Loading...
HomeMy WebLinkAboutUP 99-20PROJECT SUMMARY -SHEET FILE #: UTP 99-20 PROJECT TYPE:Use Permit APPLICANT: Andrew W. Clay " ADDRESS: 293 Middlefork Lane, Oroville, CA 95966 OWNER ADDRESS: REPRESENTATIVE: ADDRESS: PROPERTY• l -d • At the end of Dove Court,approximately 1111 feet off • SimmonsRoad, northeast of Oroville AP#: 071-400-013 TOWN/AREA: Oroville GENERAL PLAN DESIGNATION: Timber Mountain 1. Application complete: 5/17/99 Amount: L1,064,00 Receipt #: 17547 2. 3. 4. 5. 6. 7. Comments- to: • • DDS, Assessor.,Comm, Comments received from: Env. Health 6/4/99 & Public Works 5/21/99 Rezone Petition Signatures Checked: Mailing List/Lead-in Sheet: Assigned To: Environmental Determination: State Clearinghouse No: 8. Staff Report: Subject to Fish & Game: Project Video: Categorical Exemption-CEQA# Negative Declaration Mitigation Negative Declaration Environmental Impact Report Gen. Rule Ex. -CEQA # 15061.(bx3) Other 9. Clearinghouse circulation required: Yes No Date Sent to SCH: 10. Publication Notice Written:�1-/- �l 9 Display Ad Prepared: 11. Notices Mailed: /-/_!r,q 9 Number of Notices: 12. Newspaper Publication Date: i-le"fs 13. Planning Commission Hearing(s): 9' 30 9 9 Action taken: Special Conditions: Commission Resolution No. 14. Board of Supervisors' Hearing(s): Action taken: Board Resolution No.: Type Use Permit/Send for signature: N.O.E. / N.O.D. / APPENDIX G: Send validated Use Permi Assessor's Memo: Copy of Use Permit / Variance to Planning Technician: Ordinance No: Adopted: Fish & Game Fees Paid: Yes No Andrew W. Clay, Use Permit to allow a permanent second dwelling unit on property zoned "U (Unclassified). The property is located at the end of Dove Court, approximately 1,000 feet off of Simmons Road, identified as APN 071-400-013, northeast of Oroville. (File UP99-20) (SB) (VIDEO) A video of the site was shown. Mr. Betts gave a brief summary of the project. Chairman Leland said he had a problem with the double density question. Mr. Betts said the project was taken in before the new ordinance was adopted and was processed under the old ordinance. He said property zoned "U" does not have to meet the General Plan density. Chairman Leland asked how they could have a zoning override the General Plan density. Mr. Wilson said it is an internal problem with the "U" zone. Commissioner Lambert said that in many cases the "U" zone is more restrictive. Chairman Leland said he has to look at this project to see if it fits the character of the neighborhood. Mr. Wilson said the surrounding parcel sizes range from 6 to 26 acres: Commissioner Lambert discussed rezoning the property. Mr. Wilson said the General Plan designation does not fit the area. Chairman Leland asked how many parcels in the area have a second dwelling. Mr. Betts said one parcel has a second dwelling that is 640 square feet for senior citizens. The hearing was opened to the public. Andrew Clay said he purchased the land in 1986 when it was a 5 acre minimum. He said the area around him is residential. He said he has a large investment in this property. He wants to keep the first home for a guest house. He said he has a fire break around the property and has a 4000 gallon water tank for fire protection. Commissioner Lambert asked if all the improvements were done with permits and the applicant said yes. Mr. Betts said there was a letter of intent signed by the applicant to remove the mobile home once the new dwelling was ready for occupancy or apply for a Use Permit for the second dwelling unit. He said to make this a guest house the applicant would need to remove the kitchen facilities and it could not be any larger than 500 square feet. Commissioner Lambert said she has a concern with allowing a second dwelling on this property. Mr. Wilson said when you look at the Timber Mountain General Plan designation and the parcel sizes that exist on the ground, it appears that the designation was put on here to preclude further lot splits. ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES ■ SEPTEMBER 30, 1999 ■ Commissioner Mooney said the land should be zoned Foothill Residential instead of Timber. Chairman Leland said when the zoning was put in place, there was an attempt to limit the density to what exists at the time. Mr. Wilson said correct, with the stipulation of allowing a second unit with a Use Permit. Commissioner Cage said it sounds as though the conditions the Commission passed for second dwellings should be applied to this Use Permit. The hearing was closed. It was moved by Commissioner Mooney to approve the Use Permit for Andrew Clay. The motion died for lack of a second. Commissioner Cage said she would like to pass on this item, but she did not get an answer to her question. She said the conditions that the Commission passed are not listed on this report. Mr. Betts said they did not apply the new conditions and'the new ordinance to this project. Commissioner Nelson said when the applicant built the new unit there was a stipulation that the old unit would be removed or apply for the Use Permit. Chairman Leland said Commissioner Cage could make a motion adding the conditions adopted under the new ordinance. Commissioner Lambert asked if the Commission could make a'motion"that incorporates the new ordinance conditions, when they are hearing this under the old ordinance. Chairman Leland said this is a discretionary Use Permit, and can be granted with mitigating conditions. He said he was inclined to not approve this. He said he can not find this consistent with the neighborhood. He said the area has larger parcels. He said the character of the neighborhood is for less density in this area. Commissioner Lambert said the applicant can remove the first unit. She said the second unit does not fit. She said she has a problem with approving this. She said this application does not fit the density, the guest home criteria, the new ordinance, and it does not fit the his Plan density. It was moved by Commissioner Lambert, seconded by Commissioner Nelson, and carried to deny the Us(,- Permit sePermit for Andrew W. 'Clay by the following vote: AYES: Commissioners Nelson and Lambert, and Chairman Leland NOES: Commissioners Cage and Mooney ABSENT: No one ABSTAINED: No one ■ BUTTE COUNTY PLANNING COMMISSION ■ MINUTES 0 SEPTEMBER 30, 1999 ■ DEPARTNIENItF DEVELOPMENT SERVICES BUTTE COUNTY UNIFORM APPLICATION FIRLICANT: Agcnt information to he oruvided is on other side: PPLICANT-S NAME ( if appq=c is different item owner an affidavit is required CITY. STATE & ZIP CODE - 9S AME OF PROPOSED PROJECT (If any OCATION OF PROJECT ( Major cma strews and Address, if any) �q - I IriL Lw I C). rov,,Ile_ eVqsl GENERAL INFORMATION REQUIRED ASSESSOR'S PARCEL NUMBER: FILE NUMBER (FOR OFFICE USE) . . r) r.y) \ -\ TELEPHONE ( <5%r-) .4 OWNER S NAME 91 A;z.pw L, 6 CLL, I TELEPHONE (6- 06 I -V- a)qLo P kA- --s I ccse4 4v lot -e e)Z� E3 REZONE ADDRESS: CITY. STATE & ZIP CODE - ZONE GENERAL PLAN E aSTING LAM USE SITE SIZEin Squxe Feet or Acres) r MINOR VARIANCE _S e Ce .3 G LUCi RIF Pf3) 4tA �.VROPOSED &(i� Square Fla) U"'I "I STRUCTURES (in Square Feet) (Check One) (Check One) PROPERTY IS OR PROPOSED TO BE SEWERED TO BE ON SEPTIC PROPERTY IS OR PROPOSED TO BE ON PUBLIC WATER PROPERTY IS OR PROPOSED TO BE ON WELL WATER PROPERTY IS OR PROPOSED APPLICATION REQUESTED Planning 01visluk MAY 17 1999 oroville,calitomia C] TENTATIVE SUBDIVISION MAP E3 TENTATIVE PARCEL MAP [3 WAIVER OF PARCEL MAP E3 BOUNDARY LINE NIODIFICATION [3 LEGAL LOT DETERMINATION [3 CERTIFICATE OF MERGER E3 MINING AND RECLAMATION PLAN E:3 OTHER PROJECT DESCRIPTION FULL DESCRIPTION OF PROPOS size of parcels.)