Loading...
HomeMy WebLinkAbout030-230-062 (2)Butte County Department of Public Works DENNIS SCHMIDT, DIRECTOR LAND DEVELOPMENT DIVISION Storm Water Management Program 7 County Center Drive Oroville, CA 95965 (530) 538 7266 Telephone (530) 538 7171 Fax National Pollutant Discharge Elimination System (NPDES) Phase II Construction Storm Water Permit and Storm Water Pollution Prevention Plan (SWPPP) Acknowledgment [LESS THAN 1 ACREI Reference Number: B17-1767 Date: 8/9/2017 Location: 3009 GRAND AVE By: JMD Parcel Number: 030-230-062 Sub Type: SFD-CUSTOM/MODEL Owner Name: BOELMAN, CHERI LEYANE & CAIltlbone: 5304036015 Description: SFD (1857) COV (692) By signing below, I the project owner/owners' agent, certify that this project WILL NOT DISTURB 1 acre or more of land and that I therefore, do not need to apply for a Construction Storm Water Permit from the State of California Regional Water Quality Control Board. Phased projects that contain multiple site buildouts of less than one acre but when combined with subsequent phases total more than one acre of disturbed soil will require a Construction Storm Water Permit from the State of California Regional Water Quality Board. )ate 8/9/2017 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 530.538.7601 Buttecounty.net/dds Oroville, California 95965 F: 530.538.7785 NOTICE TO BUILDERS** Before your building permit can be issued, your plans must be checked for compliance with the California Building Codes. In addition, your plans are routed to other regulatory entities including but not limited to Planning, Public Works, Environmental Health, and the California Department of Forestry for their clearances and approvals. There are some things you can do to expedite your permit: - Make sure your application is complete. - Be responsive to requests from County departments for any additional materials or requirements. The Building Division places its highest priority on processing building permits as quickly as possible and each day that passes without a complete application adds to processing time. Every permit issued by the Building Official shall expire and become null and void if the work authorized by such permit is not started or completed within one year from the date of issuance of such permit (per Butte County Code Chapter 26, Article 1, Section 263.1). A permit may be renewed (for a fee) prior to expiration a maximum of two (2) times, provided construction progress has been documented by the Building Division during each year during scheduled inspections. No changes may be made in the original plans and specifications for such work. In order to reinstate action on a permit after expiration, the permittee shall pay a new full permit fee and additional plan checking and documentation may be required. Upon completion of work covered by this permit, please contact this office for final inspection. As a reminder to you, it is illegal to occupy this building or any portion of the building for which this permit is issued without a final inspection. EXPIRATION OF PERMIT APPLICATION AND REFUND POLICY** Application for which a permit has not been issued will expire one year after date of application. Refunds may only be made upon written request by the person who originally paid the fees. Refunds for permit applications, if the permit has not issued, but not after 180 days from the date of fee payment. Fees paid at the time of application are for Plan Check and administration. The Plan Check portion of fees is refundable only if the permit is cancelled or withdrawn before any plan checking is done. Building Division costs will be deducted prior to authorizing a refund and a charge to process the refund application will be assessed. The current refund processing fee is $127.00. Refunds on permits (issued) may be requested prior to the expiration of the permit, provided no work has been done pursuant to the permit. An Inspection may be required (and deducted from any refund amount) to determine no work was done. Fee/refund information can be read on-line at httl2:Hmunicipalcodes.lexisnexis.com/codes/butteco/ "When filed, this application and all supporting material becomes subject to the California Public Records Act. All public information related to this application is subject to public inspection and will be posted on the County's website for electronic access. Permit Number: B17-1767 Date: 8/9/2017 Parcel Number: 030-230-062 Location: 3009 GRAND AVE, OROVILLE Phone: 5304036015 Owner Name: BOELMAN, CHERI LEYANE & CARL Description: SFD (1857) COV (692) Signature of Applicant: Date: 8/9/2017 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 530.538.7601 Buttecounty.net/dds Oroville, California 95965 F: 530.538.7785 PERMIT APPLICATION DATA SHEET Reference Number: B17-1767 Date: 8/9/2017 Location: 3009 GRAND AVE By: JMD Parcel Number: 030-230-062 Sub Type: SFD-CUSTOM/MODEL Owner Name: BOELMAN, CHERI LEYANE & Phone: 5304036015 CARL ; Description: SFD (1857) COV (692) The above permit application has the following Clearances required prior to permit issuance. Please contact each department indicated below regarding specific requirements pertaining to your permit application. YES SEWER DISTRICTS ❑ Thermalito Irrigation District, 410 Grand Avenue, Oroville CA 95965 — 530.53.3.0740 ❑ LOAPUD, 1960 Elgin Street, Oroville CA 95966 — 530.533.2000 ❑ City of Chico, PO Box 3420, 411 Main Street, Chico CA 95927 — 530.879.6700 PARKS & RECREATION DISTRICTS (form will be available after plans have been reviewed by building department) ❑ Chico Area Recreation District, 545 Vallombrosa, Chico CA 95926 — 530.895.4711 ❑ Durham Park & Recreation District, 9447 Midway, Durham CA 95938 — 530.345.1921 ❑ Feather River Recreaction & Park District, 1875 Feather River Blvd, Oroville CA. 95965 — 530.533.2011 ❑ Paradise Parks & Recreation, 6626 Skyway Road, Paradise CA 95969 — 530.872.6393 SCHOOL DISTRICTS (form will be available after plans have been reviewed'by building department) ❑ Biggs Unified School District, 300 B Street, Biggs CA 95917 — 530.868.1281 ❑ Chico Unified School District, 1163 East 7th Street, Chico CA 95926 — 530.891:3006 ❑ Durham Unified School District, 4920 Putney Drive, Durham CA 95938 — 530.895.4675 ❑ Gridley School District, 429 Magnolia, Gridley CA 95948 — 530.846.4723 ❑ Marysville School District, 1919 B Street, Marysville CA 95901 — 530.741.6000 ❑ Oroville Elementary School District, 2795 Yard Street, Oroville CA 95966 — 530.532.3000 Oroville Union High, 2211 Washington Ave, Oroville CA 95966 — 530.538.2300 Ext: 105 ❑ Paradise Unified School District, 6696 Clark Road, Paradise CA 95969 — 530.872.6400 OTHER 7' Recorded copy of Agricultural Acknowledgment Statement - See Attached Instructions ❑ City of Biggs Planning Department, 3016 Sixth Street Biggs CA 95917 — 530.868.5447 ❑ FEMA Flood Elevation Certificate (required within 48 hours or permit will be placed on hold until received) ❑ Other: "When filed, this application and all supporting material becomes subject to the California Public Records Act. All public information related to this application is subject to public inspection and will be posted on the County's website for electronic eco S. Signature of Applican Date:_8/9/2017 Department of Development Services 7 County Center Drive Oroville, California 95965 DEVELOPMENT SERVICES BOELMAN, CHERI LEYANE & CARL RE: 030-230-062 Tim Snellings, Director Pete Calarco, Assistant Director T: 530.538.7601 Buttecounty.net/dds F: 530.538.7785 Permit No: B17-1767 To meet the requirements of Butte County Code Section 26-12 (available on line at http://municipalcodes.lexisnexis.com/codes/butteco ), one or more of the following may be required before a building permit can be issued for the above referenced project. The construction of curbs, gutters, sidewalks or walkways, public roads, proper access from public roads, and drainage facilities; Dedication of any necessary rights of way; and For commercial or industrial uses or for multiple living uses having three (3) or more living units per parcel, the construction of an enclosure for containers used to hold solid waste and/or. recyclable materials for collection. Requirements prior to issuance of building permit: Submit sufficient information to the Land Development Division of the Public Works Department, 7 County Center Drive, Oroville, CA 95965, that demonstrates compliance with County Code Section 26 -12. If construction plans and/or engineering analysis are required, submit information in duplicate in accordance with County Improvement Standards (available on line at http://www.buttecounty.net/publicworks/divisions/landdevelopmentlirnpstd.htmi ) with a minimum plan checking deposit of $690.40. Important Note: If improvements in compliance with County Code Section 2612 are required, any construction plans and/or engineering analysis must be reviewed and approved by the Land Development Division of the Public Works Department prior to construction of the improvements and the required improvements must be constructed, bonded, or guaranteed with a deposit of an in lieu fee prior to issuance of this building permit. The process can require significant time and must be completed prior to issuance of the building permit. If you have any questions, please contact the Land Development Division at (530) 538 7266, Monday through Friday, 8:00 a.m. to 4:00 p.m. have read and undgrsland the above requirements: Signature:/ g!; // / / Date: 81912017 Butte County Fire Department Fire Prevention Bureau Residential Building Requirements 176 Nelson Ave, Oroville, CA 95965 530.538.7888, 530.538.2105 Fax 530.538.6226 Inspection Line Permit Number: B17-1767 Date: 8/9/2017 Location: 3009 GRAND AVE By: JMD Parcel Number: 030-230-062 Sub Type: SFD-CUSTOM/MODEL Owner Name: BOELMAN, CHERI Phone: LEYANE & CARL Description: 2993 & 3009 GRAND AVE To meet the requirements of Government Code section 51182, Butte County Fire'department requires a pre -construction inspection to provide the below building and site requirements to the property owner. Your property is located within the Butte County Fire Departments response area and must meet the below requirements: ❑ Public Resources Code 4290 (emergency access, signing/addressing, fuel modification standards) ❑ Public Resources Code 4291 (defensible space) ❑ California Fire Code LPG tank protection ❑ Butte County Improvement Standards Requirements prior to scheduling the pre inspection: Full plan submittal to Butte County Development Services Building Division To request an inspection call 530.538.6226; this is Fire Prevention Bureau's recorded inspection line; you will need the information at the top of this page. Inspection request that come through any other phone numbers will cause a delay in processing your permit. For the pre inspections, the property owner or authorized agent (contractor) is required to meet the inspector at the construction site. I have read and understand the above pre inspection requirements. Signature Date: 8/9/2017 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 530.538.7601 Buttecounty.net/dds autte County Oroville,,California 95965 F: 530.538.7785 DEVELOPMENT SERVICES PLAN CHECK SQUARE FOOTAGE VERIFICATION Permit Number: B17-1767 Owner's Name: BOELMAN, CHERI LEYANE & CARL Assessor's Parcel Number: 030-230-062 Date of Application:, 8/9/2017 E Square Footage Verification No Change: NOTES: Verified By: Confirmed TRAKiT Updated by: (Plan Check Signature) Date: f Date: I At Application: Change To: wing Area 1857 Garage Area 0 Covered Area 692 Open Area 0 Other U No Change: NOTES: Verified By: Confirmed TRAKiT Updated by: (Plan Check Signature) Date: f Date: I Butte County Department of Development Services FORM NO PERMIT CENTER DBP -43 7 County Center Drive, Oroville, CA 95965 Main Phone 530.538.7601 Fax 530.538.7785 www.buttecountv.net/dds IMPORTANT! NOTICE TO PROPERTY OWNER Dear Property Owner: An application for a building permit has been submitted in your name listing yourself as the builder of the property improvements specified at '?2,,d `i . A- 6� We are providing you with an Owner -Builder Acknowledgment and Information Verification Form to make you aware of your responsibilities and possible risk you may incur by having this permit issued in your name as the Owner -Builder. We will not issue a building permit until you have read, initialed your understanding of each provision, signed, and returned this form to us at our official address indicated. An agent of the owner cannot execute this notice unless you, the property owner, obtain the prior approval of the permitting authority. OWNER'S ACKNOWLEDGMENT AND VERIFICATION OF INFORMATION DIRECTIONS: Read and initial each statement below to signer that you understand or verify this information. 1. I understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner -Builder" building permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an Owner -Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner -Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. OYD. I understand building permits are not required to be signed by property owners unless they are responsible for the construction and are not hiring a licensed Contractor to assume this responsibility. 3. I understand as an "Owner -Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed Contractor and having the permit filed in his or her name instead of my own. 4. I understand Contractors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. 5. I understand if I employ or otherwise engage any persons, other than California licensed Contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer" under state and federal law. (M 6. 1 understand if I am considered an "employer" under state and federal law, I must register with the state and federal government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. bT7. I understand under California Contractors' State License Law, an Owner -Builder who id single-family residential structures cannot legally build them with the intent to offer them for sale, unless all work is performed by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed under contract with a licensed general building Contractor. Pagel of 2 Revised 7.20.2015 2�8. 1 understand as an Owner -Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owner(s) that result from any latent construction defects in the workmanship or materials. (f9. 1 understand I may obtain more information regarding my obligations as an "employer" rom the Internal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of Industrial Accidents. 1 also understand I may contact the California Contractors' State License Board (CSLB) at 1-800- 321-CSLB (2752) or www.cslb.ca.gov for more information about licensed contractors. (610. 1 am aware of and consent to an Owner -Builder building permit applied for in my name, and understand that l am the party legally and financially responsible for proposed construction activity at the following address: 11. 1 agree that,.as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern Owner - Builders as well as employers. 0112. I agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license, the Contractors' State License Board may be unable to assist you with any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner -Builder and wish to hire Contractors, you willbe responsible for verifying whether or not those Contractors are properly licensed and the status of their workers' compensation insurance coverage. Before a building permit can be issued, this form must be completed and signed by the property owner and returned to the agency responsible for issuing the permit. Note: A copy of the property owner's driver's license, form notarization, or other verification acceptable to the agency is required to be presented n the permit is issued to verify the property owner's signature. Signature of property owner: Date: ��`%// Note: The following Authorization Form is required to be completed by the property owner only when designating an agent of the property owner to apply for a construction permit for the Owner -Builder. AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Notice to Property Owner, the execution of which I understand is my personal responsibility, 1 hereby authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary to obtain an Owner -Builder Permit for my project. Scope of Construction Project (or Description of Work): Project Location or Address: Name of Authorized Agent: Tel No: Address of Authorized Agent: I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled out the above information and certify its accuracy. Note: A copy of the owner's driver's license, form notarization, or other verification acceptable to the agency is required to be presented when the it is issued to verify the property owner's signature. 117 Property Owner's Signature Date: Revised 7.20.2015 Page 2 ore