Loading...
HomeMy WebLinkAbout015-360-038Butte County BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm) Development Services cannot guarantee inspections on the date requested �'---� Office: 530.538.7601 Fax: 530 Permit No: B17-1313, Issued: 6/29/2017 APN: 015-360-038 Address: 206 HAVEN LN, CHICO _ - Owner: MONTAGUE VAL D Permit Type- SOLAR ROOF -RES Description: Installation of roof mount solar w/main panel u www.t3uttetrounty.nertaas Flood Zone: None SRA Area: - No SETBACKS for Zon8np. AG_ SRA. PW Front:, Centerline of Road: Rear: SRA: Street: AG: Interior , Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING . Insinection TVDe 1VR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor ' 404 Gas Piping Underground/floor '403 Underfloor Framing - 149 Underfloor Ducts '- 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing, 411 d Coach Info Manufactures Name: Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior " 135 Roof Nail/Drag Trusses _' 129 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framin 128 Gas Piping House 403 Gas Test House . 404 Shower Pan/Tub Test 408 ' Do Not Insulate Until Above Si ned n Inspection T e IVR INSP DATE T -Bar Ceiling 145 _OFFICE COPY�+.- r- t f9 31-3 E I Address: "' ! Pool I, -►.W_ i i� Gas j, (GAS By: _ Pre-( `. Electric By — • G Date: Pre -1 '_,�: . I PoolFencin Alarms/Ba_rrien —503 Pre -Plaster 1 507 813 Fire Sprinkler Test or Final. - -702 Manufactured Homes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric .218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Ski rtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: r ry r� ttlFinals Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final. - -702 t. Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL - . . I *Project Final is a Certificate of Occupancy for (Residential Only) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1.YEAR { RENEWAL 30 DAYS PRIOR TO EXPIRATION PV SOLAR SYSTEM SPECIFICATIONS: z m ® sdar SYSTEM SIZE - 5.880KW DC/ 4.830KW AC w o o N MONTAGUE RESIDENCE, MODULE TYPE & AMOUNT - (21) JINKO-SOLAR JKM280M-60B . w ZN. MODULE DIMENSIONS - (L/W/H) 64.97in/ 39.06in/ 1.57in M w =oz 206 HAVEN .LN INVERTER - (21) ENPHASE IQ6-60-2-US "moo CH I CO, CA 95926 INVERTERS) USED IN THIS DESIGN IS/ARE COMPLIANT WITH CEC 201.690.12 (RAPID SHUTDOWN). SEE MANUFACTURER DATA SHEET. INTERCONNECTION METHOD - LOAD BREAKER z GOVERNING CODES ALL WORK SHALL CONFORM TO THE FOLLOWING COOE9 SHEET INDEX: • ,�. - • 2016 CALIFORNIA BUILDING CODE PV 0.0 - COVER SHEET 2016 CALIFORNIA ENERGY CODE PV 1.0 - SITE PLAN • 2016 CALIFORNIA ELECTRICAL CODE PV 2.0 - MOUNTING DETAIL • 2016 CALIFORNIA FIRE CODE PV 3.0 - FRAMING DETAIL • 2016 CALIFORNIA GREEN CODE E 1.0 - 3 -LINE DIAGRAM • 2016 CALIFORNIA MECHANICAL CODE E 2.0 -NOTES `` r� • 2016 CALIFORNIA PLUMBING CODE E 3.0 - WARNING LABELS =` o _ • 2016 CALIFORNIA RESIDENTIAL CODE E 4.0 - WARNING LABELS CONT. ` • ANY OTHER LOCAL AMENDMENTS E 5.0 - ELECTRICAL PHOTOS E 5.1 - ELECTRICAL PHOTOS CONT. Q z _.vim'✓......-. Y-. - _ "--� _,,o_`...._ -we r1F i':- - - N z ..4 .` SHEET ,y NAME: W IW !- > w NOTES: O = r A PHOTOVOLTAIC MOUNTING RACK INSPECTION MAY BE REQUIRED PRIOR TO PANEL INSTALLATIONS _ ~ d " ANY MODIFICATIONS TO THE EXISTING ROOF AND/OR PLUMBING DRAIN, WASTE, AND/OR VENTS AR TO COMPLY WITH THE 2016 SHEET d CBC/CPC NUMBER: - - ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS '. THE BACKFEED BREAKER SHALL NOT BE MARKED FOR "LINE' AND "LOAD" MARKINGS CONDUIT RUN THROUGH THE ATTIC OR UNDER EAVES DENOTED WITH DASHED LINES ON SITE PLAN > SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED, PURSUANT TO SECTIONS R314 AND R 315 OF THE CRC a WIND SPEED: 11OMPH N- SNOW LOAD: OPSF CATEGORY: C L11 G RAFTER DIM: 2X4 Z RAFTER SPACING: 24" W 0 m N zoo w Z�m Roof Section 1 �' g • ' Rod mm: xu Rml Ttll: 15 fj a w x O Z R""1 Typo: SHINGLE o = Z ." PV SYSTEM SIZE: a 5.880 kW DC _ _ _ _ _ _ z r PV SYSTEM SIZE: 4.830 kW AC I \mO o CIRCUIT KEY: O O 19 2" PV CIRCUIT #1 ..-:::::::::::.-.-::::::::::::::::::::::::::::::::::::::::::.-::::<.. 14 MODULES O ¢• PV CIRCUIT #2 - , "`"` 7 MODULES U a I O ¢13 1fi-a• ! s .� zag m KEYNOTESLEGEND a BY OF V EMT CONDUIT RUN FROM Roof Section 2 o 1. JUNCTION BOX TO ELEC PANEL R -f n lmw : 160 11001 TW: ISRo"l ^ MOUNTED NO MORE THAN 3.1/2' AND T yp": SHINGLE Q5 m 5 N NO LESS THAN 1/2' ABOVE THE ROOF JUNCTION BOX ATTACHED TO ARRAY USING ECOFASTEN HARDWARE TO Z m 2 KEEP JUNCTION BOX OFF ROOF 21 NEW JINKO SOLAR JK11281IM-60B PV 206 HAVEN LN CHICO CA 95926 w cr 0: MODULES WITH AN ENPHASE > > w w m O IO6-60-2-US MICRO-INVERTERFRONT OF HOUSE ¢ a Z MOUNTED ON THE BACK OF EACH Q MODULE Z Z 0 UTILITY METER N 1008114551 - PV SHEET INTERCONNECTION POINT VIA SP. NAME: SUB -PANEL HOUSING A DEDICATED PV w Z OCPD , AIC NEW PHOTOVOLTAIC AC DISCONNECT .. LOCATED WITHIN 10' OF MSP a NEW DEDICATED PHOTOVOLTAIC © SYSTEM COMBINER PANEL SHEET NUMBER: PV SYSTEM SITE PLAN ml36" SAFETY OFFSET FOR ROOF ACCESS SCALE: 3/32" = 1'-0" d ROC PE HEX FL 30( Si TORQUE (a:)ROCK-IT MOUNT PV 2.0 NOT TO SCALE ROCKdT COUPLING MID CLAMP ® ROCK -IT COUPLING SHELF TIE PLATE-/ W X5/16':1 1/2' HEX FLANGE BOLT SIDE VIEW 300 SERIES SS /-ROCK-IT COUPLING U MID CLAMP M Z w Q VJ Z. W J.2 Z„m >Uj W xCiz ;72 U �0 Q U ROCK -IT F– < COUPLING SHELF Z ISOMETRIC VIEW O j 2 ROCK -IT COUPLING ASSEMBLY PV Z.O NOT TO SCALE TOP VIEW CANTILEVER U3 OR LESS ---' -' - I — — I CLAMP SPACING =MAX COUPLING CLAMP I I i RAFTER ROCK -IT SLIDE 7! METAL MODULE MODULE EPDM BONDEDASHER I FLASHING i ORMS WATTERTIGHT SEAL RAFTER - - I I = ANDc_CAP G AMP cPA .IN . APV SYSTEM MOUNTING DETAIL (21MODULES IN PORTRAITMNDSCAPE PV 2.0 N0T i0PV2.0 NOiroSckE _ COM"SkINGLESI 2112 MIN3-MIN AND 6' MAX BETWEEN TOP OF ROOF AND BOTTOM OF MODULE 5116-c4 1/2- ONE HOLE STEEL STRAP SS LAG SCREW 1 TORQUE=1322 FT -LBS. PV MODULE, TYP. MOUNT pV 3 p O TO FRAMING OF EXISTING ROOF TYPE, PARALLEL - CONDUIT MOUNT BRACKET 6- MA llb OF ROOF _ MODUI SECTION VIEW I FLASHING OR TILE STRAP —J (2)SECTION VIEW PV 2.0 NOTTOSCALE Pv20 Pm Tow AYTYP. ELEVATION / I �C�ONDDUIT MOUNTING DETAIL SHEET NUMBER: 0 CV a ROOF SECTION 1 ROOF SECTION 2 W w U W D NNN O O V/ all W Z"m Mu j ROOF SECTION 1 FROM PV 1.0 ROOF SECTION 2 FROM PV 1.0 W o z MEMBER SIZE: MEMBER SIZE: R=z TRUSS 2X4 AT 24" O.C. TRUSS 2X4 AT 24" O.C. C7 o' 92 6'4 F-- a Z Zzi 1" 1" 18" EAV -0" ri 18" EAV 3 1/2" INTERIOR HORIZONTAL DISTANCE INTERIOR HORIZONTAL DISTANCE vI n o ` te •o N S � � O gn � N O rn z w z 00 > z ¢ J J z z m • SHEET NAME: w Z tl � SHEET NUMBER: FRAMING DETAIL M NOT TO SCALE a Photovoltaic System Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) - c ? 