Loading...
HomeMy WebLinkAboutB15-0396Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification LM CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 1 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 This compliance document is only applicable to additions 300 ft or less, or additions that do not require HERS field verification for compliance. When HERS verification is required, a CFIR-ADD-01 shall first be registered with a HERS Provider Data Registry. Alterations to Space Conditioning Systems that are exempt from HERS verification requirements may use the CFIR-ADD-02 and CF2R- ADD -02 Compliance Documents. Possible exemptions from duct leakage testing include: less than 40 ft of ducts were added or replaced; or the existing duct system was insulated with asbestos, or the existing duct system was previously tested and passed by a HERS Roter. If space conditioning systems are altered and are not exempt from HERS verification, then a CFIR-ADD-01 must be completed and registered with a HERS Provider Data Registry. Additions or alterations that utilize Closed Cell Spray Polyurethane Foam (ccSPF) with a density of 1.5 to less than 2.5 pounds per cubic foot having an R -value other than 5.8 per inch, or Open Cell Spray Polyurethane Foam (ocSPF) with a density of 0.4 to less than 1.5 pounds per cubic foot having an R -value of 3.6 per inch, shall complete and register a CFIR ADD -01 with a HERS Provider Data Registry. If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction for which they are responsible. Alternatively, the person with chief responsibility for construction shall prepare and sign this certificate for the entire construction. All applicable Mandatory Measures shall be met. Temporary labels shall not be removed before verification by the building inspector. A. GENERAL INFORMATION 01 Project Name: Daguere Addition 02 Date Prepared: 2-23-15 03 Project Location: 1670 Bidwell Ave. 04 Building Front Orientation (deg): 180 05 CA City: Chico 06 Number of Dwelling Units with Additions: 1 07 tip Code: 95926 08 Fuel Type: natural gas 09 Climate Zone:, 11 10 Total Conditioned Floor Area (ft 2) (Addition): 149 11 Building Type Single Family 12 Slab Area (ft): NA 13 Project Scope: <300 sq. ft. BUTTE PERMR #B 'TTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CODE O pLIANCE DATE / BY�— 1L-vuN"1'Y FEB 2 3 2015 DEVELOPMENT SERVICES CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION � CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 2 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 B. OPAQUE SURFACE DETAILS — Framed (Section 150.2(a)) 01 02 03 04 05 06 07 08 09 10 11 Tag/ID Assembly Type Frame Type Frame Depth (inches) Frame Spacing (inches) Proposed Required Comments Cavity R -value Continuous Insulation R -value LI -Factor Appendix JA4 Reference LI -Factor Table Cell wall wood 4 16 13 NA NA NA NA NA only R-13 req'd ceiling wood 6 24 38 NA 0.025 4.2.1 A21 0.025 floor o/ crawlspa wood 6 16 19 NA 0.037 4.4.1 A4 0.037 Bl TTE COUNT r,_9;'N`. F ivi ppjae' g CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification CEC-MR-ADD-02-E Revised 01/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 3 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 C. OPAQUE SURFACE DETAILS — Non -framed (Section 150.1(c)1) 01 02 03 04 05 06 07 08 09 10 11 Tag/ID I Assembly Type Assembly Materials Thickness (inches) Proposed Required Comments Core Insulation R -value Continuous Insulation R -value U -Factor Appendix 1A4 Reference U -Factor from Package A Table Cell R -value U -factor R -value U -factor Table Cell R -value U -fa ctor R -value