Loading...
HomeMy WebLinkAboutPRED 07-0007_PLANNING SEPARATOR SHEET a,„ bel- r3z - 039 Pao,ERNUMeEa �R�u o7— ota» PROJECT SUMMARY SHEET FILE NO.: PRED07-0007, PREDEVELOPMENT REVIEW APN: 021-132-039 ZONING: GNL PLN: APPLICANT: Denise Younie & Denny Stevens PHONE: 5308930793 ADDRESS: 1530 Humboldt Rd. Ste. 5 FAX: 5308939592 Chico, CA 95928 EMAIL: dense@crlandco.com OWNER: CR Land Company PHONE: 5305183373 ADDRESS: 501 Little Ave. FAX: [Owner Fax] Gridley, CA 95948 EMAIL: REPRESENTATIVE: The Engineering Group PHONE: 5308990409 ADDRESS: 1250 East Ave. Ste. 10 FAX: Chico, CA 95926 EMAIL: timwood@theengineeringgroup.us PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. LOCATED: 501 LITTLE AVE TOWN/AREA: GRIDLEY 1. Application accepted: 7/26/2007 Amount: $ Receipt No: 2. Assigned to: Mark Michelena 3. Comments sent to: Environmental Health,Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF 4. Date to Inter-Departmental Review Committee(IDR): 7/31/07 5. Date Status Letter sent to applicant: 6. Date scheduled for IDR: 8/22/07 7. Comments received from: 8. Rezone Petition Signatures Checked: 9. Mailing List/Lead-in Sheet: 10. Environmental Determination: Clearinghouse circulation required: Yes No Date Sent to SCH: State Clearinghouse No. Categorical Exemption-CEQA# Negative Declaration Mitigation Negative Declaration Subject to Fish &Game: Environmental Impact Report De Minimis: Gen. Rule Ex.—CEQA# Other 11. Staff Recommends: Approval Denial 12. Notices Mailed: Neg Dec Hearing Number of Notices: 13. Newspaper Publication Date: Neg Dec Hearing O C P G B 14. Planning Commission Hearing(s): Action taken: 15. Board of Supervisors' Hearing(s): Action taken: Board Resolution No.: Ordinance No: Adopted: 16. Remanded to Planning Commission: 17. Type approval/denial letter, send to applicant: 18. N.O.E./N.O.D. /APPENDIX G: Fish &Game Fees Paid: Yes No 19. Take file to Public Works: (Lf Butte County Department development Services p bq-ovv1- �uTTF TIM SNELLINGS,DIRECTOR I PETE CAL, O,ASSISTANT DIRECTOR o 0 7 County Center Drive o 0 Oroville,CA 95965 0 0 (530)538-7601 Telephone o (530)538-7785 Facsimile �+ y ovN� PROJECT INFORMATION Project# o-7-00.0 APPLICANT'S NAME: (If applicant is different from owner an affidavit is required.) ASSESSOR'S PARCEL NUMBER: Denise Younie& Denny Stevens 021 - 132 -039 ADDRESS: STREET,CITY,STATE,&ZIP CODE TELEPHONE: 1530 Humboldt Rd, Suite 5, Chico CA 95928 (530 ) 893 - 0793 E-MAIL: FAX: denise@cdandco.com (530 ) 893 - 9592 OWNER'S NAME: TELEPHONE: CR Land Co. ( 530 ) 518 - 3373 ADDRESS: STREET,CITY,STATE,&ZIP CODE: 501 Little Ave, . Gridley CA 95948 PROPERTY INFORMATION NAME OF PROPOSED PROJECT(if any) SITE SIZE(in square feet or acres) Younie Rezone7 16.00 AC LOCATION OF PROJECT(major cross streets and address,if any) Ne-*-.- 6-1 lie ) Little Ave, between French Ave. &Dewsnup Ave., Butte County ZONE GENERAL PLAN EXISTING LAND USE PROPOSED LAND USE A-5 AR Vacant Residential EXISTING STRUCTURES(square feet) PROPOSED STRUCTURES(square feet) UNDER WILLIAMSON ACT CONTRACT NONE I Aprox. 1500 sf ❑Yes No (Check One) (Check One) ❑ PROPERTY IS OR PROPOSED TO BE SEWERED ❑ PROPERTY IS OR PROPOSED TO BE ON PUBLIC WATER ® PROPERTY IS OR PROPOSED TO BE ON SEPTIC ® PROPERTY IS OR PROPOSED TO BE ON WELL WATER APPLICATION TYPE ❑ADMINISTRATIVE PERMIT [:1 TENTATIVE SUBDIVISION MAP ❑LEGAL LOT DETERMINATION ❑ TENTATIVE PARCEL MAP ❑USE PERMIT ❑WAIVER OF PARCEL MAP F]MINOR USE PERMIT BUTTE COUNTYCERTIFICATE OF CORRECTION ❑ ❑COMMUNICATIONS FACILITY UP/MUP JUL 2 v c 2007 ®REZONE ❑VARIANCE 1 ®GENERAL PLAN AMENDMENT ❑MINOR VARIANCE DE MENf SE VICES ❑SING AND RECLAMATION PLAN ❑LOT LINE ADJUSTMENT ❑DEVELOPMENT AGREEMENT ❑CERTIFICATE OF MERGER ❑ OTHER PROJECT DESCRIPTION FULL DESCRIPTION OF PROPOSED PROJECT(Attach necessary sheets. If this application is for a land division,describe the number and size of parcels.) This project proposes to rezone the property to a zoning that will allow the creation of 1 acre lots for residential purposes. Provided that a community system or sewer services become available, a higher density can be obtained. OWNER CERTIFICATION I CERTIFY THAT I AM PRESENTLY THE LEGAL OWNER OR THE AUTHORIZED AGENT OF THE OWNER OF THE ABOVE DESCRIBED PROPERTY. FURTHER,I ACKNOWLEDGE THE FILING OF THIS APPLICATION AND CERTIFY THAT ALL OF THE ABOVE INFORMATION IS TRUE AND ACCURATE. (If an agent is to be authorized,execute an affidavit of authorization and include the affidavi with this aDDlication.) DATE: G ..O-���� SIGNATURE: AGENT AUTHORIZATION To Butte County,Department of Development Services: The Engineering Group, Inc. (530)899-0409 Print Name of Agent Phone Number 1250 East Ave, Suite 10, Chico CA 95926 Mailing Address is hereby authorized to process this application on my/our property,identified as Butte County Assessors Parcel Number(s) 021-132-039 This authorization allows representation for all applications,hearings,appeals,etc.and to sign all documents necessary for said processing,but not including document(s)relating to record title interest. Owner(s) of Record(sign and print name) Denise Younie, Co. Owner Denny Stevens, Co. Owner Print Name Print Name ture Signature Print Name Print Name a Signature Signature Print Name of Applicant(f other than owner) Signature of Applicant(cf other than owner) Tim Wood,The Engineering Group, Inc. (530)899-0409 Print Name of California Civil Engineer/Land Surveyor Phone Number 1250 East Ave, Suite 10, Chico CA 95926 timwood@theengineeringgroup.us Mailing Address Email Address 13UTTE COUNTY JUL 2 2� DEVEL®Pir,�t',iv y SERVICES i Butte County Department of Development Services T rF TIM SNELLINGS,DIRECTOR i PETE CALARCO,ASSISTANT DIRECTOR o 0 0 0 7 County Center Drive 0 0 Oioville,CA 95965 a o (530)538-7601 Telephone CSU N'�y (530)538-7785 Facsimile PRE-DEVELOPMENT CONFERENCE INFORMATIONAL SHEET Applicant Name: Denise Younie& Denny Stevens Project Number: /W07­000 The Pre-Development Conference is a chance to meet with county staff prior to formally submitting a development application. After receiving a complete application packet, the Department of Development Services will schedule a pre-development, inter-departmental review meeting that includes the applicant and/or applicant's representative and representatives from the Development Services Department, Environmental Health Division, Public Works Department, County Fire Department, and any other agency with applicable interest in the proposed development site. The purpose of the meeting is to inform the applicant of local,state and/or federal requirements that may apply to their project. This allows the applicant an advan.zed opportunity to incorporate those requirements into the design of the project. Any direction given shall be preliminary and is subject to further refinement or change as the application progresses through the formal application process. Following the meeting, the Department of Development Services shall send a letter to the applicant summarizing what was discussed, including any additional filing requirements for the formal application. Please submit the following in preparation for the conference: • A completed, signed Project Information Form. • A detailed Project Setting Description(instructions attached). • Twenty (20) copies of a conceptual site plan. • Payment of the currently required fee may be made by check payable to"Butte County Treasurer". The Public Fee Schedule is available under"Fees" at: htti)://www.buttecounty.net/dds/Planning/. Detailed information submitted at this stage will help the Department of Development Services staff better evaluate your project. The Pre-Development Conference is held in the Development Services Department Conference Room A, located at 7 County Center Drive, Oroville and will be scheduled upon receipt of your complete application packet. If you have any questions, please contact the Planning Division at (530)538-7601. K:\Planning\FORMS\APPLICATIONS\PreDevelopmentConference.doc Butte County Department .,,, Development Services vT TIM SNELLINGS,DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR 0 F0 0 0 7 County Center Drive o 0 Oroville,CA 95965 ° a-ra,...: ° (530)538-7601 Telephone o 0 (530)538-7785 Facsimile PROJECT SETTING DESCRIPTION INSTRUCTIONS Applicant Name: Denise Younie&Denny Stevens Project Number: P91-:5007-000-7 Please address the following on a separate sheet of paper: 1. Identify any applicable proposed development schedule, including anticipated, incremental, or phased development and all associate projects. 2. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies. 3. Describe the site as it exists before the project,including information on topography, soil stability, plants, animals, and any cultural,historical, or scenic aspects. Describe any existing structures on the site and the use of the structures. 4. Describe the surrounding properties, including information on plants, animals and any cultural, historical, or scenic aspects. Indicate the type of land use(residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back,rear yard, etc.). 5. Include any special studies prepared for the project site including, but not limited to traffic, biology, wetlands delineation,archaeology,etc. t :BUTTE COUNTY J& 16 2007 DE�ED?MtNT Butte County Department of Development Services COUNT TIM SNELLINGS,DIRECTOR/ PETE CALARCO,ASSISTANT DIRECTOR JUL 2 6 2007 7 County Center Drive DEVELO-pMENT Oroville, CA 95965 (530) 538-7601 Telephone (530) 538 7785 Facsimile PROJECT SETTING DESCRIPTION Application Name: Denise Younie&Denny Stevens Project Number: PV01-02D 1. Identify any applicable proposed development schedule, including anticipated, incremental, or phased development and all associate projects. • Development of the proposed lots will occur after subsequent to approval of the rezone for land development. 2. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies. • The proposed project will be required to satisfy Regional Water Quality Control Board requirements under their Storm Water Pollution Prevention Plan (SWPPP). 3. Described the site as it exists before the project, including information on topography, soil stability, plants, animals and any cultural, historical, or scenic aspects. Describe any existing structures on the site and the use of the structures. • The property is vacant with the prevalence of various non-native grasses. 4. Describe the surrounding properties, including information on plants, animals and any cultural, historical, or scenic aspects. Indicate the type of land use (residential, commercial, etc.)intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development(height, frontage, set-back, rear yard, etc.). • The 16.00 AC +/- property is currently outside of the City of Gridley's sphere of influence, but is directly adjacent to the City Boundary. The property is bounded by French Ave to the west Dewsnup Ave to the East, Little Ave on the north, and the existing lateral#4 to the south. 5. Include any special studies prepared for the project site including, but not limited to traffic, biology, wetlands delineation, archaeology, etc. • No special studies have been prepared for the project at this time. N SCALE: 1"=20'0' I W E E S Q a PN .021-070-101 PN 021,- 09 _LI_TTLE..AVENUE. _ _ Y _ S 89'23'55 E 1280.00'Qo -� m 00 Z:A-5 - d� o I p u! ( l(7/l �N 02T-132-03 , ¢O 'to . QCL00':_ W 17.66' N _ 30 ! PN 021-132-04 `�� � � S 89°59'OQ" W 427.87 2.02 AC t t. PN 021-132-00 PN 021-132-00 0.50 18.63 AC t REZONE PLAT NOTES: FOR 1. EXISTING ZONING: A-5 (AG. - 5 AC. MIN.) DENISE YOUNIE&DENNY STEVENS PROPOSED ZONING: A-R (AG. - RESIDENTIAL) 2. EXISTING GENERAL PLAN: A-R (AG. - RESIDENTIAL) APN: 021 -132-039 PROPOSED GENERAL PLAN: MDR (MEDIUM DENSITY RESIDENTIAL) - 13 UNITS PER ACRE A PORTION OF LOTS 6 AND 7, ACCORDING TO 3. EXISTING USE: RESIDENTIAL & VACANT THAT CERTAIN MAP ENTITLED, "MAP OF GRIDLEY COLONY NO. 4", WHICH MAP WAS FILED IN THE LEGEND: OFFICE OF THE RECORDER OF THE COUNTY OF BOUNDARY LINE BUTTE, STATE OF CALIFORNIA, FEBRUARY 5, CENTERLINE - 1907 IN MAP BOOK 6, AT PAGE 8. CITY OF GRIDLEY - , BY SPHERE OF INFLUENCE THE ENGINEERING GROUP CITY LIMITS BUTTE LOT 6 AS PER MAP OF GRIDLEY COUNTY 1250 EAST AVE., SUITE 10 COLONY NO. 4 (6) CHICO, CA 95926 LOT 7 AS PER MAP OF GRIDLEY JUL 2 6 2007530-899-0409 F: 530-899-0943 COLONY NO. 4 (7) DEVELOPIviLlIJULY 10, 2007 SHEET 1 OF 1 SERVICES Page 1 of 1 Jolliffe, Stacey From: Jolliffe, Stacey Sent: Friday, July 20, 2007 12:01 PM To: 'James Renfro'; 'apierce@theengineeringgroup.us' Cc: Thistlethwaite, Charles Subject: PRIED request on APN 021-132-039 James, From our conversation today, I understand that the predevelopment request for APN 021-132-030 outside Gridley for Stevens and Younie was submitted with incorrect information regarding the proposed General Plan Designation. The maps were submitted with a note that the proposed General Plan is MDR, medium density residential. In actuality, the request should have been to leave the existing AR General Plan designation. This would allow for one-acre lots given a minimum lot size in the AR General Plan designation of one acre. Please confirm or correct my understanding so that we can continue processing the predevelopment application. Thank you and have a nice weekend. Stacey Jolliffe Principal Planner, Current Planning Section Butte County Dept. of Development Services 7 County Center Drive Oroville, CA 95969 Phone: 530.538.7541; FAX 530.538.2140 Email: sjolliffe()buttgcounty.net Webite: www.buttecounty.net/dds BUTTE ' COUNTY JUL 2 6 2007 DEVELOP lOIENT 5ERVJCES 7/20/2007 i THE ENGINEERING GROUP, INC. Development Engineering, Eco-Hydraulics, Surveying BUTTE COUNTY July 13, 2007 'JUL 1. 9 2007 Butte County DEVELOPMENT Department of Development Services _ SERVICES 7 County Center.Drive Oroville, CA 95965 Subject: Pre-Development Conference (APN 021-132-039) Address: Little Ave, between French Ave. 8s Dewsnup Ave near Gridley, CA TEG Job No.:1553 Enclosed are the following items for the Pre-Development Conference: • Signed Project,Information Form • Signed'Agent Authorization Form • Project Setting Description • Twenty(20)copies of the conceptual site plan • One(1) 8 'V2 x l l.plat showing subject area • One(1)Reduced 11.x 17 of Conceptual Site Plan with Aerial Overlay • One(1) Conceptual Site Plan of a Potential Lot Layout for a 1 Acre Parcel alternative • Check No. 147 in the amount of$1766.20 Please note that we have communicated with LAFCO and the City of Gridley in regards to annexing the property to the City. At this time the City is not in favor of annexing as although the property'is adjacent to the City Limits, it is also adjacent to and outside of their Sphere of Influence. The current zoning and general plan are shown on this plat in hopes to determine the potential for development of this parcel. . If you have any questions please feel free to contact me at 899-0409. Sincerely, Amber Pierce - Project Coordinator. , 1250 East Ave.Suite 10•Chico,CA 95926 Page 1 of 1 Tel 530.8 99.0409 •Fax 530.899.0943 •e-mail.teg@theengineeringgroup.us Butte County Dei tment of Development Ser -es QTt TIM SNELLINGS, DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR 0 F0 0 0 7 County Center Drive o 0 Oroville,CA 95965 0 - �:_ _ o (530)538-7601 Telephone 0 0 (530)538-7785 Facsimile c0(114 l July 31,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/29/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner, so that preparations can be made for the IDR meeting on 8/29%07 Do you find this application complete? ❑ NO. Please respond prior to or at the IDR meeting, regarding completeness of application. What is needed to make the application complete? ❑ YES. My Department's conditions and/or mitigation measures are attached or will be provided at the IDR meeting. If conditions cannot be provided at or prior to the IDR meeting they must be provided no more than 1 week after the meeting. Standard Conditions are attached for your convenience. PLEASE SEND YOUR RESPONSE TO: mmichelena@buttecountv.net Signature: Department: Date: K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 Butte County Department of Development Services ��TrF TIM SNELLINGS,DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR o 0 0 0 7 County Center Drive o - _ 0 Oroville, CA 95965 0 `_� '' '` o (530)538-7601 Telephone (530)538-7785 FacsimileC�luij1% www.buttecounty.net/dds ADMINISTRATION* BUILDING*PLANNING July 31,2007 TO: Environmental Health FROM: Mark Michelena,Butte County Planning Division SUBJECT: Request for Comments on a Development/Land Use Application APPLICANT: Denise Younie&Denny Stevens,PRED07-0007 APN: 021-132-039 DATE OF Inter-Departmental Review: 8/29/07 IDR RESPONSE REGARDING ti / COMPLETENESS OF APPLICATION DUE BY: 8/27/07 AGENCY/DEPARTMENT CONDITIONS/MITIGATION MEASURES DUE BY: 9/13 0 The Planning Division has received a project aPPlicatio�de�scribed below. This application is being provided to you for review. This is your opportunity to make comments regarding the completeness of this application, to be determined at the Inter-DepartReview (IDR) Committee meeting on 8/29/07, and/or to recommend conditions( /or mitigation measures relevant to your agency's/department's area of expertise andljurisdiction. PROJECT DESCRIPTION: A Pre-Develop wept applicant to review a proposed rezone of a 16- acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel boun�ded_by the A-5 zoning. The applicant has mentioned that if a community system or sewer sys"em be es available, a higher density may be requested. This higher density would requieja(General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel's not nhe City of Gridley's Sphere of Influence. The project site is located on,south side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. COUNTY, UPER SOR DISTRICT NO.: 4 I ZONING: A-5,� GENERAL PLAN: AR If a Asponse cannot be submitted prior to the due dates listed above, please call Mark Michelena at 538- 7376 or.sendrhlm an email at mmichelena@buttecounty.net. You do not have to respond to this request if you have no comments to include. Thank you for your attention to this matter. Please return response to project planner. IDR COMMITTEE—APPLICATION COMPLETE ❑ No Name: Date: i ❑ Yes Name: Date: F:\Planning\PROJECTS\PRED\YOUNIE PRED07-0007\ADMINISTRATIVE\YOUNIE PRED07-0007 REQUEST FOR COMMENTS Corrected IDR date.doc Butte County De Iment of Development Se ;es QTr TIM SNELLINGS, DIRECTOR PETE CALARCO,ASSISTANT DIRECTOR o F0 0 0 7 County Center Drive o 0 Oroville,CA 95965 0 - .