April 24, 2007
Butte County Board of Supervisors
25 County Center Drive
Oroville, CA 95965
Subject: Appeal Hearing - M&T Chico Ranch Mine
Final EIR Certification
Mining Permit
Reclamation Plan and Financial Assurance Estimate
Recommendation
Staff recommends a motion of intent to adopt the following:
1. Resolution Certifying the Final EIR, Adopting Findings of. Fact and Adopting a
Mitigation Monitoring Plan
2. Resolution approving the Mining Use Permit with Conditions of .Approval,
Reclamation Plan and Financial Assurance Estimate and a Statement of
Overriding Considerations
(It is staff's recommendation that the Board first consider the Land. Conservation Act
Committee's recommendation of denial regarding immediate cancellation, then proceed with
consideration of the mining project. The mining project contains a condition that the applicant
obtains Board approval of the immediate cancellation request or a determination of
compatibility. )
Board of Supervisors — Appeal Hearing
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007
Summary
The Planning Commission certified the Final EIR and conditionally approved the mining permit,
reclamation plan, financial assurance estimate and a statement of overriding considerations on
February 22, 2007 with a 3-2 vote. Two appeal letters were filed regarding this action. County
code provides a de novo hearing on such appeals. This means that the Board may consider
all of the record, not just the content of the appeal letters.
The project is located in Williamson Act contracted land. The applicant filed a request for
immediate cancellation on October 11, 2005. The Land Conservation Act Committee (LCA)
made a recommendation of denial for the immediate cancellation. The LCA made a
recommendation that only four of the required five findings can be made. Finding #5 requires
that there is no proximate, non -contracted land which is both available and suitable for the
proposed use or that development of the contracted land would provide more contiguous
patterns of urban development (Government Code 51282(b). While the immediate
cancellation is part of the project, it is addressed in a separate staff report specific to the
Williamson Act for the Board of Supervisors and reflects the LCA's recommendation.
Background
The project consists of a long-term, off -channel gravel mining operation proposal by Baldwin
Contracting. The mining would take place on 193 -acres of a 235 -acre site over a 20 to 30—
year period. Reclamation would occur incrementally and would consist of the creation of open -
water wetland wildlife habitat and agricultural uses. The aggregate would be processed
(washed and screened) on a 40 -acre area at the site. The project is located on a portion of the
M&T Chico Ranch approximately 1.5 miles east of the Sacramento River and approximately 5 -
miles southwest of the City of Chico in an area north of and adjacent to Ord Ferry Road, east
of and partially adjacent to River Road. Access to the site would be provided by River Road.
Assessor Parcel Numbers: 039-530-023 and 039-530-025 (formerly 039-530-019, 039-530-
020).
This project has been determined to have significant environmental impacts associated with
aesthetics and visual resources, agricultural land, air quality, archeological resources, drainage
and flooding, geology, noise, traffic and circulation, water quality/groundwater, land use,
biological resources, and cumulative impacts associated with air quality and traffic and
circulation. Traffic and air quality impacts are considered significant and unavoidable even
with mitigation and will require a statement of overriding considerations if the project is
approved.
The project application was filed in 1996 and a previous version of a Draft EIR was circulated
in 1998. Significant changes were required in that document and in the early 2000's another
Draft EIR was circulated. This was presented to the Planning Commission for consideration of
certification in 2003; however, the Department of Conservation had identified inconsistencies
with the Williamson Act. The applicant chose to file a request for immediate cancellation for a
portion of the lands that are in the Williamson Act contract. The Land Conservation Act
2
Board of Supervisors — Appeal Hearing
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007
committee considered this request in February and April 2006. Their recommendation to the
Board of Supervisors is that only four of the five required findings can be made.
Staff began the public hearing process again with the Planning Commission with a hearing on
November 30, 2006. This item was continued to December 14, 2006 and January 25, 2007.
At the January 25, 2007 hearing, the Commission made a motion of intent to certify the Final
EIR and approve the project and continued the item to February 22, 2007. Findings were
presented to the Planning Commission on February 22, 2007 for their consideration and the
Planning Commission voted 3-2 to certify the Final EIR and approve the project with a
statement of overriding considerations. Certifying the EIR means that the Planning
Commission considered that the EIR met the requirements of CEQA and reflected the
County's independent judgment.
