Loading...
HomeMy WebLinkAbout079-240-007r JACKSON, TED,. RUTIi4 BILL' , 6065 UPPER ;PALERMO RD. OROVILLE O�L� y a( -oO? CONT; LARRY WEST ` ADD BEDROOM/SFS^ 007 rY� i RtSIDENTIAL 036-280-054 94-1205B,E " JACKSON, TED, RUTH & BILL' 6065 UPPER PALERMO RD., OROVILLE CONT; LARRY WEST ADD BEDROOM/ SF - 12-9) i JOB FINALED Signature r V= OK O = Not OK ' NotReaayab1e MOBILE HOMES Date/Initials MOBILE HOME UTILITIES (Plans) OK except #'a 1. Zoning Requirements -Setbacks -Easements 2. Soils; Special MH Support Sketch 3. Sewer; Location -Test -Fall -C/O Concrete 4. Water; Location -Teat -Easement Needed (Sketch) 5. Electricity; Location-Clearences-Grnd-/ /Amp -Concrete 6. Gas; Location-Teat=Wrap: / /" L"ft. / /"Net. or/ /" L"ft./ /"LPG 7. Well Clearance & Disconnect 8. Utility Clearance Date/Initials MOBILE HOME INSTALLATION (Plans) OK except #'s 1. Zoning Requirements -Setbacks Easements 2. Footings; Size -Spacing -Marriage Line = 3.. Gas; MH Teat -Demand -Valve -Connector 4. Electricity; MH Test -Crossovers -Breakers -Clearances S. Drain; MH Test -Fall -Flex Connector 6. Water; MH Teat -Regulator -Connector 7. Water and Sewer Connected -C/O to Grade -HD Approval 8. Gas and Electricity Tagged 9. Exits; Insp.-Sketch 10. Cert. of Occupancy MISCELLANEOUS Date/Initial DECKS, COVERS, CARPORTS, GARAGES, (Plans)OK except #'a 1. Zoning Requirements -Setbacks -Easements 2. Footings; Soils -Size -Depth -Spacing -Connectors -Steel 3. Decks; Griders and/or Joists -Decking -Bracing -Stairs -Rails 4. Wood Awn.; Posta-Beams-Rftrs -Connectors Shthg.-Rfg.-Bracing 5. Alum. Awn.; Columns -Connections -Splice -Decal -Enclosures 6. Carports; Windows -Doors 7. Electric 8. Frmg; Sils-Anchors-Studs-Rftrs-Trusses 9. Siding; Nailing -Veneer -Stucco -Mesh 10. Roof; Shthg-Roofing 11. Ext.; Steps -Doors -Landings Date/Initials POOLS (Plans) OK except #'s 1. Setbacks -Easements 2. Soils; Compaction -Structure Stability 3. Pool Structure; Steel -Connections -Thickness Dead Men -Lining 4. Elec.; Receptacles and Lighting, Distances-GFI 5. Elec.; Pool Lighting; 15 volts-GFI 6. Elec.;Enclosures; Conduit Entries -Terminals -Listed 7. Elec.; Bonding; Metal w/5' -Circulating Equip. -Heater. 8. Elec.; Grounding; Equip. w/5' Circulating Equip. -Pool Lghtg. Boxes-Enclosures-Panelboards-Ina. to Main in Conduit 9. Health Department Approval 10. Plumb.; Cir. Test -Water Supply Test V=OK O = Not OK - = Not Applicable = Not Ready OK except #'s RESIDENTIAL (Single & Duplex) 2. Ftg., Main; Soils-Elec. Grnd.- tg. Depth 1 3. Ftg., Garage; Soils-Steel-Elec. Grnd.-/ /" Ftg. Depth 4. Ftg., Porches & Decks; Soils -Steel-/ /Ftg. Depth 5. Stemwalls, Main; Steel-Blockouts-Wrapped 6. Stemwalls, Garage; Steel-Blockouts-Wrapped 6a. Hold Downs and Special Anchors 7. Slab; Steel -Wrapped 8. Piers -Fireplace Ftg.-Steel 9. D.W.V.; Fall -Fitting -Test -2 Way C/O -Sewer Test 10. UF. Gas Pipe; Size -Anchors - yard gas piping: size -test 11. Water Pipe; Test -Anchor -Regulator -Service Test 12. Electric; Underground 13. Plenums & Ducts; Clearance -Materiel -Support -Ins. 14. Girders -Sills -Anchor Bolts -Joists -Vents -Cripples 15. Access & Ventilation 16. Insulation Date/Initialr6. MBINO Permit OK except #'s Water Htr.; Vent -Access -Combustion Air -Baffle Water Pipe; Test & Anchor -Nail Protection .W.V.; Test -Fittings & Anchor-Naii Protection hower Pan; Test, First Floor -Tub Access 20. Test Tub & Shower, Second Floor -Tub Access 21. Gas Pipe; Size & Anchors OK except #'s 9f .. Fjxt"ure & Transformer Clearance -Ins. Protection & Switches at Doors Size oxes & No. of Conductors -Stapled ex Installed Close to Edge of Studs & C.J. JW. ground made up w/Mach. Fastners-Bond Gas & Water 27. 2 AppRaace Circuts in Kitchen & Conductor Size/GFI ubfeed Wire Size / / ga. Cu or AI-A.C. Wire Size / / ga. Cu or Al ange Circ. / / ga. Cu or AI -Oven Circ. / / ga. Cu or Al. lnsu1jW Neutral ❑ Yes ❑ No e ** a- iser Conductors & Ground -Main Disconnect 3j/qW1p-.,Clearances Panels -Motors -Mach. Equip. a21,914mes Closet Light -Shower Light -Spa Light Smoke Detector Date/Initials MECHANICAL (Permit) OK except #'s 34. A.C. Ducts Insulation & Support 35. Vent Fan; Exhaust above insulation 36. Condensate Drain & Overflow; Size & Grade 37. Furnance-Vent; Access -Comb. Air -Return Air Vent -115 outlet 38. Attic Access & Platform if Furnance in Attic s) OK except #'s Material & Anchors 4*.1'BQring Wells over Girders & Floor Nailing 4Z/D,!�ft,Stop in Walls (rat proof) 4,4/Fyf'Stops; Furred Ceilings -Stairs -Chases -Tub 44. Headers & Beam -Size & Bearina Date/Initials FRAMING (Continued) 49. Ft -Post Caps -Anchors -Connectors 46 Ong. Joist-Rftr. ties -Pu rlin-roof Brac-Truss-Shthng.-Rfng. ace Ties or Type A Flue -Fireplace Throat clearance A 'c Access; Size & Romex Protection -Draft Stop -Ins. Baffles 49-Bdrm. Windows or Exiting Doors -Sill Hgt. & Dimensions 'S6"13�ge Fire Protection Framing 5`1-. ropAY-Line Firewall & Openings Wit. Do rs-One 3' -Check Garage -3rd Story, 2 Exits . tai ; Width -Headroom -Rise -Run -Landing -Fire Protection 64-'plywc6d on Roof Overhang -Attic Vents -Rafter Outriggers Siding -Nailing Veneer . o o Mesh -Drip Screed -Fd. Vents-Underflr. Access Gla_zing Area -Glass Protection -Skvliahts-Plastic Y,ZVjW9. Insulation -Walls -Ceilings 'fI/ ` 60. Infiltration -Wells -Windows Date/Initials FINAL lens OK except #'s AO-txt. Steps -Door & Sidelight Protection -Landings Detector 6T- Furnace; Vents -Clearance -Comb. Air-Connector- Inssarege; Above Floor -Ducts -Mach. Protection 64 Be room Exiting G.F.I.,& Bath Fixtures & Tub Access -Spa lec. Trim & Subpanel; Breaker Sizes & Labels ­�6, airs & Rails 68--F ce or Stove; Clearances -Hearth fif'Elec. Outlets at Wood Panel; Int. & Ext. �KiLFiXt & Appliance; Grnd: Air Gap -Cooking Clearance -4+-Erec Outlets & Receptacles at Kit. Counter _22 -Garage Fire Door; Swing -Landing -Closer -31C." uct in Garage -Damper r74- Wtr-otr.; Vents -Clearance -Comb. Air-Connector-P.R.V. 1 arage; Above Floor -Mach. Protection Plb., Elec. & Mach. Equip. Listed for Location eceptacles in Garage; (G.F.I.)