Permit No: B17-1814 Issued: 8/14/2017
APN: 005-465-002
Address: 497 E 21 ST ST, CHICO
Owner: Angela Rios
Permit Type: SOLAR ROOF -RES
Description: Installation of roof mounted solar 3.135 kw
I.
Flood Zone: None SRA Area: No
,SFTBACK,S for Zonenty. AG. SRA_ PW
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING
T
Inspection Type
JVR I SP DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Setbacks
131
Do Not Pour Concrete Until Above are Sign d
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
Blockin nder inin
612
Tiedown/Soft Set System
611
Do Not Install Floor Sheathing
or Slab Until Above Signed
Shearwall/B.W.P.-Interior
134
Shearwall/B.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Manometer Test
605
Do Not Install Sidin Stucco or Roofing Until Above Si ned
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
128
Gas Piping House
403
Gas Test House
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Swimming
Pools
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Swimming
Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck
505
Pool Fencing/Alarms/Barriers
503
Pre -Plaster
507
Manufactured Homes
Setbacks
131
Blockin nder inin
612
Tiedown/Soft Set System
611
Permanent Foundation System
613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Ski rtin Ste s/Landin s
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia:
Finals
Public Works Final 538.7681
Fire De artment/CDF 538.6226
Env. Health Final 538.7281
Sewer District Final
**PROJECT FINAL ZS•17
-rrujeci anal Is a i-ernncace of occupancy Eor txesiaennai umy)
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
0
Butte County Department of Development Services
PERMIT CENTER
7 County Center Drive, Oroville, CA 95965
f""'.• ""'••'-� Main Phone (530) 538-7601 Fax (530) 538-7785
www.buttecounty.net/dds
Declaration of Installation
for Smoke Alarms and Carbon Monoxide Alarms
FORM NO
DBI -01
The newly adopted 2013 California Residential Code requires the installation of Carbon
Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances
are installed and in dwelling units that have attached garages. The;policy for Carbon Monoxide
Alarms in Butte County states: "Any permit obtained in which the value of worts exceeds $1000
associated with a Residential Group R Dwelling Unit or Sleeping Unit shall conform to the
following 2013 California Residential Code requirements for Smoke and Carbon Monoxide
Alarms (Section R314 & R315)."
2013 California Residential Code requirements for Carbon Monoxide Alarms:
R316.1 New construction: An approved carbon monoxide alarm shall be instilled in dwelling'
units and in sleeping units within which fuel -burning appliances are installed and in dwelling
units that have attached garages.
R315.1.2 Power supply: For new construction required carbon monoxide alarms shall receive
their primary power from the building wiring where such wiring is served from a commercial
source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to
the permanent building wiring without a disconnecting switch other than as required for over -
current protection.
Exceptions:
1. In dwelling units where there is no commercial power supply the carbon monoxide alarm may be solely
battery operated.
2. In existing dwelling units a carbon monoxide alarm is permitted to be solely batteryoperated where
repairs or alterations do not result in the removal of wall and ceiling finishes
or there is no access by means of attic, basement or crawl space.
R315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be
installed within the dwelling unit or within a sleeping unit the alarm shall be inte-connectedin a
manner that activation of one alarm shall activate all of the alarms in the individual unit.
Exception:
1. Interconnection isnot required in existing dwelling units where repairs do no. result in the
r removal of wall and ceiling finishes, there is no access by means of attic basement or crawl
space, and no Previous method for interconnection existed
R315.2 Where required in existing dwellings: Where a permit is required for alterations,
repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping
units that have attached garages or fuel -burning appliances shall be provided with a carbon
monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be,
required in the specific dwelling unit or sleeping unit for which.the permit was obtained.
R315.2.6 Alarm requirements: No person shall install,, market, distribute, offer for sale or sell
'any carbon monoxide device in the State of California unless the device and instructions have
been approved and listed by the State Fire Marshal.
xv
A
Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the
following locations:
1. Outside of each separate dwelling unit sleeping area in the immediate vicinity of the
bedroom(s).
2. On every level of a dwelling unit including basements.
R315.1.5 Multiple -purpose alarms: Carbon monoxide alarms combined with smoke alarms
shall comply with Section R315, all applicable standards, and requirements for listing and
approval by the Office of the State Fire Marshal, for smoke alarms.
Butte County's Interpretation of 2013 CRC, Sections 314 & 315 for
Smoke Alarms & Carbon Monoxide Alarms:
Where alterations, repairs or additions exceeding $1,000 in valuation, existing dwellings shall be
retrofitted with smoke alarms and those that have attached garages or fuel -burning appliances shall have
carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for
Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements
for Carbon Monoxide Alarms.
DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY
As Owner/Contractor, Uwe affirm and declare under the penalty of perjury, under the laws
of the State of California, by our signatures below as Owner/Contractor, that I/we will
comply prior to final inspection with Items A & B as specified herein:
A. Both Owner/Contractor have read and clearly understand the aforementioned 2010
California Residential Code (CRC) Carbon Monoxide Alarm requirements.
B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to
final inspection as per the aforementioned building code and maintaining such
installation. Smoke Alarms will also be installed prior to final inspection as_per the 2010
CRC.
Smoke and Carbon Monoxide alarms are now installed in the following locations:
rYti-r- �S LL �JL fwlC, � i l' t EV A �17K{ 1ALLZ C VM --i SA -Sr— NA M
Owner's name (print):
KJ AU— e�►)t=L.:S UUI<w v QCj
A•.1m NAf rrA.1%t& 'brM< S
Owner's signature: I I✓` V '� Date: C J-
Contractor's name (print): .� J r CSLB License:
Contractor's signature: Date: ° ( 7
Project Address: LA9q E. ZIS�-Sk �' �n � CQ� Permit #:11(ji�����
Page 2 of 2
c
S euc l u ra t .
.r
Y
ENGINEERSti
DESIGN RESPONSIBILITY:
The Rock-it System Installation Manual is intended to be used under the responsible charge•of a registered'-, 4i
design professional where required by the authority having jurisdiction. In all cases, the urger of the Installation
Manual has sole responsibility for the accuracy of the design and. integrity of the system.
i
The Installation Manual does not check the capacity of the building structure to support the loads imposed on
5
. the building by the array, such as bending strength of roof rafters spanning between supports: This requires.., -y
. t
additional knowledge of the building and is outside the scope of,the Installation Manual a:.-id our review. =
...
If you have any questions on the above, do not hesitate to call.. 4 oFEssi.
Prepared By:,'
PZSE, Inc. - Structural Engineers t
-n,0.s3e7e
r
'
Roseville,,CA.1 - '
Exp. 331-17 *•
v
OF
8150 Sierra'College Boulevard, Suite) 50, Roseville, CA 95661
e,916.961.3960 916.961.3965 t 'www.pzse.com ;.
PZH
structural
ENGINEERS
January 16, 2017
Rillito River Solar, LLC dba EcoFasten Solar
289 Harrel Street
Morrisville, VT 05661
TEL: (877) 859-3947
Attn.: Engineering Department,
Re: Engineering Certification for the EcoFasten Rock -it System Installation Manual
This letter is to document that PZSE, Inc. -Structural Engineers has reviewed EcoFasten Rock -it System
Installation Manual published October 12, 2015 and specifically the "Loading Tables".
SCOPE OF THE SYSTEM:
The EcoFasten Rock -it System is a solar panel support system for installing solar photovoltaic arrays on sloped
roofs of buildings. Typically such buildings are residential with shingle or tile roofs. The number and spacing of
attachments to the roof structure can vary depending on various site specific criteria including, but not limited
to, roof slope, spacing of supporting structural members and environmental loading.
SCOPE OF OUR REVIEW:
PZSE, Inc.—Structural Engineers provided a review of the following
• Rock -it System design methodology
w Rock -it System Installation Manual
• Rock -it System Loading Tables
and has determined that all information, data and analysis contained within the Installation Manual are based
on, and are in compliance with, the structural requirements of the following Reference Documents:
• Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-10
• International Building Code, 2015 Edition, by International Code Council, Inc.
• California Building Code, 2016 Edition, by California Building Standards Commission
• Aluminum Design Manual, 2010 & 2015 Editions, by The Aluminum Association
This letter certifies that the EcoFasten Rock -it System Installation Manual and Loading Tables are in
compliance with the above Reference Documents.
8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661
916.961.3960 916.961.3965 1www.pzse.com
193.82 s�.C+.