'm° '5 ro ? g = , Y N .1. m e c c $ w e Wts) 5985 DC System Si!2W - _ 5A Tag # Description Wire Gauge # of Conductors/Color Conduit Type Conduit Size AC System Size (Watts) 4830 1 Enphase Engage Cable THWN-2 12 AWG 3(Ll, L2, G) N/A -Free Air N/A -Free Air Module/Inverter Count 21 20A - 1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A -Free Air N/A -Free Air 2 THWN - 2 10 AWG 4(21.1 2L2) B/R EMT 3/4" 2 THWN-2-Ground 8AWG 1(GRN) EMT 3/4" 3THWN-2 10 AWG 3(1L111.21N)B/R/W EMT 3/4" 3 THWN-2 -Ground 8AWG 1(GRN) EMT 3/4" Point of Interconnection, Wad Side 705.12(0)(2)(3)(b) Parallel PV Circuit 1: 14 t 2 �17 nvoy- 240V Continuous,Modules / 1 60A breaker on combiner ouput;. Parallel with lO KAlC tircult breakers NEMA4 Junction Box with Irreversible Vis a We a e Knife'NC Minimum GECsize6 Ground5plicellVP) - Disconnect AWG copper L� O N 4V. C m v v v U an O O p n od o1 oc I e 0.8 O .. N S b Z m n 7 m Z W w � Z e N Q N _ Z Z u rn SHEET Existing 240W125A NAME: Service Panel, Single Phase, with 100A Main _ by Disconnect C 3 J A M O SHEET NUMBER: rl W Rapid Shutdown - Disconnec4 Square D 2 AA DU221RB, 240W30A. - _ 5A Unfused, NEMA3, or equivalent 20A - Inverter: Enphase - IQ6.60-2-USuR APV Circuit 2:7 t 2 1 Oy�Oso Modules ' Point of Interconnection, Wad Side 705.12(0)(2)(3)(b) Parallel PV Circuit 1: 14 t 2 �17 nvoy- 240V Continuous,Modules / 1 60A breaker on combiner ouput;. Parallel with lO KAlC tircult breakers NEMA4 Junction Box with Irreversible Vis a We a e Knife'NC Minimum GECsize6 Ground5plicellVP) - Disconnect AWG copper L� O N 4V. C m v v v U an O O p n od o1 oc I e 0.8 O .. N S b Z m n 7 m Z W w � Z e N Q N _ Z Z u rn SHEET Existing 240W125A NAME: Service Panel, Single Phase, with 100A Main _ by Disconnect C 3 J A M O SHEET NUMBER: rl W SOLAR MODULE 1q6 -60-2-U_5 Enphase L._.- MICRG4NVERTER AT EACH MODULE, ATTACHED WITH ECOLIBRIUM SOLAR HARDWARE A6 BARE CU GROUND (ATTACHED TO FIRST MODULE IN ARRAY). BALANCE OF ARRAY _ GROUNDING CONNECTIONS MADE THROUGH ARRAY HARDWARE MICROINVERTER CONNECTION TO ENGAGE TRUNK CABLE - Inverter Make/Model I IQ6-60-2-US Max. Dc Volt Rating 48 Volts Max. Power at 40 C 230 Watts Nominal AC Voltage 240 Volts Max. AC Current 0.96 Amps Max. OCPD Rating 20 Amps Max. Panels/Circuit 16 15 Short Circuit Current 15 Amps Other Notes PV Module Rating @ STC 120.16 Module Make/Model JKM285M-60B 240 Max. Power -Point Current limp) 8.9 Amps Max. Power -Point Voltage [Vmp) 32 Volts Open -Circuit Voltage (Voc) 38.7 Volts Short -Circuit Current (Ist) 9.65 Amps Max. Series Fuse (OCPD) 15 Amps Nom. Max. Power at STC (Pmax) 285 Watts Max. System Voltage 1000 V DC (UL) Voc Temperature Coefficient -0.29 AC Output Current According to art. 690.8(B)(1) 120.16 Amps Nominal AC Voltage 240 Volts THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Rooftop conductor ampacities designed in compliance with art. 690.8, Tables 310.15(8)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Loacation specific temperature obtained from ASHRAE 2013 data tables. ASHRAE 2013 - Highest Monthly 2%D.B. Design Temp.: 38.7'C Lowest Min. Mean Extreme D.B.: -3.8 -C • Designed according to, and all code citations are relevant to, the CEC 2016. • Utility Service Provided by PGE • No battery back-ups are tied to the designed inverter(s). • Inverter(s) used in this design is/are compliant with 690.12 (Rapid Shutdown). See manufacturer data sheet • Array grounding and bonding designed in compliance with 690.47(C)(3). Conductor Calculations N a o� m - Wire gauge calculated from art. code 310.15(8)(16) with ambient temperature calculations from io art.310.1S(2)(a). For "On Roof' conductors we use the 90°C column ampacity, 0.5"-3.S" off -the -roof temperature v Z m adjustment from 310.15(B)(3)(c), and raceway fill adjustments from 310.15(8)(16). m a s For "Off Roof' conductors we use the 75`C column ampacity, or the 90•C column ampacity with m = O the relevant ambient temperature and raceway fill adjustments, whichever is less. 12 Q The rating of the conductor after adjustments MUST be greater than, or equal to, the continuous o u a duty uprated output current. - Calculation Example - Wire Rating (90'C) x Ambient Temperature Adjustment x Conduit Fill Adjustment >= Continuous Duty Output Current � W � (On Roof, Tag 2): 10 gauge wire rated for 40 A, 40 A x 0.65 x 0.8 (4 Conductors) = 20.8 A >= ~ N 16.8 A (Off Roof, Tag 3):10 gauge wire rated for 3S A, 35 A >= 2S.2 A Q N 11 n i SHEET NAME: O IC • m m OCPD Calculations N a o� Breakers sized according to continuous duty output current. PV circuit nominal current based off N z oR of modules per Circuit X (1.25[art. 210.19(A)(1)(a))) X (0.96 Max AC current per micro -inverter) .. u Circuit Nl = 14 modules, Output Current w/ continuous duty = 16.8 < 20A Breaker - W I. - Circuit g2 = 7 modules, Output Current w/ continuous duty = 8.4 < 20A Breaker system output current w/ continuous duty = 25.2 < 30A (System OCPD) Z m z ¢ J � W � ~ N � o � 2 Z Q N 11 n SHEET NAME: * , P, .'a `, t {+ - ' t.Y- ., `1. Y, �.. �f_- wy • .. ..•• ,. T w - a.. - • aw ,.. i a �� —'f Y M1 •� ! .y. 5 YInverter Grounded Systems Per 690. C - "' - ` Main Service Panel Signage - '• ' r °+ c n °' • `` ` . _ • (Installed on the Face of the Service Meter)WARNING • s v ? m 'ELECTRICAL SHOCK.