Loading...
HomeMy WebLinkAbout1 (2).ECLAMATION PLAN FOR M & T Chico Ranch Mine (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to - assist smaller -scale mine operators in environmentally non -sensitive areas to conform to the requirements of the Surface Mining and Reclamarion Act (SMARA) and related Board regulations. It serves as an example of an acceptable reclamation plan format. The prototype is not intended to place any additional requirements on mining operators, nor to limit lead agency control in implementing SMARA's reclamation requirements. Please print or type, attach additional sheets if necessary CALIFORNIA MINE ID# iif one has been assigned]: GENERAL OWNERSHIPIOPERATION INFORMATION: MINE NAME: LOCATION OF MINE [include address)- The M&T Chi co Ranch, 3964 Chico River Road, Chico, CA is located in Butte County on -private land bordered on the north by Chico River Road, to the'south by Ord Ferry Road, to the east•by Fell Road, and to the west by Dayton Road.• This property is legally -described as Assessor's Parcel Numbers 339-53-19 and 39-53-20 in Sections 13, 24, 25 of Township 21N, Range 1W M.D.B. RRCFf1AP THAT IDENTIFIES HOW TO ACCESS THE MINE SITE FROM THE NEAREST -HIGHWAY. CHECK BOX IF LOCATION MAP IS ATTACHED - (See Exhibit 1.) 'Baldwin Contracting wi-Li be the operator under an agreement wica MINE OPERATOR IS): Pacific Realty Associates, L.P. and ICRC Holdings, Inc. " TELEPHONE NUMBER (S): 530-342-2954 530-891-6555 MAILING ADDRESS: M & T Chico Ranch Baldwin Contracting Company 3964 Chico River.Road 1764 Skyway Chico, CA 95928 Chico, CA 95928 MINE OPERATOR'S DESIGNATED AGENT Gf applicable): I TELEPHONE NUMBER: 530-891-6555 MAILING ADDRESS: Baldwin Contracting Company 1764 Skyway Chico, --CA 95928 M & T Chico Ra -rich dine Reclamation Plan Pade I 4 GENERAL MINING OPERATION INFORMATION MINED MINERAL COMMODITY (IES): Rock. Sand. Gravel, Soil ESTIMATED ANNUAL PRODUCTION: 250,000 cubic yards/year ESTIMATED TOTAL PRODUCTION: 5,500,000 cubic yards TOTAL NUMBER OF ACRES TO BE DISTURBED BY THE SURFACE MINING OPERATION: 235 TOTAL NUMBER OF ACRES TO BE RECLAIMED: 193 MAXIMUM ANTICIPATED DEPTH OF MINING: 10 FEET; 115 ELEVATION Imean sea Ievei► START UP DATE (Indicate whether actual or proposaA: Spring 2004 ! SITE MAP: ATTACH A TOPOGRAPHIC MAP OF LANDS THAT WILL BE AFFECTED BY MINING OPERATIONS. THE MAP SCALE SHOULD BE 1' -100' TO 1"-500' SO THAT THE FOLLOWING MAY BE 113ENTIFIED EASILY: EXISTING SITE CONDITIONS: PROJECT BOUNDARIES. EXISTING SURFACE TOPOGRAPW MW CROSS SEC770N, RAILROADS, UTILITIES, ROADS, DRILL HOLES. WATER WELLS, MONITORING WELLS, STREAMS, VEGETATION, AND ANY OTHER SURFACE FEATURES RELATED TO THE MINING OPERATION OR RECLAMATION; ' Exhibit 1 MINING OPERATION FEATURESPOSED ACCESS ROADS, SETBACKS, LOCATION AND VOLUME OF TOPSOIL STOCKPILES, CREST, TOE. AND VOLUME OF OVERBURDEN STOCKPILES, CREST AND TOE OF PITIS), LOCATION OF PROCESSING FACILITIES. EROSION CONTROL FACILITIES, SETTLING PONDS, TEMPORARY STREAM DIVERSIONS, AND EQUIPMENT STORAGE AREAS. Exhibit 1 FINAL SITE CONFI UliAMONs RECLAIMED DRAINAGE AND SURFACE CONFIGURATION, EROSION CONTROL FACILITIES, AND PROPOSED FINAL TOPOGRAPHY IMTNCROSS SECTION. Exhibit 2 1x CHECK BOX IF SITE MAP IS ATTACHED 11) DESCRIBE THE ENVIRONMENTAL SETTING'OF THE MINE SITE, INCLUDING THE FOLLOWING: PROVIDE A GENERAL DESCRIPTION OF VEGETATION