-Romex Protection Insulation -Foam -Looked in Attic ❑ Yes Rails & Deck Construction -Post Caps -?9--Fdn: Gents & Crawl Hole Door -Drainage & Wood -Earth Clearance Looked under Floor ❑ Yes 80. Following inist O, Drive Yes ❑ No; Walks es ❑ No; Planters VJ'Yes ❑ No Na4--6tneeo,' Brown -Finish Unit; Disconnect, Electrical, Plumbing Aal-Vents Above Roof; Plbg: Appliance -Fireplace. -Clearance to 44.-Wgter Well; Disconnect, Electrical, Plumbing Sff-'_Ex rlor Elec. Trim; G.F.I. Receptacle -Underground Vegj,LW-on Throughout House 8 . I 5 Protection Corrections from Previous Inspections 8 . gas Test -Meters Tagged; Gas -Electric 9 . titer & Sewer Connected -C/O to Grade -HD Approval Of Energy compliance Certificate -Other Certificates Comments at Final: COUNTY OF BUTTE - DEPARTMENT OF DEVELOPMENT SERVICES - BUILDING DIVISION 7 County Center Drive - Oroville, California 95965 - Telephone (916) 538-7541 P� MIT NO. APPLICATION AND PERMIT �� OS ( ASSESSOR PARCEL NUMBER 036-280-094 ZONING ARMH25 BUILDING PERMIT OWNER TED, RUTH -9 'RIT.T. JACKSON TELEPHONE SQ. FT. OCC. BUILDING VALUATION 340 R 18 360.00 OWNER'S MAILING ADDRESS 6065 UPPER PATERMID RT) OROVILLF, 99966 CONTRACTOR'S NAME LARRY WEST TELEPHONE 19*11-5478 CONTRACTOR'S MAILING ADDRESS Fireplace CONSTRUCTION LENDER UNKN WN Total Valuation $ LENDER'S MAILING ADDRESS Filing Fee $ 20.00 Permit Fee $ 198.00 ARCHITECT OR ENGINEER LICENSE NO. Plan Checking Fee $ Energy Plan Checking Fee $ 23.00 ARCHITECT OR ENGINEER'S MAILING ADDRESS Penalty $ BUILDING ADDRESS 6065 UPPER PALERMO RD PERMIT FEE $ 369 70 OROVILLE, 95965 PLUMBING PERMIT Filing Fee 20.00 Each Trap 7.00 Solar or heat pump water heater 23.00 Water piping 15,00 LOT NO. SUBDIVISION'S NAME PARCEL MAP Each gas water heater or vent 15.00 USE OF STRUCTURE SF IS Duplex O Mobilehome ❑ Other SPECIFY Gas piping system 1 - 5 outlets 15.00 Building sewer 15.00 Mobile Home S G W @20.00 TYPE OF WORK New ❑ Addition CK Remodel O Utilities O Installation O Other ❑ Describe Work: 17 X 20 PERMIT FEE $ Contractor ELECTRICAL PERMIT Filing Fee 20.00 BEDROOM 11V OR LESS Main Service ( OOAORLESS ) 23.00 Main Service ( 200A To IOOOA 46.00 NEW CONST. DWELLING OCCUP. OR ADONS. ( 8 ACC. BLDS. 1 3.50 FT,$0. CONTRACTORS LICENSE LAW( I declare under penalty of perjury (check one) 1 am a licensed under provisions of Chapter 9, Division 3 of the Business and Professions C de and license is in full for and effect. y any s License No. (pZ�fBl / Classification .(� O I, as the owner, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec 7044) O I, as the owner, am exclusively contracting with licensed contractors. (Sec 7044) O 1 am exempt under Sec. Business and Professions Code forthis reason NEW CONST. MULTI -OUTLET -NON-RESID. ( BRANCH CIRCUITS I 7.50 POWERAPPARATUS ' & SINGLE OUTLET CIR. Ex. Occup. ( OUTLET OR FIXTURES 1 BAL. @ (.50 Ex. Occu FIXED APPLNS. OR p' ( OUTLETS (RESID.) EA. ) 5.00 Temporary Service 23.00 Mobile Home Facilities 20.00 Misc. Wiring 23.00 WORKER'S COMPENSATION INSURANCE 1 declare under penalty of perjury (check one): O This permit is for $100.00 (valuation) or less. O 1 have placed on file with the County of Butte Dept. of Development Services, Building Division a Certificate of Workmen's Compensation Insurance or a Certificate of Consent to Self -insure. I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. Notice to Applicant: If after making this statement, should you become subject to the Worker's Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit will be revoked. PERMIT FEE s 31.90 Contractor MECHANICAL PERMIT Filing Fee 20.00 Heating Cooling Hood 6.50 Ventilation PERMIT FEE $ Contractor I certify that I have read this application and state that the above information is correct. I agree to comply to all Butte County Ordinances and California State Laws relating to building construction, and hereby authorize representatives of the County of Butte to enter upon the above mentioned property for inspection purposes. I also agree to save, indemnify and keep harmless the County of Butte against all liabilities, jgments, costs, and expenses which may in any way accrue against said seque a of 'e granting of this permit. /� pp County4ref X Date 7— 2S— 6 � Sign Aplicant Owner Contractor O Agent An OSHA pe it is required for excavations over 5"0" deep and demolition or construction f structures over 3 stories in height. Mobile Home Installation Fee $ Energy Inspection Fee $ 46.00 c0N T. TOTAL FE HAZ D. FE IMP I Ftp CDF I PARCEL PD ND ISS This permit is hereby issued under the applicable provisions of the Butte County Code and/or Resolutions to do work indicated above for which fees have been paid. STE-D.D.S.-B.D. PERMIT EXPIRES ON Me rel eiptNo. 162623 - 447.60 E CANARY -ASSESSOR PINK -INSPECTOR GOLDENROD -APPLICANT — .COUNTYOF BUTTE - DErARWMENTOF DEVBL0'PMENTSERVICES -BUILDING DIVISION 7COUNTY CENTER^DRI OROVILLE, CALIFORNIA95965 -TELEPHONE (916)538-7-1,41 PERMIT APPLICATION DATA SHEET OWNER Jo-i5k So n r A. P. No. Proposed Building Use Building Inspector Date At time of permit application, I was advised the following data must be submitted prior to permit processing and/or issuance: DATE RECEIVED BY 1. All items have been submitted......................................... 