IV.. PUBLIC HEARINGS CONTINUED FROM MAY 13 1982:
.
;ATIVE DF�CLAPLATIOX
ITEt.j.,ON .11HICH NEC
ENDED
RE
E N' ACT HA
RE ARDINt
Roha1—d'R.. -16ga_n_,;- I 1'i h in g pexis,
and tcclana
ti
-On
plan��r-a�p.licpr,..gold. jlinc 0Pfoperty. Zoned•
of
"A-211 (rieneral" .located. on the west side north of Dry
Creek Road,.approxinatcly 3 miles nor
?Idssilia Val-ley...R(
)ad:- J.denti.�fke.das-AP' 41'-03-:27,..
:.south-of Paradise -
'Mrs. Kircher called the attention of the Commissioners to -the Geology andreceived,eaTlier
.-Hyro1ogy-.Report mailed to them on May 14 and to the memo
the from the Department..of Public Works recommending*a $S., . 000
performance bond.
Commissioner Max said he did not wish to make an undue hardship for the
applicant or extra cost, but that he did have some concerns about the ye . t
unknown.
The hearing was opened.
ion't. the. A-moUnt:'Of `.the pe.rformance-bond., stating.
'Ron Logan-took-exc-ept — had to put it back -as
that they had no place to storethe: overburden and
ed that the entire 20 cu.
- W 0
they ent. along --aftd that .contractors ha.d.estimat
for, $500,to $1,000 He asked whether.
a
yjq. per day could be replac
r o ther than putting up the money for
lien ;could,'be :p..laded.on.. his property
the' bdrid..
mmiss:ton of : the ' requirement- for:a
C()mtfi,_js: :jo ef.Schradet. r.eA11hd.b&'the'CoJ:' of
to 'plating the' lien ' and the necessity and expense.
166
t. .COUNTY PLANNING COMMISSION
MINUTES May 20, 1982
a foreclosure sale of d the land just for a little reclamation
iaork.
estiori that perhaps. Fish and
In resporise to Commissioner Behuriin's suSg perhaps the work could
Carie could'be made a reclamatibondawcretch ait conditioned to be shutemonded
proceed without a performanc Mrs.Kircher r,•
if the reclamation. is.not_.proceeding as•called for, urisdictions, and even
the Commission that we•.ioould.:.be:`cr..oss.ing. political j
"Wand. will-i:ng,.;:to. do: the monitoring . _.
though: Fish: and Game• might - '.e ;'able, ermi.t. She also called
that it - could;"not : be . a condition "of. the mining P.
ro osed.Conditiori 22 which calls for t1torbedaccomplished
attention to.p P times per year, is
the site, no less than three`(3) times
to,.Section 13-109 of the County
pursuaby the Public.IVorks Department,..
Code."
is.siorier Sui
chrader said.that he had voteWatS inlnegotve iatir►gentandf the
CommA,gave qui e a y
EIR, and `.that the..Commission g„, „ q
even though Mr. Logan -had made less°somemtypetofnasperformancenbondbors,
he would still.have to go along with Y
Commi.ssioner
Bennett said that Logan had no place "to put the overburden--
had no choice:but to put it back in the hole.
in was closed: It .+as agreed that .the'.Commission would review
.hearing
'Itel openation'- at the end of Phase 'I .
,. _ ... Commissioner
on r
Commissioner Max then made a motion which was seconded by C
Schrader to-: n
finding
A. Adopt and certify -the mitigated Neeative Declaratioroval of
that conditions have been incorporated into the environmental effects
this project which mitigate t significant
o the California L-nvir
identified in the initial study pursuant
and
onmental Quality Act; "K..;,,,•.n:�..,:,
/'� x
•ter .,.v.� .t..y. .5. _ .k 7_y� -r` b`Y` n Code
.. yr 1•..o.iies,S•s.li: q;' •..i ”' 9":" L Dutte CAounty
r
eot mec`ts' `the ortci a' "f�•
B. Find that .the prof and...
Section. -13 and Code Section .24-47;.