_rg> Ve_e_!� r3 GENERAL PLAN AMENDMENT P kA- --s I ccse4 4v lot -e e)Z� E3 REZONE USE PERMIT C3 MINOR USE PERMIT 0 VARIANCE r MINOR VARIANCE .3 C3 ADMINISTRATIVE PERMIT 0 DEVELOPMENT AGREEMENT APPLICATION REQUESTED Planning 01visluk MAY 17 1999 oroville,calitomia C] TENTATIVE SUBDIVISION MAP E3 TENTATIVE PARCEL MAP [3 WAIVER OF PARCEL MAP E3 BOUNDARY LINE NIODIFICATION [3 LEGAL LOT DETERMINATION [3 CERTIFICATE OF MERGER E3 MINING AND RECLAMATION PLAN E:3 OTHER PROJECT DESCRIPTION FULL DESCRIPTION OF PROPOS size of parcels.)_rg> Ve_e_!� PROJECT (Attach awessary sheets. If this application is for a land division describe the number and Ze_ ekliek.'L-4 Mp%�'&_ qc>.Ake— esvk 4e P kA- --s I ccse4 4v lot -e e)Z� t. .- J 1 (4 rs gA44 Lias Sf;,�!o_ccxAe_ icze-e-ess DjU3e_r es VM, 04� OWNER CEW111*1CATION I CERTIFY THAT I A.%j PRESENTLY THE LEGAL OWNER OR THE AUTHORIZED AGENT OFTHE OWNER OFTIE ABOVE DESCRIBED PROPERTY. FURTHER. I ACK.NOwjMGE THE FM.D;G OF THIS APPLICATION AND CERTIFY TILATALL OF THE B INFORMATION IS TRUE AND PYE ACCURATE. (if an cnij is to be audxx-ded. cloW4 an UltdAvit of aUth"i=i0n AM u, c the it Wi 113M ficallun.) DATE: Z/-;t/L?j SIGNATURE: tv, AGENT AUTHORIZATION To Butte County, Department of Development Services; Print Paine of Ageae gad Phone Ntmbcr Mailing Address is hereby authorized to process this application for on my property, identified as Butte County Assessors Parcel Number This authorization allows representation for all applications, hags, appeals, etc. and to sign all documents necessary for said processing, but not including document (s) relating to record title interest. Owner(s) of Record: (sign and print name) ptinr Name Sisasawm Architect and/or Engineer. Print ; Iame of j6-&cw aad Pboae Number Mailing Addmss FOR OFFICE USE ONLY Verify: 5/l.� %�°j Date received: YrirA Name Sipature Total amount received: _LZ_AP Number(s) gal Description 7/ Owners Authorization Zoning requirements ______Project Description _Copies of plot plan t _ �'11 i= Taken by S Receipt No.'.H•Irv,) Plan vo payment of the currently required Application Fee and/or Deposit (Any unused portion of a deposit) will be returned upon final action. --- -y� Current fee for this application is S as of Make check payable to "Butte County Treasurer". COUNTY OF BUTTE ENVIRONMENTAL INFORMATION FORM (To be Completed By Project Applicant) Date Filed General Information: 1. Na �d add n of own9j'and/ develo 'rr and/or pr i spons HK(lr efRJ (_'l uL( 2. Address of projectC- Assessor's Parcel Number: O` 3 C)o 0 3. N me address, and tel one number of person to be contacted concern g this project: 4. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies: e- 5. Existing general plan designation: 7 M 6. Existing zoning district: UL 7. How is land currently used? eSe � �. a � 8. Proposed use of site (Project for which this form is filed): eo-'eL. Project Description: 9. Site size: (�;L0 (Acres/Sq. Feet) 10. Off-street panting spaces: Full size: to Compact: Total: 11. Plans attached Yes 4, No _ 11 12. Proposed development schedule ��w e -ALL re -S cxICe-o-A 4 G�sT 13. Associated projects 14. Anticipated incremental or phased development -01A Attach description of project containing the following information: 15. If residential, include the number of units, schedule of unit sizes, range of sale prices or rents, and type of household size expected. 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area and loading facilities. 17. If industrial, indicate type, estimated employment per shift, and loading facilities. planning DNISIon V1 AY 17 1999 Oroville, c-automia ❑ Butte County Department of Development Services 0 Planning Division 0 0 18. If institutional, Indicate the major function, estimated employment per shift, estimated occupancy, lording facilities, and community benefits to be derived from the project. 19. If the project involves a variance, conditional use, rezoning application, or any development permits, state this and indicate clearly why the application is required: If permits have already been issued, please atta;h as Exhibit Are the following items applicable to the project or -its effects? Discuss below all items checked yes (attach additional sheets as necessary). YES NO 20. Change in existing features of any hills, buttes, canyons or substantial alteration of ground contours. _ 21. Change in scenic. views or vistas from existing residential lands areas or public or roads. _ 22. Change in pattern or character of general area of project. _ 23. Significant amounts of solid waste or litter. _ 24. Change in dust, ash, smoke, fumes or odors in vicinity. _ J. 25. Change in bay, lake, river, stream or ground water quality or quantity, or alteration of existing drainage patterns. _ 26. Substantial change in existing noise or vibration levels in the vicinity. _ 27. Site on filled land or on slopes of 10 percent or more. _ 28. Use of, or disposal of potentially hazardous materials, such as toxic substances, flammable or explosives. — 29. Substantial change in demand for municipal services including districts). (police, fire, water, sewage, etc. special _ L 30. Substantially increase fossil fuel consumption x (electricity, oil, natural gas, etc.). 31. Relationship to a larger project or series of projects. _ 0 Butte County Department of Development Services 0 Planning Division ❑ E J Environmental Setting: (Attach brief description) 32. Describe the project site as it exists before the project, including information on topography, soil stability, pl ants and animals, and any cultural, historical, or scenic aspects. Describe any existing structures on the site :and the use of the structures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical, or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one -family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set -back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or Polaroid photos will be accepted. Certification I hereby certify that the statements fumished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date R K:\FORMS\SUBM17rAL\ENV-INFO I foteei SO e- 30 Yl as �J2 � o�.0 e ,�-d �� f we���'e X 000 • . a.v d . Q `ue e #0 VL1 Oak wwd'lowd (I k, o o: I s y�0 -/S a r ee e e C I 'fI I ca e t�4 4k,e occo-16�-t-d (tee 0oc� _ ` �- ems& 0- es s S,k-tJ'o UkAJ teee,, �Mm ,e (4: e- -' rte` c,� (� PSE 0 Butte County Department of Development Services 0 Planning Division 0 C :.Y Lq H- O L,' e)+4 DO 7' .9 (1 p > y vcNso>J Dr? (�`�'� Wo -3 e.1 v S ' ����� ~ . , EL: 071 400 013 000 STATUS: AC / CL('4Y ANDREW W & KATHERINE L 293 MIDDLEFORK LN � OROVILLE CA 95966 EL: 071 090 009 000 STATUS: AC SCHWING HOWARD R & BETTY . 