HomeMy WebLinkAboutB15-2059STRUCTURAL CALCULATIONS Butte County #3 Door Landing Oroville, CA Job Number: 14-419 September 30, 2015 G Vvo-- I _ - wNo. 58201 Exp. 6/3D/' o S� 9T CIV CF CPA, PERMIT 0 nls= 2nS� BUTTE COUNTY-OWELOPMENT SERVICES CODE CIOMPLIANCE DATE (� S j I S BY--�. r • 9-- • a architecture + engineering BUTTE ���c�C COUNTY OCT 0 2 2015 DEVELOPMENT SERVICES r STRUCTURAL CALCULATIONS Butte County #3 Door Landing Oroville, CA Job Number: 14-419 September 30, 2015 G Vvo-- I _ - wNo. 58201 Exp. 6/3D/' o S� 9T CIV CF CPA, PERMIT 0 nls= 2nS� BUTTE COUNTY-OWELOPMENT SERVICES CODE CIOMPLIANCE DATE (� S j I S BY--�. r • 9-- • a architecture + engineering BUTTE ���c�C COUNTY OCT 0 2 2015 DEVELOPMENT SERVICES September 29, 2015 Butte County Development Services 2081211 Street Oroville, CA 95965 To Whom it may concern: This project encompasses the analysis of an existing elevated concrete waffle slab where some top reinforcing bars have been inadvertently cut. The slab was analyzed using Ram Concept software based on slab thicknesses and reinforcing as determined from the original design drawings. No original calculations were available. The focus of the evaluation is to determine if the cut top reinforcing bars have a negative effect such that slab no longer has the capacity to support the dead load and code required live load. The analysis technique using the Ram software was to run 3 models. One with reinforcing intact, one with the assumed cut top bars shortened and one with the whole section of slab removed. The results of the different analysis are presented in graphical format on the following pages. Summary and repair procedures: The removal of the top reinforcing did not add any requirement for additional top reinforcement in the software model. It was not determined whether any of the cuts affected the bottom reinforcing. The software model indicated the bottom reinforcing was a more critical element for the slab stability. These concerns were addressed by the addition of steel plates on the underside of the deepened portions of the waffle slab to transfer the forces across any possible disruption that may have occurred in the bottom reinforcing. Sincerely. Don Russell, PE Russell, Gallaway Associates, Inc. US Meyers Street Suite 110 t 530.342.0302 Chico, Californio 95928 f 530.3421882 W W W.rgachico.com Project: Butte County #3 Door Landing DR Job No. 15-419 10/1/2015 Russell, Gallaway Associates Structural Engineering DESIGN LIVE AND DEAD LOADS ROOF DEAD LOAD: TYPICAL FLOOR LOADS: = PSF 13" Conc. Waffle Slab = 90.0 PSF = PSF Suspended Ceiling = 2.0 PSF = PSF Fire Sprinklers = 2.0 PSF = PSF Partition Loads = 15.0 PSF = PSF = PSF = PSF PSF SUB -TOTAL = 0.0 PSF = PSF SLOPE CORRECTION "X:12" 12.00 1.41 TOTAL FLOOR DEAD LOAD: = 109.0 PSF MISCELLANEOUS = 1.5 PSF FLOOR LIVE LOAD: = 50.0 ROOF DEAD LOAD: = 2 PSF ROOF SNOW LOAD: = 0.0 PSF EXTERIOR WALL LOADS: ROOF LIVE LOAD: = 12.0 PSF 10" Conc = 120.0 PSF = PSF = PSF = PSF = PSF = PSF = PSF = PSF = PSF = PSF TOTAL EXTERIOR WALL: = 120.0 PSF = PSF SOILS DATA: SNOW LOAD DESIGN CRITERIA: SOILS REPORT: City Minimums ELEVATION =1 220.0 FT GEOTECHNICAL ENGINEER: n/a GROUND SNOW LOAD (Pg) = 0.0 PSF DATE OF REPORT: n/a BASIC BEARING PRESSURE EXPOSURE: PARTIAL �.7 Ce = 1.00 PADS & CONT. FNDT. = Qa = 1,500 PSF INCREASE FOR WIDTH = 0.0 % THERMAL: UNHEATED U Ct = 1.20 INCREASE FOR DEPTH = 0.0 % MAX. SOIL PRESSURE - Qa = 1,500 PSF FLAT ROOF SNOW LOAD (Pf) = 0.0 PSF ISOLATED FOUNDATIONS = 1,500 PSF ALLOW PASSIVE PRESSURE = 200.0 PCF __ ROUGHNESS: Obstructed or Non -Slippery V I Cs = 1.00 ALLOW SOIL FRICTION = 0.35 EQUIV. FLUID PRESSURE = 35.0 PCF SLOPED ROOF SNOW LOAD (Ps) = 0.0 PSF Russell, Gallaway Associates Structural Engineering Element: Standard Plan - 12 Floor Slab 3.cpt - 10/1/2015 Element: Standard Plan Qlemenl: Veer Un06: User !cots; User Dim—lone; Well Elements Below; Wall FJe U; Above; Column Elements aelovr; Colum Ele—,la Above; Slab Element; Polnt Springs: Pelnt Spnng I— U-Springe; IJne Spring l— Nee SpAnga; Nee SpAng loons; PolM Suppe Element: Standard Plan - 12 Other Dead Loading: All Loads Plan ONar Dee. WWing: U— U..; U— Nobs; Use• V­'­ imer 'b PoIM I .%; VOW WW Iron.: ftM LOW Velum; W. L.Wa; U.. bW Irons; Lba t W W..; Arae L.eOs; Area L.W Irons; bee lnW Wues; D —ft.mV— User LIM Us...... ; User Dhasi.lons: EIam.M: NlWil Elements Z": WW 0— M—; Wall El—DWI.. Only; CW— El.mwb Baba; C.lumn El—Ab -; Slab Ebm.nb; Sbb El.m.n1 DUDIn. Only; C�CCC]C==C7�CCC7 CCCC�C CCCCC .e,.I; 7:JCCC:- =CCCCD CCO-3 = ❑ C==30 CCCCJ��=F=CCC CrC=a-Q CC11:17Q -71-11=0 CCC= FC CQDjD CCCC)�= _CCC 7C CCCM`C C CC�-TC D:JCCC:1_ _=CDC_�u CCCD_C CCCC-IC7 ��CCOC==—'C`CO CCC�;._C CCOCr'I ��CCOC=0CC.0` 0 CCCC=JCu =CC)-7_=C7C_ _C 7T -FD CC C CC CCC►��C 7�C`.