C. Approve :i mining permit and reclamation plan on AP 41-08-27, �
subject to the following conditions:
1. Provide on-site fire protection measures.
2. Obtain a current streambed alteration permit, for any work with-'
in or near Dry. Creek, from the Califarnia Department of Fish
and Game. Update permit as required to ensure periodic review
:of the operation.
3. Submit a current report of wastei,iater discharge to the
California Regional:l9ater Quality Control Eoard and comply
167 ,4
8a--
C. Proper development of drainage.for open pi . t miT area.
ft
COr�JJSSION
COUNTY
PLANNING
MINUTES
May 1982
with requirements pertaining -to wastewater discharge.
4
Settling ponds to be.locateA-above-'the-100-year flood plain
.:
2.
and have enoiigh'capacity to contain all process water
drainage. (Dept. of Fish Game)
without discharging to..surface
5 .
Submit a reclamation performance bond, pursuant to Sec. 13-106..
:
$31*000 *.' and''letter al-
14. •
of the County Code: in the amb unt"of
Jowing the County of Butte,-orpersons , designated by.the County,
'reciamat event
jS.
raccomplish- ion in the. I
access to the property to
of default.
Preserve as much vegetation as possible to Promote groun
:stability and Te.dude'orosion..
. ...: . :. . . Monday
.. hour , f operation to 6 A. M. to .6 P. M. ,
Lim�it - ours. 6
7.
through Saturday.
8.
S' I a- Valle Road, - at such
r . ove D ry 'C-.C'e C k Road 'from ` 1 dude vehicle dust
Improve
time as mining traffic ijarr.ants t.Q...re .0
for'. ifaff-ic: safety purposes,.-
iimpacts"a'.nd
Erosion control measures are required.
a. Stabilization of all graded areas.
Stabiliz ati on of the stre3 mbank in area of mining
operation.
C. Proper development of drainage.for open pi . t miT area.
ft
'esibackslope of e, cavated. material to jvith�stand- an earth-
:D gn x c
10.
quake of magnitude.6.S.Richter.
Undertake reclamation immedi,ately.once each open pit mine has
been -pTocess.040:*.�`(::',
!eal tfi.A4mini s trat ion. (OSHA)
`-anA. ;H
L
a.,
.:
2.
1.1cet;the-OcduPIudeiine fofttor4ge.4n:.usefjlatmalds
',,.
Retain areas not to be mined in their natural state.
13.
Utilize sediment ponds to contain the discharge of sediments
14. •
to Dry Greek.
jS.
logy
Thear-plicant further proposes that any hydrology or geoation
to the -Negative Declar
reports prepared and appended
168.
B1]TTF. COUNTY -'PLANNING. 2COMMISSION i
r1INUTES - May 20, 198
will be 'cons
'If
addressed'.
'I£ flamm*ables . are stored. -above grounii, then LAMM fuel tank
16. �� the ,word 'lFLA�'[MABLE. �� (CDF)
will be stenciled in :4 letters,
17. Each tank will require 30 foot clearance of all flammable
vegetation: (CnF)
18. A 20 lb, dry chemical fire extinguisher at.each,storage tank
site -will be .required. (CDF)
an
19. If fuel storage tanks are installed willrbe�requiredn (CDF)
approved type vapor recovery sys
the
2Q f: Repair any damage to rtessilla•Vtersect�on,due of.DryoCreekmRo.adg
operation that occurs at the in
and Ttess.ilia Valley Road. (DP1V)
21. Mining operation to be limited to a.maximum of 20 cubic
yards .p.e,,r: day: with subsequent' review..by the Planning Com-
(:. °mission for propos;ed'expansion to.Phase II.
periodic review of the site, no less than three (.3) times .per
.22. P the Public-IVorks Department,
year, is to.be accomplished byCode.
pursuant to Section 13-109 o.f the County
23. No blasting to be permites during ted on,premis
Phase I.
24, Applicant must also comply with all other applicable State
and local statutes, ordinances. and regulations.`
AYES: Commissioners Bennett.,.Behunin, Schrader, Max and Chairman
Lambert. _..
NOES: No one.
ABSENT: No one..
Motion carried.
V. PUBLIC..HEARINCS = NEW: