HomeMy WebLinkAboutB15-0396Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
LM
CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 1 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
This compliance document is only applicable to additions 300 ft or less, or additions that do not require HERS field verification for compliance. When HERS verification is required, a CFIR-ADD-01
shall first be registered with a HERS Provider Data Registry.
Alterations to Space Conditioning Systems that are exempt from HERS verification requirements may use the CFIR-ADD-02 and CF2R- ADD -02 Compliance Documents. Possible exemptions from duct
leakage testing include: less than 40 ft of ducts were added or replaced; or the existing duct system was insulated with asbestos, or the existing duct system was previously tested and passed by a
HERS Roter. If space conditioning systems are altered and are not exempt from HERS verification, then a CFIR-ADD-01 must be completed and registered with a HERS Provider Data Registry.
Additions or alterations that utilize Closed Cell Spray Polyurethane Foam (ccSPF) with a density of 1.5 to less than 2.5 pounds per cubic foot having an R -value other than 5.8 per inch, or Open Cell
Spray Polyurethane Foam (ocSPF) with a density of 0.4 to less than 1.5 pounds per cubic foot having an R -value of 3.6 per inch, shall complete and register a CFIR ADD -01 with a HERS Provider Data
Registry.
If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction for which they are
responsible. Alternatively, the person with chief responsibility for construction shall prepare and sign this certificate for the entire construction. All applicable Mandatory Measures shall be met.
Temporary labels shall not be removed before verification by the building inspector.
A. GENERAL INFORMATION
01
Project Name:
Daguere Addition
02
Date Prepared:
2-23-15
03
Project Location:
1670 Bidwell Ave.
04
Building Front Orientation (deg):
180
05
CA City:
Chico
06
Number of Dwelling Units with Additions:
1
07
tip Code:
95926
08
Fuel Type:
natural gas
09
Climate Zone:,
11
10
Total Conditioned Floor Area (ft 2) (Addition):
149
11
Building Type
Single Family
12
Slab Area (ft):
NA
13
Project Scope:
<300 sq. ft.
BUTTE
PERMR #B
'TTE COUNTY DEVELOPMENT SERVICES
REVIEWED FOR
CODE O pLIANCE
DATE / BY�—
1L-vuN"1'Y
FEB 2 3 2015
DEVELOPMENT
SERVICES
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION �
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 2 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
B. OPAQUE SURFACE DETAILS — Framed (Section 150.2(a))
01
02
03
04
05
06 07 08 09
10
11
Tag/ID
Assembly Type
Frame Type
Frame
Depth
(inches)
Frame
Spacing
(inches)
Proposed
Required
Comments
Cavity
R -value
Continuous
Insulation
R -value
LI -Factor
Appendix JA4 Reference
LI -Factor
Table
Cell
wall
wood
4
16
13
NA
NA
NA
NA
NA
only R-13 req'd
ceiling
wood
6
24
38
NA
0.025
4.2.1
A21
0.025
floor o/ crawlspa
wood
6
16
19
NA
0.037
4.4.1
A4
0.037
Bl
TTE COUNT
r,_9;'N`.
F ivi
ppjae' g
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
CEC-MR-ADD-02-E Revised 01/15 CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 3 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
C. OPAQUE SURFACE DETAILS — Non -framed (Section 150.1(c)1)
01
02
03
04
05 06 07 08 09
10
11
Tag/ID
I Assembly Type
Assembly Materials
Thickness
(inches)
Proposed
Required
Comments
Core
Insulation
R -value
Continuous
Insulation
R -value
U -Factor
Appendix 1A4
Reference
U -Factor from
Package A
Table
Cell
R -value
U -factor
R -value
U -factor
Table
Cell
R -value
U -fa ctor
R -value
U -factor
..D. -,OPAQUE SURFACE DETAILS — Mass Walls (Section 150.1(c)1)
01
02
03
04
05
06 07 08 1 09
10 11
r
Tag/ID
Walls
Above
Grade
Mass Type
Mass
Thickness
(inches)
Furring Strip
Thickness
(inches)
Proposed
Required
Interior Insulation
Exterior Insulation
AppendixJA4
Reference
Interior Insulation
Exterior Insulation
R -value
U -factor
R -value
U -factor
Table
Cell
R -value
U -fa ctor
R -value
U -factor
RUITECOUNTY
BUILDING DIVISION
CA Building Energy Efficiency Standards - 2013 Residential Compliance APPROVED January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
CEC-CFIR-ADD-02-E (Revised 01115) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 4 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15 ,
E. SLAB INSULATION (Table 150.1-A)
01
02
03
04
05
06
Floor Type
Proposed
Required
Comments
Insulation
R -value
Insulation
LI -factor
Insulation
R -value
Insulation
U -factor
• Heated slab floors require mandatory slab insulation (see Table 110.8-A).
