HomeMy WebLinkAbout047-260-199 (8)brIq
Williamson Act Cancellation 04-02 (A.P. -No 047-260-199)
Petitioner's proposed use of the contracted land after cancellation of the
Land Conservation Contract with the County is entirely consistent with the North
Chico Specific Plan. The property is zoned appropriately for residential
development and not for agricultural use. Development of the contracted land
` would provide more contiguous patterns of urban development than development of
proximate non -contracted land. Without the cancellation and development of the
petitioner's land the adjacent lands, specific, but not limited to, the Guernsey, Levy
and Hauselt parcels to the south and north, which are zoned for residential
development, will not, in the near future, develop in a contiguous and rational way
with respect to circulation, emergency vehicle access and health and safety concerns
as expressed in the North Chico Plan Goals and Policies. The proposed cancellation
and development implements many of the goals and policies specifically outlined
and enumerated in the North Chico Specific Plan, all of which have been studied
and been subject to public hearing and input, such as:
Page 2.2 Table 2.1 . "Circulation: lack of an east/west connector"
Petitioner's proposed use contemplates the construction of such a connector.
Page 2.3 Paragraph 5 "Circulation: route would become a new east/west
route through the plan area... would provide for improved internal circulation as
well as alternative access routes into the plan area"
Petitioner's proposed use contemplates the construction of a new east/west
route as well the internal construction of roadways that would link future
residential construction of contiguous parcels in the immediate area as well as the
North Chico area at large.. `
Page 2.6 Table 2.3 Items 4, 5 and 9
Petitioner's proposed use contemplates the development and construction
that meet the specific policy criteria outlined
r
Page 2.8 Item 8"enhanced street entries shall be required at the following
location" (a)., the new arterial / Highway 99 intersection.
Petitioner's proposed use contemplates the construction of such an arterial.
Page 2.9 Fire, Item 1; Fire station placement
Petitioner's proposed use contemplates the construction of a new east/west
route which will benefit the entire North Chico area with respect to adequate and
timely access to the existing fire station on Highway 99, thus improving public safety
and response time for the entire area.
e
J_
Page 3.4 Paragraph 4 "Open space lands throughout the Plan area are
intended to protect natural and cultural resources"
Petitioner's proposed use contemplates designated `open space' :areas on the
contracted land.
Page 4.2 Paragraph 2 "The plan provides for the safe and efficient
movement of vehicles, et al..."
Petitioner's proposed use contemplates the construction and implementation
of roadways within the project including the east/west arterial as well as internal
connectors to adjacent land, in the near future.
Page 4.3 Paragraph 1 "Arterial streets are at the top of the street
hierarchy system"
Paragraph 3 "The major new circulation feature within the NCPO
area will be the new arterial street originating at Hicks Lane... extending westerly
over Mud Creek to SR99"
Petitioner's proposed use contemplates the construction of the new east/west
arterial(the new Kittyhawk Drive).
Page 5.7 Item 2"Design stormwater facilities, including detention basins, to
ensure public safety... "
Petitioner's proposed use contemplates the construction of stormwater
facilities and detention basins.
Page 6.1 Paragraph 5
Petitioner's proposed use contemplates the initiation of California Water
Service for the proposed development which will, by taking the lead and initiative
benefit the North Chico area at large. Petitioner has received correspondence from
the Water Service indicating its intent to initiate water service in the area
Appendix A-8, (BUTTE COUNTY GENERAL PLAN POLICIES, Circulation)
5.1.1 "All road system shall provide for the safe evacuation of residents and
adequate access for fire and other emergency services by providing ad least two
means of emergency access to an interconnected collector system."
It appears that the existing Autumn Park subdivision with 45 homes was approved
and exists today with a single point of ingress/egress at Kittyhawk Drive and Garner
Lane in with what appears to be a violation of general plan policies and will remain
so until such time Kittyhawk Drive is completed and connected to SR99.
Petitioner's proposed use contemplates construction of the east/west arterial
which will immediately address the current unsafe condition existing with Autumn
Park and the other residences in the North Chico area and provide a more
2
contiguous patterns of urban development than development of proximate
noncontracted lands.
Butte County Board of Supervisors Resolution 95-47.
Page 3 Paragraph 2 "The NCSP has been modified to require the County to
work with CalTrans on the installation of traffic signals at SR99 and the new .
arterial."
Petitioner's proposed use has necessitated the completion of a traffic study.
Traffic study concludes and calls for an intersection at SR99 and the continuation of
the east/west arterial (Kittyhawk Drive). Intersection to be signalized with separate
turn lanes. Completion of the signalized intersection is consistent with and meet the
the goals and policies of the North Chico Specific Planning area.
Page 3 Paragraph 3 "Chico General Plan identifies this land as a future
growth area and constrains growth in other areas...." Growth is further constrained
in other areas through ag-preservation policies, zoning, greenline, and
environmental constraints such as wetlands and meadowfoam.
Page 4 Paragraph 3 "Chico General Plan requires the infilling and
-increased densities to create a more compact urban form. Thus, development
within the NCSP area is necessary to accommodate future growth."
Memorandum of Agreement between City of Chico and Butte County:
Page 3, Paragraph 7 "Such needed public facilities will include new streets"
Petitioner's proposed use contemplates the construction of new collector and
arterials to county standards
Page 4, Paragraph 5 " desirable to foster and encourage orderly development in
the NCSP area.
Petitioner's proposed use is consistent and necessary for such orderly
development.
Page 4, Paragraph 6 "Gov Code Sections 65351 and 65352 contemplate that the
public interest beyond individual city/county boundaries shall be considered.