2. Plot plans, 3/4 sets, signed by preparer of plans . .......................... 3_ Complete plans, 3/4 sets, signed by preparer of plans . ...................... .4. Engineered plans and calcs, 3/4 sets, with wet signature on plans . ............. 5. Hazardous Material Form. .......... ................................... . 6. Energy Design Compliance and supporting documentation . .................. 7. Statement of Intent for Non -Heated and A/C Buildings . ...................... 8. Engineered truss details and layout in duplicate (required prior to plan check). .... 9. Mobilehome data and manufacturer's installation instructions, 2 sets. ........... 10. Fees of $ 11. Impact fees as shown on attached schedule. -- 12. California Department of Forestry plan approv/f es. 3' 13. Flood elevation letter (100 year flo . ) by C Fforni gineer. . . 14. Sanitation and plot plan approval rOv( f- Health Department . ........... . 15. City of Chico plumbing permit . ......................................... . 16. Plot plan and business license approval from City of Biggs/Gridley. . .......... 17. Planning approval for (A) Use: (B) Parking: . ........ 18. Contact Land Development.about (A) Improvements (B) Drainage. ....... . 19. Driveway permit (construction approval required prior to occupancy). .. . . 20. Pre -inspection for to Building Ins re for required. . . to Building Inepedor (Date) 21. Contractor's license information. (No., Name Style, Classification) . .............. 22. Certificate of Workmans Compensation Insurance . .......................... 23. Owner -Builder Verification (Given to owner , Mail to owner _). ........... 24. Recorded copy of Agricultural Acknowledgement Statement . .................. 25. Letter of signature authorization . ........................................ + 26. Copy of recorded deed of parcel creation and 60 right of way to a public road. .... . 27. Letter of intent on building use . ......................................... T 28. Mobilehome utility clearance . ........................................... 29. Documentation of legal access . ..................... :.................. 30. Documentation of 50% subdivision developed or (A) Road improvements completed and (B) Parcel meets zoning area and frontage requirements . ............... 31. Existing violations/expired permits . ...................................... 32. Plan check list . ..................................................... 33 34. Wh;ryou issue the permit, process as follows: Mail to .. ner. Mail to contractor. x Telephone and hold forpickup atno 1,P office. Deliver with inspector. Other Parcel Creation Acreage Applicant Date O 7 7 Copy of Haz=Mat form sent Health Dept. Fire Dept. lair Pollution Date Copy of plans sent Health Dept. Fire Dept. Other Date By The following data must be submitted prior to permit issuance: (Circle new item not checked above). 1. Index permit for above items No. 2. Additional items required: Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter by _ Date Contractor, designer, owner, was advised of above required data by _ phone _ mail Counter by _ Date Plans checked by Date Plans approved by Date Sets of plans on hold in File cabinet AP folder - Copy - Department of Public Works NLY F_II. USE I/ .�J Plot Plan Aaached Floor Plan Ana ed Scnt to D.D. �- TO: Building Department FROM: Environmental Health SUBJECT: Sanitation Clearance ac S gky-m Rd Owner Loca ion j AP// / Plan Approved for: Hold final for: Final clearance O.K. for: Sewage Disposal Water Supply Water Supply 9 % Water Supply me. Other ¢ h ✓'-�, G l � 1/yx�— T� Clearance for bedroom mobile h NOTE: Environmental Health Specialist Date BUTTE COUNTY SCHOOLS IMPACT FEE CERTIFICATION FORM (One Form Per Building) School District �r o v Ile- U n r e) 4 Building Department No. A.P. Number (23 'J WOSI- Jurisdiction . 0 City 1XI County Proper Proper Subdiv Residential Development Commercial/Industrial 0 0 No. of Living. MHI Units New Sq. Footage A d ion (Group R) 0 Addition Identification (Floor Plans reviewed by School District Personnel) 111q C. ch 01'61'st ict certifies that Sq. Footage (Including Exterior Roofed Areas) a � Date plicant) (Sss) ;. U. p .. (� (Phone Number) (City) (State) has complied with the requirements of Resolution No. �Q z representing 13 ."TO square feet. School District Representative Paid by Check Number Remarks Bank Number Paid by Cash (Zip Code) by payment of $ -�--as=s Date O NE If, subsequent to the School District Representative signing this Butte County Schools Impact Fee Certification Form, the School District is notified by the applicable Local Planning Agency that this project is being reviewed under the California Environmental Quality Act (CEQA), this.project may be subject to additional school fees to fully mitigate its impact on the school district's schools. White (applicant), Yellow (building department), Pink (school district) feeformmkl (4/92) TABLE OF CONTENTS TOC Project Title.......... Addition for Jackson Date........ 05/03/94 1 d Project Address........ 6065 Upper Pa ermo R . Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check/ Date MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -TOC User#-MP1320 User-CALCTECH Run -Existing + Addition TABLE OF CONTENTS .Report Page FORM CF -1R ................ 