F. RADIANT BARRIER (Section 150.1(c)2
01
02
Radiant Barrier installed below the roof deck and on all gable end walls
Comments
YES
A radiant barrier is required (for Climate Zones 2-15)
• Radiant barriers shall meet specific eligibility and installation criteria to receive energy credit for compliance with the Building Energy Efficiency Standards
for low-rise residential buildings. Refer to RA4.2.1
• The emittance of the radiant barrier shall be less than or equal to 0.05 as tested in accordance with ASTM C1371 or ASTM E408.
For Prescriptive Compliance the attic shall be ventilated to provide a minimum free ventilation area of not less than one square foot of vent area for each 300 ft2 of
attic floor area with no less than 30 percent upper vents. Ridge vents or gable end vents are recommended to achieve the best performance. The material should
be cut to allow for full airflow to the venting.
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
� E "M _�" - i
CEC-CFIR-ADD-02-E (Revised 01115) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 5 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
G: ROOFING PRODUCTS (COOL ROOF) (Section 150.1(c)ll)
01
02
03
04
05
06 07 08 09
10 11 12
Mass Roof
25lb/ft2 or
Greater
Roof Pitch
Method of
Compliance
Product
Type
CRRC Product ID
Number
Proposed
Required
Initial Solar
Reflectance
Aged Solar
Reflectance
Thermal
Emittance
SRI
(Optional)
Aged Solar
Reflectance
Thermal
Emittance
SRI
(Optional)
NO
.8:12
ASR/TE
asphalt
Addition Type ftz
NA
0.20
0.75
Maximum
0.20
0.75
Calculated
Maximum
Calculated
Maximum
U -factor
SHGC
Calculated
Calculated
based on
based on
Allowed ftZ
Allowed ftZ
Allowed %
Allowed
<400
44.7
75
NA
60
0.32
0.25
NOTES:
• Any roof area covered by building integrated photovoltaic panels and solar thermal panels are exempt from the above Cool Roof requirements.
• Liquid field applied coatings must comply with installation criteria from section 110.8(1)4.
