Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
079-090-030
L3 m FA / . / ^/ FA PERMIT NO. (} Q� .• PERMIT EXPIRES .v . OWNER FRIEDA HART MARTIN CONTR. owner ASSESSOR PARCEL 36-54-19 LOCATION 230 Loma Vista Drive,.Oroville Temp. Power Pole Called PG&E Temp. Elec. Service Called PG&E Temp. Gas Service Called PG&E JOB FINALED (Date) Signature __.._ = OK = Not OK = Not Applicable MOBILEHOMES = Not Ready MISCELLANEOUS Date MOBILEHOME UTILITIES (Plans) OK except q s Date DECKS, COVERS, CARPORTS, ETC. (Plans) OK except N's 1. Zoning Requirements -Setbacks -Easements 2. Soils; Special MH Support -Sketch 3. Sewer; Location -Test -Fall -C/0 -Concrete 1. Zoning Requirements -Setbacks -Easements _ 2. Footings; Size -Depth -Spacing -Connectors 3. Decks; Girders and/or Joists -Decking -Bracing -Stairs -Rails 4. Water; Location -Test -Easement Needed (Sketch) 4, Wood Awn.; Posts-Beams-Rftrs.-Connec.-Shthg.-Rfg.-Bracing 5. Electricity; Location-Clearances-Grnd.-/ / Amp -Concrete 5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures 6. Gas; Location -Test -Wrap:/ /"L"ft./ /"Nat.or/ _ /"L"ft./ /"LPG 6. Carports; Windows -Doors 7. Utility Clearance _ 7. Elec. Card -BI Date Card -BI Date Card -BI Date Card -BI Date _ Card -BI Date Date Card -BI Date MOBILEHOME INSTALLATION (Plans) OK except N's 1. Zoning Requirements -Setbacks -Easements Card -BI Date Date Card -BI Date POOLS (Plans) OK except N's 1. Setbacks -Easements 2. Footings; Size -Spacing -Marriage Line 2. Soils; Compaction -Structure Stability 3. Gas; MH Test -Demand -Valve -Connector 3. Pool Structure;'Steel-Connections-Thickness-Dead Men -Lining 4. Electricity; MH Test -Crossovers -Breakers -Clearances 4. Elec.; Receptacles and Lighting; Distances-GFI 5. Drain; MH Test -Fall -Flex Connector 5. Elec.; Pool Lighting; 15 volts-GFI 6. Water; MH Test -Regulator -Connector 6. Elec.; Enclosures; Conduit Entries -Terminals -Listed 7. Water and Sewer Connected -C/0 to Grade -HD Approval 7, Elec.; Bonding; Metal w/5' -Circulating Equipment -Heater 8. Gas and Electricity Tagged 8. Elec.; Grounding; Equip. w/5' -Circulating Equip. -Pool Lghtg. Boxes -Enclosures -Panel boards -Ins. to Main in Conduit 9. Exits; Insp.-Sketch 10. Carl. of Occupancy 9. Health Department Approval 10. Plumb; Cir. Test -Water Supply Test Card B -I Date Card -BI Date Card -BI Date Card -BI Data Card B -I Date Card -BI Date Card -BI Date Card -BI Date V = OK 0 = Not OK - = Not Applicable = Not Ready RESIDENTIAL (Single and Duplex) ' Date UNDERFLOOR (Plans) OK except #'s Date FRAMING (Continued) 1. Zoning requirements -Setbacks -Easements 48. Property Line Firewall & Openings 2. Ftg., Main; Soils-Steel-Elec. Grnd.- / /". Ftg. Depth 49. Ext. Doors -One 3' -Check Garage -3rd story, 2 exits 3 4. Fig., Garage: Soils -Steel- / /" Ftg. Depth Ftg_, Porches & Decks; Soils -Steel- / /" Ftg. Depth 0 51. Stairs; Width -Headroom -Rise -Run -Landing -Fire Protection_ Plywood on Roof Overhang -Attic Vents -Rafter Outriggers 5. Stemwalls, Main; Steel-Blockouts-Wrapped-Slab 52. Siding -Nailing -Veneer 6. Stemwalls, Garage; Steel-Blockouts-Wrapped-Slab 53. Stucco Mesh -Drip Screed-Fdn. Vents-Underflr. Access_ 7. Piers -Fireplace Ftg.-Steel 54. _ Glazing Area -Glass Protection -Skylights -Plastic 8. D.W.V.: Fall -Fittings -Test -2 way C/O -Sewer Test 55. Shear Walls; Nailing -Bolts 9. Gas Pipe; Size -Anchors 10. Water Pipe: Test -Anchors -Regulator -Service Test 11. Electric: Underground 12. Plenums & Ducts; Clearance -Material -Support -Ins. __ 13. Girders -Sills -Anchor Bolts -Joists -Vents -Cripples Card -BI Date Card -BI Date Card -BI Date Card -BI Date Card -BI Date Card -BI Date Card -BI Date _ Card -BI Date Date FINAL (Plans) OK except N's 56. Ext. Steps -Door & Sidelight Protection -Landings Ca rd__ OF Date Card -BI Card -BI Date Card -BI Date PLUMBING (Permit) OK except N's 14. Water Ht.: Vent -Access -Combustion Air 15. Water Pipe: Test & Anchors -Nail Protection 16. D.W.V.: Test-Fttngs & Anchors -Nail Protection 17. Shower Pan: Test, First Floor -Tub Access 18. Test Tub & Shower, 2nd Floor -Tub Access 19. Gas Pipe: Size & Anchors Date _ Card -BI Date Date Card -BI Date 57. Smoke Detector 58, Furnace; Vents -Clearance -Comb. Air -Connector - In Garage; Above Floor -Ducts -Meth. Protection 59. Bedroom Exiting 60. G.F.I. & Bath Fixtures & Tub Access 61. Elec. Trim & Subpanel; Breaker Sizes -Labels 62. Stairs & Rails 63. Fireplace or Stove; Clearances -Hearth 64. Elec. Outlets at Wood Panel; Int. & Ext. 65. Kit. Fixt. & Appliance; Grnd.