HomeMy WebLinkAboutADM 99 (11)0 is
BUTTE COUNTY
ADMINISTRATIVE PERMIT FOR TEMPORARY TRAVEL TRAILER
Assessor's Parcel Number for Site:Ol0 — �. /3a — 0 1
Street Address of Site:
Applicant's Name: ( u.J� 6� S T• M&�,,s
Applicant's Mailing AddressR
Applicant's Telephone Number:
Building Permit Receipt Number:j('1�`-c�
(Show copy of Permit signed and issued)
Date Sewage Disposal Permit issued: qZEV-MQ5LN —ESSV E6--�:,
(Show copy of Permit signed and issued)
RSc(14
I certify that the above information is correct and that I have read Butte County Code
Section 24-300-C (on the reverse side of this application.)
Applicant's Signatur . ate: :Z — 5 —Q5
TO BE FILLED IN BY PLANNING DIVISION
Date Application Received:
Zoning Verified by a`. "r s
Permits Reviewed by L4:61 �t- - DSC 12
Associated Building Permit # e9 5—,- o Z y %
Administrative Permit
Planning Approval by
Date Approved: 70
L` a 0"i
File: "Administrative Permits"
Date revised: July 20, 2004
K:\Planning\FORMS\APPLICATIONS\ADMINISTRATIVE PERMITS\Temp. Travel Trailer.doc
5
0 0
The approved Administrative Permit is subiect to
Chapter 24 of the Butte County Code
24-300
C. Temporary uses in zones permitting a residential use:
Temporary travel trailer as a dwelling unit during construction of a single family
residence or the rehabilitation of a single-family residence that has been damaged
by fire, earthquake, tornado, other acts of nature, or has been deemed condemned
or uninhabitable by the County, subject to the following requirements:
A. The travel trailer may be placed for a period not to exceed one (1) year
from the date of issuance of the Administrative Permit; provided however,
the Planning Manager may extend such Administrative Permit for one six
(6) month period. Such extension by the Planning Manager shall be done
only upon a showing of physical or financial hardship by the applicant.
B. That the occupant has secured a building permit for a residence.
C. That the occupant has secured a sewerage disposal permit from the Butte
County Environmental Health Division.
D. That before six (6) months have elapsed from the date of the issuance of
the building permit, the occupant shall have completed the foundation,
rough plumbing, framing and the roof of the proposed residence; and
E. That the house must be completed within the one-year period and the
trailer dwelling must be abandoned.
F. The applicant must obtain the necessary permits from the Butte County
Building Division and Environmental Health Division for the travel trailer
installation.