Loading...
HomeMy WebLinkAbout005-465-002DEVELOPMENT SERVICES BUTTECOUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 5 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax:530.538.7785 www.ButteCounty.net/dds f Permit No: B17-1814 Issued: 8/14/2017 APN: 005-465-002 Address: 497 E 21 ST ST, CHICO Owner: Angela Rios Permit Type: SOLAR ROOF -RES Description: Installation of roof mounted solar 3.135 kw I. Flood Zone: None SRA Area: No ,SFTBACK,S for Zonenty. AG. SRA_ PW Front: Centerline of Road: Rear: SRA: Street: AG: Interior Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING T Inspection Type JVR I SP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin nder inin 612 Tiedown/Soft Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Manometer Test 605 Do Not Install Sidin Stucco or Roofing Until Above Si ned Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Ski rtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL ZS•17 -rrujeci anal Is a i-ernncace of occupancy Eor txesiaennai umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION 0 Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 f""'.• ""'••'-� Main Phone (530) 538-7601 Fax (530) 538-7785 www.buttecounty.net/dds Declaration of Installation for Smoke Alarms and Carbon Monoxide Alarms FORM NO DBI -01 The newly adopted 2013 California Residential Code requires the installation of Carbon Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. The;policy for Carbon Monoxide Alarms in Butte County states: "Any permit obtained in which the value of worts exceeds $1000 associated with a Residential Group R Dwelling Unit or Sleeping Unit shall conform to the following 2013 California Residential Code requirements for Smoke and Carbon Monoxide Alarms (Section R314 & R315)." 2013 California Residential Code requirements for Carbon Monoxide Alarms: R316.1 New construction: An approved carbon monoxide alarm shall be instilled in dwelling' units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. R315.1.2 Power supply: For new construction required carbon monoxide alarms shall receive their primary power from the building wiring where such wiring is served from a commercial source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to the permanent building wiring without a disconnecting switch other than as required for over - current protection. Exceptions: 1. In dwelling units where there is no commercial power supply the carbon monoxide alarm may be solely battery operated. 2. In existing dwelling units a carbon monoxide alarm is permitted to be solely batteryoperated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. R315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be inte-connectedin a manner that activation of one alarm shall activate all of the alarms in the individual unit. Exception: 1. Interconnection isnot required in existing dwelling units where repairs do no. result in the r removal of wall and ceiling finishes, there is no access by means of attic basement or crawl space, and no Previous method for interconnection existed R315.2 Where required in existing dwellings: Where a permit is required for alterations, repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping units that have attached garages or fuel -burning appliances shall be provided with a carbon monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be, required in the specific dwelling unit or sleeping unit for which.the permit was obtained. R315.2.6 Alarm requirements: No person shall install,, market, distribute, offer for sale or sell 'any carbon monoxide device in the State of California unless the device and instructions have been approved and listed by the State Fire Marshal. xv A Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the following locations: 1. Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s). 2. On every level of a dwelling unit including basements. R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with smoke alarms shall comply with Section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms. Butte County's Interpretation of 2013 CRC, Sections 314 & 315 for Smoke Alarms & Carbon Monoxide Alarms: Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings shall be retrofitted with smoke alarms and those that have attached garages or fuel -burning appliances shall have carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As Owner/Contractor, Uwe affirm and declare under the penalty of perjury, under the laws of the State of California, by our signatures below as Owner/Contractor, that I/we will comply prior to final inspection with Items A & B as specified herein: A. Both Owner/Contractor have read and clearly understand the aforementioned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements. B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to final inspection as per the aforementioned building code and maintaining such installation. Smoke Alarms will also be installed prior to final inspection as_per the 2010 CRC. Smoke and Carbon Monoxide alarms are now installed in the following locations: rYti-r- �S LL �JL fwlC, � i l' t EV A �17K{ 1ALLZ C VM --i SA -Sr— NA M Owner's name (print): KJ AU— e�►)t=L.:S UUI<w v QCj A•.1m NAf rrA.1%t& 'brM< S Owner's signature: I I✓` V '� Date: C J- Contractor's name (print): .� J r CSLB License: Contractor's signature: Date: ° ( 7 Project Address: LA9q E. ZIS�-Sk �' �n � CQ� Permit #:11(ji����� Page 2 of 2 c S euc l u ra t . .r Y ENGINEERSti DESIGN RESPONSIBILITY: The Rock-it System Installation Manual is intended to be used under the responsible charge•of a registered'-, 4i design professional where required by the authority having jurisdiction. In all cases, the urger of the Installation Manual has sole responsibility for the accuracy of the design and. integrity of the system. i The Installation Manual does not check the capacity of the building structure to support the loads imposed on 5 . the building by the array, such as bending strength of roof rafters spanning between supports: This requires.., -y . t additional knowledge of the building and is outside the scope of,the Installation Manual a:.