Loading...
HomeMy WebLinkAboutB14-2466 091-200-023Z W in z W W p m Z W Z 4» Z d W W W W Q d W O�OQ�.ffi�00�`"Q0=Z Zdf- OW W °CZ�ZaZaW WF-uF,Za=per _-o W d� U' E..4, �0N-WWm�l Z 'Z O oC aC 'a p 0: zzu,j>- =uj0 Lu In CL JZQO ,J►.. O0 4 '�' L. -'Z p3�>a0 =lm-Z�Jt W mmZmaQ R$A=j OCi mWZZ4a05viuznLur=Z LU OOJOnowltol fus �~ZCLO �®auv�i�HupadOaaa Drawn By; JKP Ckd. By: CJR Date: 10/24/14 Revision: 2 DRAWING NUMBER I❑ i BIOGAS IN FROM D I GE5TER 0. 89 l I: COMPRE55ED NATURAL GAS (ONO) SYSTEM (UNISON SYSTEM) 2: FUELING STATION (ANC -,-f GNG SYSTEM) 3: SWITCH GEAR 4: "E" CONDENSATION PUMP (PHASE III) 5.: "E" TRUCK RAMP (PHASE 1) 6: (1) "N" 4" PVC 5GH40 ELECTRICAL CONDUIT 7: (2) "N" 4" PVC 5GH40 SPARE ELECTRICAL CONDUIT a: (1) "N" 6" UNDERGROUND HDPE100 GAS PIPE G: (1) "N" 4" UNDERGROUND HI7PE100 GAS PIPE 10: (3) "N" 2" PVG 5GH40 SPARE COMMUNICATION LINE CONDUIT 11: (1) "N" 2" PVG SCH40 WATER LINE (CONNECT "E" ONSITE POTABLE WATER TO "E" PHASE III WATER LINE) 12: (2) "N" 3" GALVANIZED RIGID CONDUIT (CRC) TO "E" SERVICE PANEL 13:ANG1 FUEL DISPENSER 14-UN15ON GLYCOL CHILLER 15:GNG CONTROL PANELS - ELECTRICAL PANEL "NOTES: I. ALL PIPING SHALL BE PRESSURE TESTED a 6Opsi PRIOR TO PROCESS INITIATION. 2. SEE TRENCH DETAIL I/PI. PLUMB I NO/E-LEGTR I GAL. PLAN GNC SYSTEM GOMFONEN T5 UNISON I FUELING STATION COMPONENTS ANSI COMPRESSOR AND DRYER BIOGAS GLEANING/ DRYER 14'Lx5'Wxl2'H PSA SKID &'Lx5'Nx 14'H 0'Lx0'Nx14'H PHASE IV PHASE IV PHASE IV TAIL GAS TO DIGESTER CHILLER CONTROL PANEL5 ELECTRICAL PANEL 10'Lx4.5' Nx6.7'H 55Lx25IWx&'H 4'Lx25Wx5'H PHASE IV PHASE' IV PHASE IV GNG GOMPRE55OR I O'Lx5'Wx5'H PHASE IV 13 \ \ \ \ 1 g \ \ 8 \\ --\ \ \\ 7 0 6 GNG STORAGE 14'Lx6'Wx,5'H PHASE IV PRIORITY PANEL 4'Lx 1.5'Wx6'H PHASE IV GNG DISPENSER 5.5'Lx I.25'Wx7.3'H PHASE IV 6'ERMrr /y 2 yG Z t. Z W z++ _ pm �ZW. WN W +�Wu+�~QQW Zat= 0! �Z�Z0ZaZ WF -Vi-Z-xdn'=OZW<* z �o o�ap� �v aWWZ�a�zu.0` ZW mays==Q=�ZaV -jQp0 tJfQ'�F-WOC mW W m0-�W0 ZWZZX0=�.0W0X . 3tW- 0 403 .® ;zp3WeQ ujWzz<`0-vf-O�W�=z 00m02WE OZ t°4aw Ix- Zmm Ow CCpLLVvf° F-vf V pdQ0�4Q 2 W F lom Z V • M a co V ct O 00`0 E 0 UP Lflj 4) .. V Q a Sr r N. Q? e � M � 00 CL i� � a= IV (DCO ^E M 0 OL V �, % P a� O = i 0 -c V) a Drawn By: JKP Ckd. By: CJR Date: 10/'24/14 Revision: 2 DRAWING NUMBER Ip 2 REMOVE AFTER GENERATOR SERVICE IS COMPLETE PHASE 2 PG+E OVERHEAD PG+E CUTOUTS PG+E TRANSFORMER PADMOUNT 480/277V PHASE 2 RENDER PLANT PG+E FEED TO BE DISCONNECTED (8)-5"C PG+E SECONDARY PHASE 1 BIOGAS POWER FROM RENDER PLANT CNG POWER FROM RENDER PLANT RENDER PLANT POWER FROM PG+E UTILITY METER PG+E — KWH EXISTING RENDERING PLANT MAIN SERVICE MSt 2000A, 480/277V, NEMA 3R 65K AIC 8000l 250 nl 225 ^l 200 ^l DIST PANEL DP1 800A, 480/277V RENDER PLANT N SKINNING RM MCC MCC3 225A, 480V PHASE 1 600A 480/277V (TEMP) FEED FROM RENDERING PLANT (2)-4"C 3-500MCM AL, 350MCM AL N, #1/0 AL G PHASE 2 (FUTURE FEED TO RENDER PLANT) (6) MAIN BREAKERS 250 vl n BIG GRINDER GR5 250A, 480V 800 vl n 1000A 480/277V (FUTURE) PHASE 2 FEED FROM DIGESTER MAIN SERVICE (3)-4"C 3-500MCM AL, 350MCM AL N, #4/0 AL G 600 vl � TP1 CNG TIE PANEL 1000A, 480/277V NEMA 3R 35K AIC 400 nl 150 ^l 4"C 6-350MCM ALI #1/0 AL G CNG DIST PNL DP4 PI JMP� + nnmTM, 400A 480V NEMA -3R 35K AIC 200 vl 150 v 50/2 V J 3-250MCM AL ,1 #6 CU G 3—#3/0 AL I, #6 CU G PHASE 1 DIGESTER MCC 3 PUMPS + CONTROL 400A 480/277V (TEMP PWR) 3-250MCM AL , #6 Co G TX 4C GROUND AND BOND AS PER NEC INCLUDING: #6 TO 10'x5/8" CU CLAD GND ROD #6 COPPER TO DP4 GND BUS 0 E O ►n "�4 CO"14 � N0 C: Q U C o o ^a U) W ° C" a ` r01r'0- Lo0 a r'L LO O L0 O, N o m IL H ELECTRICAL NOTES USES PNL BOILER NEW PLANT CNG MCC 4 1 " C 2#8, #8G 1. ALL WIRE THHN/THWN COPPER DP2 TRUCK SHOP MCC6 200 COMPR, DRYER UNLESS NOTED OTHERWISE 250A, 480V 200A, 480V 800A, 480V 150 DISPENSER 95A I--- 2. MINIMUM POWER WIRE SIZE #12 #14 FOR CONTROL ,ANGI COMPRESSOR PWR PNL Q UNLESS NOTED OTHERWISE ATMI UNISON PNL 150A 480V —i 3. CONDUIT TO BE GRC UNLESS NOTED OTHERWISE GAS CONDITIONING CL PVC MAY BE USED UNDERGROUND - 4. INSTALLATION TO MEET ALL LOCAL CODES AND NEC COMPLY WITH CALLFORK4 122A 480V TX 4C Q 5. ALL CIRCUIT BREAKERS SHALL BE LEGIBLY AND ELECTRICAL CODE-AR77CLE250 CNG MCC 5 25 25 KVA z n-, DURABLY MARKED. REQUIREMENTS FOR GROUNDING / 35 480 TO 12 /240V / Q Q 6. OUTDOOR ENCLOSURES TO BE NEMA -3R 600A 480/277V (TEMP CNG) PHASE 1 AND BONDING INCLUDES: Tx� VAC PUMP 5 KVA L RAINTIGHT _ _ 48a To , 7. ALL SWITCH AND OUTLET BOXES TO BE MOUNTED FEED FROM RENDERING PLANT HILLER ,240 z BETWEEN 16" AND 48" ABOVE FLOOR ELECTRICAL EQUIPMENT LLJ W UNLESS OTHERWISE NOTED (CONTINUED AT RIGHT) INSTALLED IN WET LOCATIONS 50 1 .25" C 3#2, #8G 1h z SHALL BE IDENTIFIED & LISTED — 8. ALL ELECTRICAL WORK TO COMPLY WITH 2002 NEC FOR WET LOCATIONS PER CEC 0 J ARTICLE 100 & 110.11 12 CIRCUIT z LLJ 9. ALL RACWAYS MOUNTED ON ROOF TO BE DERATED FOR TEMP AS PER 120V — NEC 310-16 