145 SCHWING LOOP � OROVILLE CA 95966 — EL: 071 090 014 000 STATUS: AC THACKREY M JO 70 BOBCAT SADDLE OROVILLE CA 95966 "EL: 5371 090 022 000 STATUSs AC 68 BOBCAT SADDLE / OROVILLE CA 95966 EL: 071 400 003 000 STATUS: AC ( CAULKINS IRVING S & DELORES C JT 740 SIMMONS RD ' < OROVILLE CA 95966 EL: 071 400 004 000 STATUS: AC GIC -.:L FRANK J' JR ETAL / 480 BOYNTON AVENUE #2 SAN JOSE CA 95117 ' EL: 071 400 006 000 STATUS: AC HALLIBURTON WAYMAN S & BARBARA R � ^ 19 SPENCE WAY /L OROVILLE CA 95966 |` � —_ - .`_--- ---_- EL: 071 400 010 nnr STATUS: AC). MCDONALD CHARLES & MARTHA ETAL TC 2047 HARDNETT CT OROVILLE CA 95965 EL: 071 400 011 000 STATUS: AC MCMEECHAN CHARLES M & KYLE A JT P O BOX 18635 SOUTH LAKE TAHOE CA 96151 EL: 071 400 014 000 STATUS: AC YENSON GAY O JR & LOLA J j-1- III T 111 DOVE COURT OROVILLE CA 95966 0 EL: 071 400 021 000 STATUS: AC TRZECIAK HANK & SUSAN ETAL TRZECIAK TIMOTHY & LEIALOHA 440 MONTEREY ST BRISBANE CA 94005 EL: 071 400 023 000 STATUS: AC MOUNTAIN MAN MATHAUSER DANNY & CUMMINGS TROY A 9 SCHRODER DR OROVILLE CA 95966 ' EL: 071 400 025 000 STATUS: AC COLETTI SUSAN R 623 SIMMONS RD OROVILLE CA 95966Y �`�L: 0vl 4�M �L�6 000 STATUS: AC BURROWS FAMILY LIVING TRUST | BURROWS ARCHIE R & FRANCES N TRUS 555 SIMMONS RD OROVILLE CA 95966 EL: 071 400 027 000 STATUS: AC . WOJCIK STANLEY & LORELEI 162 EMILY WAY GRANTS PASS OR 97527 EL: 071 400 028 000 STATUS: AC HILL CRAIG A & KIMBERLY 59 MAYBERRY ROAD OROVILLE CA 95966 EL: 071 400 029 000 STATUS: AC DOWNING FAMILY REVOCABLE TRUST DOWNING BARRY M & JOVITA V TRUSTE 136 SCHWIN8 LOOP !(� OROVILLE CA 95966 / j---'-�--�-��-----__ --`- -------- - --- -`` EL: 071 400 034 000 STATUS: AC SKOW CHARLES A & HELEN C CP 1212 GLENWOOD AVE CHICO CA 95926 EL: 071 400 035 000 STATUS: AC NAKANO TAKUYA & HELEN T JT 589 CASSERLY ROAD WATSONVILLE CA 95076 EL: 071 400 036 000 STATUS: AC MUNOZ FAMlLY TRUST MUNOZ RALPH H & ALICE T TRUSTEES 21911 DELORES CUPERTINO CA 95014 . EL: 071 400 039 000 STATUS: AC HILL RUDY C & BETTY JO JT .' 385 HILLCREST 'r OROVILLE CA 95965 ' ' — -'- EL: 071 400 040 000 STATUS: AC KONGLE DONA K 10 MAYBERRY ' { OROVILLE CA 95966 _ ' EL: 071 400 041 000 STATUS: AC . � JONES JANET MARIE ETAL | 10403 QUIET HILL ! di LA PORTE TX 77571 �`��^ ~'^ '~~ 042 ~~~ ~'~'~~^ ~~ {� WILSON MICHAEL L ETAL ~ LECOMPTE THERESA E ` 457 SIMMONS RD � OROVILLE CA 95966 1 ' EL: 071 400 048 000 'STATUS: A� ' � DONAHUE EDWARD W ETAL 5841 STUBBLEFIELD WAY � SACRAMENTO CA 95823 ' EL: 071 400 049 000 STATUS: AC � JORDAN-CURASI DENNIS & LESLEY 1655 WEST DATE AVE PORTERVILLE CA 93257 ' '- EL: 071 400 050 000 STATUS: �C ` ( POOLE THOMAS & LORI � P O BOX 5192 ` OROVILLE CA 95965= _ EL: 071 400 056 000 STATUS: AC � HARMON DEBRA 245 MIDDLEFORK LN OROVILLE CA 95966 EL: 071 400 057 000 STATUS: AC JONES LYNNE SUZANNE 211 MIDDLEFORK LN OROVILLE CA 95966 EL: 071 400 058 000 STATUS: PC OLSON HERBERT F & MARIAN L 407 SIMMONS RD OROVILLE CA 95966 CLAIMANT: ADDRESS: CITY & STATE: DATE OF CLAIM: Andrew W. Clay 293 Middlefork Lane Oroville, CA 95966 November 18, 1999 COUNTY OF BUTTE Oroville, California GENERAL CLAIM IN IMPORTANT.' SEE INSTRUCTIONS SUBMIT CLAIM TO DEPARTMENT RECEIVING GOODS OR SERVICES MFWA/FF;FFsu)F DATE DESCRIPTION OF CLAIM DESCRIBE FULLY TO AVOID DELAY AMOUNT 11-18-99 Use Permit, File No. UP 99-20, AP#071-400-013, Refund of Remaining Fees $228. 75 TOTAL $228. 75 1, the undersigned, declare under penalty of perjury that the services or articles claimed have been pe rm d or and correct as stated. Dated this day of �,? u �� �( 19 , at Calif. li d, and that this claim is true I, the undersigned, hereby certify that, to the best of my knowledge, the services or articles specified above have been performed or delivered and that there is a Budget Appropriation [ J or Specific Board Approval [ J (Check one) for the same. Dated this gT'` day of �ec 19 2 , at Q r'' -O -ui t [Q . Calif. 6—� , De artment Head or Authorized De ut Dept. Code 480-001 Ex . Code 4120900 PAYABLE FROM GENERAL FUND DO NOT WRITE BELOW THIS LINE -AUDITOR'S USE ONLY DEPT. & SUB. PROJ. SUB. OBJ. CLAIM NO. INV. NO. INV. DATE ENCUMB. GROSS AMT. t Count LAND OF NATURAL WEALTH AND BEAUTY DIRECTOR'S OFFICE DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530)538-7785 www.buttecounty.net November 18, 1999 Andrew W. Clay 293 Middlefork Lane Oroville, CA 95966 RE: Use Permit, File No. UP 99-20 AP#071-400-013 Dear Mr. Clay: The total cost for the processing of the above -referenced application is $471.25. Please sign, date, and return the enclosed claim form to this office. Once we receive the claim form, we will then process your refund in the amount of $228.75. Deposit on 5-17-99, Receipt No. 17547 $700.00 Professional Planner $250.75 Mapping $ 73.75 Clerical $146.75 Total $471.25 Refund Due $228.75 Should you have any questions, please contact Brian Larsen at 538-7601 Monday through Friday, between 8:00 a.m. and 4:00 p.m. Sincerely, (� Thomas A. Parilo Director of Development Services TAP: jb Enclosure EDate 12/07/99 Wevelopment Services Depar ment Time 10:48 am Applicant Billing Worksheet UP 99-20 * Andrew W. Clay 293 Middlefork Lane Oroville, CA 95966 In reference to UP 99-20 Rounding None Full Precision No Last bill / / Last aging Last charge 10/01/99 Last payment / / Amount $0.00 Date/Slip# Description HOURS/RATE AMOUNT 05/17/99 Teri B. / C 1.00 34.00 #23453 Clerical 34.00 07/26%99 David D. / P z 0.75 44.25 #24882 Processing 59.00 09/06/99 Lynn R. / C 0.75 33.75 #25444 Clerical 45.00 09/06/99 Larry P. / P 1.25 73.75 #25557 Processing 59.00 09/06/99 Paula A. / C 1.00 34.00 #25597 Clerical 34.00 09/06/99 Steve B. / P 2.00 118.00 #25616 Processing 59.00 09/06/99 David.D. / P 0.25 14.75 425671 Processing 59.00 09/20/99 Steve B. / P 1.25 73.75 #25692 Processing 59.00 09/20/99 Lynn R. / C 1.00 45.00 #25833 Clerical 45.00 TOTAL BILLABLE TIME CHARGES 9.25 Page 1 TOTAL $471.25 TOTAL BILLABLE COSTS $0.00 Date 12/07/99 Development Services DepartMent Time 10:48 am Applicant.Billing Worksheet UP 99-20 * :Andrew W. Clay (continued) TOTAL NEW CHARGES PAYMENTS/REFUNDS/CREDITS 05/17/99 Deposit - Receipt #17547 (700.00) 12/07/99 Refund/Claim Form to Auditor 228.75 TOTAL PAYMENTS/REFUNDS/CREDITS NEW BALANCE Page 2 $471.25 ($471.25) TOTAL NEW BALANCE $0.00 INTER -DEPARTMENTAL MEMORANDUM DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION To: Jill Broderson From: Steve Betts Subject: Billing for