors; minimum R-8 in concrete raised floors. §150(1): Slab edoe insulation - water absorption rate no greater than 0.3%. water vapor transmission rate no greater than 20 pemvinch. §118: Insulation specified or installed meets California Energy Commission quality standards. Indicate type and form. §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls a. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. b. Manufactured fenestration products nave Label with certified Lf -value. and infiltration certification. c. Exterior doors and windows weatnerstripped; all joints and penetrations caulked and sealed. §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. §1500: Special infiltration barrier installed to comply with §151 meets Commission quality standards. §150(e): Installation of Fireplaces. Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures §110-13: HVAC equipment. water heaters. showerheads and faucets certified by the Commission. §150(1): Setback thermostat on all applicable healing systems. §150(j): Pipe and Tank Insulation 1. Indirect hot water tanks (e.g., unfired storage tanks br backup solar hot water tanks) have insulation blanket (R-12 or greater) or comoined intenouexterlor insulation (R-16 or greater). 2 First 5 feet of pipes closest to water heater tank, non -recirculating systems, insuiated (8-4 or greater). 3. All buried or exposed'piping insulated in recirculating sections of hot water system. 4. Cooling system piping oelow 55OF insulated. 5. Piping insulated between heating source and indirect hot water tank. §150(ml: Ducts and Fans 1. Ducts constructed. installed and seated to comply with UMC Sections 1002 and 1004: dura insulated to a minimum installed value of R-4.2 or ducts enclosed entirely within conditioned space. 2. Exhaust fan systems nave backdraft or automatic dampers 3. Gravity venfiiatino systems serving conditioned space have either automatic or readily accessible. .manually operated dampers.. §114: Pool and Spa Heating Systems and Equipment _ 1. System is certified witn 78% Ihermai efficiency, on -ori switch, weatherproof operating instructions. no eiecuic resistance neating and no pilot fight 2 System is installed with: - a. At least 36' cede oetween filter and heater for future solar heating. b. Cover for outdoor cools or outdoor spa. 3. Pool system nas airectionai inlets and a circulation dump time switch. §115: Gas-fireo centrai furnace. pool neater, spa neater or household cooxino appliance have no continuously burin piiot tight. (Exception: Non-etectncal cooking appliance with pilot < 150 Shuhr.) Lighting Measures §1'50(k): 40 lumenswan or greater for general lighting in kitchens and rooms with water closets: and recessed cefiing fixtures iC iinsuiauon