•. _ Per 690.54, 690.56(8), & 705.10 • a - • w Z m rNn ,. •IF A GROUND . .Note: Roofline placard not needed unless PV disconnect is not at the - - -.. - - i • m a S •NORMALLY GROUNDED CONDUCTORS same location as the main service MAY BE UNGROUNDED AND ENERGIZED '' - • • • ■ w o u o O N u Q Combiner Boxes, J-Boxes,'Disconnects, Devices, & • '" - -• _ = • Inverters In Un -Grounded Systems Per 690.35(F) - • • • ■ c • • • • m - (String systems) • • • • •+ _ • CONDUCTORSWARNING ELECTRICAL SHOCK HAZARD THE DC • 4 L— PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED • .� ' - Conduit,Racewas, and 1 -Boxes Labeled Eve SO' ♦ • N AC Disconnect and Any Load Centers (Combiner Panel) .. ■ POWER •- • _ ..- = Per 690.17(E) & 705.12 SECOND SOURCE IS A PHOTOVOLTAICPHOTOVOLTAIC RATED AC •UTPUT CURRENT:, 20.16 Am Y • m AC DISCONNECT RATED • �� � v " NOM. OPERATING AC V• • , V DC Disconnect Per 690.17ELECTRICAL t. •• s •., , - d " WARNING ' SHOCK HAZARD ■• NOT TOUCH TERMINALS. TERMINALS ON WARNING m N BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED OPENPOSITION ELECTRICAL SHOCK HAZARDa ■• NOT TOUCH• o v BOTH . ••■ ■ n oa - ENERGIZED IN THE OPEN POSITION p - Inverter Output Connection (Solar Breaker) at •: " , Main Service Panel Per 705.12 .. .• ! Z m n .. �. WARNING t > INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS - Rapid Shutdown Per 690.56(C) Rapid Shutdown Disconnect Per 690.12(5) Installed On AC Disconnect • r` ° - t z z s _ - PHOTOVOLTAIC SYSTEM • ■- _ ■ ■• •• • Y '. a+ SHEET, t _ RAPIDf'.WITH SHUTDOWN NAME:. • •' •' if - ';'� 'i. y • •1 T' i � • ti. .. t - + F • , ' • w, � { -r , ` '. � ` C- „� k • ry ... e _ ;: .,_a>; -f' �' . ice, I[a. H '4 • , _ r ,nm onf r• - _� .,+ _ .. ` - $t• '� • j ^• ' - + r • • . - +... .,r Y, f t.r.f7!, - SHEET ' r * .� �� �Cy` f•�Y "r .. .. t ; �. ' i •tom. µ,�' w NUMBER W. +' ALL STICKERS DESCRIBED HERIN SHALL BE MADE OF WEATHERPROOF ADHESIVE THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO • eh SMALLER THAN 3/8" WHITE ARIAL FONT TEXT AND HAVE A RED BACKGROUND UNLESS OTHERWISE DEPICTED OR DESCRIBED. i `. •` r A , . '`` ; - h ,T " � ' if ,Y(. � w .. * _w y f t i '� 1�� ` , ` CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED WARNING: DUAL POWER SOURCEn WARNING WARNING 1 4 9 12 °P Property of Vivint Solar SECOND SOURCE 15 A PHOTOVOLTAIC SYSTEM ELECTRICAL SHOCK HAZARD ELECTRICAL SHOCK HAZARD - -- MAIN BREAKER DE -RATED TO "' DUE TO SOLAR RATED AC OUTPUT CURRENT: "' A IF A GROUND FAULT IS INDICATED, - THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE ry $ CIRCUITS NOM. OPERATING AC VOLTAGE:*** V NORMALLY GROUNDED CONDUCTORS UNGROUNDED AND MAY BE ENERGIZED Z Z 2 ***AMPS OF •AMPS PV SOURCE ALLOWED Property of Vivint Solar MAY BE UNGROUNDED AND ENERGIZED Property of Vivint Solar O1 ¢ > 0 - DO NOT INCREASE MAIN BREAKER RATING WARNING: PHOTOVOLTAIC POWER SOURCE Property of Vivint Solar SITE PLAN PLACARD SHOWING ADDITIONAL POWER 5 13 m (SO 8 Property of Vivint Solar Property of Vivint Solar SOURCE AND DISCONNECT LOCATIONS. PLACARD p Y WARNING 10 � o = 8 a 3 WARNING PHOTOVOLTAIC AC DISCONNECT INVERTER OUTPUT CONNECTION - SHALL BE MOUNTED ON EXTERIOR OF ELECTRICAL o u ELECTRICAL SHOCK HAZARD RATED AC OUTPUT CURRENT: "' A DO NOT RELOCATE THIS OVERCURRENT DEVICE PANEL (only when necessary) T ' DO NOT TOUCH TERMINALS. TERMINALS ON BOTH 6 NOM. OPERATING AC VOLTAGE: "• V Property of Vivint Solar Property of Vivint Solar THE LINE AND LOAD SIDES MAY BE ENERGIZED IN Property of Vivint Solar PHOTOVOLTAIC POWER SOURCE DC DISCONNECT 11 14 PV disconnect THE OPEN POSITION PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID RATED MAXIMUM POWER POINT CURRENT (IMP). — A rapid shutdown Property of Vivint Solar 7 SHUTDOWN RATED MAXIMUM POWER POINT VOLTAGE (VMP) ...V- placard indicated on E.3 - Property of Vivint Solar MAXIMUM SYSTEM VOLTAGE (VOC) -V L PHOTOVOLTAIC DC DISCONNECT SHORT CIRCUIT CURRENT (ISC) "'A CID 8 Property of Vivint Solar Property of Vivint Solar V 0 '•• -value calculated for each } account, for specific value see the previous warning label page •� m m v 11 y 14 4 7 a lu - ---- ROOFTOP ARRAY g 12 6 6 6 2 4 13 IF APPLICABLE m EVERY IV AND o WITHIN V OF v u ELBOWS•;y�G,cgOGZ 3 9 3 3 3 1 1 2 5 S 5 S g O 5 qo a . w <L O�OgFO uiOi m ! MICRO -INVERTER q Ti�!]T � 7 m SYSTEMS DC Z DISCONNECT - m INSIDE ? ? $ - SHEET [OR] _ . _. ,..__.,...___ — -- -' --�--- -- VISIBLE/LOCKABLE VIVINT SOLAR METER VISIBLE/LOCKABLE �• SUB PANEL MAIN SERVICE SOLAR INVERTERS COMBINER PANEL NAME: 12 JUNCTION (MAY BE ON ROOFTOP (WHEN USED) A/C DISCONNECT (WHERE REQUIRED) A/C DISCONNECT WHEN REQUIRED) DISCONNECT PANEL REQUIRED) STRING -INVERTER BOX INTEGRATED WITH (WHERE 1O 1O 01 d ARRAY) TYPICAL SOLAR GENERATION INSTALLATION INSIDE PANEL m a m SYSTEMS (NOT ALL DEVICES ARE REQUIRED IN EVERY JURISDICTION) 3 o. SHEET NUMBER: ALL STICKERS DESCRIBED HERIN SHALL BE MADE OF WEATHERPROOF THESE PLACARDS SHALL BE PLACED ON ALL INTERIOR AND EXTERIOR DIRECT-CURRENT (DC) CONDUIT, ENCLOSURES, RACE -WAYS, CABLE ADHESIVE, THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO ASSEMBLIES, JUNCTION BOXES COMBINER BOXES, AND DISCONNECTS TO ALERT THE FIRE SERVICE TO AVOID CUTTING THEM. MARKINGS SMALLER THAN 3/8" WHITE ARIAL FONT TEXT, AND HAVE A RED SHALL BE PLACED ON ALL -DC CONDUIT EVERY 10 FT (3048 MM), WITHIN 1 FT (305MM) OF TURNS OR BENDS AND WITHIN 1 FT (305 MM), ABOVE BACKGROUND, UNLESS OTHERWISE DEPICTED OR DESCRIBED. AND BELOW PENETRATIONS OF ROFF/CEILING ASSEMBLIES, WALLS OR BARRIERS Iui .r f r i i I i I � i i t " � . +�, � -. c i i r. r h I 6 www-jinkosoIar.com V , ' w � • J r z= C VL US 1# [► LISTED gA r • sr;• KEY FEATURES High Efficiency High module efficiency up to 1/ /2%, with :Iassivated,Emitter Rear Contact-• TERC) technology 0 High Voltage AN® 1000V standard: 1500V option lowers 90S costs and yields better LC:OE"•, - _. 1 Innovative Solar Cells .' Four bulbar cell technology improves module efficiency f PID -free World's ist PID -Free module at 85 CB5%RH .} � �. '.