Loading...
HomeMy WebLinkAboutPRED 04-21_PLANNING lo �� V VUVNYVII� WAVNNYAIA - - SEPARATOR SHEET- „„ 3I ( - oio PROJECT NUMBER b PROJECT SUMMARY SHEET FILE NO.: PRIED 04N-21 PROJECT TYPE: Predevelopment Conference APN: 068-341-010 APPLICANT: Malcolm Hall ADDRESS: P.O. Box 1001, Owatonna, MN 55060 PHONE: (800) 872-9256 OWNER: Malcolm Hall ADDRESS: P.O. Box 1001, Owatonna, NM 55060 REPRESENTATIVE:Alan Brown, P.E., BBA Engineering ADDRESS: 2060 Park Avenue, Oroville, CA 95965 PROJECT DESCRIPTION: Pre-Development Conference to review a proposed subdivision of 7.75 acres into 20 residential lots served by water and sewer LOCATED: on the north side of Hildale Avenue, at the intersection of Hildale and Mountain View Drive, at 4001 Hildale Avenue, Oroville PROPERTY ZONED: A-R(Agricultural-Residential) GENERAL PLAN DESIGNATION: LDR(Low Density Residential) TOWN/AREA: Oroville 1. Application accepted: 4/28/2004 Amount: $ 1454.00 Receipt#: 405619 2. Assigned to: Dan Breedon r 3. Pre-Development Letter sent to applicant and agencies: 4. Conference Room reserved: 5. Date and time scheduled for c n�—fererfce: f/)a4 6. Comments received from: 7. Staff Report: Project Video: 8. Follow-up letter to applicant: COUNTY OF BUTTE AUDITOR'S CERTIFICATE AND TREASURER'S RECEIPT OROVILLE, CA ATR NO -13732 RECEIVED FROM PLANNING Bkd 0 316 DATE 412912004 FUND FUND DEPT' ACCT CASH DESCRIPTION TITLE CODE CODE CODE CODE AMOUNT DEPOSIT DATE: W9 RECEIPTS: -406524 PCAI�dp ING&PPL FEES GENL 01 10 44001. 421 101001 1,05S.6D ��� Project Number Amount of Fee PCr OM34-1=0f0 M HAL PRED 04-21 — $1.068:06 -PN072-411-052 F KIRK ADfv1'02-27 LAND DEVELOPMENT GENL 0010 44M4 4611700 101601 337.00 Project Number Amount of Fee APN088-341-010 PA RAIL PRED 04-21 $337.00 ENVIRONMENTAL HLTH GENL 0010 5 3 4614501 101001 66.00 Project plumber Amount of Fee APN:088-341-010 M HALL FRED 04-21- $68.00 FIRE PLNG APPL FEE FIRE PROTECT 0100:- 4617240 101001 43.00 Project Number Amount of Fee APN:088-341-010 M HALL PRED 04=21 $43.00 DOCUMENT/COPY SALES GENL 0010 440001 4711810 101001 15-IDD i I S v TOTAL $ 11519.00 APPROVED BY: RECEIVED BY: AUDITOR-CONTROLLER 7 ASURER By: By:—, y: /w 4' -Thursday,April 29,2004 Development Services PLANNING DIVISION; ver. 1.0 Counter DDS Planning $1,008.00 Person Mark (General Fund) Payment Date 4/28/2004 Public Works $337.00 (Land Development) Receipt Number 405619 Environmental Health $66.00 Received From Malamar Construction CDF(Fire Department) $43.00 Applicant Malcolm Hall NOD/NOE $0.00 i (Recording Fee) Aunt Minnie $0.00 Application Number sPRED 0421 $1, 500 or$2,000 or In Reference To Planning Review/EIR $0.00 . Parcel Number 068-341-010 -- - Fish/Game $0.00 Check Number/Cash :4222 ALUC $0.00 Total Received (Airport Land Use) _ $1 ,454.00 - ----- Non Sufficient $0.00 Total Fees $1 ,454.00 [ Funds ($25.00 Fee) Cell Tower $0.00 ($2500.00) Public Sales/Copies $0.00 Other: $0.00 i COUNTY OF BUM 40569 OFFICIAL RECEIPT LlOFFICE OR DEPARTMENT ISSUING RECEIPT, 20q Received from ,lei n L f)- 1n tR i Tie Surm of L15 q Q) For 11.x.L( t l C Received: f(� Received By j F���{ - CASH " ❑ Title CHECK ' By DAVCO BUSINESS FORMS•(530)743-0511 Form 75702 4222 MALAMAR CONSTRUCTION, INC. C LIC. 519150 P.O. BOX 1001 PH. 507-455-0442 OWATONNA, MN 55060 9101161 Y DAT9 `.J 'PAY �.� TO THE ORDS OF- IBM Wells Fargo Wk Minnesota,NA. Owatonna ' - 101 N.Cedar St. Owatonna,MN 55060 ' www.—Ilsfargocom FOR �-P� � �� �.�� - — � ✓' moi &P 11°004 2 2 211'-'-1:09 10000 491:4 2705 L344511' DEPARTM NT OF DEVELOPMENT SERVICES BUTTE COUNTY UNIFORM APPLICATION APPLICANT: Agent information to be provided is on other side. APPLICANT'S NAME: (If application is different from owner an affidavit is required.) ASSESSOR'S PARCEL NUMBER: MALCOLM HALL 68-341-010 ADDRESS: CITY;STATE;&ZIP CODE FILE NUMBER: (FOR OFFICE USE) P.O. Box 1001 Owatonna, MN 55060 fik'&D w- NAME OF PROPOSED PROJECT(If any) T800) ELEPHONE: HILDALE SUBDIVISION 872-9256 LOCATION OF PROJECT(Major cross streets and Address,if any) HILDALE AVENUE @ MOUNTAIN VIEW GENERAL INFORMATION REQUIRED OWNER'S NAME: 7('800) ELEPHONE: MALCOLM HALL 872-9256 ADDRESS: CITY,STATE,&ZIP CODE: PO BOX 1001 Owatonna, MN 55060 ZONE GENERAL PLAN EXISTING LAND USE SITE SIZE(in Square Feet or Acres) AR I LDR Single family Residence 7.75 ACRES EXISTING STRUCTURES(in Square Feet) PROPOSED STRUCTURES(in Square Feet) (Check One) (Check One) ® PROPERTY IS OR PROPOSED TO BE SEWERED ® PROPERTY IS OR PROPOSED TO BE ON PUBLIC WATER ❑ PROPERTY IS OR PROPOSED TO BE ON SEPTIC ❑ PROPERTY IS OR PROPOSED TO BE ON WELL WATER APPLICATION REQUESTED ❑GENERAL PLAN AMENDMENT ❑TENTATIVE SUBDIVISION MAP ❑REZONE ❑TENTATIVE PARCEL MAP ❑USE PERMIT W-- BUTTE ❑WAIVER OF PARCEL MAP ❑MINOR USE PERMIT COIIN ry ❑BOUNDARY LINE MODIFICATION ❑VARIANCEAPR L A 2WWq ❑LEGAL LOT DETERMINATION ❑MINOR VARIANCE ❑CERTIFICATE OF MERGER [:1SE ADMINISTRATIVE PERMIT DEERVVICESICESIV>< _ S ❑MINING AND RECLAMATION PLAN ❑DEVELOPMENT AGREEMENT ®OTHER Pre Development Conference PROJECT DESCRIPTION FULL