CORRECTION FACTORS FOR 110 DEG F I— � COMPLY WITH CALIFORNL4 ELECTRICAL 1021/2 10. DERATE WIRE AS PER NEC 310-15 (B)2 FOR MORE THAN CODE -for wiring methods- secure 0 X z 3 CURRENT CARRYING CONDUCTORS PER CONDUIT conductors and conduit per all applicable w (J� requirements as required by the 2013 CEC for the specific method of wiring 30 SCALE Label, circuit breaker(s), disconnect(s), COMPRESSOR NONE fuse(s),switch(es) and their 50 HP ANGI DRYER DATE accessories, to identify their location LP 4C 7/29/ 14 and or equipment 100A 120/240V REV No REV BY CNG AREA REVDATE 1 Provide readily accessible capability to 1 0/29/ 14 DRAwN circuit breaker(s), disconnect(s), - �-Z-- PERMIT # JO Fuse(s),switch(es) and their accessories BUTTE ^Ok.W .S DWG NO as required :a:Jj defined in California E4 r s 13-05A Electr r.:µ Code PATE `< S/11�✓"--- - ----- — SHEET NO ................ . ........... E 2 ..........:........................................_............................._.................................................. ......... ..... ►n "�4 CO"14 �C\j rnN �I LL j �n C" � o a 0 �- D E H �CV) 1,_4 W Co a to cu P4 �a Q U CD z L,J 0 W Li <C W Q U W � n 07 n __j -F __j I— (� > o C Ln rz z7 — 0 ELECTRICAL NOTES USES PNL BOILER NEW PLANT CNG MCC 4 1 " C 2#8, #8G 1. ALL WIRE THHN/THWN COPPER DP2 TRUCK SHOP MCC6 200 COMPR, DRYER UNLESS NOTED OTHERWISE 250A, 480V 200A, 480V 800A, 480V 150 DISPENSER 95A I--- 2. MINIMUM POWER WIRE SIZE #12 #14 FOR CONTROL ,ANGI COMPRESSOR PWR PNL Q UNLESS NOTED OTHERWISE ATMI UNISON PNL 150A 480V —i 3. CONDUIT TO BE GRC UNLESS NOTED OTHERWISE GAS CONDITIONING CL PVC MAY BE USED UNDERGROUND - 4. INSTALLATION TO MEET ALL LOCAL CODES AND NEC COMPLY WITH CALLFORK4 122A 480V TX 4C Q 5. ALL CIRCUIT BREAKERS SHALL BE LEGIBLY AND ELECTRICAL CODE-AR77CLE250 CNG MCC 5 25 25 KVA z n-, DURABLY MARKED. REQUIREMENTS FOR GROUNDING / 35 480 TO 12 /240V / Q Q 6. OUTDOOR ENCLOSURES TO BE NEMA -3R 600A 480/277V (TEMP CNG) PHASE 1 AND BONDING INCLUDES: Tx� VAC PUMP 5 KVA L RAINTIGHT _ _ 48a To , 7. ALL SWITCH AND OUTLET BOXES TO BE MOUNTED FEED FROM RENDERING PLANT HILLER ,240 z BETWEEN 16" AND 48" ABOVE FLOOR ELECTRICAL EQUIPMENT LLJ W UNLESS OTHERWISE NOTED (CONTINUED AT RIGHT) INSTALLED IN WET LOCATIONS 50 1 .25" C 3#2, #8G 1h z SHALL BE IDENTIFIED & LISTED — 8. ALL ELECTRICAL WORK TO COMPLY WITH 2002 NEC FOR WET LOCATIONS PER CEC 0 J ARTICLE 100 & 110.11 12 CIRCUIT z LLJ 9. ALL