Clay UP, FIle # UP 99-20 Date: October 18, 1999 I reviewed the billing for this project and determined that the number of hours I spent working on it is too high for several reasons: Dave Doody was first assigned this project, and I repeated some of the work he did; and, I did site visit and charged for the whole time I was out of the office but during that trip I also made a site visit to another nearby project (does this make any sense?). Anyway, I would like 1.75 hours of my time deducted from the time indicated on the billing sheet - my time will now be 2 hours. Thank you. EDate 10/22/99 Development Services DepOtment Time 10:55 am Applicant Billing Worksheet Page 1 UP 99-20 Andrew W. Clay 293 Middlefork Lane , Oroville, CA 95966 In reference to UP 99-20 Rounding None y ` Full Precision No Last bill / / Last aging • / / Last charge 10/01/99 Last payment / / Amount $0.00 Date/Slip# Description HOURS/RATE AMOUNT TOTAL 05/17/99 -Teri B. / C 1.00 34.00 #23453 Clerical 34.00 07/26/99 David D. / P 0.75 44.25 #24882 Processing 59.00 09/06/99 Lynn R. / C 0.75 33.75 #25444 Clerical 45.00 09/06/99 Larry P. / P 1.25 73.75 #25557 Processing + 59.00 09/06/99 Paula A. / C 1.00 34.00 #25597 Clerical 34.00 , 09/06/99 Steve B. / P 2.00 118.00 #25616 Processing 59.00 09/06/99 David D. / P 0.25 14.75 #25671 Processing 59.00 09/20/99 Steve B. / P 1.25 73.75 #25692 Processing .59.00 09/20/99 Lynn R. / C 1.00 45.00 #25833 Clerical 45.00 TOTAL BILLABLE TIME CHARGES 9.25 $471.25 TOTAL BILLABLE COSTS. $0..)0 Date 10/22/99 *Development Services'Depaltment Time 10:55 am Applicant Billing Worksheet Page 2 UP 99-20 :Andrew W. Clay (continued) TOTAL NEW CHARGES $471.25 PAYMENTS/REFUNDS/CREDITS 05/17/99 Deposit - Receipt #17547 (700.00) TOTAL PAYMENTS/REFUNDS/CREDITS ($790.00) NEW BALANCE New Current period (228.75) TOTAL NEW BALANCE ($228.75) EDate 10/01/99 Development Services Department Time 12:06 pm Applicant Billing Worksheet Page 1 UP 99-20 Andrew W. Clay. 293 Middlefork Lane Oroville, CA 95966 In reference -to UP 99-20 Rounding None Full Precision No Last bill / / Last aging Last charge 09/17/99 Last payment / / Amount $0.00 Date/Slip# Description HOURS/RATE AMOUNT TOTAL 05/17/99 Teri B. / C 1.00 34.00 #23453 Clerical 34.00 07/26/99 David D. / P 0.75 44.25 #24882 Processing 59.00 09/06/99 Lynn R. / C 0.75 33.75 #2.5444 Clerical 45.00 09/06/99 Larry P. / P 1.25 73.75 #25557 Processing 59.00 09/06/99 Paula A. / C 1.00 34.00 #25597 Clerical 34.00 09/06/99 Steve B. / P 3.50 206.50 #25616 Processing 59.00 09/06/99 David D. / P 0.25 14.75 #25671 Processing 59.00 TOTAL BILLABLE TIME CHARGES 8.50 $441.D0 TOTAL BILLABLE COSTS $0.30 TOTAL NEW CHARGES $441.00 PAYMENTS/REFUNDS/CREDITS- 05/17/99 Deposit - Receipt #17547 (700.00) Date 10/01/99 Development Services Department P Time 12:06 pm Applicant Billing Worksheet Page 2 UP 99-20 :Andrew W. Clay (continued) TOTAL PAYMENTS/REFUNDS/CREDITS NEW BALANCE kyy/UU.UUJ New Current period (259.00) TOTAL NEW BALANCE ($259.00) October 5, 1999 Andrew W. Clay 293 Middlefork Lane Oroville, CA 95966 Re: Use Permit, AP 071-400-013, UP 99-20 Dear Mr. Clay: tte Coun L A N D O F NAT U R A L W EA L T H A N D B E A U- Y PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 , FAX: (530)538-7785 www.buttecounty.net The Butte County Planning Commission held a meeting on September 30, 1999, regarding your request for a Use Permit for a permanent second dwelling unit, was denied. Should you desire to appeal this decision you must do so, in writing, with the appeal feet of $50.00 to the Clerk of the Board of Supervisors, 25 County Center Drive, Oroville, California, prior to the expiration of the 10 -day appeal period which is at 5:00 p.m., Monday, October 11, 1999. Should you have any questions regarding this matter, please contact Steve Betts at this office between 8:00 a.m and 4:00 p.m., Monday through Friday. Sincerely, Lynn Richardson Planning/Administrative Support Service Assistant /lr k:\forms\deniaI.frm Ila September 23, 1999 Andrew W. Clay 293 Middlefork Lane Oroville, CA 95966 Re: Use Permit, AP 071-400-013, UP 99-20 Dear Mr. Clay: i6ufte Count L A N D O F NATURAL WEALTH AND B E A U a Y PLANNING DIVISION DEPARTMENT OF DEVELOPMENT SERVICES 7 COUNTY CENTER DRIVE • OROVILLE, CALIFORNIA 95965-3397 TELEPHONE: (530) 538-7601 FAX: (530) 538-7785 www.buttecounty.ne4 Enclosed is a copy of the Agenda Report concerning your application for a Use Permit for a permanent second dwelling unit at the end of Dove Court, approximately 1,000 feet off of Simmons Road, northeast of Oroville. Should you have any concerns with the report or conditions of approval, please contact us in advance of the meeting so that we may work together to resolve your concerns. A public hearing has been set for September 30, 1999, at 9:30 a.m. This meeting will be held in the Board of Supervisors' Room, 25 County Center Drive, Oroville, California. The Planning' Commission recommends that the applicant or their authorized representative be present at the hearing to respond to any questions the Commission may have. Should you have any questions regarding this matter, please contact Stephen Betts of this office at 538-7601, between 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely, 4�— Lynn Richardson Planning/Administrative Support Service Assistant Enc. j:\wpdocs\pclts\schedule.mrg BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT - September 30, 1999 Applicant: Andrew W. Clay Parcel Size: 20 -acres File #: UP 99-20 Zone date: 01-06-87 Request: This is a proposal for a Use Permit for a permanent second Project Stephen Betts, dwelling unit Planner: Associate Planner G.P.: Timber -Mountain Supervisor District:. 1 Zoning:. U (Unclassified) Attachments: APN: 071-400-013 A. Conditions of approval - B. Vicinity Map Location: At the end of Dove Court, C. General Plan/Zoning approximately 1,000 feet off of Map Simmons Road, northeast of D. Site Plan Oroville in the Loafer Creek area. STAFF CONEWENT: Staff recommends approval of the Use Permit with conditions and findings. This application was submitted prior to the adoption of the new Second Dwelling Unit Ordinance. PROJECT DESCRIPTION/SITE CHARACTERISTICS: This is a proposal to allow a permanent second dwelling unit. The proposed second dwelling unit, a mobile home, already exists on the property and until recently was the residence of the applicant. A new home was recently constructed on the site, which is now the residence of the applicant. The new dwelling was allowed to be constructed because the applicant signed a letter of intent agreeing to remove the mobile home or obtain a Use Permit for a second dwelling unit. The property is developed with the two dwellings, a garage, two septic systems, two wells, and a water tank. The proposed second dwelling unit is located on Middlefork Lane, which traverses the site. Access to the new dwelling is via a driveway