ccven approved. COMPLIANCE STATEMENT This certificate of compliance fats the building features and performance specifications needed to comply'wfth TO 24, Parts 1 and 6, of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the irtdiyidual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations. any shading feature that is varied is indicated in the Special F-eawrestRemarks section. Designer or Owner (per Business a Professions code) Name: Tida/Firm: Address: Telephone: Lic. e: o _ (signature) (date) i Enforcement Agency Name: Title: Agency. Telephone: (signaturwstamp) (date) Documentation Author. Name: Tide/Firm: Address: Telephone: Certificate of Compliance: Residential Documentation Author Telephone r-- Climate Zone 11 79— // 14 Build'Permit N ,_Ic :S� Chedtod B y / Due Enf.'oromma Agency Use Only BUILDING DATA Minimum Duct North Area 1 Conditioned Floor Area O 0 Number of Stories conditioner. heet pump) � Slab/Raised Floor �— Number of _Units Addition Alone East South" .S• S3West . Single Family Detached (SFD) [ ] 4:0_ 2 [ ] Single Family Attached (SFA) [ ] Existing Building Skylight O (] multi -Family (MF)(] Existing -Plus -Addition _� e::) B T-M,DING SHELL INSULATION t Component Insulation L.ocatiiorlileomments f Type R -Value (attic, to garage, my ECL etc.) Roof.............- Roof ............. Wall .............. wau............. Floor ............. Floor ............. _ .= Slab Edge ....i FENESTRATION Shading Devices -Eenestration -Area Type Interior Exterior Overhang Framing Type Orientation (SO (single, double) (roller blind, etc.) (shadescreen, etc.) (yeshto) (metal/wood) North North East. ( ) East/T- ift South - South ( ) West West t Skylight....... 0_ THERMAL MASS Type/Covering Area Thickness HVAC SYSTEMS Minimum Duct Type (furnace, air Efficiency Location Duct Heat Pump conditioner. heet pump) (AFUE,SEER.HSPF) (auric, etc.) R -Value Thermostat Tyne (split or nkgl 0 ATn(_ 1 G HOT NVATER SYSTEMS T ank (kfat�t R Value (signature) S VStcm T (storage RILS. CtC.) Capacity Number Energy Factor Ext- Tank Tns _ — p i ntri heti nn .Z i SPECIAL FEATURES/REMARKS ►I Point System Summary: Climate Zone -11 Pont scores 1. Ceiling Insulation or R -value 361 U -value 10.0281 2. Walllnsulatlon or R -v ue 191 U -value 10.0651 3. Raised Floor Insulation or R -value (191 U -value 10.0371 4. Slab Edge Insulation or R -value 101 F2 actor 10.751, S. Infiltration Any Ducts in Unconditioned Space? (Y / N) I`t'J 6. Fenestration Heat Loss 25- L, Type U -value 10.651 Total- Fen s. 11161 Sum 1-0 7. Fenestration Heat Gain % Fenestration SCshade open EH. % Fenes. North t'5 x East �, I �- x t South 42 x West 91 K x Skylight _2_ x -------_- Overhangs? ( Y / N ) 8. Interior Thermal Mass or % Exp. Slad(20J Int