The Planning Commission's action on use permits is subject to a 10 -day appeal period. Two
appeal letters were filed within the appeal period. Howard Ellman, an attorney representing
Parrot Ranch/Llano Seco filed an appeal. Ron Jones also submitted an appeal letter with 13
signatures including property owners, Butte Environmental Council (BEC) and the Sacramento
River Preservation Trust. Additionally, the applicant's attorney, Jeff Dorso of Deipenbrock-
Harrison, has submitted a. letter discussing the issues raised in the appeal letters (copy
attached to this report). The appeal letters argue that the Planning Commission's action was
incorrect. Issues raised in the appeal letters include problems with General Plan consistency,
land use compatibility, prime farm land, flood impacts, ground water contamination, inadequate
CEQA process, inadequate findings, failure to fully describe the environmental setting and
surroundings and failure to demonstrate the need for aggregate. The appeal process is not
limited to the issues raised in these letters because the appeal hearing is de novo.
The Planning Commission heard substantial testimony on the project and the Final EIR at its
meetings in 2003 and at the recent meetings beginning on November 30, 2006. The
Commission rendered its decision with some additions to the record. At the December 14,
2006 meeting, the Planning Commission directed staff to include clarifications (errata) to the
text in the Final EIR. The errata includes a description of the Llano Seco Ranch as part of the
Regional Environmental Overview and reference to the Williamson Act immediate cancellation
request as part of the Detailed Project Description.
In addition to the information considered by the Planning Commission, the Board of
Supervisors has the related Williamson Act recommendation from the Land Conservation Act
Committee for its use in rendering a decision on the immediate cancellation. A separate staff
report has been prepared for consideration. Consideration of immediate cancellation is
considered a discretionary decision under CEQA. The Draft EIR evaluated the impacts
associated with the mining activities at the proposed location and provided mitigation
measures. It also discussed the Williamson Act. Once the applicant filed the request for
immediate cancellation, staff determined that the Final EIR needed to discuss the additional
action that would be required by the Board of Supervisors. This was included in the review of
the Planning Commission for the public hearing series beginning with the November 30, 2006
hearing date.
3
Board of Supervisors — Appeal Hearing
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007
Impact 4.6-5: Park Avenue/East 20th Street/East. Park Avenue - The
proposed Project will exacerbate LOS F operating conditions on Park Avenue
from East 20th Street to East Park Avenue under cumulative conditions.
Impact 4.6-6: East Park Avenue/Park Avenue/Highway 99 -The proposed .
Project will exacerbate LOS F operating conditions on East Park Avenue from
Park Avenue to Highway 99 under cumulative conditions.
Impact 4.6-7: Bruce Road/Highway 32/Skyway - The proposed Project will
exacerbate LOS E operating conditions on Bruce Road from Highway 32 to
h
Skyway under cumulative conditions.
Impact 4.6-8: Baldwin Plant Driveway/Skyway - The proposed Project will
exacerbate LOS F operating conditions in the a.m. peak hour and LOS D in the
p.m. peak hour at the intersections of.the Baldwin Plant driveway and Skyway
under cumulative conditions.
Where an agency considers approving a project where the significant impacts will occur, it
must identify social or economic benefits through a statement of overriding considerations.
This statement identifies certain benefits that outweigh the impacts. The list is provided in the
attached Planning Commission resolution and includes the following: Local source of
aggregate, tax revenue, employment opportunities, development of an important mineral
resource as designated by the State Geologist (MRZ-2), potential decrease in transport
distance and related air quality, fuel usage and road miles traveled, creation of habitat,
monitoring of ground water quality and a decreased reliance on in -stream mining. A Board of
Supervisors resolution has also been prepared containing the same findings for a statement of
overriding considerations.