to Dove Court. The site slopes steeply down to Lake Oroville. The property is heavily vegetated with oaks and manzanita. ■ BUTTE COUNTY PLANNING CON IISSION AGENDA REPORT ■ PAGE 1 ■ ANALYSIS: General Plan and Zoning: The project site is designated as Timber -Mountain by the Land Use Element Map of the General Plan. Residential uses are allowed by the General Plan as secondary uses. The Timber -Mountain designation requires a minimum parcel size of 40 -acres, with one single-family dwelling.per parcel. The project site is zoned U (Unclassified). The Unclassified Zoning District allows second dwelling units by Conditional Use Permit (Section 24-230.C.1). Second dwelling units in the Unclassified zone do not have to meet the General Plan density requirements (Section 24-230.C.1). Surrounding Uses and Compatibility: Surrounding parcels range in size from 6 to 26 acres and land use on these parcels is rural residential. An adjacent parcel has a second dwelling unit that is restricted to senior citizen occupancy. The operating characteristics of the proposed second dwelling unit are such that it will be compatible with the other residential uses in the area. Simmons Road and Middlefork Road are wide enough to safely handle two-way traffic. These roads also have a good gravel base in most places and do not contain any ruts or washouts. Additional vehicle traffic generated by the proposed second dwelling unit will cause a minor increase in airborne dust which may impact dwellings located near the site's access roads. The second dwelling unit may generate approximately 10 vehicle trips per day (Institute of Traffic Engineers, Trip Generation Handbook). However, it is expected that this amount of vehicle traffic will not be generated due to the remote location of the second dwelling unit. The vehicle traffic generated by the proposed second dwelling unit is not expected to cause a significant impact to vehicle circulation in the project area. Simmons Road and Middlefork Road are private roads and the responsibility of maintaining these roads lies with the property, owners in the area. Local Agency Review: The Butte County Environmental Health Division indicates that the property is suitable for on-site sewage disposal and the two existing septic systems have been installed with the proper permits. ACTIONS FOR CONSIDERATION: Staff recommends that the Planning Commission take the following actions: I. Find that the project is Categorically Exempt from environmental review under a Class 3 Exemption. II. Approve Use Permit 99-20 for Andrew Clay, subject to the conditions found in Exhibit A and subject to the following findings: ■ BUTTE COUNTY PLANNING CONMSSION AGENDA REPORT ■ PAGE 2 0 A. The proposed use of the property will not impair the integrity and character of the zone in which the land lies, and that the use would not be unreasonably incompatible with, or injurious to, surrounding property, or detrimental to the health, safety and general welfare of the persons residing or working in the neighborhood, or to the general health, welfare and safety of the County because: The second dwelling unit will not cause a significant increase in vehicle traffic. 2. The second dwelling unit use will not cause a significant increase in noise levels. There are sufficient on-site parking spaces for both dwellings 4. - There is adequate area for the required septic systems. B. The project is consistent with the Unclassified zone which allows second dwelling units with a Use Permit, and is consistent with Timber -Mountain General Plan land use designation which allows residential uses as a Secondary Use. K:\PROJECTS\UPC\CLAY.UP\CLAY.RPT ■ BUTTE COUNTY PLANNING CONMSSION AGENDA REPORT ■ PAGE 3 ■ EXHIBIT A USE PERMIT BUTTE COUNTY PLANNING COMMISSION DATE: (Certified Mail Rec.) UP 99-20 PERMIT NO. 071-400-013 ASSESSOR'S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the special conditions set forth below: Andrew Clay is hereby granted a Use Permit in accordance with application filed: Use Permit for a permanent second dwelling unit. 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit` constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65. 2. Unless otherwise provided for in a special condition to this use permit, all conditions must be completed prior to or concurrently with the establishment of the, granted use. The use granted by this permit must be established within 24 months of the delivery of the countersigned permit to the Permittee. 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works upon receipt of a substantiated written request by the applicant, or their respective designee. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If any use for which a use permit has been granted is not established within two years of the date of receipt of the countersigned permit by the Permittee, the permit shall become null and void and reapplication and a new permit shall be required to establish the use. 5. The terms and conditions of this permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. 0 BUTTE COUNTY PLANNING CONMGSSION AGENDA REPORT ■ PAGE 4 ■ Construction, installation or development of structures or facilities on the parcels shall comply with the latest California Fire Safe Regulations (Public Resources Code 4290), and all other applicable State and County codes, ordinances and regulations in effect at the time of application for improvement permits. 2. Building identification and/or addresses shall be installed .in conformance with Public Resources Code 4290 and shall be posted at the beginning of building construction and maintained continuously thereafter. 1. Applicant must also comply with all other applicable State and local statutes, ordinances and regulations. I hereby declare under penalty of perjury that I have read the foregoing conditions, that they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: Applicant NOTE:. Issuance of this Use Permit does not waive requirement of obtaining Building and Health Department permits before starting construction, nor does it waive any other requirements. Butte County Planning Commission Chairman CC: Land Development Division Building Division Health Department Butte County Fire Department/CDF ■ BUTTE COUNTY PLANNING COMMISSION AGENDA REPORT ■ PAGE 5 0 F 0 0 BUTTE COUNTY PLANNING COMMISSION NOTICE OF PUBLIC HEARING Notice is hereby given by the Butte County Planning Commission that a public hearing will be held on Thursday, September 30, 1999, in the Butte County Board of Supervisors' Room, County Administration Center, 25 County Center Drive, Oroville, California, regarding the following item: 9:30 a.m. - Andrew W. Clay, Use Permit to allow a permanent second dwelling unit on property zoned "U" (Unclassified). The property is located at the end of Dove Court, approximately 1,000 feet off of Simmons Road, identified as APN 