H. FENESTRATION/GLAZING
AREAS ALLOWED (Section 150.2(a)l)
01
02 03
04 05
06
07
08
Maximum Allowed
Maximum Allowed
Fenestration Area For All Orientations ftZ
West -Facing Fenestration Area Only ftz
The Greater
The Greater
Maximum
Maximum
Addition Type ftz
Allowed
Allowed
Comments
Maximum
Maximum
Calculated
Maximum
Calculated
Maximum
U -factor
SHGC
Calculated
Calculated
based on
based on
Allowed ftZ
Allowed ftZ
Allowed %
Allowed
<400
44.7
75
NA
60
0.32
0.25
BUTTE COUNTY
C?' It nr� �
r..�UILE)IING DIvIS10Iq
CA Building Energy Efficiency Standards - 2013 Residential Compliance APPROVED January 2015
t2
Prescriptive Residential Additions 300 For Less, or Additions That Do Not Require HERS Field Verification
CEC-CF1 R -ADD -02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION '"'
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 6 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
I. FENESTRATION PROPOSED AREAS AND EFFICIENCIES
01
02
03
04
05
06
07
08
09
10
11
12
13
Tag/ID
Fenestration Type
Frame Type
Dynamic
Glazing
Orientation
N, S, W, E
or Roof
Number of
Panes
Proposed
Fenestration
Z
Area ft
Proposed
West Facing
Fenestration
Area ftZ
Proposed
U -factor
Proposed
SHGC
Source
Exterior
Shading
Device
Combined
SHGC from
CF1R-ENV-
03
2868
door w/ glazing
vinyl
-------------
W
2
17.8
17.8
0.32
0.25
NFRC
none
0,25
2630
operable window
vinyl
-------------
N
2
7.5
0.32
0.25
NFRC
none
0.25
2630
operable window
vinyl
-------------
N
2
7.5
0.32
0.25
NFRC
none
0.25
14
Total Proposed Fenestration Area
32.8
15
Maximum Allowed Fenestration Area
75
16
Compliance Statement
Total Proposed Fenestration Area <_ Maximum Allowed Fenestration Area
® Yes ❑ No
17
Total Proposed West -Facing Fenestration Area
17.8
18
Maximum Allowed West -Facing Fenestration Area
60
19
Compliance Statement
Total Proposed West -Facing Fenestration Area <_ Maximum Allowed West -Facing Fenestration Area
® Yes ❑ No
20
Proposed Fenestration U -factor
0.32
21
Required Fenestration U -factor
0.32
22
Compliance Statement
Proposed Fenestration U -factor <_ Required Fenestration U -factor
BUTTE Q01 INTY
® Yes ❑ No
23
Proposed Fenestration SHGC
BUILDING DIVISDIN0.25
24
Required Fenestration SHGC
A PQnO /C:n
0.25
25
Compliance Statement
Proposed Fenestration SHGC15 Required Fenestration SHGC
® Yes ❑ No
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
CEC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 7 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
J. SPACE CONDITIONING(SC) SYSTEMS - HEATING/COOLING (Prescriptive section 150.2(b).
Alterations to Space Conditioning Systems shall be exempt from HERS verification requirements as prerequisite for use of the CFIR-ADD-02 and CF2R-ADD-02 Compliance Documents. If new space
conditioning systems are installed or existing systems are altered and are not exempt from HERS verification, then a CFIR-ADD-01 shall be completed and registered with a HERS Provider Data
Registry. In each row below for each dwelling unit in the building, check the box that indicates the exemption from HERS verification compliance:
❑ a: space conditioning system was not altered;
❑ b: less than 40 ft of ducts were added or replaced;
❑. c: (exempt from duct leakage testing) if: the existing duct system was insulated with asbestos;
❑ d: (exempt from duct leakage testing) if: the existing duct system was previously tested and passed by a HERS Rater.
01
02
03
04
Dwelling Unit Name
SC System Identification or Name
SC System Location or Area Served
Exemption from HERS Verification
Addition
existing HVAC
existing house + addition
❑ a ® b ❑ c ❑ d
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
121
0 0 0 0
_ r- IT/
BUILDING DIVISION
AHPHOVED
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
CEC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION �
CERTIFICATE OF COMPLIANCE CF1R-ADD-02-E
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification (Page 8 of 9)
Project Name: Daguere Addition I
Date Prepared: 2-23-15
K. WATER HEATING SYSTEMS (Section 150.1(c)8)
List water heaters and boilers for both domestic hot water (DHW) heaters and hydronic space heating.'