__ o (530)538-7601 Telephone o (530)538-7785 Facsimile C0�/N�'` July 31,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner,so that preparations can be made for the IDR meeting on 8122%07:1 Do you find this application complete? ❑ NO. Please respond prior to or at the IDR meeting, regarding completeness of application. What is needed to make the application complete? ❑ YES. My Department's conditions and/or mitigation measures are attached or will be provided at the IDR meeting. If conditions cannot be provided at or prior to the IDR meeting they must be provided no more than 1 week after the meeting. Standard Conditions are attached for your convenience. PLEASE SEND YOUR RESPONSE TO: mmichelena@buttecounty.net Signature: Department: Date: K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: A. STREETS ❑ 1. Prior to or concurrently with the recordation of the Parcel/Final Map, provide a fully executed road maintenance agreement for all non-publicly maintained access roads on the County approved form A no-.e shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Parcel/Final Map stating: "In accordance with Civil Code Section 845, maintenance of the road as shown hereon shall be shared by those properties with a legal interest in it." ❑ 2. All access rights shall be reserved by deed per County Ordinance, offered for dedication, and depicted on the Parcel/Final Map. For each private access within the map boundary, place the following note on the Parcel/Final Map: "gpproved road name is a non-exclusive easement for ingress, egress, road and public services purposes, to be reserved in deeds and is hereby offered for dedication to the County of Butte." ❑ 3. Prior to the recordation of the Parcel/Final Map, demonstrate to the Department of Public Works that there is approved access conforming to County Code to each parcel from a publicly maintained road. ❑ 4. Prior to or concurrently with the recordation of the Parcel/Final Map, Deed to Butte County in fee simple feet of right-of-way from the centerline of along the entire property frontage. The right-of-way shall be sufficient for the installation of Improvement Standard No. S-5 at all street intersections. ❑ 5. Prior to or concurrently with the recordation of the Parcel/Final Map, relinquish abutter's rights of access to Butte County, along the frontage of parcels , except at approved access points. ❑ 6. Prior to recordation of the Parcel/Final Map, provide street name signs per requirements of the Department of Public Works. Street names shall be reviewed by the County Address Coordinator and one name for each new street shall be recommended to the Board of Supervisors for approval prior to recordation of the Parcel/Final Map. A minimum of five alternate names for each new street shall be submitted. ❑ 7. Prior to final road inspection, install all necessary traffic safety signs including stop signs. A note shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Parcel/Final Map stating: "No public entity shall be responsible for the maintenance of the traffic safety signs including stop signs. In accordance with Civil Code Section 845, maintenance of the traffic safety signs shall be shared by those properties with a legal interest in them." ❑ 8. Prior to recordation of the Parcel/Final Map, obtain an encroachment permit and improve all new and existing driveway approaches to publicly maintained roads as specified in the County Improvement Standards and the terms of the encroachment permit. ❑ 9. Prior to the recordation of the Parcel/Final Map, obtain an encroachment permit and construct a standard S-18 road approach in accordance with County Improvement Standards. Adequate sight distance at the intersection of access road and shall be provided. ❑ 10. Provide a cul-de-sac designed and constructed as specified in the County Improvement Standards. The Parcel/Final Map shall show the cul-de-sac. ❑ 11. Prior to the recordation of the Final map, construct, or provide a performance bond and labor and material bond for the construction of, a ''/2+ 12' / full street section on to an RS-_geometric standard. Minimum structural section to be_" AC, and_" AB, prime coat, fog seal and 95 %relative compaction. Submit design to Land Development Division for approval. "R" value determination and other data may be required to support the section design ❑ 12. Prior to the recordation of the Final map, construct, or provide a performance bond and labor and material bond for the construction of, a '/z + 12' / full street section on to an RS- road standard with curb, gutter, and sidewalk and AC, and _" AB, prime coat, fog seal and 95 % relative compaction. Construct a '`/2+ 12' /full street section on to an RS-—road standard with_curb, gutter,and sidewalk and_" AC, and AB, prime coat, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval. "R" value determination and other data may be required to support the section design. ❑ 13. Prior to recordation of the Parcel Map, provide approved access to each parcel from a County maintained road or from a stat--highway. Improve parcel frontage to RS-_ LD-_ ane- access road to parcel being divided to RS-_ LD-_. (If the parcels being created are 5 acres or less in gross area, submit road and drainage plans to the Department of Public Works for plan checking and approval prior to construction). ❑ 14. Prior to recordation of the Parcel Map, submit road and drainage improvement plans for the installation and construction of the street frontage improvements on to County Improvement Standards. Improve parcel frontage on to a '/2 + 12' / full street section to an RS- road standard including, but not limited to curb, gutter and sidewalk for parcels with gross acreage of one acre or less. ❑ 15. Show on the additional map sheet of the Parcel/Final Map a_ft. building setback from the edge of the ultimate right-of-way of based on Butte County Code Section 24-75(d). ❑ 16. Street lighting shall be provided in accordance with Butte County requirements, accepted design criteria, and recommendations of Pacific Gas & Electric Company. If the developer chooses to install the streetlights and pay energy costs through a County Service Area (CSA), he/she must complete the formation of the CSA prior to recordation of the Final Map. The CSA formation process will require the Developer to fund the service until the beginning of the first fiscal year in which service charges can be collected for the CSA, and agree to an annual maximum service charge to ensure continued operation of the facilities. B. DRAINAGE ❑ 1. Prior to recordation of the Parcel/Final Map, a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall detail existing drainage conditions and shall specify how drainage waters shall be detained or retained on- site and/ or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. ❑ 2. Prior to final improvement inspection by the Department of Public Works, all new drain inlets shall be labeled with the county approved drain marker per County Standard S-40. Improvement plans shall show and/or note the requirements for labeling inlets pursuant to Butte County Standard S-40. ❑ 3. Prior to recordation of the Parcel/Final Map, establish 100 year flood plain elevations and the lowest floor elevations for any structures, in accordance with Butte County Code §26-25. Show on the additional map sheet the elevations (by contours) and the location of an accepted NGVD29 (National Geodetic Vertical Datum of 1929) benchmark and a temporary benchmark on-site. ❑ 4. Prior to, or concurrently with the recordation cf the Parcel/Final Map, pay the applicable drainage fees in effect at the time of recordation of the Parcel/Final Map for the drainage area. (The current fee is now $ /acre.) ❑ 5. Prior to grading, a Construction Storm Water Permit will be required by the State Water Resources Control Board if the project results in a disturbance (including clearing, excavation, filling, and grading) of one or more acres. The Permit must be obtained from the State Water Resources Control Board prior to construction. If a Construction Storm Water Permit is required, place a note on an additional map sheet that states: "The development of this Parcel/Final Map requires a construction storm water permit. Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require a permit. Development of individual lots may require an additional permit(s)." C. PARCEL/FINAL MAP ❑ 1. Show all easements of record on the Parcel/Final Map. ❑ 2. Prior to or concurrently with the recordation of the Parcel/Final Map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7, of the California Government Code commencing with Section 66492. ❑ 3. Pay the recording fees in effect at the time the Parcel/Final Map and related documents are recorded. ❑ 4. Prior to or concurrently with the recordation of the Parcel/Final Map, pay all applicable assessments established by affected assessment districts, in full. ❑ 5. Prior to the recordation of the Parcel Map, prove to the satisfaction of the Director of Public Works that the parcel to be divided is a legal parcel. ❑ 6. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Parcel/Final Map regarding . T BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE ENVIRONMENTAL HEALTH DIVISION FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: D. LEACHFIELDS ❑ 1. Identify on the additional map sheet a 100-ft. leachfield free setback from each existing well. ❑ 2. Meet the sewage disposal requirements of Butte County Code Section 26-26 for the installation of sewage disposal systems within a flood plain/floodway. ❑ 3. Prior to commencing construction or installation of any required site improvements on the property, verify that winter groundwater elevations are in compliance with County Improvement Standards, Appendix 7. ❑ 4. Identify on the additional map sheet an area for wells and a 100-ft. leachfield free setback around that area on parcels ❑ 5. Identify on the additional map sheet a 50-ft. leachfield setback from the drainage way on (lots) (parcels) ❑ 6. Identify on the additional map sheet a 100-ft. leachfield setback from the highwater line of the creek on (lots) (parcels) ❑ 7. Identify on the additional map sheet a 100-ft. leachfield setback from the spring on (lots) (parcels) ❑ 8. Identify on 'the additional map sheet a .200-ft. leachfield setback from the highwater line of the lake on (lots) (parcels) ❑ 9. Identify on the additional map sheet a leachfield setback for four (4) times the height of the cut on (lots) (parcels) ❑ 10. Locate, and, if necessary, relocate the sewage disposal systems serving existing buildings on (lots) (parcels) E. SEWAGE DISPOSAL AREAS ❑ 1. Identify on the additional map sheet those areas with slopes in excess of thirty (30)percent as "Unsuitable for Sewage Disposal". ❑ 2. Identify on the additional map sheet usable sewage disposal areas proven to meet the requirements of County Improvement Standards, Appendix 7. Combine with adjacent (parcel(s)) (lot(s)) any parcel not proven to contain usable sewage disposal area. ❑ 3. Identify on the additional map sheet unsuitable sewage disposal areas. ❑ 4. Those wells indicated on the Tentative Map or on the Final Map that are proposed to be destroyed, in order to provide required usable sewage disposal areas, shall be destroyed under a valid Butte County Environmental Health Division permit. ❑ 5. Identify on the additional map sheet that no water well may be located within 100 feet of the usable sewage disposal area on (lots) (parcels) ❑ 6. Prior to recordation of the Final Map, in the nitrate area record an executed Future Sewer Service and Storm Drainage Agreement. ❑ 7. Meet the requirements of the (Watershed Protection Zone), (Villa Verona Moratorium Area), (Cohasset Specific Plan). F. INDIVIDUAL WATER SUPPLY ❑ 1. Prior to the issuance of a building permit, prove that the required quantities of domestic water are available to (lots) (parcels) ❑ 2. Prove that the required quantities of domestic water are available or place the statement on the additional map sheet of the Final Map that "There is no evidence that domestic water is available" for (lots) (parcels) ❑ 3. Provide a source of domestic water for the building on (lot) (parcel) ❑ 4. Prior to Final Map, verify that domestic water can be provided to meet minimum standards for and other suspected contamination. G. PUBLIC WATER SUPPLY ❑ 1. Prior to the issuance of a building permit, design and construct a new community water supply system in compliance with the California State Safe Drinking Water Act. ❑ 2. Prior to recordation of the Final Map, provide a letter or other documentation from stating that they are willing and able to supply domestic water to (lots) (parcels) ❑ 3. Place a note on the additional map sheet that states "Development of (lots) (parcels) will require connection to a public water supply". ❑ 4. Prior to Final Map, verify that domestic water can be provided to meet minimum standards for and other suspected contamination. H. EXISTING COMMUNITY SEWER ❑ 1. Prior to the Final Map, provide a letter or other documentation from stating that they are willing and able to supply sewer service to (lots) (parcels) ❑ 2. Place a note on the additional map sheet that states "Development of (lots) (parcels) will require connection to a public sanitary sewer". ❑ 3. Prior to the issuance of a building permit, -ander a permit issued by the Environmental Health Division, properly abandon the septic tank and.connect the dwelling(s) on (lots) (parcel(s)) to public sewer. I. NEW COMMUNITY SEWER ❑ 1. Prior to the Final Map, provide community sewage collection, treatment and disposal facilities in compliance with California State Regional Water Quality Control Board, the Butte County Code, California Health and Safety Code, Federal Law and other applicable codes and regulations governing the design, construction and operation of the facilities. ❑ 2. Prior -to the Final Map, comply with all sewage disposal facility construction standards and health and safety and requirements of the Butte County Code,. California Health and Safety Code, Federal Lxv, and other applicable codes and regulations governing the construction of such facilities. ❑ 3. Prior to the Final Map, provide a community services district or other legal (government) entity adequate to insure the operation, maintenance or repair of the sewage collection, treatment and disposal facilities. At a minimum, creation of the entity shall: a. Insure financing of operation, repair and maintenance. b. Provide qualified individuals and operational procedures for facility operations, repair and maintenance. C. Provide adequate resources to comply with all monitoring and other Regional Water Quality Control Board Waste Discharge Requirements. d. Provide adequate resources for facility inspections and reports. e. Provide' adequate resources and/or mechanism to insure adequate funding of a major sewage treatment and a disposal facility replacement or reconstruction if necessary. f. Provide a liability risk assessment for review by the County of Butte. g• Indemnify the County of Butte and communityservices district or other government entity for all claims and liability that may occur relative to the sewage disposal facilities. ❑ 4. Locate