5,293
vivint. PV SOLAR SYSTEM SPECIFICATIONS:
a
�Do
SYSTEM SIZE - 3.135KW DC/ 2.530KW AC
w
z
RIOS RESIDENCE MODULE TYPE & AMOUNT - (11) JINKO SOLAR JKM285M-60B
m
o �mm
MODULE DIMENSIONS - (L/W/H) 64.97in/ 39.06in/ 1.57in
w Woz
497 E 21 ST ST INVERTER - (11) ENPHASE IQ6-60-2-US
U) <__
UU
C H I C O, CA 95928 'INVER I EH(S) USEU 114 I n1a ue5i6iv IJ/AR[ comrLIAUT W1T11 012-9 209,544,11 (P4pm CHI ITnnwN) SFF MANI IFA(;TIIRER DATA SHEET,
Q a
INTERCONNECTION METHOD - LOAD BREAKER
GOVERNING CODES SHEET INDEX:
ALL WORN SHALL CONFORM TO THE FOLLOWNG CODES PV 0.0 - COVER SHEET
• 2016 CALIFORNIA BUILDING CODE PV 1.0 - SITE PLAN
• 2016 CALIFORNIA ENERGY CODE PV 2.0 - MOUNTING DETAIL
�p
• 2016 CALIFORNIA ELECTRICAL CODE PV 3.0 - FRAMING DETAIL
• 2016 CALIFORNIA FIRE CODE E 1.0 - 3 -LINE DIAGRAM
}
• 2016 CALIFORNIA GREEN CODE E 2.0 - NOTES
r'
• 2016 CALIFORNIA MECHANICAL CODE E 3.0 -WARNING LABELS
ti'
• 2016 CALIFORNIA PLUMBING CODE E 4.0 - WARNING LABELS CONT.
.'
• 2016 CALIFORNIA RESIDENTIAL CODE E 5.0 - ELECTRICAL PHOTOS
a
/ f
• ANY OTHER LOCAL AMENDMENTS E 5.1 - ELECTRICAL PHOTOS CONT.
W
J
■L
T
N
pO
8
J1 4;9171 Ea s 121 s I ft,,eelt < ]i
aa
%
N
a
p
N N
m
Z
Z �
� 7 �
Z
-Q
J J m
as 3
z z 0
SHEET
NAME:
w w
>w
'�.
NOTES:
O _
A PHOTOVOLTAIC MOUNTING RACK INSPECTION MAY BE REQUIRED PRIOR TO PANEL INSTALLATIONS
in
ANY MODIFICATIONS TO THE EXISTING ROOF AND/OR PLUMBING DRAIN, WASTE, AND/OR VENTS AR TO COMPLY WITH THE 2016
SHEET
CBC/CPC
NUMBER:
ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS
O
THE BACKFEED BREAKER SHALL NOT BE MARKED FOR "LINE" AND "LOAD" MARKINGS
O
CONDUIT RUN THROUGH THE ATTIC OR UNDER EAVES DENOTED WITH DASHED LINES ON SITE PLAN
>
SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED, PURSUANT TO SECTIONS R314 AND R 315 OF THE CRC
a
• - -
'�,
r
o O
is �•:a
• o�_��
ry
�
r�o
>r., Z--3,o tom .vi Zc,
A a; <.Yn'Om mX -<m Om y�
W.
.m33� �cc"13�n.
Dn0 ANc Opc01-'
nsvz m z z
. .,
i•
Z .
... -
c�Nm-o .aN. :E >� m�
mDsm mv.yo z-y.
N ' O K
z; m m x
�pc� v�y mzy�
O- r•
m
m-
t-
l
N T T j T Oz
M.-g L1 n0 00 z3
gyp
T Z c m O VI T O
mGN=.zO z y 02T
�0a
2
O
_
-
C,
ONm �O< 3a mm
Wm 20 yA
(Dip�p DzaE
11yS 0. =.3OX z;OO
m
N'
-n r
y m
®
O
..
..
•.T•O
o 'M z
mo
'O
^,
.Ti1
N'�VO'¢OLV�.00Zp
r. 0. �20.�n
XDSyO m mmOC
myvx �;OS O t7y
z
O
N0_.-OOffl
>�<ORI
•
J<
3r) <
�T-1
W y
�., Z�
^ m< 3 �.1
�p y J
N
Ai KK vo mivc
0 0r- .illyy y 1
D.. .. O •r:
=� N O
••
Op
O
C
N
N y .00
t.
ZO3 Om0p .m p
-a
t
.
C
T
W CA%
V!'^ V
47 O <
rj
y m 0T
i I
N -'
O v'
'•,.
m
• Cm1 •, ;.
S b m :fl O 0
moms O< O0 1 -
N
a _
,/-<�
�//��
77 VJ 77, UJ
' . Rig +;
.��♦ •
.,.
T
V! VJ
497E 21ST ST, C H I CO,
CA 95928 :. •�
m m
_"' _ , .
;
FRONT OF HOUSE
,
_
• _ i
" ' '
t 3•
-
r .
.
l
-�
r - ----------l------•
1
`
a
----
- � t. �
�
— —
�;;`;.:�
lO
-
;i.3
AIC •.
I '
ry
•
11111111111111117O
O
�
O
ry
O
O
: O
• ,
♦
•.
�
tl
IF
Dcn
}
A
r
N
cn
•.
z N
3
' yzz N
SITE m
INSTALLER: VNINTSOLAR
M
plO� pC�IDC�^C..
I\ RESIDENCE
liC
m m
PV-1.0.
, m
y
INSTALLER NUMBER: 1.877.404.4129
�,/ivi�� , @
�r • 999
1
497
E21ST ST r
My
PLAN
CHICO, CA 95928
DRAWN BY: JS S: 5795530
Lasl Modified: 811012017
UTILRY ACCOUNT NUMBER: 540866D746A
r
TOR
1 )ROCK -IT MOUNT
n I NOT TO SCALE
'
COMP SHINGLES
2 1/2 MIN
/ 4 APV SYSTEM MOUNTING DETAIL
wz.0 rrormwue
W MIN AND 6' MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE
CANTILEVER 1/3 OR LESS
SS LAG SCREW
TORQUE=13t2 FT -LBS.
PV MODULE, TYP. MOUNT 0 O
PV .
3
TO FRAMING OF EXISTING
COUPLING CLAMP '
ROOF TYPE, PARALLEL
6' MASZIhTIbIoF ROOF
\j`
ROCK -IT SLIDE
MODULE
METAL
FLASHING
(E.DM BONDED WASHER
ORMS WATERTIGHT SEAL
RAFTER
71
'
COMP SHINGLES
2 1/2 MIN
/ 4 APV SYSTEM MOUNTING DETAIL
wz.0 rrormwue
W MIN AND 6' MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE
5116'x4 12'
SS LAG SCREW
TORQUE=13t2 FT -LBS.
PV MODULE, TYP. MOUNT 0 O
PV .
3
TO FRAMING OF EXISTING
SECTION VIEW
ROOF TYPE, PARALLEL
6' MASZIhTIbIoF ROOF
\j`
3 SECTION VIEW
PV 2.0 NOT TO SCALE / 1P�V ARRAY TYP. ELEVATION
w z.o
ROCK -IT COUPLING
MID CLAMP
COUPLING SHELF
TIE PLATE—/ W "ShWx1 1/2' COUPLII
HEX FLANGE BOLT
SIDE VIEW 300 SERIES SS
w
a
LIQ
U
Z
'h
(n ,, U m
LLI w o Z
F-
En 0
O
ROCK -IT COUPLING ASSEMBLY
PV 2.0 NOT TO SCALE TOP VIEW
CLAMP - ATTACHMENT CLAMP -ATTACHMENT
COUPLING PERMITTED COUPLING
CLAMP SPACING
111
I I I
RAFTER MODULE
I--
MODULE
1 1 I
/�L= LANDSCAPE CLAMP SPACING
2 )MODULES IN PORTRAIT/LANDSCAPE
w2.0 rormstue
ONE HOLE STEEL
CONDUIT MOUNT BRACKET
FLASHING OR TILE
(2:)CONDUIT MOUNTING DETAIL
PV 2.0 x --1
( I
�I L
RAFTER
i
L=PORTRAIT
CLAMP SPACING
rvXMt: /A
V/
Z _j
Q
Z) F-
0 w
2 p
SHEET
NUMBER
0
04
ROOF SECTION 1
ROOF SFCTION 1 FROM PV 1.0
U m
Z m�
LLJ Nz
�mm
C/)
W Wow
�2j
QUO
O
ry T
0
a�7
N
y�y
e�
pN
O
�qq
J
O
N
O
N
gm
o
N
0
K
N
-
Z W
Z m
Z �
i Z
w
J J
r
m
J
Z
N f~q
Z Z
p
SHEET
NAME:
C7
J
Z
W
0
LL
-
SHEET
NUMBER:
FRAMING DETAIL
M
NOT TO SCALE
a
1
20A
5A
Inverter.Enphase
106.60.2 -US
_ EnvoyS
OtiYck
(;6% . 2
PVCucuitl:ll t 2 om ner ane nvoy- 40V(ontinuous,
Modules / 1 protection max 60A breaker on combiner oupuq
Parallel = with 10 KAIC circuit breakers
NEMA4 function Box with lrfeversible
Ground Splice tTYP) '
Photovoltaic System
�
c71
Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER)