-id our review. = ... If you have any questions on the above, do not hesitate to call.. 4 oFEssi. Prepared By:,' PZSE, Inc. - Structural Engineers t -n,0.s3e7e r ' Roseville,,CA.1 - ' Exp. 331-17 *• v OF 8150 Sierra'College Boulevard, Suite) 50, Roseville, CA 95661 e,916.961.3960 916.961.3965 t 'www.pzse.com ;. PZH structural ENGINEERS January 16, 2017 Rillito River Solar, LLC dba EcoFasten Solar 289 Harrel Street Morrisville, VT 05661 TEL: (877) 859-3947 Attn.: Engineering Department, Re: Engineering Certification for the EcoFasten Rock -it System Installation Manual This letter is to document that PZSE, Inc. -Structural Engineers has reviewed EcoFasten Rock -it System Installation Manual published October 12, 2015 and specifically the "Loading Tables". SCOPE OF THE SYSTEM: The EcoFasten Rock -it System is a solar panel support system for installing solar photovoltaic arrays on sloped roofs of buildings. Typically such buildings are residential with shingle or tile roofs. The number and spacing of attachments to the roof structure can vary depending on various site specific criteria including, but not limited to, roof slope, spacing of supporting structural members and environmental loading. SCOPE OF OUR REVIEW: PZSE, Inc.—Structural Engineers provided a review of the following • Rock -it System design methodology w Rock -it System Installation Manual • Rock -it System Loading Tables and has determined that all information, data and analysis contained within the Installation Manual are based on, and are in compliance with, the structural requirements of the following Reference Documents: • Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-10 • International Building Code, 2015 Edition, by International Code Council, Inc. • California Building Code, 2016 Edition, by California Building Standards Commission • Aluminum Design Manual, 2010 & 2015 Editions, by The Aluminum Association This letter certifies that the EcoFasten Rock -it System Installation Manual and Loading Tables are in compliance with the above Reference Documents. 8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661 916.961.3960 916.961.3965 1www.pzse.com 193.82 s�.C+. 5,293 vivint. PV SOLAR SYSTEM SPECIFICATIONS: a �Do SYSTEM SIZE - 3.135KW DC/ 2.530KW AC w z RIOS RESIDENCE MODULE TYPE & AMOUNT - (11) JINKO SOLAR JKM285M-60B m o �mm MODULE DIMENSIONS - (L/W/H) 64.97in/ 39.06in/ 1.57in w Woz 497 E 21 ST ST INVERTER - (11) ENPHASE IQ6-60-2-US U) <__ UU C H I C O, CA 95928 'INVER I EH(S) USEU 114 I n1a ue5i6iv IJ/AR[ comrLIAUT W1T11 012-9 209,544,11 (P4pm CHI ITnnwN) SFF MANI IFA(;TIIRER DATA SHEET, Q a INTERCONNECTION METHOD - LOAD BREAKER GOVERNING CODES SHEET INDEX: ALL WORN SHALL CONFORM TO THE FOLLOWNG CODES PV 0.0 - COVER SHEET • 2016 CALIFORNIA BUILDING CODE PV 1.0 - SITE PLAN • 2016 CALIFORNIA ENERGY CODE PV 2.0 - MOUNTING DETAIL �p • 2016 CALIFORNIA ELECTRICAL CODE PV 3.0 - FRAMING DETAIL • 2016 CALIFORNIA FIRE CODE E 1.0 - 3 -LINE DIAGRAM } • 2016 CALIFORNIA GREEN CODE E 2.0 - NOTES r' • 2016 CALIFORNIA MECHANICAL CODE E 3.0 -WARNING LABELS ti' • 2016 CALIFORNIA PLUMBING CODE E 4.0 - WARNING LABELS CONT. .' • 2016 CALIFORNIA RESIDENTIAL CODE E 5.0 - ELECTRICAL PHOTOS a / f • ANY OTHER LOCAL AMENDMENTS E 5.1 - ELECTRICAL PHOTOS CONT. W J ■L T N pO 8 J1 4;9171 Ea s 121 s I ft,,eelt < ]i aa % N a p N N m Z Z � � 7 � Z -Q J J m as 3 z z 0 SHEET NAME: w w >w '�. NOTES: O _ A PHOTOVOLTAIC MOUNTING RACK INSPECTION MAY BE REQUIRED PRIOR TO PANEL INSTALLATIONS in ANY MODIFICATIONS TO THE EXISTING ROOF AND/OR PLUMBING DRAIN, WASTE, AND/OR VENTS AR TO COMPLY WITH THE 2016 SHEET CBC/CPC NUMBER: ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS O THE BACKFEED BREAKER SHALL NOT BE MARKED FOR "LINE" AND "LOAD" MARKINGS O CONDUIT RUN THROUGH THE ATTIC OR UNDER EAVES DENOTED WITH DASHED LINES ON SITE PLAN > SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED, PURSUANT TO SECTIONS R314 AND R 315 OF THE CRC a • - - '�, r o O is �•:a • o�_�� ry � r�o >r., Z--3,o tom .vi Zc, A a; <.Yn'Om mX -<m Om y� W. .m33� �cc"13�n. Dn0 ANc Opc01-' nsvz m z z . ., i• Z . ... - c�Nm-o .aN. :E >� m� mDsm mv.yo z-y. N ' O K z; m m x �pc� v�y mzy� O- r• m m- t- l N T T j T Oz M.-g L1 n0 00 z3 gyp T Z c m O VI T O mGN=.zO z y 02T �0a 2 O _ - C, ONm �O< 3a mm Wm 20 yA (Dip�p DzaE 11yS 0. =.3OX z;OO m N' -n r y m ® O .. .. •.T•O o 'M z mo 'O ^, .Ti1 N'�VO'¢OLV�.00Zp r. 0. �20.�n XDSyO m mmOC myvx �;OS O t7y z O N0_.-OOffl >�<ORI • J< 3r) < �T-1 W y �., Z� ^ m< 3 �.1 �p y J N Ai KK vo mivc 0 0r- .illyy y 1 D.. .. O •r: =� N O •• Op O C N N y .00 t. ZO3 Om0p .m p -a t . C T W CA% V!'^ V 47 O < rj y m 0T i I N -' O v' '•,. m • Cm1 •, ;. S b m :fl O 0 moms O< O0 1 - N a _ ,/-<� �//�� 77 VJ 77, UJ ' . Rig +; .��♦ • .,. T V! VJ 497E 21ST ST, C H I CO, CA 95928 :. •� m m _"' _ , . ; FRONT OF HOUSE , _ • _ i " ' ' t 3• - r . . l -� r - ----------l------• 1 ` a ---- - � t. � � — — �;;`;.:� lO - ;i.3 AIC •. I ' ry • 11111111111111117O O � O ry O O : O • , ♦ •. � tl IF Dcn } A r N cn •. z N 3 ' yzz N SITE m INSTALLER: VNINTSOLAR M plO� pC�IDC�^C.. I\ RESIDENCE liC m m PV-1.0. , m y INSTALLER NUMBER: 1.877.404.4129 �,/ivi�� , @ �r • 999 1 497 E21ST ST r My PLAN CHICO, CA 95928 DRAWN BY: JS S: 5795530 Lasl Modified: 811012017 UTILRY ACCOUNT NUMBER: 540866D746A r TOR 1 )ROCK -IT MOUNT n I NOT TO SCALE ' COMP SHINGLES 2 1/2 MIN / 4 APV SYSTEM MOUNTING DETAIL wz.0 rrormwue W MIN AND 6' MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE CANTILEVER 1/3 OR LESS SS LAG SCREW TORQUE=13t2 FT -LBS. PV MODULE, TYP. MOUNT 0 O PV . 3 TO FRAMING OF EXISTING COUPLING CLAMP ' ROOF TYPE, PARALLEL 6' MASZIhTIbIoF ROOF \j` ROCK -IT SLIDE MODULE METAL FLASHING (E.DM BONDED WASHER ORMS WATERTIGHT SEAL RAFTER 71 ' COMP SHINGLES 2 1/2 MIN / 4 APV SYSTEM MOUNTING DETAIL wz.0 rrormwue W MIN AND 6' MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE 5116'x4 12' SS LAG SCREW TORQUE=13t2 FT -LBS. PV MODULE, TYP. MOUNT 0 O PV . 