DESCRIPTION OF PROPOSED PROJECT(Attach necessary sheets. If this application is for a land division,describe the number and size of parcels.) The project proposes subdividing 7.75 acres into 20 residential lots to help meet the demand for upscale rural residential homes. Domestic water is proposed to be served by South Fork Power and Water. Sewer will be by Lake Oroville Area Public Utilities District following annexation. BUTTE COUNTY APR 2 8 2004 OWNER CERTIFICATION DEVELOPMEN't SERVICES I CERTIFY THAT I AM PRESENTLY THE LEGAL OWNER OR THE AUTHORIZED AGENT OF THE OWNER OF THE ABOVE DESCRIBED PROPERTY. FURTHER,I ACKNOWLEDGE THE FILING OF THIS APPLICATION AND CERTIFY THAT ALL OF THE ABOVE INFORMATION IS TRUE AND ACCURATE. (If an agent is to be authorized,execute an affidavit of authorization and include the affidavit with this application.) DATE: ' S ' 6 L SIGNATURE: K:\FORMSIIINIFORM APPLICATION Page 1 of 2 AGENT AUTHORIZATION TO: Butte County, Department of Development Services: 010-n (�. &own 68A &�G1V�E-UZM (530) 534-1911 Print Name Phone Number 2060 Park Avenue, Oroville, CA 95965 Mailing Address is hereby authorized to process the application for Malcolm Hall on my property, identified as Butte County Assessor Parcel Number 68-34-010. This authorization allows representation for all applications, hearings, appeals, etc. and to sign all documents necessary for said processing,but not including document(s) relating to record title interest. Owner(s) of Record: (sign and print name) Print Name Print Name Signature S' ature Architect and/or Engineer: MoA G.6t?t uun PF,166A�-M&T-WaDA (53a) 5-9U' 1gi Print Name of Architect/Engineer and Phone Number 2060 Park Avenue, Oroville, CA 95965 Mailing Address FOR OF'F'ICE USE ONLY Verify: q Date Received: I of?)IDq Total Amount Received: ❑ AP Number(s) ❑ Legal Description ❑ Owners Authorization ❑ Zoning Requirements ❑ Project Description r ❑ Copies of plot plan Taken by: Receipt No. �c1 . E.H. (0 LD. 7.00 Plan AV,?-0� FD �3 d d Payment of the currently required Application Fee and/or Deposit(Any unused portion of a deposit)will be returned upon final action. I Current fee for this application is as of Make check payable to "Butte County Treasurer". KAFORMMUNIFORM APPLICATION Page 2 of 2 COUNTY OF BUTTE ENVIRONMENTAL INFORMATION FORM (To be completed By Project Applicant) Date Files q 4so� General Information: 1. Name and address of owner, and/or project sponsor: Malcolm Hall PO BOX 1001 OWATONNA, MN, 55060 2. Address of Project: 4001 HILDALE AVENUE, OROVILLE, CA 95966 Assessor's Parcel Number: 068-341-010 3. Name, Address, and Telephone number of person to be contacted concerning this project: Malcolm Hall PO BOX 1001., OWATONNA, MN. 55060. : 800-872-9256 4. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies: L.O.A.P.U.D. ANNEXATION 5. Existing general plan designation: LDR 6. . Existing zoning district: AR 7. How is land currently used? 1 SINGLE FAMILY RESIDENCE 8. Proposed use of site (Project for which this form is filed): RESIDENTIAL SUBDIVISION BUTTE Project Description: COUNTY 9. Site size: 7.756 APR 2 a 2004 (Acres/Sq. Feet) ®EVE]LOPMEN'r 10. Off-street parking spaces: Full size: NIA Compact::v'ER"'10 Total: 11. Plans attached: Yes XXX No 12. Proposed development schedule: NIA 13. Associated projects NONE 14. Anticipated incremental or phased development Single Phase Attach description of project containing the following information: 15. If residential, include the number of units, schedule of unit size, rage of sale price or rents, and type of household size expected. Approximately 20 residential parcels. Home size range — 2500 — 4500 sf; Parcel price $200,000. - $300,000. 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sale area and loading facilities. N/A 17. If industrial, indicate type, estimated employment per shift, and loading facilities. N/A ❑ Butte County Department of Development Services ❑ Planning Division ❑ • 18. If Institutional, indicate the major function, estimated employment per shift, estimated occupancy loading facilities, and community benefits to be derived from the project. N/A 19. If the project involves a variance, conditional use, rezoning application or any development permits, state this and indicate clearly why the application is required. If permits have already been issued, please attach as Exhibit. Are the following items applicable to the project or its effects? Discuss below all items checked yes (attach additional sheets as necessary). YES NO 20. Change in existing features of any hills, buttes, canyons or XXX substantial alterations of ground contours. 21. Change in scenic views or vista from existing residential areas or XXX public lands or roads. 