Relationship to the Williamson Act Immediate Cancellation request
The Planning Commission has not been delegated the authority to review Williamson Act
cancellation requests. The Land Conservation Act Committee, an advisory committee, serves
in this capacity for the Board of Supervisors. Consideration of approval of the project also
includes immediate cancellation from the Williamson Act as requested by the applicant. The
project arrives at the Board from the Planning Commission and the Land Conservation Act
Committee under separate reviews.
The Planning Commission was aware of the Land Conservation Act Committee's
recommendation to the Board. Staff advised the Planning Commission that the authority for
considering the immediate cancellation is held at the Board of Supervisors upon hearing the
LCA's recommendation. If the Planning Commission's approval of the mining project had not
been appealed, then the Board would have only heard the recommendation of the LCA
considering the immediate cancellation request.
6
Board of Supervisors — Appeal Hearing
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007 .
(b) It is the purpose and intent of the board of supervisors to create and maintain
.an effective and comprehensive surface mining and reclamation policy with.
regulation of surface mining operations so as to assure that:
(1) Adverse environmental effects are prevented or minimized and that mined
lands are reclaimed to a usable condition which is readily adaptable for alternative
land use.
(2) The production and conservation of minerals are encouraged, while giving
consideration to values relating to recreation, watershed, wildlife, range, and
forage and aesthetic enjoyment.
(3) Residual hazards to the public health and safety are eliminated.
(4) The extraction of minerals is essential to the continued economic well-being of
the county and to the needs of society, and that reclamation of mined lands is
necessary to prevent or minimize adverse effects on the environment and -to
protect the public health and safety.
(5) The reclamation of mined lands as provided in this article will permit the
continued mining of minerals and will provide for the protection and subsequent
beneficial use of the mined and reclaimed land.
(6) Surface mining takes place in diverse areas where the geologic, topographic,
climatic, biological and social conditions are significantly different and that
reclamation operations and the specifications therefore may vary accordingly.
(c) This article shall be reviewed annually and revised, as necessary, in order to
ensure that it is in accordance with the state policy for mined lands reclamation
and to encourage the mining industry of Butte County.
One of the purposes of a reclamation plan is to identify a proposed end use and to return the
land to a condition that is appropriate for the proposed end use. The proposed end use of a
lake with habitat does not conflict with section 13-101 of the Butte County Code.
Statement of Overriding Considerations
The Planning Commission's approval of the project required a statement of overriding
considerations under CEQA. The EIR had identified impacts that cannot be reduced to a level
of less than significant. These are listed in the Final EIR and the statement of overriding
considerations. A summary listing of these impacts are as follows:
Impact 4.5.-5: Addition to Carbon Monoxide (CO) Hot Spots - Certain
intersections in the vicinity of the Project will experience congestion under
cumulative conditions.
Impact 4.6-4: Highway 32NVest 51h Street Intersection - The proposed Project
will add 10 or more trips per day to the intersection of State Highway 32/West 5th
street. This intersection has been identified as a location having 4 or more
accidents in a 12 -month period over the last three years. This location also had
more than one accident over a 12 -month period, which involved heavy vehicles.
This is considered a significant impact.
Board of Supervisors — Appeal Hearing
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007
Additional background discussion is provided in the attached Planning Commission staff
reports. This includes the November 30, 2006, December 14, 2006, January 25, 2007 and
February 22, 2007 reports.
General Plan Consistency and Land Use Compatibility
The appeal letters have challenged the consistency with the General Plan referencing a page
in the Agricultural Element. General Plans are required to be vertically and horizontally
consistent. The Land Use Element lists resource extraction and processing as a secondary
use in the Orchard and Field Crop land use designation. The zoning ordinance lists mining as
a conditionally permitted use. The Draft and Final EIR address General Plan consistency
under CEQA. Conditionally permitted uses are those that may not be appropriate in all
locations of the same zone and thus require discretionary review. The key part of the use
permit process is to evaluate the site proposed in the use permit application and determine
that with conditions, the location is appropriate and consistent with the General Plan. The
criteria for granting use permits are contained in Section 24-45.10 of the Butte County Code.