U -factor ..D. -,OPAQUE SURFACE DETAILS — Mass Walls (Section 150.1(c)1) 01 02 03 04 05 06 07 08 1 09 10 11 r Tag/ID Walls Above Grade Mass Type Mass Thickness (inches) Furring Strip Thickness (inches) Proposed Required Interior Insulation Exterior Insulation AppendixJA4 Reference Interior Insulation Exterior Insulation R -value U -factor R -value U -factor Table Cell R -value U -fa ctor R -value U -factor RUITECOUNTY BUILDING DIVISION CA Building Energy Efficiency Standards - 2013 Residential Compliance APPROVED January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification CEC-CFIR-ADD-02-E (Revised 01115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 4 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 , E. SLAB INSULATION (Table 150.1-A) 01 02 03 04 05 06 Floor Type Proposed Required Comments Insulation R -value Insulation LI -factor Insulation R -value Insulation U -factor • Heated slab floors require mandatory slab insulation (see Table 110.8-A). F. RADIANT BARRIER (Section 150.1(c)2 01 02 Radiant Barrier installed below the roof deck and on all gable end walls Comments YES A radiant barrier is required (for Climate Zones 2-15) • Radiant barriers shall meet specific eligibility and installation criteria to receive energy credit for compliance with the Building Energy Efficiency Standards for low-rise residential buildings. Refer to RA4.2.1 • The emittance of the radiant barrier shall be less than or equal to 0.05 as tested in accordance with ASTM C1371 or ASTM E408. For Prescriptive Compliance the attic shall be ventilated to provide a minimum free ventilation area of not less than one square foot of vent area for each 300 ft2 of attic floor area with no less than 30 percent upper vents. Ridge vents or gable end vents are recommended to achieve the best performance. The material should be cut to allow for full airflow to the venting. CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification � E "M _�" - i CEC-CFIR-ADD-02-E (Revised 01115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 5 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 G: ROOFING PRODUCTS (COOL ROOF) (Section 150.1(c)ll) 01 02 03 04 05 06 07 08 09 10 11 12 Mass Roof 25lb/ft2 or Greater Roof Pitch Method of Compliance Product Type CRRC Product ID Number Proposed Required Initial Solar Reflectance Aged Solar Reflectance Thermal Emittance SRI (Optional) Aged Solar Reflectance Thermal Emittance SRI (Optional) NO .8:12 ASR/TE asphalt Addition Type ftz NA 0.20 0.75 Maximum 0.20 0.75 Calculated Maximum Calculated Maximum U -factor SHGC Calculated Calculated based on based on Allowed ftZ Allowed ftZ Allowed % Allowed <400 44.7 75 NA 60 0.32 0.25 NOTES: • Any roof area covered by building integrated photovoltaic panels and solar thermal panels are exempt from the above Cool Roof requirements. • Liquid field applied coatings must comply with installation criteria from section 110.8(1)4. H. FENESTRATION/GLAZING AREAS ALLOWED (Section 150.2(a)l) 01 02 03 04 05 06 07 08 Maximum Allowed Maximum Allowed Fenestration Area For All Orientations ftZ West -Facing Fenestration Area Only ftz The Greater The Greater Maximum Maximum Addition Type ftz Allowed Allowed Comments Maximum Maximum Calculated Maximum Calculated Maximum U -factor SHGC Calculated Calculated based on based on Allowed ftZ Allowed ftZ Allowed % Allowed <400 44.7 75 NA 60 0.32 0.25 BUTTE COUNTY C?' It nr� � r..