22. Change in pattern or character of general area of project. XXX 23. Significant amounts of solid waste or litter. XXX 24. Change in dust, ash, smoke, fumes or orders in vicinity. XXX 25. Change in bay, lake, river, stream or ground water quality or quantity, or alteration of existing drainage patterns. XXX 26. Substantial change in existing noise or vibration levels in the XXX vicinity, 27. Site on filled land or on slopes of 10 percent or more. XXX 28. Use of, or disposal of potentially hazardous materials, such as XXX toxic substances, flammable or explosive. 29. Substantial change in demand for municipal services(police, fire, water, sewage, ect. Including special districts). XXX 30. Substantially increase fossil fuel consumption (electricity, oil, XXX natural gas, ect.). 31. Relationship to a larger project or series of projects. XXX BUTTE COUNTY APR 2 9 2004 DEVELOP!"'''a SERV!rF�' ❑ Butte County Department of Development Services ❑ Planning Division ❑ Attachment A ENVIRONMENTAL SETTING 32. The site is an existing 7.75-acre rural residential parcel, with one 2700 sf. House and a four car detached garage. The property has a gentle easterly slop of 3-5%. The Redding gravely, sandy loam soil of the site are stable. The site has native oak and pine trees. Native animals include rabbits, turkeys, squirrels, and birds. See attached photographs 33. The surrounding properties include smaller '/z acre to larger acreage rural residences. There are no known cultural or historic resources on the site. See attached photographs CO-UNTY APR 2 % 2004 DESERO CESNT j Environmental Setting: (Attach brief description) 32. Describe the project site as it exists before the project, including information topography, soil stability, plants and animals, and any cultural, historical, or scenic aspects. Describe any existing structures on the site and the use of the struct5ures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. **SEE ATTACHED** 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical, or scenic aspects. Indicate the type of land use (residential, commercial, ect.). I, intensity of land use(one-family, apartment houses, shops, department stores, ect.), and scale of development (height, frontage, set0-back, rear yard, ect.). attach photographs of the vicinity. Snapshots or Polaroid photos will be accepted.**SEE ATTACHED** Certification I hereby certify that the statements furnished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date Signature for 7V44­e --,xl Ad BUTTE COUNTY APR 2 B 2004 OE SER �NT ❑ Butte County Department of Development Services ❑ Planning Division ❑. 3 N• BUTTE COUNTY DEVELOPMENT SERVICES 7 County Center Drive Oroville, CA 95965 (530) 538-7620 FAX (530) 538-7785 to: Tim Wood fax #: 899-0943 from: Dan Breedon, Principal Planner (530/538-7629) date: November 24, 2004 DPW Conditions -Malcolm Hall TSM subject: pages: NOTES: . As requested. i • �J BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE PARCEL MAP APPLICANT: Malcolm Hall DATE: 5/18/04 AGENT: ATN: 068-341-010 FILE#: PLANNER: Dan Breedon PROJECT DESCRIPTION: Pre-Application Review Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: A. STREETS ® 1. Prior to, or concurrently with the recordation of the Parcel Map, provide a fully executed road. maintenance agreement on the County approved form. ® 2. Provide street name signs per requirements of the Department of Public Works prior to recordation of the Parcel Map. Street names shall be approved by the County Address Coordinator prior to the recordation of the Parcel Map. ® 3. Obtain encroachment permit for all new or existing driveway approaches and construct them to County standards,as specified in County Improvement Standards. ® 4. Provide a cul-de-sac, designed and constructed to county standards as specified in the County Improvement Standards. The Parcel Map shall show the cul-de-sac. ❑ 5. Prior to the recordation of the Parcel Map, prove, to the satisfaction of the Director of Public Works, that there is approved access conforming to County standards to each parcel from a publicly maintained road. ® 6. All access rights shall be reserved by deed, per County Ordinance, and offered for dedication and depicted on the Parcel Map. ® 7. The developer shall provide all necessary traffic safety signs including stop signs. A note shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Parcel Map stating: "No public entity shall be responsible for the maintenance of the stop sign. In accordance with Civil Code Section 845, maintenance of the road,including the stop sign, shall be shared by those properties with a legal interest in the private right-of-way or easement." ® 8. Pay the recording fees then in effect for recording the Parcel Maps and related documents. ® 9. Deed to Butte County, in fee simple, 30 feet of right-of-way from the centerline of Hildale Ave. . The right of way shall be sufficient for the installation of standard No. S-5 at all street intersections. ® 10. Provide two-way traversable access to each parcel from a County maintained road or from a state highway. Improve parcel 20, 19, 1, 18 frontage to RS- 2A and access road to parcel being divided to RS-2B . (If the parcels being created are 5 acres or less in gross area, submit road and drainage