wastewater ponds separate, as required, from areas of residential development. Meet design requirements for.control of mosquitoes and nuisance insects in the wastewater ponds to the satisfaction of the appropriate Mosquito and Vector Control District. ❑ 5. If a homeowners association is provided, obtain approval of the By-laws and CC & Rs by Butte County Environmental Health, and, if required, by the California State Regional Water Quality Control Board. Approval shall be obtained prior to recordation of the Final Map. J. COMMUNITY SEWER SPECIAL NITRATE'AREA ❑ 1. In accordance with the Chico Area Nitrate Action Plan, provide for a connection to the public sewer, if practical and feasible. A determination that connection is not practical and feasible shall be made with the concurrence of the Central Valley Regional Water Quality Control Board and the Environmental Health Division. NOTE: Board staff is currently requiring a density of no greater than one equivalent residential unit per acre for development on septic tanks where sewer is not available. ❑ 2. If connection to a public sewer is not feasible prior to recordation of the Final Map: a. Provide the minimum required sewage disposal area as required by the Butte County Subdivision Ordinance and the Nitrate Action Plan. b. In conformance with the City of Chico Sanitary Sewer Master Plan, dated December 20, 1985, construct dry line sewer mains to serve the project and stubbed out to the property line to for future public sewer connection. C. Provide a community services district or other legal (government) entity adequate to ensure the maintenance of the dry sewer main and, when necessary, the activated sewer main. d. Sign and record sewer and storm drainage agreements for compliance with the Nitrate Action Plan. e. Place the following notes on the additional map sheet or document to be recorded concurrently with the Final Map: "Butte County permit for the installation of individual septic systems shall require the construction of sewer laterals for future public sewer connection." "Lots within this subdivision are subject to sewage flow restrictions that preclude high water use business activities." "The discharge of wastewater, other than domestic sewage, into individual sewage disposal systems requires approval of the California State Regional Water„ Quality Control Board, Central Valley Region." f. Provide CC & Rs for the project that specify maximum allowable domestic sewage flows per lot or parcel approved by the Regional Water Quality Control Board, Central Valley Region. Within the CC & Rs, provide for changes to be with the concurrence of the Regional Water Quality Control Board, Central Valley Region. K. SOLID WASTE DISPOSAL PLANS ❑ 1. Place a note on a separate document which is to be recorded with the map or on an additional map sheet of the Parcel Map or Final Map stating "Solid waste disposal shall be the responsibility of each property owner. Trash and debris shall be picked up weekly by either a trash collection company approved by the County of Butte or the property owner shall assume the responsibility for taking trash and debris to a County approved land fill". BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE BUILDING DIVISION FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: L. BUILDING PERMITS F-1 1. Prior to building permit issuance for a new residential dwelling unit(s), the applicant shall pay all applicable development fees at the rate in effect at the time of acceptance of the application. Such fees, may include, but not be limited to: Park Fee, School Fee, Drainage Fee, Permit and Plan Checking Fees, Water and Sewer Service Fees, and Fire Protection Fees. ❑ 2. Prior to building permit issuance for a new commercial or industrial development, or addition to an existing development, the applicant shall pay all applicable development fees at the rate in effect at the time of acceptance of the application. Such fees shall include, but not be limited to: School Fee, Drainage Fee, Permit and Plan Checking Fees, Water and Sewer Service Fees, and Fire Protection Fees. M. EXISTING STRUCTURES ❑ 1. Comply with the Uniform Building Code for property line clearances considering use, area and fire resistant construction of existing buildings. ❑ 2. Existing building(s) shall be made to comply with current Building and Zoning regulations for the intended new use of the building(s) or the existing building(s) shall be demolished. BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE PLANNING DIVISION FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: N. SITE DEVELOPMENT ❑ 1. Prior to the issuance of building permits, the plans, incorporating all applicable conditions, of approval shall be submitted to the Planning Division to verify compliance with said conditions of approval. ❑ 2. Where a proposed development will have 5 or more mailing addresses, the site plan shall show the location of centralized mail delivery units. Concrete bases and the centralized mail delivery units, shall be installed by the developer. Specifications of the concrete bases and mail delivery units shall be in accordance with the requirements of Postal Service and the Butte County Department of Public Works. O. LANDSCAPING ❑ 1. A Landscape and Lighting Maintenance District, Community Service District, Homeowners Association, or other alternative entity acceptable to the Planning Manager, shall be established to maintain landscaping. [❑ 2. A plan of the existing on-site mature trees, located in any area proposed for buildings and vehicular access, shall be provided to and approved by the Planning Division prior to the issuance of building permits and/or prior to grading or vegetation removal. The applicant shall minimize the removal of mature trees, where possible. A mature tree shall be defined as a tree with a trunk measuring 4 inches in diameter, 4 feet from ground level. Mature trees removed shall be replaced by planting replacement trees of equal number and not less than gallon size. ❑ 3. For division of land, where lots of 1 acre or less are created, street trees of not less than 15-gallon size shall be installed in accordance with Butte County standards as specified in . The street trees shall be planted at an average of one every 30 feet on streets inside the land division and at an average of one every 20 feet on Circulation Element roads. ❑ 4. All graded slopes, over 5 feet in height, or cn slopes greater than %, shall be seeded, planted, mulched or hydroseeded or otherwise protected to prevent erosion. A permanent irrigation system shall be installed for non-native vegetation. A one year Faithful Performance bond shall be posted to guarantee installation and established growth. ❑ 5. Prior to the commencement of grading and/or construction activity, all individual or groups of oak trees which are to be retained as part of the project, shall be fully protected through the use of root protection zones (RPZ). During construction, RPZs shall be established using protective fencing enclosing an area with a radius 1.5 times the distance from the trunk to the dripline. Within this protective buffer, no grading, trenching, fill, or vegetation alteration of any kind shall be allowed. The RPZs shall be maintained after the completion of construction in order to continue to protect the oak trees, but the fencing shall be removed. P. FINAL MAPS ❑ 1. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet which states, "Structures, dumping, fill material, vegetation removal and/or excavation shall not be allowed within the 50 foot No Disturbance Setback as depicted." The 50 foot "No Disturbance Setback" shall be measured from the top of bank or outer edge of the riparian vegetation along Creek, whichever is greater. Limited vegetation removal necessary for flood control and normal orchard operations is permissible within the "No Disturbance Setback;" however, all living and thriving native trees shall be retained and all vegetation removal shall be approved by the Department of Fish and Game prior to removal. ❑ 2. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet which states, "Residences constructed on lots and shall be constructed in a mann;r to bring the sound levels from dBA exterior source to 45 dBA interior." ❑ 3. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet which states, "At the time of building permit application, if a Deer Herd Impact fee(s) is currently in effect, it shall be paid prior to the issuance of the building permit." ❑ 4. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet which states, "Fencing for areas other than residential areas shall be limited to a maximum of 5 wire strands. The lower strand shall be at least 16" above the ground and the upper strand shall be no higher than 48" above the ground." ❑ 5. Prior to the recordation of the Final Map, the applicant shall pay all overdue or outstanding County fees. Q. GRADING ❑ 1. Place a note on a separate document which is to be recorded concurrently with the Final Map or on an additional map sheet stating "During construction, should any archaeological artifacts be discovered, the Planning Division shall be notified immediately, and all work shall cease until a qualified archaeologist has examined the artifacts and the site and submitted his or her findings to the Planning Division, and recommended clearance to continue. Recommencement of construction shall be upon the approval of the Planning Division. "Archaeological artifacts" are defined as follows: ❑ 2. Prior to any.clearing, grading and/or construction in a Federal or State identified 100 year floodplain and/or streambed the following entitlements must be obtained: a California Fish and Game 1604 Streambed Alteration permit and an Army Corps 404 permit or exemption certificate. R. ADDITIONAL APPROVALS ❑ I. This application is approved subject to the conditions contained herein. The tentative subdivision map on file in the Planning Division identified as Exhibit "B" and dated 520 is incorporated by reference. ❑ 2. All lots are subject to the payment of the 'North Oroville/Thermalito Traffic Impact Fees. ❑ 3. The applicant/owner shall sign the CSA 87 Traffic and Drainage Mitigation Agreement and/or pay the required fee(s) prior to the issuance of building permits. If the agreement is used it shall be recorded by the applicant prior to the recordation of the Final Map. ❑ 4. The applicant shall execute the Oroville Area Traffic Mitigation Fee Agreement prior to the recordation of the Final Map and place a note on the Final Map or separate document which is to be recorded concurrently stating, "A traffic mitigation fee of$750 shall be paid prior to the issuance of a building permit for each new or additional living unit." ❑ 5. To insure the maintenance and continuance of the orchard or other agricultural use of the property, all lot owners shall enter into the County approved Orchard Management Agreement. The agreement shall terminate in 10 years or upon a rezoning of the parcel/lot to a zone other than A-5 through A-160. The agreement shall be recorded and recording fees paid by the applicant. ❑ 6. The developer shall display a current County Zoning and County Land Use Map in the sales office at all times, and/or suitab_e alternatives. ❑ 7. All sales maps that are distributed or made available to the public shall include but not be limited to showing future and existing schools, parks, and streets. ❑ 8. The Sheriff Facilities Impact Fee shall be paid, pursuant to the provisions of Chapter 3, Article II of the Butte County Code, prior to the issuance of a building permit or prior to the issuance of a Use Permit for a Mobile Home Park. The fee amount shall be determined and calculated as of the date of application for building permit. ❑ 9. Prior to recordation of the Final Map or application for a building permit, the applicant shall pay the then-current established fee for the West Chico Fire Station Fund. ❑ 10. Approval of this request shall not waive the requirement to comply with all applicable Federal, State, and County laws, ordinances, and regulations in effect at the time of building permit application. BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE BUTTE COUNTY FIRE DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: S. FIRE CLEARANCE ❑ 1. Construction, installation or development of buildings and/or roads, driveways, gates and bridges on parcels/lots shall comply with the latest California Fire Safe Regulations—Public Resources Code 4290, 4291 and current Butte County Improvement Standards, whichever is stricter. ❑ 2. Prior to construction, a pressurized community water system for fire protection is required. Bonding may be allowed with the approval of the County Fire Chief. Average required hydrant spacing is feet, hydrant size inches, and residual fire flow of GPM. Fire hydrant identification, road reflectors or post reflectors acceptable to the County Fire Chief shall be installed or bonded, prior to Parcel or Final map recordation. Submit plans to the Fire Department for review and approval prior to construction. ❑ 3. Place a note on a separate document and recorded concurrently with the Parcel, Final map or an additional map sheet stating that "Fire suppression sprinkler systems shall be installed in all new residential dwellings in accordance with NFPA Standard 13D, unless a pressurized community water system with hydrants that meet Fire Department specifications serves the property." A note stating "Automatic Fire Sprinklers conforming to NFPA Standard 13D required" is to be added to all affected building plans. ❑ 4. In lieu of hydrant installation, prior to recordation of the Parcel or Final map, payment shall be made into the hydrant fund at the current rate per lineal foot of street frontage. ❑ 5. Prior to building construction, provide an all weather access of at least 10 feet wide and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of all structures. ❑ 6. Place a note on a separate document,which is to be recorded concurrently with the Parcel or Final map, or-on an additional map sheet stating, "Building identification and/or addresses shall be installed in conformance with Public Resources Code 4290 and shall be posted at the time of permit issuance and maintained continuously thereafter. Butte County Department of Development Services oQTrF0 TIM SNELLINGS,DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR o 0 7 County Center Drive o - o ;��. Oroville,CA 95965 0 --_-_-__ o (530)538-7601 Telephone (530)538-7785 Facsimile www.buttecou nty.net/dds ADMINISTRATION " BUILDING* PLANNING July 31,2007 TO: Enter Agency or Department FROM: Mark Michelena,Butte County Planning Division SUBJECT: Request for Comments on a Development/Land Use Application APPLICANT: Denise Younie& Denny Stevens, PRED07-0007 APN: 021-132-039 DATE OF Inter-Departmental Review: 8/22/07 IDR RESPONSE REGARDING COMPLETENESS OF APPLICATION DUE BY: 8/20/07 AGENCY/DEPARTMENT CONDITIONS/MITIGATION MEASURES DUE BY: 9/6/07 The Planning Division has received a project application as described below. This application is being provided to you for review. This is your opportunity to make comments regarding the completeness of this application, to be determined at the Inter-Departmental Review (IDR) Committee meeting on 8/22/07, and/or to recommend conditions and/or mitigation measures relevant to your agency's/department's area of expertise and jurisdiction. PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. COUNTY SUPERVISOR DISTRICT NO.: 4 ZONING: A-5, GENERAL PLAN: AR If a response cannot be submitted prior to the due dates listed above, please call Mark Michelena at 538-7376 or send him an email at mmichelena@buttecounty.net. You do not have to respond to this request if you have no comments to include. Thank you for your attention to this matter. Please return response to project planner. IDR COMMITTEE—APPLICATION COMPLETE ❑ No Name: Date: ❑ Yes Name: Date: GVROJECTSUrakit Merge DocumentAREQUEST FOR COMMENTS.doc "DRAFT"LEAD IN SHEET PROJECT NUMBER: W07-00o:Z AP#(s): Od 1- 13a -03 q APPLICANT: e, 4-- OtA nV OWNER(S): ,IZ- REPRESENTATIVE: ��/j/rte%�/l�l✓� �`y t% PROPOSED REQUEST: (by counter planner) i i FINAL REQUEST: (by project planner) LOCATION: (by counter planner) r FINAL LOCATION: (by project planner) EXISTING ZONING: GENERAL PLAN DESIGNATION: . SIZE: �� SUPERVISORIAL DISTRICT#: DATE RECEIVED: �1 COUNTER PLAN`NER'S INITIALS: ASSIGNED PLANNER: Date Pro'ect Assi ed: -1 o 7 IDR Date: 30 Day Complete: 17 Tentative Hearing Date: w COMMENT DISTRIBUTION LIST Project Number:t��07'00a 7 County Offices and Cities: Planning Division: X Assessor's Office-Mapping _ BCAG Environmental Health — City of Biggs _ ALUC Building Manager City of Chico _ APCD X LAFCo City of Gridley _ Butte Co.Farm Bureau X Agricultural Commission — City of Oroville Chico Airport Commission X Public Works/Land Dev _ Town of Paradise _ Chief Administrative Officer County Counsel Fire Protection: X California Department of Forestry _ El Medio Fire Protection District Domestic Water: S.F.W&P.Agency(OWID) _ Butte Water District — Del Oro Water Co. California Water Service Co. _ Thermalito Irrigation District _ Other Utilities: _ PG&E North-Chico _ Pacific Bell _ Chambers Cable TV PG&E South-Oroville Viacom Cable TV Irrigation District: Biggs/West Gridley Water _ Durham Irrigation Dist. _ Paradise Irrigation Dist. R.ichvale Irrigation Dist. Table Mountain Irrigation Dist. — Sewer: L.O.A.P.U.D. _ Sterling City Sewer Main Skansen Subdivision(CSA 21) Drainage Districts: fo Sacramento&San Joaquin Drainage Dist. Reclamation District No. 833 Drainage District 200 _ Rec amation istnct o. Reclamation District No.2056 State Agencies: 4- CalTrans _ . Dept.of Water Resources Dept.of Fish and Game Federal Agencies: U.S.Forest Service _ U.S.Bureau of Land Management Other Districts,Agencies,Committees,etc.: i Butte County Department of Development Services O�vT� 0. TIM SNELLINGS, DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR o 0 0 0 7 County Center Drive o _0 0 o Oroville, CA 95965 (530) 538-7601 Telephone cOUNty (530) 538-7785 Facsimile www.buftecounty.net/dds j www.buttegeneraIplan.net ADMINISTRATION * BUILDING" PLANNING September 4, 2007 Denise Younie 1530 Humboldt Road, Suite 5 Chico, CA 95928 Re: PRED07-0007 - A Pre-Development applicant to review a proposed rezone of a '16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. APN 021-132-039 Attendees: Denise Younie, Applicant Doug Fogel, BC Environmental Health Amber Pierce, Representative StuartEdell, BC Department of Public Works Chuck Thistlethwaite, BC Planning Manager Mark Michelena, BC Senior Planner Dear Ms. Younie: This letter is intended to provide a summary of the information provided in the Pre-Development meeting held on August 29, 2007, regarding your proposals for a re-zone and tentative subdivision map. The following written comments are included with this letter: 1. Butte.County Public Works—Draft conditions 2. Butte County Fire (CDF) Department—Draft Conditions 3. Butte County Agricultural Commissioner 4. Butte County Environmental Health 5. Butte County Building Division 6. City of Gridley 7. Gridley Unified School District k . Page 1 of 3 : s 8. Butte County Local Agency Formation Commission 9. CalTrans If staff receives anadditional comments from outside agencies, the will be sent out b email. Y g � Y Y The following is a brief summary of the comments discussed at the meeting: i Planning— 1. Discussed issues of creating 1-acre lots adjacent to the city of Gridley. Is not consistent with possible future urban expansion by the city. 2. The option of using the Flexible Lot Provision section (BCC 24-82) was discussed. Upon further review of BCC 24-82, the Flexible Lot option is not possible based on the parcel being in an Urban Area and that a minimum of 25 lots are required for community septic systems and community wells. 3. There is a possibility of applying for a PUD (Planned Unit Development) Rezone. It gives you the flexibility of smaller lot (clustering). I have enclosed the PUD section of the zoning code. Please review and contact me if you have any questions. If this method is chosen, the county would require comments from the City of Gridley with regard to the proposed lot layout/design of the project. 4. Not discussed at the meeting; but it will help in processing the project, if a biological study, wetlands survey and an archeological report be prepared and submitted with the application. Other studies may be required during project review. Public Works— 1. A preliminary drainage plan will need to be submitted as part of the application. Discussed the requirement of not increasing peak-storm runoff through detention or retention. Issue of sustained flows. 2. Discussed that different road improvement standards for City Street (Little Avenue) versus County Street (Little Avenue and Dewsnup Avenue) along parcel frontage. A permanent road division is required for roads and drainage maintenance. 3. Please review attached draft conditions of approval. Note that draft conditions submitted are based on preliminary review and based on plans submitted for the Pre-Development Meeting. The project will be re-evaluated at time of proj--ct application submittal. Environmental Health— 1. Parcels will need to show compliance with Appencix VII, wet season groundwater monitoring is necessary. This will be the case whether they go with individual septic systems or a community sewage system concept. 2. A community sewage system will.require compliance with Regional Water Quality Control Board requirements. 3. Recommend beginning their pre-application right away- in order to use the coming wet season. 4. Testing for arsenic in at least one test well may be necessary in order to prove potable water availability in this area. Again this will be necessary whether individual wells. or a community system is proposed. Page 2 of 3 -'fi 5. Community well would require additional construction standards and monitoring. California Department of Forestry— 1. Please review attached draft conditions of approval. Note that draft conditions submitted are based on preliminary review and based on plans submitted for the Pre-Development Meeting. The project will be re-evaluated at time of project application submittal. Agricultural Commissioner— 1. No concerns. Parcel not currently in production. Note that these issues are not exhaustive. During the processing of the actual application, other issues may arise that could place significant conditions on your project. If you have any questions, please do not hesitate to call meat 530-538-7376, or email atmmichelena@buttecounty.net. Sin e ellyy, Mark Michelena Senior Planner Cc: CR Land Company The Engineering Group Enc Page 3 of 3 24-210 PUD (Planned Unit De---'-)pment) Zone. Page 1 of 2 Chapter 24 ZONING* Article III. Zone Districts* 24-210 PUD (Planned Unit Development) Zone. (a) Purpose. The purpose of the Planned Unit Development(PUD)Zone is to allow diversification in the relationship of various uses, buildings, structures, lot sizes and open spaces, to encourage and take advantage of opportunities for more integrated, flexible and superior design than is available through the application of conventional regulation which anticipates individual lot development. It is the intent of this zone to provide a flexible means to implement the goals, policies and programs of the Butte County general plan while ensuring the provision of adequate standards to protect the public health, safety and general welfare. It is also the purpose of this zone to encourage innovative, high-quality design, efficient use of land and modern site planning for residential, agriculture, commercial and industrial purposes. (b)Adoption and use limitations. A planned unit development(PUD)zone shall be established by the adoption of an ordinance by the board of supervisors rezoning the property to the Planned Unit Development Zone and adopted by reference a land use and development plan, the provisions of which, together with any other provisions which in the opinion of the board of supervisors are necessary and included in the ordinance, shall constitute the regulations for the use, improvement and maintenance of the property within the boundaries of the zone. Except as hereinafter provided, no use, building, structure or parcel may be made, created or otherwise altered except as it complies with the ordinance adopted pursuant to this chapter. (c) Land use density area. The residential land use density of any planned unit development zone shall not exceed that allowed by the Butte County general plan designation for the proposed site. (d) Preapplication conference. Before filing any application for planned unit development zoning, the prospective applicant is encouraged to submit to the planning division preliminary plans, sketches and basic site information for consideration and advice as to the relationship of the proposed development to the applicable general and specific plans and policies. Other departments and agencies with responsibilities for review, comment or other regulation of the proposed development may participate at the discretion of the director of development services, and with the participation of appropriate responsible agencies, pursuant to section 210800.3 of the Public Resources Code and section 15066 of the California Environmental Quality Act (CEQA) Guidelines. (e) Development criteria. In addition to the criteria listed on the attached sheet[of Ordinance No. 3176], the following items are required: (1) Each PUD shall, as a minimum, provide off-street parking in accordance with chapter 24, off- street parking. Additional parking equal to fifty (50) percent of the required spaces shall be provided unless modified by the director of development services or planning commission. (2) In residential PUDs plans shall provide that not less than twenty-five (25) percent of the residential portion of the project shall be utilized for purposes other than residential dwellings and paved areas for vehicular uses. No less than forty-five (45) percent of such twenty-five (25) percent shall be utilized for recreation or park areas available for use by all residents. The same criteria for open space area shall apply to agricultural PUDs which may or may not include residential uses. (3) Each industrial or commercial PUD shall provide that not less than ten (10) percent of the project shall be developed as landscaped areas. (4) Each PUD shall obtain tentative clearance from the Butte County health division, division of environmental health, for sewage disposal and water supply for the project at the density proposed. Soil tests, drilling of test wells or geologic reports are among the steps that may be required to provide evidence of sewage disposal capability and water availability for domestic use. Minimum lot areas for septic systems must comply with section 20-120.1 of the Butte County subdivision ordinance and appendix VII of the improvement standards for subdivisions. (f)Applying for a rezone to PUD. The planned unit development is intended to allow diversification in the relationship of various uses, buildings, structures, lot sizes and open spaces while ensuring substantial compliance with the general plan and the intent of the County Code in requiring adequate standards necessary to satisfy the requirements of public health, safety and http://municipalcodes.lexisnexis.com/codesibutteco/ DATA/CHAPTER24/Article I1I Z... 8/30/2007 24-210 PUD (Planned Unit De ' ipment)Zone. Page 2 of 2 general welfare. Each application for a rezone to PUD shall include: (1)A completed rezoning application form. (2)A completed environmental information appendix"E"form. (3) Copies, as specified in the rezone application, of a preliminary development plan and a reproducible master, the plan should be drawn to scale and indicate: a. Proposed use(s) of all land in the subject area; b. Existing natural land features and topography of the subject area; c. Circulation plan for all vehicular and pedestrian ways, including typical section of roadways; d. Metes and bounds of the subject property; e. Location and dimensions of all existing structures; f. Locations of landscaping, parking areas, fire hydrants, street lighting, typical proposed structures, sewage disposal and water supply systems; g. Preliminary grading for the development. (4)A title report which includes a written legal description of the subject area, that report to be not more than six(6) months old. (5)A preliminary report on provisions for and location of storm drainage, sewage disposal and public utilities. (6)A statement which describes the organization of any proposed homeowners' association, listing the intended covenants, conditions and restrictions. (7)A statement from the applicant explaining how the proposed development conforms to, and is consistent with, the general plan. (8) Include a statement that describes the intended height and bulk of the structures and their relationship to the surrounding areas. (9)A statement concerning any proposed phasing of the project, indicating the sequence and timing of each phase and how each unit would independently constitute reasonable and orderly development of the area. Additional information may be required by the planning commission or board of supervisors at the time of any public hearing. (g)Application. Any application for rezoning to planned unit development shall be accompanied by a proposed development plan to be reviewed for tentative map approval pursuant to chapter 20 of the Butte County Code. All applicable fees will be submitted as part of the application. Such fees will include those required fora tentative subdivision map application. As to form and content, the proposed development plan map and the review process shall conform to the requirements of this Code for a tentative map. The director of development services shall set the application for hearings as in the case of other rezoning and tentative map applications. After reviewing the recommendations from the planning commission, the board of supervisors will approve/deny the tentative map at the same hearing as the PUD rezone is approved/denied. (Ord. 3850, § 13, 4-22-03: Ord. No. 3176, § 1(Exh. A), 1-24-95; Ord. No. 3906, §2, 3-22-2005) << previous I next>> http://municipalcodes.lexisnexis.com/codesibutteco/ DATA/CHAPTER24/Article_III_Z... 8/30/2007 O LAND USE ELEMENT O AGRICULTURAL RESIDENTIAL Primary Uses: Agricultural uses and single-family dwellings at rural densities. Secondary Uses: Animal husbandry,forestry, intense animal uses, home occupations, mining, outdoor recreation facilities, environmental preservation activities, airports, utilities, public and quasi-public uses, group quarters, care homes and transient lodging. Site Designation Criteria: 1. Beyond service areas of community water and sewer systems. 2. Less than 30% slopes. 3.. Adjacent or near to existing roads and public utilities. 4. Not within flood plains or known active faults. 5.. Past official actions. Intensity of Use: Minimum parcel size of one to forty acres. One single-family dwelling per parcel. Home occupations, farm animals, other uses and setbacks regulated to maintain rural character. Consistent Zones: A-20, A-40, TM-20, TM-40, FR-20, FR-40, & C-F. Conditionally Consistent Zones: A-5, A-10, TM-1 thea TM-10, FR-2 thru FR-10, SR-1, AR- MH-3, RT-1A, & PA-C, subject to findings of conformity with Conditionally Zoning and Development criteria listed below. Conditional Zoning and Development Criteria: 1. Compatible with neighboring agricultural activities.. 2. Evidence of adequate water and sewage disposal capacity. 3. Availability of adequate fire protection facilities. 4. Adequately maintained approved road access with Sufficient capacity to service area. .5. Reasonable accessibility to commercial services and schools. Zoning Factors: t. Existing parcel sizes and residential densities.. 2. Slope., 3. Soil conditions and water availability. 4. Effects on adjacent uses, crop production, livestock grazing, forestry, resources extraction and wildlife habitat. 5: Proximity to public roads and other public facilities. 6. Distance from airports, railroads and industrial uses. 7. Existing utilities and drainage facilities. O BUTTE COUNTY GENERAL PLAN O ADOPTED BY RESOLUTION 73-222 O October 30. 1979 O LUE - 51 ❑ LAND USE ELEMENT 0 8. Potential for surface cracking, landslides and erosion. 9. Effects on noise, traffic flow and safety, water quality, air quality, wildlife habitat and general environmental quality. 10. Local desires. 