� r - OLow -Light Performance Advanced glass and solar cell su `ace texturing allow for,excellent wnumr perlorrrtance in low -light environments _ ++'+ Strength and Durability ` =aotlPs Withstands snow f00 n -�1' r (C• p�) and wind (2400Pay loads, sale mist and ammonia , LINEAR PERFORMANCE WARRANTY r 10 Year Product Warranty 25 Year Linear Power Warranty j j 100% � Linear performance warranty _ y 97% qUSlandard performance warranty ' vsse valtte rrom hrlko r.• _ ,r, f vox. - - 66fy a r . . au» '. L r - l9 4 years 25 1 r'.iutnnt•Yn1lagOd7a:nt-VVtapn rempemture Dependence ti,..4,,... — i l III 111, s - _1 . , � • i :. `° a �, , � � W , - �^ 1 ilI III i SII .� .. i �r•- ( , � °� � `," ,r.# �:_L.; '1 f, 1 ;. • III I I I III I - � ,., ! I III!_- ,I <�—'�^� ' I ►i� i 1 1 i . ' +• , ,,J - • ri �). 1? •i � :5 1 i5 .11 I. �' �.` 1. I �r + 'rSll OacA .. 1. . .{ "it ,{ •Y ' - . • ) , 1 • vciiage : v } �. Ce11 ;e,rp:ratwa;'Gi . r r r ( • - . • ` Cell Type Mono-crystalline PERC 156x156mm (6 inch) �» ti "m 0i cells tiU (li. Ili) i'�• f • Oimensinnc 1650x992s40mm(6497x39.06x1.57inch) W Weight 19.0 Kg 141 9 ibs I i Front Glass 3.2mm, high Tiansinission, low Iron, a 1 AR Coatiog Tempereet Glass r ` Packaging Configurations Fame Anodized Aluminium Allcy, 8vu t:pxei -tit.e unprtl hulction Box IP67 Rated 25prs/ box. SOpcsipallet, 700 prs!40'Hp Container Caput Carlos I2AWG, Length: M00mm (39 37 inch) r Fire ryDe ' TypeSPEC IFICATIONS,.' •, r S i r i � c ! Module Type • • JKM270M-60B JKM275NI-608 J1<1,4280M-60B JKM285M-606 J_ KM290M-60B + STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT • + • Maximum Power (Pmax) 270Wo 201VJp 275wp 205WP 280WP 209Wp 285Wp 212Wp 29OWp 216Wp Maximum Power Voltage (Vmp) 31.4V 29,3V 31,6'V 29,tiV 31,8V 29.7V .• 32,OV 29.9V 32.2V 30.2V - - Maximum Power CLInent (Imp) 6.60A 6. BSA 8.70A 6.93A 8.81A 7'UlA 8.90A • 7,12A 9,02A 7 21A Open-circuit Voltage (Voc) _ 38AV 35.6V 38 5V 36 OV 38 6V 36 2V 38,7V 3BAV 38,8V 36.6V 1 Short-circuit Cu: rent (Isc) 9.28A 7 15A !),.'OA 7 54A 9.53A 7.67A 9.65A 7 72A 9 78A ' 7 BtA - Module Efficiency STC (%) 16.50% 16.5011, 17,1,1% 17 41% +� 17.72% t `5 Operating Tempemturet C) 10"C-•851C + Maximum system voltage - - 1000VOC(UL) - - - Maximum series fuse ,ating 15A g Power tolerance 0­3% • ; remperature coefficients of ?max -0 39%1'C s .� Temperature coefficients of Voc ' -0.29%PC ' y Temperature coefficients of Isc { 0 05"WC Nominal operating cell temperature (NOCT) 45±2'C STC: `.V{ Irradiance 1000W/m1 Cell Temperature 25"C +"T AM=1.5 j k„ 1 NOCT: 4_' Irradiance 800bV/m- � Ambient Temperature 20"C AM=1.5 _ Wind Speed lm/s ' Power meawrement •oleiance: [1') �L d. r, t•+.. •�' .i _ . .. ' ll, • i i - - 1,i+F1 j. ' : = 1' • r .•)ka i�.wn, 'i~ ,n h. �.., �. .t .,., f1.`t.... .. ., p,-){. 1..,.9 n, �,� •, 5, i'... T ).,,+, n•f . + ..�-f.);C; �.'UwtaYGE,•.1.^. _e •+.iG:v 1 , . r Enphase IQ 6 and IQ 6+ Microinverters UL To learn more about Enphase offerings; visit enphase.com The high-powered smart grid -ready Enphase IQ 6 Micro'" and Enphase IQ 6+ Micro" dramatically simplify the installation process while achieving the highest efficiency for module -level power electronics. Part of the Enphase IQ System, the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy", Enphase Q Aggregator', Enphase IQ Battery', and the Enphase Enlighten`" monitoring and analysis software. The IQ 6 and IQ 6+ Micro extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing. Enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved two -wire cabling Built-in rapid shutdown compliant (NEC 2014) Productive and Reliable • Optimized for high powered 60 -cell and 72 - cell* modules More than a million hours of testing Class II double -insulated enclosure Smart Grid Ready Complies with fixed power factor, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles * The IQ 6+ Micro is required to support 72 -cell modules "aENPHASE Enphase IQ 6 and IQ 6+ Microinverters INPUT DATA (DC) IQ6-60-2•US AND IQ6-60-5-US 1O6PLUS-72-2-US AND IQ6PLUS-72-5-US Commonly used module pairings' 195 W - 330 W + 2.3.5 W - 4nn W + Module compatibility 60 -cell PV modules only 611 -cell and /2 -cell PV modules Maximum input DC voltaqe 48 V 62 V Peak power tracking voltage 27V 3711 27 V - 1.5 V Operating range 16 V - 48 V 16 V - 62 V Min/Max start voltaqe 22 V / 48 V 22 V / 62 V Max OC short circuit current (module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed under single fault 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection squires max 20A per branch circuit OUTPUT DATA (AC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Peak output power 240 VA -��-� 290 VA Maximum continuous output power 230 VA 280 VA Nominal voltage/range' 240 V / 211-264 V 208 V (1cb) / 183-229 V 240 V / 211-264 V 208 V (1(P) ! 183-229 V Nominal output current 0-964 1 11 a 1 17 A 1 3S 4 Nominal frequency _ 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz Power factor at rated power 1.0 1.0 Maximum units per 20 A branch circuit 16 (240 VAC) 13 (240 VAC) 14 (singie-phase 208 VAC) 11 (single-phase 208 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 A 0 A Power factor (adjustable) 0.7 leading... 0.7 lagging 0.7 leading... 0.7 lagging EFFICIENCY @240 V @208 V (ICO) @240 V @208 V (1(0) CEC weighted efficiency 97.0% 96.5% 97.0% 96.5% MECHANICAL DATA Ambient temperature range -40°C to +65°C Relative humidity range 4% to 100.6 (condensing) Connector type MC4 or Amphenol H4 UTX Dimensions (WxhlxD) 219 mm x 191 mm x 37.9 mm (without bracket) Weight 1.5 kg (3.3 lbs) j Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Environmental category ! UV exposure rating Outdoor - NEMA 250, type 6 (IP67) 1 FEATURES Communication Power line Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase iQ Envoy Compliance UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES -0003 Class B, CAN/CSA-C22.2 NO. 1071-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1, No enforced DC/AC ratio. See the compatibility calculator at enohace cgm/Pn- rsrs r000rt/rtt 1 rl ctnm alibilitv,. 