plans to the Department of Public Works for plan checking and approval prior to construction). • ❑ 11. Submit road and drainage improvement plans for the installation and construction of the street frontage improvements on to standard, including but not limited to P.C.C. curb, gutter and sidewalk, and the required street section for parcels with gross acreage of one acre or less. Construct or install the required improvements. ® 12. Relinquish abutter's rights to Butte County,along the Hildale Avenue frontage of parcels 20, 19, 1, 18 , except at approved access points. Show common driveway easement for parcels 19 and 20. ® 13. Prior to the recordation of the Parcel Map,obtain an encroachment permit and construct a standard road approach S-18A' in accordance with County Improvement Standards. Adequate sight distance at the intersection of access road and Hildale Ave. shall be provided. ® 14. Show on the additional map sheet of the Parcel Map a 50 ft. building setback from the centerline of Hildale Ave. and Hall Rd. B. DRAINAGE ® 1. Prior to the recordation of the Parcel Map a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. ❑ 2. Establish 100 year flood plain elevations and.the lowest floor elevations for any structures. Show on the additional map sheet the elevations (by contours) and the location of an accepted NGVD benchmark and a temporary benchmark on-site. ❑ 3. Pay the applicable drainage fees in effect at the time of recordation of the Parcel Map for the drainage area. (The current fee is now$ /acre.) ® 4. A Construction Storm Water Permit will be required by the State Water Resources Control Board if the project results in a disturbance(including clearing,excavation,filling,and grading)of one or more acres. Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require a permit. The Permit must be obtained from the State Water Resources Control Board prior to construction. C. PARCEL MAP ® I. New lot lines'shall comply with the applicable setback requirements of the Butte County Zoning Ordinance and the County adopted Uniform Building Code. ® 2. Show all easements of record on the Parcel Map. ® 3. Prior to or concurrently with the recordation of the Parcel Map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7,of the California Government Code commencing with Section 66492. ❑ 4. Prior to the recordation of the Parcel Map, prove, to the satisfaction of the Director of Public Works,that the parcel to be divided is a legal parcel. ❑ 5. Prior to or concurrently with the recordation of the Parcel Map, pay all applicable assessments established by affected assessment districts,in full. ❑ 6. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Parcel Map regarding r 06/04/2004 08:13 5305382426 CITY OF OROVILLE PAGE 01 CITY OF OROVI.LLE l� PLANNING DEPARTMENT JO SHERMAN, PLANNING MANAGER Phone(530) 538-2436 FAX (530) 536-2426 FAX TRANSMITTAL TO: NUMBER OF PAGES(including this page): 3 June 4, 2004 ATTN: Dan Breedon , Butte County Planning 538-7785 SUBJECT: Hall TSM on Hildale Good morning! This FAX includes comments from Building & Parks and Trees. Public Works hasn't responded yet, may send a representative. Regarding compatibility with the City's Planning regulations: 1. City,General Plan Diagram is Low Density Residential, which allows only 1/2 acre minimum. 2. City zoning is R-1, which allows 6 units'per.acre. General Plan designation is the most recently adopted. City has come reconcilation to do. 3. Lots seem to conform to our size requirements (frontage, area, etc). We require a minimum 40-foot frontage on cul-de-sac, with 60 feet at the 20-foot setback line. 4. Our maximum cul-de-sac length is 600 feet (we don't specify where that length ends - at beginning or end of bulb!). But we can grant waivers in reasonable situations. I don't know if this is a reasonable situation, because of 45, below. 5. Wouldn't it be advantageous to extend a street from Hildale to Olive Hwy? It's a VERY long distance from Arbol to Oakvale. Maybe topo is not conducive to an extension - too steep? At any rate, the aerial photo suggests this propertymay be the last opportunity to achieve an extension, and stubbing out a street should not affect Hall's plans too much. It should be considered, at least. 6. The offset between Mountain View and the new street is unfortunate. If there is any plan to demolish or move the existing house, the layout should be flipped so the streets are aligned. Thank you for giving us the opportunity to comment. Jo 06/04/2004 08:13 5305362426 CITY OF OROVILLE PAGE 02 PRE-APP PROJECT: Butte Co TSM on Hildale at Mountain View (Hall) 5/04) BUILDING DEPARTMENT 1. Facility shall be designed by a registered professional designer. 2. Building plans shall conform to the 2001 California Building Code. 3. A hour fire wall is required for all exterior walls within feet of the property line. 4, Must meet the California Code of Regulations(CCR), Title 24, Part 2, Sections 1101 B, at seq. requirements: 5. No comment. FIRE DEPARTMENT 1. Fire hydrants shall be installed per the requirements of the Oroville Fire Department and California Water Service Company, Oroville Wyandotte Irrigation District, Thermalito Irrigation District. 