AND A LIST OF PLANTS CURRENTLY ON SITE THAT MAY BE SUITABLE FOR RECLAMATION: -See Supplemental Attachment.Item 1. (2) ADDRESS THE PRESENCF/ABSENCE OF SENSITIVE SPECIES, SENSITIVE HABITATS (WETLANDS, VERNAL POOLS, ETC.). ADDRESS SPECIES, HABITATS THAT ARE CONSIDERED SENSITIVE WITHIN THE LEAD AGENCY'S JURISDICTION feg. Oak Woodland, Bishop pine foresO. See Supplemental Attachment Item 2. I M & T Chico Ranch Mine Reclamation Plan Page 2 5 O FfGEj'4ER,,AL MINING OPERATION INFORMATION can't] IBE THE GEOLOGY OF THE AREA SURROUNDING THE MINE SITErea surrounding* the mine site lies in the Great Valley Province on Quaternary alluvium. The geomorphic position of the -site --is complex; portions of the site are located on the distal end of an alluvial fan; other portions are located on the•co-mingled stream terraces of the Sacramento River and Little Chico Creek. Remnants of a much older. Pleistocene fan terrace soil (paleosol) with an old duripan lie just below the surface in a few places on the site. The area primarily occupies Quaternary alluvial. deposits from regional drainages (the Sacramento River and st=eams from the foothills .to the east). A more detailed subsurface geology description is found in the Hydzology Report. (2) DESCRIBE THE GEOLOGY OF THE AREA TO HE MINED: Geologic map units for the mine site include Quaternary alluvial deposits (valley fill materials associated with deposition from theoSacramento . River and alluvial deposits of Little Chico Creek) and Pleistocene gravel deposits of mixed lithology, probably originating in the Sierra Nevada Mountains lying. to the east. Aquifer. and subsurface deposits are described in the Hydrology Report. DESCRIBE THE TYPE OF MINING TO BE EMPLOYED [eg. quarry/ avdc and shovel operation): Open sand and -gravel pit utilizing dragline equipment. GENERAL LEAD AGENCY INFORMATION LEAD AGENCY: Butte County Division of Environmental Planning STAFF CONTACT: Dan Breedon TELEPHONE NUMBER: 530-538-7629 MAIUNG ADDRESS: Butte County Planning division 7 County Center Drive Oroville, CA 95965 USE PERMIT NUMBER [H app6cablel: DATE PERMIT WAS APPROVED ANDIOR AMENDED: PERMIT EXPIRATION DATE: M & T Chico Ranch Mine Reclamation Plan Page 3 6 1 1 1 i t 1 1 1 1 1 1 t 1 t 1 1 1 rASSURANCE LEAD AGENCY. INFORMATION cont) ONS 2770 AND 2773.1 REQUIRE MINE OPERATORS TO OBTAIN A LEAD AGENCY APPROVED FINANCIAL O ENSURE RECLAMATION OCCURS PURSUANT TO THE RECLAMA T ION PLAN. ATTACH A COPY OF THE PROVED FINANCIAL ASSURANCE. CHECK HERE IF YOU ATTACHED A COPY OF THE PROPOSED FINANCIAL ASSURANCE ❑ CHECK HERE IF YOU ATTACHED A COPY OF THE APPROVED FINANCIAL ASSURANCE NOTE; A RECLAMATION COST ES—MMAi cc WORKSHEET ii IS AT CACHED FOR YOUR ASSISTANCE IN DETERMINING THE APPROPRIATE FINANCIAL ASSURANCE AMOUNT (APPENDIX A). DETAILED DESCRIPTION OF RECLAMATION ACTIVITIES [attach additional sheets, if needed] [Pursuant to Public Resources Code Section 27721 DESCRIBE THE PROPOSED USE OF THE SITE ONCE MINING CEASES AND RECLAMATION IS COMPLETED: See Supplemental Attachment Item 3. ATTACH EVIDENCE THAT ALL OWNERS OF A POSSESSORY INTEREST IN THE LAND TO BE MINED HAVE BEEN NOTIFIED OF THE PROPOSED END USE (eg. copies of notices sent to land owner and mineral rights owner). ❑ CHECK BOX IF EVIDENCE IS ATTACHED (Permittee is landowner) PROVIDE A TIME SCHEDULE FOR THE RECLAMATION OF EACH AREA DISTURBED BY