=�J� _ =C1=,CCC C COQ �❑ CCC���J -!�CCC]C-JCCC rCC�Cl CCC} ;C� D.ICCCi_ I Q,_=C_JC_CCi CC C:=C _CCC;- _❑��� 7CC C� ]_.,CCC 1-7--F-771--ED EL-0C2C7 �_ )CCCC Cw.ICCC► CC ❑.]C C rCC��C7 -7-J'`CC�7 :C7CCG CCC��=Tu CCC�C~ CCCj MCCv-�-jC 1?TCCC 1_ �C-7CCU CCCCC C rC�JC7 S�CCu�= C�CCC� CC�_Ff ji= Floor Slab 3.cpt - 10/1/2015 �t 1 J I R 5r Other Dead Loading: All Loads Plan - 17 Live (Reducible) Loading: All Loads Plan - flue (Re We) Loading: User U ­User Notes; Usar Olmenslona; polnt Loeda; PoIM LoW Imm; point load VNum; Une L—ft; Una boo loons: Line Loed Values; Area Leede; Arm Load 1— Aro. bed Values; Or 6%, import: Usar Lines; User Notoe; Usar Oenanalom; Element: Wolf Elem,M Below; WaB Elements Above; Wall Element Outline OMy; C.1— Eletrcnm Bd—: Golumn Elgnenta Above; slap Elmnentr; 81.1, El—, Oudlne Onty; SCC CCC= =^CGCG) CCG=.O CC^CCE,..=_`50 SCC❑=3�=CJCCCD CCCI-�j=C] CCC!C) 7nCCC]C= _C1:3CC❑ CEF-1=7 3 1:11:ETM= =C---JCCC CCCl:•_ F1 Ef-O-- JCCCCj:= yCJCCCC) CCCi7 D CCCI�_]C :3 LLJ-J-=CJ-1CCE E:E:DD 1J CCCC:1CJ C3CC[CC=C7�CCC7 CCC CSC CCCGGC�'. JCCCC)C=0�C7�CCC) CCOC-C)0CCC]�-Z)CD 1 JCC Cly _ _C=7CC❑ CCO� C > CCC]=7-1FI JCCC0-7= CICCC] CC0JC CrCt��C 1C `C3�� -1 �CCCIJ� �CJCCCJEl --1 Q CCCC�C+ TCC❑"�- -CSC- M C_CCI �.C) CCC:KX-! CCC . G CC0i3DL- _C'-JCCD CCC l�G CCCl�C] -CC]T_ =C�' =C�► CCC!=�-73 71 1 Floor Slab 3.cpt - 10/1/2015 +6 c { t' }r t t' 1 m Live (Reducible) Loading: All Loads Plan - 18 i Floor Slab 3.cpt - 10/1/2015 Design Status: Latitude Top Reinforcement Plan Design Smuts: Use, Llnss; Use, Notes; User OBewuloM: betide Spm Ossigns; Spm 0.1w Top Berl; Spm Deslgn IW Desalplloa LOB Wde 05 Deelgns; 05 O.Iw Top Kers: On u I -W: Use, Uses; User Notes; User 01 n—[Om; EI—M: WWI Elamerds Below, Well Elemmm Al,—; Well Element MO.. Only: Colum F.J—. M—; Column El—.e Above; Mole El—.n : Bleb Element Mill- Only; Rolntonxment: Top Fses Con=e- w Relnt.; Both Feces ConMn W Rohl.: Auto Fee. ConesMmW Relld.; Co—t,sted Relnf. Des O lone; Top Foes Olstdbueed Rdnf.; B.U, Faces DlsBlbuted ReInt.; Auto Fern Olat1bulvd Rolnl.; Oia butod R.W. O—Apdons; LOft di U Sole • t:M stn LSI .1=Ivt rx,�T r — ✓ - c i f ` _z,J 1 �tyB5z.11T�� _Jf•-�; 121aSMT =7:7CCQ ] Q�7Csa�5vTJ CCQ ]=albs„� CEEj D7J r __�'—�r {C�-7 L' 513T! II�.I � �ZIj..S ... _ �tl T — UrsruT.� L li _ I I:Wsati (LTJ �� �s�T_. .- eBST,1+ sT � -7J�-= I Design Status: Latitude Top Reinforcement Plan - 58 T TF �� BSL - 1LI5 L B BST 11 BST B'BST JC `� a j _u 1165 T.