gO ri
u
Tag g
Description
Wire Gauge
0 of Conductors/Color
Conduit Type Conduit Size
OC System Size (Watts) 3135
AC System Site (Watts) 2530
40
o
1 Enphase Engage Cable THWN•2
12 AWG .
3(L1, L2, G)
N/A -Free Air N/A -Free Air
- Rapid Shutdown
Point ol h terconnection, Wad
Module/inverter Count 11
c
N
a
y
m
'~^ N
r" O1
U
p
e
Disconnect Square D
Sid 7 5.121D)12)(3)Ib)
1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A -Free Air N/A -Free Air
J �
W
2 THWN-2 10 AWG 2(1L111.2)8/R EMT 3/4"
` DU221RS, 240W30A,
2 THWN•2-Ground 8AWG 1(GRN) EMT 3/4"
m
OHO?
Existing Module Information:
Type: YL260P-29b
fa.. F
j
umi
equivalent
1.1 L3N
o
m
=
count: 36
SHEET
A A
M
Existing 240W200A
NAME:
j
Service Panel, Single
be
Existing PV Combiner Panel Existing Inverter Information:
Type: M215.60 -21.1.422 -IG
" 75A
Disconnect
count: 36
_
45A
2
SA
SHEET
it
NUMBER:
MsLoc a e Knife'AZC
Minimum GEC size4
Disconnect
AWG copper
W
-
VISIBLE LOCKABLE
-
KNIFE' A/C
DISCONNECT
Square
•
DU222RB
°o
60A/240V
UNFUSED NEMA3
20A
5A
Inverter.Enphase
106.60.2 -US
_ EnvoyS
OtiYck
(;6% . 2
PVCucuitl:ll t 2 om ner ane nvoy- 40V(ontinuous,
Modules / 1 protection max 60A breaker on combiner oupuq
Parallel = with 10 KAIC circuit breakers
NEMA4 function Box with lrfeversible
Ground Splice tTYP) '
�
c71
gO ri
u
ut o:
Z m
e
n
m
- Rapid Shutdown
Point ol h terconnection, Wad
Z
Disconnect Square D
Sid 7 5.121D)12)(3)Ib)
J �
W
e
` DU221RS, 240W30A,
m
Unfused, NEMA3, or
fa.. F
j
umi
equivalent
1.1 L3N
SHEET
A A
M
Existing 240W200A
NAME:
Service Panel, Single
be
Phase, with 175A Main
" 75A
Disconnect
e "
c 3
45A
2
SA
SHEET
it
NUMBER:
MsLoc a e Knife'AZC
Minimum GEC size4
Disconnect
AWG copper
W
SOLAR MODULE
Enphese 6 -60 -2 -US
L_ _10_ ._
MICR04NVERTER AT
EACH MODULE. ATTACHED
WITH ECOLIBRIUM SOLAR
HARDWARE
96 BARE CU GROUND
(ATTACHED TO FIRST MODULE IN
ARRAY). BALANCE OF ARRAY _
GROUNDING CONNECTIONS
MADE THROUGH ARRAY
HARDWARE
MICROINVERTER CONNECTION
TO ENGAGE TRUNK CABLE .
Inverter Make/Model - 1Q6 -60 -2 -US
Max. Dc Volt Rating
48
Volts
Max. Power at 40 C
230
Watts
Nominal AC Voltage
240
Volts
Max. AC Current
0.96
Amps
Max. OCPD Rating
20
Amps
Max. Panels/Circuit
16
15
Short Circuit Current
15
Amps
Inverter Make/Model M215-60-2LL-S22-IG
Max. Dc Volt Rating
45
Volts
Max. Power at 40 C
215
Watts
Nominal AC Voltage
240
Volts
Max. AC Current
0.9
Amps
Max. OCPD Rating
20
Amps
Max. Panels/Circuit
17
15
Short Circuit Current
15
Amps
Other Notes
PV Module Rating @ STC
10.56
Module Make/Model
JKM285M-60B
240
Max. Power -Point Current (imp)
8.9
Amps
Max. Power -Point Voltage (Vmp)
32
Volts
Open -Circuit Voltage (Voc)
38.7
Volts
Short -Circuit Current (Isc)
9.65
Amps
Max. Series Fuse (OCPD)
15
Amps
Nom. Max. Power at STC (Pmax)
285
Watts
Max. System Voltage
1000 V DC (UL)
Voc Temperature Coefficient
Voc Temperature Coefficient
-0.29
%/C
AC Output Current According to art. 690.8(8)(1)
10.56
1 Amps
Nominal AC Voltage
240
1 Volts
THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR)
Rooftop conductor ampacities designed in compliance with art.
690.8, Tables 310.15(B)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c),
310.15(8)(16), Chapter 9 Table 4, 5, & 9. Loacation specific
temperature obtained from ASHRAE 2013 data tables.
ASHRAE2013-
Highest Monthly 2% D.B. Design Temp.: 38.7'C
Lowest Min. Mean Extreme D.B.: -3.8 -C
PV Module Rating @ STC
Module Make/Model
YL260P-29b
Max. Power -Point Current (Imp)
8.59
Amps
Max. Power -Point Voltage (Vm )
30.3
Volts
Open -Circuit Voltage (Voc)
37.7
Volts
Short -Circuit Current (Isc)
9.09
Amps
Max. Series Fuse (OCPD)
35
Amps
Nom. Max. Power at STC (Pmax)
260
Watts
Max. System Voltage
1000 V (IEC) / 600 V (UL)
Voc Temperature Coefficient
-0.32
1
• Designed according to, and all code citations are relevant to, the CEC 2016.
• Utility Service Provided by PGE
• No battery back-ups are tied to the designed inverter(s).
• Inverter(s) used in this design is/are compliant with 690.12 (Rapid Shutdown). See manufacturer data sheet
• Array grounding and bonding designed in compliance with 690.47(C)(3).
I Conductor Calculations I
- Wire gauge calculated from art. code 310.15(8)(16) with ambient temperature calculations from
art. 330.15(2)(a).
For "On Roof' conductors we use the 90'C column ampacity, 0.5"-3.5" off -the -roof temperature
adjustment from 310.15(8)13)([), and raceway fill adjustments from 310.15(8)(16).
For "Off Roof' conductors we use the 75'C column ampacity, or the 90'C column ampacity with
the relevant ambient temperature and raceway fill adjustments, whichever is less.
I he rating of the conductor after adjustments MUST be greater than, or equal tu, Ole cunlinuuus
duty uprated output current.
Calculation Example - Wire Rating (90'C) x Ambient Temperature Adjustment x Conduit Fill
Adjustment >= Continuous Duty Output Current
(On Roof, Tag 2): 10 gauge wire rated for 40 A, 40 A x 0.65 x 1 (2 Conductors) = 26A>= 13.2A
OCPD Calculations
Breakers sized according to continuous duty output current. PV circuit nominal current based off p
of modules per Circuit X (1.25(art. 210.19(A)(1)(a))) X (0.96 Max AC current per micro -inverter)
Circuit #1 = 11 modules, Output Current w/ continuous duty = 13.2 < 20A Breaker
system output current w/ continuous duty = 13.2 < 15A (System OCPD)
L
O
40:
C
ra�
M
« m
0
Z a
NUMBER:
a
N goes ARM I Ms 2=1 W
CTsa � W
�Cr 'RIF �ft
" Wyly
J�-
e
all bb%;;Iwi
0 "M lot
f
fl*-� UO OMW
.,. sae ,^yl � . 7. - ••J
h t'
t ,R
e {" J
♦:1
t
+" Z w z m INSTALLER: VIVINT SOLAR B@ .,
E 5.1, ' m m ELEC. m m INSTALLER NUMBER: 1.877,404,6129 V'v�n� �I RIOS RESIDENCE
{^� .PHOTOS' i • 497E21STST
' CHICO, CA 95928 _
DRAWN BY: JS S: 5795530 Last Modified: 8I10I2017 - UTILITY ACCOUNT NUMBER: 540868014" '
www.jinkosoIar-com
.. i
.�
' t r
C UL US �^ r.