MINING. IF APPLICABLE , INDICATE RECLAMATION PHASES ON YOUR SITE MAP. See Supplemental Attachment Item 4. DISCUSS HOW THE IMPLEMENTATION OF THIS RECLAMATION PLAN WILL AFFECT FUTURE MINING IN THE AREA leg. reclamation will not preclude future mining at this site since reclamation calls for open space). Reclamation will not preclude future mining in the area if resource extraction is incomplete at cessation or mining activities. DESCRIBE HOW THE PROPOSED RECLAMATION OF THE MINE SITE WILL AFFECT PUBLIC HEALTH AND SAFETY, GIVING CONSIDERATION TO THE DEGREE AND TYPE OF EXISTING AND PROBABLE FU T URE PUBLIC EXPOSURE TO THE SITE. Public exposure -and access to the site is limited (the lands are private farmlands). No public health and safety issues will be affected. No public access to the site in the future is contemplated, except for observation platforms and parking areas off the public highway near. the M & T Chico Ranch Mine Rec!amation Paan Page 4 (DETAILED DESCRIPTION OF RECLAMATION ACTIVITIES con't] BRIEFLY DISCUSS HOW CONTAMINANTS WILL BE CONTROLLED AND MINE WASTE WIL.BE DISPOSED leg. fuel storage]. NOTE: IF CYANIDE IS USED FOR ON-SITE PROCESSING, PRC SECTION 21151.7 REQUIRES THE PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT. See Supplemental Attachment Item 5. ATTACH A TOPOGRAPHIC MAP SHOWING THE CONFIGURATION OF THE SITE ONCE RECLAIMED. LT CHECK BOX.IF MAP !S AT Sll Ff ED Exhibit 2 UST AND ATTACH COPIES OF ANY ADDITIONAL INFORMATION REQUIRED BY THE LEAD AGENCY AS INDICATED IN THE SMARA ORDINANCE leg. reclamation of the mine site must comply with the provisions of tre Countv s Oak 0�dinancej.w Additional information includes Hydrology Report, slooaing stuay, Groundater Quality Data, Excavation Stability Study.all included as appendices to the DEIR as well as wetland delineation previously submitted. II CHECK BOX IF ALL ABOVE LISTED DOCUMENTS ARE ATTACHED. RECLAMATION STANDARDS PURSUANT TO SMARA SECTION 2773, MY RECLAMATION ACTIVITIES WILL COMPLY WITH THE FOLLOWING STANDARDS PROVIDED IN T HE CALIFORNIA CODE OF REGULATIONS (CCR), TITLE -1 4, ARTICLE 9, SECTIONS 3700-3710. CHECK APPLICABLE BOX TOPSOIL SALVAGE, MAINTENANCE, AND REDISTRIBUTION - IF THE END USE CALLS FOR REVI GETATION OR CULTIVATION OF DISTURBED LANDS, I AGREE TO CONDUCT TOPSOIL SALVAGE, MAINTENANCE, AND, REDISTRIBUTION ACTIVITIES IN CONFORMANCE WITH CCR SECTION 3711. Explain the reclamation procedures you will use to meet the standard cited above: See Supplemental 'Attachment Item 6. M & T Chico Ranch 111ine Reclamation Plan Paae 5 �I [RECLAMATION. STANDARDS can't) CHECK APPLICABLE BOX REVEGETATION - REVEGETATION WILL BE A PART OF MY APPROVED RECLAMATION PLAN. 1 AGREE TO CONDUCT MY REVEGETATION ACTIVITIES IN CONFORMANCE WITH CCR SECTION 3705. UNLESS NON-NATIVE SPECIES SUCH AS FORAGE GRASSES OR ORNAMENTALS WILL BE USED, SPECIFY AT LEAST FOUR'NATIVE SPECIES THAT OCCUR ON SITE OR IN THE VICINITY OF THE'PROJECTSAND WILL BE USED FOR REVEGETATION. CHECK BOX IF THE END USE PRECLUDES REVEGETATION OR THE CULTIVATION OF DISTURBED LANDS. Q CHECK BOX IF REVEGETATION IS NOT CONSISTENT WITH THE APPROVED END USE. PROPOSE REVEGETAMON PLAN: See.Supplemental Attachment item 7. IIFSOPOSED REVEGETATION MIX: See Supplemental Attachment Item 8. MA T Chico Ranch Mine Reclamation Plan Page o [RECLAMATION STANDARDS can't] J SUCCESS OF REVEGETATION WILL BE JUDGED UPON THE EFFECTIVENESS OF THE VEGETATION FOR THE APPROVED END USE AND BY COMPARING QUANTIFIED VEGETATIVE COVER, DENSITY, AND NUMBER OF SPE91ES OF THE RECLAIMED MINED LANDS TO LOCAL AREAS OF NATURALLY OCCIORRIN(I VEGETATION OR PRE - MINING CONDITIONS (BASELINE). 