01
02
03
04
05
06
07
08
09
10
it
12
13
14
15
"
Dwelling Unit
Name
Water Heating
System
Identification or
Name
Water Heating
System Location
or Area Served
Water
Heating
System
Type
Water
Heater
Type
# of
Water
Heaters
in System
Water
Heater
Storage
Volume
(gal)
Fuel Type
Rated
Input
Type
Rated
Input
Value
Heating
Efficiency
Type
Heating
Efficiency
Value
Standby
Loss (%)
Exterior
Insulation
R -Value
Back -Up
Solar
Savings
Fraction
NA
R1 ITTE
CQI IITV
-lull-DING
DfVfSf
N
AFHHUVED
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
Prescriptive Residential Additions 300 Ft2 or Less, or Additions That Do Not Require HERS Field Verification
rm
-EC-CFIR-ADD-02-E (Revised 01/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF113-ADD-02-E
Prescriptive Residential Additions 300 Ft or Less, or Additions That Do Not Require HERS Field Verification (Page 9 of 9)
Project Name: Dag Vere Addition Date Prepared: 2-23-15
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: `
Documentation Autho Signa e: /
Gregory A. Peitz
Company:
Signature Date:
Gregory A. Peitz, Architect
2-23-15
Address:
CEA/ HERS Certification Identification (if applicable):
383 Rio Lindo Ave.
City/State/Zip:
Phone:
Chico, CA 959261(530)894-5719
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued fo a Mr4ing, and made available to the enforcement agency
for all applicable inspections. I understand that a registered copy of this Certificate of Compliance is required to be inclu ed Ith the do mentation the builder provides to the building
owner at occupancy.
Responsible Designer Name:
Responsible Designer S nat
Gregory A. Peitz
Company,
Date Signed:
Gregory A. Peitz, Architect
2-23-15
Address:
License:
383 Rio Lindo Ave.
C21283
City/State/Zip:
Phone:
Chico, CA 95926
(530) 894-5719
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300.
BUTTE COUNTY
BUILDING DIVISION
APPROVED
CA Building Energy Efficiency Standards - 2013 Residential Compliance January 2015
5. �� R SHAD L BE INSTALLED PROPERLY, BEHIND
` �4. ROCK B EHALK5. .�
/INLET L .5 (MINIMUM 2 PER SIDE) AT ALL DRAIN PROP. 71NE7
,
/SITE, ,ATIONS WITHIN 150' OF THE PROJECT. n
5.
IN FILTERS SHALL BE PLACED INSIDE EACH 7A6.
,�DONED
t'o .
�0, B N BARS SHALL BE PLACED ACROSS THE 62 �G ST K OF'ALL DRAIN INLETS. `•
ABILIZE ALL DISTURBED SOILS IN THE FRONT
ARD, AREAS WITHIN 15' OF THE BACK CURB OR j
SIDEWALK. (STRAW OR EROSION BLANKETS MAY.BE
USED FOR THIS APPLICATION) ' tF
6. STABILIZE ALL SLOPES HHERE EROSION COULD •. '"
OGGUR AND CAUSE 51LT RUN OFF, (STRAW,
'VISQUEEN OR EROSION BLANKETS MAY BE USED
FOR THIS APPLICATION)
'I. ALL PAINT, FUEL, CONSTRUCTION PRODUCT5 ETC. ` , �, PERMIT # -
SHALL BE STORED IN A COVERED LOCATION AWAY' "f i BUTTE COUNTY DEVELOPMENT SERVICES
FROM 51DEHALKS AND STORM DRAIN INLETS. r. _ p
10. PORTABLE CHEMICAL TOILETS IF PROVIDED ON R VIEWED Fort
THE 517E MUST BE KEPT. OFF OF STREETS AND I I , `• • r COO COMPLIANCE
50E4ALKS AND A LEAST 50' FROM THE NEAREST" I 9 _
STORM DRAIN. I I { ? DATE/! �l1� I BY CJ '
11. ALL TRASH MUST BE COLLECTED AND STORED I
PROPERLY. DO NOT LET ITEMS SUCH AS DRYWALL I ,
MUD BOXES, PAINT BUCKETS, CLEANING MATERIAL
` CONTAINERS, ETC. COME IN CONTACT HITH ANY I I - (E) 5 r »� -•
. RAINFALL OR STORM HATER RUNOFF. I' BARN
t�12.' PROVIDE A DE516CRE
NATED AREA FOR CONTE
WASHOUT. HAY BAILS LINED WITH VISOUEEN MAY BE I I s {
USED FOR THIS APPLICATION. ROLLAWAY BINS MAY I
AL50 BE USED. ALL CONCRETE WASHOUT SYSTEMS 1 y
SHALL BE PLACED OFF OF THE PAVED STREETS.