3 TO FRAMING OF EXISTING SECTION VIEW ROOF TYPE, PARALLEL 6' MASZIhTIbIoF ROOF \j` 3 SECTION VIEW PV 2.0 NOT TO SCALE / 1P�V ARRAY TYP. ELEVATION w z.o ROCK -IT COUPLING MID CLAMP COUPLING SHELF TIE PLATE—/ W "ShWx1 1/2' COUPLII HEX FLANGE BOLT SIDE VIEW 300 SERIES SS w a LIQ U Z 'h (n ,, U m LLI w o Z F- En 0 O ROCK -IT COUPLING ASSEMBLY PV 2.0 NOT TO SCALE TOP VIEW CLAMP - ATTACHMENT CLAMP -ATTACHMENT COUPLING PERMITTED COUPLING CLAMP SPACING 111 I I I RAFTER MODULE I-- MODULE 1 1 I /�L= LANDSCAPE CLAMP SPACING 2 )MODULES IN PORTRAIT/LANDSCAPE w2.0 rormstue ONE HOLE STEEL CONDUIT MOUNT BRACKET FLASHING OR TILE (2:)CONDUIT MOUNTING DETAIL PV 2.0 x --1 ( I �I L RAFTER i L=PORTRAIT CLAMP SPACING rvXMt: /A V/ Z _j Q Z) F- 0 w 2 p SHEET NUMBER 0 04 ROOF SECTION 1 ROOF SFCTION 1 FROM PV 1.0 U m Z m� LLJ Nz �mm C/) W Wow �2j QUO O ry T 0 a�7 N y�y e� pN O �qq J O N O N gm o N 0 K N - Z W Z m Z � i Z w J J r m J Z N f~q Z Z p SHEET NAME: C7 J Z W 0 LL - SHEET NUMBER: FRAMING DETAIL M NOT TO SCALE a 1 20A 5A Inverter.Enphase 106.60.2 -US _ EnvoyS OtiYck (;6% . 2 PVCucuitl:ll t 2 om ner ane nvoy- 40V(ontinuous, Modules / 1 protection max 60A breaker on combiner oupuq Parallel = with 10 KAIC circuit breakers NEMA4 function Box with lrfeversible Ground Splice tTYP) ' Photovoltaic System � c71 Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) gO ri u Tag g Description Wire Gauge 0 of Conductors/Color Conduit Type Conduit Size OC System Size (Watts) 3135 AC System Site (Watts) 2530 40 o 1 Enphase Engage Cable THWN•2 12 AWG . 3(L1, L2, G) N/A -Free Air N/A -Free Air - Rapid Shutdown Point ol h terconnection, Wad Module/inverter Count 11 c N a y m '~^ N r" O1 U p e Disconnect Square D Sid 7 5.121D)12)(3)Ib) 1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A -Free Air N/A -Free Air J � W 2 THWN-2 10 AWG 2(1L111.2)8/R EMT 3/4" ` DU221RS, 240W30A, 2 THWN•2-Ground 8AWG 1(GRN) EMT 3/4" m OHO? Existing Module Information: Type: YL260P-29b fa.. F j umi equivalent 1.1 L3N o m = count: 36 SHEET A A M Existing 240W200A NAME: j Service Panel, Single be Existing PV Combiner Panel Existing Inverter Information: Type: M215.60 -21.1.422 -IG " 75A Disconnect count: 36 _ 45A 2 SA SHEET it NUMBER: MsLoc a e Knife'AZC Minimum GEC size4 Disconnect AWG copper W - VISIBLE LOCKABLE - KNIFE' A/C DISCONNECT Square • DU222RB °o 60A/240V UNFUSED NEMA3 20A 5A Inverter.Enphase 106.60.2 -US _ EnvoyS OtiYck (;6% . 2 PVCucuitl:ll t 2 om ner ane nvoy- 40V(ontinuous, Modules / 1 protection max 60A breaker on combiner oupuq Parallel = with 10 KAIC circuit breakers NEMA4 function Box with lrfeversible Ground Splice tTYP) ' � c71 gO ri u ut o: Z m e n m - Rapid Shutdown Point ol h terconnection, Wad Z Disconnect Square D Sid 7 5.121D)12)(3)Ib) J � W e ` DU221RS, 240W30A, m Unfused, NEMA3, or fa.. F j umi equivalent 1.1 L3N SHEET A A M Existing 240W200A NAME: Service Panel, Single be Phase, with 175A Main " 75A Disconnect e " c 3 45A 2 SA SHEET it NUMBER: MsLoc a e Knife'AZC Minimum GEC size4 Disconnect AWG copper W SOLAR MODULE Enphese 6 -60 -2 -US L_ _10_ ._ MICR04NVERTER AT EACH MODULE. ATTACHED WITH ECOLIBRIUM SOLAR HARDWARE 96 BARE CU GROUND (ATTACHED TO FIRST MODULE IN ARRAY). BALANCE OF ARRAY _ GROUNDING CONNECTIONS MADE THROUGH ARRAY HARDWARE MICROINVERTER CONNECTION TO ENGAGE TRUNK CABLE . Inverter Make/Model - 1Q6 -60 -2 -US Max. Dc Volt Rating 48 Volts Max. Power at 40 C 230 Watts Nominal AC Voltage 240 Volts Max. AC Current 0.96 Amps Max. OCPD Rating 20 Amps Max. Panels/Circuit 16 15 Short Circuit Current 15 Amps Inverter Make/Model M215-60-2LL-S22-IG Max. Dc Volt Rating 45 Volts Max. Power at 40 C 215 Watts Nominal AC Voltage 240 Volts Max. AC Current 0.9 Amps Max. OCPD Rating 20 Amps Max. Panels/Circuit 17 15 Short Circuit Current 15 Amps Other Notes PV Module Rating @ STC 10.56 Module Make/Model JKM285M-60B 240 Max. Power -Point Current (imp) 8.9 Amps Max. Power -Point Voltage (Vmp) 32 Volts Open -Circuit Voltage (Voc) 38.7 Volts Short -Circuit Current (Isc) 9.65 Amps Max. Series Fuse (OCPD) 15 Amps Nom. Max. Power at STC (Pmax) 285 Watts Max. System Voltage 1000 V DC (UL) Voc Temperature Coefficient Voc Temperature Coefficient -0.29 %/C AC Output Current According to art. 690.8(8)(1) 10.56 1 Amps Nominal AC Voltage 240 1 Volts THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(8)(16), Chapter 9 Table 4, 5, & 9. Loacation specific temperature obtained from ASHRAE 2013 data tables. ASHRAE2013- Highest Monthly 2% D.B. Design Temp.: 38.7'C Lowest Min. Mean Extreme D.B.: -3.8 -C PV Module Rating @ STC Module Make/Model YL260P-29b Max. Power -Point Current (Imp) 8.59 Amps Max. Power -Point Voltage (Vm ) 30.3 Volts Open -Circuit Voltage (Voc) 37.7 Volts Short -Circuit Current (Isc) 9.09 Amps Max. Series Fuse (OCPD) 35 Amps Nom. Max. Power at STC (Pmax) 260 Watts Max. System Voltage 1000 V (IEC) / 600 V (UL) Voc Temperature Coefficient -0.32 1 • Designed according to, and all code citations are relevant to, the CEC 2016. • Utility Service Provided by PGE • No battery back-ups are tied to the designed inverter(s). • Inverter(s) used in this design is/are compliant with 690.12 (Rapid Shutdown). See manufacturer data sheet • Array grounding and bonding designed in compliance with 690.47(C)(3). I Conductor Calculations I - Wire gauge calculated from art. code 310.15(8)(16) with ambient temperature calculations from art. 330.15(2)(a). For "On Roof' conductors we use the 90'C column ampacity, 0.5"-3.5" off -the -roof temperature adjustment from 310.15(8)13)([), and raceway fill adjustments from 310.15(8)(16). For "Off Roof' conductors we use the 75'C column ampacity, or the 90'C column ampacity with the relevant ambient temperature and raceway fill adjustments, whichever is less. I he rating of the conductor after adjustments MUST be greater than, or equal tu, Ole cunlinuuus duty uprated output current. Calculation Example - Wire Rating (90'C) x Ambient Temperature Adjustment x Conduit Fill Adjustment >= Continuous Duty Output Current (On Roof, Tag 2): 10 gauge wire rated for 40 A, 40 A x 0.65 x 1 (2 Conductors) = 26A>= 13.2A OCPD Calculations Breakers sized according to continuous duty output current. PV circuit nominal current based off p of modules per Circuit X (1.25(art. 210.19(A)(1)(a))) X (0.96 Max AC current per micro -inverter) Circuit #1 = 11 modules, Output Current w/ continuous duty = 13.2 < 20A Breaker system output current w/ continuous duty = 13.2 < 15A (System OCPD) L O 40: C ra� M « m 0 Z a NUMBER: a N goes ARM I Ms 2=1 W CTsa � W �Cr 'RIF �ft " Wyly J�- e all bb%;;Iwi 0 "M lot f fl*-� UO OMW .,. sae ,^yl � . 