13ASEUNE PERFORMANCE STANDARD DENST((NOTE 1) End use will be groundwater recharge and wildlife habitat ponds and will require little if any revegetation. Natural COVER (NOTE 2) revegetation will be augmented as described above by seeding SPECIES or planting to establish vegetation communities appropriate RICHNESS (NOTE 3) for the end land use of wildlife habitat. . (See Supplemental Attachment Item 9.) NOTE 1: NO. OF INDIVIDUAL PERENNIAL PLANTS ROOTED PER 100 SQ FT NOTE 2: VERTICAL PROJECTION OF PERENNIAL PLANTS ONTO GROUND -EXPRESSED AS % leg. if the sun was directly over a specified area, what percentage of that area would be shaded by the trees, plants, etc.[. NOTE 3: NO. OF PERENNIAL SPECIES PER 100 SQ FT I� CHECK APPLICABLE BOX IF THE MINING OPERATION WILL NOT BE CONDUCTED ON PRIME AGRICULTURAL LANDS, AND THE SITE'S'END USE WILL NOT BE AGRICULTURE, CHECK THIS BOX. ❑ IF THE MINING OPERATION WILL BE CONDUCTED ON PRIME AGRICULTURAL LANDS, BUT THE SITE'S END USE WILL NOT BE AGRICULTURE, CHECK THIS BOX. ❑ PRIME AGRICULTURAL LAND RECLA 4ATION - THE MINING OPERATION WILL BE CONDUCTED ON PRIME AGRICULTURAL LANDS, AND THE SITE'S END USE WILL BE AGRICULTURAL THUS, 1 AGREE TO RECLAIM PRIME AGRICULTURAL LANDS IN CONFORMANCE WITH CCR SECTION 3707. (Explain the'reclamation procedures you will use to meet the standard cited above) J RECLAMATION SUCCESS WILL BE JUDGED ON THE FOLLOWING PERFORMANCE STANDARD BASELINE PERFORMANCE STANDARD PRODUCT1Vlr( - M & T Chico Ranch Mine Reclamation Plan Page 7 10 [RECLAMATION STANDARDS can't] CHECK APPLICABLE, BOX 13 OTHER AGRICULTURAL LAND RECLAMATION - THE MINING OPERATION WILL BE CONDUCTED ON NON -PRIME AGRICULTURAL LANDS WHERE THE SITE'S END USE WILL BE AGRICULTURE: THUS, 1 AGREE TO RECLAIM NON- PRIME AGRICULTURAL LANDS IN CONFORMANCE WITH CCR SECTION 3708. (Explain the reclamation procedures you will use to meet the standard cited above) e% RECLAMATION SUCCESS WILL BE JUDGED ON THE FOLLOWING PERFORMANCE STANDARD BASELINE PERFORMANCE STANDARD PRODUCTIVITY NOTE: PERFORMANCE STANDARD SHOULD BE BASED ON PRODUCTIVITY leg, bushels'per ave, tors per acrel. d IF THE MINING OPERATION WILL BE CONDUCTED ON :YON -PRIME AGRICULTURAL LANDS, BUT THE SiTE'S END USE WILL NOT BE AGRICULTURE. CHECK THIS BOX. Q WILDLIFE PROTECTION - I AGREE THAT ALL WILDLIFE AND WILDLIFE HABITAT WILL BE PROTECTED IN ACCORDANCE WITH CCR SECTION 3703 (CHECK BOX). Provide a description of how the above protection will be accomplished: Access to wildlife ponds will be .limited and controlled. Management of wildlife populations will follow best management practices for the resources. Ponds.are on private, controlled -accessed property. Protection will be enforced. CHECK APPLICABLE BOX GX. BACKFILLING, REGRADING, SLOPE STABILITY. AND RECONTOURING - I AGREE THAT ALL BACKFIWNG, REGRADING, SLOPE STABILITY, AND RECONTOURING WILL CONFORM WITH CCR SECTION 3704. Explain the reclamation procedures_ you will use to meet the standard cited above: See Suanlemental Attachment Item 10. �. CHECK THIS BOX IF FINAL RECLAIMED FILL SLOPES, INCLUDING PERMANENT