,- i:.TN..
'* LISTED' , CE
r
F
AnK
KEY FEATURES
High Efficiency
High module efficiency up to 1 / /2%. with P_issivated Emittef Reav Contact
C0N Fgt'0X {PERC) :ethnology
AAD High Voltage '
1000V slandard: 1500V notion lowers 90S costs grid yields belle( LCOE ,
Innovative Solar Cells " +
Four liusbar cell technology improves module efficiency
OPID -Free
�..
World's ist PID -Free module at 95 C/85%RH
Low -Light Performance
A'2% _
Advanced glass and solar cell surface textuiing allow for excellent
10'PNf'n perlormance in luw-light environments
++r4 Strength and Durability
Wi!hstands snow (5a0opa) and wind t2400Pa) loads, salt mist and ammonia r r
LINEAR PERFORMANCE WARRANTY
10 Year Product Warranty • 25 Year Linear Power Warranty - y
i
'00 Linear performance warranty
97% qd� Slandani performance warranty
95% na/ t a(4e frpm JrnkO r • r
90%. Solar- _
- Snear Wa
. RI17.7► �
t
t--5 t9 years
zs
f
Engin rmgDrNings,r w,,,,,. *,,,,.,R, ,.,•.,
rirmer ° .
a
Packaging Configurations
i. i,.,u enre, -one pnflet • �
2Spcs/ box . SOpcs,' allet• 700 prs/40'HQ Container
r ,
Gurnm•Ypi(tagO Q>'ugr•Volte�e rempereture Dependence
•._�Civ04%PeW1•�TT.. •—on5c;4ac:Pni:ur - ,
w,{tag. •. V : CMI :empm,w.r'C; i
Cell Type Mono -crystalline PERC 156x156mm (6 inch) .y
No of cells 60 (6 10) r
Dimensions 1650x992<40mm (F,,4.97x39-06x1.57 inch) f
Weight 19.0 kg ;41.9 ibs)
Front Glass 3.2mm, High T!ansmission. LOW Iron.
-.AR Coating Tempered Glass
Frame Anodized Aluminium Alley' '
t iunction Box IP67 Rated '
Cntput Cables 12AWG. Length: 1000mm (39 37 inch)'
Fire Type Type 1
Module Type -
JKM27OM-60B JKM275f,4.606
JK1,4280NI-60B
JKk4285M•608
JKM29OM-GOB
•
STC NOCT STC NOCr
STC NOCT
STC NOCr
STC NOCr ,
Maximum Power (Pmax)
270Wo 201 vVP 275Wp 205Wo
7.8(1YYp 209Wp
285Wp '212Wp
29OWp 216Wp -•
Maximum Power Voltage (Vmp)
31,4V 29.3V 31,6V 29 GV
31.8V 29.7V
32,OV 29.9V
32.2V 30.2V `
Maximum Power Current (Imp)
8.60A 6.85A 18.70A 6.93A
8.81A 7 U'IA
SAGA 7.12A
9,U2A 7 21A
Open -circuit Voltage (Voc)
38.4V 35.6V 38 5V 36 OV
.38 6V a6 2V
3H,TV 36.4V
38.8V 36.6V
' Short-circuit Cu!rent(Isc)
928A, ?15A 9,n0A'54A �.
9,53A. 76711
9.65A 772A
978A '781A�e_
• Module Efficiency STC (°�) '
16,509416.50%16,509417
I'l%
U• 17,1t1%17,72%..
� 5 ,
Operating Trmpemturei C)
+
-40"C-•R5"C r
�'
+
Maximum system voltage -
100(1VOCIUL)
-
Maximum se!(es fuse, ating
1
15A
!• , r
Power tolerance -
0-•31y
-
remperature coefficients of Pmax
t
-0 3911WC
+ • • .
Tempe, ature coefficients of Voc
-0.29%PC
--
Temperature coefficients of lsc
O OSkr'C
Y
Nominal operating cell temperature (NOCT)
s
15±2'C
,
S r
STC: 4 Irradiance 1000W/m/
�. Cell Temperature 25°C
N�
AM 1.5
'
NOCT: `a%:Irradiance SOObV/m
Ambient Temperature
20"C te'
AM=1.5 r
•
bVind Speed 1rn/s
- ..
' Powe, measurement :olefance: = 3"f.
••
'� ,1H, r,..�y-• rt .,�., ..,..
.:r ..• t• .... a•
::r.n•'.a,�, 1. �
: r 1. • .,. , .,
a;
Enphase
IQ 6 and IQ 6+
Microinverters
9
To learn more about Enphase offerings, visit enphase.com
The high-powered smart grid -ready
Enphase IQ 6 Micro'" and Enp-iase IQ 6+ Micror"
dramatically simplify the instalation process while
achieving the highest efficienW for module -level
power electronics.
Part of the Enphase IQ System, the IQ 6 and IQ
6+ Micro integrate seamlessly with the Enphase
IQ Envoy", Enphase Q AggregEtor-, Enphase IQ
Battery-, and the Enphase Enlighten`" monitoring
and analysis software.
The IQ 6 and IQ 6+ Micro extend the reliability
standards set forth by previous: generations and
undergo over a million hours o, power -on testing.
Enabling Enphase to provide an industry-leading
warranty of up to 25 years.
Easy to Install
Lightweight and simple
Faster installation with improved twc-wire
cabling
Built-in rapid shutdown compliant (NEC 2014)
Productive and Reliable
Optimized for high powered 60 -cell and 72 -
cell* modules
More than a million hours of testing
Class II double -insulated enclosure
Smart Grid Ready
Complies with fixed power factor, vol' -age and
frequency ride -through requirements
Remotely updates to respond to changing
grid requirements
Configurable for varying grid profiles
R The IQ 6+ Micro is required to support 72 -cell -nodules
'= ENPHASE
Enphase IQ 6 and IQ 6+ Microinverters
INPUT DATA (DC)
IQ6-60-2-US AND IQ6-60-5-US
I06PLUS-72-2-US AND IQ6PLUS-72-5-US
Commonly used module pairings'
195 W -330 W +
2.35 W -400 W +
Modulo compatibility
60 -cell PV modules only
60 -cell and /2 -cell PV modules
Maximum Input UC voltage
48 V
62 V
Peak power tracking voltage
27V 371/
27 V - 15 V
Operating range
16 V - 48 V
16 V - 62 V
Min/Max start voltaqe
22 V / 48 V
22 V / 62 V
Max DC short circuit current (module Isc)
15A
15 A i
Overvoltage class DC port
it
II
p
DC port backfeed under single fault
0 A
0 A
PV array configuration
1 x 1 ungrounded array; No additional DC side protection
required;
AC side. protection requires, max 20A per branch circuit
OUTPUT DATA (AC)
I06 -60 -2 -US AND IQ6-60-5-US
IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US I
Peak output power
240 VA
290 VA
Maximum continuous output power
230 VA
280 VA
Nominal voltage/range'
240 V / 211-264 V 208 V (1 (D) / 183-229 V
240 V / 211-264 V 208 V (10)! 183-229 V f
Nominel output currant
0.964, 1 11 A
1 17 A 1 3S A
Nominal frequency-, _
60 Hz '60
Hz
Extended frequency range
47- 68 Hz
47. 68 Hz
Power factor at rated power
1.0
1.0
Maximum units per 20 A branch circuit
16 (2.40 VAC)
13 (240 VAC)
14 (single-phase 208 VAC)
11 (single-phase 208 VAC)
Overvoltage class AC port
III
III
AC port backfeed under single fault
0 A
0 A
Power factor (adjustable)
0.7 leading... 0.7 fagging
0.7 leading ... 0.7 lagging ..