7. - ••J h t' t ,R e {" J ♦:1 t +" Z w z m INSTALLER: VIVINT SOLAR B@ ., E 5.1, ' m m ELEC. m m INSTALLER NUMBER: 1.877,404,6129 V'v�n� �I RIOS RESIDENCE {^� .PHOTOS' i • 497E21STST ' CHICO, CA 95928 _ DRAWN BY: JS S: 5795530 Last Modified: 8I10I2017 - UTILITY ACCOUNT NUMBER: 540868014" ' www.jinkosoIar-com .. i .� ' t r C UL US �^ r. ,- i:.TN.. '* LISTED' , CE r F AnK KEY FEATURES High Efficiency High module efficiency up to 1 / /2%. with P_issivated Emittef Reav Contact C0N Fgt'0X {PERC) :ethnology AAD High Voltage ' 1000V slandard: 1500V notion lowers 90S costs grid yields belle( LCOE , Innovative Solar Cells " + Four liusbar cell technology improves module efficiency OPID -Free �.. World's ist PID -Free module at 95 C/85%RH Low -Light Performance A'2% _ Advanced glass and solar cell surface textuiing allow for excellent 10'PNf'n perlormance in luw-light environments ++r4 Strength and Durability Wi!hstands snow (5a0opa) and wind t2400Pa) loads, salt mist and ammonia r r LINEAR PERFORMANCE WARRANTY 10 Year Product Warranty • 25 Year Linear Power Warranty - y i '00 Linear performance warranty 97% qd� Slandani performance warranty 95% na/ t a(4e frpm JrnkO r • r 90%. Solar- _ - Snear Wa . RI17.7► � t t--5 t9 years zs f Engin rmgDrNings,r w,,,,,. *,,,,.,R, ,.,•., rirmer ° . a Packaging Configurations i. i,.,u enre, -one pnflet • � 2Spcs/ box . SOpcs,' allet• 700 prs/40'HQ Container r , Gurnm•Ypi(tagO Q>'ugr•Volte�e rempereture Dependence •._�Civ04%PeW1•�TT.. •—on5c;4ac:Pni:ur - , w,{tag. •. V : CMI :empm,w.r'C; i Cell Type Mono -crystalline PERC 156x156mm (6 inch) .y No of cells 60 (6 10) r Dimensions 1650x992<40mm (F,,4.97x39-06x1.57 inch) f Weight 19.0 kg ;41.9 ibs) Front Glass 3.2mm, High T!ansmission. LOW Iron. -.AR Coating Tempered Glass Frame Anodized Aluminium Alley' ' t iunction Box IP67 Rated ' Cntput Cables 12AWG. Length: 1000mm (39 37 inch)' Fire Type Type 1 Module Type - JKM27OM-60B JKM275f,4.606 JK1,4280NI-60B JKk4285M•608 JKM29OM-GOB • STC NOCT STC NOCr STC NOCT STC NOCr STC NOCr , Maximum Power (Pmax) 270Wo 201 vVP 275Wp 205Wo 7.8(1YYp 209Wp 285Wp '212Wp 29OWp 216Wp -• Maximum Power Voltage (Vmp) 31,4V 29.3V 31,6V 29 GV 31.8V 29.7V 32,OV 29.9V 32.2V 30.2V ` Maximum Power Current (Imp) 8.60A 6.85A 18.70A 6.93A 8.81A 7 U'IA SAGA 7.12A 9,U2A 7 21A Open -circuit Voltage (Voc) 38.4V 35.6V 38 5V 36 OV .38 6V a6 2V 3H,TV 36.4V 38.8V 36.6V ' Short-circuit Cu!rent(Isc) 928A, ?15A 9,n0A'54A �. 9,53A. 76711 9.65A 772A 978A '781A�e_ • Module Efficiency STC (°�) ' 16,509416.50%16,509417 I'l% U• 17,1t1%17,72%.. � 5 , Operating Trmpemturei C) + -40"C-•R5"C r �' + Maximum system voltage - 100(1VOCIUL) - Maximum se!(es fuse, ating 1 15A !• , r Power tolerance - 0-•31y - remperature coefficients of Pmax t -0 3911WC + • • . Tempe, ature coefficients of Voc -0.29%PC -- Temperature coefficients of lsc O OSkr'C Y Nominal operating cell temperature (NOCT) s 15±2'C , S r STC: 4 Irradiance 1000W/m/ �. Cell Temperature 25°C N� AM 1.5 ' NOCT: `a%:Irradiance SOObV/m Ambient Temperature 20"C te' AM=1.5 r • bVind Speed 1rn/s - .. ' Powe, measurement :olefance: = 3"f. •• '� ,1H, r,..�y-• rt .,�., ..,.. .:r ..• t• .... a• ::r.n•'.a,�, 1. � : r 1. • .,. , ., a; Enphase IQ 6 and IQ 6+ Microinverters 9 To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 6 Micro'" and Enp-iase IQ 6+ Micror" dramatically simplify the instalation process while achieving the highest efficienW for module -level power electronics. Part of the Enphase IQ System, the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy", Enphase Q AggregEtor-, Enphase IQ Battery-, and the Enphase Enlighten`" monitoring and analysis software. The IQ 6 and IQ 6+ Micro extend the reliability standards set forth by previous: generations and undergo over a million hours o, power -on testing. Enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved twc-wire cabling Built-in rapid shutdown compliant (NEC 2014) Productive and Reliable Optimized for high powered 60 -cell and 72 - cell* modules More than a million hours of testing Class II double -insulated enclosure Smart Grid Ready Complies with fixed power factor, vol' -age and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles R The IQ 6+ Micro is required to support 72 -cell -nodules '= ENPHASE Enphase IQ 6 and IQ 6+ Microinverters INPUT DATA (DC) IQ6-60-2-US AND IQ6-60-5-US I06PLUS-72-2-US AND IQ6PLUS-72-5-US Commonly used module pairings' 195 W -330 W + 2.35 W -400 W + Modulo compatibility 60 -cell PV modules only 60 -cell and /2 -cell PV modules Maximum Input UC voltage 48 V 62 V Peak power tracking voltage 27V 371/ 27 V - 15 V Operating range 16 V - 48 V 16 V - 62 V Min/Max start voltaqe 22 V / 48 V 22 V / 62 V Max DC short circuit current (module Isc) 15A 15 A i Overvoltage class DC port it II p DC port backfeed under single fault 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side. protection requires, max 20A per branch circuit OUTPUT DATA (AC) I06 -60 -2 -US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US I Peak output power 240 VA 290 VA Maximum continuous output power 230 VA 280 VA Nominal voltage/range' 240 V / 211-264 V 208 V (1 (D) / 183-229 V 240 V / 211-264 V 208 V (10)! 183-229 V f Nominel output currant 0.964, 1 11 A 1 17 A 1 3S A Nominal frequency-, _ 60 Hz '60 Hz Extended frequency range 47- 68 Hz 47. 68 Hz Power factor at rated power 1.0 1.0 Maximum units per 20 A branch circuit 16 (2.40 VAC) 13 (240 VAC) 14 (single-phase 208 VAC) 11 (single-phase 208 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 A 0 A Power factor (adjustable) 0.7 leading... 0.7 fagging 0.7 leading ... 