2. Turn-around shall most City Standards. 3. Fire sprinklers shall be installed. 4. Prior to occupancy of the facility, fire extinguishers shall be provided. The type and number shall be determined at the time of occupancy inspection. 5. Install a KNOX BOX for access by emergency personnel. 6. No comment. Asa(-de-sac �� .►�� �be. vrJ�AI � ctce�,r.m�o(�ie ire seg,-v�c� ve1.�.�Q. Tu�Q►ce.�c,(�r ��as 14 �/ � .,.� ✓ J,..� .:��Qa„r. >•••� � •J�.l� l„-/-20D�,1 06/04/2004 08:13 5305382426 CITY OF OROVILLE PAGE 03 PRE-APP PROJECT: Butte Co TSM on Hildale at Mountain View (Hall) (5/04) PARKS AND TREES DEPARTMENT 1. Street trees shall be installed with the cost thereof borne by the developer, prior to occupancy of new structure. 2. Parking lots shall meet the 50%shade factor requirement prior to occupancy. X 3. A landscaping and irrigation plan prepared by a licensed landscape architect, or contractor with a contract to install landscaping, shall be submitted to and approved by the Parks and Trees Department, prior to issuance of building permit. LANDSCAPE PLANS SHOULD NOT BE SUBMITTED TO THE BUILDING DEPARTMENT FOR APPROVAL 4. The property owner shall sign a Landscape Maintenance Agreement which runs with the land and is binding on all successors in interest prior to occupancy. 5. Additional requirements may be imposed as conditions of Development Review Board approval. 6. Arborist report required prior to building permit (call 530-892-1118,Western Chapter of International Society of Arborculture,for information about persons qualified to prepare reports) 7. No comment. 1 31D LC spec;C-:c.,��i o,a 3 �,,. �t-►-�,�.� Tom.s 5��� �� �.�s�\�l a�o� ��11 �� =C P�r.►o 3 OC.R.A , ►� �Y- i e of Q-aAH;cV{ GaAs -"c) 64 AuRl441 "b Q�� ON p� Ma;.J�NAa1Cri.� �" "s- Inter-Departmental Memorandum To: Dan Breedon, Senior Planner From: Ted Crawford, Fire Department Subject: Pre-Development Conference, AP#68-341-010, Malcolm Hall TSM Date: June 2, 2004 The following is submitted for the pre-development conference scheduled for June 4, 2004 for the Malcolm Hall Tentative Subdivision Map on Hildale Ave, Oroville area: 1. A community pressurized water system with fire hydrants that meet the fire department standard is required. The minimum fire flow from the hydrant system is 1000 gallons per minute with fire hydrants spaced a maximum of 500 feet apart. The hydrant size is 6 inches. (Reference Butte County Improvements Standards dated June 2002). Submit plans to the Fire Department for review and approval prior to construction of facilities. 2. Construction, installation or development of structures or facilities on the parcels/lots shall comply with the latest California Fire Safe Regulations, (Public Resource Code 4290),.and all other applicable State and County codes, ordinances and regulations in effect at the time of application for improvement permits. 3. Building identification and/address shall be installed in conformance with Public Resources Code 4290 and shall be posted at the beginning of building construction and maintained continuously thereafter. 4. Fire hydrant identification, reflector or post reflectors shall be installed acceptable to the County Fire Chief. 5. The proposed subdivision is within the Oroville Urban Area according to the Butte County Improvement Standards dated June 2002, appendix I. According to the Butte County Code, Section 20-133, cul-de-sacs cannot be over 500 feet in length. PRC 4290 Fire Safe Regulations would allow up to 800 foot length. These conditions are based on the information submitted and may change if the subdivision plans are revised. If there are any questions please contact me at 538- 7994. CC: D. Dyer Chrono R PROJECT: d) (5/04) PUBLIC WORKS DEPARTMENT 1. All utilities shall be installed underground in accordance with Chapter 25B of City Code. 2. Sewer service hook-up and fees are required, payable prior to issuance of building permit. 3. Drainage fees are required, payable prior to issuance of building permit (Thermalito) . 4. Traffic.mitigation fees are.required, payable prior to issuance of building permit. 5. Provide additionai right-of-way per the requirements of the Public Works Department and/or Caltrans: D< 6.. Provide.a "no access" strip along 141(.bALs_ 7. Construct street improvements to City Standards. 