11. Potential for pest insect breeding. O BUTTE COUNTY GENERAL PLAN O ADOPTED BY RESOLUTION 79-222 O October 30, 1979 O LUE - 52 1! BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE#: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a j 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: A. STREETS ❑ 1. Prior to or concurrently with the recordation of the Final Map, provide a fully executed road maintenance agreement for all non-publicly maintained access roads on the County approved form. A note shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Final Map stating: "In accordance with Civil Code Section 845, maintenance of the road as shown hereon shall be shared by those properties with a legal interest in it." ® 2. All access rights shall be reserved by deed per County Ordinance, offered for dedication, and depicted on the Final Map. Place the following note on the Final Map: "agpproved road name is a non-exclusive easement for ingress, egress, road and public services purposes, to be reserved in deeds and is hereby offered for dedication to the County of Butte." ❑ 3. Prior to the recordation of the Final Map, demonstrate to the Department of Public Works that there is approved access conforming to County Code to each parcel from a publicly maintained road. ® 4. Prior to or concurrently with the recordation of the Final Map, Deed to Butte County in fee simple 30 feet of right-of-way from the centerline of French Ave., Little Ave. and Dewsnup Ave. along the entire property frontage. The right-of-way shall be sufficient for the installation of Improvement Standard No. S-5 at all street intersections. ❑ 5. Prior to or concurrently with the recordation of the Final Map,relinquish abutter's rights of access to Butte County along the I frontage of parcels 1,except at approved access points. ® 6. Prior to recordation of the Final Map, provide street name signs per requirements of the Department of Public Works. Street names shall be reviewed by the County Address Coordinator and one name for each new street shall be recommended to the Board of Supervisors for approval prior to recordation of the Final Map. A minimum of five alternate names for each new street shall be submitted. ® 7. Prior to final road inspection, install all necessary traffic safety signs including stop signs. ® 8. Prior to recordation of the Final Map, obtain an encroachment permit and improve all new and existing driveway approaches to publicly maintained roads as specified in the County Improvement Standards and the terms of the encroachment permit. ❑ 9. Prior to the recordation of the Final Map,obtain an encroachment permi and construct a standard S- 181 road approach in accordance with County Improvement Standards. Adequate sight distance at the intersection of access road and I shall be provided. Right-of-way required for construction of road approach and roadside drainage shall be provided. ® 10. Provide cul-de-sacs designed and constructed as specified in the County Improvement Standards. The Final Map shall show the cul-de-sacs. ❑ 11. Prior to the recordation of the Final map, construct or provide a performance bond and labor and material bond for the construction of a 1/2+12' /full street section on French Ave., Little Ave. and Dewsnup Ave.to an RS-2B geometric standard. Minimum structural section to be I"AC,and I"AB, prime coat, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval prior to construction. "R" value determination and other data may be required to support the section design. Form a Zone of Benefit or other approved maintenance entity within the county's Permanent Road Division for operation and maintenance of interior street and storm drain facilities. ® 12. Prior to the recordation of the Final map, construct or provide a performance bond and labor and material bond for the construction of a ''/z+ 12' street section on French Ave., Little Ave. and Dewsnup Ave. to an RS-213 road standard with vertical curb, gutter, and sidewalk and 3" AC, and 12" AB, prime coat, fog seal and 95 % relative compaction. Construct a full street section on interior streets to an RS-2B road standard with rolled curb, gutter, and sidewalk and 3"AC, and 12" AB, prime coat, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval prior to construction. "R"value determination and other data may be required to support the section design. Form a Zone of Benefit or other approved maintenance entity within the county's Permanent Road Division for operation and maintenance of interior street and storm drain facilities. ❑ 13. Prior to recordation of the Parcel Map, provide approved access to each parcel from a County maintained road or from a state highway. Improve parcel I frontage to RS J LD J and access road to parcel being divided to RS J LD j County Improvement Standards. (If the parcels being created are 5 acres or less in gross area, submit road and drainage plans to the Department of Public Works for plan checking and approval prior to construction). ❑ 14. Prior to recordation of the Parcel Map, submit road and drainage improvement plans for the installation and construction of the street frontage improvements on I to I County Improvement Standards. Improve parcel I frontage to a ''/z+ 12' / full street section on I to an RS J road standard including, but not limited to curb, gutter and sidewalk for parcels with gross acreage of one acre or less. Construct, or provide a performance bond and labor and material bond for the construction prior to recordation of the Parcel Map. ® 15. Street lighting shall be provided in accordance with Butte County requirements,accepted design criteria,and recommendations of Pacific Gas&Electric Company. Where the County has determined that it is not detrimental to health and safety,the developer may choose to only install electrical outlets for streetlights. If streetlights are to be installed,the annual energy costs shall be funded through a County Service Area(CSA)or other entity as approved by the Public Works Director. The developer must complete the formation of the CSA or other approved entity prior to recordation of the Final Map. The formation of a CSA or other approved entity will require the developer to fund the service until the beginning of the firs'fiscal year in which service charges can be collected and to agree to an annual maximum service charge to ensure continued operation of the facilities. ❑ 16. Construct access to lot I per Butte County Code 20-136. Submit design to the Department of Public Works for review and approval prior to construction. ® 17. Prior to recordation of the Final Map, construct or provide a performance bond and labor and material bond for the construction of a landscaping strip within the public right-of.--way adjacent to French Ave.,Little Ave. and Dewsnup Ave. if driveways do not front on French Ave.,Little Ave. or Dewsnup Ave. Submit design to Land Development Division for approval prior to construction. The Developer must complete the formation of a County Service Area(CSA)or other Department of Public Works approved maintenance entity for landscaping prior to recordation of the Final Map. The maintenance entity formation process will require the Developer to fund the service until the beginning of the first fiscal year in which service charges can be collected for the maintenance entity, and agree to an annual maximum service charge to ensure continued maintenance of the facilities. B. DRAINAGE ® I. Prior to recordation of the Final Map,a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall detail existing drainage conditions and shall specify how drainage waters shall be detained or retained on-site and/ or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. If storm drainage facilities serve new public roads, the developer must complete the formation of a County Service Area (CSA) or Zone of Benefit within a Permanent Road Division or other Department of Public Works approved entity prior to recordation of the Final Map. The CSA formation process will require the Developer to fund the service until the beginning of the first fiscal year in which service charges can be collected for the CSA, and agree to an annual maximum service charge to ensure continued operation of the facilities. ® 2. Prior to final improvement inspection by the Department of Public Works, all new drain inlets shall be labeled with the county approved drain marker per County Standard S-40. Improvement plans shall show and/or note the requirements for labeling inlets pursuant to Butte County Standard S-40. ❑ 3. Prior to recordation of the Final Map, establish 100 year flood plain elevations and the lowest floor elevations for any structures, in accordance with Butte County Code §26-25. Show on the additional map sheet the elevations(by contours)and the location of an accepted NGVD29 (National Geodetic Vertical Datum of 1929)benchmark and a temporary benchmark on-site. ❑ 4. Prior to, or concurrently with the recordation of the Final Map, pay the applicable drainage fees in effect at the time of recordation of the Final Map for the I drainage area. (The current fee is now $ /acre.) ® 5. Prior to grading, a Construction Storm Water Permit will be required by the State Water Resources Control Board if the project results in a disturbance (including clearing, excavation, filling, and grading)of one or more acres. The Permit must be obtained from the State Water Resources Control Board prior to construction. If a Construction Storm Water Permit is required, place a note on an additional map sheet that states: "The development of this Final Map required a construction storm water permit. Construction activities that result in a land disturbance of less than one acre,but which are part of a larger common plan of development, also require a permit. Development of individual lots may require an additional permit(s)." C. FINAL MAP ® 1. Show all easements of record on the Final Map. ® 2. Prior to or concurrently with the recordation of the Final Map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7,of the California Government Code commencing with Section 66492. ® 3. Pay the recording fees in effect at the time the Final Map and related documents are recorded. ❑ 4. Prior to or concurrently with the recordation of the Final Map, pay all applicable assessments established by affected assessment districts, in full. ❑ 5. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Final Map regarding�. 6. Prior to recordation of the Final Map, a preliminary soils report or acceptable soils waiver letter prepared by a California registered civil engineer and based upon adequate testing shall be submitted to the Department of Public Works for review and approval. U f _ Butte County Depai ..:ent of Development Servit;Cs QTT TIM SNELLINGS,DIRECTOR PETE CALARCO,ASSISTANT DIRECTOR 0� F0 0 0 7 County Center Drive o o Oroville, CA 95965 0 - ._ o (530)538-7601 Telephone 0 0 (530)538-7785 Facsimile cOUN'�y August 29,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the Cary of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue,between French Avenue and Dewsnup Avenue,adjacent to the Ci hof Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard co of the PP g P Y PY application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner,so that preparations can be made for the IDR meeting on 8/22/07. Do you find this application complete? ❑ NO. Please respond prior to or at the IDR meeting,regarding completeness of application. What is needed to make the application complete? ❑ YES. My Department's conditions and/or mitigation measures are attached or will be provided at the IDR meeting. If conditions cannot be provided at or prior to the IDR meeting they must be provided no more than 1 week after the meeting. Standard Conditions are attached for your convenience. Provide title report for more detailed analysis PLEASE SEND YOUR RESPONSE TO: mmichelena@_buttecounty.net Signature: E. Schroth Department: Public Works Date: 8/1/07 K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP " APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE BUTTE COUNTY FIRE DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: S. FIRE CLEARANCE ❑ 1. Construction, installation or development of buildings and/or roads, driveways, gates and bridges on parcels/lots shall comply with the latest California Fire Safe Regulations—Public Resources Code 4290, 4291 and current Butte County Improvement Standards, whichever is stricter. X 2. Prior to construction, a pressurized community water system for fire protection is required. Bonding may be allowed with the approval of the County Fire Chief. Average required hydrant spacing is_800_feet, hydrant size_6_inches, and residual fire flow of —1,000 GPM. Fire hydrant identification, road reflectors or post reflectors acceptable to the County Fire Chief shall be installed or bonded, prior to Parcel or Final map recordation. Submit plans to the Fire Department for review and approval prior to construction. ❑ 3. Place a note on a separate document and recorded concurrently with the Parcel, Final map or an additional map sheet stating that "Fire suppression sprinkler systems shall be installed in all new residential dwellings in accordance with NFPA Standard 13D, unless a pressurized community water system with hydrants that meet Fire Department specifications serves the property." A note stating "Automatic Fire Sprinklers conforming to NFPA Standard 13D required" is to be added to all affected building plans. ❑ 4. In lieu of hydrant installation, prior to recordation of the Parcel or Final map, payment shall be made into the hydrant fund at the current rate per lineal foot of street frontage. X 5. Prior to building construction, provide an all weather access of at least 1.0 feet wide and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of all structures. ❑ 6. Place a note on a separate document, which is to be recorded concurrently with the Parcel or Final map, or on an additional map sheet stating, "Building identification and/or addresses shall be installed in conformance with Public Resources Code 4290 and shall be posted at the time of permit issuance and maintained continuously thereafter. DRkFU I Clear Day Page 1 of 2 Michelena, Mark From: Read, Darren [Darren.Read@fire.ca.gov] Sent: Thursday, August 02, 2007 7:57 PM To: Michelena, Mark Subject: FW: YOUNIE PRED07-0007 IDR set for 8/22/07 Attachments: YOUNIE PRED07-0007 Standard Conditions.doc; YOUNIE PRED07-0007 IDR Eval COA.doc Mark, No conditions for the rezone. However depending on the way its developed later fire conditions 2 and 5 would be required. Darren Read Fire Captain, Fire Protection Planning Butte Unit Fire Prevention Bureau CAL FIRE/Butte County Fire Department 176 Nelson Ave. Oroville CA 95965 (530) 538-7888, Office (530) 538-2105, Fax From: Upton,Tiffany [mailto:TUpton@buttecounty.net] Sent:Tuesday, July 31, 2007 11:56 AM To: Aguila, Michelle; Banner, Brad; Betts, Steve; Breedon, Dan; Castanon, Yvette; Cochran, Ada; Fogel, Doug; Gillis, Kathy; Jolliffe, Stacey; Kirk, Maureen; Loker, Sally; Lucas, Steve; Damon, Matt; Nelson, Carl; Read, Darren; Reimers, Ken; Schroth, Eric; Thistlethwaite, Charles Subject: YOUNIE PRED07-0007 IDR set for 8/22/07 Good Morning, Please review the attached documents as they are bieng provided to you for your comments. Please contact Mark Michelena at mmichelena([,buttecounty.net with your comments and questions. Thank you, Tiffany Upton 8/7/2007 Butte County. Depat lent of Development Servit_; uTT TIM SNELLINGS,DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR o �0 0 0 7 County Center Drive o o Oroville, CA 95965 0 o (530) 538-7601 Telephone (530)538-7785 Facsimile August 2,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue,between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence _s routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner,so that preparations can be made for the IDR meeting on 8/22/07. Do you find this application complete? Parcel is situated adjacent the Gridley city sphere of influence on the north and east and General Plan designation is AR and MDR. Existing residential development and infrastructure provide a good Agricultural buffer on the north and south boundaries. No agricultural buffer is required on the east and west boundaries. The smallest subdivision parcel units are presently limited by zoning to 5 acres.Of the 19 adjacent parcels the sizes range from .15 acres to 18.6 acres.They are predominantly(14/19)2 acres or less.The parcel is completely framed by developed infrastructure. Signature: �Rq6ert C. 9fla 0MUDAk. Commissioner Department: Agriculture Date: August 2,2007 K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 (8/28/2007 09:41 CSN) Building Division Clear file Items of inquiry Structures appear to be located on one,proposed one acre lot. -Verify if applicant will keep structures on lot or remove them by demolition or relocation? History SF (Building Permit# 37-65B) Finaled 9/23/1965 Miscellaneous agriculture structures on site appear to be established prior to April 9, 1982. This date was when Agricultural Building Exemption Permit requirement was established. (8/1/2007 11:36 CLW) Soil is probably Honcut Loam, however, groundwater monitoring would be required for any future subdivisions. August 17, 2007 b 60Nrr Mark MichelenaZQQ, Butte County Planning Division ��'dc�s�•? 