1 FORM MF -1R................ 4 FORM C -2R ................. 6 FORM C -3R ................. 9 HVAC SIZING ............... 14 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title.......... Addition for Jackson Date........ 05/03/94 d Project Address........ 6065 r UppePalermo R . Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check/ Date MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM CF -1R User#-MP1320 User-CALCTECH Run -Existing + Addition GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front Orientation. Number of Dwelling Units... Number of Stories.......... Floor Construction Type.... Component Type Wall Door Floor Roof Wall S1abEdge Wall Orientation 1108 sf Single Family Detached Existing Plus Addition Front Facing 0 deg (N) 1 1 Raised Floor (Package E) BUILDING SHELL INSULATION Insulation Assembly R -value U -Value Location/Comments R-0 0.306 R-0 0.330 R-0 0.097 R-19 0.047 R-13 0.083 R-0 0.900 R-13 0.090 # of Interior Area U- Pan- Shading/ (sf) Value es Description FRONT, RIGHT, BACK, LEFT FRONT ENTRY, ADDITION TO CRAWLSPACE FLAT CEILING, ADDITION ADDITION ADDITION ADDITION FENESTRATION Over - Exterior hang/ Framing Shading Fins Type Window Front (N) 26.3 1.190 1 Drapes.Std None Yes Metal Window Right (W) 36.0 1.190 1 Drapes.Std None None Metal Window Back (S) 32.3 1.190 1 Drapes.Std None Yes Metal Window Left (E) 0`10.0 1.190 1 Drapes.Std None None Metal Window Front (N) -12.0 0.750 2 Drapes.Std None Yes Metal Window Back (S) 10.0 0.750 2 Drapes.Std None Yes Metal Window Left (E) -10.0 0.750 2 Drapes.Std None None Metal Skylight Horz 4.0 0.800 2 None None None Metal THERMAL MASS Area Thickness Type Exposed (sf) (in) Location/Comments S1abOnGrade Yes 340 3.5 Exposed at Addition CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM CF-lR User#-MP1320 User-CALCTECH Run -Existing + Addition HVAC SYSTEMS R-2.1 existing duct insulation R-0 existing floor insulation per Form 3 R-0 existing wall insulation per'Form 3s R-13 wall insulation required at Addition per Form 3s R-19 existing ceiling insulation per Form 3 R-19 ceiling insulation required at Addition per Form 3 Opaque U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per MFR'S. NFRC testing & certification at Addn. Viking metal frame dual -pane clear glazing reqd. at Addition E.FURN.75: per CEC TABLE 7-2 for pre -1978 construction E.AC.8.0: CEC MIN. REQUIREMENT HWH: NOT ALTERED - NO CALCULATIONS Minimum Duct Duct Thermostat Equipment Type Efficiency Location R -value Type Furnace 0.750 AFUE Attic R-2.1 NoSetback ACSplit 8.00 SEER Attic R-2.1 NoSetback SPECIAL FEATURES/REMARKS R-2.1 existing duct insulation R-0 existing floor insulation per Form 3 R-0 existing wall insulation per'Form 3s R-13 wall insulation required at Addition per Form 3s R-19 existing ceiling insulation per Form 3 R-19 ceiling insulation required at Addition per Form 3 Opaque U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per MFR'S. NFRC testing & certification at Addn. Viking metal frame dual -pane clear glazing reqd. at Addition E.FURN.75: per CEC TABLE 7-2 for pre -1978 construction E.AC.8.0: CEC MIN. REQUIREMENT HWH: NOT ALTERED - NO CALCULATIONS CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM CF -1R User#-MP1320 User-CALCTECH Run -Existing + Addition COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features/ Remarks section. DESIGNER or OWNER Name.... Larry West Company. Larry West Construction Address. 2342 Via Laton Oroville, CA 95966 Phone... (916) 533-5478 License. Signed.. (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) DOCUMENTATION AUTHOR Name.... Neal Kuopus Company. CALCTECH Address. Drawer G Feather Falls, CA 95940 Phone... (916) 589-4219 Signed.. � S/13 q (date) MANDATORY MEASURES CHECKLIST:• RESIDENTIAL Page 4 MF -1R Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Building Permit Plan Check Date Field C edk Date MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM MF -1R User#-MP1320 User-CALCTECH Run -Existing + Addition Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents,. the features noted shall be considered by all parties as binding minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES Design- Enforce- er ment *150(a): Minimum R-19 ceiling insulation. 150(b): Loose fill insulation manufacturers labeled R -Value. *150(c): Minimum R-13 wall insulation in framed walls (does not apply to exterior mass walls). *150(d): Minimum R-13 raised floor insulation in framed floors; minimum R-8 in concrete raised floors. 150(1): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. 118: Insulation specified or installed meets CEC quality . standards. Indicate type and form. 116-17: Fenestration Products, Exterior Doors and Infiltration/ exfiltration controls a. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. b. Manufactured fenestration products have label with certified U -value, and infiltration certification. c. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. 150(f): Special infiltration barrier installed to comply with Sec. 151 meets CEC quality standards. 150(e): Installation of Fireplaces, Decorative Gas Appliances and gas logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. MANDATORY MEASURES CHECKLIST:- RESIDENTIAL Page 5 MF -1R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM MF -1R User#-MP1320 User-CALCTECH Run -Existing + Addition SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES Design- Enforce- er ment 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the CEC. 150(1): Setback thermostat on all applicable heating systems. 