RACWAYS MOUNTED ON ROOF TO BE DERATED FOR TEMP AS PER 120V — NEC 310-16 CORRECTION FACTORS FOR 110 DEG F I— � COMPLY WITH CALIFORNL4 ELECTRICAL 1021/2 10. DERATE WIRE AS PER NEC 310-15 (B)2 FOR MORE THAN CODE -for wiring methods- secure 0 X z 3 CURRENT CARRYING CONDUCTORS PER CONDUIT conductors and conduit per all applicable w (J� requirements as required by the 2013 CEC for the specific method of wiring 30 SCALE Label, circuit breaker(s), disconnect(s), COMPRESSOR NONE fuse(s),switch(es) and their 50 HP ANGI DRYER DATE accessories, to identify their location LP 4C 7/29/ 14 and or equipment 100A 120/240V REV No REV BY CNG AREA REVDATE 1 Provide readily accessible capability to 1 0/29/ 14 DRAwN circuit breaker(s), disconnect(s), - �-Z-- PERMIT # JO Fuse(s),switch(es) and their accessories BUTTE ^Ok.W .S DWG NO as required :a:Jj defined in California E4 r s 13-05A Electr r.:µ Code PATE `< S/11�✓"--- - ----- — SHEET NO ................ . ........... E 2 ..........:........................................_............................._.................................................. ......... ..... I / / / NEW OVERHEAD 12KV / PG+E NEM / I / FUTURE / PHASE 2 / / 12KV POLEMOUN' PG+E DISCONNE( PG+E NEM / UNDERGRI \ 5" PVC A PG+E OVERHEAD 60KV 12KV \ I 12KV ESQUON 102171101 / \ POND \ / MS2 1600A 480\ 277' GENERATOR SERV / / POND POND / (E) TO BE DISCONNECTED / PG+E TX / MOB E HOME PADMOUNT TRANSFORMER,'' PAD, GUARDPOSTS O PG+E NEM �g / (2) 3" GRC TP1 1000A 480/277V TO (E) SERVICE NEMA 3R PULL BOX TIE PANEL I / / 36 X 30 X 12 PAD, GUARDPOSTS / (2) 4" PVC r �\ DP4 400A 480V /\ \ SHOP \\ CNG DIST PNL CNG DISC 1-1 7v MS1 OOOA 480/27 v \ / / CNG SC EXIST G MAIN SER ICE \ \ \�48 ONC PULL BOX RENDERI G PLANT OR SIMILAR O PROTECT FROM TRAFFIC CNG EQUIF / / / / OFFICE 0) / U Lv SHIPPEE RD Im BIOMASS DIGESTER GENERATOR 0.7 MW E ;,�iTE J*, 4"Y Pr V-i_OPMENT SERVICES D tEVIEVI D FOR Zl// ELECT SITE PLAN SCALE APROX V1 = 50' 11X17 IS REDUCED PLOT - ORIGINAL IS 24X36 C O U ti ccyi L1� c� .4 �c\j (D p Q U c so Li j o �_0 U) w U 0 U z w U) C.0 r -- U~ CL Lo O o� D E d 0 o 0m N o EL a NOTED �m 00 Iy O c� .4 �c\j Q M c\j LLJLi Li j U U cv U z w '-+ •d U~ CL o .., E4 O D E d 0 SCALE a NOTED �m 00 9/25/13 REV NO 13 B a, 10/29/14 DRAWN U p DWG NO co U CD 13-05B SHEET NO U z CL w z w w Q w Q U W � F— u5 Q:� Q O Lo n--, z c- .o Iy O Q r LLJLi U r-) z w Q O CL IL O w SCALE NOTED DATE 9/25/13 REV NO 13 B 1 _ REVDATE 10/29/14 DRAWN JO DWG NO 13-05B SHEET NO E3 NOTE.