7 County Center Drive Oroville, CA 95965 Re: Request for Comments on development of Assessor Parcel No 021- 132-039; Denise Young and Denny Stevens. \ Dear Mr. Michelena: The City of Gridley has received the above-noted request for comments on City Qfa rezone application to change the above-noted County land use designation for this parcel from A-5 to AR-1. It is our understanding that this change would allow development of up to 14 parcels adjacent to the City of Gridley. Gridley As background, City staff has met with the applicants on several occasions to discuss annexation of this property. The applicants were informed of our 685 Kentucky Street current General Plan Update and Sphere of Influence Amendment process that Gridley, CA 95948 projects growth to occur north of the current City limits to South Avenue. The City is concentrating efforts on completing their General Plan Update and is not entertaining additional Sphere Amendments at this time. However, depending on growth pressure and development rates, the City may look at including this property at a future date. We anticipate completion of our current Sphere Amendment within 18 months. While there may be a market for this type of development(1 acre lots), urban development should occur within City limits. Allowing this type of development seems to be poor planning that will have long term consequences contrary to both our goals of achieving smart growth and preserving agricultural land. When additional information is submitted by the applicant, we would appreciate the opportunity to review and comment. If you would like to discuss this matter further, please feel free to call me at(530) 846-3631. Sincerely, Andrea Redamonti Community Development Director COUNCIL•ADMINISTRATION • FINANCE• 530.846.5695 PLANNING • PUBLIC WORKS • 530.846.3631. BUILDING• (530) 846-3632 FAX-530-846-3229 Y : BUTTE LINTY CO _ Hca AUG 3 0 2007 DEVELOPMENT SERVICES Gridley Unified School District 429 Magnolia Street Gridley, California 95948-2533 Phone (530)846-4721 Fax (530)846-4595 Clark S. Redfield, Superintendent August 27, 2007 Butte County Department of Development Services Mark Michelena 7 County Center Drive Oroville, CA 95965 Dear Mr. Michelena, Re: Denise Younie and Mark Stevens development PRE07-0007 The following are Gridley Unified School District comments relative to development PRE07-0007. The following issue should be addressed: 1. Bus pull out for student pick ups: As the community of Gridley continues to grow the-School District will b&fesponsible to pick up and transport more and more •students. Bus pull outs for loading and unloading make for a safer environment. 2. There is no mitigation for parking space that is advantageous to a community. The Gridley Unified School District has been working with the City of Gridley to develop joint use spaces. 3. There is no mention of mitigation for the short fall between actual cost of housing students and the amount the school district can charge for developer fees. It would be in the best interest of the county to encourage, strongly encourage developer to reach an agreement with the school district for full funding for the impact of potential new students. Thank you, Clark S Redfield Supernnfendenf Gridley Unified School-D•istrict -'. :' .,.:,': Michelena, Mark From: Matthew Friedman [matthewfriedman@dot.ca.gov] Sent: Thursday, August 02, 2007 9:_26 AM To: Michelena, Mark Subject: Younie Stevens Development/Land Use Applicat on (PRED07-0007) Dear Mr. Michelena, Thank you for the opportunity to comment on the Development/Land Use Application (PRED07-0007) for the Younie and Stevens project. The project proposes a change of zoning for 16 acres in the vicinity of Gridley from "A-5" to "A-1" to allow for the creation of 16 single-family lots. Based upon minimal impacts to the State Highway System, we have no comments. Matt Friedman, Transportation Planner Caltrans District 3 703 B St. Marysville, CA 95901 (530) 741-4004 i I i 1 BUTTE LOCAL AGENCY FORMATION COMMISSION 1453 Downer Street, Suite C a Croville, California 95965-4950 (530)538-7784 0 Fax (530)538-2847 o www.buttelafco.org rE L P MEMORANDUM TO: Mark Michelen,ate, Senior Planner, Butte County Planning Division FROM: Steve Betts, Principal Planner SUBJECT: PRED 07-0007—Denise Younie &Denny Stevens DATE: August 8, 2007 The affected parcel is located within the boundaries of the following local agencies (TRA 075- 014): • Gridley-Biggs Cemetery District • Butte County Mosquito &Vector Control District • Gridley Union Elementary School District • Gridley Unified School District • Butte Community College District • CSA 34 - Gridley Swimming Pool • CSA 37 - Gridley Biggs Ambulance • CSA 164—Butte County Animal County District • Butte County Resource Conservation District • Butte Water District • Reclamation District 833 Thank you for the opportunity to review the above referenced project. While LAFCO has no specific land use jurisdiction over this project located in the unincorporated area of the County, we do have concerns regarding the nature of the development proposal. LAFCO has a fundamental responsibility pursuant to California Government Code Section 56000 to discourage urban sprawl, preserve open space and prime agricultural lands, ensure the efficient delivery of governmental services, and encourage the orderly formation of local agencies. With this legislative charge,please consider the following comments at this preliminary stage in the project review. 1. The proposed project encompasses 16± acres of agricultural lands on the south periphery of the City of Gridley, outside of but adjacent to the City of Gridley city limits and the City of Gridley's Sphere of Influence. These lands are currently zoned for agricultural uses and are intended for agricultural uses and rural residential development. This project would alter the land use and place the project in direct conflict with surrounding agriculturally zoned lands. This type of development appears Mark Michelena August 8,2007 Page 2 of 3 to be inconsistent with the LAFCO responsibility to discourage urban sprawl and preserve agricultural lands. The following LAFCO Policies apply to the proposal: 2.3.1 Urban Development. LAFCO will encourage proposals that result in urban development to include annexation to a city wherever reasonably possible, and discourage proposals for urban development without annexation to a city. 2.6 Compact Urban Form and Infill Development Encouraged. When reviewing proposals that result in urban development, LAFCO will consider whether the proposed development is timely, compact in form and contiguous to existing urbanized areas. LAFCO will favor development of vacant or under-utilized parcels already within a city or other urbanized area prior to annexation of new territory. However, the Butte LAFCO recognizes that under certain circumstances the redevelopment of underutilized land and infill parcels are subject to the desires of the property owners necessitating the annexation of vacant lands on the periphery of the city boundaries. 2.7 Adequate Services. LAFCO will consider the ability of an agency to deliver adequate, reliable and sustainable services, and will not approve a proposal that has significant potential to diminish the level of service in the agency's current jurisdiction. The agency must provide satisfactory documentation of capacity to provide service within a reasonable amount of time. For this proposal, the site should be annexed into the City of Gridley in order to provide the project site with municipal services. Please note that the three parcels to the north of property should be included in any annexation proposal to prevent piece-meal annexation and to ensure orderly boundaries. Shou13 the proposal go forward without annexation, LAFCO may have a difficult time making the affirmative findings to approve any action(such as annexation to a special district or creation of a new special district) that would be required for the proposal. The City of Gridley is currently in the process of updating their General Plan, along with a Sphere of Influence update. The applicant and the County should consult with the City of Gridley to determine the City's interest in including this parcel in the SOI update and possible annexation into the City. 2. If urban type services(e.g. street lighting, landscaping, drainage, fire protection, etc.) for the new development are proposed to be provided through annexation to an existing local agency or by a formation of a new local agency such as a county service area Mark Michelena August 8,2007 . Page 3 of 3 (CSA) or a community service district(CSD), LAFCO as the authorizing agency, should be consulted early to allow for a meaningful analysis of the issue prior to County consideration of the development application. This early coordination will allow for the anticipated LAFCO action to be fully integrated into the project review process and should result in the proposal being: A. Fully described in the project description; and B. Fully addressed in the appropriate environmental documents; and C. Circulated to LAFCO for review as an agency with an approval role; and D. Fully integrated into the public hearing process. The absence of this early coordination and failure to address the LAFCO related issues as described will require additional environmental review and related studies at such time an annexation/formation is requested resulting in unnecessary costs and delays. It should be understood that such a request would be reviewed based on state law and local LAFCO policies which are clearly directed at maximizing service efficiencies, minimizing the creation of new governmental entities, limiting urban sprawl and directing new development to areas with existing urban service providers. 3. The project site is located in an area that lacks adequate storm water drainage facilities and is within the boundaries of Reclamation District 833. RD 833 should be consulted early to ensure that the proposal would not cause any increase in storm water drainage into RD 833 facilities,which are already operating at full capacity during winter storm events. 4. The proposal could have an impact to agricultural uses on the adjoining parcels. Will the project be designed to incorporate a 300-foot building setback, consistent with County policies? These comments are preliminary based on the general project descriptions provided. LAFCO will review the project in greater detail during the CEQA review process. If you have any questions please contact me at your convenience. PROJECT COORDINATION FORM DATE of IDR: 8/29/07 PLANNER: Mark Michelena PROJ. NAME: Younie, Denise PROJ. NUMBER: PRED07-0007 TYPE: Completeness of Application APN: 021-132-039 Evaluation DEPARTMENT COMMENTS READY FOR HEARING? PLANNING _. ���- , l �It'% �? l,.�i1Y1l �l rl " � Si �'�x�0 C �1 ,,, w/x�►^ Y'S/r?a� cry 6;1,d1e Imp aL 4 PUBLIC WORKS And, x" � s a �, A 0 , � � L ENVIRONMENTA HE LTH0MM W". odd. co >� AN MOM-(�14 Id �"C.OU4' 0214177v? v4 ; eel'e lel Ih COUNTY COUNSEL AG. 1110 coravo� ' blo�(okxePy p1kod,,dvv1, BUILDING ASSESSOR FIRE .(0 ore vidd GAADMINISTRAqV1/&Agenda�20f719DRMAgenda,�PROJECT C ORDINATION FORM.doc A ►�'�'�j�� � f77 ""'." v'' -fes-''�1`v'1 • � i e � � ;• � ' 4 t_ J ' I I City of Gridley MmAR ARGridley --L F1�Qpw c A-5 . . m AR A-5 Gridl Urban Area OU Rd Ir �_ ♦T ss(j 5 1:0QEFO g } f r w iie t a ,+ n C]� �" ❑J r3^ '9 rel �.n q�0 �! �- - a. �� NO 71 10 to, tj LIJ NA s CG 4 rr •^ L Q6 0 ,..,„ '� ; i, 4(.f},'..• ti � '���r'��lit �. .r. Or • 1• f i✓ $ l c .�FJ In ,3 r ll• � w �y0�� T4.I 960614. •C•• �,. I li y.y v r'�,`-' r•7 S' i 1 t� tiL.fi.. •Ot Ooh•• d - '+�-�•L L'V ~-'' .. •` ()"r , ���+�r � � try .. '•�i� ' •:. .•.... I -y - - - - of i 4-- - • 4-t`', •' +1 `�`�' � - _ # -i ,�; i,—J••••e U �� t' �la'(�)))) o Y*i $tom � ,; 10 I � �s • r• war wry r S• �,f; �� 7r- 14( �74__1 _ � °r: _ - bks � *.�c .. i r,�� •+ ..r '� -•�' d ', �" - S n _ 24-82 Flexible lot size provision- Page 1 of 5 Chapter 24 ZONING* Article III. Zone Districts* 24-82 Flexible lot size provisions. (a) Purpose and intent. The purpose and intent of the flexible lot size provisions contained in this section is to increase the retention of natural resources, open space, and wildlife habitat, avoid hazardous areas, and further implement the goals and policies of the Butte County General Plan. Following are specific goals of the flexible lot size provisions: (1) Provide an incentive to create quality residential developments, particularly where special conditions exist that prevent the attainment of the maximum permitted density of a property that could otherwise be attained through conventional subdivision desicn; (2) Require the avoidance of hazardous areas (e.g., one hundred (1 00)year flood zones) and preservation of environmentally sensitive areas (e.g., wetlands and special-status species habitat), productive agricultural and timber lands, and important cultural and scenic resources; (3) Facilitate innovative development concepts that achieve greater consistency with the Butte County General Plan; (4) Provide permanent open space for a variety of natural resource purposes; (5) Preclude additional development that may conflict with neighbo.-hood quality of life; (6) Provide increased open space which may include active and passive recreation features that reduce demand for public park land; (7) Reduce infrastructure requirements by reducing the length of streets and water and sewer lines and by potentially reducing street width requirements. (b)Applicability. The provisions contained in this section are applicable, as described in this section: (1) Processing requirements. Allowed by right in all residential zoning districts that allow flexible lot size provisions, as specified in this section. A conditional use permit, planned unit development(PUD), or other rezoning application is not required; (2)Applicable parcel size. Parcels that could potentially be subdivided based on the minimum lot size specified in the applicable zoning district; (3) Land divisions. This process is applicable to all subdivisions, parcel maps and parcel map waivers regardless of the number of lots proposed; (4) Optional use. Use of the flexible lot size provisions is optional. Persons wishing to subdivide and develop land may utilize this section or may proceed under other existing County Code requirements without use of these provisions; (5) Reference to flexible lot size provisions. Residential development applications submitted pursuant to this section shall be clearly identified as being so-designed on the tentative map; (6) Limitation on location. The use of the flexible lot size provisions shall not be applicable in urban areas designated in the Improvements Standards for Subdivsions, Parcel Maps and Site Improvements for Chapter 20 of the Butte County Code or within any adopted airport Comprehensive Land Use Plan. (c)Application requirements. The following processing procedures apply to the flexible lot size provisions. These procedures must be followed once a decision has been made to utilize the flexible lot size provisions. Subsequent to completion of the steps described in this subsection, a formal application filed pursuant to the flexible lot size provisions shall be processed and acted upon in accordance with standard provisions of the County Code governing tentative map and waiver applications, as specified in subsection (d) of this section. (1) Preliminary consultation. It is recommended that applicants proposing to utilize the flexible lot size provisions meet with development services staff prior to making an application. Once the decision has been made to proceed, the applicant must submit information specified in subsection (c)(2) of this section in order to begin the pre-development review process required in subsection (c)(3) of this section. (2) Supplementary application materials. The following materials sl-all be submitted: a. Opportunities and constraints mapping. At a minimum, this mapping shall illustrate land not suitable for development, as described in subsection (g)(1) of this section. b. Conceptual development plan. The conceptual development plan shall identify building http://municipalcodes.lexisnexis.com/codes/butteco/ DATA/CHAPTER24/Article_I1I_Z... 8/22/2007 Butte County Department of Development Services 0 UTtFo TIM SNELLINGS, DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR o 0 0 0 7 County Center Drive o Oroville, CA 95965 (530) 538-7601 Telephone (530) 538-7785 Facsimile www.buttecounty.neVdds www.buttegeneralplan.net ADMINISTRATION * BUILDING* PLANNING August 16, 2007 Denise Younie & Denny Stevens 1530 Humboldt Road, Suite 5 Chico, CA 95928 REGARDING: A Pre-Development application (PRED07-0007) meeting to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel is bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be _requested. This higher density would require a General ,Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. Dear Ms. Younie and Mr. Stevens: This letter is to inform you that a pre-application conference has been scheduled for August t 29, 2007 at 1:00 p.m. in the Department of Development Services Conference Room A, at 7 County Center Drive, Oroville. Your attendance at this meeting is requested. Should you have any questions or need any additional information, please feel free to call me at (530)538-7153, between the hours of 7:30 a.m. and 4:30 p.m., Monday through Friday, or