150(j): Pipe and Tank insulation 1. Indirect hot water tanks (e.g., unfired storage tanks or backup solar hot water tanks) have insulation blanket (R-12 or greater) or combined interior/exterior insulation (R-16 or greater). 2. First 5 feet of pipes closest to water heater tank, non - recirculating systems, insulated (R-4 or greater). 3. All buried or exposed piping insulated in recirculating sections of hot water system. 4. Cooling system piping below 55 degrees insulated. 5. Piping insulated between heating source and indirect hot water tank. *150(m): Ducts and Fans 1. Ducts constructed, installed and sealed to comply with UMC sections 1002 and 1004; ducts insulated to a minimum installed value of R-4.2 or ducts enclosed entirely within conditioned space. 2. Exhaust fan systems have backdraft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 114: Pool and Spa Heating Systems and Equipment 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System installed with: a. At least 36 inches pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spa. 3. Pool system has directional inlets and a circulation. pump time switch. 115: Gas-fired central furnace, pool heater, spa heater or household cooking appliance have no continuously burning pilot light (Exception: Non -electrical cooking appliance with pilot < 150 Btu/hr.). LIGHTING MEASURES Design- Enforce- er ment 150(k): 40 lumens/watt or greater for general lighting in kitchens and rooms with water closets; and recessed ceiling fixtures IC (insulation cover) approved. COMPUTER METHOD SUMMARY Page 6 C -2R Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone.............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 1 Field Check/ Date MICROPAS4 v4.02 File-JACKSOEA Wth-CTZllS92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing + Addition MICROPAS4 ENERGY USE SUMMARY Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin Space Heating.......... 15.12 40.97 -25.85 Space Cooling.......... 15.89 34.43 -18.54 Total 31.01 75.40 -44.39 *** Water Heating not calculated *** GENERAL INFORMATION Conditioned Floor Area..... Building Type............... Construction Type ......... ,Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Footprint Area ............. Ground Floor Area.......... Slab -On -Grade Area......... Glazing Percentage......... Average Ceiling Height..... 1108 sf Single Family Detached Existing Plus Addition Front Facing 0 deg (N) 1 1 ReducedYear Raised Floor 1 8864 cf 1108 sf 1108 sf 340 sf 12.7 % of FA 8 ft BUILDING ZONE INFORMATION (Package E) Floor # of Vent Special Area Volume Dwell Cond- Thermostat Height Vent Area Zone Type (sf) (cf) Units itioned Type (ft) (sf) HOUSE Residence 1108 8864 1.00 Yes NoSetback 2.0 n/a COMPUTER METHOD SUMMARY Page 7 C -2R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing + Addition OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-val Azm Tilt Gains Reference Comments HOUSE - Existing 1 Wall 210 0.306 R-0 0 90 Yes R.0.2X4.24 FRONT 2 Door 20 0.330 R-0 0 90 Yes None FRONT ENTRY 3 Wall 156 0.306 R-0 270 90 Yes R.0.2X4.24 RIGHT 4 Wall 224 0.306-R-0 180 90 Yes R.0.2X4.24 BACK 5 Wall 46 0.306 R-0 90 90 Yes R.0.2X4.24 LEFT 6 Floor 768 0.097 R-0 0 0 No FC.0.2X6.16 TO CRAWLSPACE 7 Roof 768 0.047 R-19 0 0 Yes R.19.2X4.24 FLAT CEILING HOUSE - New 8 Wall 131 0.083 R-13 0 90 Yes- MW.13.2X4.16 ADDITION 9 Door 17 0.330 R-0 0 90 Yes None ADDITION 10 Wall 130 0.083 R-13 180 90 Yes MW.13.2X4.16 ADDITION 11 Door 20 0.330 R-0 180 90 Yes None ADDITION 12 Wall 126 0.083 R-13 90 90 Yes MW.13.2X4-.16 ADDITION 14 Wall 12 0.090 R-13 0 90 Yes AW.13.2X4.16 ADDITION 15 Roof 336 0.047 R-19 0 0 Yes R.19.2X4.24 ADDITION PERIMETER LOSSES Length F2 Insul Solar Surface (ft) Factor R-val Gains Location/Comments HOUSE - New 13 S1abEdge 57 0.900 R-0 No ADDITION FENESTRATION SURFACES # of Vent Sc Sc Interior Area Pan- Frame Open . U- Act Glass Int Shading/ Surface (sf) es Type Type value Azm Tlt Only Shade Description HOUSE - Existing 1 Window 6.3 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 2 Window 10.0 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 3 Window 10.0 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 4 Window 36.0 1 Metal Slider 1.190 270 90 1.00 0.88 Drapes.Std 5 Window 16.0 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 6 Window 6.3 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 7 Window 10.0 1 Metal Slider 1.190 180. 90 1.00 0.88 Drapes.Std 8 Window 10.0 1 Metal Slider 1.190 90 90 1.00 0.88 Drapes.Std HOUSE - New 9 Window 12.0 2 Metal Slider 0.750 0 90 0.88 0.78 Drapes.Std 10 Window 10.0 2 Metal Slider 0.750 180 90 0.88 0.78 Drapes.Std 11 Window 10.0 2 Metal Slider 0.750 90 90 0.88 0.78 Drapes.Std 12 Skylight 4.0 2 Metal Fixed 0.800 0 0 0.88 0.88 None COMPUTER METHOD SUMMARY Page 8 C -2R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZllS92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing + Addition Area Surface (sf) HOUSE - Existing 1 Window 6.3 2 Window 10.0 3 Window 10.0 5 Window 16.0 6 Window 6.3 7 Window 10.0 HOUSE - New 9 Window 12.0 10 Window 10.0 Mass Type Area Thick Heat Conduct- Surface (sf) (in) Cap ivity R -value Location/Comments HOUSE -Existing 1 S1abOnGrade 340 System Type 3.5 28.0 0.98 R-0.0 Exposed at Addition HVAC SYSTEMS Minimum Duct Efficiency Location HOUSE Furnace 0.750 AFUE Attic ACSplit 8.00 SEER Attic SPECIAL FEATURES/REMARKS Duct Duct R -value Efficiency R-2.1 0.780 R-2.1 0.740 R-2.1 existing duct