2: Nominal voltage range can be extended beyond nominal if required by the utility. To learn more about Enphase offerings, visit enphase.com ;, ; nc use "nergv II r:gr.ts aese! :zc All ra:ie:-erk ar brands asec are :ne nicpc,ty o` rn ,hz se :: gy. in E N P H A S E :()I :� =Y dl 1 `J w1,�i � �.�� - -���. � •tom. '_ �� ����. liclitimi 0 r i FI® -DEQ- - -- - - DOAEc6RtstenQ -Solar° V Committed to the connection Document date 3.6.2017 Contents Pg, 1 ..... .... .- a... _..._.. ........ . .......... . .. ... Assetsof Design Features System Components i u Pg. 2 _...,.., Rock -It 2.0 Mount Assembly i G Rock -It 2.0 Coupling Assembly YPg.3 .. ....... _-,.._ ,. _ _..-.. ... Rock -It 2.0 Hybrid Mount Assembly i Rock -It Clip SS Assembly Pg, 4 .....,.,,..> ............................................. .. .... . ....... ... .,. _...._.... , _. _ ............., Array Layout h GreenFasten Flashing Install Pg. 5 .......... ,...., .,....... ... ............., Rock -It System 2.0 Install iPg. 6 ....... ..................... .., ........ .. _ ... .... ............ ........ ... ....._ .. ........... „ Ground Lug Install " Rock -It Clip SS Install Pg. 7 -11 ..,........._........................... ............................. ... ....... ... .... ... ............... Standoff Spacing Tables Snow Load 0-20 psf Snow Load 21-30 psf Snow Load 31-40 psf Snow Load 41-50 psf Snow Load S1-60 psf Pg. 12 ............................................... .................. ............................... Grounding Information Bonding Assembly and Bonding Path Pg. 13 ................... ............................ .............................. ......... ............... I . Thermal Expansion and Bonding Bracket Spacing Staggered Layout Cantilever r Pg, 14........................................................................................................ Evaluated, Compatible Modules System Specifications www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 ROCK -IT SYSTem 2.0 Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that are fast and easy to install, straightforward, secure and cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow ouard and solar industries for two decades. FeaTu r -es • Fastest, easiest to level system on the market • Conforms to UL 2703 First Edition • Class A Fire Rating with Type 1 modules • Integrated electrical bonding • SIMPLE- only 4 components • North-South adjustability • Only one tool required (1/2"deep well socket) • Vertical adjustment of Y-4" �� I cl I I �.vl I lr"LJI Icl IIS - I C�cc.111 eIJ ROCK -IT SLIDe . ROCK -IT 2.0 ROCK -IT 2.0 COUPLInG 4" For COMP SHInGLe mounT & LOaD Beann' G F=OOT 8" FOr TILe S9STeI'1'1 comPonenTS* - oPTIonaL ROCK -IT 2.0 HyBrID mounT (ReFe.r TO PG. s) ROCK -IT CLIP SS (ReFer TO PG. 6) ROCK -IT 2.0 Array sKIrT EcoFasten Solar` EcoFasten Solar products are protected by following U.S. Patents: 8,151,522 8,153,700 8,181,398 8,166,713 8,146,299 8,209,914 8,245,454 8,272,174 8,225,557 9,010,038 9,134,040 9,175,478 9,212,833 *Components for use with 32mm modules are available as special order. Components for use with 32mm modules are labeled as such on packaging. Side profile of Mid -Clamps on Rock -it 2.0 Mount and Rock -It 2.0 Couplings is slightly different for use with 32mm modules. Please refer to evaluated, compatible modules on page 14. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 1 ROCK -IT 2.0 MounT ASSeMBLY NOTe: ITems 1-7 SHIP assemBLeD ITem 6 Pre-ToraueD 1 5/16"-18 Hex Flange Bolt (or Hex w/star washer) 300 Series SS 2 Rock -It Mid -Clamp 6000 Series AL (fig. A: Mid -Clomp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It Shelf 2.0 6000 Series AL 5 Flange Level Nut 300 Series SS 6 Rock -It Pedestal 6000 Series AL 7 Rock -It -Tie Plate 6000 Series AL 8 Rock -It -Slide -Tile 2.0 6000 Series AL (sold separately) g i 9 Rock -It -Slide -Comp 2.0 6000 Series AL (sold separately) i 4 ITems 8-9 are accePTaBLe BracKeTS FO' use WITH THe /. ROCK -IT 2.0 4 (SOLD separaTeLY ) ROCK -IT 2.0 COUPLING aSSeMBL9 NOTe: ITems 1-4 SHIP aSSel'71BLeD 1 5/16"-18 x 1.25" or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL (fig. A. Mid -Clomp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It -Coupling -Shelf -2.0 6000 Series AL 5 Load Bearing Foot fig.. A (32mm) i www.ecofastensolar.com info@ecofastensolar.com 877=859-3947 2 i r d ROCI-<-IT 2.0 HYBRID mounT ASSe MBLY NOTP: ITem-, 1 -in SHIP aSSP.mBLeD , SI 1 5/16"-18 x 1.25"or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MidClamp 6000 Series AL i (fid. A. Mie! -Clump jw use with 32t -nm o7udulesj • .6�, i ,._4i `7 r -` 3 3 Rock -It -Coupling -Shelf -2.0 6000 Series AL 4 Crushable Spacer - Cardboard or Similar 5 Flange Level Nut 300 Scries SS 6 Rock -It Pedestal 6000 Series AL 7 3/8" ID Star Washer 300 Series SS 8 3/8"-16 x 3" Hex Tap Bolt 300 Series SS 9 5/16"-18 x 3/8" Hex Serrated Flange Bolt 300 Series SS 10 Rock -It Tie -Plate -T 6000 Series AL I k fig. A I (32mm) I ROCK -IT CLIP SS ASSeMBL9 NOTe: ITems 1-3 SHIP assemBLeD r I 1 Stainless Steel Carriage Bolt -.313-18X.75 2 Rock -It Clip SS 3 Stainless Steel Flange nut .313-18 www.ecofastensolar.com info@ecofastensolar.com 877-859-3947. 