13. AFTER INSTALLATION OF THE ABOVE ITEMS ARE I - I r-
COMPLETE, A MAINTENANCE PR GRAM NEEDS TO I '
BE DEVELOPED TO INSURE THE CONTINUED I 1 j • ' `
EFFECTIVENESS OF YOUR BMP'S. I I
r : m I ,
y ; z BUTTE
COUNTY '
a Pool (E) FEB ' 2 3 2015
EXLST. i GARAGE
SE TIG
DEVELOPMENT -.
SERVICES
. • tom` �7`1 I SHOP
A•' fay..t..k .:F 4 .-r {� ti� ,* .. y r - .r w �J f'7'' r r, r7 a t -*r- • 4, I . Y +A .1 ....i.
r ` ,.(E) FENCE'
• � - � � �i�i�0 EDS � - � '
_ r I
ADDITION o
♦� ♦ w. .:� - it 3 " * - - r 7 , •�-s, .
r ,� 1 t a � � •
EXISTING .
ERESIDENGE01,A14e ,f
(E) DRIVEWAY
XjsT-
_ WELL ..
PROP. T — a
LINE r
• 11�0'.,
qOF BIDNEL'L "y.
•X - ' i a • .... J :� •` .. " � -. `:f
51TE PLAN",..,
LA, 1f'
. • _ III = XX -0":
x ' 6
ONNER: Marcel and Mary Doguerre
SITE INFO:I6-10 B►dwell Ave.
SHEET
IF
ADDRESS: 16-70 Bidwell Ave.
CHICO CA
ARCHITECT;; `'
CHICO GA ,,.
MINIMUM ER05ION AND .SEDIMENT
• ,ONTROL5 FOR PROJECTS
_
D15TURBINC7LE55 THAN ONE ACRE
r
. «
r•'� THE BMP'S (BEST MANAGEMENT PRACTICES) L15TED
-
c' BELOW MUST BE IN PLACE DURING THE RAINY
r
SEASON (OCTOBER 15 THROUGH APRIL 15) AND MAY
8E REQUIRED AT OTHER TIMES BASED ON WEATHER
#
�.
LOCatIOn'Of st►'UCtUCe•aS"SF10Wn
y
AND 51TE CONDITIONS THROU61.101) ' THE'YEAR. THE
.. •4, •• 1
pn
BMP'S LISTED ARE MINIMUM REQUIREMENTS ANDplot
t
ADDITIONAL BMRS GOULD BE REOUIRED BASED ON
SITE CONDITIONS.
plan Is in flood Zone )(= 1
" •: Np
n t
Flood
- I. STABILIZED ENTRY,)PROVIDE MIN 8" TO b°
' t` Elevation .Ce' ' '
rtificate `
- FRACTURED-ROCK'5O' LONG x115' WIDE BY b" DEEP
OVER CONSTI;JGTIC;N GRADE•FABRIG.
2. ALL SOILS TRACKE:V ONTO PAVED ROADWAYS
MU5T BE CLEANED ION A DAILY BA515. WHEN
+'
` 5TREETS ARE HEC OR DURI1,16 A RAIN EVENT THERE
q?;a' r . •SHALLBE NOTRA (, 9 OF SOILS ONTO THE
w
- -
-
5. �� R SHAD L BE INSTALLED PROPERLY, BEHIND
` �4. ROCK B EHALK5. .�
/INLET L .5 (MINIMUM 2 PER SIDE) AT ALL DRAIN PROP. 71NE7
,
/SITE, ,ATIONS WITHIN 150' OF THE PROJECT. n
5.
IN FILTERS SHALL BE PLACED INSIDE EACH 7A6.
,�DONED
t'o .
