HomeMy WebLinkAbout001-220-036C
LQz
t o O
lA
M 1,0 F—
!Z v H U
Y LL
<n L F
(� 0)U w
_ E- U U
v O w
_ U
In R Q
y m C J v
w U to O
E U
O wO
U '�, >
O U
Vol
0
z
a
U
U
w
U
O
O
O
J
F
F
F
Q
Q
Q
E
E
E
J
J
J
C
C
G
m
i
0
0
(7
U
U
¢
L
U
i
l
t
l
t
W
of
QLL
w
�
l
t
i
Ji
t
rn
U
z
z
z
Z
O
0
L
z
_J 0
W
Lu
>
z
U
W
g
U?
=
Q
w
F__
Q
ul
N
=
Eiste��t�T
Submit completed form In person or by
BUffE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING men to:
CONSTRUCTION DEBRIS RECOVERY FINAL REPORT Butte County Development Services -
Final inspection will not be scheduled until completed report submitted Building
2_
Building Q 2 1% Z2 7 County Center Drive
APN: / 1 Building Permit # Oroville, CA 95965
Owner Name: v Owner Phone: I 1
Jobsite Address:
Jobsite Contact:
Company:
Project Type: n Construction -1Demolition
Jobsite Phone:
MATERIAL Reuse Recycle Disposal ACTUAL FACILITIES/SERVICE PROVIDERS USED
Tonna a Tonna a Tonna e
Inert Material (Concrete, asphalt)
Lumber
PlanUrree Debris
Dry Wall
Metal
Cardboard
Other:
Other:
Total tons of material disposed of (not recycled or reused)
Total tons of material not disposed (either recycled of reused)
Percent recycled/reused %
Please sign indicating that the above information is true and correct to the best of your knowledge:
Applicant:
(Owner or Contractor): Date:
Circle which
Final Report returned with comments: (Initial) Date:
Attach copies of weight receipts, gate tags, or
other verifying information for all materials
that were reused, recycled or disposed.
Final Report approved: (Building Inspector) Date:
E
2
a
Butte County Department of Development Services
TIM SNELUNGS, DIRECTOR I PETE CALARCO, AS DIRECTOR
7 County Center Drive
Oroville, CA 95965
(530) 538-7601 Telephone
(530) 538-2140 Facsimile
www.buttecounty net/dds
www.butteaeneralalan net
ADMINISTRATION " BUILDING * PLANNING
MINIMUM EROSION AND SEDIMENT CONTROLS FOR
PROJECTS DISTURBING LESS THAN ONE ACRE
The BMP's (Best Management Practices) listed below must be in place during the rainy season
(October 15 through April 15) and may be required at other times based on weather and site
conditions throughout the year. The BMP's listed are minimum requirements and additional BMP's
could be required based on site conditions.
• Stabilized entry: Provide minimum 3" to 6" fractured rock '50' long x 15' wide by 6° deep over
construction grade fabric.
• All soils tracked onto paved roadways must be cleaned up on a daily basis. When streets are wet or
during a rain event there shall be no tracking of soils onto the street.
• Wattles installed properly behind curb or sidewalks.
• Rock bags (minimum 2 per side) at all drain inlet locations within 150' of the project site.
• Internal filters placed inside each drain inlet.
• Trash bars across the back of all drain inlets. -
• Stabilize all disturbed soils in the front yard areas within 15' of the back of curb or sidewalk. (Straw
or erosion blankets may be used for this application)
• Stabilize all slopes where erosion could occur and cause silt run off. (Straw, visqueen or ero
blankets may be used for this application) sion
• All paint, fuel, construction products etc. shall be stored in a covered location away from sidewalks
and storm drain inlets.
• Portable chemical toilets if provided on the site must be kept off of streets and sidewalks and at least
50' from the nearest storm drain inlet.
• All trash must be collected and stored properly. Do not let items such as drywall mud boxes, paint
buckets, cleaning material containers etc. come in contact with any rainfall or storm water runoff.
•' Provide a designated area for concrete washout.. Hay bales lined with visqueen may be used for this
application. Rollaway bins may also be used. All concrete washout systems shall be placed off of
the paved streets.