EFFICIENCY
@240 V "@208 V (1fAp
@240 V @208 V (.1 (0)
CEC weighted efficiency
97.0% 96.5 %
97.0% 96.5%
MECHANICAL DATA
Ambient temperature range
40°C to +65°C ^y
Relative humidity range
4% to 100:5 (condensing)
Connector type
MC4 or Amphenol H4 LTX
Dimensions (WxFlxD)
219 mm x 191 mm x 37.9 mm (without bracket)
Weight
1.5 kg (3.3 lbs)
Cooling
Natural convection - No fans
Approved for wet locations
Yes
Pollution degree
PD3
f
Environmental category / UV exposure rating
Outdoor - NEMA 250, type 6 (IP67)
FEATURES
Communication -
Power liner
Monitoring
Enlighten Manager and iMyEnlighten monitoring
options
Compatible with Enphase iQ Envoy
Compliance
UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES -0003 Class B,
CRN/CSA-C22.2 No. 1071-01
This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and
NEC -2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC
and DC conductors, when installed according manufacturer's instructions,
1 No enforced DC/AC ratio. See the compatibility calculator at an hyi a&.com/aa1-uSiSU13oort/mudUle-cum atp ibillivv.
2. Nominai voltage range can be extended beyond nominal if required by the utility.
To learn more about En.phase offerings, visit enphase.com
'=I E N P H A S E
0
;Oa KC-Fasteir S61ar°
o Committed to the connection
Document date 3.6.2017
Contents
Pg. 1 ........... ''~'~^--~-^-... .............. --'......... ....... .....
|
�
/
... `~' .......... Assets ofDesign
Features
System Components
Pg. 3
Rock -k 2.0 Mount Assembly
Rock -It 2.OCoupling Assembly
Pg.3- '--- ---'--.
Rock -it 2.OH�bridMount Assembly
RocWt{]ip 5S Assembly
Pg. 4`~~^'^--`-----'''-----.
---'—' ........... - . - - Array Layout
GreenFasten Flashing install
pg. 5 -'' ..... —'~~--~'~........
`
....... ... ...... - Roch,|tSVStern 2.0 Install
P2.6 -'''--~'-'~'^-^- ~'-'--'—'-^-'
-- -^' --~- Ground Lug Install
Rock -It Clip S5 Install
Pg. 7'11 ...... ........... ........... -............... ... ...... .... ...................
'..... ........... ............ . Standoff Spacing Tables
�
Snow Load O-2Opsf
Snow Load Z1'3Opsf
Snow Load 31'4OpSf
Snow Load 41'5Opsf
Snow Load 51-6Opsf
Pg. 13 '--^-^^'~''----------`----'. -' --'' - -----'--^---^----.
GKouDd|Og|Ofornl@ti0O
Bonding Assembly and Bonding Path
Po. 1] '----^'--'`--',---`'------' '--'' ---'
........... Thermal Ex,,:)ansion and Bonding
Bracket Spacing
Staggered Layout
Cantilever
Pg. 14 .... ........................................................... .............. ........... ...... .......... Evaluated, Compatible Modules
System Specifications
»xvvvvecofas1enxo|accomo info@ecofastenso|ar.conn 877'869-3947
ROCK -IT SySTeM 2.0
Designed with the installer in mind.
EcoFasten Solar specializes in solar roof attachments that are fast and easy to install, straightforward, secure and
cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one-stop source
for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry
standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in
service in the snow guard and solar industries for two decades.
FeaTur-es
• Fastest, easiest to level system on the market
• Conforms to LIL 2703 First Edition
• Class A Fire Rating with Type 1 modules
• Integrated electrical bonding
• SIMPLE- only 4 components
North-South adjustability
• Only one tool required (1/2"deep well socket)
• Vertical adjustment of 3"-4"
1 1 T i m r -/
m Pr-� !"N 1'" 1 c% n T * _ F- /'1 /-1 l I l r r�
:JS I CI I I L LJI I ILJI ICI I I S' — I CLCUII �L.v
Yg t4s,
r;
ROCK -IT SLIDe ROCK -IT 2.0 ROCK -IT 2.0 COUPLInG
4" For comp SHInGLe MOUnT & LOaD BearinG FOOT
8" For TILe
SgSTem comPonenTS* - OPTIonaL_
ROCK -IT 2.0
HY BrID MounT
(ReFer TO PG. S)
ROCK -IT CLIP SS
(ReFer TO PG. 6)
ROCK -IT 2.0
Array sKIrT
A
QV,
EcoFaSEM Solav
EcoFasten Solar products are protected by the following U.S. Patents:
8,151,522 8,153,700 8,181,398 8,166,713 8,146,299
8,209,914 8,245,454 8,272,174 8,225,557 9,010,038
9,134,040 9,175,478 9,212,833
*Components for use with 32mm modules are available as special order. Components for use with 32mm modules are labeled as such on
packaging. Side profile of Mid -Clamps on Rock -It 2.0 Mount and Rock -It 2.0 Couplings is slightly different for use with 32mm modules.
Please refer to evaluated, compatible modules on page 14.
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 1
6
k
ROCK -IT 2.0 mounT ASSeMBLY
NOTe: ITems 1-7 SHIp assemBLeD
ITem 6 pre-ToroueD
1 5/16"-18 Hex Flange Bolt (or Hex w/star washer) 300 Series SS
2 Rock -It Mid -Clamp 6000 Series AL
(fig. A: Mid -Clamp for use with 32mm modules)
3 Conical Spring 300 Series SS
4 Rock -It Shelf 2.0 6000 Series AL R
5 Flange Level Nut 300 Series SS
6 Rock -It Pedestal 6000 Series AL
7 Rock -It -Tie Plate 6000 Series AL
8 Rock -It -Slide -Tile 2.0 6000 Series AL (sold separately)
9 Rock -It -Slide -Comp 2.0 6000 Series AL (sold separately)
J
i
� f
ITemS 8-9 are accePTaBLe
BracKeTS F=Or use WITH THe
ROCK -IT 2.0
(SOLD SeparaTeLY )
ROCK -IT 2.0 COUPLING asseI'1'1BL9
NOTe: ITems 1-4 sHlp assemBLeD
1 5/16"-18 x 1.25"or 1.5" Hex Flange Bolt 300 Series SS
2 Rock-It-Coupling-MidClamp 6000 Series AL
(fig. A: Mid -Clamp for use with 32mm modules)
3 Conical Spring 300 Series SS
4 Rock -It -Coupling -Shelf -2.0 6000 Series AL
5 Load Bearing Foot
fig.. A I
(32mm)
www.ecdfastensolar.com info@ecofastensolar.com 877-859-3947 2
ROCI-<-IT 2.0 HYBRID MOl.. nT ASseMBLY
NOTP; ITP-.mS 1-InSHIP aSSPMBLeD
'- 1 5/16"-18 x 1.25°or 1.5" Hex Flange Bolt 300 Series SS
2 Rock-It-Coupling-MidClamp 6000 Series AL
`. (fily. A. Mid -Clump fur use with 32o -w? o7odulesj
�= 2i 3 Rock -It -Coupling -Shelf -2.0 6000 Series AL
4 Crushable Spacer - Cardboard or Similar
5 Flange Level Nut 300 Series SS
6 Rock -It Pedestal 6000 Series AL
r4.) 7 3/8" ID Star Washer 300 Series SS
8 3/8"-16 x 3" Hex Tap Bolt 300 Series SS
9 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS
5, 10 Rock -It Tie -Plate -T 6000 Series AL
fig. A
Q2mm)
A
i
ROCK -IT CLIP SS ASSeM BLY
NOTe: ITems 1-3 SHIP assemBLeD
1 Stainless Steel Carriage Bolt -.313-18X.75
2 Rock -It Clip SS
3 Stainless Steel Flange nut .313-18
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3'
Array LagOUT
Find the required structural attachment points.
Mark these using a vertical (N -S) chalk line on the
center of the rafters.
Spacing may vary depending upon project specific
structural requirements; i.e. high snow and wind
load areas may require lesser bracket spacing in
the E -W axis vs. the maximum spacing. Max spacing
is 48"for portrait orientation and 72" for landscape
orientation. Consult project layout diagram for
project specific bracket spacing on the roof.
Install Rock -It Mounts to predetermined mount
spacing.
The array skirt sections are the width of a typical
60 cell module — use the array skirt as a guide to
lay out module placement.
Note: The distance between the rows of mounts is calculated by the module dimension N -S plus 1 3/8"
(35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum
distance between the lag screw and the edge of the shingle is 1/2".
GreenFasTen FL_asHinG insTaLL
1 Locate the rafters and snap horizontal and vertical lines to mark the installation
position for each GreenFasten flashing.