-Air Gap -Cooking Clearance 66. Elec. Outlets & Receptacles at Kit. Counter Date ELECTRICAL Permit OK except q's 67. Garage Fire Door; Swing -Landing -Closer 68. A.C. Duct in Garage -Damper Card B -I Card B -I 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. Fixture & Transformer Clearance -Ins. Protection Elec. Receptacles Spacing -Lights &Switches at Doors Size Boxes & No. of Conductors -Stapled _ Romex Installed Close to Edge of Studs & C.J. Equip. Ground made up w/Mech. Fasteners -Bond Gas & Water 2 Appliance Circuits in Kitchen_ & Conductor Size Subfeed Wire Size / / ga. Cu or AI-A.C. Wire Size / / ga. Cu or At Range Circ. / / ga. Cu or AI -Oven Circ. / / ga. Cu or AI, Insulated Neutral Yes _No _ _ Service -Riser Conductors & Ground -Main Disconnect _ Equip. Clearances: Panels-Motors-Mech. Equip. Clothes Closet Light -Shower Light Date Card -BI Date _ Date Card -BI Date 69. Wtr. Htr.; Vents -Clearance -Comb. Air-Connector-P.R.V.- In Garage; Above Floor -Meth. Protection 70. Plb., Elec. & Mech. Equip. Listed for Location 71. 72. Receptacles in Garage; F.I.)-Romex Protec. Insulation -Foam -Looked Insulation -Foam -Looked in Attic ❑Yes 73. Guard Rails & Deck Construction -Post Caps 74. Fdn. Vents & Crawl Hole Door -Drainage & Wood -Earth Clearance Looked under Floor ❑ Yes ---- 75. Following inslld.: Drive ❑ Yes ❑ No; Walks ❑ Yes ❑ No; Planters ❑Yes ❑No 76. Stucco; Brown -Finish 77, A.C. Unit; Disconnect-Clrnces-Brkr. & Cond. Size -115V Outlet - 78. Vents Above Roof; Plbg.-Appliance-Firepl.-Clearance to Opngs. 79. Water Well; Disconnect, Electrical, Plumbing Exterior Elec. Trim; G.F.I. Receptacle -Underground _80. -- ' 81. Ventilation throughout House 82. Glass Protection Date MECHANICAL (Permit) OK except q's _ _ _ 83. 84. _ Corrections from Previous Inspections Gas Test -Meters Tagged; Gas -Electric 31. 32. 33. 34. 35. A.C. Ducts. Insulation & Support _ Vent Fan. Exhaust above Insulation _ Condensate Drain & Overflow. Size & Grade Furnace -Vent: Access -Comb. Air -Return Air Vent -115V -outlet Attic Access & Platform if Furnace in Attic _ 85. Water & Sewer Connected -C/O to Grade -HD Approval _ 86, Energy Compliance Certificate -Other Certificates -- "- - -" - Card -BI Date Card -BI Date Card -BI Caid-BI Date Date Card -BI Date Card -BI Oate Card -BI Date Date Card -BI Date Card -BI Date Card -BI Date FRAMING(Plans) OK except p's ' Com tents at Final: 36. Sills; Proper Material & Anchors 37. Walls. Studs -Nailing, Spacing & Bracing -Plates -Sound 38. Bearing Walls over Girders & Floor Nailing _ 39. Draft Stop in Walls (rat proof) 40. Fire Stops: Furred Ceilings -Stairs -Chases -Tub 41 Header & Beam -Size & Bearing 42. Hangers -Post Caps -Anchors -Connectors 43. Ging. Joist-Rftr. Ties-Purlin-Root Brac.-Truss-Shthng.-Rfng. _ 44. Fireplace Ties or Type A Flue -Fireplace Throat 45. Attic Access. Size & Romex Protection -Draft Slop -Ins. Baffles 46. Bdrm. Windows or Exiting Doors -Sill Hgl. & Dimensions 47. Garage Fire Protection Framing (NOTE Anentrymust be made each time youvisit jobsite) COUNTY OF BUTTE,-.- DEPARTMENT OF PUBLIC WORKS 7 County Center Drive - Oroville, California 95965 - Telephone 916/534-4541 APPLICATION AND PERMIT ERMIT NO AS3Sr A�CEL_L,MB R `IJ ZON1 BUILDING PERMIT OWNER` 1 T;Ero ,0 75 7 OL SO. FT. 0, C- BUILDING V ION O ER'S M1#1YING ADDRESS � �� V�1' �� CO RACTOR'S N ME ,v TE EPHONE CONTRACTOR'S MAILING ADDRESS Fireplace CO RUCTION LENDER UNKNOWN Total Valuation $ Filing Fee $ 10.00 LENDER'S MAILING ADDRESS Permit Fee $ ARC/-IJTECT OR ENGINEER LICENSE NO. Plan Checking Fee ,$' l6 00 Energy Plan Checking Fee $ /L,:_ n ARCHITECT OR ENGINEER'S MAILING ADDRESS Penalty $ BUILDING ADDRESS j, `J( .s to r. Permit fee � r $ 00 PLUMBING PERMIT Filing Fee 10.00 Each Trap 2.00 fG, r©Vi �S- Solar or heat pump water heater 20.00 LOT NO. SUBDIVISION NAMEPARCEL`MAP —C Water piping 5.00 Q Each qas water heater or vent 5.00 USE OF STRUCTURE SF Duplex❑ Mobilehome❑ Other SPECIFY Gas piping system 1 - 5 outlets 5.00 , Q Building sewer 5.00 Mobile Home S G W 0.00 ea TYPE OF WORK New. Addition ❑ Remodel ❑ Utilities ❑ Installation❑ Other ❑ Describe work: Permit Fee $ .49 Contractor ELECTRICAL PERMIT Filing Fee 10.00 LL CCJJCC77 Main service 6111 OR LESS 100 AMP OR LESS 10.00 Main service EA. ADD'L 100 AMP 2.50 CONTRACTORS LICENSE LAW I declare under penalty of perjury (check one): ❑ I am licensed under provisions of Chapt. 