• After installation of the above items is complete a maintenance program needs to be developed to
insure the continued effectiveness of your BMP's.
t
K:\BUILDING\201 BApproved forms\Res Green Bldg. forms\Erosion & Sediment Control Measures.doc A
r
J
f
EXHIBIT A DRAWING
S P
l
lO
o
p Q:3
a Q
Q
n
o
3
lO
o
; Q
r
'O
T
•+
3
P ei
3
z o
s
I1I11111
3
3
P
e!•
3
IA (b
000000000
-
1
3
�'•
0000000000
I
-3
0000000000
-
-
i
O
0 3
000 0000`00
r -
3-
� Q
O
.h3
O
no o s = o
f.
.+
y
Ix W CL
f+
Q IA
P
n
to
O 3 3
IX
n
ua°i
�. I
0% O
<
3CO
3' O
P
3
rp
KABUILDING\201 MApproved forms\Res Green Bldg. forms\Erosion & Sediment
Control
Measures.doc
w
M
to
0
64.67'
C 8 011
BUILDING MASTER PLAN
PERMIT S-?9� # M,0 f Dopy
ASSESSOR'S PARCEL # 001 —22-0- OPS
PER....—
BUTTE
-
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE,OMPLIANCE
DATE 11
61 C BY
F.P .
.5.
Complete constniction Post Debris Recovery
final: report and V.O.C. documentation and
submit to Building Division prior to final
..huilrlino inenortinn ,
Lot 38
20' Rear Building Setback Line
j The 2013 CBC, CMC, CPC, CEC, CFC, j
FIOOd Zone'` -CGBC and 2013 California Energy
qq:
FIRM.:. 600 ?G ` �✓ �. Standards as amended by the jurisdiction
I
to this is project
i •
See attached= -Minimum erosion control and.
sediment controls for projects disturbing less
than one acre
c
J
Y
U
f0
N
C_
mEn I
1 Energy Requirements see
attached energy certificate of compliance
for specific energy requirements for this
building
I . i V//J Model 1309
M
Garage
PG&E
Meter
Gas
Meter
APPROVED
City of Biggs
Planning Department
09/14/2015
Entry
7
DE
PUBLIC WORKS AND
PLANNING REVIEW
COMPLETED BY -THE
l CITY OF. BIGGS
Front=ng setback Line
NO CONSTRUCTION 1
EASE N
N►ENTS
ALL PORTIONS OF
OF EASEMENT- STRUCTURE TO g
FOUNDA710NS INCLUDING F E
WALLS oOTINGS,
10' Ut1_Iut�Easem_ nt - EAVES AND ROOF
Fire sprinkler Permit:.will be re
for this structure se- quired . I
parate Remit will
be required to be issued prior to rough
frame inspection
64.87 1 - -
LA
O
In
L6
P
APPROVED PLANS SAND PERMIT
SHALL BE ON SITE. FOR ALL ..•
APN# 001-220-038-000 INSPECTIONS
ourth Stree3240
,
9
Sliding
.0
0'
@F4r
I
>
4' CW:X a mw STEEL
M
ZIMT11,
NPE ZZ -01,90 i�r
..8
ara-go Ton
Area �
ir 6ing.,
-P-802
...................... ........ ................................... ......... .........
2*4r
Lmm
Room
8'-W CIng.
1309 Floor Layout Plan
WW- oo/y
PERMIT #
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE COMPLIANCE
DATE 1//2-3 BY C -y
7 1
Bathroom
Red =,m, 1
Bedroom 2
Waster
Be room
D.
2 at
,0
o
2wi
:c4fom
:mF
Roorim
Kitchen.:
Y
Bad.
,P -On Ono..
Bedroom
TAMIng.
L
.0
0'
@F4r
I
>
4' CW:X a mw STEEL
M
ZIMT11,
NPE ZZ -01,90 i�r
..8
ara-go Ton
Area �
ir 6ing.,
-P-802
...................... ........ ................................... ......... .........
2*4r
Lmm
Room
8'-W CIng.
1309 Floor Layout Plan
WW- oo/y
PERMIT #
BUTTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE COMPLIANCE
DATE 1//2-3 BY C -y
7 1