Mass/CFA 9. Exterior Wall Mass Shade Elf. Ratio V _ _ 0. Heating System Ext WaU Mass ,'f x three.. R-0 .74 -48 AFUE or HSPF Duct Effie. [t story: Effective AFUE Zonai Concol, .2 [78% or 6.81 0.63: 2+s ry: 0.881 or HSPF Adju 1 11. Cooling System /0-V x I t _ 0 2. Wall Insulation R-21 1 SEER (10.0[ Duct Effie. I1 story: Effective SEER •27 Zona4canuol Famdy Family 0.81; 2+ story: 0.871 •13 Adjustrrient 101 12. Water Heating -5 35% -66 49 System 1 • � , S?j 2-1Z- �- -25 Heater Pe Energy Factor ' ExL ns. RR-value Auxliiary input bis (SG50[ (0.531' (121 (None[ ISTD] System 2 -40 -36 •31 -27 Heater Type (None( Energy Factor -. Ext Ins. R -value Auxtiiary Input Dismoucon -11 t � - -6 -4 .2 1. Ceiling Insulation R -value Numoer of stones One Two three.. R-0 .74 -48 -27 R•19 -5 -4 .2 R•30 -1 -1 0 R-38 0 0 0 2. Wall Insulation R-21 1 1 Single• Sk*e- •27 25 Famdy Family Muull- R-0 -72 -57 -43 R•11 -7 -6 -4 R-13 •5 -4 -3 R-15 -4 -3 -2 R-19 0 0 0 R-21 1 1 1 3. Raised Floor Insulation Three Insolation in Floor 0 Numoer of stones R -value One Two Three R•0 •14 -9 -5 R-11 -3 .2 1 R-19 0 0 0 R-30 2 1 Point Total: 4. Slab Edge Insulation Number of Stones R -value One Two Three R-0 1'0 0 0 R-5 6 4 2 R-7 7 4 2 6. Fenestration Heat Loss -34•31 .87 .67 .52 .51 Total 1.31 1.21 1.11 1.01 .91 .81 .76 Percent or to to to .to to to S. Infiltration (Duct Air Leakage) Duns to Uncondatoned Space 0 No Ducts in Uncona toned Soace 3 L}l41ue 71 .66 .61 .56 .51 .46 .41 .36 .35 to to to to to . to '10 , to or GA cc CA SOY. -100 -76 -09 -02 •55 48 -41 •38 -34•31 .87 .67 .52 .51 -27 •24 -20 •17 •13 -10 401. •77 •58 -52 •47 .41 '-36 -30 •27 25 22 19 .16 •13 -11 -8 -5 35% -66 49 -44 -39 -34 -29 -25 -22 .20 •17 •15 .12 _ -tA •7 -5 .3 301% -54 -40 -36 •31 -27 •23 -19 .17 .15 .13 -11 -8 -6 -4 .2 0 28% -50 -36 -32 -28 -25 -21 -17 -15 -13 •11 •9 •7 -5 -3 •1 1 26% -45 •33 •29 •25 -22 -18 •14 •13 -11 •9 •7 -5 -4 •2 0 2 24% -11 -29 •26 -22 -19 •16 -12 -11 -9 -7 -6 -t .2 •1 1 3 221. -36 -25 •22 -19 •I6 •13 -10 -8 .7 .5 -4 •2 •1 1 2 4 20% -31 .22 •19 •16 •13 •11 •8 -6 -5 -4 •2 '-1 1 2 3 5 18% •27' •18 -16 -13 •11 -8 -6 -4 -3 -2 --1 1 2 3 4 6 16% •22 -14 -12 --10 -8 -6 -3 •2 -1 0 1 2 3 4 6 7 14% -18 •11 -9 •7 -5 -3 -1 0 1 2 3 4 5 6 7 8 12% •13 •7 -6 4 -2 •1 1 2 3 4 4 5 6 7 8 9 101. -0 4 •2 -1 1 2 3 4 5 0 6 7 8 8 9 10 8% -1 0 1 2 3 4 6 6 7 7 8 8 9 9 10 11 7. Fenestration Heat Gain (tsaseo on Shane Ettecuveness Ratio) p Eft North East - South West Skylight " % .87 .67 42 -St I .87 .67 .52 :.51 .87 .67 S2 .51 .87 .67 .52 .51 .67 .66 Fen• or to to ,or • or to to ; or or to to or or to to or or or -sm. more .86 •66 class more .86 .66 less more .86 .66 less more .86 .66 less mora less 18% -5 -4 .3 •2 -21 -20 -15 •12 -26 •23 -16 •12 .36 •32 •23 -16 -75 •50 161. -4 -4 .2 •1 -18 -16 •13 •10 -21 -19 -13 -9 •31 •27 •19 -14 50 13 14% --d •3 .2 -1 -14 19 -11 -8 -16 •14 .10 -7 -26 •23 -16 -11 •55 -38 12% •3 -2 .1 -1 -11 3 -8 -6 -12 -10 -7 -4 •21 .18 •13 -8 46 -31 11% •2 -2 .1 0 -10•7 HP HP -6 -10 -8 -5 •3 -19 -16 •11 -7 -41 •28 10% •2 -2 1 0 -8 Three -6 •5 -8 .7 .4 •2 -16 -14 -9 -6 •37 -25 9% =2 -1 .1 0 -7 1 •5 .4 .6 -5 •3 -1 -14 -12 -8 •5 •32 -22 8% -1 •1 1 0 -6 J-4 -4 -4 .4 .4 -2 0 -11 •10 -6 -4 •28 -19 71. -1 -1 0 0 •5 3.0 -4 -3 •3 -3 -1 0 -10 -8 •5 •3 -24 -17 6% -1 -1 0 0 -4 14 .3 -2 -2 •2 -1 0 -8 •7 -4 -2 •20 -14 5% -1 0 0 0 •3 18 -2 -2 -2 •1 0 0 -6 •5 •3 -1 -16 •12 4% 0 0 0 0 -2.1 .16 •13 •1 •i •1 0 1 -4 ..d •2 0 -12 -10 3% 0 0 0 0 -1 •1 -1 0 0 0 0 1 -2 -2 0 1 •9 .7 2% 0 0 0 1 0 0 0 0 0 0 1 1 0 0 1 2 -6 •5 1% 1 1 1 1 1 1 1 1 0 0% 0 0 1 1 2 2 •3 -2 0% 1 1j 1 1 1 1 1 1 0 0 0 0 3 3 3 3 0 0 8. Interior Thermal Mass Method A (Slab•on-grade Construction Only) Percent One Two Three Exposed story Stories Stories 0 0.00 -3 0 .2 0.20 -1 10 2 -2 7 .1 4 1 20 8 'T 0.80 0 10 0 30 14 1 9 1 17 1 . 40 1.40 3 14 2 1.60 1 50 13 4 .23 3 14 2 60 19 5 4 3 100% 2 70 13 6 9 4 F 2 80 8 -17 5 Elf SEER 3 90 Effective 9 neo 6 Sum of 1-0 3 100 Gas 10 Pkg 6 -24 4 .4 +6 Method B HP HP Ira to Stab Floor to Raised Floor Mass 5.0 Stones less -15 Stones +5 /CFA One Two Three One Two Three 0.0 -11 -8 -0 .1 -1 0 0.1 -10 -7 -6 0 0 0 0.3 -9 -6 •5 1 1 1 0.5 -8 -5 -4 2 2 2 1.0 -6 -3 .1 4 4 5 1.5 -4 .1 1 6 6 6 20 -2 2 4 8 8 8 25 1 3 5 9 9 9 3.0 3 '6 . 5 11 10 10 4.0 4 6 7 13 13 13 5.0 4 6 8 14 14 14 6.0 5 7. 9 , 15 15 15 7.o 7 i 10 16 16 16 8.0 8 9 11 18 17 17 9. Exterior Wall Thermal Mass Exterior -_Single- Single- Wall `Family Family Mass Detached Attaated Multi Family 0.00 0 0 0 0.20 3 3 2 0.40 7 5 4 0.60 - 9 8 6 0.80 ; 12 10 7 1.00 14 12 9 1.20 17 13 10 1.40 18 14 11 1.60 - 21 17 13 1.80 .23 18 14 zoo 24 19 14 10. Heating System Houses With Ducts (R42) Sum of 1.6 Gas Split Pkg -25 -24 -14 -4 AFUE HP HP or to to to - HSPF HSPF less -15 •5 +5 +6 to +15 16 or more 781. 6.8 6.6 0 0 0 0 0 0 801. 7.0 6.8 1- 1 1 1. 0 0 85% 7.4 7.2. 5 4 3 2 2 1 90% 7.8 7.6 8 7 5 4 3 1 95% 8.3 8.0 11 9 7 5 4 2 100% 8.7 8.5 13 11 9 7 4 2 Effective AFUE or HSPF -17 -0 -13 Elf SEER (AFUE or HSPF s duct efficiency) -16 Effective 7.9 neo 2 Sum of 1-0 Pckg -25 or Gas Split Pkg -25 -24 -14 .4 +6 16 AFUE HP HP or to to to to or 5.0 HSPF KW less -15 -5 +5 +15 'mono One storyFlouse 6.0 5.8 -16 -13 -9 -6 33% 29 28 -62' '-53 -44 •34 -25 -16 40% 3.5 3.4 -40 -34 -28 - -22 -16 -10 501. 4.4 4.2 -19 -16 -13 -10 -7- -5 60% 5.2 5.1 •4 -4 -3 -2 -2 -1 64% 5.6 5.4 0 0 0 0 0 0 70%. 6.1 5.9 6 5 4 3 2 1 80% 7.0 6.8 13 11 9 7 5 3 90% 7.8 7.6 19 16 13 11 8 5 100% 8.7 8.5 24 20 17 13 10 6 Two or Three Story House Story House 33% 29 28 •69 -58 -48 -37 -26. -15 401. 3.5 3.4 -46 -39 -32 -24 -17 -10 50% 4.4 4.2 -24 .20 .16 •13 -9 -5 60% 5.2 5.1 -9 A -6 -5 -3 -2 69% 6.0 5.8 0 0 0 0 0 0 701. 6.1 5.9 1 1 1 1 0 0 80% 7.0 6.8 9 8 6 5 3 2 90% 7.8 7.6 15 13 10 8 6 3 100% 8.7 8.5 .20 17 14 11 8 4 13.6 18 Zonal Control Adjustment 10 6 3 System Type 15.0 14.6 20 16 11 7 3 Resistance 6 4 3 2 1 0 Other 3 3 2 1 1 0 11. Cooling System Houses With Ducts (R4.2) SEER Sum of 7.9 Split Pang -25 or .24 to -1410 -4 to AC AC less •15 •5 +5 +6 to .15 16 or more 10.0 9.7 0 0 0 0 0 0 11.0 10.7 4 3 2 2 1 0 120 11.6 8 6 5 3 1 0 13.0 126 11 9 6 4 2 0 14.0 13.6 13 11 8 5 2 0 15.0 14.6 16 12 9 6 2 0 0.67 -20 Effective SEER -01 32 -19 (SEER x duct efficiency) -17 -0 -13 Elf SEER -M -16 Sum of 7.9 neo 2 SPIn Pckg -25 or -24 to .14 to -4 to +6 to 16 or AC AC less -15 -5 +5 +15 more One Story House 7 5 -5 -1 4 5.0 4.9 -29 -23 -17 -11 .4 0 6.0 5.8 -16 -13 -9 -6 -2 0 7.0 6.8 -7 -6 -4 •3 •1 0 8.0 7.8 -1 0 0 0 0 0 8.1 7.9 0 0 0 0 0 0 9.0 8.7 5 4 3 2 1 0 10.0 9.7 9 7 5 3 1 0 11.0 10.7 12 10 7 4 2 0 120 11.6 15 12 9 6 2 0 13.0 126 18 14 10 6 3 0 14.0 13.6 20 16 11 7 3 0 15.0 14.6 22 17 12 8 3 0 Two or Three Story House 5.0 4.9 -35 •27 -20 -13 •5 0 6.0 5.8 -21 -17 i 2 -8 -3 0 7.0 6.8 -11 A -7 -4 •2 0 8.0 7.8 .4 -3 •2 -1 -1 0 8.7 8.4 0 0 0 0 0 0 9.0 8.7 2 1 1 1 0 0 10.0 9.7 6 5 4 2 1 0 11.0 10.7 10 8 6 4 1 0 120 11.6 13 10 7 5 2 0 13.0 126 16 12 9 6 2 0 14.0 13.6 18 14 10 6 3 .0 15.0 14.6 20 16 11 7 3 0 Adjustment for No Tattle Inmisdoe Nu moor of Water Mtitr:a Water Hexer Tvoe One Two SG50 .2 •5 SG75 •3 a SE •5 -0 HP •2 .4 Have Siva Adjustment Mouse Size (n2) Subtotal Water I MM Poen Score •less than 1000 1000 to 1499 -30 47 .5 .25 •14 .4 -20 -11 .3 -15 A .3 a0 -a .2 . •5 -3 •1 0 0 0 5 3 1 10 6 2 15 9 3 20 11 3 25 14 4 House She AdJuttrnellt Mimes Site (ftp) Subtotal Ism 2000 Watermuzzlig to or. Pram Spore 1999 more -W 0 3 .25 0 2 -20 0 2 -15 0 1 .10 0 1 .5 0 0 0 0 0 5 0 0 10 0 1 15 0 1 20 0 .2 25 0 .2 Zonal Co=d Adjustment All 6 5 4 2 1 0 12. Water Heating One water Hester - No AuxllLwy Cn dfts Dtrntbubmt Sytaem2 Remc Systems Waw Cwnalls Etmpy STD HWM Pipe No Tines Oemd Heater Tvoel Zones Factor POU Insul CM SG50 All 0.53 0 3 1 -0 -5 0 0.63 5 8 6 .4 0. 5 0.73 8 11 9 0 4 a SG73 All 0.48 -2 1 -1 -12 -7 -2 038 3 6 5 -5 -1 4 am 7 10 8 -1 3 7 SE All 0.67 -20 -12 -17 -01 32 -19 0.93 -17 -0 -13 38 -M -16 IG+ AN neo 2 5 3 IE At OM '-21 -12 HP 6.11.13.15 1.80 4 7 5 -5 -1 4 Two ;Muer Pintas - No Awdliary Credhs SG50 All am .7 .4 -6 -17 •12 •7 0.63 1 5 3 -0 •4 1 an 6 10 a -2 2 7 SG75 All 0.48 -12 -0 •11 -22 -17 -12 0.58 .1 3 0 -11 -0 -1 0.68 6 9 7 .4 1 6 SE A9 0.87 -22 -14 -19 -6 -35 -22 093 -16 -7 -12 -39 -28 -15 ;G All am .4 •1 .3 IE AS 0.93 -21 -12 HP 6.11.13.15 1.80 •1 3 1 -10 -6 0