PILES OR DUMPS OF MINE WASTE ROCK AND OVERBURDEN, WILL NOT EXCEED 2:1 (HORIZONTAL:VERTICALI. EXPLANATION: See Reclamation Slopes on Exhibit 2. M & T Chico Ranch Mine Reclamation Plan Page 8 11 [RECLAMATION STANDARDS cont] 13 CHECK T141S BOX IF FINAL RECLAIMED FILL SLOPES, INCLUDING PERMANENT PILES OR DUMPS OF MINE WASTE ROC.0 ' AND OVERBURDEN, WILL BE [INDICATED SLOPE RATIOI WHICH IS STEEPER THAN 2:1 (HORIZONTAL•VERTICAL). ATTACH A SITE-SPECIFIC GEOLOGIC AND ENGINEERING ANALYSIS THAT DEMONSTRATES THAT THE PROPOSED FINAL SLOPE WILL HAVE A MINIMUM SLOPE -STABILITY FACTOR OF SAFETY THAT IS SUITABL_c FOR THE PROPOSED END USE, AND THAT THE PROPOSED FINAL SLOPES CAN BE SUCCESSFULLY REVEGETATED. 'EXPLANATION: Not applicable */PLEASE PROVIDE A GEOLOGIC CROSS SECTION OF CUT AND FILL SLOPES AT LOCATIONS OF MAXIMUM SLOPE HEIGHT. PLEASE IDENTIFY CROSS SECTION LOCATIONS ON THE SITE MAP. D DRAINAGE, DIVERSION STRUCTURES, WATERWAYS, AND EROSION CONTROL - I AGREE THAT ALL DRAINAGE DIVERSION STRUCTURES,WATERWAYS, AND EROSION CONTROL FACILITIES WILL CONFORM TO CCR SECTION 3706 [CHECK BOX). Explain the reclamation procedures you will use to meet the standard cited above: See Supplemental Attachment Item ll. /IDE�iFY ALL DRAINAGE, DIVERSION STRUCTURES, WATERWAYS, AND EROSION CONTROL FACILITIES ON THE. SITE MAP See Exhibit 2. 13 BUILDING, STRUCTURE, AND EQUIPMENT REMOVAL- I AGREE TO RECLAIM ANY BUILDINGS, STRUCTURES, AND EQUIPMENT AREAS IN CONFORMANCE WITH CCR SECTION 3709 (CHECK BOX!. Explain the reclamation procedures you will use to meet the standard cited above: There are currently no buildings or structures within the proposed permit area. Buildings and structures associated with the aggregate *processing plant will be removed when mining is completed. ."IDENTIFY ON THE SITE MAP THE LOCATIONS) WHERE ALL EQUIPMENT, SUPPLIES, AND OTHER MATERIALS WILL BE STORED; See Exhibit 1 ."IDENTIFY WHICH BUILDINGS, STRUCTURES AND EQUIPMENT WILL BE: (1) DISMANTLED AND REMOVED OFF SITE; AND/OR (1) REMAIN ON SITE AS CONSISTENT WITH THE END USED. All buildings, structures and equipment will be dismantled and removed off-site when minin is completed O CLOSURE OF SURFACE OPENINGS - I AGREE TO CLOSE ALL SURFACE OPENINGS IN ACCORDANCE WITH CCR SECTION 3711 [CHECK BOX), Explain the reclamation procedures you will use to meet the standard cited above: Not applicable ./IDENTIFY ALL SURFACE OPENINGS ON SITE MAP. M & T Chico Ranch `line Reclamation Plan Page 9 12 t 1 i 1 1 1 1 1 1 1 1-. 1 1 1 II [RECLAMATION STANDARDS cont] CHECK APPLICABLE BOX 4STREAM PROTECTION, INCLUDING SURFACE AND GROUNDWATER : I AGREE STREAMS, INCLUDING SURFACE AND GROUNDWATER WILL BE PROTECTED IN ACCORDANCE WITH CCR SECTION 3740. ExpWp the reclamation procedures you will use to meet the standard cited above: Please see Supplemental Attachment Item 11 for description of Erosion and Sediment Control Plan. Surface and groundwater quality protection are provided by compliance with Regional Water Quality Control Board storm water discharge permits.' The streambed and streambanks or Little Chico Creek will not be disturbed except for road and conveyor. crossings. Stanchions supporting the conveyor will be footed in non -sensitive areas and the road crossing of the stream will be improvements on an existing crossing with no increased impact. The only surface water stream, Little