2 Drill a pilot hole (1/4" diameter) for the lag bolt. Backfill with sealant. Eco Fasten Solar
recommends an EPDM mastic.
3 Insert the flashing so the top part is under the next row of shingles and pushed far
enough up slope to prevent water infiltration through vertical joint in shingles. The
leading edge of flashing must butt against upper row of nails to prevent turning
when torqued.
4 Line up pilot hole with GreenFasten flashing hole.
Insert the lag bolt through the EPDM bonded washer, the Rock -It slide, the gasketed
hole in the flashing and into the rafter.
Torque: The range is between 100-140 torque inch -pounds depending on the type
of wood and time of year. The visual indicator for proper torque is when the EPDM
on the underside of the bonded washer begins to push out the sides as the washer
compresses. If using an impact wrench to install the fasteners be careful not to over
torque the fastener. You may need to stop and use a ratchet to finish the install.
*The Engineer of Record shall check capacity of rafter to support lag screw loading.
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947
ROCK -IT SJ- STeM 2.0 inSTaLL
4
- .../..gyp
6
ra
Install Eco Fasten Solar Flashing with Rock -It Mounts
Fallow Eco Fasten Solar Install instructions for flashing and bracket install (GreenFasten shown above)
Optimum vertical distance between lag bolts is 1 3/8'plus module dimension
Set mounts on eave most row so that the Rock -It Pedestal is on the South end of Rock -It Slide
Set mounts on all upper rows so that the Rock -It Pedestal is an the North end of Rock -It Slide
2 Install Array Skirt on Eave Mounts
Loosen Hex Flange Bolt in Rock -It Mid -Clamp
Slide Array Skirt into front channel on Rock -It Shelf
Tighten Hex Flange Bolt to engage the Array Skirt
3-5 Install Rock -It Couplings
Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting an the roof
(Each Load Bearing Foot is set to same height as the Rock -It Mounts - adjust accordingly)
On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling
On eave row only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt drawing the Array Skirt sections together
Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface
NOTE: If a coupling lands on a rafter, the Hybrid Mount' should be used in place of the Rock -It Coupling (refer to image 3a)
-Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal, or by purchasing separately
6 Align and Straighten First Row of the Rock -It System with Array Skirt
Use North-South adjustment of the Rock -ti Pedestal to stnighten array skirt
Torque screw on side of Rock -It Pedestal to 150 in -lbs to secure it to the Rack -It Slide
Adjust Flange Level � lut to level the system (optional — can be leveled during or after installation)
7-10 Install 1 st Row of PV Modules
Slide upslope Rock-It.Mounts down to engage top of first module
Install Rock -It Couplings an the upslope side of 1st row of panels
Torque 1 st and 2nd row of Mid -Clamps on Rock -It Mounts and Rock -It Couplings to 150 in -lbs. (Torque to 130 In -lbs. when installing with 32mm modules)
Install balance of PV modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules
11 Level the Rock -It System
• When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value)
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 5
I
i
ra
Install Eco Fasten Solar Flashing with Rock -It Mounts
Fallow Eco Fasten Solar Install instructions for flashing and bracket install (GreenFasten shown above)
Optimum vertical distance between lag bolts is 1 3/8'plus module dimension
Set mounts on eave most row so that the Rock -It Pedestal is on the South end of Rock -It Slide
Set mounts on all upper rows so that the Rock -It Pedestal is an the North end of Rock -It Slide
2 Install Array Skirt on Eave Mounts
Loosen Hex Flange Bolt in Rock -It Mid -Clamp
Slide Array Skirt into front channel on Rock -It Shelf
Tighten Hex Flange Bolt to engage the Array Skirt
3-5 Install Rock -It Couplings
Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting an the roof
(Each Load Bearing Foot is set to same height as the Rock -It Mounts - adjust accordingly)
On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling
On eave row only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt drawing the Array Skirt sections together
Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface
NOTE: If a coupling lands on a rafter, the Hybrid Mount' should be used in place of the Rock -It Coupling (refer to image 3a)
-Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal, or by purchasing separately
6 Align and Straighten First Row of the Rock -It System with Array Skirt
Use North-South adjustment of the Rock -ti Pedestal to stnighten array skirt
Torque screw on side of Rock -It Pedestal to 150 in -lbs to secure it to the Rack -It Slide
Adjust Flange Level � lut to level the system (optional — can be leveled during or after installation)
7-10 Install 1 st Row of PV Modules
Slide upslope Rock-It.Mounts down to engage top of first module
Install Rock -It Couplings an the upslope side of 1st row of panels
Torque 1 st and 2nd row of Mid -Clamps on Rock -It Mounts and Rock -It Couplings to 150 in -lbs. (Torque to 130 In -lbs. when installing with 32mm modules)
Install balance of PV modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules
11 Level the Rock -It System
• When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value)
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 5
I
i
T.
GrounDLnG LUG InSTaLL
Necessary Components:
Bumcly CL50-ITN Ground Lug (UL Listing #KDER.E9999)
Note: Drill and deburr hole in Ground Lug prior to installation
14 AWG -4 AWG Copper Ground Wire"
8-32 x 0.5" Serrated Flange Head Bolt (300 Series SS)
8-32 Serrated Flange Nut (300 Series SS)
11/32" and 1/4" wrenches or ratchets/sockets
1 Insert the flange bolt into the module ground hole. Place Ground Lug over the
bolt and turn to desired orientation.
2 Install Flange Nut.
3 Tighten Flange Nut/Bolt.
4 Place wire in Ground Lug channel and tighten set screw to complete assembly.
Torque Values:
14-10 AWG= 20 in -lbs.
8 AWG= 25 in -lbs.
6-4 AWG= 35 in -lbs.
"Minimum of 1/4"clearance required between bare copper wire and aluminum.
ROCK -IT' CLIP SS InSTaLL
•:�r•�cat�udr�tcurrma!�t�1CJ1K�Rs
2' %%ftcm
1 Locate all parts
•
-Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting
the micro-inverter/power optimizer. See fig. A for acceptable mounting locations.
2 Install the Rock -It Clip SS
Slide the Rock -It Clip SS onto the lip of the module frame.
Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS.
• Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the
Rock -It Clip SS.
Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against
the Clip Flange to avoid rotation during tightening.
i
www.ecofastensolar.com info@ecofastensolar.com
877-859-3947 - 6
t6r
2' %%ftcm
1 Locate all parts
•
-Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting
the micro-inverter/power optimizer. See fig. A for acceptable mounting locations.
2 Install the Rock -It Clip SS
Slide the Rock -It Clip SS onto the lip of the module frame.
Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS.
• Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the
Rock -It Clip SS.
Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against
the Clip Flange to avoid rotation during tightening.
i
www.ecofastensolar.com info@ecofastensolar.com
877-859-3947 - 6
t
Snow Load 0-20 psf
Modules in Landscape
Wind Speed
Exposure
Category
2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12
Zone 1 Zone 2 Zone 3 Zone 1 _ : Zone 2 Zone 3
ASCE 7-05
ASCE 7-10
< 6:12 1. 7:12 < Roof Pitch
< 12:12
B
159
93
59 1q'd
Zone 3 Zone 1 Zone 2
Zone 3
88
88
85 mph
110 mph
t C
114
67
42 '•itl9
_ °.tee
C-6,�-�65
D
96
56
35 91
74
74
B
146
85
54 i -
Willi
3'-
80
80
90 mph
115 mph
C
104
61
38 98
59
35
D
88
51
32 83
68
68
18 47 38
38
B
123
72
45 3.
95
95
100 mph
125 mph
C
88
51
32 83
68
68 ..
D
74
43
27 70
.57
57
33
B
98
57
36 93
76
76
110 mph
140 mph
C
70
41
26 66
54
54
34
19
D
59
34
22 56
46
46.
- -
-18 .y 46 -37 .
B
85
50
31 81
66
66
120 mph
150 mph
C
61
36
22 58
47
47
11...22...
