Loading...
HomeMy WebLinkAbout001-220-036C LQz t o O lA M 1,0 F— !Z v H U Y LL <n L F (� 0)U w _ E- U U v O w _ U In R Q y m C J v w U to O E U O wO U '�, > O U Vol 0 z a U U w U O O O J F F F Q Q Q E E E J J J C C G m i 0 0 (7 U U ¢ L U i l t l t W of QLL w � l t i Ji t rn U z z z Z O 0 L z _J 0 W Lu > z U W g U? = Q w F__ Q ul N = Eiste��t�T Submit completed form In person or by BUffE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING men to: CONSTRUCTION DEBRIS RECOVERY FINAL REPORT Butte County Development Services - Final inspection will not be scheduled until completed report submitted Building 2_ Building Q 2 1% Z2 7 County Center Drive APN: / 1 Building Permit # Oroville, CA 95965 Owner Name: v Owner Phone: I 1 Jobsite Address: Jobsite Contact: Company: Project Type: n Construction -1Demolition Jobsite Phone: MATERIAL Reuse Recycle Disposal ACTUAL FACILITIES/SERVICE PROVIDERS USED Tonna a Tonna a Tonna e Inert Material (Concrete, asphalt) Lumber PlanUrree Debris Dry Wall Metal Cardboard Other: Other: Total tons of material disposed of (not recycled or reused) Total tons of material not disposed (either recycled of reused) Percent recycled/reused % Please sign indicating that the above information is true and correct to the best of your knowledge: Applicant: (Owner or Contractor): Date: Circle which Final Report returned with comments: (Initial) Date: Attach copies of weight receipts, gate tags, or other verifying information for all materials that were reused, recycled or disposed. Final Report approved: (Building Inspector) Date: E 2 a Butte County Department of Development Services TIM SNELUNGS, DIRECTOR I PETE CALARCO, AS DIRECTOR 7 County Center Drive Oroville, CA 95965 (530) 538-7601 Telephone (530) 538-2140 Facsimile www.buttecounty net/dds www.butteaeneralalan net ADMINISTRATION " BUILDING * PLANNING MINIMUM EROSION AND SEDIMENT CONTROLS FOR PROJECTS DISTURBING LESS THAN ONE ACRE The BMP's (Best Management Practices) listed below must be in place during the rainy season (October 15 through April 15) and may be required at other times based on weather and site conditions throughout the year. The BMP's listed are minimum requirements and additional BMP's could be required based on site conditions. • Stabilized entry: Provide minimum 3" to 6" fractured rock '50' long x 15' wide by 6° deep over construction grade fabric. • All soils tracked onto paved roadways must be cleaned up on a daily basis. When streets are wet or during a rain event there shall be no tracking of soils onto the street. • Wattles installed properly behind curb or sidewalks. • Rock bags (minimum 2 per side) at all drain inlet locations within 150' of the project site. • Internal filters placed inside each drain inlet. • Trash bars across the back of all drain inlets. - • Stabilize all disturbed soils in the front yard areas within 15' of the back of curb or sidewalk. (Straw or erosion blankets may be used for this application) • Stabilize all slopes where erosion could occur and cause silt run off. (Straw, visqueen or ero blankets may be used for this application) sion • All paint, fuel, construction products etc. shall be stored in a covered location away from sidewalks and storm drain inlets. • Portable chemical toilets if provided on the site must be kept off of streets and sidewalks and at least 50' from the nearest storm drain inlet. • All trash must be collected and stored properly. Do not let items such as drywall mud boxes, paint buckets, cleaning material containers etc. come in contact with any rainfall or storm water runoff. •' Provide a designated area for concrete washout.. Hay bales lined with visqueen may be used for this application. Rollaway bins may also be used. All concrete washout systems shall be placed off of the paved streets. • After installation of the above items is complete a maintenance program needs to be developed to insure the continued effectiveness of your BMP's. t K:\BUILDING\201 BApproved forms\Res Green Bldg. forms\Erosion & Sediment Control Measures.doc A r J f EXHIBIT A DRAWING S P l lO o p Q:3 a Q Q n o 3 lO o ; Q r 'O T •+ 3 P ei 3 z o s I1I11111 3 3 P e!• 3 IA (b 000000000 - 1 3 �'• 0000000000 I -3 0000000000 - - i O 0 3 000 0000`00 r - 3- � Q O .h3 O no o s = o f. .+ y Ix W CL f+ Q IA P n to O 3 3 IX n ua°i �. I 0% O < 3CO 3' O P 3 rp KABUILDING\201 MApproved forms\Res Green Bldg. forms\Erosion & Sediment Control Measures.doc w M to 0 64.67' C 8 011 BUILDING MASTER PLAN PERMIT S-?9� # M,0 f Dopy ASSESSOR'S PARCEL # 001 —22-0- OPS PER....— BUTTE - BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CODE,OMPLIANCE DATE 11 61 C BY F.P . .5. Complete constniction Post Debris Recovery final: report and V.O.C. documentation and submit to Building Division prior to final ..huilrlino inenortinn , Lot 38 20' Rear Building Setback Line j The 2013 CBC, CMC, CPC, CEC, CFC, j FIOOd Zone'` -CGBC and 2013 California Energy qq: FIRM.:. 600 ?G ` �✓ �. Standards as amended by the jurisdiction I to this is project i • See attached= -Minimum erosion control and. sediment controls for projects disturbing less than one acre c J Y U f0 N C_ mEn I 1 Energy Requirements see attached energy certificate of compliance for specific energy requirements for this building I . i V//J Model 1309 M Garage PG&E Meter Gas Meter APPROVED City of Biggs Planning Department 09/14/2015 Entry 7 DE PUBLIC WORKS AND PLANNING REVIEW COMPLETED BY -THE l CITY OF. BIGGS Front=ng setback Line NO CONSTRUCTION 1 EASE N N►ENTS ALL PORTIONS OF OF EASEMENT- STRUCTURE TO g FOUNDA710NS INCLUDING F E WALLS oOTINGS, 10' Ut1_Iut�Easem_ nt - EAVES AND ROOF Fire sprinkler Permit:.will be re for this structure se- quired . I parate Remit will be required to be issued prior to rough frame inspection 64.87 1 - - LA O In L6 P APPROVED PLANS SAND PERMIT SHALL BE ON SITE. FOR ALL ..• APN# 001-220-038-000 INSPECTIONS ourth Stree3240 , 9 Sliding .0 0' @F4r I > 4' CW:X a mw STEEL M ZIMT11, NPE ZZ -01,90 i�r ..8 ara-go Ton Area � ir 6ing., -P-802 ...................... ........ ................................... ......... ......... 2*4r Lmm Room 8'-W CIng. 1309 Floor Layout Plan WW- oo/y PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CODE COMPLIANCE DATE 1//2-3 BY C -y 7 1 Bathroom Red =,m, 1 Bedroom 2 Waster Be room D. 2 at ,0 o 2wi :c4fom :mF Roorim Kitchen.: Y Bad. ,P -On Ono.. Bedroom TAMIng. L .0 0' @F4r I > 4' CW:X a mw STEEL M ZIMT11, NPE ZZ -01,90 i�r ..8 ara-go Ton Area � ir 6ing., -P-802 ...................... ........ ................................... ......... ......... 2*4r Lmm Room 8'-W CIng. 1309 Floor Layout Plan WW- oo/y PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CODE COMPLIANCE DATE 1//2-3 BY C -y 7 1