8. Paved width of interior streets 9. Paved.width of abutting streets X 10. Separation between curb and sidewalk C P2.EFr�e.kEb) 11. Development shall be designed to avoid excessive grades on City streets _p�_ 12. Reconstruct all or portion of abutting street 13. Provide center-turn lane on abutting street 14. Provide acceleration/deceleration lane on abutting street 15. Provide bike lane 16. Street lights shall be installed per the requirements of the Public Works Department and Pacific Gas and.Electric Company. IX,_ 17. Provide drainage.detention/retention facilities sufficient that there is no increase in the"pre-project peak stormwater discharge from the site for any design storm event up to and including a 100-year design storm event. �X _ 18. Provide plan to eliminate cross=lot drainage y 11, - 19. A site. grading, drainage, and improvement plan prepared by a registered civil engineer shall be submitted to and approved by the Public Works Department prior to any work on the site. 20. Grading plans will.not be approved without evidence that all State- and federal- required permits have beemobtained (Regional Water Quality Construction Activity.Permit.for. site 1 acre or larger;Fish and Game 160.3 for work in stream banks; Nationwide 404 for fill of wetlands) ,AL ZAA* PROJECT: (5104) Public Works Department, Continued 21. Existing easements shall be shown on the site plan. V� 22. Frontage improvements including curb, gutter, sidewalk, paveout, and utility lines shall be'shown on the plans: . 23. Proposed ultimate development.shall be.shown on the site-plan. 24. Site plan shall be submitted separately from the building plans. 25. Obtain an encroachment permit from the Public Works Department and/or Caltrans for any work in the public right-of-way.. 26. Owner shall provide "as-built' construction plans prior to occupancy of the building. _ 27. formation of landscaping, lighting; and/or drainage assessment district is required (residential subdivisions) 28. Merger.required.* 29. No comment. A l&►G N1 t."t-9_.SAV 4r PQVIb _ s'. C.tN9 .ALo^iC, EYLo,.►�Ac.�_ of Ntt.Aa��. t.�tl'� 1�2AtN tNtt�T Cit-bV_-Sac Df$I CA _,WALL ave Lt.►— ct T`t 3S,1'77 vCL {fit Y c V"loy Q Q.L e90 all CPO Rj. �r �►� �` _ ,_ I -. _ - - � i j �: ..�. I t .� - � - �' �. e Butte County Department ofDevelopment Services V o� T rF o YVONNE CHRISTOPHER,DIRECTOR 7 County Center Drive O O Oroville,CA 95965 O _ O (530)538.7601 Telephone 0 - "- (530)538.7785 Facsimile O - -�y'.O c0U IN ADMINISTRATION * BUILDING * GIS * PLANNING May 14, 2004 Local Agencies and Departments: RE: Pre-application Review, APN: 68-341-010 for Malcolm Hall for Tentative Subdivision Map dividing a 7.75 acre parcel into 20 residential parcels with an average parcel size of one-third acre The Butte County Department of Development Service, Planning Division has received a request for a pre-application conference regarding the above referenced parcels. The property is currently zoned A-R (Agricultural Residential), with a General Plan designation of Low Density Residential. A project description and map is enclosed. The purpose of the meeting is to inform the applicant of local or state requirements that may apply to their project. This allows the applicant to incorporate those requirements into the design of the project when the actual application is made. The applicant will be present to answer questions and receive comment. The pre-application conference will be held in the Department of Development Services Conference Room A' located at 7 County Center Drive, Oroville, on June 4, 2004 at 10:00 am. If your department has concerns or comments regarding the proposal, please have someone attend or submit written comments to this department prior to the meeting date. Comments may be sent to the above address or faxed to (530)538-7785 attention Dan Breedon,prior to the meeting date. If.you have any questions please contact me at(530)538-7629. Thank you for your anticipated cooperation in this matter. Dan Breedon Principal Planner Enclosures cc: IDR Committee Jo Sherman, City of Oroville Lake Oroville Public Utility District South Feather Water and Power Agency Brute County Depar trnent ofDevelopnent Services �j3T rF YVONNE CHRISTOPHER,DIRECTOR 0 0 0 0 7 County Center Drive 0 0 Oroville,CA.95965 0 - o (530)538-7601 Telephone 0 o (530)538-7785 Facsimile CQUN'fjy ADMINISTRATION*BUILDING*GIS*PLANNING May 14, 2004 Mr. Alan Brown, P.E. BBA Engineering P.O. Box 1001 Owatonna, MN 55060 Dear Mr. Brown: RE: Pre-'application Review, APN: 68-341-010 for Malcolm Hall for Tentative Subdivision Map dividing a 7.75 acre parcel into 20 residential parcels with an average parcel size of one-third acre This letter is to inform you that a pre-application conference has been scheduled for June 4, 2004 at 10:00 a.m. in the Department of Development Services Conference Room A, 7 County Center Drive, Oroville. Your attendance at this meeting is requested. Should you have any questions or need any additional information, please feel free to call me at (530)538-7629, between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday. Si ely - Van reedon Principal Planner cc: Malcolm Hall LEAD IN SHEET FILE NO: PRED 04N-21 APN: 068-341-010 APPLICANT: Malcolm Hall P.O. Box 1001 Owatonna, MN 55060 OWNER: Malcolm Hall REPRESENTATIVE: Alan Brown, P.E., BBA Engineering REQUEST: Pre-Development Conference to review a proposed subdivision of 7.75 acres into 20 residential lots served by water and sewer LOCATION: on the north side of Hildale Avenue, at the intersection of Hildale and Mountain View Drive, at 4001 Hildale Avenue, Oroville SIZE: 7.75 acres SUPERVISORIAL DISTRICT# 1 EXISTING ZONING: A-R, (Agricultural-Residential) GENERAL PLAN DESIGNATION: LDR(Low Density Residential) ZONING HISTORY: SURROUNDING ZONING: SURROUNDING LAND USE: SITE HISTORY: APPLICABLE REGULATIONS: ASSIGNED PLANNER: Dan Breedon Date Application Received: 4/28/2004 Date Project Assigned: ' 5/3/2004 IDR Date: 30 DU Complete: Preset Hearing Date: : i "DRAFT"LEAD IN SHEET FILE NO: ��-L�'/ -�1 AP# APPLICANT: OWNER: REPRESENTATIVE: �� F-NG-(Al e-E7ZtnfC-- PROPOSED REQUEST: (to be filled out by person taking in application) pr�E��v Plne r r- c,2Feac �- Ce -ro A- Pa4P cxSE0 Sy8p� s �N o�- -7.257 A C-f-G-S „-o ar Q r S ✓�� e See eJV GagLu WAi-tw- ANO SFwgrL FINAL REQUEST: (to be filled out by project planner) i • 1 r J SIZE: I S LOCATION: Jfk- �S/21- of Nle-0 -tr �4-u�- ae� ,-r' t/.k� /.vr�r wo fil mo pw 06w 4--r X100 SUPERVISORIAL DISTRICT# ' EXISTING ZONING: A �� GENERAL PLAN DESIGNATION: ASSIGNED PLANNER: PLANNER'S INITIALS Date Application Received C� O Date Proiect Assigned .5• o pr IDR Date 1�I�� 1INT y �r . APS �nn4 30 Day Complete ” Preset Hearing Date DEVELOYSERVICESN K TIanningTormsTead In Sheet.doc } COMMENT DISTRIBUTION LIST County Offices and Cities: Chief Administrative Officer X Develop.Services Director X Public Works Director X Environmental Health X Assesor X Building Manager _Sheriff _BCAG _ALUC X LAFCo _Air Quality Mgmt. _Butte Co.Farm Bureau _Biggs _Gridley _Chico _Oroville _Paradise Chico Airport Commission Information Systems Dept. —Animal Control X Agricultural Commission X County Counsel Irrigation District: _Butte Water _Biggs/W.Gridley Water _Durham Irrigation _OWID _Paradise Irrigation _Richvale Irrigation —Table Mountain Irrigation _Thermalito Irrigation _Other Domestic Water r _Butte Water District _California Water Service Co. _Del Oro Water Co. OWID _Thermalito I rri gationDi strict _Other sewer _Butte Water District _Themalito Irrigation _Sterling City Sewer Main Skansen Subdivision(CSA 21) _L.O.A.PUD Fire Protection X California Department of Forestry _EI Medio Fire Protection District Recreation Districts _Chico Area Recreation _Durham Area Recreation _Feather River Rec.&Park Paradise Recreation&Park Richvale Recreation &Parks Utilities _PG&E North-Chico _Chambers Cable TV _Pacific Bell PG&E South-Oroville Viacom Cable TV State Agencies _CalTrans(Traffic) _Dept.of Water Resources _Dept.of Fish and Game _Forestry(Attn:Craig Carter) _Dept of Parks and Rec. _Highway Patrol _Central Reg.Water Quality Cont. _Caltrans,Aeronautics Program _Off.of Governmental&Env.Relations _Department of Conservation _Off.of Mining Reclamation Dept.Social Services,Comm.Care Licensing Federal Agencies _US Forest Service _US Bureau of Land Management _US Fish&Wildlife Service Army Corps of Engineers _National Marine Fisheries Sservice Other Districts,Agencies,Committees,etc. _Lime Saddle Dist _Community Association School Districts _Drainage _Butte Env.l Council _Reclamation _Cal Native Plant Society _Butte Co.Mining Committee _Forest Ranch Community Assoc. _Paradise Pines Com. Assoc. _Butte Ck.Watershed Conservancy _Mosq.Abatement.Oroville/Butte Co K:\Planning\Forms\DISTR.wpd _ _ --- . . • ENGINEERING TRANSMITTAL A Callfornip Corporation r DATE: 4/21 /04 JOB NO. 04-008 2060 Park Avenue • P.O. Box 1576 • Oroville, CA 95965 (530)534-1911 (530)533-6457 • FAX(530) 534-0908 SUBJECT: Hildale Estates Subdivisiorl Pre Development Conference TO: Butte County Planning 7 County Center Drive nrnville., CA 95965 ATTENTION: AP# ENCLOSED PLEASE FIND THE FOLLOWING 10c HEREWITH ❑ UNDER SEPARATE COVER VIA Application ❑ Computations ❑ Authorization ❑ Owner's Certificate ❑ Calculations ❑ Description ❑ Check For$ ❑ Road Maintenance ❑ Design ❑ Deeds ❑ BBA# Client# Agreement ❑ Estimate ❑ Final Map ❑ Environmental ❑ Street Sign Application ❑ Original _ LlPlat L1 Public Report ID Test Results a Prints# i5 ❑ Tentative Map ❑ Subdivider Statement JjjK Photographs ❑ Specifications ❑ Title Report# ❑ Zoning&General Plan ❑ THESE ARE TRANSMITTED FOR: ❑ YOUR APPROVAL ❑ YOUR INFORMATION ❑ YOUR FILES [:) CHECKING ❑ RECORDING ❑ REVISION ❑ SIGNATURE ❑ FOLLOW UP ❑ PER YOUR REQUEST REMARKS: CCU�y� i MalcolmHall ll Alan G. Brown P.E. COPY TO: SIGNED: -t!v7 v b;X 44 i.,', NIAQ -R- ��1��:1�� A, f7�� �r�...b� s L'"M } !` ��s- -�, �q'�4�`f• s1i r��h�p.�vt..4'�i����'%.?� r �. •�LL Yz ..j �•r�"Yf' � .f✓ � ,- jt.r� •r't' S' s 3rKK� r ,,G"S"i .i' � r�. `���!' ��,..r.•'t .ami.:�-- .vc !-t:aY f s-r i'S w'�'�'s+�` `Sr s.-} S f k., �.� r,� * � q yb: � a � f"' w T r*t ! � � � � '•,'a'r cw�t�,�( 4h -r�ir� �.f ro ! � r4- r ; �, y.. � ♦ '��G�` til^zir>• <S> rw :Rq'-' �.r` 4 y ''✓". 4 .x +.-�,` �+' a+s.1. r 3� N�yd'Yz'��x *�""f,. a S.y ♦ S.x'' i7c��,+��� � y��_' �+�_s3G e.4'ti �'�'�•,�� ,-��{'`13C� k 3#..,- i w S_.t�-` �' ?mss .c, 4�: v �� '.�!�`' •a>< ,� -�T+x w +ry F '` _� s��JM<� l ..