email me at mmichelenana=buttecounty.net. Sincerely, Mark Michelena Senior Planner Cc. CR Land Company The Engineering Group BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE#: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of 'r Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: A. STREETS ❑ 1. Prior to or concurrently with the recordation of the Final Map, provide a fully executed road maintenance agreement for all non-publicly maintained access roads on the County approved form. A note shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Final Map stating: "In accordance with Civil Code Section 845, maintenance of the road as shown hereon shall be shared by those properties with a legal interest in it." ® 2. All access rights shall be reserved by deed per County Ordinance, offered for dedication, and depicted on the Final Map. Place the following note on the Final Map: "approved road name is a non-exclusive easement for ingress, egress, road and public services purposes, to be reserved in deeds and is hereby offered for dedication to the County of Butte." ❑ 3. Prior to the recordation of the Final Map, demonstrate to the Department of Public Works that there is approved access conforming to County Code to each parcel from a publicly maintained road. ® 4. Prior to or concurrently with the recordation of the Final Map, Deed to Butte County in fee simple 30 feet of right-of-way from the centerline of French Ave., Little Ave. and Dewsnup Ave. along the entire property frontage. The right-of-way shall be sufficient for the installation of Improvement Standard No. S-5 at all street intersections. ❑ 5. Prior to or concurrently with the recordation of the Final Map,relinquish abutter's rights of access to Butte County along the I frontage of parcels 1,except at approved access points. ® 6. Prior to recordation of the Final Map,provide street name signs per requirements of the Department of Public Works. Street names shall be reviewed by the County Address Coordinator and one name for each new street shall be recommended to the Board of Supervisors for approval prior to recordation of the Final Map. A minimum of five alternate names for each new street shall be submitted. ® 7. Prior to final road inspection,install all necessary traffic safety signs including stop signs. ® 8. Prior to recordation of the Final Map, obtain an encroachment permit and improve all new and existing driveway approaches to publicly maintained roads as specified in the County Improvement Standards and the terms of the encroachment permit. ❑ 9. Prior to the recordation of the Final Map,obtain an encroachment permit and construct a standard S- 181 road approach in accordance with County Improvement Standards. Adequate sight distance at the intersection of access road and I shall be provided. Right-of-way required for construction of road approach and roadside drainage shall be provided. ® 10. Provide cul-de-sacs designed and constructed as specified in the County Improvement Standards. The Final Map shall show the cul-de-sacs. ❑ 11. Prior to the recordation of the Final map, construct or provide a performance bond and labor and material bond for the construction of a 1/2+12' / full street section on French Ave., Little Ave. and Dewsnup Ave.to an RS-213 geometric standard. Minimum structural section to be I"AC, and I"AB, prime coat, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval prior to construction. "R" value determination and other data may be required to support the section design. Form a Zone of Benefit or ofzer approved maintenance entity within the county's Permanent Road Division for operation and maintenance of interior street and storm drain facilities. ® 12. Prior to the recordation of the Final map, construct or provide a performance bond and labor and material bond for the construction of a ''/z+ 12' street section on French Ave., Little Ave. and Dewsnup Ave. to an RS-2B road standard with vertical curb, gutter, and sidewalk and 3" AC, and 12" AB, prime coat, fog seal and 95 % relative compaction. Construct a full street section on interior streets to an RS-213 road standard with rolled curb, gutter, and sidewalk and 3"AC, and 12" AB, prime coat, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval prior to construction. "R"value determination and other data may be required to support the section design. Form a Zone of Benefit or other approved maintenance entity within the county's Permanent Road Division for operation and maintenance of interior street and storm drain facilities. ❑ 13. Prior to recordation of the Parcel Map, provide approved access to each parcel from a County maintained road or from a state highway. Improve parcel I frontage to RS J LD J and access road to parcel being divided to RS J LD J County Improvement Standards. (If the parcels being created are 5 acres or less in gross area, submit road and drainage plans to the Department of Public Works for plan checking and approval prior to construction). ❑ 14. Prior to recordation of the Parcel Map, submit road and drainage improvement plans for the installation and construction of the street frontage improvements on I to I County Improvement Standards. Improve parcel I frontage to a 'h+ 12' / full street section on I to an RS J road standard including, but not limited to curb, gutter and sidewalk for parcels with gross acreage of one acre or less. Construct, or provide a performance bond and labor and material bond for the construction prior to recordation of the Parcel Map. ® 15. Street lighting shall be provided in accordance with Butte County requirements,accepted design criteria,and recommendations of Pacific Gas&Electric Company. Where the County has determined that it is not detrimental to health and safety,the developer may choose to only install electrical outlets for streetlights. If streetlights are to be installed,the annual energy costs shall be funded through a County Service Area(CSA)or other entity as approved by the Public Works Director. The developer must complete the formation of the CSA or other approved entity prior to recordation of the Final Map. The formation of a CSA or other approved entity will require the developer to fund the service until the beginning of the first fiscal year in which service charges can be collected and to agree to an annual maximum service charge to ensure continued operation of the facilities. ❑ 16. Construct access to lot I per Butte County Code 20-136. Submit design to the Department of Public Works for review and approval prior to construction. ® 17. Prior to recordation of the Final Map, construct or provide a performance bond and labor and material bond for the construction of a landscaping strip within the public right-of-way adjacent to French Ave.,Little Ave. and Dewsnup Ave. if driveways do not front on French Ave., Little Ave. or Dewsnup Ave. Submit design to Land Development Division for approval prior to construction. The Developer must complete the formation of a County Service Area(CSA)or other Department of Public Works approved maintenance entity for landscaping prior to recordation of the Final Map. The maintenance entity formation process will require the Developer to fund the service until the beginning of the first fiscal year in which service charges can be collected for the maintenance entity, and agree to an annual maximum service charge to ensure continued maintenance of the facilities. B. DRAINAGE ® 1. Prior to recordation of the Final Map,a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall detail existing drainage conditions and shall specify how drainage waters shall be detained or retained on- site and/ or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. If storm drainage facilities serve new public roads, the developer must complete the formation of a County Service Area (CSA) or Zone of Benefit within a Permanent Road Division or other Department of Public Works approved entity prior to recordation of the Final Map. The CSA formation process will require the Developer to fund the service until the beginning of the first fiscal year in which service charges can be collected for the CSA, and agree to an annual maximum service charge to ensure continued operation of the facilities. ® 2. Prior to final improvement inspection by the Department of Public Works, all new drain inlets shall be labeled with the county approved drain marker per County Standard S-40. Improvement plans shall show and/or note the requirements for labeling inlets pursuant to Butte County Standard S-40. ❑ 3. Prior to recordation of the Final Map, establish 100 year flood plain elevations and the lowest floor elevations for any structures, in accordance with Butte County Code §26-25. Show on the additional map sheet the elevations(by contours)and the location of an accepted NGVD29(National Geodetic Vertical Datum of 1929)benchmark and a temporary benchmark on-site. ❑ 4. Prior to, or concurrently with the recordation of the Final Map, pay the applicable drainage fees in effect at the time of recordation of the Final Map for the I drainage area. (The current fee is now $ /acre.) ® 5. Prior to grading, a Construction Storm Water Permit will be required by the State Water Resources Control Board if the project results in a disturbance (including clearing, excavation, filling, and grading)of one or more acres. The Permit must be obtained from the State Water Resources Control Board prior to construction. If a Construction Storm Water Permit is required, place a note on an additional map sheet that states: "The development of this Final Map required a construction storm water permit. Construction activities that result in a land disturbance of less than one acre,but which are part of a larger common plan of development, also require a permit. Development of individual lots may require an additional permit(s)." C. FINAL MAP ® 1. Show all easements of record on the Final Map. ® 2. Prior to or concurrently with the recordation of the Final Map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7,of the California Government Code commencing with Section 66492. ® 3. Pay the recording fees in effect at the time the Final Map and related documents are recorded. ❑ 4. Prior to or concurrently with the recordation of the Final Map, pay all applicable assessments established by affected assessment districts, in full. ❑ 5. Place a note on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the Final Map regarding�. ❑ 6. Prior to recordation of the Final Map, a preliminary soils report or acceptable soils waiver letter prepared by a California registered civil engineer and based upon adequate testing shall be submitted to the Department of Public Works for review and approval. Butte County Depa ent of Development Servh QT T TIM SNELLINGS, DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR 0� F0 0 0 7 County Center Drive o 0 Oroville, CA 95965 0 - - --= 0 (530)538-7601 Telephone o 0 (530)538-7785 Facsimile August 29,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue,between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner,so that preparations can be made for the IDR meeting on 8/22/07:' Do you find this application complete? ❑ NO. Please respond prior to or at the IDR meeting, regarding completeness of application. What is needed to make the application complete? ❑ YES. My Department's conditions and/or mitigation measures are attached or will be provided at the IDR meeting. If conditions cannot be provided at or prior to the IDR meeting they must be provided no more than 1 week after the meeting. Standard Conditions are attached for your convenience. Provide title report for more detailed analysis PLEASE SEND YOUR RESPONSE TO: mmichelena@buttecounty.net Signature: E. Schroth Department: Public Works Date: 8/1/07 K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 1 f BUTTE COUNTY STANDARD CONDITIONS FOR TENTATIVE SUBDIVISION MAP APPLICANT: Denise Younie & Denny Stevens DATE: 7/26/2007 AGENT: The Engineering Group, Inc. APN: 021-132-039 FILE #: PRED07-0007 PLANNER: Mark Michelena PROJECT DESCRIPTION: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available, a higher density may be requested. This higher density would require a General Plan Amendment and Rezone, or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue, adjacent to the City of Gridley. Those items checked are conditions of approval. PLEASE CONTACT THE BUTTE COUNTY FIRE DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: S. FIRE CLEARANCE ❑ 1. Construction, installation or development of buildings and/or roads, driveways, gates and bridges on parcels/lots shall comply with the latest California Fire Safe Regulations—Public Resources Code 4290, 4291 and current Butte County Improvement Standards, whichever is stricter. X 2. Prior to construction, a pressurized community water system for fire protection is required. Bonding may be allowed with the approval of the County Fire Chief. Average required hydrant spacing is_800_feet, hydrant size_6_inches, and residual fire flow of _1,000 GPM. Fire hydrant identification, road reflectors or post reflectors acceptable to the County Fire Chief shall be installed or bonded, prior to Parcel or Final map recordation. Submit plans to the Fire Department for review and approval prior to construction. ❑ 3. Place a note on a separate document and recorded concurrently with the Parcel, Final map or an additional map sheet stating that "Fire suppression sprinkler systems shall be installed in all new residential dwellings in accordance with NFPA Standard 13D, unless a pressurized community water system with hydrants that meet Fire Department specifications serves the property." A note stating "Automatic Fire Sprinklers conforming to NFPA Standard 13D required" is to be added to all affected building plans. ❑ 4. In lieu of hydrant installation, prior to recordation of the Parcel or Final map, payment shall be made into the hydrant fund at the current rate per lineal foot of street frontage. X 5. Prior to building construction, provide an all weather access of at least 10 feet wide and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of all structures. ❑ 6. Place a note on a separate document, which is to be recorded concurrently with the Parcel or Final map, or on an additional map sheet stating, "Building identification and/or addresses shall be installed in conformance with Fublic Resources Code 4290 and shall be posted at the time of permit issuance and mainta_ned continuously thereafter. 1 ' 1 { Clear Day Page 1 of 2 Michelena, Mark From: Read, Darren [Darren.Read@fire.ca.gov] Sent: Thursday, August 02, 2007 7:57 PM To: Michelena, Mark Subject: FW: YOUNIE PRED07-0007 IDR set for 8/22/07 Attachments: YOUNIE PRED07-0007 Standard Conditions.doc; YOUNIE PRED07-0007 IDR Eval COA.doc Mark, No conditions for the rezone. However depending on the way its developed later fire conditions 2 and 5 would be required. Darren Read Fire Captain, Fire Protection Planning Butte Unit Fire Prevention Bureau CAL FIRE/Butte County Fire Department 176 Nelson Ave. Oroville CA 95965 (530) 538-7888, Office (530) 538-2105, Fax From: Upton,Tiffany [mailto:TUpton@buttecounty.net] Sent: Tuesday, July 31, 2007 11:56 AM To: Aguila, Michelle; Banner, Brad; Betts, Steve; Breedon, Dan; Castanon, Yvette; Cochran, Ada; Fogel, Doug; Gillis, Kathy; Jolliffe, Stacey; Kirk, Maureen; Loker, Sally; Lucas, Steve; Damon, Matt; Nelson, Carl; Read, Darren; Reimers, Ken; Schroth, Eric; Thistlethwaite, Charles Subject: YOUNIE PRED07-0007 IDR set for 8/22/07 Good Morning, Please review the attached documents as they are bieng provided to you for your comments. Please contact Mark Michelena at mmichelenatu'�r,buttecounty.net with your comments and questions. Thank you, Tiffany Upton 8/7/2007 r> .Clear Day Page 2 of 2 Department of Development Services Office Specialist Sr. Phone: 538-5260 Fax: 538-7785 8/7/2007 Butte County Depat ent of Development Servic QTr TIM SNELLINGS,DIRECTOR PETE GALARCO,ASSISTANT DIRECTOR o F0 0 0 7 County Center Drive o 0 Oroville,CA 95965 0 o (530)538-7601 Telephone 0 0 (530)538-7785 Facsimile cOUNty August 7,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner, so that preparations can be made for the IDR meeting on 8/22/07: Do you find this application complete? i ❑ NO. Please respond prior to or at the IDR meeting, regarding completeness of application. What is needed to make the application complete? X YES. My Department's conditions and/or mitigation measures are attached or will be provided at the IDR meeting. If conditions cannot be provided at or prior to the IDR meeting they must be provided no more than 1 week after the meeting. Standard Conditions are attached for your convenience. PLEASE SEND YOUR RESPONSE TO: mmichelena@buttecounly.net .net Signature: Darren Read Department: CDF Date: 8/2/07 UPlanning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 Butte County Depai ent of Development Servico %3T TF TIM SNELLINGS,DIRECTOR I PE i e%;ALARCO,ASSISTANT DIRECTOR 0 0 0 0 7 County Center Drive 0 0 Oroville,CA 95965 0 0 (530)538-7601 Telephone 0 0 (530)538-7785 Facsimile cOUN'�y August 2,2007 To: Inter-Departmental Review Committee Subject: Evaluation and Completeness of Application Applicant: Denise Younie&Denny Stevens,PRED07-0007 Planner: Mark Michelena APN: 021-132-039 Location: A Pre-Development applicant to review a proposed rezone of a 16-acre parcel from A-5 to AR-1. The northeast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounded by the A-5 zoning. The applicant has mentioned that if a community system or sewer system becomes available,a higher density may be requested. This higher density would require a General Plan Amendment and Rezone,or annexation to the City of Gridley. The project parcel is not in the City of Gridley's Sphere of Influence. The project site is located on south side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent to the City of Gridley. 