9, Div. 3 of the Business and Professions Code and my license is in full force and effect. License No. 31 R3 6-7Classification ❑ I, as the owner, or my employees with wages as their sole compen- sation, will do the work,and the structure is not intended or offered for sale. (Sec. 7044) ❑ I, as the owner, am exclusively contracting with licensed contract- ors. (Sec. 7044) ❑ I am exempt under Sec. , Business and Professions Code for this reason NEW CONST. DWELLING OCCU , OR ADDNS. ACC. BLDGS. h2sgft PIS NEW CONSTR. ULTI.OUTLET NO N.RESID BRANCH CIRCUITS 2.50 ea /POWER APPARATUS hl l SINGLE OUTLET CIR. / Ex. Occup(OUTLETS OR FIXTURES 9A O30 FIXED APLNS. Ex. Occup. OUTLETS IPRESID IKEA.) 2.00 Temporary service 10.00 Mobile Home Facilities 15.00 Misc. Wiring g 15.00 Permit Fee $ WORKMEN'S COMPENSATION INSURANCE I declare under penalty of perjury (check one): ❑ The permit is for $100.00 (valuation) or less. I� I have placed on file with the County of Butte Building Department l� a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -Insure. ❑ I shall not employ any person in any manner so as to become subject to the W. C. laws of California. Notice to Applicant: If after making this statement, should you become subject to'the W. C. provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. Contractor MECHANICAL PERMIT Filing Fee 10.00 Heating Cooling g Hood 3,00 Ventilation permit Fee $ Contractor I certify that I have read this application and state that the above information is correct. I agree to comply to all County Ordinances and State Laws relating to building construction, and hereby authorize representatives of the County of Butte to enter upon the above-mentioned property for inspection purposes. 1 also agree to save, indemnify and keep harmless the County of Butte against all liabilities, judgments, costs, and expenses which may in any way accrue against said County in consequence of the granting of this permit. %�``�� Date 3/% Signature of Applicant — Owner ❑ Contractor ❑ Agent ❑ An OSHA permit is required for excavations over 5'0" deep and demolition or construct- ion of structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee $ TOTAL PERMIT FEE $ OCCUP. CONST.TYPC VW I PVol PARC P ND ss E This permit is hereby issued under sions of the Butte County Code and/or work icated above for which R CTQR OF PUBLIC By PERMIT EXPIRES Date the applicable provi- resolutions to do fees have been paid. WORKS Date A9 S, /O eceipt No. L HITE-D.R.W., YELLOW -ASSESSOR, NK -INSPECTOR, GOLDENROD -APPLICANT FW COUNTY OF BUTTE - DEPARJIE(N :.OF. PUBLIC WORKS - BUILDING DIVISION 7 COUNTY CENTER DRIVE - OROVILLE, CALIFORNIA 95965 - TELEPHONE: 916/534-4541 PERMIT APPLICATION DATA SHEET ' Permit No. OWNER >^.lP .I G a ✓`� ` /� t ) '' P. No. Proposed Building Use ��+4 rtl bS� Building Inspector Date ` s y At time of permit application, I was advised the following data must be submitted prior to permit processing andJor issuance: DATE RECEIVED APPROVED 1. All items have been submitted. . . . . . . . . . . . 2. Plot plans in duplicate./triplicate, signed by preparer of plans. 3. Complete plans in duplicate. /triplicate, signed by preparer of plans. 4. Complete engineered plans and calcs, with wet signature on plans, 5. Plans with Energy Design Compliance Statement. . . . . . 6. CUSD "Fees Paid" Stamp on Floor Plan . . . . . . . . 7 Statement of Intent for Non -Heated and AC Buildings. 8. Fees of $ . , , . . , , t Letter of signature authoriza 'on. • ✓` F• ' Sanitation approval from Health Dept. 11. Planning approval for (A) Use: (B) Parking: 12. Certificate of Workmen's Compensation Insurance. . . . . . 13. Contractor's License Information (no., name style, classif.) 