�r 7�L �,^'' .r--.r,�"� {.�;P`F•a;t 3•d. r� �'�.�i��•x��+ n' i.�r��''�"'".c�a��x:1�^4� *� . Y. r r.� �T'3t� : �r ���1G�•.r�'Ej, �;i•.a... a���r tt�f�ti7t�K"�* �-.�( ��. �-�`.`�• '�'�' ,LN31AI OUAW woo $ Z Hdd 4UN1103 juna 41 NrVARA,-M-1 �J- r WIMM"aYs vva v �f 7{ sip .~ F.• SRI '.v`'t1T� r- .,¢; i� y �`• �ry?fir'", t ` i q. h F� `r r 1 r ^ , .r s" WWI o rr }�Q�;:� v: o � � •°rn r a �� =Y .O 1 v,. s #v -cN�"ry�- 1, ��, c - ''�_" =s '� •.,,.� '.`F cs m c • i I , dOIS ,: •� Jk.Ll •'i SEETIOJS 14 & 15 T. 19N. R.4E. M. - 34 .68 21 F16 19 234.54 330.00 340.00 32 43 0 39 2 m 40340 0 3 - 1'=400' 1.39 �`- 1 Op� AC m 2.25,A - 1.55 0' 1.60 AC O CAMPGROUNDS �7s.0 _ 4.35 AC 26 r RS 110-9 2 7 r 33 2 0 54 2 r 42 1.87 Ac _93 o0 � N64 5 N��QP69� 5.14 ACt 1 A nC}3 .se 5 � 10.31 AC 1.01 AC .84 ' 53 15 N Q1 AC 11 34 tiro Act 6 Act � c ti`''�1.02 AC ?6280 10 S 9F�q 21 a9°� .70AACf26 O 16 �O0 5 �k. %33 13et.sC 42 11 12 13 24 2 1 5 -3.00 AC O� 7 �O 1.01 AC 2 3.56 AC 33 O .1 20 ,p r 1.01 A 41 -'Act PM 41- 4 �M 98-161 �1 A �2$22 ? O 37 2! �s• 37 �cg 34 245 NUTE, These parcels are for assessment purposes M 105-172 �ti 1 40 ^Ory 17 25 1 4i� ACt 1.44 ACt 45 ACt only and my not constitute legal parcels. e X36 7.68 AC BATON 39 a3 O 2.25 AC .43 ACt ARB. BIX DN. UNE ROUGE tn�'0 B zk0 2 Ac 38 7996) 32 44 2 ACg2 341 2Ac 31 28 DRIVE PM s1 ! � 121 AG 0��•, OR,v $ N89'56'15 30 43 �\ �2 ry o� 247 �.' n 00 184.64 . , 0.70 0.80 179.75 179.75 185.00 327.62 215.00 125.00 1.22 AC�1 t 46 ,neje .' ^ 30 N 24 1 ,e 1 AC 23 O a m 5 O i ,9 `� 3.09 AC , 1.84 AC 18 19 17 1 16 N 12 11 m tg 45� s 11 ?z8 i' rr <6' 13319 ` �' 1 / o 2.98 276 ACt 3.12 AC ?1.01 A Q yi X325 6.07 ACf i' r 25 o r a �} 1.59 AC 26 2.45 AC O 27 ,� r AU o 2�d � N � PM40-94 1.99 ACt 3`�Q � 10 ,• 23 „1j 8. �, 9 205 $ 216.00 1.85 ACt 701.86 154.54 250 ^ 990 7.76 AC m � nj 9.90 5.� 100 1.87 3s{Bge Q 1.71 ACf 4�0 act A 680 35 37 71 w o ACt 36 8 ti� 2 1 N Q r o o 'it c 5 10 15 ' 1 ACt a?00oa O S \J�J+�/ tag o ( pQ)N' `` 261 r c, r' c��, .52 t .89 � o `.J (n r µ n 184.92 �� AC 2949 "' _ 'r AVENUE 13 ?1&5614 5.06Ac 75 17253 O int 12 s1 Act 1.60 AC o 156PM46 2.35Ac / h 24 ie 39 9 20 300.00 $ 464.62 326.41 4, 35 % � G) 10 ACt 20 2 1.47 AC 344 OC 2.30 At; 1.11 .76 Act �i2 i2 O 22 O ?�s31 Z O 161.34 1.12 O 2.80 AC 47 7 D ``` r D 314.05 ACf 14 . t 7 00 ^7? 1.48 w 977 1 95•1 46471 O < `�� Z 99' ti , RS 120-48 ; 25= Z 1`� <o O AC ACt 46 2.01 N � 4d, N ACf l6 5 6.74Act o 9.92 AC 25' �' O 3.19 AC147RS54 t'� A 2 AC 10 PM 105-96 ------ 281.14 602.00 ; 160.00 157.37 _ l 199 _ r 8 .3o Act 15 14 15.03Ac. 23 ; 6 \-.,22 23 3 36-41 -- 36-80 �. � tI ARB. BU(. DN. UNE 92.48 36-82 RS 74-62 1 `36 `42 Butte County Assessor's Map C� Book 68, Page 34 N NOTE. These parcels are for assessment purposes only and may not constitute legal parcels. CREATED BY CREATED ON 12=7-1999 REVISED BY DB REVISED ON 08-13-2003 RANCHERIA SUBDIVISION 26 M.O.R. 9/10 EFFECTNE 2004-05 Roll OROVILLE WYANDOTTE FRUIT LANDS 16 10 M.O.R. 3A/5A Compiled By The Butte County Assessor's Office t -VV d w .. Ruggle Road E ac �. U u o R- 464 ...,�,�,.., Of HEADQUARTERS Hosanna way BEACH& P7bLRK Northvievw Lir, DEP +61} ::� 200' 90' . �' 90' ! T trvooii RESOURCE � Lnof WATERo N 0 v`;tav �' dd- a� ro 4 o16 2 ° so thviewO�C � D ; IOn Basin 40 c 8,600 SF Lot 9 Lot 10 Lot 11 cv o 17,292 SF Ri 13,176 SF �, ic: � co M Ln 13,423 F OLIVE '�� '�tY j ► Richter Hidq '-' ,. 100' �• Rc 12' Access „ . aPHlR' e Easement Mp SC!-> p VaX� ��. v Lot 8 To Be ` Dedicated not SCALE: 1'=40 s c To The County Lid 17,190 SF RQ�Ie �.� CD 0f e "�` �,�/ W L o-t, 12 150' HALL 12,632 SF VICINITY MAP Q \ 110 SF Z W - R/W O - NOTE Lot 7 17,812 SF Lot 13 1. CUL-DE-SAC LENGTH = 625' CD o 2. SINGLE PHASE DEVELOPMENT 8,107 SF 2CU� M Lot 5 100' 13,621 SF �ASTING EPIC - I �� t 14 T�l B _ 146` _ 8025 SF - GENERAL N0 rE, S: Lot 6 SY�T o APN # 068-341-010 16,671 SF �QBANDC3�NED Co ZONING: AR .. 114' GPD: LDR ._ _ \ \ Z I '-- . . Lot 4 WA PW "" 19911 TER: SF -.-. . . � SEWER: LOAPUD 80' 134' �; - � 11;269. SF DRAINAGE: BUTTE COUNTY u� F EXISTING PARCEL SIZE: 7.;756 AC CJ �� Lot 15 - 132' W� 8980 SF }� . LEGEND: �� 126 EXISTING HOUSECo -- CENTERLINE i' Lot 3 60 /W �EXIS ING , 10,558 SF GARA 400 �.. EXl ING GROUND CONTOUR \ `3 r` ­ L'd t 16 rn PHOTO # AND ORIEN TA TION / 9873 SF E?�TSTIN 4 W I 137' \ .GRAVE D/W Lot 2 Lot 20 10,558 SF Lot/19 Lot 17 132' I . . 10,767 SF = 132' . 6 137' cx� = Lot 1 Ln -. . 11,315 SF . Lot 18 9g� 16,514 SF 1441 _ Z - ----_ z ' 3 PLAN VIEW - 2� 200� W SCALE: 1" = 40' APR ~ OE S RVIc SST i Approved B . Date FIELD BOOK DRAWN APPROVED BY: DATE SHEET p JDS _ p HIL L0ALAE ESTA TES SUSLNVISION ELEVATION DATUM DESIGNED AGB SSA El1/�".��NEER/NCs 4001 HILDALE APN 068-341.-010 OF CIVIL ENGINEERS - —4— CHECKED AGB LANs suRVE�roRs BUTTE COUNTY, CALIFORNIA 1 MIKE CRUMP, P.E. 2060 Pork Ave. Oroville, CA 95966 (530) 534-1911 FAX (530) 534-0908 HALL 0OHMELOPMENT SHEETS DIRECTOR OF PUBLIC WORKS BUTTE COUNTY DATE NO REVISION BY APP'D SCALE AS NOTED ALAN GEORGE BROWN RCE 2457$ JOB NO, 44_008- 4-02-04 }