- VALVES AND FLANGES OF SCREWED FITTINGS - UNCLASSIFIED 15 FT Cl D2 (ALL AROUND ANCILIARY EQUIPMENT) CLEAR TO FLAMMABLE OR CUMBUSTABLE LIQUIDS CLEAR TO ALL �20 FT ELECTRICAL INSTALLATIONS --- Fll5 FT Cl D2 DRYER FUELING EQUIPMENT COMPOUND AREA � (NO POWER LINES OVERHEAD) COMPRESSOR SKID Cl D2 10 FT CLEAR TO PROPERTY LINES, BUILDINGS, OR ANY SOURCE OF IGNITION 10 Fr CLEAR TO PUBLIC STREET OR SIDEWALK LINE NOTE 1: OTHER CODES AND REGULATIONS MAY APPLY NOTE 2: REFERENCE ONLY -FINAL SITE DESIGN BY OTHERS NOTE 3: CONSULT NFPA 30A FOR ADDITIONAL SITE REQUIREMENTS OR CLEARANCES IF CNG REFUELING AT A SITE WHERE OTHER TRANSPORTATION FUELS ARE BEING DISPENSED OR STORED. B 06FE812 ADDED NOTE 3 AND DISPENSER ESD NOTE GT A 02FE812 UPDATED POINT OF TRANSFER DH AND ASSOCIATED DIMENSIONS REV I DATE BY I DESCRIPTION REV I DATE BY DESCRIPTION CLEAR TO READILY IGNITABLE MATERIAL Cl D2 (ALL AROUND CONTAINERS) COMPRESSOR SKID � Cl D2 � Cl D2 (ALL AROUND 15 FT COMPRESSOR) 5 FT C1 D1 50 FT CLEAR TO DISPENSING � DEVICES WITH LIQUID OR \ GASEOUS Fi 5-15 FT \ Cl D2 -ALL RELIEF VALVES OR VENT (NP.) (ALL DIRECTIONS FROM POINT SOURCE) NOTE: VENTING TO ATMOSPHERE GENERALLY OCCURS AT COMPRESSOR, STORAGE, ANCILIARY EQUIPMENT, AND OCCASSIONALLY AT THE DISPENSER NOTE: DISCHARGE FROM RELIEF VALVES WITHIN 15 DEGREES OF LINE OF DISCHARGE IS C1D1 UP TO 15 FT 5 50 FT CLEAR TO RAILROAD TRACKS .Jives v IL-rr DEFINITIONS: (REF. OSHA HAZARDOUS (CLASSIFIED) LOCATIONS C 1 D 1- CLASS 1, GROUP D, DIVISION 1 CLASS 1: GASES, VAPORS, AND LIQUIDS (ART. 501) GROUP D: HYDROCARBONS, FUELS, SOLVENTS, ETC. DIVISION 1: NORMALLY EXPLOSIVE AND HAZARDOUS Cl D2 - CLASS 1, GROUP D, DIVISION 2 CLASS 1: GASES, VAPORS, AND LIQUIDS (ART. 501) GROUP D: HYDROCARBONS, FUELS, SOLVENTS, ETC. DIVISION 2: NOT NORMALLY PRESENT IN AN EXPLOSIVE CONCENTRATION (BUT MAY ACCIDENTALLY EXIST) CLEAR TO ALL SOURCES OF IGNITION CLEAR TO BUILDINGS, MOBILE HOMES CLEAR OF 10 FT PUBLIC SIDEWALKS, STREETS, OR ROADS STORAGE CONTAIN Aviv iruiv�nJ 3 FT � FUEL MANAGEMENT PEDESTAL (OPTIONAL) POINT OF TRANSFER CNG RECEPTArI 17" PERMIT # i/y-upb/ L BUTTE COUNTY DEVELO[` � r 7--VICES REVIEWEC -CCK _ CODE CO P, DATE NOTE: SECTION 8.11.5 AN EMERGENCY MANUAL SHUTDC DEVICE SHALL BE PROVIDED WITHIN 10 FT. OF THE DISPENSING AREA AND ALSO GREATER THAN 25 FT. FRON 5 FT MIN xA Y 5 FT Cl D2 LL AROUND"' K )ISPENSER), THE DISPENSING AREA. J10 