Petitioner's proposed development provides for a buffer and open space
along State Highway 99, as well as improved access to the State Highway,
benefitting the State at large.
Clearly, the County has intended to comply with Government Code Section
3
65581, by approving the General and Specific Plans. That Section reads:
It is the intent of the Legislature in enacting this article:
(a) To assure that counties and cities recognize their responsibilities in contributing
to the attainment of the state housing goal.
(b) To assure that counties and cities will prepare and implement housing elements
which, along with federal and state programs, will move toward attainment of the
state housing goal.
(c) To recognize that each locality is best capable of determining what efforts are
required by it to contribute to the attainment of the state housing goal, provided
such a determination is compatible with the state housing goal and regional housing
needs.
(d) To ensure that each local government cooperates with other local governments
in order to address regional housing needs.
Furthermore, a review of Government Code Section 65580. should be made
under that Section which reads:
The Legislature finds and declares as follows:
(a) The availability of housing is of vital statewide importance, and the early
attainment of decent housing and a suitable living environment for every
Californian, including farmworkers, is a priority of the highest order.
(b) The early attainment of this goal requires the cooperative participation of
government and the private sector in an effort to expand housing opportunities and
accommodate the housing needs of Californians of all economic levels.
(c) The provision of housing affordable to low- and moderate -income households
requires the cooperation of all levels of government.
(d) Local and state governments have a responsibility to use the powers vested in
them to facilitate the improvement and development of housing to make adequate
provision for the housing needs of all economic segments of the community.
(e) The Legislature recognizes that in carrying out this responsibility, each local
government also has the responsibility to consider economic, environmental, and
fiscal factors and community goals set forth in the general plan and to cooperate
with other local governments and the state in addressing regional housing needs.
In that light, a review of the Department of Housing and Community
Development's
"California's Deepening Housing Crisis" (February 15, 2006) Copy enclosed
the average annual statewide need for housing units is approximately 220,000.
Since 1999 less than 170,000 residential new construction permits have been issued
on an annual basis. Median prices have increased due to increased costs and supply
4
and demand issues. The affordability of homes as measured against income has .
fallen.
According to the Housing and Community Development "Housing Policy
Development", Chapter 2 California Housing Production Needs 1997 -2020
(http://www.hcd.ca.gov/hpd/), the Northern California Non Metropolitan Region"
will have 2.1% of the states projected population growth with 75% of that growth in
the Butte/Shasta counties area. Petitioner's proposed use of the land will assist in "
providing and meeting the housing and employment needs of those in the area now.
Cancellation of the existing contract and allowing immediate development of the.
petitioner's parcel not only meets the local needs of the Urban area of the City of
Chico, and Butte County, it assists Butte County in meeting it regional planning
needs as well as assisting in the overall housing crisis existing in the State of
California, thus meeting the goals of Government Code Section 65580 and the
public interest provisions of Government Code Section 51282 with respect to the
cancellation.
Additionally with respect to subdivision (d) of Section 65580 states:
Local and state governments have a responsibility to use the powers vested in them
to facilitate the improvement and development of housing to make adequate '
provision for the housing needs of all economic segments of the community.
The allowance of an early cancellation of the petitioner's contract is a clearly'
proper use of the County's powers to facilitate such in the public interest. And the
facts support such a finding.
In summary, cancellation of the contract is proper in that petitioner's proposed use
of. residential development of the land, including residences and public
infrastructure is in the public interest and will provide:
a. Development consistent with the Butte County General Plan and North Chico
Specific Plan;
b. The development and construction of a residential development which supplies
badly needed housing for the region and the state at large.
(http://www.bcag.org/ planning/2003_regional_housing_needs_plan.html);
c. The construction of an east/west arterial providing access for emergency services
and more orderly circulation for the area, county and state;
d. The elimination of an old, marginally economic, and out of place walnut orchard
.thereby eliminating the need for agricultural setbacks (300 feet) on adjacent
5
properties either already constructed with residences or severely restricting and/or
precluding development of adjacent properties zoned residential under the Butte
County General and North Chico Specific. Plan until after the year 2012, as well as
the nuisance and safety considerations involved with herbicide and pesticide
spraying associated with agricultural uses. The land is not high value agricultural .
land due to the existing and proposed encroachment of urban residential
development. The original agricultural orchard use has been greatly compromised
due to the change in zoning and use of surrounding and adjacent properties.
e. The, rational, orderly implementation and development of the North Chico area,
including improved circulation, public utilities, and public safety. Without the
cancellation and development of the petitioner's land the adjacent lands, which are .
`zoned for residential development, will not, in the near future, develop in a
contiguous and rational way with respect to circulation, emergency vehicle access
and health and safety concerns as expressed in the North Chico Plan Goals and
Policies.
As a final footnote, it should be recognized that the Environmental Impact Report
prepared for the North Chico Specific Plan reviewed the impact on a; land uses in
the planning area. The report noted that implementation of the specific plan would
result Lthe. conversion of 475 acres of agricultural lands. Because 21:3 acres of those
land were not considered prime agricultural land and because the remaining 213
acres. are substantially in conflict with adjacent residential development and are
located on the urban side of the Greenline, the impact was considered less than
significant. The report further explained the SR99 was established as the boundary
between urban/suburban development to the east and agricultural tc the west -under'
the County Greenline policy. Therefore the agricultural portion of the plan,
including petitioner's parcel are not located in an area identified for :agricultural use
with no impact anticipated by development as urban/suburban residential.