071-400-013, northeast of Oroville. (File UP99-20) (SB) The above mentioned Ordinance is available for public viewing at the office of the Butte County Development Services Department, Planning Division, 7 County Center Drive, Oroville, California. For information call: (530) 538-7601 (Monday through Friday, 8:00 a.m. to 4:00 p.m.) Comments may be submitted in writing at any time prior to the hearing or orally at the meeting listed above or as may be continued to a later date. Upon action taken by the Planning Commission on the project an appeal may be filed with the Clerk of the Board of Supervisors. The appeal period is 10 days. If you challenge the above applications in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the Planning Commission, at or prior to, the public hearing. BUTTE COUNTY PLANNING COMMISSION THOMAS A. PARILO, DIRECTOR DEVELOPMENT SERVICES To be published in the Oroville Mercury on Saturday, September 18, 1999. UP 99-20 APN 071-400-013 Andrew Clay : X FRA Lake Orovifis WN3� t s MIM L% Wter 4 R HERD AREA, DEVELOPMENT IPERMITTED CRITICAL WINTER RA GE, 40 ACRE MINIMUM LOTS j C BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PHONE, COUNTER AND MEETING CONVERSATION AND DOCUMENTATION REPORT NAME OF CONTACT 4IA DATE TIME D a Z� SUBJECT Al'0- _D �_� �•��-� � DISCUSSION: Th 10, qo /- a�-� rO z"o REPORT TAKEN BY: WHERE REPORT TO BE KEPT: 2 C:\OFW IN40\TAP\PHN.RPT r BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: Public Works FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Andrew W. Clay, UP 99-20 DATE: May 21, 1999 CONTACT PERSON: A� Planning Department MAY 2;6 1999 Oroville, California The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit for a permanent second dwelling uni on property zoned i J (j Jnclassified) located at the end of Dove Court. approximately 1,000 feet off of Simmons Road northeast oiH�, identified as APN 071 _ 400-013. Supervisorial District No. 1. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - —DEVELOPMENT REVIEW COMMITTEE ON September 23, 1999. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN June 7, 1999. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): 0 Date:CZ 7 County Center Drive - Oroville, California 95965 - 530-538-7601 RMYR-7785 M04 21 1999 COUNTY OF BUTTE LAND DEVELOPMENT DIV BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: Environmental Health Enviro a al Health �Y 1 1999 Chico, lifomia Environmental Health FROM: Butte County Planning Division MAY 2 %��9 RE: Request for Comments on a Development Application: Andrew W. Clay, UP 99-20 DATE: May 21,1999 CONTACT PERSON: 7 Coun:ll Caller unve Oroville, Ca The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit for a permanent second dwelling uni on property zoned U (Unclassified) located at the end of Dove Court, approximately 1,000 feet off of Simmons Road, northeast of identified as APN 071- 400-013. Supervisorial District No. 1. 0 Z o Ve (Q,( THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR HEARING BEFORE THE (check one) _X_ PLANNING COMMISSION - — DEVELOPMENT REVIEW COMMITTEE ON September 23, 1999. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN June 7, 1999. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attachadditionalpages if necessary): (Jo-hdita arLana+P I h 4i^ om I kky'e. OY2 wet KC&I2 AQ CAL im',x to C'Aa *CdkQ In Date: 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538rVV �7,1J50 .J! YYYY 4 1999 ®rOville, California LEAD IN SHEET liff• 1"' 1 1 11 1 APPLICANT: Andrew W. Clay, 293 Middlefork Lane, Oroville, CA 95966 OWNER: Same REPRESENTATIVE: SIZE: 20 acres • • the end of Dove Court,approximately 1111 feet off of umo Road, northeast • Chico SUPERVISORAL DISTRICT # -I— EXISTING ZONING: ZONING HISTORY: 01/06/87 Ord. #2574 SURROUNDING ZONING: SURROUNDING LAND USE: Rural residential SITE HISTORY: GENERAL PLAN DESIGNATION: Timber Mountain APPLICABLE REGULATIONS: G Rec'd 05-17-99 COMMENT DISTRIBUTION LIST APPLICATION: Andrew W. Clay DATE: May 21, 1999 County Offices and Cities: ��cc-- Chief Administrative Officer X ✓_X_ Environmental Health Sheriff X_ LAFCo _ Biggs Oroville Irrigation District: Develop. Services Director /X— Assessor X_Assessor BCAG _ APCD _ Gridley _ Paradise Animal Control X Butte Water _ Biggs/W. Gridley Water OWID _ Paradise Irrigation _ Table Mountain Irrigation _ Thermalito Irrigation Domestic Water _ Butte Water District _ California Water Service Co. _ OWID _ Thermalito Irrigation District _ Sewer Dept of Parks and Rec. _ _ Butte Water District _ Skansen Subdivision (CSA 21) Fire Protection _X California Department of Forestry Recreation Districts _ Chico Area Recreation _ Paradise Recreation & Park Utilities Themalito Irrigation L.O.A. PUD El Medio Fire Protection District Durham Area Recreation Richvale Recreation & Parks Public Works Director Building Manager ALUC Butte Co. Farm Bureau Chico Chico Airport Commission Agricultural Commission Durham Irrigation Richvale Irrigation Other Del Oro Water Co. Other Sterling City Sewer Main Feather River Rec. & Park PG&E North - Chico _ Chambers Cable TV _ Pacific Bell _ PG&E South - Oroville Viacom Cable TV State Agencies CalTrans (Traffic) _ Dept. of Water Resources _ Dept. of Fish and Game Forestry (Attn: Craig Carter)_ Dept of Parks and Rec. _ Highway Patrol Central Reg. Water Quality Cont _ Caltrans, Aeronautics Program _ Department of Conservation _ Off. of Mining Reclamation _ Off. of Governmental & Env. Relations Dept.Social Services, Comm.Care Licensing Federal Agencies _ US Forest Service _ US Bureau of Land Management _ US Fish & Wildlife Service Army Corps of Engineers Other Districts, Agencies, Committees, etc. Lime Saddle Dist _ Community Association _ Mosq. Abatement. Oroville/Butte Co Drainage _ Butte Env.l Council _ Paradise Pines Com. Assoc. Reclamation _ Cal Native Plant Society _ Butte Co. Mining Committee _ Forest Ranch Community Assoc. _ Butte Ck. Watershed Conservancy_ School Districts BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES PLANNING DIVISION TO: FROM: Butte County Planning Division RE: Request for Comments on a Development Application: Andrew W. Clay, UP 99-20 DATE: May 21, 1999 CONTACT PERSON: The Planning Division has received a project application for the property described below. The purpose of this comment sheet is to: 1. Determine if the information contained in the application is adequate to allow your jurisdiction to review the project and submit conditions, if any; and to 2. Determine the appropriate environmental documents to prepare for this project, as well as to identify particular environmental concerns to be addressed or mitigation measures your agency/department may want incorporated. If the application is determined to be complete within 30 days of its submittal it should be heard at the estimated hearing date indicated below. If a response cannot be submitted within the time frame given, or if additional information is needed, please call 538-7601. Thank you in advance for your time and efforts. This is an application for Use Permit for a permanent second dwelling uni on property zoned i 1(lJnclassified) located at the end of Dove Court, approximately 11,000 feet off of Simmons Road, northeast of Chico, identified as APN 071 _ 400-013. Supervisorial District No. 1. THIS ITEM HAS BEEN TENTATIVELY SCHEDULED FOR A HEARING BEFORE THE (check one) _X PLANNING COMMISSION - —DEVELOPMENT REVIEW COMMITTEE ON September 23, 1999. COMMENTS, IF ANY, ARE REQUESTED BY NO LATER THAN June 7, 1999. If no comments or communications are received by the above date, the assumption will be made that your agency has no comment. COMMENTS (Attach additional pages if necessary): By: Date: 7 County Center Drive - Oroville, California 95965 - 530-538-7601 - FAX 530-538-7785 BUTTE COUNTY STANDARD CONDITIONS FOR USE PERMIT APPLICANT: Andrew W. Clay DATE: May 21, 1999 AGENT: APN: 071-400-013 FILE #: UP 99-20 PLANNER: PROJECT DESCRIPTION: Use Permit for a permanent second dwelling unit Those items checked are conditions of approval. PLEASE CONTACT THE BUTTE COUNTY FIRE D .PAR NT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS Construction, installation or development of structures or facilities on the parcels/lots shall comply with the latest California Fire Safe Regulations, (Public Resources Code 4290), and all other applicable State and County codes, ordinances and regulations in effect at the time of application for improvement permits. 2. Building identification and/or addresses shall be installed in conformance with Public Resources Code 4290 and shall be posted at the beginning of building construction and maintained continuously thereafter. Fire hydrant identification, reflector or post reflectors shall be installed acceptable to the County Fire Warden. 4. In lieu of a pressurized water system or water storage tank, payment of $200.00 per created parcel into the Battalion _water tend fund, is required prior to the issuance of a building permit. 5. A pressurized community water system for fire protection is required. The specific locations and fire flow requirements shall be in accordance with the Fire Department specifications and to the satisfaction of the County Fire Warden. Average required hydrant spacing _ feet, hydrant size _ inches, and residual fire flow _ gpm. Submit plans to the Fire Department for review and approval prior to construction of facilities. 6. In lieu of hydrant installation, payment may be made into the hydrant fund at a cost of $1.72 per lineal foot of street frontage. The estimated fee amount is $ —7. Prior to recordation of the Map or application for a building permit, the applicant shall pay the then current fee for the West Chico Fire Station Fund. —8. Provide an all weather access of at least 10 foot wide and with a vertical clearance of 15 feet that will accommodate a 40,000 pound fire apparatus to all structures. APPLICANT: applicant DATE: May 21,1999 AGENT: APN: 071-400-013 FILE #: UP 99-20 PLANNER: PROJECT DESCRIPTION: Use Permit for a permanent second dwelling unit Those items checked are conditions of approval. PLEASE CONTACT THE BUILDING DIVISION FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS H. BUILDING PERMITS 1. Prior to building permit issuance for a new residential dwelling unit(s), the applicant shall pay all applicable development fees at the rate in effect at the time of acceptance of the application. Such fees, shall include, but not be limited to: ' Park Fee, School Fee, Drainage Fee, Permit and Plan Checking Fees, Water and Sewer Service Fees, and Fire Protection Fees. - —2. Prior to building permit issuance for a new commercial or industrial development, or addition to an existing development, the applicant shall pay all applicable development fees at the rate in effect at the time of acceptance of the application. Such"fees shall include, but not be limited to: School Fee, Drainage Fee, Permit and Plan Checking Fees, Water and Sewer Service Fees, and Fire Protection Fees. EXISTING STRUCTURES _ 1. Comply with the Uniform Building Code for property line clearances considering use, area and fire - resistiveness of existing buildings. Existing building(s) shall be made to comply with current Building and Zoning regulations for the intended new use of the building(s) or the existing building(s) shall be demolished. • APPLICANT: Andrew W. Clay AGENT: FILE #: UP 99-20 DATE: May 21, 1999 APN: 071-400-013 PLANNER: • PROJECT DESCRIPTION: Use Permit for a permanent second dwelling unit Those items checked are conditions of approval. PLEASE CONTACT THE PLANNING DIVISION FOR COMPLIANCE WITH THE' FOLLOWING CHECKED CONDITIONS J. SITE DEVELOPMENT The project site shall be developed in accordance with the approved project site plan and the conditions contained herein. Said site plan is on file in the Planning Division, is identified as "Exhibit B" and dated _, 19_ and is incorporated herein by this reference. 2. Prior to the issuance of building permits, the plans, incorporating all applicable conditions of approval shall be submitted to the Planning Division to verify compliance with said conditions of approval. 3. Trash receptacle areas shall be enclosed by a 6 foot high solid masonry wall with view obstructing gates and a solid or semi -open shade cover. Plans to be reviewed and approved by the Planning Division prior to construction. 4. Prior to any use of the project site or business activity being commenced thereon, pursuant to this permit, conditions of approval contained herein shall be completed to the satisfaction of the Planning Division. 5. All electrical and mechanical equipment, including but not limited to air conditioning units, electrical boxes, transformers, and backflow preventers, shall be screened from public view. Screening shall be to the satisfaction of the Planning Division and in compliance with the Building Division. K. LANDSCAPING 1. A detailed landscape and irrigation plan consistent with the project site plan shall be submitted to and approved by the Planning Division prior to the issuance of building permits. 2. A plan of the existing on-site mature trees, located in any area proposed for buildings and vehicular access, shall be provided to and approved by the Planning Division prior to the issuance of building permits and/or prior to grading or vegetation removal. The applicant shall minimize the removal of mature trees, where possible. A mature tree shall be defined as a tree with a trunk measuring 4 inches in diameter, 4 feet from ground level. Mature trees removed shall be replaced by planting replacement trees of equal number and not less than _ gallon size. 3. All landscaped areas shall be inaintained in a healthy and thriving condition, free from weeds, trash,. and debris, during the term of this permit. 