FT P V-0 Iu2 AREA ANGI ENERGY SYSTEMS UNLESS OTHERWISE SPECIFlED TITLE 15 PLUMB STREET -CE1 MILTON, WI 53563 Lry PH: 608-868-4626 BREAK SHARP EDGES CUSTOMER =NERGY SYSTEMS FX: 608-86e-2723 ALL DIMENSIONS IN INCHES FACTRIONAL 1.125 SHEEP THIS DRAWING AND ALL INFORMATION THEREIN IS THE SOLE PROPERTY OF ANGI TWO PLACE DECIMAL 1.010 AND SHOULD NOT BE COPIED, REPRODUCED, OR SUBMITTED TO OTHERS WITHOUT THREE PLACE DECIMAL f.005 DRAWN BY WRITTEN AUTHORIZATION. ALL REPRODUCTIONS ARE SUBJECT TO RETURN ON DEMAND. ANGLES t1' CLEAR TO BUILDINGS, MOBILE HOMES, PUBLIC SIDEWALKS, STREETS, OR ROADS NFPA 52 - 2013 EDITION (SECTION 8.4.2) OUTDOOR CLEARANCES FOR CNG FUELING EQUIPMENT PROJECT N0. 1 /1 SCALE NA DRAWING N0. DH DATE 09 FEB 11 Z-1009 REV. B WINDCHILL ME Phase IV of North State Rendering's Biogas Project CNG equipment installation Biogas produced by the anaerobic digester consists of 65% CH4 (methane) and 34% CO2. In order to use biogas as a fuel in trucks, CH4 content must be —98%, and the gas must be compressed. The current permit is for the installation of equipment that cleans up the Biogas to ^-98% CH4, compresses it, and dispenses it to North State Rendering's trucks. Previous document submittal included unnecessary plans for the equipment itself. After meeting with county staff, Biogas Energy is submitting the attached documentation. This phase of the project encompasses the installation of equipment that 1) cleans biogas supplied from the digester into pipeline quality natural gas (UNISON system) 2) compresses and dispenses the Compressed Natural Gas (CNG) for truck fuel (ANGI system) Biogas is fed from the digesters via underground pipe to the UNISON system comprised of: 1) biogas dryer - compressor skid 2) Pressure Swing Absorption (PSA) biogas cleanup skid 3) Glycol chiller (for the biogas dryer) From the UNISON system, the cleaned natural gas is piped to the ANGI system, while the off gas (consisting of 85% CO2 and 15% CH4) is piped back to the digester to be mixed with new biogas being produced. The ANGI system is comprised of 1) biogas dryer skid 2) biogas compressor skid 3) 3 storage tanks 4) CNG dispenser The dispenser is used only by North State Rendering and is not available to the public. An electrical panel supplying electricity to the equipment is supplied by Layman Electric. q,trt, PERMIT BUTTE CnuNrr-,, CkVELOPM -NT SERVICES EWER FOR CODE i PLIANCE DA7�._. _ I BY U