—J-. .� )G >> o j JCr�3� _ `--J �� t LL�1`- �L-���_ M1 I�_^� �—_ L y 2 =—. W T` �I s L_.a_� -.-.�--1 L—CS as T: T— I Design Status: Latitude Top Reinforcement Plan - 58 Floor Slab 3.cpt - 10/1/2015 Design Status: Latitude Bottom Reinforcement Plan Da1Dn ISM—U.., U..;User Note.; User DY,wfalont; "".de Spen 01,18m; Span Dealgn Bolbrn Bb.; Spsn ID -19.a D—Optlone; Wilude DS Doalgia; DS D IgBODor. Bars; pm.InB IntW: Ute, Ll ; User Nota; U.er Ok—lom; Element: Well Elam— Below; MR 0—Abwo; Well Element Outline Drdy; C.1— Elements 6.1—: CWFJ Ab-.; Slab El—.tds; Sl.b EI -1 Outline Dory; Relnformmenl: Bodom Fooe Conccntrebd ROW.: Both Fame Com ­ted ROW.: Auto Fam Cam ­d Relnl.; C­beted ROInt. Dasalpdons; Bodom Fam Dlwbuted Relnl.; Both Foca Dl.blbubd R.f.t; Aub Fam Dl.vlbubd R.Ifd.; Dlsblbubd R.In/. Dosulpd.m; W Design Status: Latitude Bottom Reinforcement Plan - 59 l� z iS In (21* - 1 ! 1 I1Sa/8' % ail ai - l 4]9i11_"p� lyda C3d.a_ O sat B. ❑y— xaa e. . _ _ _ m m m t 0 ` SAe B. _-0 _ ]P R.-0` — �i387dB._'C 17[f 1 __ _ _ Design Status: Latitude Bottom Reinforcement Plan - 59 Floor Slab 2.cpt - 10/1/2015 Element: Standard Plan Elwa : Usa Unee; Veer Notes; 1.1— Ill—ims; Well Elwbe Kelm; Wog FJem M Moee; Column Elements Balm: Colum Elements Move: Sbe M—h: Poipt Sphege; Point Spdeo -Dona: Line Springy; Line Spring 1w Nee SoMm: Mee Spann loose; PCiM SUDM Element: Standard Plan - 12 Other Dead Loading: All Loads Plan 0d,u Daw LoWing: Um U m; User Notal; User Wmanalm, paid Lows; Polm Low 1— Point Low Wun; Una Wada; Una Lead Ions; Line Wad VW,m: Arae Loft; Argo U ­d Icons; Ares LOW Volute;'9 Import: Uaa, Un.: U.., -.I.; U— INWI Elannnft 8.1m; Wad El— Abm,; Well EIm,M OuMn, ONY: Cal,ann EJe to BIm: CWum, Elements Above; Slab Elm,nb; Slab El— Outline Onty: J:M C D --I CD :3 C E 0 [==-D C E: D D --] F -I :121cf-OM- =FDCCD E [I CQ - Q F E: Q -1:1 F -I ]Ii F -F -CE =E]CFE] EEF-Q==HD CEDD-1 3 0 c --JEL-01 CCD --jl ED 1:F0:j:]0 F Q -J �--'f= F C: ED E: F [I TC IF -1:13=30 -n 7- 0 0 A'-, EY� -1E I -L C: t -I -1 =Q L L- D --1 :3 Q J j F r- Q -j CI- JE:E:F- [j- L= c 0 =CJCCCQ I- IQ CEDD-E] F- Q -_j -D Q 41 Floor Slab 2.cpt - 10/1/2015 Other Dead Loading: All Loads Plan - 17 I Live (Reducible) Loading: All Loads Plan . W. )Rafuelble) Loedln8: W. floes; User Notes; Uaer 111-1ona; ftW 1 .Os: ftW Lo.f twos; pWnt Lo.f Vat— U.. Loofa; U.. Load Irons; Lt.. bed W. -Arae bole; Arae Loot Irons; Are. L." Wuea: XMInB Import: We, Llnas; U— Notes; Uaa 01, l io : EIem.M: 1W I Cl—Blow; Was Elml.nt. Abm,; tWl EIg M Oudino WY; Colum Ef— Blow; Colomn EI.meMa Ab-.; 31eb Ef—M.: Bleb FJ—t Oudlne Ont, C�CCC]C= _'—'" CCCCI CCGC7=C CC—^.0=rE.