Chico Creek, will not be disturbed. There will be no in -stream mining. a CHECK THIS BOX IF THE MINING OPERATION 1S CONDUCTED IN A STREAM OR OTHER WATERWAY AND ATTACH CROSS SECTIONS, OR AERIAL PHOTOGRAPHS. IDENTIFYING BASELINE STREAMBED ELEVATIONS. ./CHANGES IN. CHANNEL ELEVATIONS AND BANK EROSION SHALL BE EVALUATED ANNUALLY. EXTRACTION QUANTITIES AND ANNUAL CROSS SECTIONS AND/OR AERIAL PHOTOGRAPHS SHOULD BE SUBMITTED WITH THE ANNUAL REPORT REQUIRED BY PRC SECTION 2207. CXCHECK THIS BOX IF THE MINING OPERATION IS NOT CONDUCTED IN A STREAM OR OTHER WATERWAY. II MONITORING Pursuant to CCR Section 2773(a), the success of reclamation will be monitored for three years, or until performance standards are met, provided that, during the last two years, there has been no human intervention, including, for example, irrigation, fertilization, or weeding. Remedial measures will be implemented as necessary to achieve the performance standards.. - M & T Chico Ranch Mine Reclamation Plan Page 10 13 R I I I 11 CHECK APPLICABLE BOX !'ILLIN,0�-2. VXMLLING. REGRADING. SLOPE STASLUTY. AND BECONTOUf4NQ•I AGREE THAT ALL BACKcca SECTION 3704*''. REGRADING -SLOPE STABILITY. AND RECONTOURING WILL CONFORM WTH the "am mcdur= -, cu wal use ;* mg*t the standard cited *bovo: ation -krilling of cm4tta wetiands 2nd ixkcs Will tAka. plata.. Exted 51000 will �.-' aiiinirml. No t* tion and if stabilization �r_-f el03LO�kprcven 4iTr'bc:-=aitOi4'-n:iha first year.to deern: n b'" on the =c Of monitoring will =de io necessary. Doc-- first Y 14 TOP -,CIL MANAGEMENT Monitoring Will include verification that topsoil is being stockpiled and managed as described in Topsailing. above. 17 ANNUjkL REPORT 110 XpOct will dc:cribe mcgeation Tho rtmlu of mmiloring will be reported annually to Butte County. annual mcx=,ts ImplenmLed during the pceceding year, cui=marize 6a rinnmd ind cumulative r"u"st said dt='bd oboe activities planned for the coming Year. SUCMS OF REyMEEATION WILL BE JUDGED UPON THE EFFECTPJENESS OF THE VMEIAMN FOR THF. ApMVED END USE AND BY COMPARING QUAtITIMED VEGEUMVE COVER. DENSITY; AND NUMBER OF $MIES OF THE REMANED LUNED LANDS M LocAL AREAS OF NATURAUY-OCCUPJUNG VWEDoMW 04 ME4ANtNG CONDITIONS (BASEUNE). ' +jwtm=e%w 3p&-*ildfikli� pond =&d milt rtqtnm if my m"g"oa-.- "Saxitid daRib,%TWo loy seeding of olmtint to esItawish yepwioa Pislmral=yc&fijj&—v 4 coamunwits appropriae for the aid Ind. of wUdlifo hsbit&L .. Q1 C}iEM APPUCABLE BOX 'z - MiNMOpERjiMN WILL WT BE CONDUCTED ON PRIME AGRICULTURAL LAND IF THE po THE Sfft-'S EM ME WILL NOT BE AGMCLKTLAT_ CHECX THIS BOX IF THE MIMING OpeMON WILL Be CONDUCTED ON PRIME AaaCLUURAL LANDS, BUT UEE SITE'S END USE WILL NOT Be AMCLUUM CHECK THIS BOX. 0 VALL RE CONDUCTED ON PRIME AGRICULTURAL LAIM RECLAPAAMON -THE NINWG OPERAnO TO . MME AGNCUnWL LANDS, AND THE SITE -5 END USE WILL BE AGRIOA3URAL THUS, I AGREE ae.