14. Owner -Builder Verification (Given to owner0, Mail to owner ❑•). —15. Improvements may be required. . . . . . . . . . . . 16. Mobi lehome Installation Data. . . . . . . 17 Pre -Inspection for RequiredPre-Inspec. request to (Date) , Building Inspector Recorded copy of Agricultural Acknowledgment Statement.`/ 19. Driveway Permit. 20. Plot plan approval from city of 21. 22. When you issue the per I , p ocaxss as follows: Mail to owner, Mail to contractor. Telephone ��-�J 9 and hold for pickup at_�2p_eoffice, Deliver w/inspector. Other Applicant Date .31f/% Copy of plans sent Health Dept., Fire Dept., Other Date The following data must be submitted prior to 1. Index permit for above items No. 2. Additional items required: it issuance: (Circle new item not checked above), Contractor, designer, owner, was advised of above required data by_phone_mil count date Contractor, designer, owner, was advised of above required data by—phone—m; ll o r by date Plans checked by Copy—DPW Date Plans approved by Sets of plans on hold inQ2sFile cabinet AP folder — Flours: 10:00 a.m. - 3:00 p.m. TO Buildinq Department FROM: Environmental'Health SUBJECT: Sanitation Clearance Final clearance O.K. for: Water Supply Clearance for C:2 --I bedroom mobil home Other NOTE * * * Sanitarian to Owner Location AP# Plan Approved for: Sewage Disposal _Z Water Supply Hold final for:\ Water Supply Final clearance O.K. for: Water Supply Clearance for C:2 --I bedroom mobil home Other NOTE * * * Sanitarian to FORM RESIDENTIAL ENERGY PLAN CHECK/INSPECTION'-SUMMARY Owner 4; Climate Zone 4—Permit No . Floor Area Compliance path: Package ❑ A ❑ B ❑ C r! oint System ❑ Budget Other x413 16 3 MIN R -VALUE DESCRIPTION REQ'D INSTALLED ITEMS (1) INSULATION; Q� Roof./Ceiling Wall `t -0 61 _ ❑ Slab Floor Perimeter ❑ Raised Floor (2) INFILTRATION• ❑ (A) A vapor barrier is required in climate zones, 1, 14 & 16. (B) All manufactured windows and sliding glass doors shall meet the 1972 ANSI Air Infiltration Standards and shall be certified and / labeled. 11 [� (C) All swinging doors and windows leading to unconditioned areas shall be fully weatherstripped.. Tight - the above standard features plus: [� (D) Continuous infiltration barrier ❑ (E) Electrical outlet plate gasket ❑ (F) Air-to-air heat exchanger (3) GLAZING: (A) Location r Area Glazing %Floor Area Single Double Triple Total Bldg/�cf ,rte, 6 ❑ North ❑ East ❑ West ❑ Skylights ^� (B) Shading Shading Coefficient D sc ipt' n [� East 4. (� South_ West a G, !� L1 a f u h Cl / Skylights ❑/ (C) South Overhang Length of projection_ 2. ft. Description c ❑ (D) Moveable insulation: Area ft Description Id' (E) Thermal 1pass Type Area Ft.2 HC=� R- 2 MC .. Location - ❑ Type - Area Ft. HC= R= MC= Location ❑ Type - Area Ft.2 HC= R= MC= Location ❑ Type - Area w Ft.Z HC= R= MC= Location ` C_7 Type - Area Ft.2 HC= R= MC= Location ❑ Type - Area Ft. HC= R= MC= Location 7/83 7/83 FORM ❑ (4) MASONRY AND FACTORY -BUILT FIREPLACES shall be equipped with tight fitting closeable metal or glass doors covering the entire opening of the firebox; a combusibn air intake equipped with a readily accessible, openable, and tight fitting damper to draw air from the outside of the building; and a tight fitting flue damper with a readily accessible control. *1(5) HEATING. VENTILATING; AIR CONDITIONING SYSTEM (A) Heating [� Central Gas Furnace 71r (brand and model number) SE Btu/hr (heating capacity) ❑ Heat Pump (brand and model number) ACOP Btu/hr (heating capacity at 47°F) ❑ Active Solar type (liquid or air) Collector brand and ft2 model number solar fraction collector area collector orientation collector tilt rated y -intercept rated slope ❑ Other (describe) *1 (B) Cooling . Q� Electric Air Conditioners--� (brand and model number) (seasonal EER) Btu/hr (cooling capacity at 95°F) ❑ Electric Heat Pump _ EER Btu/hr (cooling capacity at 95°F) ❑ Other (describe) ❑ (C) A TWO-STAGE THERMOSTAT, which controls the supplementary heat on its second stage, shall be required for heat pumps. (D) AN AUTOMATIC SETBACK shall be provided for all thermostats, except those controlling heat pumps. [� (E) AN INTERMITTENT IGNITION DEVICE shall be provided for all gas-fired fan type central furnaces, gas-fired fan type wall furnaces and gas cooking appliances. LaJ' (F) BACKDRAFT DAMPERS shall be provided for all fan systems exhausting air to the outside. (G) DUCT CONSTRUCTION & INSULATION. All transverse duct, plenum, and fitting joints shall be.sealed with pressure.sensitive tape or mastic to prevent air loss and shall be insulated to conform to the provisions of Section 1005 of the UMC, 1976 Edition. 2 r' FORK 1 (6) DOMESTIC WATER SYSTEM []� (A) Gas Only Gallons (brand and model number) (tank size) ❑ Heat Pump w/ElectricBackup ' (brand and model number) Gallons (tank size) ❑ *2 Active Solar (collector brand and model number) (rated y -intercept) (rated slope) (solar fraction) ft 2 (backup heater type, brand and model number) (collector area) (collector orientation) (collector.tilt) ❑ Location of Solar Panels ❑ Other (Describe) (B) TANK INSULATION. Storage type water heaters and storage and backup tanks for solar systems shall -be externally wrapped with R-12 insulation or greater. C� (C) PIPE INSULATION. The five feet of pipe closest to the water heater and outside conditioned space shall be insulated with a minimum of R-3. Steam and steam conditioned space shall be insulated with a minimum of R-3. Steam and .steam condensation return piping and recirculating hot water piping outside the building envelope shall be insulated in accordance with T20 -1408(d). (D) FLOW RESTRICTORS shall be provided for showerheads and faucets as outlined in the new appliance efficiency standards and shall be certified to the Energy Commission. (7) LIGHTING (A) Lamps used in luminaries for general lighting in kitchens and bathrooms shall have an efficacy of not less than 25 lumens per watt (usually florescent). *1 Submit documentation of sizing heating and cooling equipment by Manual J, sizing charts (form #4) or other approved methods, section 2-5352(g), and fill out the following: Heating: Winter design temperature c�V °, elevation 0 ', heating load 'ETU elevaion factor /to © x heating load = maximum outlet capacity gas furnace O PJ BTU Cooling: Summer design temperature °, cooling load _BTU (USE ONLY AS A SIZING GUIDE, COOLING MAY BE INADEQUATE) *2 Submit T.I.P.S.E. chart or other approved system (form #5) to document sizing of solar panels. ® DESIGN COMPLIANCE STATEMENT: The above building design meets the requirements of Title 24, Part 2, Chapter 2-53 of the California Administration Code. 7/83 '00 � SIGNATURE OF BUILDING DESIGNER OR APPLICANT 3 Table 3-13. Infiltration Control Features Points i-- ' I T I Coctrol Features 1 Points I 1 I I T -- Standard �•� i 0 i .? 1 0:9 alr-changes per hr I I I I I I Tight I +12 I I I i 0.6 air changes per hr I' I I I i Table 3-15. Cas Furnace Without RefrIseratlon Cool!ne Points I Seasonal Efficiency I Points I i (SE), X I I I 71 - 76 I 0 1 I 77 - 82 I +2 I I 83 - 88 ( +4 1 1' 89 - 94 I +6 I 1 95 up I +8 i Table 3-16. Heat Pumo Points I Energy Efficiency I Points I I Ratio (EER) I I I 7.5 - 7.9 +3 I I 3.0 - 8.3 I +6 I I 8.4 - 9.7 I +9 I 1 8.8 = 9.1 I +12 I 9.2 - 9.6 I +13 I I 9.7 - 10.2 I +18 1 I 10.3 - 10.9 1 +21 I I 10.9 - 11.5 I +24 1 1 11.6 - 12.3, 1 +27 I I 12.4 - I 13.2 I +30 I I 1 0 1 e 4 6 Table 3-17. Cas Furnace With RefrlRiiatlon CoollnR Points !Refrigeratlonl Cas Furnace I I Cooling I SE : I I 1- 7-183- 89- 95 I 1761 8:1 881 941 o I +�I +21 +41 +61 +8 1 I '8.4-= B.7 +21 +41 +61 +91+10 1 I R.8 - 9.2 1 +4I +61 +81+101+12 1 1 9.1 - 9.7 1 +61 +81+101+121+14 1 1 9.8 - 10.3 1 +al#.lot+121+141+16 1 1 10.4 - 10.9 I+1G;+12i+141+16;+18 I I' 11.0 - 11.6 1+121+ic1+161+181+20 I I I I I I I 7/7/83 TABLE 3-14 (FDAPTEO) MASS DWELLING_ AREA 1,000 1,500 SQ. FT. I A s C D 1 A -rC 0 2,000 ZONE i1 iNTER.10111 THERMAL MASS POINTS 2,500 I 3,000 I 3,500 4,000 I 4,SGO 5.000 ; 8 C 0 A 8 C 0 1 A 8 C O. A R C D 1 A 6 L D A R C C 1 50 2 2 2 2 2 2 2 0 1 2 2 2 0 1 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 0. a 0 0 1 !03. 4 6 4 6 4 6 2 44 2 2 2 4 2 2 2 2 2 *2 2 2 2 2 2 2 2 2 2 2 0 2 2 2 2 7 2 2 0 2 2 2 2 2 0 2 0 2 2 2 2 2 0 2 0 0 2 2 2 2 0 2 OI 0 0 2 0 2 0 2 0 O 200 253 8 10 8 10 6 8 4 5 6 6 6 6 4 6 2 4 4 6 4 6 4 4 2 2 4 4 4 4' 2. 4 2 2 2 4 2 4 .2 2 2 2 2 2 .2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 I 2' 2 2 2 2 2! 