4. All graded slopes, over 5 feet in height, or on slopes greater than _%, shall be seeded, planted, mulched or hydroseeded or otherwise protected to prevent erosion. A permanent irrigation system shall be installed for non-native vegetation. A one year Faithful Performance bond shall be posted to guarantee installation and established growth. —5. In parking lots of commercial and industrial development, trees of not less than 15 gallon size shall be provided to reduce heat gain from -the paved surface and to soften the visual impact of the paved area. Such trees shall be planted at a minimum density of one tree every three parking spaces. Tree species shall be approved by the Planning Division prior to planting. 6. Prior to the commencement of grading and/or construction activity, all individual or groups of oak trees which are to be retained as part of the project, shall be fully protected through the use of root protection zones (RPZ). During construction; RPZs shall be established using protective fencing enclosing an area with a radius 1.5 times the distance from the trunk to the dripline. Within this protective buffer, no grading, trenching, fill, or vegetation alteration of any kind shall be allowed. The RPZs shall be maintained after the completion of construction in order to continue to protect the oak trees, but the fencing shall be removed. L. GRADING During construction, should any archaeological artifacts be discovered, the Planning Division shall be notified immediately, and all work shall cease until a qualified archaeologist has examined the artifacts and the site and submitted his or her findings to the Planning Division, and recommended clearance to continue. Recommencement of construction shall be upon the approval of the Planning Division. Archaeological artifacts are defined as follows: 2. Prior to any clearing, grading and/or construction in a Federal or State identified 100 year floodplain and/or streambed the following entitlements must be obtained: a California Fish and Game 1604 Streambed Alteration permit and an Army Corps 404 permit or exemption certificate. M. ADDITIONAL APPROVALS Prior to the issuance of building permits payment of the North Oroville/Thermalito Traffic Impact Fees shall be made. —2. Prior to the issuance of a building permit for each new or additional living unit the applicant shall execute the Oroville Area Traffic Mitigation Fee Agreement and pay the established fee. 3. Prior to the issuance of the Use Permit, to insure the maintenance and continuance of the orchard or other agricultural use of the property, the property owner shall enter into the County approved Orchard Management Agreement. The agreement shall terminate in 10 years or upon a rezoning of the parcel/lot to a zone other than A-5 through A-160. The agreement shall be recorded and recording fees paid by the applicant. —4. Approval of this request shall not waive compliance with all sections of the Zoning Ordinance and all other applicable State and County laws and regulations in effect at the time of building permit application. 5. This Conditional Use Permit is granted for a period of month(s) at the end of which time it shall expire (unless the approving authority has held a hearing thereon and granted an extension. In connection with such an extension the approving authority may add, change, or delete conditions. 6. Approval of this Conditional Use Permit shall become null and void if the use for which it has been granted is not established within two calendar year from the date of approval. No formal cancellation or revocation action by the County will be necessary. The developer shall display a current County Zoning and County Land Use Map in the sales office at all times, and/or suitable alternatives. 8. Approval of this application does not become effective unless, prior to 4:00 p.m. on _, 199_, the applicant shall sign and file with the Department of Development Services an Indemnity Agreement in a form satisfactory to the County Counsel. 9. Prior to the issuance of a building permit or prior to the issuance of a Use Permit for a Mobile Home Park the Sheriff Facilities Impact Fee shall be paid, pursuant to the provisions of Chapter 3, Article II of the Butte County Code. The fee amount shall be determined and calculated as of the date of application for building permit. 10. Prior to the issuance of the Use Permit the applicant or property owner shall sign and record the CSA 87 Traffic and Drainage Mitigation Agreement or pay the required fees prior to the issuance of the Use Permit. 11. Prior to the issuance of the Use Permit, the applicant shall contact the Butte County Tax Collector's Office to begin the process of a Transient Occupancy Registration Certificate. A Transient Occupancy Registration Certificate shall be required within ten (10) days after commencing business for a motel, hotel, inn, tourist home, bed and breakfast, rooming house, apartment house, mobile home park, recreational vehicle park, campground, or parking area (See Chapter 23A). 12. Prior to the issuance of the Use Permit, the applicant shall pay all outstanding County fees. OFFICIAL RECEIPT COUNTY OF BUTTE STATE OF CALIFORNIA OFFICE OF PLANNING APPLICANT RECEIPT 17547 RECEIVED FROM gip; • , 4 -id RECEIPT TOTAL PUBLICPUBLIC LAFCO PLANNING SALES ENV. HEALTH FIRE NOE/NOD FIG FEE OTHER DATE NO. RECEIVED WORKS . OFFICIAL RECEIPT COUNTY OF BUTTE STATE OF CALIFORNIA OFFICE OF PLANNING APPLICANT RECEIPT 17547 RECEIVED FROM gip; • , V V NV . OJ O� SECTION 21 a PTN. 20 T. 20 N. R..5 E.\ 08 • � ))17 /6 20 21 86/.92 /3/7.82 , 455 !0.0 AC. 09 7/-40 V N= PENCE WAY Assessor's Map No. 7/ - County of Butte, Calm April,1981 REVS - 93 4 89° zi' 08" li D'*,Z- --- 4oc) oen ON(TE i v I J HOGILE HoMr_ FRI) POSE D �iEP11G \ 1 Si�E P�A�I N as- zq, 01- F, A.P. IJ, o -t 147- 5. oz.' Foo - of3-000 tb f_ Planning Division MAY 1 7 1999 Oroville, Califomia t� 816 zI' 08 II 5- _a �xlsfi u� r USLL 400 \ �\ I �IolkD PRaPns� v SEP11c, 1452.611 � �veAi�IAI�E S�JAL� i � a�- �- In -`C7 / � �_Exlsfl►JGr K I J HorBILE OoMr- 1 0-1 a I N es" 7-9' of F 147-5. oz' 4�dce- X? 0-1 l - of S -coo f Planning Division MAY 1 7 1999 Oroville, Califomia 4 s1° zl' OS'' r, 7 I M I DDI Foy K La N �- - 1 1452. ei' 1 I 147.5. oz' a � f 4_ Planning Division MAY 17 1999 Oroville, Califomia 0 PON 0 Q 14 5z. bi d, 0-1 cr A-1 147-5-04' Al f 4t - Planning Division MAY 1 7 1999 C),Tz — 406 — 0 3 -000 Oroville, CA.110,mia 81 n z 1' 08 Q 14 5z. bi d, 0-1 cr A-1 147-5-04' Al f 4t - Planning Division MAY 1 7 1999 C),Tz — 406 — 0 3 -000 Oroville, CA.110,mia 4 81' zi' 08 6 MI�vIEFo�K La,NE—� 1 -a r- �r �USLLU� - ,9 � 400 , I / �oPoSEv — 1440 — '- - °. %fl o 3 ' ' T I o I O I 1 \ PAMA 3O U� b -- _ rt-, CID ,+► 145z. els d, 0-1 to i 147-5. oz' i �1. -of3-coo ko f 4_ planning Division MAY 17 1999 Oroville, Califomia AUP93-26, Senior Citizen Dwelling