Loading...
HomeMy WebLinkAboutATTACHMENT GENDAT ONS RECOMM or: rem v 1. E%t�r be,* o' al of vegetation shall 'riot excee. sary o construe 't A-barriers'.6 the minimum -necessary 'to complete operati W. ons. is unavoidable,': a'--6urtaIA`e­nc 6gure to. disturbed portions of any stream channel or'lake m` 4 —M. ar- of the lake beyond -the'-. Oe`&fei­%­, gin - within, the high water mark of the stream or lake be installed.!The endldiuj��.iikl n ­Any j W"Sik is"c0M shall. -be 'restored to as near their original condition as Shall be r6mci 'd *'hdii't possible.' .:13. Silt settlhig*,bagid-Aillb '166i6d'i 2. Restoration shall include the revegetation of -;tripped -or lakejo prAyppj,.-..diSco1ore t- or exposed areas. reachii�j or lake. 3. Rock,- r1prap, or other, erosion protection shall be placed .1.4. Preparation.. shalLbe ma e So in areas.where vegetation cannot reasonably be expected erodible'surfabes; , H be ive, to become reestablished. little erosion: �j b6t�iiiial. Fr'equent:*a placeir on dlrt.i6ldi�-,cit- trac or. o e 4. Instalfiti6n-bf,bridges, culverts,'or other structures shall )j­ pontrol'erosfo�, n stfearil be such - that 4ater -flow is not impairtd! water co#tli "d t ro6'. or d6w.nstreaTn--!,passa:ge.-of fish is,assur Wash' 9,MR,( J90 loin ottom;jtof -jfpm orAry.:�-,,cuh c nf or I I" .. h6theF;d&,�' 4ris' shall B Mhel .-grade.�` Bottom 0 ow t la e or tj ing sti�arh e culv�rfi 8611`1'e,�pla&id.bblow stream VQ ad 16.:" A'S ilt catchme'ni basin shi 5. Plans 1or:Aes*jgn:,`o:'f -coni te sill;,--' A t6 ere an 6 itures'"" immedi4tely bel6t� that could potentiall�-,Impede fish migrati'*O*ns"-'miist-be.*::�&.:-4��.,.'.�� -ment: basin shall--,--b'e- c"Q'InIii- approved by Deoittm6nCengineers; .:1, , , I- i .- om., in' d u :01,111,tkftiil,� after alH1owifik-:*P1tef,'- e 6. When any darn:jany, hriffic'la-1 obstruction) Is being ave a 6 th -0 �gr­ i I I e . ft e constructed, maintained,'. .,or aced in operation, suffi- removed from' the stre".�,- cient water shall at all tit Ve allow . ed to pass down- stream to maintain' fishlife below the dam. 17. If oper vi, ­ ations require mo ng% --'b - ­ a 1, 0.91 rezil 7. An adequate fish passage facility must be incorporated flowing stream,'' such 6 without substantially tteiffilo c into any barrier that obstructs fish passage. gs; t e,op"""16- reyeated.crossin h c -fill crossihi., A 8. An ificial obstruction) constructed shall g damu(ay art cu vert, .1 or ro. k be b ilt om material such as clean washed y r gravel 0 '18. If a stream chan -A h tbro"' 'b" which will cause little or no siltation. tions, its low - flo chafffi6l." W CP , ... k. � . . I "i , ""' 4 9. Equipment shall not be operated in the stream channels as possible to its naturAnl4iiW* of.flowing live streams except as may be necessary to future bank erosion -p : :. :-- :a la construct crossings or barriers and fills at channel 4­.."'� " 'N' changes. Shall b8:­re:-turMP 4 V - 10. When work in a' flowing stream is unavoidable, the state wIth6Uf!t...d entire streamflow shall be diverted around* the work The gradfent'6t e S' a area bf a barrier, temporary -culvert, and/or a new as nearly as -possible the me- channe capable,,;of permittin nd down. to disturbance, g upstream a stream flsh 'movement. Construction of - the barrier and/or the new channel shall normally, begin in the ..19.; Structures and associated materials'. not.._'.dQj downstream area and continue in an upstream direc. withstand high seasonal flows shall be'i6WdW tion, and the flow shall be diverted only when con- above the high water mark b6fore iuch--flow struction of the diversion is completed. Channel bank 20, No debris, soil, Silt, sarid, ;b or barrier construction shall be 'adequate to prevent ark, slash, sawdu bish,. cement 'or concrete:,or-44shl .4.ij�ete seepage into or from the work area. Channel banks or Fetroleum roducts-6r dihei'd I f6bi`64"Ik barriers shall not be made of earth or 'Other substances ..Vj . . rorn K de 7t subject to erosion unless first enclosed by sheet piling, ahy ogging, constructi6fi, it ,of whatever nature shall 'R"Y" ',k rap, or other protective material. The enclosure laced where it may -be,­wishi; ro rip ancl the supportive material shall be removed When' Into; waters of the State," en operaj16 .j the work -is completed and the removal shall normally, Fleted,,any excess materials or deblig-ou B., m downstream in an upstream direction. proceed fro rom. -the -work area. No pbbish '.'the hig�'.,Wati H. Temporary fills, shall be cqpstructed of nonerodible . witMn' 150 feet'6f . . inateriaLs and shall be removed immediately.upon work'. or lake.' completion. ff .. r iot! y- the.� Depiutniut-:;�' 21.. The operator�I-W% if I 12. Equipment shall not be operated in the lake or its - Came of the:(6i9`of completion of bpefatip margin except during excavation and as may be neces- five days piiq. "16"'Such com , t pletion .4 r) r 001 00,,_­� "i V, 'Y