300 12 12 10 6 8 8 6 4 6 6 6 4 6 6 4 2 4 4 4 2 4 4 2 2 2 2 2 2 2 2 2 7 2. 7 2 2 350 14 14 12 8 10 10 8 6 6 6 6 4 6 6 6 2 6 4 4 2 4 4 4 2 4 4 2 2 4 4 2 7 2 2 2 2 400 14 14 12 8 10 10 8 6 6 8 6 4 6 6 4 4 6 - 6 4 2 4 4 4 2 4 4 4 2 4 4 2 2 3 4 2 2 $00 600 18 22 IB 20 16 18 10 12 12 14 12 14 10 12 6 8 10 12 10 12 8 10 6 6 R 10 8 10 6 8 4 6 6 8 6 8 6 6 4 4 6 8 6 C 6 6 2 4 6 6 6 6 4 6 2 4 4 6 4 6. 4 4 2 4 2( 6 4 6 4 1 j 2 1 103 230 900 1.010 1,700 1,200 1.700 1,400 24 26 28 30 .12 34 34 34 24 24 28 30 37. 32 34 34 20 22 74 26 28 30 32 32 14 16' 16 16 20 22 22 24 18 70 22 ?2 24 26 28 28 16 16 20 20 24 26 26 28 It 16 18 20 22 22 24 26 10 10 12 14 14 16 16 18 14 14 16 18 20 22 22 24 14 14 16 18 20 20 22 24 12 12 14 16 18 18 20 20 8 8 10 10 10 12 12 1: 10 12 14 14 16 18 18 20 10 10 14 11 16 18 18 20 10 10 12 12 14 14 16 18 6 6 8 8 8 10 10 12 10 10 12 12 1/ 14 16 18 10 10 12 12 14 14 14 16 6 B 10 10 12 12 IA 14 6 6 6 6 8 8 6 10 80 10 10 12 12 14 14 14 R 10 10 12 12 12 14 6 8 3 10 10 12 12 12 4 8 4 - 6 3 6 t10 6 1 8 1.120 8 12 8 14 6. 6 a TO 10 12 12 11 6 6 '8 8 10 10 to 12 4 4 1 6 6 6 6 8 6 6 6 8 10 la 12 12 A 6 8 8 10 10 i0 1? 6 6 6 0 8 8 10 :G 41 6 II 6 17 8 •I 61 !0 6 In 6� 10 61 10 6 6 a 6 e In 10 13 e' 6 6 6 B 8 F. 17 2 i s t i 4 i 6 i 6 4 1.500 1 2.300 It 2,S00 J.000 3,500 4.330 36 31 31 24 30 34 30 34 26 32 18 22 _ 21 30 34 21 30 34 22 26 30 11 18 22 1310 22 26 34 20 26 30 32 18 22 26 30 12 16 18 22 18 22 26 30 32 18 22 26 30 32 16 20 24 26 30 10 14 16 18 20 16 120 24 28 30 32 16 20 24 26 30 32 14 18 22. 24 26 30 8 12 14 I22 16 �24 ld 20 14 16 ?d 14 18 2t 24. 28 30 12 16 13 22 71 26 8 10 :2 14 16 18' 17 16 20 22 26 78 12 16 20 22 24 28 10 !4 IB 20 27 24 61 12 8I 14 1.• ly 14) :2 14i `4 lE 26 ti 14 13 :J ;/ 2S 1;. 1? 16 !: 23 2Z o i B 1 :e li 14 ' If 1,500 130 32 32 28 20 ]U 30 26 U is ^. 2- ;£ ; 5_007 72 17 Zi 231 i3 ;G 76 1= '• A) 1. 3'i Concrete Slab: HC -8.93; R-.29; Factor -7.3 ^ ' 2. 3 3/4• Thick Common Brick- IIC-7.125; it -.13; Factor -7.3 8) 1. 54' Concrete S1aD: "[111.106; ;1.458; Fattor•7.1 C1 T. B' Solid Filled Block: HC -20.6]; R-1.93; Factor•6.1 2. B• Selld Filled Bloci With Both Sides Exposed To Conditioned Air. ROTE: Use all ,Quare footage directly exposed to conditioned air for The real'Mass Area: HC -10.164; R-.96;; Factor -6.1 0) 1• Thick Concrete/Tile: KC-2.SS; R-.083• Factor! -3 7 wood stove ¢33 pointsrio back up) casablanca fan + !.point Table 3-19. Zonally Controlled Electric Resistance Space Heating Points - I Points for this measure v!11 I Table 3-20. Solar Hater Heatinz With Cas Backus Points , I be completed after the CEC 1 I has approved an Alternative i I ComponentPackage for Resistance I neat. Table 3-15. Active Solar Space - Net Solar Fraction I Points I (NSF), Z I I I � Hultlfamil (per unitpoints) Floor Area I 0-6 i 0 I 1 7 - 14 I +2 I I 15 - 23 I +4 I I 24 - 30 I +6 I 1 31 - 39 I +8 I 1 40 - 47 I , +10 I I 48 - 55 1 4-12 I I 56 - 63 I +14 I I 64-71 I +18 I 72 up I +20 I Hultlfamil (per unitpoints) Floor Area Net Solar Fraction (NSF), Z per unic, -�` 0�.9 10-19 20-29 30-39 40-49 50-59 60-69 70-79 600-799 0J-� +7 +10 +14 +17 +21 +24 800-999 0 +3�,.�+5 +8 +11 +14 +16 +19 1,000-1,499 0 +2 �+4 +6 +8' +10 +12 +14 1,500-1,999 0 +1 +3� +4 +6 +7 +8 +10 2,(100 and up 0' +1 +2 ,+4 +5 1 +6 +7 +9 All others (pe build ng points) 800-899 0 +5 +10 +14 +19,� +24 _ +29 +34 900-999 0 +4 +9 +13 +11 +t`l�- +26 +30 +)il 1,000-•1,199 0 +4 •1.7 +11 +15 +-19 -.t26 1,20f,1,499 0 +3. +6 +9 +12 +15 +18 -+`21' 1,500-1,999 0 +2 +5 +7 1 +9 +12 +14 +16 2,1;170-2,999 0 +2 +3 +5 +7 +8 +10 +11 3,06.0 nr.d uo 0 +1 +3 1 +4 +5 +7 +S +10 Table 3-21. Other Water Vesting Pts. System Type Cis &ly , } Beat P%ap I Solar with Electric I I I Resistance Backup I I I Meeting the Require- 1 I I seat• to Part 2 I 0 i I I I I Eleecrtc Resistance I I Oaly -40 ; I I 1 TOTAL POINTS = -able 3-1. Slab Floor Points Table 3-2. Raised I ln�uls- 1 R -Value of Insulation I I,& -Value of I clan I I I`1 In�ulatlon I Depth, I I I II r inches 1 0-2 13-4 1 5-6 1' 7+ I �' I I 1 l I 1 I below3-` 3-4 5- 7 I 12•--13.L�5�1--3 I --2-I--1-1 --�1 8- 12 I 16 - 19 1 -5 1 -2 1 -1 1 0 1 1 13 - 18 I 20 + 1 -s 1.