30-Day Complete 8/27/07 Date of IDR 8/22/07 This application is being provided to you for comments. Please see attached documents. A hard copy of the application, including maps, has been sent to Environmental Health, Building Manager, LAFCo, Agricultural Commission, Public Works, Assessor, City of Gridley, CalTrans, Gridley Union High School, Gridley Union Elementary School and CDF. All Environmental Health correspondence is routed through Karen Frederick at 7 County Center Drive. The purpose of this notice is to give you the opportunity to comment on the completeness of this application electronically to the planner,so that preparations can be made for the IDR meeting on Do you find this application complete? Parcel is situated adjacent the Gridley city sphere of influence on the north and east and General Plan designation is AR and MDR. Existing residential development and infrastructure provide a good Agricultural buffer on the north and south boundaries. No agricultural buffer is required on the east and west boundaries. The smallest subdivision parcel units are presently limited by zoning to 5 acres.Of the 19 adjacent parcels the sizes range from .15 acres to 18.6 acres.They are predominantly(14/19)2 acres or less.The parcel is completely framed by developed infrastructure. Signature: 4Zp6ert C. 9fiX DerutyAg. Commissioner Department: Agriculture Date: August 2,2007 K:/Planning/Projects/A New File/IDR Memos/IDR Completeness 8/30/05 (8/1/2007 11:36 CLW) Soil is probably Honcut Loam, however, groundwater monitoring would be required for any future subdivisions. i i Butte County Department of Development Services 0 TrF0 TIM SNELLINGS,DIRECTOR I PETE CALARCO,ASSISTANT DIRECTOR 0 0 7 County Center Drive ° __ ° Oroville,CA 95966 - ° ° (530)538-7601 Telephone ° (530)538-7785 Facsimile CO(JN'�y www.buttecounty.net/dds ADMINISTRATION"BUILDINGPLANNING July 31,2007 TO: Environmental Health FROM: Mark Michelena,Butte County Planning Division SUBJECT: Request for Comments on a Development/Land Use Application APPLICANT: Denise Younie&Denny Stevens,PRED07-0007 APN: 021-132-039 DATE OF Inter-Departmental Review: 8/29/07 IDR RESPONSE REGARDING COMPLETENESS OF APPLICATION DUE BY: 8/27/07 AGENCY/DEPARTMENT CONDITIONS/MITIGATION MEASURES DUE BY: 9/1`37 The Planning Division has received a project applicatio. described below. This application is being provided to you for review. This is your opportunity to mak `omments regarding the completeness of this application, to be determined at the Inter-Dar meant, 1 Review (IDR) Committee meeting on 8/A/07, and/or to recommend conditions and/V mitigation measures relevant to your agency's/department's area of expertise and1junsd ction.. PROJECT DESCRIPTION: A Pre-Developmept applicant to review a proposed rezone of a 16- acre parcel from A-5 to AR-1. The;orthe'ast portion of the project site is adjacent to the City of Gridley. The rest of the parcel bounde b the A-5 zoning. The applicant has mentioned that if a community system or sewer s spm becomes available, a higher density may be requested. This higher density would requir� Gener'�al Plan Amendment and Rezone, or annexation to the City of Gridley. The project par�ee�s not in the City of Gridley's Sphere of Influence. The project site is located owouth side of Little Avenue, between French Avenue and Dewsnup Avenue,adjacent tot a City of Gridley. COUNT ` SUPiERVISOR DISTRICT NO.: 4 ZONING: A-5 GENERAL PLAN: AR If a ren s an t be submitted prior to the due dates listed above, please call Mark Michelena at 538- 7376 or '�im an email at mmichelena@buttecounty.net. You do not have to respond to this request if you have no comments to include. Thank you for your attention to this matter. Please return response to project planner. IDR COMMITTEE—APPLICATION COMPLETE ❑ No Name: Date: Yes Name: Date: F:\P1anning\PROJECTS\PRED\YOUNMSPR,^E�D07-0007\ADMINISTRATIVE\YOUNIE PRED07-0007 REQUEST FOR CONMNTS.doc (8/28/2007 09:41 CSN) Building Division Clear file Items of inquiry Structures appear to be located on one, proposed one acre lot. -Verify if applicant will keep structures on lot or remove them by demolition or relocation? History SF (Building Permit# 37-65B) Finaled 9/23/1965 Miscellaneous agriculture structures on site appear to be established prior to April 9, 1982. This date was when Agricultural Building Exemption Permit requirement was established. August 17, 2007 �p At ?, Mark Michelena Butte County Planning Division �1'IctS 7 County Center Drive Oroville, CA 95965 Re: Request for Comments on development of Assessor Parcel No 021- 132-039; Denise Young and Denny Stevens. Dear Mr. Michelena: The City of Gridley has received the above-noted request for comments on City a rezone application to change the above-noted County land use designation for f this parcel from A-5 to AR-1. It is our understanding that this change would allow development of up to 14 parcels adjacent to the City of Gridley. Gridley As background, City staff has met with the applicants on several occasions to discuss annexation of this property. The applicants were informed of our 685 Kentucky Street current General Plan Update and Sphere of Influence Amendment process that Gridley, CA 95948 projects growth to occur north of the current City limits to South Avenue. The City is concentrating efforts on completing their General Plan Update and is not entertaining additional Sphere Amendments at this time. However, depending on growth pressure and development rates,the City may look at including this property at a future date. We anticipate completion of our current Sphere Amendment within 18 months. While there may be a market for this type of development(1 acre lots), urban development should occur within City limits. Allowing this type of development seems to be poor planning that will have long term consequences contrary to both our goals of achieving smart growth and preserving agricultural land. When additional information is submitted by the applicant, we would appreciate the opportunity to review and comment. If you would like to discuss this matter further,please feel free to call me at(530) 846-3631. Sincerely, C' r ;t'i"!.,f. f, ;a,�:,.�; .. �r.,.o .A-ndrea:.Redamonti ., (Community Development Director° COUNCIL-ADMINISTRATION -FINANCE- 530.846.5695 PLANNING - PUBLIC WORKS - 530.846.3631 BUILDING - (530) 846-3632 FAX-530-846-3229 Ill�ff�.. �-�I� S(.'(l. .ii:7+ �1; 7i: ��i.'.I�a 11� BUTTE LOCAL AGENCY, FORMATION COMMISSION 1453 Downer Street, Suite C • Oroville, California 95965-4950 (530)538-7784 • Fax (530)538-2847 • www.buttelafco.org P'` MEMORANDUM TO: Mark Michelena, Senior Planner, Butte County Planning Division s FROM: Steve Betts, Principal Planner SUBJECT: PRED 07-0007—Denise Younie & Denny,Stevens DATE: August 8, 2007 The affected parcel is located within the boundaries of the following local agencies (TRA 075- 014): • Gridley-Biggs Cemetery District • Butte County Mosquito &Vector Control District • Gridley Union Elementary School District • Gridley Unified School District • Butte Community College District • CSA 34 - Gridley Swimming Pool • CSA 37 - Gridley Biggs Ambulance • CSA 164—Butte County Animal County District • Butte County Resource Conservation District • Butte Water District • Reclamation District 833 Thank you for the opportunity to review the above referenced project. While LAFCO has no specific land use jurisdiction over this project located in the unincorporated area of the County, we do have concerns regarding the nature of the development proposal. LAFCO has a fundamental responsibility pursuant to California Government Code Section 56000 to discourage urban sprawl, preserve open space and prime agricultural lands, ensure the efficient delivery of governmental services, and encourage the orderly formation of local agencies. With this legislative charge,please consider the following comments at this preliminary stage in the project review. 1. The proposed project encompasses 16f acres of agricultural lands on the south periphery of the City of Gridley, outside of but adjacent to the City of Gridley city limits and the City of Gridley's Sphere of Influence. These lands are currently zoned for agricultural uses and are intended for agricultural uses and rural residential development. This project would alter the land use and place the project in direct conflict with surrounding agriculturally zoned lands. This type of development appears i Mark Michelena August 8,2007 Page 2 of 3 to be inconsistent with the LAFCO responsibility to discourage urban sprawl and preserve.agricultural lands. The following LAFCO Policies apply to the proposal: 2.3.1 Urban Development. LAFCO will encourage proposals that result in urban development to include annexation to a city wherever reasonably possible, and discourage proposals for urban development without annexation to a city. 2.6 Compact Urban Form and Infill Development Encouraged. When reviewing proposals that result in urban development, LAFCO will consider whether the proposed development is timely, compact in form and contiguous to existing urbanized areas. LAFCO will favor development of vacant or under-utilized parcels already within a city or other urbanized area prior to annexation of new territory. However, the Butte LAFCO recognizes that under certain circumstances the redevelopment of underutilized land and infill parcels are subject to the desires of the property owners necessitating the annexation of vacant lands on the periphery of the city boundaries. 2.7 Adequate Services. LAFCO will consider the ability of an agency to deliver adequate, reliable and sustainable services, and will not approve a proposal that has significant potential to diminish the level of service in the agency's current jurisdiction. The agency must provide satisfactory documentation of capacity to provide service within a reasonable amount of time. For this proposal, the site should be annexed into the City of Gridley in order to provide the project site with municipal services. Please note that the three parcels to the north of property should be included in any annexation proposal to prevent piece-meal annexation and to ensure orderly boundaries. Should the proposal go forward without annexation, LAFCO may have a difficult time making the affirmative findings to approve any action(such as annexation to a special district or creation of a new special district)that would be required for the proposal. The City of Gridley is currently in the process of updating their General Plan, along with.a Sphere of Influence update. The applicant and the County should consult with the City of Gridley to determine the City's interest in including this parcel in the SOI update and possible annexation into the City. 2. If urban type services (e.g. street lighting, landscaping, drainage, fire protection, etc.) for the new development are proposed to be provided through annexation to an existing local agency or by a formation of a new local agency such as a county service area Mark Michelena August 8,2007 Page 3 of 3 (CSA) or a community service district(CSD), LAFCO as the authorizing agency, should be consulted early to allow for a meaningful analysis of the issue prior to County consideration of the development application. This early coordination will allow for the anticipated LAFCO action to be fully integrated into the project review process and should result in the proposal being: A. Fully described in the project description; and B. Fully addressed in the appropriate environmental documents; and C. Circulated to LAFCO for review as an agency with an approval role; and D. Fully integrated into the public hearing process. The absence of this early coordination and failure to address the LAFCO related issues as described will require additional environmental review and related studies at such time an annexation/formation is requested resulting in unnecessary costs and delays. It should be understood that such a request would be reviewed based on state law and local LAFCO policies which are clearly directed at maximizing service efficiencies, minimizing the creation of new governmental entities, limiting urban sprawl and directing new development to areas with existing urban service providers. 3. The project site is located in an area that lacks adequate storm water drainage facilities and is within the boundaries of Reclamation District 833. RD 833 should be consulted early to ensure that the proposal would not cause any increase in storm water drainage into RD 833 facilities, which are already operating at full capacity during winter storm events. 4. The proposal could have an impact to agricultural uses on the adjoining parcels. Will the project be designed to incorporate a 300-foot building setback, consistent with County policies? These comments are preliminary based on the general project descriptions provided. LAFCO will review the project in greater detail during the CEQA review process. If you have any questions please contact me at your convenience. Michelena, Mark From: Matthew Friedman [matthew_friedman@dot.ca.gov] Sent: Thursday, August 02, 2007 9:26 AM To: Michelena, Mark Subject: Younie Stevens Development/Land Use Application (PRED07-0007) Dear Mr. Michelena, Thank you for the opportunity to comment on the Development/Land Use Application (PRED07-0007) for the Younie and Stevens project. The project proposes a change of zoning for 16 acres in the vicinity of Gridley from "A-5" to "A-1" to allow for the creation of 16 single-family lots. h Highway System, we have no comments. Based upon minimal impacts to the State g y y , Matt Friedman, Transportation Planner Caltrans District 3 703 B St. Marysville, CA 95901 (530) 741-4004 1 7 4 43,470 s4 ft. 1 43,587 sq. ft. 1.00 acres 10 43,555 s4 ft. 1.00 acres 40,327 s4 ft. 1.00 acres 0.93 acres 8 • 43,373 sq. ft. ` 1.00 acres 5 43,533 s4 ft. IAO acres . 11 40,444 sq. ft. .--- - _ _--- --- -_ __ -. -- - - - - - _ _ 2 093a- - - - - --- - - - - _ - � --- - - - - - Cres. __ - - --- - 43555 sq. ft. _ -- - - - 1.00 acres 9 44,929 sq, ft. 1.03 acres 6 43,476 sq. ft. 1.00 acres 12 40,444 sq. ft. 0.93 acres 3 42,593.sq. ft. 0.98 acres 14 43,684 sq. ft. 1.00 acres 13 ' 43,352 sq. ft. • - 1.00 acres BUTTE COUNTY JUL 2 6 2007 DEVELOPMEN`Y SF RvICES W A r � gt. ill � C mum SPRU E COLUSA HIGHWAY ; ?, Z S CITY OF GRIDLEY 'L 9 < �r f - ? r-.►w- SI o LITTLE C, AVENUE �^• , < < z W E U Z F = S j VICINTIY MAP NTS _ NIEXI1. STING ZONING: A-5 (AG. - 5 AC. MIN.) PROPOSED ZONING: AR (AG. - RESIDENTIAL) 2. EXISTING GENERAL PLAN: AR (AG. - RESIDENTIAL) PROPOSED GENERAL PLAN: MDR (MED. DENSITY RESIDENTIAL) - 13 UNITS PER ACRE 3. EXISTING USE: VACANT GP:MEDIUM DENSITY LEGEND: RESIDENTIAL BOUNDARY LINE • °` CENTERLINE - ` a, — ( M ' ADJACENT PROPERTY LINE 4' CITY'OF GRIDLEY SPHERE OF INFLUENCE LINE —_ CITY LIMITS LOT 6 AS PER MAP OF GRIDLEY COLONY NO. 4 (6) ►�+ I LOT 7 AS PER MAP OF GRIDLEY a ' COLONY NO. 4 (7) ASSESSOR'S PARCEL NUMBER 030-132-03 O ZONING Z - GENERAL PLAN GP • w „� ZONING - PLANNED DEVELOPMENT, GENERAL PLAN - MEDIUM + + + + + "ILEA / NG _ _S, GENERAL PLAN DENSITY RESIDENTIAL i �OIESIDENTIIAL SUBURBAN R 0 ZONING - A-5, P GENERAL PLAN - AR Z:A-s PRE-DEVELOPMENT REZONE & GP:AR o GENERAL PLAN AMENDMENT PLAT x FOR 21_ Z' DENISE YOUNIE&DENNY STEVENS Z: R-s GP:RESIDENTIAL, APN: 021 -132-039 (15.88 AC f) SUBURBAN A PORTION OF LOTS 6 AND 7, ACCORDING TO -,. THAT CERTAIN MAP ENTITLED, "MAP OF GRIDLEY w COLONY NO. 4", WHICH MAP WAS FILED IN THE 1' OFFICE OF THE RECORDER OF THE COUNTY OF BUTTE, STATE OF CALIFORNIA, FEBRUARY 5, 1907 IN MAP BOOK 6, AT PAGE 8. WITHIN T 17 N, R 2 E, S 2 M. `-=B.. �0TE I BY I'? COUNTY �j THE ENGINEERING GROUP, +��. 2 620 1250 EAST AVE., SUITE 10 J CHICO, CA 95926 DEVELOPMENT P: 530-899-0409 F: 530-899-0943SERVICES JULY 10, 2007 SHEET 1 OF 1