-so CCn�3=-CI �DCCD EC:DD-C] CCD��C7 ;C=CCC7 CCnD_❑ CCn��C) ��CCCI�= = O�CCCJ C1=CSC;❑ CC ���CJ ��CCC)� : =OCC❑ CCCt�=_� CCC►��C� ^.�CCC�=❑=C�'CCCC]�CCL���C7❑CCC]CCC� '��CCC�� '=C7`=1CCC1 CC�J��CCCCCr.�1 =3CC0�- _=C3CCC) CL_LI—.D--❑ CCu�:1Q :1 --3 CC► --OQCCC} CCCf-D --- 0 CCC}-Q�jCJ CCO� : =!O CC❑ CCC; C) CE: C►:D I]O �_1C C❑ 1. . C'�7CC0 CC_1=-C CCO�^1Cj ��CCC? _►==OJCCC7 CCC ''�-CJ CCC}��G' .CTCCC'^� �C�1CIC- CCC=,^C CCC?�CC� J- CO=7CCCi CCC3")_=F= CC0`l-TC1 =,n ]�C❑ CCED �C-.0 CC❑ -j- IT,,-Ji 7 �C7:jCC❑ CCC -_� =LI I CCCJ �i = _C`3CCCJ CCC -CJ C CCI-jff L3 Floor Slab 2.cpt - 10/1/2015 (LrS� 1 ! t t. i, �y i I f' I �l ) Live (Reducible) Loading: All Loads Plan - 18 t ( Floor Slab 2.cpt - 10/1/2015 Design Status: Latitude Top Reinforcement Plan Oaslpn See": User Linos; User Notes; Us. Di—lens; Loft Wtle Spin D-lg-; Spin Design Top Don; Spm Design Ser Deseripllens; W Wtle DS DeelDns; DS Deaigi Top Sirs; lCe—MO I.Pert User Lines; User Notei; User Danenslons; Element: Well Element Below; Ws0 Elennnt Above; Well Element Outline Only: Colum Elmlenis Balm: Column Element Ab—; Slab Elements; Sleb El— Outline Only; Relnfo—ne: Top Fero Coneeneetd Reinf.; Both Feer Cenoeneetod RIM.; Aum F—Cineeneatod Rabd.; Con—led ROW. Descriptions; Top Fete DWibufed Relnt.; Beth F— DIeW buted Refnf.; Auto Fere DieVibutod Robd; Dlseibufed Rein. Desolpllons; Latter& U Sole • 1—:2550 r— ? p5 T. I 4{d5a1,T 121%Ss1]T) L I _ _LJ- L Sr11T LC ` 12i ' gA L L � ��CCCG� C17_1C 5„]Ti 1 CI 2 Ss]]S LC��J ?C1 ^Basi L_i.�.J�� 1+ssT7 ❑..—�. 1 l _rT ❑r— �❑ - 4 I i-�-� _ L- C 1L. _ nS:L L'L_L__11YSS._� L 1 LosT- I '1 11 NST _ fit-.. ` 8F5 T. �.❑ -StlSS� _ `s 11 AST— - } t ❑ ❑ rcF- 1 "-CL MI Lj i MS TTS = J _—)F5T _ _���]p5 T•1 3T.. I� I TiyS'T S'AS T.'45T Design Status: Latitude Top Reinforcement Plan - 58 Floor Slab 2.cpt - 10/1/2015 Design Status: Latitude Bottom Reinforcement Plan anion Sf h,s: Deer Linn; Wer Motes: Mar Denenslonn; Ledtude Sven Danlgns; Span Design Sotlpn Sent; Sp- Design Ser 0—dptlons: tatbude DS Design.; OS Design Soflmn Sara: Muvinp Impel: We, 1.11n: uae. Motes; Wer Denanslonep El—..: Wall El—.