This section states: The Planning Commission, on the basis of the evidence submitted at the
hearing, may grant use permits required by the provisions of this chapter when it finds that the
proposed uses of the property will not impair the integrity and character of the zone in which
the land lies and that the use would not be unreasonably incompatible with, or injurious to,
surrounding properties or detrimental to the health and general welfare of the persons residing
or working in the neighborhood or to the general health, welfare and safety of the county. The
Planning Commission considered the record as a whole and determined that the project is
consistent with the General Plan.
Mr. Jones' appeal letter references page AE -14 of the Agricultural Element with a quoted
section from this page. This section appears in Program 3.6 which states: Providea definitive
purpose section for the agricultural zones and a list of agricultural uses, including, but not
limited to, crop production, orchards, aquaculture, animal husbandry, agricultural industries,
and the like, which preserve, promote, and support the agricultural area. The above program
is a requirement to provide more definition to the agricultural uses in the agricultural zones of
the County. This is not a statement or a restriction as to the activities that are conditionally
permitted in the agricultural zones. Program 3.6 is listed under policies and Goal #3 of the
Element: Support the management of agricultural lands in an efficient, economical manner,
with the minimal conflict from non-agricultural uses.
Additional quotes were referenced from County Code. Below are those two quotes underlined
in the full context of Section 13-101 of the Butte County Code.
Chapter 13 Surface Mining and Reclamation
13-101 Purpose and intent.
(a) The purpose of this article is to implement the provisions of the California
Surface Mining and Reclamation Act of 1975 as amended (the "Act," Public
Resources Code section 2710 et seq.).
C!
Board of Supervisors — Appeal Hearing '
M&T Chico Ranch Mine (MIN 96-03)
April 24, 2007
The project was conditioned at the Planning Commission level for compliance with the
Williamson Act, either through immediate cancellation or a determination of compatibility. The
LCA's recommendation. is that the immediate cancellation request does not meet all of the
required findings. Since the Planning Commission's approval has been appealed, staff
coordinated both items to be considered by the Board at the same time. The immediate
cancellation request is discussed in more detail in the Williamson Act staff report _that
accompanies this item.:
If you have any' questions, please do not hesitate to contact me at 530-538-6821 or Pete
Calarco, Assistant Director at 530-538-2167.
Sincerely,
Tim Snellings, Director
Attachments:
Vicinity Map
Attachment A - Board Resolution Certifying EIR
Exhibit 1 — Impact Statement, Mitigation Measures and Findings of Fact
Exhibit 2 — Mitigation Monitoring Plan
Attachment B - Board Resolution Approving Project
Exhibit 1 — M&T Chico Ranch Mine Financial Assurance Cost Estimate
Exhibit 2 — Statement of Overriding Considerations
Exhibit 3 - Conditions of Approval
Table A — Public Works Fair Share Cost Estimates
Attachment C - Appeal Letters:
Howard Ellman (representing Parrot Ranch/Llano Seco Ranch)
Ron Jones (serving as the contact for 13 concern property
owners/organizations)
Attachment D - Letter to the Board — Deipenbrock Harrison on behalf of Baldwin
regarding the appeal letters
Attachment E - Planning Commission Staff Reports
November 30, 2006 and Minutes/Transcript
December 14, 2006 and Minutes/Transcript
January 25, 2007 and Minutes/Transcript
February 22, 2007 and Minutes
Attachment F - Planning Commission Resolutions (PC07-06 & PC07-07)
Draft EIR
Final EIR (includes additional Williamson Act discussion and Errata Additions)
Reclamation Plan
k.4� �Oili 1 \1uI11 IQ.1:•I
Z
sci:le: ..51.1195TSnoe6 Hafc,i
_e4Ut?rne S°N?41 Nbs USN _ .__. Y.
Y i
Awe
l
I iy $,:e.m .a r Ft ra al a ?
_ .'12yrhtiSq x -� T''�� -.v11a
J e
'.yCroek Y' `.. _... J^5s,�,•St� �. r` - tr1, r,,
i
r
Project Site
wrPr1161dn� I¢¢C
VICINITY MAP
M&T CHICO RANCH MINE
(MIN 96-03)