-1 1 0 1 +1 1 1 •19+ 7/7/83 Table 3-3a. Ceiling Insulation R -Value of Insulation I Points 19 ! -4 22 I -2 c�- 38 I +2 49 I +4 Table 3-7. South -Facing Glazing Pts Table 3-10. Shading Coefficient Points I I Glazing Type 1 I Total 1 I I 2 of I Sngl, I Dbl,-r-Trp-1.7 I Floor ! (U- I (U • ! (U • ! I Area 11.10) 10.65) 10.41)1 1 ro, "-1-+3 ZONE 1 1 +3 1143 I OWNER G1e POINTS PERMIT NO. r ASSIGNED ACTUAL 1. SLAB - INSULATION 0 I 2. RAISED FLOOR - R-19-- 1 -P 1 3. CEILING - R-30 �_ 4. Q WALL - R-19 ' ` s 1 -� �j - 6F � r, 0_ 5. NOP.TH GLAZING - 2.40L3.6% elf 6. EAST GLAZING - 2.5-3.67.f G i3 7. SOUTH GLAZING - 1.6-3.6% ll, - B. WEST GLAZING - 2.9-3.67. �� 9. SKYLIGHT - 0-1.3%- -7 ! 10. SHADING (Exclude Overhang) ! -10 I -8 I EAST - • 66 -17 I -12 I SOUTH - .19-.42 r p O -19 ! WEST - .13-.36 cG e =�- -,3 112.1-13.2 I .SKYLIGHT - .37-.57 -16 I ,11. HORIZONTAL SOUTH OVERHANG 2' -24 I 1Z. MOVABLE INSULATION - NONE 14.6-15.3 i 13. i INFILTRATION (Standard=0)(Tight=+12) _ 0 14. -THERMAL MASS .1X0 / SF -� 15. GAS FURNACE (SE) 71-76% !' 16. HEAT PU11P (EER) 7.5-7.9% 17. DUAL PACK (SE, SEER) 8.0-8.3/71-76% WOOD STOVE 9 G s WATER -HEATER b ATTIC x'10 OTHER . TOTAL POINTS = -able 3-1. Slab Floor Points Table 3-2. Raised I ln�uls- 1 R -Value of Insulation I I,& -Value of I clan I I I`1 In�ulatlon I Depth, I I I II r inches 1 0-2 13-4 1 5-6 1' 7+ I �' I I 1 l I 1 I below3-` 3-4 5- 7 I 12•--13.L�5�1--3 I --2-I--1-1 --�1 8- 12 I 16 - 19 1 -5 1 -2 1 -1 1 0 1 1 13 - 18 I 20 + 1 -s 1.-1 1 0 1 +1 1 1 •19+ 7/7/83 Table 3-3a. Ceiling Insulation R -Value of Insulation I Points 19 ! -4 22 I -2 c�- 38 I +2 49 I +4 Table 3-7. South -Facing Glazing Pts Table 3-10. Shading Coefficient Points I I Glazing Type 1 I Total 1 I I 2 of I Sngl, I Dbl,-r-Trp-1.7 I Floor ! (U- I (U • ! (U • ! I Area 11.10) 10.65) 10.41)1 1 ro, "-1-+3 Glazing Type ST , Dbl, U- l U- l ! 0.42- ! 10.65 I 1 +3 1143 I up -to 1.5_1-+2-1-+2-1 +2 1 ( 3.6 I �6= -1 1�1 0 I I 3.7- 5.2.1 -4 1 -P 1 -2 I 1 5.3- 6.5 I -6 1 -4 1 -3 I I 6.6- 7.7 I -9 1 -6 1 '5 1 I 1.8- 8.9 I -11 1 -8 I -7 I I 9.0-10.0 ! -13 1 -10 .) -9 Table 3-4a. Wall Insulation Points 110.1-11.5 I -17 ! -13 1 -11 1 111.6-13.0 1 -21 I =16 I -14 I I R -Value of Insulation 1 Points I i 13.1-14.5 I -25 I -19 I -16 L I I I i 14.6-16.0 I -28 I -22 I -19 I I 4;:19-�� I +2 - i� Tablr a 3=8. 30 i +3 1 1 Total I L of Floor Table 3-5. North -Facing, Glazing Pts I Area T- I ! I Total I 1 t of I Floor l 1 Area 10.66 1 11.10 Glazing Type ST , Dbl, U- l U- l ! 0.42- ! 10.65 I ! I Trpl. u- I 0.41 1 down I I S Floor Area tation I East I 0.1 .-1.2.1 +4 ! ';`+4 1) +4 I I 1.3-1 +1 I D I +2 I I 2.4- .6 ! -2 I 0 ! +1 i i 3.7- 4.8 I -4 I -2 I. -1 I ! 4.9= 6.1 I -7 I -4 -3 ! 1 6.2- 7.3 I -9 I -6 ! -5 I 1 7.4- 8.2 1 -12 ! -8 I -7 ! 1 8.3- 9.7 1 -14 ! -10 I -8 I I 9.8-10.8 1 -17 I -12 I -10 I 110.9-12.0 ! -19 ! -14 ! -12 I 112.1-13.2 I -22 I -16 I -13 I 113.3-14.5 I -24 I -18 I -15 I 14.6-15.3 i -27 i -20 i -17 Pts. Glazing Type uaa, i von, i arpa, (u - I (u - I (u - 1.10) 1 0.65) 1 0.41) 0 1 +• 1 +6 1 •6 1 I up to 1.3 1 +5 1 +6 1 +6 1 1 1.4 ^2.2 1 +3 1 +4 I +S I I z. i- 2.11 0 l +i I +3 i 1 if! -_-3-6' 1 -3 I 1 +1 I 3:7--4:2'1•?-5 I C_ --2-p 0 1 4:3= 5:o'I- -8 1 -4 1 -2 1 1 5.1- 5.6 i -10 1 -6 I -4 1 5.7- 6.2 I -13 1 -8 1 -6 I 1 6.3- 6.9 I -15 1 -10 1 -7 ! I '7.0- 7.6 I -18 1 •-12 1 -9 I 7.7- 8.2 I -20 I -14 1 -11 I 1 8.3- 8.8 I -22 I -16 1 -13 ( 8.9- 9.5 1 -25 I -18 I -15 I I 9.6-10.1 I -27 ! -20 i -16 I 110.2-11.0 1 -29 I -23 I -17 I 111.1-11.8 I -35 1 -26 I -21 I 1 11.9-12.7 I -38 1 -29 I -24' I 112.8-13.5 I -42 I -32 I -27 I 13.6-14.3 1 -46 1 -35 1 -29 I 114.4-15.2 I -50 I -33 1 32 I I SC by I I Orten- I S Floor Area tation I East I I 3.2 { ( i 0-3.1 I 6o3 1 0 I +1 1 +2 1 0 -.19 1 .20-.36 1 0 1 0 I i1 1L.37 :6671 0-1--0__(-r-�0� - `0 I .67-.82 1 0-1 1 -1 .83 up i 0 1 -1 1 -2 I South 1-0-1 3.2 1 6.4 18:0 1 9.6 I I -to .il to I- to I to I up 1,11 .1 1 6.3 1 7.9 1 9.5 1 I 0 -.18 1 0 1 +1 1 +2 1 +2 1 +3 ( 19-.42 1 1 <�. 