�4 RECLAIM PRIME Aj=CUt3URAL LANDS IN CO W-OpjAANCE WITH,CCR SECTION 3707. CHECK APPLICABLE PAX OTHER AGFdct UVM LAND RECLAMATION -THE MINING OPERATION WILL BE CONDUCTED ON NON-* C3 THUSAGRM PRIME AGR LANDS WHERE THE SIT'E'S ENO USE WILL BE AOFJOJfiAI- TO LANDS IN CONFORMANCE WfM'CCR 370"-' .SECTION FtEcL&j.UMON NON -PRIME AGRICULTURAL If THE MINING OPERATION WILL BE COND=ED ON NON -MME AGRICLILTUFLAL LANDS, 13UTTHESZTE'S' END USE VOLL NOT BE AGRICUMCL CHECK THIS BOX VALDUFE PROTECTION -1 AGREETHAT ALL WILDLIFE KAS(TAr WILL BE PROTECTED IN ACCORDANCE WTnj CCR SECTION 3703 ICHE(X BOXI. PProvide* A d&ocdpdm of how the above protection will be Accem to wildl1re ponds vAll be Urnited and cmtro� Mxalgemeftt of wildlife, p*PUI'L6Om 'mill fO ubw best'...... will b for the r=wc= Ponds am Orl Priy's prop,_-dy- Protection pttEaStrrTCll prx� catamed. I I I 11 CHECK APPLICABLE BOX !'ILLIN,0�-2. VXMLLING. REGRADING. SLOPE STASLUTY. AND BECONTOUf4NQ•I AGREE THAT ALL BACKcca SECTION 3704*''. REGRADING -SLOPE STABILITY. AND RECONTOURING WILL CONFORM WTH the "am mcdur= -, cu wal use ;* mg*t the standard cited *bovo: ation -krilling of cm4tta wetiands 2nd ixkcs Will tAka. plata.. Exted 51000 will �.-' aiiinirml. No t* tion and if stabilization �r_-f el03LO�kprcven 4iTr'bc:-=aitOi4'-n:iha first year.to deern: n b'" on the =c Of monitoring will =de io necessary. Doc-- first Y 14 BUIL.DINa, STRUCTURE. AND Et1UIPMF.NT REMOVAL - I .AGREE TO RECLAIM ANY BUILDINGS, STRUCTURES, AND ECLUIPMEXT AkEAS IN CONFORMANCE VATH CCR SECTION 3709 (CHECK BOXI. Expo the reciemsdon procedures you wo use to moot the standards glad above. T� Ice currently no buiidiags oc sUuctarzr vvitbia Iha pscsposed permit acts. Bu Wings Luc s Ul berm aycd a(- ed with the aUm;ate pro�+At ply ray mix Cotsateta plant. Gerd asphaltic cancrcu pleat wtTl be rsa�oYcd Wh=UIWQZ ilscomplctcd. �. THE SYTE MAP THE LocATION(51 VAI ME ALL EQUIPMENT, SUPPLIES, ANO OTHER MATERIALS WALL BE STORED: ' Phase see Fzhibit 1. EIIUIP>dENT VYILL 8E. (1 I DISMANTLED AND REMOVED WYENM WHICH BU( MGS, STRUCTURES, AND l..:. OFF SrM ANOIOR 121 REMAIN ON SITE AS CONSISTENT WITtl THE END USED. res and equipment will be dismantled and removed off-site wbett milting is COtnp All buildings, sd[uetulde 'LA CLD61)RE OF SURFACE OPENINGS - I AGREE dT�O CLOSE on SURFACE OpIE INGs use t to CC DANCE WITH CCR SECTION 3712 IC HECK BOXI. E:tPI� You standards cited abovo: Not Applicsbic ,f IDENfiFY ALL SURFACE OPENINGS ON SITE MAP. C-47 15 pertorm „recd control ,s noc undertake habitat isnpfavcn-mm with aativa plana, including oaks, cotloawoods i... 'Villow: coliectcd Prom on-:itc rrsourees, and perform other revegetation efforts :s nccr..:xry. CHECK THIS BOX IF FINAL RECL>IMED FILL SLOPES, INCLUMNO PERMANENT PILES OR DUMPS OF MINE WASTE ROCK AND OVERBURDEN, WALL NOT EXCEM 2:1 (HORRONTAUVERTICAL" EXYLANAT(ON: Slopca =rco= than ¢moi 1 be below the watertiae in the ponds, C] ajEj= T}II9 BOX IF FINAL RECLAIMED FILL =PM INCLUDING PERMANENT PILES OR DUMPS OR MINE TITAN 2:1 WATT@ ROCK MID OVSMUROEN WILL SE: IINDtCAT'E SLOP£ RAMOI WVUCH IS STEE,''EIR alpEamwAL'`lfri mi. ATTACK A SITE FIC OEM= AND ENWNEERMCI A OMIS THAT DEMONSTtWSPS T= THE PROPOA'M FINAL SLOPE WALL KAVE A MINIMUM SWPE-& ABIUTf FACTOR P30POSED fWAL S1.^PES ' OR SAFSTY THAT IS'5VTA Ac' FOR THE PROPOSED END USF -'VM i rW THE CAN BE VU==FkXD` O.ZVMEUQs...3' . MLANA71ON: Not applioabie. DfWKWE DIVERSION STRUCTUF= WM W&G AMD EROSIOf1 CONTROL -I AGREETW ALL WILL CONFORM bRAINAM DIVE tutu 3TRUC UPES, WIQ'ERWAYS. AND EROSION CONTROL FACAI ITIES TO CCR SECTION 3706 jCHECX BOX). EXPIAIR the reelarmdon proowures You WM use to meat the standards cksd si>ovs. nae be advcrsnly atfccted by this op"Won. Poods will CAPMM moff Lad rdm= pr&4ining drainage shall resources. Drainabo festures will be Waters Its popds fill POodt W'U.becoloa