— Below; Wall Elements Al,-.; Wall Element ODUlne Only; ColumElements Balm; ElemenBelow; Column Elcmeldn Above; Slab Elements; Slab Etmlcnt Outline Only; Relnrnt aara— B... Fete Concentremd Rebd.: 8oM Farm Commne-ehd ROM.: Auto Fx Concentrated Reinf.; C ... a ated ROIM. Des ibdons: Bodo. Face Dl.tributed Relnf.; Both Face. Dbtrlbuted Relnt ; Auto Fero Oletrlbutsd Relnt, Distributed Relief. Deeufodona: W Seale • 1:230 .. r ff� !�I sesiige.�t _aiefaB. E;=.f 3 faa tlsil9B.l— l_ z ,fen— 1'tI 9/SalB i m, 1 Iwefsl ITAa, Qd.&_� _ —•❑ _.. Sae R. J ❑ M _ MB. _ ! id B. t _7rAlBA i! B. I +_.._.—� lm m m I,_ . - Int-; � r-- T=g'='"'^ -_ •-- - �. _ .— _� is "�= I i `TFC 8. ❑ ].B. ❑` o U R. ❑ 7MEl. c - •tt- - ._ _ - .-_ Y. —: - .;: - _ �--�.fy Lam= Design Status: Latitude Bottom Reinforcement Plan - 59 Floor Slab.cpt - 10/1/2015 Element: Standard Plan Elmer: User Llnes; User Nubs; Us,r DlmarV:lon.; Well EI—te Bel.1; wee E —ee "..; Cobmn El--" 88101; Colum ae le Apse; SI.b V—ft; Point SP -9.; P.Int SpA g Icon.; Lin. SPAngs; Lin, Spring Icons; Arae SpAngs; Are, SpAng Icons; P.hA SupM p hg Import: User Line,; Us,r Nobs; Uw De wWom: S.N. =1: 50 Element: Standard Plan - 12 Floor Slab.cpt - 10/1/2015 Other Dead Loading: All Loads Plan Of, OW Loading: U— Un.; if— Notes; U... M—Ion.; Pa" Loofa; Point Load Imm; Point Loaf Velum; Una Lam%; Una Load loam; Lin. Load Values; n,no Lewis; Aron Loot! Imm; An,. Law val..; = .Import:U—U-.;User Notvctft� Ute, Wall Elm,nts BvI.,. Wait Ef— ftav, ~ Elm,nt Ouill,,. Oty; C.1— 8—ta Blow; C.1u.. El—ras Above; Slab EI—nit: Slab El—I Milint, Only; iival, Other Dead Loading: All Loads Plan - 17 D t=-]-E:D FEE3 = C r--F-Fj --- I-)Ej I—CCC] --F–f- ] ED E F Q-,-2- -i - 7 7 - LLr 0 0 13 -3=" c ='-'F- E C E F7 ' F 3,- c 0 '0 70� SCJ Ir 4 JEIJ Other Dead Loading: All Loads Plan - 17 Live (Reducible) Loading: All Loads Plan flue [RS clb!6) Lo,dl.g: Usm U- lultsm, No=; U- Mm,­ims; Polm Lomft; POIt L W I- Plat l W Wfum; U- Loaft; U,6 L W In U.a LoW Values; Arw L4LOW VwUft; O 110 IqMo: U- Ll.w; U- NOW; UW Dk­IOM; "WI Elm— Below; MH El- Abma: Well Elmem O Ino Only; Col— El—. Bd—; C.1... Elements AW-: Slab Et—.