43=:66-1 0 1 0 1 0 1 0 1 0 1, -1 1 -2 1 e2 ,I -3 I 67 up 1 0-1' -2 1 -4 1 -4 1 -6 I .1 1 1.6 1'3.2 1,6.4 1 8.0 I [fil to I to I to� I to I up 1 .5 1�3 116-.3)1 7.9 1 1(.r 1 _ 1 1 0-.12 1 0 1 +1 1 +3 1 +6 1 +7 .13-.36 I 0 1 0 I 0 1 0.1 0 .37-.57 I 0 1 1 1 -3 I -6 1 -7 :58= E2=1=21 I (I=6-1 -12 ( -15 .83 up 1 I -2 I -4 I -8 1 -16-1 -20 I I I i Skylight 1.6 1 3.2 1 4.0 �I to I to ( to ( to 1 to 1-71 1 3.1- 1 3.9 1'3.2 0-.12 I+1�1, +3 1 +6 I +7 .13-.36 1 0 1 0 I�0 I 0 l 0 .37-.57 1 0 1 -1 I -3�1 -6 I -- .58-.82 .1 -1 I -3 I -6�1-12 I -. .83 up -2 -4 -8 1'1`1 -20 j i i I I I I I Table 3-11 Table 3-9. Sk lie.ht Points 1 -- Table 3-6. East-Facinq Glazing Pts. 1 Length Out I I Glazing Type I I from Wall I I Glazing Type I I Total I I 1 ft Total I I I 1Nof T Sngl.Dbl, Trpl, I 1 2 of I Sngl, Dbl, Trpl, I Floor I U- l u- I U - I I Horizontal South bouth Glazing 1 Area, X of floor I 0-6.3 1 6.4 up I ,or Points I Floor I (U - 1 (U - I (U - I I , At N\1 0.66- 1 0.42- 1 0.41 I 1 0 - 0. I -z 1 w 1 T 1 Area 1 1.10) 1 0.65).1 0.41)1 1 1,1.10 1 0.65 1 down 1 1 0.6 - 1.0 1 -2 1 -3 1 i I ol' ointsl f1 2.1 :-0 'u1.9 -1 .- --01-1�-�2 Points I nes_-o,ineup to 1.3`T1 1 0 0 1 I upt-1:--2 -1 I 1! ' 1.4- 2.4 1 +1. 1 +2 1 +2 1 I 2.3- 2.8 I 61 -4 I -3 1 Table 3-12. Movable Insulation -12 I 1 2.5- 3.6 I -2 I 0 1 O 1 I 2.9- 3.6 1_91\m -6 I -S I Points g I ) 3.7- 4.6 I -5 I -2 1 -1 1 I 3.7- 4.2 I =11 11 -8 I -6 I I MovableI'-6 4.7- 5- - S.0 nsula\tio, n 1 5 -10 -5 5.1- 5.6 -16 12 -10 Area, zof-Floor I Points 6.8_7.7_I�13 1 -8 1 -7 1 1 5.7- 6.2 1 -19 -12 1 1 C10- 6.3- 6.9 -21 \ 16 -13 1 2 18.8- 1 1 -17 1 -1 -10 1 1 7.0- 7.6 -24 8 . II 1 -15 1 1 0 - 5.5 `I 0 I 9.8-11.2 I -21 I .-1S I -13 ; I 7.7- 8.2 I -26 I ';20 1 -17 I I 5.6 - il.5 I +2 I •:. 1;1 11.3-12.7 -25 _-18 -15 8.3- 8.8 -28 -22. 1 -19 11.6 - 17.3 12.8-14.0 I\� ] -2 -_, 14.1-15. 3 -24 -20 9.6-10.1 33+83. II I 26 1 =22 1 1 _23.6+ 1 +8 a I • -!-------�-- - �---- -:�- --� �---� -�-- --- -�-- --. 1. 1-------- ... _ _.._ _... I.. I Return to DPW St AGRICULTURAL STATEMENT OF ACKNOWLEDGEMENT FOR RESIDENTIAL DEVELOPMENT RECORD[il BUTT E C01UNTY OFFICIAL RECORDS BY Section 26-8.1 of the Butte County Code requires this acknowledgement be recorded prior to issuance of a building permit. 87'1O3(;s 1981 BAR t9 The property described herein is adjacent to land or included OMQAOE,;.GRUBBS within an area zoned for agricultural purposes, and residents of this property may be subject to inconveniences or discomfort arising from RECORDER FEE the use of agricultural chemicals, including, but not limited to herbicides, pesticides, and fertilizers; and from the pursuit of agricultural operations including, but not limited to cultivation, plowing, spraying, pruning, and harvesting which occasionally generate dust, smoke, noise, and odor. Butte County has established agricultural zones which have as a priority use.for productive agricultural purposes, and residents within said zones and on adjacent property should be prepared to accept such inconvenience or disconform from normal, necessary farm operations. All that real property situate in the County of Butte, State of California, described as follows: Parcel two, as shown on that certain Map filed in the Office of the County of Butte, State of California, on January 10, 1980, Parcel Maps, at Page:49. Date: March 19; 1987 FRIEDA"E. HART PROPERTY OWNERS: the Recorder of in Book 73 of NOT COMPARED WITH ORIGINAL DOCU-MENT State of; California ).. On this the 19th day of March 19 87 before )�SS. me, the undersigned Notary Public, personally appeared County of Butte ) FRIEDA E. HART--------------------------- �■rirra■vismao■so■■■■■rs�R1 ■ PENNI L. CATES r NOTARY PUBLt"ALIFORNIA ■ �� gee County My CommissbnEXPir9S0d•19,t990 ■ r■■■■*■■■■m■■s■■�■■■■ )CPersonally known to me. j/ Proved to me on the basis of satisfactory evidence. to be the person(s) whose names) is subscribed to the within instrument and acknowledged that she executed the same for the purposes therein contained. IN WITNESS WHEREOF, I hereunto set my hand and official seal. i Notary Public Present A.P. No. C-��- 5 `f _ l '. wY A.++vrr w-ram•.. Nme� rvrt ..'e w�+... a.a �a:r. " s "t. r�1M r..,V.,a n .. aln `I of ;ant ars �-ap ciftc's Icns MUST X11 of t-'d I'll r 0in1;3wfv1 tri (V 11v'3 na '� 111101A wriltun parraist n1 frorn f4Q Do,- At" VVork% Centy of BOO,1 •-1 q S'nl za 1 IM ti0 A sotback of "if, Mrrt rcrty [Ingskbac{c of � Oft. from tl— r: dr + cant"r41r� A .a11 "- Ir h structu,�w i, Fr #.juipmont except TY d brei k4 EPAR L