�UILE)IING DIvIS10Iq CA Building Energy Efficiency Standards - 2013 Residential Compliance APPROVED January 2015 t2 Prescriptive Residential Additions 300 For Less, or Additions That Do Not Require HERS Field Verification CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION '"' CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 6 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 I. FENESTRATION PROPOSED AREAS AND EFFICIENCIES 01 02 03 04 05 06 07 08 09 10 11 12 13 Tag/ID Fenestration Type Frame Type Dynamic Glazing Orientation N, S, W, E or Roof Number of Panes Proposed Fenestration Z Area ft Proposed West Facing Fenestration Area ftZ Proposed U -factor Proposed SHGC Source Exterior Shading Device Combined SHGC from CF1R-ENV- 03 2868 door w/ glazing vinyl ------------- W 2 17.8 17.8 0.32 0.25 NFRC none 0,25 2630 operable window vinyl ------------- N 2 7.5 0.32 0.25 NFRC none 0.25 2630 operable window vinyl ------------- N 2 7.5 0.32 0.25 NFRC none 0.25 14 Total Proposed Fenestration Area 32.8 15 Maximum Allowed Fenestration Area 75 16 Compliance Statement Total Proposed Fenestration Area <_ Maximum Allowed Fenestration Area ® Yes ❑ No 17 Total Proposed West -Facing Fenestration Area 17.8 18 Maximum Allowed West -Facing Fenestration Area 60 19 Compliance Statement Total Proposed West -Facing Fenestration Area <_ Maximum Allowed West -Facing Fenestration Area ® Yes ❑ No 20 Proposed Fenestration U -factor 0.32 21 Required Fenestration U -factor 0.32 22 Compliance Statement Proposed Fenestration U -factor <_ Required Fenestration U -factor BUTTE Q01 INTY ® Yes ❑ No 23 Proposed Fenestration SHGC BUILDING DIVISDIN0.25 24 Required Fenestration SHGC A PQnO /C:n 0.25 25 Compliance Statement Proposed Fenestration SHGC15 Required Fenestration SHGC ® Yes ❑ No CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification CEC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 7 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 J. SPACE CONDITIONING(SC) SYSTEMS - HEATING/COOLING (Prescriptive section 150.2(b). Alterations to Space Conditioning Systems shall be exempt from HERS verification requirements as prerequisite for use of the CFIR-ADD-02 and CF2R-ADD-02 Compliance Documents. If new space conditioning systems are installed or existing systems are altered and are not exempt from HERS verification, then a CFIR-ADD-01 shall be completed and registered with a HERS Provider Data Registry. In each row below for each dwelling unit in the building, check the box that indicates the exemption from HERS verification compliance: ❑ a: space conditioning system was not altered; ❑ b: less than 40 ft of ducts were added or replaced; ❑. c: (exempt from duct leakage testing) if: the existing duct system was insulated with asbestos; ❑ d: (exempt from duct leakage testing) if: the existing duct system was previously tested and passed by a HERS Rater. 01 02 03 04 Dwelling Unit Name SC System Identification or Name SC System Location or Area Served Exemption from HERS Verification Addition existing HVAC existing house + addition ❑ a ® b ❑ c ❑ d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 121 0 0 0 0 _ r- IT/ BUILDING DIVISION AHPHOVED CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification CEC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION � CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 8 of 9) Project Name: Daguere Addition I Date Prepared: 2-23-15 K. WATER HEATING SYSTEMS (Section 150.1(c)8) List water heaters and boilers for both domestic hot water (DHW) heaters and hydronic space heating.' 