HomeMy WebLinkAboutMISCELLANEOUS CORRESPONDENCE 7/82 - 12/82 200:09 5 OF 5i
� t
"
11
di o�f
A brief d,
1 e u ber o" a c s as
� e�rein�th n m f tanCell W
SB 2074 followed tih
reviewed.: Onecounty
had a condition that the ag preserve had ;'to be witthi'rt a'
mile of fhe city, and
one app! cation WAS received. Another county„had received
76 applications.
A round table discussion
on bounty,, Planning Deparimerit budgets :was discussed
Comments are as foll'oWs:,
A'laineda
No problems. Changed from body system to coptputer
syste m lost 5 positions . Have HGO prograrti , al so.
San'Nlateo
bonit anticipate any exhaustive positions. expecting
to increase S.
Monterey
h9ght bs't 5 postitibns.` Don't think we will ^br'eak
even With blutlget. Have a budget of'$1,700,000,
pros ably ends up With $1,,034,000.
Placer
�, sing. 21. pos'itio'ns, but taking on,new "program in Lake
Tahoe, which wi1.1 take care 'of the 2 positions:
Nevada
Budget fbrObXt fiscal year 5� below last year°s
Salta Barbara
Stand to' 1 os,e about 5 perma.n'ent ful 1 -time: empIoyees;
;5' budget cut from last year's.
Santa Criz
ing cut back by about 10 positions; Budget; to, back,
too.
— —dumas - -
-- W l l have 7 employees; had 6 last year; budget better f -
t.h,s year than 'l a t year:
D'on't "ahtf (pate any cut in personnel'`budget; "cut
Amadbt^
(couldh't hear type too weak
bel 'Norte
Budget5 bolow bast year'`s;
:
s a
Shat
Doi General P1 ah, so: did, lose any positions; cut
hg
our 6wh budget by $4010004
Solaro
Budget"Wise it looks real rough;, budget has beeh'crn
from fast year+
Mad+�a
I
l"hings look' abbot the sae as, last year,
,
Tulare
Basyc'a11y a status quo .budgat; thinks there Will be
some funds for curb t
ty7
Nudget, process has been pretty much.the safite. ai>ic
P'ronosi�on; 13.Have 'had sevetal 1u7ts:
Vo"7 o
Budget. 8 hi h�:r thah last year With same ttutiiber bf
posltidns:County adjusted budget When C'Wrpasi'tori
hte out )
1"3 first ca I
I I
1
Lake
Budget cut, 5-6% an almost e,Vle category outside Of w
staff members. ,Lost Building Department this last
year.
Sari Bernardino_`
a�dget gut an add ti 7;cut 20 iri all . ,. Supposed
to make, up partly 'by increase of fees. Great 'expecta-
tions of increased. development. Also inti 1 i-ti ng' $3.0;0001
in geothermal residue: Planning Commission i'nerea ed
-
fr.,om 9.. to 13embers .
0ran;ge
Eliminating 5 Vacant po,sitioris or more.' Moving into a
cost systbro of full recovery, of fees With cost acco0ting
for: VA's .
in dooqun
primiarily got what they asked for•Waitrig to' see ;what
revehUes are.,
Merced
Lost 4 `CETA " osytons., Budget cut; .ih process of.
p.
'increas n9 fees, based on t7me study,—charge extra on
;ETR`s;
EIR's (0ich'they�prepare) and reVieW y staff of
K1hgs
Losing `2 ptls7tioh's; one of which 7s-vacaht.,
Sis�Ciyou
Probably lost 2 positions; �^evi.si g fee schedule.
Mariposa
,
Contra Costa
) -
T ansa h
_
Could not understand tape or`°t�►as not on tape
Stahislaus
�at
p
r
d h� 8 98 at 9 OC ht
ex a a�
_. I �J �� � .moi
as �� n.urhed to the h y
�The nreet��hg �r, � . r
p,5. �(pleaae 'nevi0W�,
i Fr sho:
o t e aleet7n r#�
sons t C
reV h
these. minrxtes and �tir7h�g yoU1^ 7