insulation R-0 existing floor insulation per Form 3 R-0 existing wall insulation per Form 3s R-13 wall insulation required at Addition per Form 3s R-19 existing ceiling insulation per Form 3 R-19 ceiling insulation required at Addition per Form 3 Opaque U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per MFR'S. NFRC testing & certification at Addn. Viking metal frame dual -pane clear glazing reqd. at Addition E.FURN.75: per CEC TABLE 7-2 for pre -1978 construction E.AC.8.0: CEC MIN. REQUIREMENT HWH: NOT ALTERED - NO CALCULATIONS OVERHANGS AND SIDE FINS Window- Overhang Left Fin Right Fin - Left Rght Hght Wdth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght 2.5 2.5 20 0.8. n/a n/a n/a n/a n/a n/a n/a n/a 4 2.5 20 0.8 n/a n/a n/a n/a n/a n/a n/a n/a 4 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 4 4 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 2.5 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 4 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 4 3 2 0.7 n/a n/a n/a n/a n/a n/a n/a n/a 5 2 2 0.7 n/a n/a n/a n/a n/a n/a n/a n/a THERMAL MASS Area Thick Heat Conduct- Surface (sf) (in) Cap ivity R -value Location/Comments HOUSE -Existing 1 S1abOnGrade 340 System Type 3.5 28.0 0.98 R-0.0 Exposed at Addition HVAC SYSTEMS Minimum Duct Efficiency Location HOUSE Furnace 0.750 AFUE Attic ACSplit 8.00 SEER Attic SPECIAL FEATURES/REMARKS Duct Duct R -value Efficiency R-2.1 0.780 R-2.1 0.740 R-2.1 existing duct insulation R-0 existing floor insulation per Form 3 R-0 existing wall insulation per Form 3s R-13 wall insulation required at Addition per Form 3s R-19 existing ceiling insulation per Form 3 R-19 ceiling insulation required at Addition per Form 3 Opaque U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per MFR'S. NFRC testing & certification at Addn. Viking metal frame dual -pane clear glazing reqd. at Addition E.FURN.75: per CEC TABLE 7-2 for pre -1978 construction E.AC.8.0: CEC MIN. REQUIREMENT HWH: NOT ALTERED - NO CALCULATIONS CONSTRUCTION ASSEMBLY Page 9 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing + Addition Reference Name ..R.0.2X4.24 Description . Roof R-0 2x4 24oc Type ........... Roof R -Value ........ 0 sf-F/Btuh Framing •, Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. SHNGL.ASPHLT Asphault shingle roofing 0.44 0.44 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY.0.50 0.50 in plywood 0.62 0.62 4. AIR.RF.3.50 3.5 in & greater air space: heat flow up 0.80 0.80 5c. RO.PLACEHOLD R-0 PLACE HOLDER 0.00 -- 5f. FIR.2X4 2x4 in fir framing -- 3.46 6. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.RF Inside air film: heat flow straight up 0.61 0.61 Total Unadjusted R -Values 3.15 6.61 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 3.15.x 0.93) + (1 /, 6.61 x 0.07) = 0.306 Btuh/sf-F Total R -Value: 1 / 0.306 = 3.27 sf-F/Btuh CONSTRUCTION ASSEMBLY Page 10 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing + Addition Reference Name . FC.0.2X6.16 Description .... Floor Crwl R-0 2x6 16oc Type ........... Floor R -Value ........ 0 sf-F/Btuh Framing Material ..... FIR.2X6 Spacing ...... 16 inches on center Fraction ..... 0.10 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. CRAWLSPACE Effective R -value of vented crawlspace .6.00 6.00 2c. RO.PLACEHOLD R-0 PLACE HOLDER 0.00 -- 2f. FIR.2X6 2x6 in fir framing -- 5.45 3. PLY.0.63 0.625 in plywood 0.77 0.77 4. CARPET Carpet & pad 2.08 2.08 I. FILM.IN.FLR Inside air film: heat flow down 0.92 0.92 Total Unadjusted R -Values 9.94 15.39 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 9.94 x 0.90).+ (1 / 15.39 x 0.10) = 0.097 Btuh/sf-F Total R -Value: 1 / 0.097 = 10.30 sf-F/Btuh CONSTRUCTION ASSEMBLY Page 11 3R Project Title..i........ Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing + Addition M Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Reference Name . R.19.2X4.24 Description .... Roof R-19 2x4 24oc Type ........... Roof R -Value ........ 19 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction ..... 0.07 Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. SHNGL.ASPHLT Asphault shingle roofing 0.44 0.44 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY..0.50 0.50 in plywood 0.62 0.62 4. AIR.RF.3.50 3'.5 in & greater air space: heat flow up 0.80 0.80 5c. BATT.RII.0 R-11 batt insul (cavity > 3.5 in) 11.00 7- 5f. FIR.2X4 2x4 in fir framing -- 3.46 6. BATT.R8.0 R-8 batt insul (cavity > 3.5 in) 8.00 8.00 7. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.RF Inside air film: heat flow straight up 0.61 0.61 Total Unadjusted R -Values 22.15 14.61 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 22.15 x 0.93) + (1 / 14.61 x 0.07) = 0.047 Btuh/sf-F Total R -Value: 1 / 0.047 = 21..38 sf-F/Btuh CONSTRUCTION ASSEMBLY Page 12 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZllS92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing + Addition Reference Name . MW.13.2X4.16 Description .... Wall R-13 2x4 16oc Type ........... Wall R -Value ........ 13 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing :.. 16 inches on center Fraction'...'.. 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. PART.BD.0.63 0.625 in particle board 0.82 0.82 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3c. BATT.R13 R-13 batt insul (cavity = 3.5 in) 13.00 -- 3f.. FIR.2X4 2x4 in fir framing -- 3.46 4. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R -Values 15.18 5.64 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 15.18 x 0.85) + (1 / 5.64 x 0.15) = 0.083 Btuh/sf-F Total R -Value: 1 / 0.083 = 12.11 sf-F/Btuh CONSTRUCTION ASSEMBLY Page 13 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing + Addition Reference Name . AW.13.2X4.16 Description .... Wall R-13 2x4 16oc Type ........... Wall R -Value ........ 13 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 16 inches on center Fraction ..... 0.15 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value O. FILM.EX Exterior air film: winter value 0.17 0.17 1. BLDG.PAPER Building paper (felt) 0.06 0.06 2c. BATT.R13 R-13 batt insul (cavity = 3.5 in) 13.00 -- 2f. FIR.2X4 2x4 in fir framing -- 3.46 3. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.WLL Inside air film: heat sideways 0.68 0.68 Total Unadjusted R -Values 14.36 4.82 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 14.36 x 0.85) + (1 / 4.82 x 0.15) = 0.090 Btuh/sf-F Total R -Value: 1 / 0.090 = 11.08 sf-F/Btuh HVAC SIZING Page 14 HVAC Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check Date MICROPAS4 v4.02 File-JACKSOEA Wth-CTZ11S92 Program -HVAC SIZING User#-MP1320 User-CALCTECH Run -Existing + Addition GENERAL INFORMATION FloorArea ................. Volume.. ..... ............ Front Orientation........... Sizing Location............ Latitude... .... ........ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range. .. ...... Interior Shading Used Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 1108 sf 8864 cf Front Facing OROVILLE RS 39.5 degrees 30 F 70 F 104 F 78 F 37 F No No No 0.20 HEATING AND COOLING LOAD SUMMARY Heating Description (Btuh) 0 deg (N) Cooling (Btuh) Opaque Conduction and Solar...... 16942 8378 Glazing Conduction ............... 6067 3944 Glazing Solar .................... n/a 5484 Infiltration ..................... 5042 2070 Internal Gain .................... n/a 1875 Ducts ............................ 2805 2175 Sensible Load .................... 30856 23925 Latent Load ...................... n/a 4785 Minimum Total Load 30856 28710 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. TABLE OF CONTENTS TOC Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check/ -Date MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -TOC User#-MP1320 User-CALCTECH Run -Existing Residence TABLE OF CONTENTS Report Page FORM C -2R ................. 1 FORM C -3R ................. 4 ADDITIONS ................. 7 COMPUTER METHOD SUMMARY Page 1 C -2R Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check/ Date MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing Residence MICROPAS4 ENERGY USE SUMMARY Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin Space Heating.......... 12.67 52.95 -40.28 Space Cooling.......... 16.34 49.12 -32.78. Total 29.01 102.07 -73.06 *** Water Heating not calculated *** GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Footprint Area ............. Ground Floor -Area ......... I . Slab -On -Grade Area......... Glazing Percentage......... Average Ceiling Height..... 955 sf Single Family Detached Existing Front Facing 0 deg (N) 1 1 ReducedYear Raised Floor 1 7640 cf 955 sf 955 sf 0 sf 15.8 % of FA 8 ft BUILDING ZONE INFORMATION Floor Area Volume Zone Type (sf) (cf) HOUSE Residence 955 7640 # of Dwell Cond- Units itioned (Package E) Vent Special Thermostat Height Vent Area Type (ft) (sf) 1.00 Yes NoSetback 2.0 n/a COMPUTER METHOD SUMMARY Page 2 C -2R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing Residence OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-val Azm Tilt Gains Reference Comments HOUSE - Existing 1 Wall 210 0.306 R-0 0 90 Yes R.0.2X4.24 FRONT 2 Door 20 0.330 R-0 0 90 Yes None FRONT ENTRY 3 Wall 71 0.306 R-0 0 90 Yes R.0.2X4.24 TO BE REMOVED 4 Wall 156 0.306 R-0 270 90 Yes R.0.2X4.24 RIGHT 5 Wall 16 0.306 R-0 270 90 Yes R.0.2X4.24 TO BE REMOVED 6 Wall 224 0.306 R-0 180 90 Yes R.0.2X4.24 BACK . 7 Wall 68 0.306 R-0 180 90 Yes R.0.2X4.24 TO BE REMOVED 8 Wall 62 0.306 R-0 90 90 Yes R.0.2X4.24 LEFT 9 Wall 126 0.306 R-0 90 90 Yes R.0.2X4.24 TO BE REMOVED 10 Floor 955 0.097 R-0 0 0 No FC.0.2X6.16 TO CRAWLSPACE 11 Roof 955 0.047 R-19 0 0 Yes R. 19.2X4.24 FLAT CEILING FENESTRATION SURFACES # of Vent SC Sc Interior Area Pan- Frame Open U- Act Glass Int Shading/ Surface (sf) es Type Type value Azm Tlt Only Shade Description HOUSE - Existing 1 Window 6.3 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 2 Window 10.0 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 3 Window 10.0 1 Metal Slider 1.190 0 90 1.00 0.88 Drapes.Std 4 Door 16.7 1 Glz<50% Hinged 1.040 0 90 1.00 0.88 Drapes.Std 5 Window 36.0 1 Metal Slider 1.190 270 90 1.00 0.88 Drapes.Std 6 Window 16.0 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 7 Window 6.3 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 8 Window 10.0 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 9 Window 20.0 1 Metal Slider 1.190 180 90 1.00 0.88 Drapes.Std 10 Window 10.0 1 Metal Slider 1.190 90 90 1.00 0.88 Drapes.Std 11 Window 10.0 1 Metal Slider 1.190 90 90 1.00 0.88 Drapes.Std OVERHANGS AND SIDE FINS Window- Overhang Left Fin Right Fin - Area Left Rght Surface (sf) Hght Wdth Dpth Hght Ext Ext Ext Dpth Hght Ext Dpth Hght HOUSE - Existing 1 Window 6.3 2.5 2.5 20 0.8 n/a n/a n/a n/a n/a n/a n/a n/a 2 Window 10.0 4 2.5 20 0.8 n/a n/a n/a n/a n/a n/a n/a n/a 3 Window 10.0 4 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a �n/a 4 Door 16.7 6.7 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 6 Window 16.0 4 4 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 7 Window 6.3 2.5 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 