D •
51
30
19 49
40
40- "
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff.
however the designer must round down to meet appropriate rafter spacing _
2.) Maximum allowed spacing approved by EcoFasten Solar is 72"
3.) Maximum allowed standoff capcity = 547# (per testing results)
4.) Includes additional factor of safely of 1.5 for lag pullout capacity
5.) Values based on a maximum module width of 40"
6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height
7.) All adjustment factors are set to 1. No site specific engineering is included, in this table
Snow Load 0-20 psf ,
.. tUt uta In .F►cnia.
it-
Wihd
Speed
i
2:12 <
t
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff.
however the designer must round down to meet appropriate rafter spacing _
2.) Maximum allowed spacing approved by EcoFasten Solar is 72"
3.) Maximum allowed standoff capcity = 547# (per testing results)
4.) Includes additional factor of safely of 1.5 for lag pullout capacity
5.) Values based on a maximum module width of 40"
6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height
7.) All adjustment factors are set to 1. No site specific engineering is included, in this table
Snow Load 0-20 psf ,
.. tUt uta In .F►cnia.
it-
Wihd
Speed
Exposure
Category
2:12 <
Roof Pitch
< 6:12 1. 7:12 < Roof Pitch
< 12:12
ASCE 7-05
ASCE 7-10
Zonal*
Zone 2
Zone 3 Zone 1 Zone 2
Zone 3
If,XT „.
33
^
�85mphy(K110mph•t-
_ °.tee
C-6,�-�65
.f 8
,r'�•
-x•24--'t 61r 504
*r50w-�
52:.�;42.•.�,._
¢2 _
B
83
49
30
46
90 mph .
115 mph
a C
59
35
22 56 46
D
50
29
18 47 38
38
iy+
8
+w70ia
w� 41
+.w±26d,.54r..p54.+.
100 mph;.
125 mph
j b;,. Cr�
�.y50r'
'.
� 2�,
t 18•x;{. X47 w+439'
7 42>'j
26
i ' 15 `I '' 40;�,.L ��°32
, 325 .:
33
B
56
20 53 43
43' '
110 mph
140 mph
C
40
23
14 38 31
31
D
34
19
12 32 26
26
tomIB-"
.. 49—. '
" - -28-
-18 .y 46 -37 .
37-
.120 mph'
• 150 mph
C^
35
20
12 33 27
27 p
2' --
'D"�
R29.
:.,,.,17.
10, d2B 22z
11...22...
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff
2.) Maximum allowed spacing approved by EcoFasten Solar is 48"
( 3.) Maximum allowed standoff capcity = 547# (per testing results)
4.) Includes additional factor of safety of 1.5 for lag pullout capacity
r •
5.) Values based on a maximum module length of 70"
6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height .
7.) All adjustment factors are set to 1. No site specific engineering is Included in this table
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 7
t
r
Snow Load 21-30 psf
_ Modules in Landscape
Wind Speed
Exposure
'_ Category
2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12
ASCE 7-05
ASCE 7-10
Zone 1
Zone 2
Zone 3 Zone 1
Zone 2
Zone 3
85 mph
110 mph
B
Ci
='J,to1::
r„ rf
93
67
59d 5,
42
r
Snow Load 21-30 psf
_ Modules in Landscape
Wind Speed
Exposure
'_ Category
2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12
ASCE 7-05
ASCE 7-10
Zone 1
Zone 2
Zone 3 Zone 1
Zone 2
Zone 3
85 mph
110 mph
B
Ci
='J,to1::
r„ rf
93
67
59d 5,
42
c _ -
90 mph`
115 mph
0
B
C
D
56
85
61
51
35
54 &&, •
38
32 + g8. '"
.68:
x.68;
S$-
, )68 ..•y
68 _
96
U
104
88
100 mph
125 mph
B
C
88
72
51
45 ;6B
32 8$
60
68
$$
L
D
B
74
98
43
57
27 SS= '
36 68
57
57
8
54
46
6'66
54
46
110mph140
mph
C
D
B
70
59
85
41
34
50
26 66
22 56
31 8
120 mph
150 mph
C
61
36
22 58
47
47
•
-
D
51
30
19 49 -
_ 40
40
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar s(andoff„
however the designer must round down to meet appropriate rafter spacing
2.) Maximum allowed spacing approved by EcoFasten Solar is 72"
3.) Maximum allowed standoff capcity, = 547# (per testing results)
• 4.) Includes additional factor of safely of 1.5 for lag pullout capacity
5.) Values based on a maximum module width of 40"
6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height
7,) All adjustment factors are set to 1. No site specific engineering is included in this table
Snow Load 21-30 psf
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standofl
2.) Maximum allowed spacing approved by EcoFasten Solar is 48"
3.) Maximum allowed standoff capcity = 547# (per testing results)
r 4.) Includes additional factor of safety of 1.5 for lag pullout capacity
5.) Values based on a maximum module length of 70"
f 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height _
i 7.) All adjustment factors are set to 1. No site specific engineering is included in this table
www.ecofastensolar.com info@ecofastensolar.com. 877-859-3947 8
o
I' s Pbrts`�
Wind Speed
Exposure
2:12`< Roof Pitch < 6:12
7:12 < Roof Pitch <.12:12
ASCE 7=05 ASCE 7-10
• .Cate o , Zone
1 Zone 2 Zone 3'+
Zone -1 Zone 2
Zone 3
Air Biri?.
153T r 33
1: 85 mph; 1'101mph
' 1C
65
.
)' 38-
:._a D'_'-'tL
.55..
!`•�32
B
49 30
90 mph ,115 mph
C
59
35 22
'
0
50
29 18
38
38
100 mpfi' 125 mph
z CIV',J50 - 29 m 183 "�.w
39
•�..32ar;'
;39! `
26
X=40t;^_ 3243 +
B
56
33 20
110 mph 140 mph
C
40
23 14
38 31
31
D
34
19 12
32 26
26
"^.--
120 mph 150 mph`7
B. +•^1
"iC
.49- _ t r28 --. 18 C37
' '
�'
'11
27
27
-
D� _,
29
1 T_ 10
28 . -22'•
22,..
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standofl
2.) Maximum allowed spacing approved by EcoFasten Solar is 48"
3.) Maximum allowed standoff capcity = 547# (per testing results)
r 4.) Includes additional factor of safety of 1.5 for lag pullout capacity
5.) Values based on a maximum module length of 70"
f 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height _
i 7.) All adjustment factors are set to 1. No site specific engineering is included in this table
www.ecofastensolar.com info@ecofastensolar.com. 877-859-3947 8
Snow Load 31-40 psf
Modules in Landscape
Wind Speed
Exposure
Category
2:12 < Roof Pitch < 6:12
7:12 < Roof Pitch < 12:12
ASCE 7-05
ASCE 7-10
Zone.1
Zone 2
Zone 3
Zone 1
Zone 2
Zone 3
85 mph
90 mph
100 mph
110i mph
'
120 mph
110 mph
115 mph
125 mph
140 mph
150 mph
B
C
D
8
C
D
C
D
B
C
D
B
C
-b
83 +,}
t
81$Y
a3
74
83''
59
42
35
54
38
32
45
32
27
36
26
22
31
22
1 19
5?' _
r. 51; ,.
$1
St"
'SI, =:
51'
51
$1
51
51
ST :
S
$F- ;
} xr
� �5B
-61-1
F7
56
B 49
61
51
90 mph
51
43
57
41
34
50
36
30
C 35
70
59
46
46
D 29
18
61
51
47
40
47
40
49
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff,
however the designer must round down to meet appropriate rafter spacing
2.) Maximum allowed spacing approved by EcoFasten Solar is 72" `
3.) Maximum allowed standoff capcity = 5479 (per testing results)
4.) Includes additional factor of safety of 1.5 for lag pullout capacity
5.) Values based on a maximum module width of 40"
6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height
7.) All adjustment factors are set to 1. No site specific engineering is included in this table
Snow Load 31-40 psf
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff
2.) Maximum allowed spacing approved by EcoFasten Solar is 48"
3.) Maximum allowed standoff capcity = 547# (per testing results)
4.) Includes additional factor of safety of 1.5 for lag pullout capacity t
5.) Va.ues based on a maximum module length of 70"
6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height
7,) All adjustment factors are set to 1. No site specific engineering is included in this table
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 }
I
1 et
Wind
Speed
Exposure 2:12 < Roof Pitch
Catego Zone T Zone 2
< 6:12 7:12 < Roof Pitch < 12:12
ASCE 7-05
ASCE 7-10
Zone 3 Zone 1 Zone 2- Zone 3
—85
"`11O:mph'
mph't
_
-:20;
B 49
30�
90 mph
115 mph
C 35
22
D 29
18
.100mphW
,125`mPh.
�+c vC �,. t_F29
L'. 18 1,
2b
B 33
15'
~20�
110 mph
140 mph
C 40 23
14
D 34 19
12 26 26
.. •-� -
,,-.-Y-�. �..w.