01 02 03 04 05 06 07 08 09 10 it 12 13 14 15 " Dwelling Unit Name Water Heating System Identification or Name Water Heating System Location or Area Served Water Heating System Type Water Heater Type # of Water Heaters in System Water Heater Storage Volume (gal) Fuel Type Rated Input Type Rated Input Value Heating Efficiency Type Heating Efficiency Value Standby Loss (%) Exterior Insulation R -Value Back -Up Solar Savings Fraction NA R1 ITTE CQI IITV -lull-DING DfVfSf N AFHHUVED CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification rm -EC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF113-ADD-02-E Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 9 of 9) Project Name: Dag Vere Addition Date Prepared: 2-23-15 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: ` Documentation Autho Signa e: / Gregory A. Peitz Company: Signature Date: Gregory A. Peitz, Architect 2-23-15 Address: CEA/ HERS Certification Identification (if applicable): 383 Rio Lindo Ave. City/State/Zip: Phone: Chico, CA 959261(530)894-5719 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued fo a Mr4ing, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Compliance is required to be inclu ed Ith the do mentation the builder provides to the building owner at occupancy. Responsible Designer Name: Responsible Designer S nat Gregory A. Peitz Company, Date Signed: Gregory A. Peitz, Architect 2-23-15 Address: License: 383 Rio Lindo Ave. C21283 City/State/Zip: Phone: Chico, CA 95926 (530) 894-5719 For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300. BUTTE COUNTY BUILDING DIVISION APPROVED CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015 5. �� R SHAD L BE INSTALLED PROPERLY, BEHIND ` �4. ROCK B EHALK5. .� /INLET L .5 (MINIMUM 2 PER SIDE) AT ALL DRAIN PROP. 71NE7 , /SITE, ,ATIONS WITHIN 150' OF THE PROJECT. n 5. IN FILTERS SHALL BE PLACED INSIDE EACH 7A6. ,�DONED t'o . �0, B N BARS SHALL BE PLACED ACROSS THE 62 �G ST K OF'ALL DRAIN INLETS. `• ABILIZE ALL DISTURBED SOILS IN THE FRONT ARD, AREAS WITHIN 15' OF THE BACK CURB OR j SIDEWALK. (STRAW OR EROSION BLANKETS MAY.BE USED FOR THIS APPLICATION) ' tF 6. STABILIZE ALL SLOPES HHERE EROSION COULD •. '" OGGUR AND CAUSE 51LT RUN OFF, (STRAW, 'VISQUEEN OR EROSION BLANKETS MAY BE USED FOR THIS APPLICATION) 'I. ALL PAINT, FUEL, CONSTRUCTION PRODUCT5 ETC. ` , �, PERMIT # - SHALL BE STORED IN A COVERED LOCATION AWAY' "f i BUTTE COUNTY DEVELOPMENT SERVICES FROM 51DEHALKS AND STORM DRAIN INLETS. r. _ p 10. PORTABLE CHEMICAL TOILETS IF PROVIDED ON R VIEWED Fort THE 517E MUST BE KEPT. OFF OF STREETS AND I I , `• • r COO COMPLIANCE 50E4ALKS AND A LEAST 50' FROM THE NEAREST" I 9 _ STORM DRAIN. I I { ? DATE/! �l1� I BY CJ ' 11. ALL TRASH MUST BE COLLECTED AND STORED I PROPERLY. DO NOT LET ITEMS SUCH AS DRYWALL I , MUD BOXES, PAINT BUCKETS, CLEANING MATERIAL ` CONTAINERS, ETC. COME IN CONTACT HITH ANY I I - (E) 5 r »� -• . RAINFALL OR STORM HATER RUNOFF. I' BARN t�12.' PROVIDE A DE516CRE NATED AREA FOR CONTE WASHOUT. HAY BAILS LINED WITH VISOUEEN MAY BE I I s { USED FOR THIS APPLICATION. ROLLAWAY BINS MAY I AL50 BE USED. ALL CONCRETE WASHOUT SYSTEMS 1 y SHALL BE PLACED OFF OF THE PAVED STREETS. 13. AFTER INSTALLATION OF THE ABOVE ITEMS ARE I - I r- COMPLETE, A MAINTENANCE PR GRAM NEEDS TO I ' BE DEVELOPED TO INSURE THE CONTINUED I 1 j • ' ` EFFECTIVENESS OF YOUR BMP'S. I I r : m I , y ; z BUTTE COUNTY ' a Pool (E) FEB ' 2 3 2015 EXLST. i GARAGE SE TIG DEVELOPMENT -. SERVICES . • tom` �7`1 I SHOP A•' fay..t..k .:F 4 .-r {� ti� ,* .. y r - .r w �J f'7'' r r, r7 a t -*r- • 4, I . Y +A .1 ....i. r ` ,.