8 Window 10.0 4 2.5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a 9 Window 20.0 4 5 1.3 1 n/a n/a n/a n/a n/a n/a n/a n/a COMPUTER METHOD SUMMARY Page 3 C-2R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM C -2R User#-MP1320 User-CALCTECH Run -Existing Residence HVAC SYSTEMS Minimum Duct System Type Efficiency Location HOUSE Furnace 0.750 AFUE Attic ACSplit 8.0.0 SEER Attic SPECIAL FEATURES/REMARKS Duct. Duct R -value Efficiency R-2.1 0.780 R-2.1 0.740 R-2.1 existing duct insulation ' R-0 existing floor insulation per Form 3 R-0 existing wall insulation per Form 3s R-19 existing ceiling insulation per Form 3 Opaque U -values per CEC TABLE 7-2 for pre -1978 construction Glazing U -values per CEC TABLE 7-2 for pre -1978 construction E.FURN.75: per CEC TABLE 7-2 for pre -1978 construction E.AC.8.0: CEC MIN. REQUIREMENT HWH: NOT ALTERED - NO CALCULATIONS CONSTRUCTION ASSEMBLY - Page 4 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing Residence Reference Name . R.0.2X4.24 Description .... Roof R-0 2x4 24oc Type ........... Roof R -Value ........ 0 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction ..... 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Name Description 0. FILM.EX Exterior air film: winter value 1. SHNGL.ASPHLT Asphault shingle roofing 2. BLDG.PAPER Building paper (felt) 3. PLY.0.50 0.50 in plywood 4. AIR.RF.3.50 3.5 in & greater air space: heat flow up 5c. RO.PLACEHOLD R-0 PLACE HOLDER 5f. FIR.2X4 2x4 in fir framing 6. GYP.0.50 0.50 in gypsum or plaster board I. •FILM.IN.RF Inside air film: heat flow straight up Total Unadjusted R -Values FRAMING ADJUSTMENT CALCULATION Cavity Framing Cavity Frame R -Value R -Value 0.17 0.17 0.44 0..44 0.06 0.06 0.62 0.62 0.80 0.80 0.00 -- -- 3.46 0.45 0.45 0.61 0.61 3.15 6.61 Total U -Value: (1 / 3.15 x 0.93) + (1 / 6.61 x 0.07) = 0.3.06 Btuh/sf-F Total R -Value: 1 / 0.306 = 3.27 sf-F/Btuh CONSTRUCTION ASSEMBLY - Page 5 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing Residence Reference Name . FC.0.2X6.16 Description .... Floor Crwl R-0 2x6 16oc Type ........... Floor R -Value ..... 0 sf-F/Btuh Framing Material ..... FIR.2X6 Spacing ...... 16 inches on center Fraction ..... 0.10 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. CRAWLSPACE Effective R -value of vented craw.lspace 6.00 6.00 2c.' RO.PLACEHOLD R-0 PLACE HOLDER 0.00 -- 2f. FIR.2X6 2x6 in fir framing -- 5.45 3. PLY.0.63 0.625 in plywood 0.77 0.77 4. CARPET Carpet & pad 2.08 2.08 I. FILM.IN.FLR Inside air film: heat flow down 0.92 0.92 Total Unadjusted R -Values 9.94 15.39 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 9.94 x 0.90) + (1 / 15.39 x 0.10) = 0.097 Btuh/sf-F Total R -Value: _ 1 / 0.097 = 10.30 sf-F/Btuh CONSTRUCTION ASSEMBLY Page 6 3R Project Title.......... Addition for Jackson Date........ 05/03/94 MICROPAS4 v4.02 File-JACKSOEX Wth-CTZ11S92 Program -FORM 3R User#-MP1320 User-CALCTECH Run -Existing Residence Reference Name . R.19.2X4.24 Description .... Roof R-19 2x4 24oc Type ........... Roof R -Value ........ 19 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction ..... 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 22.15 x 0.93) + (1 / 14.61 x 0.07) = 0.047 Btuh/sf-F Total R -Value: 1 / 0.047 = 21.38 sf-F/Btuh Material Cavity Frame Name Description R -Value R -Value 0. FILM.EX Exterior air film: winter value 0.17 0.17 1. SHNGL.ASPHLT Asphault shingle roofing 0.44 0.44 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY.0.50 0.50 in plywood 0.62 0.62 4. AIR.RF.3.50 3.5 in & greater air space: heat flow up 0.80 0.80 5c. BATT.RII.0 R-11 batt insul (cavity > 3.5 in) 11.00 -- 5f. FIR.2X4 2x4 in fir framing -- 3.46 6. BATT.R8.0 R-8 batt insul (cavity > 3.5 in) 8.00 8.00 7. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 I. FILM.IN.RF Inside air film: heat flow straight up 0_61 0.61 Total Unadjusted R -Values 22.15 14.61 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: (1 / 22.15 x 0.93) + (1 / 14.61 x 0.07) = 0.047 Btuh/sf-F Total R -Value: 1 / 0.047 = 21.38 sf-F/Btuh ADDITION WORKSHEET Page 7 ADD Project Title.......... Addition for Jackson Date........ 05/03/94 Project Address........ 6065 Upper Palermo Rd. Oroville CA Documentation Author... Neal"Kuopus Company ................ CALCTECH Telephone .............. (916) 589-4219 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 11 Field Check/ Date MICROPAS4 v4.02 File-JACKSOEX Program -ADDITIONS User#-MP1320 User-CALCTECH Run -Existing + Addition ADDITION WORKSHEET - COMPUTER PERFORMANCE EXISTING File Name .................. JACKSOEX Run Title.. ... ........ Existing Residence Conditioned Floor Area..... 955 sf Standard Design Energy Use. 29.01 kBtu/sf-yr Proposed Design Energy Use. 102.07 kBtu/sf-yr NEW (EXISTING PLUS ADDITION) File Name .................. JACKSOEA Run Title. ..... ....... Existing + Addition Conditioned Floor Area..... 1108 sf Standard Design Energy Use. 31.01 kBtu/sf-yr Proposed Design Energy Use. 75.40 kBtu/sf-yr FLOOR AREA RATIO Floor Existing New Area Floor Area Floor Area Ratio 955 / 1108 = 0.862 ADDITION DESIGN ENERGY USE FOR NEW (EXISTING PLUS ADDITION) Floor New Area Existing Existing Standard Ratio Proposed Standard 31.01 + 0.862 x ( 102.07 - 29.01) _ Addition Design 93.98 Note: If (Existing Proposed - Existing Standard) is negative, this difference is set to zero. ADDITION ENERGY USE SUMMARY Energy Use (kBtu/sf-yr) New.................... Addition Proposed Compliance Design Design Margin 93.98 75.40 18.58 *** Addition complies with Computer Performance ***