—; Slab 8—t Outline Only; .... =1:.,, J -JL-L"-J F-7 � C C: C! E E: 0:1 ❑ E E: El -:1 D [D D:]E:E:D:]-- F-1 � E C: ED C [: CI:j F-1 FED�--]Fj � � F__ E: 0 Q __ =CQCCI C E: 0 :1 El L=F_E1:1QF1 :1 -T -CH -0- -=JCF_Fj EE0=71 CCQ___1__1F1 CCC C E 0 C] 0 ,CCC3= C: E 11 E_ E: 0J Dl C: C: E: F:� - _E=1=11 E E F-1 -D LD =F ==117 CCC JD _T' =E:F-_F `CC]jl:CE] _-j J_ 0.= -jr-EF-1, _f --- KT:C_LJ-LT-L-J--1=0 1:711,1-10 CCM -3-70 t F_ M -:1 J F-1 C: F-1, EE:D_== F CD!3-D F-1 __1 LEI JC = Floor Slab.cpt - 10/1/2015 Live (Reducible) Loading: All Loads Plan - 18 .e f Floor Slab.cpt - 10/1/2015 Design Status: Latitude Top Reinforcement Plan Design Smms: Use, Lines; User Notes; Usa OY Wzlcr LOXmde Spen Oeslgns; Spon Deslgn Top Sora; Spon Design Ser DescrlptlO Leptude DS Oe 19g OS DUIM Top Bora; Onwing Import: Use, Llnes; User Notes; Usa 011—Islons; ElmreM: Wall Elcm,n Below; Well El— Ab—: Well Elm— Oudl- Only; Cell- Elements Below; Column Elcm.M Above; Slab EIM,Me; Slab Element WbIne Mtv; RelnbrumeM: Top Fete Cone -ted Rclnt.; B.N Feces Concentramd ROM.: Aum Fete Comm�tratad ROM.: Concentrated Rolm. Deacrlptlmu; Up Face OlaW bu2d ROW.; Both Faces DISW bund Relnt; Auto Fe Dlebtbu ROM.: OleMbutad Rebd. DeeMpdons; Ull & U SWe-t:?50 J31hS,54T !y7- moo? (L'Jj ��_jj1_..{�(�R `�CjI 'j1 C ElJ_ C�.._-1C¢1ds.iarJ LL L__J__laWs LL C]._�_T-1 -]T CE::= —O �(C�a'—�5„� 1: 1 C_ CI—J__,�o;_ C_C_(� JEI j z TC CO 1�_Br: ..mesad •. xosr�.J CN-�.C.�___� r-sr_C�.,�_.�. ❑ ❑ ❑ r-C1�� C9 t_-r�r Q T]�i C F (--, CJ_ C' r i1 J _ esi- - --iia T r char rpt ❑ti95T: ❑sAST�r,�"`”- 0 1WST=� C C_O ' r..— JE E: C —1CCC CC? SCC - -- � =tWSTY ff a x_` j F _l� _ T:tA4O5 T`��_."7WST eWST—�y�T Design Status: Latitude Top Reinforcement Plan - 58 :+ Floor Slab.cpt - 10/1/2015 Design Status: Latitude Bottom Reinforcement Plan O.IDn Ban ataw: user oes n; Win, MW.; Uan Denanslons; Letlluda span OnIg s; Bpea DnIM Bottom ; apo^ DW,I, Bar Dascdpaons; Latbuda DS DWMS; OB D.alBn Doom Bms; dnvinD Import: Dser L..; U_ Mateo; Itn Dananslons; Elomem: Well M-80— W." lement80—W." Eletrcnt Ab- ; M EIMM 0."'1"' only; Calum FJ.mant Mm; Columm Element Above; Blab Elamanb; 81ab FJ.nlont oualna Only; ..Intrr ..: Bohm Face Cmmet Rolyd.; Both Farce Conry Mwd Relnf.; Aut Fan Conrrn d R.W.; Concentretd Reltd. D..dpdone; Bofbm Fan DI Wbumd Relnl.; Both Fo MWbuted Rd,t; Auto Fon DkWbutd Rolyd.; Dletrlbu Ralnt. D..dpdone; Let BW.•1:2W , <1�IL ❑ awe. ❑ snag. � ❑ awe. a R�rps _ s I L j_� _ J�Cm CI SCG _ ❑ HE Xi I'A& ^'❑.. 3144 B. J❑ B. ❑ 'M"& 119 Design Status: Latitude Bottom Reinforcement Plan - 59 i