(E) FENCE' • � - � � �i�i�0 EDS � - � ' _ r I ADDITION o ♦� ♦ w. .:� - it 3 " * - - r 7 , •�-s, . r ,� 1 t a � � • EXISTING . ERESIDENGE01,A14e ,f (E) DRIVEWAY XjsT- _ WELL .. PROP. T — a LINE r • 11�0'., qOF BIDNEL'L "y. •X - ' i a • .... J :� •` .. " � -. `:f 51TE PLAN",.., LA, 1f' . • _ III = XX -0": x ' 6 ONNER: Marcel and Mary Doguerre SITE INFO:I6-10 B►dwell Ave. SHEET IF ADDRESS: 16-70 Bidwell Ave. CHICO CA ARCHITECT;; `' CHICO GA ,,. MINIMUM ER05ION AND .SEDIMENT • ,ONTROL5 FOR PROJECTS _ D15TURBINC7LE55 THAN ONE ACRE r . « r•'� THE BMP'S (BEST MANAGEMENT PRACTICES) L15TED - c' BELOW MUST BE IN PLACE DURING THE RAINY r SEASON (OCTOBER 15 THROUGH APRIL 15) AND MAY 8E REQUIRED AT OTHER TIMES BASED ON WEATHER # �. LOCatIOn'Of st►'UCtUCe•aS"SF10Wn y AND 51TE CONDITIONS THROU61.101) ' THE'YEAR. THE .. •4, •• 1 pn BMP'S LISTED ARE MINIMUM REQUIREMENTS ANDplot t ADDITIONAL BMRS GOULD BE REOUIRED BASED ON SITE CONDITIONS. plan Is in flood Zone )(= 1 " •: Np n t Flood - I. STABILIZED ENTRY,)PROVIDE MIN 8" TO b° ' t` Elevation .Ce' ' ' rtificate ` - FRACTURED-ROCK'5O' LONG x115' WIDE BY b" DEEP OVER CONSTI;JGTIC;N GRADE•FABRIG. 2. ALL SOILS TRACKE:V ONTO PAVED ROADWAYS MU5T BE CLEANED ION A DAILY BA515. WHEN +' ` 5TREETS ARE HEC OR DURI1,16 A RAIN EVENT THERE q?;a' r . •SHALLBE NOTRA (, 9 OF SOILS ONTO THE w - - - 5. �� R SHAD L BE INSTALLED PROPERLY, BEHIND ` �4. ROCK B EHALK5. .� /INLET L .5 (MINIMUM 2 PER SIDE) AT ALL DRAIN PROP. 71NE7 , /SITE, ,ATIONS WITHIN 150' OF THE PROJECT. n 5. IN FILTERS SHALL BE PLACED INSIDE EACH 7A6. ,�DONED t'o . �0, B N BARS SHALL BE PLACED ACROSS THE 62 �G ST K OF'ALL DRAIN INLETS. `• ABILIZE ALL DISTURBED SOILS IN THE FRONT ARD, AREAS WITHIN 15' OF THE BACK CURB OR j SIDEWALK. (STRAW OR EROSION BLANKETS MAY.BE USED FOR THIS APPLICATION) ' tF 6. STABILIZE ALL SLOPES HHERE EROSION COULD •. '" OGGUR AND CAUSE 51LT RUN OFF, (STRAW, 'VISQUEEN OR EROSION BLANKETS MAY BE USED FOR THIS APPLICATION) 'I. ALL PAINT, FUEL, CONSTRUCTION PRODUCT5 ETC. ` , �, PERMIT # - SHALL BE STORED IN A COVERED LOCATION AWAY' "f i BUTTE COUNTY DEVELOPMENT SERVICES FROM 51DEHALKS AND STORM DRAIN INLETS. r. _ p 10. PORTABLE CHEMICAL TOILETS IF PROVIDED ON R VIEWED Fort THE 517E MUST BE KEPT. OFF OF STREETS AND I I , `• • r COO COMPLIANCE 50E4ALKS AND A LEAST 50' FROM THE NEAREST" I 9 _ STORM DRAIN. I I { ? DATE/! �l1� I BY CJ ' 11. ALL TRASH MUST BE COLLECTED AND STORED I PROPERLY. DO NOT LET ITEMS SUCH AS DRYWALL I , MUD BOXES, PAINT BUCKETS, CLEANING MATERIAL ` CONTAINERS, ETC. COME IN CONTACT HITH ANY I I - (E) 5 r »� -• . RAINFALL OR STORM HATER RUNOFF. I' BARN t�12.' PROVIDE A DE516CRE NATED AREA FOR CONTE WASHOUT. HAY BAILS LINED WITH VISOUEEN MAY BE I I s { USED FOR THIS APPLICATION. ROLLAWAY BINS MAY I AL50 BE USED. ALL CONCRETE WASHOUT SYSTEMS 1 y SHALL BE PLACED OFF OF THE PAVED STREETS. 13. AFTER INSTALLATION OF THE ABOVE ITEMS ARE I - I r- COMPLETE, A MAINTENANCE PR GRAM NEEDS TO I ' BE DEVELOPED TO INSURE THE CONTINUED I 1 j • ' ` EFFECTIVENESS OF YOUR BMP'S. I I r : m I , y ; z BUTTE COUNTY ' a Pool (E) FEB ' 2 3 2015 EXLST. i GARAGE SE TIG DEVELOPMENT -. SERVICES . • tom` �7`1 I SHOP A•' fay..t..k .:F 4 .-r {� ti� ,* .. y r - .r w �J f'7'' r r, r7 a t -*r- • 4, I . Y +A .1 ....i. r ` ,.(E) FENCE' • � - � � �i�i�0 EDS � - � ' _ r I ADDITION o ♦� ♦ w. .:� - it 3 " * - - r 7 , •�-s, . r ,� 1 t a � � • EXISTING . ERESIDENGE01,A14e ,f (E) DRIVEWAY XjsT- _ WELL .. PROP. T — a LINE r • 11�0'., qOF BIDNEL'L "y. •X - ' i a • .... J :� •` .. " � -. `:f 51TE PLAN",.., LA, 1f' . • _ III = XX -0": x ' 6 SIL, a 'o co 0 ,4 LO 0 N M N N ONNER: Marcel and Mary Doguerre SITE INFO:I6-10 B►dwell Ave. SHEET GREGORY A. P E I T Z ., ADDRESS: 16-70 Bidwell Ave. CHICO CA ARCHITECT;; `' CHICO GA ,,. .62 ACRES - . 383RioLindoAve. Chico, CA. 95926 (530)894.5719 34 PHONE: (530) 2-302 ' ` • " a r . « AP 043-600=01 of: ONE SIL, a 'o co 0 ,4 LO 0 N M N N