3 Array LAYOUT • Find the required structural attachment points. Mark these using a vertical (N -S) chalk line on the center of the rafters. • Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load. areas may require lesser bracket spacing in the E -W axis vs. the maximum spacing. Max spacing is 48"for portrait orientation and 72" for landscape orientation. Consult project layout diagram for project specific bracket spacing on the roof. Install Rock -It Mounts to predetermined mount spacing. • The array skirt sections are the width of a typical 60 cell module — use the array skirt as a guide to lay out module placement. Note: The distance between the rows of mounts is calculated by the module dimension N -S plus 1 3/8" (35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1/2". GreenFasTen FLasHinis insTaLL position for each GreenFasten Flashing. vertical lines to mark the installation 2 Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3 Insert the Flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt through the EPDM bonded washer, the Rock -It slide, the gasketed hole in the flashing and into the rafter. Torque: The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. "The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 ROCK -IT SSYSTeM 2.0 inSTaLL 1 Install Eco Fasten Solar Flashing with Rock -It Mounts Follow EcoFasten Solar Install instructions for flashing and bracket install (GreenFasten shown above) Optimum vertical distance between lag bolts is 1 3/8"plus module dimension Set mounts on eave most row so that the Rock -It Pedestal is on the South end of Rock -It Slide Set mounts on all upper rows so that the Rock -it Pedestal is on the North end of Rock -It Slide 2 Install Array Skirt on Eave Mounts Loosen Hex Flange Bolt in Rock -It Mid -Clamp Slide Array Skirt into front channel on Rock -It Shelf Tighten Hex Flange Bolt to engage the Array Skirt 3.5 Install Rock -It Couplings Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting on the roof (Each Load Bearing Foot is set to same height as the Rock -It Mounts - adjust accordingly) On eave row only, slide Rock -it Skirt into front channel on Rock -It Coupling On eave row only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt, drawing the Array Skirt sections together Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface NOTE: If a coupling lands on a rafter, the Hybrid Mount- should be used in place of the Rock -It Coupling (refer to image 3a) *Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal, or by purchasing separately 6 Align and Straighten First Row of the Rock -it System with Array Skirt Use North-South adjustment of the Rock -It Pedestal to straighten array skirt Torque screw an side of Rock -It Pedestal to 150 in -lbs to secure it to the Rock -It Slide Adjust Flange Level Nut to level the system (optional - can be leveled during or after installation) 7-10 Install 1 st Row of PV Modules Slide upslope Rock -It Mounts down to engage top of first module Install Rock -It Couplings on the upslope side of 1st row of panels Torque 1 st and 2nd row of Mid -Clamps an Rock -It Mounts and Rock -It Couplings to 150 in -lbs. (Torque to 130 In-Ibs. when installing with 32mm modules) Install balance of Pv modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules Level the: Rock -it System • When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value) www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 5 Groun, DnG LUG inSTaLL Necessary Components: Bumcly CL50-ITN Ground Lug (UL Listing #KDER.ES999) Note: Drill and deburr hole in Ground Lug prior to installation 14 AWG - 4 AWG Copper Ground Wire* 8-32 x 0.5" Serrated Flange Head Bolt (300 Series S9 8-32 Serrated Flange Nut (300 Series SS) 11/32"and 1/4" wrenches or ratchets/sockets 1 Insert the flange bolt into the module ground hole. Place Ground Lug over the' bolt and turn to desired orientation. �f 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten set screw 10 complete assembly. Torque Values: 14-10 AWG= 20 in -lbs. 8 AWG= 25 in -lbs. 6-4 AWG= 35 in -lbs 77,. r *Minimum of 1/4"cle6rance required between bare copper wire and aluminum. ROCK -IT CLIP SS. InSTaLL , _ - - � •Lt tn+/•Ndr 1tm,u:a.r� IJGJitplts , r a .. ' torr na Rai >n ,T 1 Locate all parts -Locate the Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting " the micro-inverter/power optimizer. See fig. A for acceptable mounting locations. 2 Install the Rock -It Clip SS ' • Slide the Rock -It Clip SS onto the lip of the module frame. • Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. • Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-invertei/power optimizer to the Rock -It Clip SS. '• Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer Flange is tight against the Clip flange to avoid rotation during tightening. www.ecofastensofar.com info@ecofastensolar.com 877-859-3947 +6 Y Snow Load 0-20 psf Modules in Landscape Wind Speed Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2' Zone 3 ASCE 7-05 ASCE 7-10 < 6:12 7:12 < Roof Pitch < 12:12 B 159 93 59 t,-; ,1103 3„, :, ' 88 88 85 mph 110 mph C 114 67 42 103 ^^--'C'} 65-r-38 D 96 56 35 91 74 74 4 'Dt• `B .' . S5, _ �`32 B 146 85 54 ,0 '• 1 + 0 80 80 90 mph 115 mph C . 104 61 38 98 115 mph C D 88 51 32' 83 68 68 D 50 8 123 72 45 3 95 95 100 mph 125 mph C 88 51 32 83 68 68 .,- ,.0 " i•' 50;"" D 74 43 27 70 57 57 56� 8 98 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 31 D 59 34 22 56 46 46 26 _ B 85 50 31 81 66 66 120 mph 150 mph C 61 36 22 58 47 47 27 ti D 51 30 19 49 40 40 4 Notes: Spacing Governed by Snow Load - - — 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff• however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" ` 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 0-20 psf Moduids n-F"Otlratt Wind S ded Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 .. 91 rte- Zone 2 5385mphf Zone 3 Zone 1 Zone 2 Zone 3 =r•-..� —u --.A * ;B ..,x. 110rnh ^^--'C'} 65-r-38 j* F 246li— - �50r^rbzw;;50*1 4 'Dt• `B .' . S5, _ �`32 ' ^ 20 l' o. 52':'.: 42:; r+" .r . 42 ., 83 4930 46 90 mph 115 mph C 59 35 22 56 46 D 50 29 18 47 38 38 +, `,r`26,+c54'54+s r 1,00 mph" 125 mph„ .,- ,.0 " i•' 50;"" .. 29 - •' 18 it f47,; '39 -39" ~' 56� 33 32 20 53 T w 43 �., i32 43 B 110 mph, 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 _ 49 . _ 28 . 18 - -46 37 - _ 37 _ .120 mph +,150.mph C•- . 35 20 12 •33 27 27 ti `D e ' 29 17 ° 10 ...'.. :28 22'.- . . 