14— B t749�`.. 'fir 28
` +I.
.18 q
120 mph"
i 150 mph j
,'C: - 7435- s ;r 20
—12 t %27 " �; '`i 27 '
i Di
10 22 29
Notes:
Spacing Governed by Snow Load
1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff
2.) Maximum allowed spacing approved by EcoFasten Solar is 48"
3.) Maximum allowed standoff capcity = 547# (per testing results)
4.) Includes additional factor of safety of 1.5 for lag pullout capacity t
5.) Va.ues based on a maximum module length of 70"
6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height
7,) All adjustment factors are set to 1. No site specific engineering is included in this table
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 }
I
,.
,V.
Gro-unDinG inFormaTlorl ,
The rail free Rock -It System may be used to mount and ground PV modules that comply with UL 1703, only when that specific module' has been r
evaluated for mounting and grounding, in compliance with the included installation instructions. 41
Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. t, '�'"'� '�" y
Multiple Use Grounding Pins
Grounding pins within the Mid -Clamp are multiple use bonding/groundirig devices. Modules will need to be adjusted if the Mid -Clamps are. `, y f '
loosened to ensure there is "new_ "metal to pierce into upon retightening. 'R
Grounding Method.
Rock -It 2.0 Mount bonds N -S rov'vs of modules
Rock -It 2.0 Coupling bonds E -W rows of modules
Array Skirt 2.0 bonds E -W along the entire array when installed r '
One Burndy CL50-ITN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscape orientation..'
~BOI'1DInG' ASsemBL9 aI"1D BOr1Dll'1G PATH T t r
_ - •'� '
K' Bnnd path
4` ® Grounding lug .p ivy L
r-- Equipment Grounding, p"� y,,;• •'`A Integrated�6onding�
Conductor lEGfl-
g. _ Fj
jj Aqy to eanh -
4
'm Rock -it Coupling � •',j r ' e�. -'a
■ Rock -It Mount •• Uy +
_ - ROCk-II Array Skirt
.-...+a-+...,.� ..paw...••.c
t
I Bond Prlh '.tw�.7 . , � ` � t .T + � � I Bond va�th
r
• ® Grounding Lug
G• ® Grounding Lug
y y
Equipment Grounding
` { ConduaorlEGC1.
oin Ah„u , �-
Grounding
ConEquductor (EGQ
E.7,
� R �� - w Ruck•It Coupling-. _ - t9 ountl
. ON Rock-Ic Coupling• RockIt MountRockd[Array Sknt - - + • - _ Rock.I(AI ]y Skut
WWW ecofastensolar.com
info@ecofastensolar.com r
877-859-3947 iz
THermaL FXPansic)n anD BonDInG
A thermal expansion gap_is -
required per each continuous 40'
length of modltle,;.
Omit a coupling and leave a 2"
gap in the array skirt and also
between the modules at that
point.
BracKeT sPaclnG
Portrait Orientation
Landscape Orientation
— Bond Path ~
40 Grounding Lug
- 'yuluine,, c„x,oa�„g
CanducrorIE-W-
SmeurOr
p.o.r.0o�co
Rack•It Coupling
a Rock -it Mount
—Rock•it Array Skirt
32mm, 35mm & 40mm Modules: Max east/west bracket spacing is 72" OC.
Maximum easVwest bracket spacing is 48"OC. 32mm Modules: Max east/west bracket spacing is 48"OC.
Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load
areas may require lesser spacing E -W than the maximum.
STaGGereD LaYoUT I canTILever anD OFFseT
Staggered'Mounting Points
1 ®Rock -It Mount Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait
orientation installations, check layout prior to installing,
t The array layout instructions in this installation manual offer a
general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow
factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947
r
13
1
i` +_ ,
; "1
4AL
1 ®Rock -It Mount Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait
orientation installations, check layout prior to installing,
t The array layout instructions in this installation manual offer a
general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow
factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location
www.ecofastensolar.com info@ecofastensolar.com 877-859-3947
r
13
1
ROCK -IT SYSTem 2.0
EVaLuaTeD, COI'1'1PaTIBLe MODULeS
Module Manufacturer
Model Type (X used to indicate variable test)
Module Dimensions (mm)
Module Dimensions (in)
Trina Solar
TSM-XXX-PX05.08
1640 x 992 x 40
64.57 x 39.06 x 1.57
Canadian Solar
CS6P-XXXM
1638 x 982 00
64.50 x 38.70 x 1.57
Canadian Solar
CS6P-XXXP
1538 x 982 x 40
64.50 x 38.70 x 1.57
Jinko Solar
JKMXXXP-60
1650 x 992 x 40
65.00 x 39.05 x 1.57
Jinko Solar
JKMXXXM-60
1650 x 992 x 40
65.00 x 39.05 x 1.57
Jinko Solar
JKMXXXPP-60
1650 x 992 x 40
65.00 x 39.05 x 1.57
Jinko Solar
JKMXXXMM-60
1650 x 992 x 40
65.00 x 39.05 x 1.57
Yingli Solar
YL2XXP-29b
1650 x 990 x 40
65.00 x 38.98 x 1.57
LG Electronics
LG300N1 C -B3
1640 x 1000 x 35
64.57 x 39.37 x 1.38
LG Electronics
LG300N1 K -G4
1640 x 1000 x 40
64.57 x 39.37 x 1.57
Axitec Solar
AC-XXXM/156-60S
1640 x 992 x 40
64.57 x 39.06 x 1.57
RECOM
RCM -XXX -6M8
1640 x 992 x 35
64.60 x 39.00 x 1.38
Silfab
SLA 2XXP
1650 x 990 x 38
64.96 x 38.98 x 1.50
Solaria
PowerXT XXXR-BX
1621 x 1056 x 40
63.82 x 41.57 x 1.57
Hanwha Q Cells
Q.PRO G4 2XX•
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q.PLUS BFR G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q. PRO BFR G4 XXX*
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q.PRO BFR G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q.PRO BFR G4.3 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q.PEAK G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
Q.PEAK BLK G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
B.LINE PLUS 8FR G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
Hanwha Q Cells
B.LINE PRO BFR G4.1 XXX'
1670 x 1000 x 32
65.70 x 39.40 x 1.26
'Hanwho 32mm modules to be used with special order Rock -It System components. Call for details.
• Fastest, easiest to level system on the market • SIMPLE- only 4 components
• Conforms to UL 2703 First Edition North-South adjustability
• Class A Fire rating with Type 1 modules Only one tool required (1 /2"deep well socket)
• Integrated electrical bonding
Max No. of Panels
300 Modules per ground lug
Materials
300 Series Stainless Steel
6000 Series Aluminum
Max System Voltage
1000VOC
Coating
Black Andodization/Mill Finish
Class A Fire Rating
With UL7 703 Type 1 Rated
Modules
Lug Specifications
Burndy CL50-lTN Ground Lug
(UL Listing NKOER E9999)
Leveling Range
3-4"
Ground Wire
Per above Lug spec
14 AWG- 4 AWG Copper
Ground Wire
Rock -It Slide -Comp 2.0 Range
Rock -It Slide -Tile 2.0 Range
3"
7"
Max Module Size
64.96"(1650mm) x
39.05"(992mm) x 2"(50mm)
Min/Max Roof Slope
1/2:12/12:12
Max Downforce/Uplift Rating
45 PSF
Max Anchor Spacing (35mm/40mm)
Max Anchor Spacing (32mm)
72"
48"
Rock -It Mount Load Rating
547lbs with Single 5/16" Lag
3.0 Safety Factor
Skirt Box QTY
6 units
Slide Fastening Hole
5/16" diameter
Mount Box QTY
12 units
Module Cantilever
Maximum cantilever is 1/3
bracket spacing
Rock -It Slide Box QTY
50 units
Coupling Box QTY
F77n,ts
Warranty
20 Year Material and
Workmanship
iysten rnatkmg ;placed an We na undenide
of 3ock•11 Mount and Coupling)
MECO asten Solar
ROCK -IT SYS rEM
MFG 10 C00E:x70r.Qo1VW
CONFORMSTO UL 1703
wwwiwcut.awu"w
a�tum.r,.0
oersemw
e O,
www.ecofastensolar.com
Codes: National Electric Code, ANSI/NFPA 70, NEC 250, NEC 690, IRC, IBC
Standards: UL 2703 First Edition, UL 1703
info@ecofastensolar.com
��d EcoFasten Solar
877-859-3947 14