0.7 lagging .. EFFICIENCY @240 V "@208 V (1fAp @240 V @208 V (.1 (0) CEC weighted efficiency 97.0% 96.5 % 97.0% 96.5% MECHANICAL DATA Ambient temperature range 40°C to +65°C ^y Relative humidity range 4% to 100:5 (condensing) Connector type MC4 or Amphenol H4 LTX Dimensions (WxFlxD) 219 mm x 191 mm x 37.9 mm (without bracket) Weight 1.5 kg (3.3 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 f Environmental category / UV exposure rating Outdoor - NEMA 250, type 6 (IP67) FEATURES Communication - Power liner Monitoring Enlighten Manager and iMyEnlighten monitoring options Compatible with Enphase iQ Envoy Compliance UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES -0003 Class B, CRN/CSA-C22.2 No. 1071-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions, 1 No enforced DC/AC ratio. See the compatibility calculator at an hyi a&.com/aa1-uSiSU13oort/mudUle-cum atp ibillivv. 2. Nominai voltage range can be extended beyond nominal if required by the utility. To learn more about En.phase offerings, visit enphase.com '=I E N P H A S E 0 ;Oa KC-Fasteir S61ar° o Committed to the connection Document date 3.6.2017 Contents Pg. 1 ........... ''~'~^--~-^-... .............. --'......... ....... ..... | � / ... `~' .......... Assets ofDesign Features System Components Pg. 3 Rock -k 2.0 Mount Assembly Rock -It 2.OCoupling Assembly Pg.3- '--- ---'--. Rock -it 2.OH�bridMount Assembly RocWt{]ip 5S Assembly Pg. 4`~~^'^--`-----'''-----. ---'—' ........... - . - - Array Layout GreenFasten Flashing install pg. 5 -'' ..... —'~~--~'~........ ` ....... ... ...... - Roch,|tSVStern 2.0 Install P2.6 -'''--~'-'~'^-^- ~'-'--'—'-^-' -- -^' --~- Ground Lug Install Rock -It Clip S5 Install Pg. 7'11 ...... ........... ........... -............... ... ...... .... ................... '..... ........... ............ . Standoff Spacing Tables � Snow Load O-2Opsf Snow Load Z1'3Opsf Snow Load 31'4OpSf Snow Load 41'5Opsf Snow Load 51-6Opsf Pg. 13 '--^-^^'~''----------`----'. -' --'' - -----'--^---^----. GKouDd|Og|Ofornl@ti0O Bonding Assembly and Bonding Path Po. 1] '----^'--'`--',---`'------' '--'' ---' ........... Thermal Ex,,:)ansion and Bonding Bracket Spacing Staggered Layout Cantilever Pg. 14 .... ........................................................... .............. ........... ...... .......... Evaluated, Compatible Modules System Specifications »xvvvvecofas1enxo|accomo info@ecofastenso|ar.conn 877'869-3947 ROCK -IT SySTeM 2.0 Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that are fast and easy to install, straightforward, secure and cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two decades. FeaTur-es • Fastest, easiest to level system on the market • Conforms to LIL 2703 First Edition • Class A Fire Rating with Type 1 modules • Integrated electrical bonding • SIMPLE- only 4 components North-South adjustability • Only one tool required (1/2"deep well socket) • Vertical adjustment of 3"-4" 1 1 T i m r -/ m Pr-� !"N 1'" 1 c% n T * _ F- /'1 /-1 l I l r r� :JS I CI I I L LJI I ILJI ICI I I S' — I CLCUII �L.v Yg t4s, r; ROCK -IT SLIDe ROCK -IT 2.0 ROCK -IT 2.0 COUPLInG 4" For comp SHInGLe MOUnT & LOaD BearinG FOOT 8" For TILe SgSTem comPonenTS* - OPTIonaL_ ROCK -IT 2.0 HY BrID MounT (ReFer TO PG. S) ROCK -IT CLIP SS (ReFer TO PG. 6) ROCK -IT 2.0 Array sKIrT A QV, EcoFaSEM Solav EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 8,153,700 8,181,398 8,166,713 8,146,299 8,209,914 8,245,454 8,272,174 8,225,557 9,010,038 9,134,040 9,175,478 9,212,833 *Components for use with 32mm modules are available as special order. Components for use with 32mm modules are labeled as such on packaging. Side profile of Mid -Clamps on Rock -It 2.0 Mount and Rock -It 2.0 Couplings is slightly different for use with 32mm modules. Please refer to evaluated, compatible modules on page 14. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 1 6 k ROCK -IT 2.0 mounT ASSeMBLY NOTe: ITems 1-7 SHIp assemBLeD ITem 6 pre-ToroueD 1 5/16"-18 Hex Flange Bolt (or Hex w/star washer) 300 Series SS 2 Rock -It Mid -Clamp 6000 Series AL (fig. A: Mid -Clamp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It Shelf 2.0 6000 Series AL R 5 Flange Level Nut 300 Series SS 6 Rock -It Pedestal 6000 Series AL 7 Rock -It -Tie Plate 6000 Series AL 8 Rock -It -Slide -Tile 2.0 6000 Series AL (sold separately) 9 Rock -It -Slide -Comp 2.0 6000 Series AL (sold separately) J i � f ITemS 8-9 are accePTaBLe BracKeTS F=Or use WITH THe ROCK -IT 2.0 (SOLD SeparaTeLY ) ROCK -IT 2.0 COUPLING asseI'1'1BL9 NOTe: ITems 1-4 sHlp assemBLeD 1 5/16"-18 x 1.25"or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL (fig. A: Mid -Clamp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It -Coupling -Shelf -2.0 6000 Series AL 5 Load Bearing Foot fig.. A I (32mm) www.ecdfastensolar.com info@ecofastensolar.com 877-859-3947 2 ROCI-<-IT 2.0 HYBRID MOl.. nT ASseMBLY NOTP; ITP-.mS 1-­InSHIP aSSPMBLeD '- 1 5/16"-18 x 1.25°or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL `. (fily. A. Mid -Clump fur use with 32o -w? o7odulesj �= 2i 3 Rock -It -Coupling -Shelf -2.0 6000 Series AL 4 Crushable Spacer - Cardboard or Similar 5 Flange Level Nut 300 Series SS 6 Rock -It Pedestal 6000 Series AL r4.) 7 3/8" ID Star Washer 300 Series SS 8 3/8"-16 x 3" Hex Tap Bolt 300 Series SS 9 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS 5, 10 Rock -It Tie -Plate -T 6000 Series AL fig. A Q2mm) A i ROCK -IT CLIP SS ASSeM BLY NOTe: ITems 1-3 SHIP assemBLeD 1 Stainless Steel Carriage Bolt -.313-18X.75 2 Rock -It Clip SS 3 Stainless Steel Flange nut .313-18 www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3' Array LagOUT Find the required structural attachment points. Mark these using a vertical (N -S) chalk line on the center of the rafters. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser bracket spacing in the E -W axis vs. the maximum spacing. Max spacing is 48"for portrait orientation and 72" for landscape orientation. Consult project layout diagram for project specific bracket spacing on the roof. Install Rock -It Mounts to predetermined mount spacing. The array skirt sections are the width of a typical 60 cell module — use the array skirt as a guide to lay out module placement. Note: The distance between the rows of mounts is calculated by the module dimension N -S plus 1 3/8" (35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1/2". GreenFasTen FL_asHinG insTaLL 1 Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2 Drill a pilot hole (1/4" diameter) for the lag bolt. Backfill with sealant. Eco Fasten Solar recommends an EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt through the EPDM bonded washer, the Rock -It slide, the gasketed hole in the flashing and into the rafter. Torque: The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. *The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 ROCK -IT SJ- STeM 2.0 inSTaLL 4 - .../..gyp 6 ra Install Eco Fasten Solar Flashing with Rock -It Mounts Fallow Eco Fasten Solar Install instructions for flashing and bracket install (GreenFasten shown above) Optimum vertical distance between lag bolts is 1 3/8'plus module dimension Set mounts on eave most row so that the Rock -It Pedestal is on the South end of Rock -It Slide Set mounts on all upper rows so that the Rock -It Pedestal is an the North end of Rock -It Slide 2 Install Array Skirt on Eave Mounts Loosen Hex Flange Bolt in Rock -It Mid -Clamp Slide Array Skirt into front channel on Rock -It Shelf Tighten Hex Flange Bolt to engage the Array Skirt 3-5 Install Rock -It Couplings Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting an the roof (Each Load Bearing Foot is set to same height as the Rock -It Mounts - adjust accordingly) On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling On eave row only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt drawing the Array Skirt sections together Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface NOTE: If a coupling lands on a rafter, the Hybrid Mount' should be used in place of the Rock -It Coupling (refer to image 3a) -Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal, or by purchasing separately 6 Align and Straighten First Row of the Rock -It System with Array Skirt Use North-South adjustment of the Rock -ti Pedestal to stnighten array skirt Torque screw on side of Rock -It Pedestal to 150 in -lbs to secure it to the Rack -It Slide Adjust Flange Level � lut to level the system (optional — can be leveled during or after installation) 7-10 Install 1 st Row of PV Modules Slide upslope Rock-It.Mounts down to engage top of first module Install Rock -It Couplings an the upslope side of 1st row of panels Torque 1 st and 2nd row of Mid -Clamps on Rock -It Mounts and Rock -It Couplings to 150 in -lbs. (Torque to 130 In -lbs. when installing with 32mm modules) Install balance of PV modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules 11 Level the Rock -It System • When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value) www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 5 I i ra Install Eco Fasten Solar Flashing with Rock -It Mounts Fallow Eco Fasten Solar Install instructions for flashing and bracket install (GreenFasten shown above) Optimum vertical distance between lag bolts is 1 3/8'plus module dimension Set mounts on eave most row so that the Rock -It Pedestal is on the South end of Rock -It Slide Set mounts on all upper rows so that the Rock -It Pedestal is an the North end of Rock -It Slide 2 Install Array Skirt on Eave Mounts Loosen Hex Flange Bolt in Rock -It Mid -Clamp Slide Array Skirt into front channel on Rock -It Shelf Tighten Hex Flange Bolt to engage the Array Skirt 3-5 Install Rock -It Couplings Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting an the roof (Each Load Bearing Foot is set to same height as the Rock -It Mounts - adjust accordingly) On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling On eave row only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt drawing the Array Skirt sections together Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface NOTE: If a coupling lands on a rafter, the Hybrid Mount' should be used in place of the Rock -It Coupling (refer to image 3a) -Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal, or by purchasing separately 6 Align and Straighten First Row of the Rock -It System with Array Skirt Use North-South adjustment of the Rock -ti Pedestal to stnighten array skirt Torque screw on side of Rock -It Pedestal to 150 in -lbs to secure it to the Rack -It Slide Adjust Flange Level � lut to level the system (optional — can be leveled during or after installation) 7-10 Install 1 st Row of PV Modules Slide upslope Rock-It.Mounts down to engage top of first module Install Rock -It Couplings an the upslope side of 1st row of panels Torque 1 st and 2nd row of Mid -Clamps on Rock -It Mounts and Rock -It Couplings to 150 in -lbs. (Torque to 130 In -lbs. when installing with 32mm modules) Install balance of PV modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules 11 Level the Rock -It System • When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value) www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 5 I i T. GrounDLnG LUG InSTaLL Necessary Components: Bumcly CL50-ITN Ground Lug (UL Listing #KDER.E9999) Note: Drill and deburr hole in Ground Lug prior to installation 14 AWG -4 AWG Copper Ground Wire" 8-32 x 0.5" Serrated Flange Head Bolt (300 Series SS) 8-32 Serrated Flange Nut (300 Series SS) 11/32" and 1/4" wrenches or ratchets/sockets 1 Insert the flange bolt into the module ground hole. Place Ground Lug over the bolt and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten set screw to complete assembly. Torque Values: 14-10 AWG= 20 in -lbs. 8 AWG= 25 in -lbs. 6-4 AWG= 35 in -lbs. "Minimum of 1/4"clearance required between bare copper wire and aluminum. ROCK -IT' CLIP SS InSTaLL •:�r•�cat�udr�tcurrma!�t�1CJ1K�Rs 2' %%ftcm 1 Locate all parts • -Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. See fig. A for acceptable mounting locations. 2 Install the Rock -It Clip SS Slide the Rock -It Clip SS onto the lip of the module frame. Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. • Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock -It Clip SS. Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the Clip Flange to avoid rotation during tightening. i www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 - 6 t6r 2' %%ftcm 1 Locate all parts • -Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. See fig. A for acceptable mounting locations. 