22 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standofl 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcily = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity ' 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is Included in this table ' t e www.eeofastensolar.com info@ecofastensolar.com 877-859-3947 7 � r Exposure -Category • ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 90 mph 100 mph 110 mph 115 mph .125 mph. B C 0 B C D B C � ' ,10,t." n"} •f 93 67 56 85 61 51 72 51 5910 "� 42 1}$g•�{.j 35 546B'• 38 t 48 32 �'; i3$ i r�� 45 32 7 77F,77. +� ,,g$ Y ; X83 •_ a -•8B. 148 4 i t Snow Load 21-30 psf _ Modules in Landscape -Wind Speed Exposure -Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 t Snow Load 21-30 psf _ Modules in Landscape -Wind Speed Exposure -Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 90 mph 100 mph 110 mph 115 mph .125 mph. B C 0 B C D B C � ' ,10,t." n"} •f 93 67 56 85 61 51 72 51 5910 "� 42 1}$g•�{.j 35 546B'• 38 t 48 32 �'; i3$ i r�� 45 32 7 77F,77. +� ,,g$ Y ; X83 •_ a -•8B. 148 4 ; . � e 167, j ?�gg5 Be u s8, Z 'fl r, 68 -68 {.ysfi$$ r 96 0 104 88 88 D 74 43 27 57 57 110 mph 140 mph iB C 98 70 57 41 36 26 66 -54 54 12.0'mph 150 mph D B C 59 85 61 34 50 36 22 56 31 8g^ 22 58 46 66 47 46 ' 66 47 'D. 51 30 19 49. _ 40 _ 40 ` Notes • Spacing Governed by Snow Load " - 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar s(andoff,; however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safely of 1.5 for lag pullout capacity • " 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height i. 7.•) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 21-30 psf z ,votes: ®Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff ` 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) _ + 4.) Includes additional factor of safety of 1.5 for lag pullout capacity c: ' S.) Values based on a maximum module length of 70"- 6.) Based on Risk Category 11 (ASCE 7-10) structures less than 30 feet in height - ' 7.) All adjustment factors are set to 1: No site specific engineering is included in this table www.ecofastensolar.com Y info@ecofastensolar.com - 877-85973947 ,, . '8 1 Snow Load 31-40 psf s Modules in Landscape Wind Speed Exposure Catelory 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 110 mph B C D 83'.c+='83 r#t'i , % ° 83'° �c �67 56 59 ,51, 42 GX2�' '. 35 51 r- 51 ' �1x � 4511 `e { ' 51,- 90 mph 100 mph 115 mph 125 mph B C D B C '8' r �3+ $3- i. -## K t 54 1951' 38 S1�1E 32 45 32 'Sj - 51 6T. •-'. 61 ;. 51 51 110 mph 140 mph D B C 74 43 57 41 27 51': ' 36 S1 26 '..51: ' e kr 1. fit - c:6r1 . r 5?• '• 34 ` 70 4 46 46 22 }r '. ?1 0 59 34 22 1~T s1�c•^ 120 mph 150 mph B C 50 36 31 '� 1 22 S 41,• ' _ =26 3r 61 47 r=40 47 D 51 30 19 49 t •t D . ;42:= B 40 Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, , however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.) Based on .disk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 31-40 psf ` Wind Speed Exposure Cate o 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone '1' Zone 2 Zone 3 Zone 1 Zone 2 Zone.'3' 85 mph'i r 110 mph " ' """C g` la . -r3_8 24 $,s fit 9Y 1. B x:r 49 30 3 90 mph 115 mph C 51 35 22 }r '. ?1 D i. 29 18 3+ 3x 41,• ' _ =26 3r 3t' 3r 100 mph 125 mph'�'129 ;18 :.: ....� t •t D . ;42:= B 026_ r 33 �20 3f R J 110 mph 140 mph C 40 23 14 1 � 26 26 D 34 19 12 3t •- ',• -, a.-. -...r. g �-.. ...49.+_. ,i.:'28. 18— " F+ 120 mph* - 150 mphR i C • -35 " '20 12 - 27"< ;, °, ` 27 29; J7 '10 2 2p 22 _ t Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only an EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Indudes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height + 7,) All adjustment factors are set to 1. No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 I W . , • ' y 41 � + , ` � . . 4 . 1. a .1 f• GrounDinG inFormaTlon - `y'f '•:� ..� The rail -free Rock -It System maybe used to mount and ground PV modules that comply with UL 1703, only when that specific module has been, .evaluated for mounting and grounding, in compliance with the included installation instructions. Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. • F ' ` Multiple Use Grounding Pins ... Grounding pinswithin the Mid -Clamp are multiple use bonding/grounding devices. Modules will need to be adjusted if the Mid -Clamps are +, . loosened to ensure there is "new" metal to pierce into upon retightening.. ` ` + Grounding Method Rock -It 2.0 Mount bonds N -S rows of modules Rock -It 2.0 Coupling bond_ s E -W rows of modules ` ~. b` Array Skirt 2.0 bonds E -W along the entire array when installed r� One Burndy CL50`1TN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscape orientation. r' } Y BonDrG_ ,ASsemBL:y anD BonDinG PATH + j . - .. .l Bond Path Grounding Lug ,. r y ' EgWpmentr lEGCt;andi^,. F - ...- .-xr r-_ Conducto" Integrated Bonding A( m. M } - - • Rock -It CouwinB $i r� Rr �'''� ! F`: 4 •, Rock -It Ivlounl "'�.� 17 .y - ROCk-It Array Skirt A !,• Vr r, „- y x 4 ! s • `* r • t J I Bond Path Band Pah Grounding Lug Grounding Lug " Equipmen[Grounding ' t - Cond.aor1EGC1. - -L".m, Equipment Grounding I yenu'P-. ground , Conductor (EGC} _ Ruck -It Cuupliug - �rnne0y m m.[n . • DWall a Rock-Ic Coupling Rock4r mcuM < 1 .0 Rock -[t Array Skut L _ a R^CkdrrdnUnf r _ RMk-1t Arrw Skut E:J THermaL Expansion anD BonDinG A fherrrlal expansion gap -is required per each continuous 40' length of modifies. Omit a coupling and leave a 2" gap in the array skirt and also between the modules at that point. BracKeT spacinG 1 Portrait Orientation 4 I J Landscape Orientation Bord Path Grounding Lug -- cyulun�e;a Cv •wirJino Camucor I LC4- ,rcncrWly to co.;h 4Jf.0 Rock. It Couping • Rock -It Mount Rock. It Array Skirt 32mm, 35mm & 40mm Modules: Max east/west bracket spacing is 72" OC. Maximum east/west bracket spacing is 48" OC. 32mm Modules: Max east/west bracket spacing is 48"OC. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser spacing E -W than the maximum. sTaGGereo LaYOUT I canTILever anD oFFseT Staggered Mounting Points 5 e 013ock-It Mount Rock -It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing. The array layout instructions in this installation manual offer a general overview of layout: Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 13 I 4 1 1 a ROCK -IT S9STem 2.0 EVaLuaTeD, C0mpaTIBLe MODULeS Module Manufacturer Model Type (X used to indicate variable test) Module Dimensions (mm) Module Dimensions (in) Trina Solar TSM-XXX-PX05.08 1640 x 992 x 40 64.57 x 39.06 x 1.57 Canadian Solar CS6P-XXXM 1638 x 982 x40 64.50 x 38.70 x 1.57 Canadian Solar CS6P-XXXP 1638 x 982 x 40 64.50 x 38.70 x 1.57 Jinko Solar JKMXXXP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXPP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinkc Solar JKMXXXMM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Yingli Solar YL2XXP-29b 1650 z 990 x 40 65.00 x 38.98 x 1.57 LG Electronics LG300N1C-83 1640 x 1000 x 35 64.57 x 39.37 x 1.38 LG Electronics LG300N1 K -G4 1640 x 1000 x 40 64.57 x 39.37 x 1.57 Axitec Solar AC-XXXM/156-60S 1640 x 992 x 40 64.57 x 39.06 x 1.57 RECOM RCM-XXX-6MB 1640 x 992 x 35 64.60 x 39.00 x 1.38 Silfab SLA 2XXP 1650 x 990 x 38 64.96 x 38.98 x t.50 Solaria PowerXT XXXR-BX 1621 x 1056 x 40 63.82 x 41.57 x 1.57 Hanwha Q Cells Q.PRO G4 2XX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha 0 Cells Q.PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q. PRO BFR G4 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR 34.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR 34.3 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells I Q.PEAK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PEAK BLK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells B.LINE PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells B.LINE PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 'Hanwha 32mm modules to be used with special order Rock -II System components. Call for details. • Fastest, easiest to level system on the market • SIMPLE- only 4 components • Conforms to UL 2703 First Edition North-South adjustability • Class A Fire rating with Type 1 modules • Only one tool required (1/2"deep well socket) • Integrated electrical bonding Max No. of Panels 300 Modules per ground lug Materials :300 Series Stainless Steel 6000 Series Aluminum Max System Voltage 1000VDC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703 Type 1 Rated Modules Lug Specifications Burndy CL50-lTN Ground Lug (UL Listing #KDER E9999) Leveling Range 3-4" e Lug spec 14 Alt/G- 4 AWG Copper Ground Wire Rock -It Slide -Comp 2.0 Range Rock -It Slide -Tile 2.0 Range 3" 7" FGroundWire dule Size 64.96"(1650mm) x 39.05"(992mm) x 2"(50mm) Min/Max Roof Slope 1/2:12/12:12 nforce/Uplift Rating 45 PSF Max Anchor Spacing (35mm/40mm) Max Anchor Spacing (32mm) 72" 48" Rock -It Mount Load Rating 547lbs with Single 5/16" Lag 3.0 Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is 1/3 bracket spacing Rock -It Slide Box QTY 50 units Coupling Box QTY 12 units Warranty 20 Year Material and Workmanship sya3en marking fulaced an gide or underside Codes: National Electric Code, ANSI/NFPA 70, NEC 250, NEC 690, IRC, IBC of lock -it Mount and tuuplingl Standards: UL 2703 First Edition, UL 1703 *-EcoFasrcn Solar ROCK -IT SYSTEM A MFG IO iDOE. xxx QO.YYYY A CONFORMS27 TO UL 03 QrEcoFasten Solar www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 ze structural ENGINEERS January 16, 2017 r Rillito River Solar, LLC dba EcoFasten Solar 289 Harrel Street Morrisville, VT 05661 TEL: (877) 859-3947 Attn.: Engineering Department, i I Re: Engineering Certification for the EcoFasten Rock -it System Installation Manual This letter is to document that PZSE, Inc. -Structural Engineers has reviewed EcoFasten Rock -it System Installation Manual published October 12, 2015 and specifically the "Loading Tables". i SCOPE OF THE SYSTEM: The EcoFasten Rock -it System is a solar panel support system for installing solar photovoltaic arrays on sloped roofs of buildings. Typically such buildings are residential with shingle or tile roofs. The number and spacing of attachments to the roof structure can vary depending on various site specific criteria incliding, but not limited to, roof slope, spacing of supporting structural members and environmental loading. SCOPE OF OUR REVIEW: I PZSE, Inc.—Structural Engineers provided.a review of the following . • • Rock -it System design methodology • Rock -it System Installation Manual • Rock -it System Loading Tables r and has determined that all information, data and analysis contained within the Installatibn Manual are based on,. and are in compliance with, the structural requirements of the following Reference Documents: • Minimum Design Loads for.Buildings and other Structures, ASCE/SEI 7-10 • International Building Code, 2015 Edition, by International Code Council, Inc. • California Building Code, 2016 Edition, by California Building Standards Commission • Aluminum Design Manual, 2010 & 2015 Editions, by The Aluminum Association This letter certifies that the EcoFasten Rock -it System Installation Manual and Loading Tables are in compliance with the above Reference Documents. 8150 Sierra College Boulevard, Suite 150• Roseville, CA 95664 916.961.3960 916.961.3965 www.pzse.com FLE structural ENGINEES DESIGN RESPONSIBILITY: The Rock -it System Installation Manual is intended to be used under the responsible charge of a registered design professional where required by the authority having jurisdiction. In all cases, the user of the Installation Manual has sole responsibility for the accuracy of the design and integrity of the system. The Installation Manual does not check the capacity of the building structure to support the loads imposed on the building by the array, such as bending strength of roof rafters spanning between supports. This requires additional knowledge of the building and is outside the scope of the Installation Manual and our review. If you have any questions on the above, do not hesitate to call. Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA r r 8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661 916.961.3960 916.961 .3965 www.pzse.com . I r