t+o hUP 3oci for gmundwalcc jptacrupted but aventuai diVwitioc of runoff wanes will remain the =rae. IDENiIFy ALL D;RAtNAGE, OCVERSiON STRUCTURES, WATERWAYS ANO EROSION CONTROL FACILITIES ON THE SITE MAP. BUIL.DINa, STRUCTURE. AND Et1UIPMF.NT REMOVAL - I .AGREE TO RECLAIM ANY BUILDINGS, STRUCTURES, AND ECLUIPMEXT AkEAS IN CONFORMANCE VATH CCR SECTION 3709 (CHECK BOXI. Expo the reciemsdon procedures you wo use to moot the standards glad above. T� Ice currently no buiidiags oc sUuctarzr vvitbia Iha pscsposed permit acts. Bu Wings Luc s Ul berm aycd a(- ed with the aUm;ate pro�+At ply ray mix Cotsateta plant. Gerd asphaltic cancrcu pleat wtTl be rsa�oYcd Wh=UIWQZ ilscomplctcd. �. THE SYTE MAP THE LocATION(51 VAI ME ALL EQUIPMENT, SUPPLIES, ANO OTHER MATERIALS WALL BE STORED: ' Phase see Fzhibit 1. EIIUIP>dENT VYILL 8E. (1 I DISMANTLED AND REMOVED WYENM WHICH BU( MGS, STRUCTURES, AND l..:. OFF SrM ANOIOR 121 REMAIN ON SITE AS CONSISTENT WITtl THE END USED. res and equipment will be dismantled and removed off-site wbett milting is COtnp All buildings, sd[uetulde 'LA CLD61)RE OF SURFACE OPENINGS - I AGREE dT�O CLOSE on SURFACE OpIE INGs use t to CC DANCE WITH CCR SECTION 3712 IC HECK BOXI. E:tPI� You standards cited abovo: Not Applicsbic ,f IDENfiFY ALL SURFACE OPENINGS ON SITE MAP. C-47 15 CLD61)RE OF SURFACE OPENINGS - I AGREE dT�O CLOSE on SURFACE OpIE INGs use t to CC DANCE WITH CCR SECTION 3712 IC HECK BOXI. E:tPI� You standards cited abovo: Not Applicsbic ,f IDENfiFY ALL SURFACE OPENINGS ON SITE MAP. C-47 15 1 1 1 1 1 1 t 1 1 1 1 1 1 1 1 1 1 1 laee_x►aAnom sT"DARoS a«+c•a:. diE_C/K A riCABIE BOX M STREAM PaGnC'n<)N. INC.' UDII#G. SURFAC' ANo onoUNOWATER Q • 1 SECTION � E SURFAICE AND C}FpOUNO WATER WIL.L aE PROTECTED IN ACCOROANC- VM ccR the r*demst{on Arooedwes you wpwe to moat thestandards dted above: Will Ib no la-ctteam aticti •ba 001Y ruria� vntec =usuur.iita Chico tom, will trot bo d'tsturW. aa will b U S. Army Coops of. �cufsw wU" bodics iadu& w<tlslfds witidt t:ny be taoitigattcd sad toccss vvata i s > sad fedetral agetsc'm During muting Opnrati0ntt, iadnst" std P y l t►o oolle6od s rocytlo s oa sit& p'kaao coo floe Hydtolag Raport f0c a detailed description o f =rf= wxkr Slid VW=Iwatec at Ifus a>tta C 7= 30X IF THE MMQ OPDXM 19 CONDUCTEO IN A STREAM ORVtW-MA®OTHM � . XTAW t4S SFCa1 M OR ASM MWTOGaMs. IDEMiFYM BASIS { (a�3 CtiAiiNM a " YXSi' W AND SAM Ei;It]SION WALL BE EVA! APED ALlY. LD BE��{ 11,11,11111111111P11101 jar=31M AND THE ANNUAL FIMSY PRC SECTION 220y. CIie=TMS BOX IF THE MINING OPEiVMON IS KT CO UCii:D.IN A STREAM OR 1]TiiEfl W/QEAWAY: 1 1 1 i 1 1 1 1 1 1 1 1 1 lId �9/9��1QL 11: 11, FAX 91 LEAD AGENCY CUMF1CA ON fitted. hemby mmy tat mis .mduna#os pian wnpw w9h fI0V'&Abk nar" e O 4t Z ;nd 9 �S ne �7 + 9500;t aoq. acid 3740 at coq.. re 2Tf0 -enlace t�tinIM • �� 1 1�1. � a mot i�, attd w�are��� i A�1QOi�' STATEMENT CF AESPONSIBILMES trod, � � apt id r�pon�ib�y �.� d ali tti�d Iattds as dosa�d k t► it�det t a ,,,ecrm a 1SraGea 1 and 9 tooaanet►oic . d iw "n in cattocmac►oa w1h tha s�ira61 toqutce ad Ohrls M 2 of IN614 d the �.+,� y„� 8ee8oit 27�0.ei a Coda d �+ tEse Slxtxe edrt nistatin9 as =nditl= d aFP��- oeg ,and wft arty m� regt30am big 30th dead August ,1Q�. titer . ec en, Pres denti Pacific Realty Associates,•L.P. APPROVED = Vii) JIQENCY REPRESOV, FO=TIdm?O1 Paps 14 ` 17