2 Install the Rock -It Clip SS Slide the Rock -It Clip SS onto the lip of the module frame. Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. • Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock -It Clip SS. Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the Clip Flange to avoid rotation during tightening. i www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 - 6 t Snow Load 0-20 psf Modules in Landscape Wind Speed Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 Zone 1 Zone 2 Zone 3 Zone 1 _ : Zone 2 Zone 3 ASCE 7-05 ASCE 7-10 < 6:12 1. 7:12 < Roof Pitch < 12:12 B 159 93 59 1q'd Zone 3 Zone 1 Zone 2 Zone 3 88 88 85 mph 110 mph t C 114 67 42 '•itl9 _ °.tee C-6,�-�65 D 96 56 35 91 74 74 B 146 85 54 i - Willi 3'- 80 80 90 mph 115 mph C 104 61 38 98 59 35 D 88 51 32 83 68 68 18 47 38 38 B 123 72 45 3. 95 95 100 mph 125 mph C 88 51 32 83 68 68 .. D 74 43 27 70 .57 57 33 B 98 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 34 19 D 59 34 22 56 46 46. - - -18 .y 46 -37 . B 85 50 31 81 66 66 120 mph 150 mph C 61 36 22 58 47 47 11...22... D • 51 30 19 49 40 40- " Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. however the designer must round down to meet appropriate rafter spacing _ 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safely of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included, in this table Snow Load 0-20 psf , .. tUt uta In .F►cnia. it- Wihd Speed i 2:12 < t Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. however the designer must round down to meet appropriate rafter spacing _ 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safely of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included, in this table Snow Load 0-20 psf , .. tUt uta In .F►cnia. it- Wihd Speed Exposure Category 2:12 < Roof Pitch < 6:12 1. 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zonal* Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 If,XT „. 33 ^ �85mphy(K110mph•t- _ °.tee C-6,�-�65 .f 8 ,r'�• -x•24--'t 61r 504 *r50w-� 52:.�;42.•.�,._ ¢2 _ B 83 49 30 46 90 mph . 115 mph a C 59 35 22 56 46 D 50 29 18 47 38 38 iy+ 8 +w70ia w� 41 +.w±26d,.54r..p54.+. 100 mph;. 125 mph j b;,. Cr� �.y50r' '. � 2�, t 18•x;{. X47 w+439' 7 42>'j 26 i ' 15 `I '' 40;�,.L ��°32 , 325 .: 33 B 56 20 53 43 43' ' 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 tomIB-" .. 49—. ' " - -28- -18 .y 46 -37 . 37- .120 mph' • 150 mph C^ 35 20 12 33 27 27 p 2' -- 'D"� R29. :.,,.,17. 10, d2B 22z 11...22... Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" ( 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity r • 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height . 7.) All adjustment factors are set to 1. No site specific engineering is Included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 7 t r Snow Load 21-30 psf _ Modules in Landscape Wind Speed Exposure '_ Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 110 mph B Ci ='J,to1:: r„ rf 93 67 59d 5, 42 r Snow Load 21-30 psf _ Modules in Landscape Wind Speed Exposure '_ Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 110 mph B Ci ='J,to1:: r„ rf 93 67 59d 5, 42 c _ - 90 mph` 115 mph 0 B C D 56 85 61 51 35 54 &&, • 38 32 + g8. '" .68: x.68; S$- , )68 ..•y 68 _ 96 U 104 88 100 mph 125 mph B C 88 72 51 45 ;6B 32 8$ 60 68 $$ L D B 74 98 43 57 27 SS= ' 36 68 57 57 8 54 46 6'66 54 46 110mph140 mph C D B 70 59 85 41 34 50 26 66 22 56 31 8 120 mph 150 mph C 61 36 22 58 47 47 • - D 51 30 19 49 - _ 40 40 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar s(andoff„ however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity, = 547# (per testing results) • 4.) Includes additional factor of safely of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7,) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 21-30 psf Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standofl 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) r 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" f 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height _ i 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com. 877-859-3947 8 o I' s Pbrts`� Wind Speed Exposure 2:12`< Roof Pitch < 6:12 7:12 < Roof Pitch <.12:12 ASCE 7=05 ASCE 7-10 • .Cate o , Zone 1 Zone 2 Zone 3'+ Zone -1 Zone 2 Zone 3 Air Biri?. 153T r 33 1: 85 mph; 1'101mph ' 1C 65 . )' 38- :._a D'_'-'tL .55.. !`•�32 B 49 30 90 mph ,115 mph C 59 35 22 ' 0 50 29 18 38 38 100 mpfi' 125 mph z CIV',J50 - 29 m 183 "�.w 39 •�..32ar;' ;39! ` 26 X=40t;^_ 3243 + B 56 33 20 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 "^.-- 120 mph 150 mph`7 B. +•^1 "iC .49- _ t r28 --. 18 C37 ' ' �' '11 27 27 - D� _, 29 1 T_ 10 28 . -22'• 22,.. Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standofl 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) r 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" f 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height _ i 7.) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com. 877-859-3947 8 Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone.1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 90 mph 100 mph 110i mph ' 120 mph 110 mph 115 mph 125 mph 140 mph 150 mph B C D 8 C D C D B C D B C -b 83 +,} t 81$Y a3 74 83'' 59 42 35 54 38 32 45 32 27 36 26 22 31 22 1 19 5?' _ r. 51; ,. $1 St" 'SI, =: 51' 51 $1 51 51 ST : S $F- ; } xr � �5B -61-1 F7 56 B 49 61 51 90 mph 51 43 57 41 34 50 36 30 C 35 70 59 46 46 D 29 18 61 51 47 40 47 40 49 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" ` 3.) Maximum allowed standoff capcity = 5479 (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 31-40 psf Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity t 5.) Va.ues based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height 7,) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 } I 1 et Wind Speed Exposure 2:12 < Roof Pitch Catego Zone T Zone 2 < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 3 Zone 1 Zone 2- Zone 3 —85 "`11O:mph' mph't _ -:20; B 49 30� 90 mph 115 mph C 35 22 D 29 18 .100mphW ,125`mPh. �+c vC �,. t_F29 L'. 18 1, 2b B 33 15' ~20� 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 .. •-� - ,,-.-Y-�. �..w. 14— B t749�`.. 