�0, B N BARS SHALL BE PLACED ACROSS THE 62 �G ST K OF'ALL DRAIN INLETS. `•
ABILIZE ALL DISTURBED SOILS IN THE FRONT
ARD, AREAS WITHIN 15' OF THE BACK CURB OR j
SIDEWALK. (STRAW OR EROSION BLANKETS MAY.BE
USED FOR THIS APPLICATION) ' tF
6. STABILIZE ALL SLOPES HHERE EROSION COULD •. '"
OGGUR AND CAUSE 51LT RUN OFF, (STRAW,
'VISQUEEN OR EROSION BLANKETS MAY BE USED
FOR THIS APPLICATION)
'I. ALL PAINT, FUEL, CONSTRUCTION PRODUCT5 ETC. ` , �, PERMIT # -
SHALL BE STORED IN A COVERED LOCATION AWAY' "f i BUTTE COUNTY DEVELOPMENT SERVICES
FROM 51DEHALKS AND STORM DRAIN INLETS. r. _ p
10. PORTABLE CHEMICAL TOILETS IF PROVIDED ON R VIEWED Fort
THE 517E MUST BE KEPT. OFF OF STREETS AND I I , `• • r COO COMPLIANCE
50E4ALKS AND A LEAST 50' FROM THE NEAREST" I 9 _
STORM DRAIN. I I { ? DATE/! �l1� I BY CJ '
11. ALL TRASH MUST BE COLLECTED AND STORED I
PROPERLY. DO NOT LET ITEMS SUCH AS DRYWALL I ,
MUD BOXES, PAINT BUCKETS, CLEANING MATERIAL
` CONTAINERS, ETC. COME IN CONTACT HITH ANY I I - (E) 5 r »� -•
. RAINFALL OR STORM HATER RUNOFF. I' BARN
t�12.' PROVIDE A DE516CRE
NATED AREA FOR CONTE
WASHOUT. HAY BAILS LINED WITH VISOUEEN MAY BE I I s {
USED FOR THIS APPLICATION. ROLLAWAY BINS MAY I
AL50 BE USED. ALL CONCRETE WASHOUT SYSTEMS 1 y
SHALL BE PLACED OFF OF THE PAVED STREETS.
13. AFTER INSTALLATION OF THE ABOVE ITEMS ARE I - I r-
COMPLETE, A MAINTENANCE PR GRAM NEEDS TO I '
BE DEVELOPED TO INSURE THE CONTINUED I 1 j • ' `
EFFECTIVENESS OF YOUR BMP'S. I I
r : m I ,
y ; z BUTTE
COUNTY '
a Pool (E) FEB ' 2 3 2015
EXLST. i GARAGE
SE TIG
DEVELOPMENT -.
SERVICES
. • tom` �7`1 I SHOP
A•' fay..t..k .:F 4 .-r {� ti� ,* .. y r - .r w �J f'7'' r r, r7 a t -*r- • 4, I . Y +A .1 ....i.
r ` ,.(E) FENCE'
• � - � � �i�i�0 EDS � - � '
_ r I
ADDITION o
♦� ♦ w. .:� - it 3 " * - - r 7 , •�-s, .
r ,� 1 t a � � •
EXISTING .
ERESIDENGE01,A14e ,f
(E) DRIVEWAY
XjsT-
_ WELL ..
PROP. T — a
LINE r
• 11�0'.,
qOF BIDNEL'L "y.
•X - ' i a • .... J :� •` .. " � -. `:f
51TE PLAN",..,
LA, 1f'
. • _ III = XX -0":
x ' 6
SIL,
a
'o
co
0
,4
LO
0
N
M
N
N
ONNER: Marcel and Mary Doguerre
SITE INFO:I6-10 B►dwell Ave.
SHEET
GREGORY A. P E I T Z .,
ADDRESS: 16-70 Bidwell Ave.
CHICO CA
ARCHITECT;; `'
CHICO GA ,,.
.62 ACRES -
.
383RioLindoAve. Chico, CA. 95926 (530)894.5719
34
PHONE: (530) 2-302 '
` • " a
r
. «
AP 043-600=01
of: ONE
SIL,
a
'o
co
0
,4
LO
0
N
M
N
N