'fir 28 ` +I. .18 q 120 mph" i 150 mph j ,'C: - 7435- s ;r 20 —12 t %27 " �; '`i 27 ' i Di 10 22 29 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity t 5.) Va.ues based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height 7,) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 } I ,. ,V. Gro-unDinG inFormaTlorl , The rail free Rock -It System may be used to mount and ground PV modules that comply with UL 1703, only when that specific module' has been r evaluated for mounting and grounding, in compliance with the included installation instructions. 41 Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. t, '�'"'� '�" y Multiple Use Grounding Pins Grounding pins within the Mid -Clamp are multiple use bonding/groundirig devices. Modules will need to be adjusted if the Mid -Clamps are. `, y f ' loosened to ensure there is "new_ "metal to pierce into upon retightening. 'R Grounding Method. Rock -It 2.0 Mount bonds N -S rov'vs of modules Rock -It 2.0 Coupling bonds E -W rows of modules Array Skirt 2.0 bonds E -W along the entire array when installed r ' One Burndy CL50-ITN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscape orientation..' ~BOI'1DInG' ASsemBL9 aI"1D BOr1Dll'1G PATH T t r _ - •'� ' K' Bnnd path 4` ® Grounding lug .p ivy L r-- Equipment Grounding, p"� y,,;• •'`A Integrated�6onding� Conductor lEGfl- g. _ Fj jj Aqy to eanh - 4 'm Rock -it Coupling � •',j r ' e�. -'a ■ Rock -It Mount •• Uy + _ - ROCk-II Array Skirt .-...+a-+...,.� ..paw...••.c t I Bond Prlh '.tw�.7 . , � ` � t .T + � � I Bond va�th r • ® Grounding Lug G• ® Grounding Lug y y Equipment Grounding ` { ConduaorlEGC1. oin Ah„u , �- Grounding ConEquductor (EGQ E.7, � R �� - w Ruck•It Coupling-. _ - t9 ountl . ON Rock-Ic Coupling• RockIt MountRockd[Array Sknt - - + • - _ Rock.I(AI ]y Skut WWW ecofastensolar.com info@ecofastensolar.com r 877-859-3947 iz THermaL FXPansic)n anD BonDInG A thermal expansion gap_is - required per each continuous 40' length of modltle,;. Omit a coupling and leave a 2" gap in the array skirt and also between the modules at that point. BracKeT sPaclnG Portrait Orientation Landscape Orientation — Bond Path ~ 40 Grounding Lug - 'yuluine,, c„x,oa�„g CanducrorIE-W- SmeurOr p.o.r.0o�co Rack•It Coupling a Rock -it Mount —Rock•it Array Skirt 32mm, 35mm & 40mm Modules: Max east/west bracket spacing is 72" OC. Maximum easVwest bracket spacing is 48"OC. 32mm Modules: Max east/west bracket spacing is 48"OC. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser spacing E -W than the maximum. STaGGereD LaYoUT I canTILever anD OFFseT Staggered'Mounting Points 1 ®Rock -It Mount Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing, t The array layout instructions in this installation manual offer a general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 r 13 1 i` +_ , ; "1 4AL 1 ®Rock -It Mount Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing, t The array layout instructions in this installation manual offer a general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 r 13 1 ROCK -IT SYSTem 2.0 EVaLuaTeD, COI'1'1PaTIBLe MODULeS Module Manufacturer Model Type (X used to indicate variable test) Module Dimensions (mm) Module Dimensions (in) Trina Solar TSM-XXX-PX05.08 1640 x 992 x 40 64.57 x 39.06 x 1.57 Canadian Solar CS6P-XXXM 1638 x 982 00 64.50 x 38.70 x 1.57 Canadian Solar CS6P-XXXP 1538 x 982 x 40 64.50 x 38.70 x 1.57 Jinko Solar JKMXXXP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXPP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXMM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Yingli Solar YL2XXP-29b 1650 x 990 x 40 65.00 x 38.98 x 1.57 LG Electronics LG300N1 C -B3 1640 x 1000 x 35 64.57 x 39.37 x 1.38 LG Electronics LG300N1 K -G4 1640 x 1000 x 40 64.57 x 39.37 x 1.57 Axitec Solar AC-XXXM/156-60S 1640 x 992 x 40 64.57 x 39.06 x 1.57 RECOM RCM -XXX -6M8 1640 x 992 x 35 64.60 x 39.00 x 1.38 Silfab SLA 2XXP 1650 x 990 x 38 64.96 x 38.98 x 1.50 Solaria PowerXT XXXR-BX 1621 x 1056 x 40 63.82 x 41.57 x 1.57 Hanwha Q Cells Q.PRO G4 2XX• 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q. PRO BFR G4 XXX* 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR G4.3 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PEAK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PEAK BLK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells B.LINE PLUS 8FR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells B.LINE PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 'Hanwho 32mm modules to be used with special order Rock -It System components. Call for details. • Fastest, easiest to level system on the market • SIMPLE- only 4 components • Conforms to UL 2703 First Edition North-South adjustability • Class A Fire rating with Type 1 modules Only one tool required (1 /2"deep well socket) • Integrated electrical bonding Max No. of Panels 300 Modules per ground lug Materials 300 Series Stainless Steel 6000 Series Aluminum Max System Voltage 1000VOC Coating Black Andodization/Mill Finish Class A Fire Rating With UL7 703 Type 1 Rated Modules Lug Specifications Burndy CL50-lTN Ground Lug (UL Listing NKOER E9999) Leveling Range 3-4" Ground Wire Per above Lug spec 14 AWG- 4 AWG Copper Ground Wire Rock -It Slide -Comp 2.0 Range Rock -It Slide -Tile 2.0 Range 3" 7" Max Module Size 64.96"(1650mm) x 39.05"(992mm) x 2"(50mm) Min/Max Roof Slope 1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing (35mm/40mm) Max Anchor Spacing (32mm) 72" 48" Rock -It Mount Load Rating 547lbs with Single 5/16" Lag 3.0 Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16" diameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is 1/3 bracket spacing Rock -It Slide Box QTY 50 units Coupling Box QTY F77n,ts Warranty 20 Year Material and Workmanship iysten rnatkmg ;placed an We na undenide of 3ock•11 Mount and Coupling) MECO asten Solar ROCK -IT SYS rEM MFG 10 C00E:x70r.Qo1VW CONFORMSTO UL 1703 wwwiwcut.awu"w a�tum.r,.0 oersemw e O, www.ecofastensolar.com Codes: National Electric Code, ANSI/NFPA 70, NEC 250, NEC 690, IRC, IBC Standards: UL 2703 First Edition, UL 1703 info@ecofastensolar.com ��d EcoFasten Solar 877-859-3947 14