Loading...
HomeMy WebLinkAboutB15-3043 000-000-000 (2)GENERAL NOTES I. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND 51TE CONDITIONS BEFORE 5TARTIN6 WORK. THE ENGINEER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 2. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE PROJECT, INGLUDIN6 SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND,IN7EMNIFY AND HOLD DANIEL J. P0551E HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, EXCEPT FOR LIABILITY AR151N6 FROM THE 50LE NE&LI6ENCE OF DANIEL J. DOBBIE. 3. THE CONTRACTOR AGREES THAT HE/SHE SHALL NOT DEVIATE FROM THESE DRAWIN65 WITHOUT FIRST OBTAININ6 WRITTEN APPROVAL FROM THE ENGINEER. 4. ALL OMISSIONS AND/OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE WORKING DRAWINGS AND SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 5. IF CERTAIN FEATURES OF CONSTRUCTION ARE NOT FULLY 5HOWN ON THE DRAY41N65 OR GALLED OUT IN THE NOTES OR SPECIFICATIONS, THEN THEIR CONSTRUCTION SHALL BE THE SAME A5 FOR SIMILAR CONDITIONS WHICH ARE 5HOWN OR GALLED OUT ON THE DRA4NIN65 OR SPECIFICATIONS OR AS DIRECTED BY THE ENGINEER. 6. ALL CONSTRUCTION, INCLUDING MATERIALS AND Y4ORKMAN5HIP, SHALL CONFORM TO THE INTERNATIONAL BUILDING CODE 2012 EDITION AS ADOPTED AND MODIFIED BY THE STATE OF CALIFORNIA IN REFERENCE TO THE 2013 CALIFORNIA BUILDING CODE (GBG). -7. IN AREAS OF EXCAVATION THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL EXISTING UNDER6ROUND UTILITIES BEFORE STARING EXCAVATION. e. THE CONTRACTOR SHALL NOT SCALE THE WORKING DRAWINGS. SPECIAL INSPECTION I. SPECIAL INSPECTION 15 REQUIRED FOR THE FOLLOWING TYPES OF WORK IN CONFORMANCE WITH SECTION Mal OF THE 2013 EDITION OF THE "CALIFORNIA BUILDING CODE"' (GBG): INSTALLATION OF BOLTS IN CONCRETE 2. THE FOLLOWING REOUIREMENT SHALL BE MET FOR SPECIAL INSPECTION: A. THE SPECIAL INSPECTOR SHALL BE UNDER THE SUPERVISION OF A RE615TEREP PROFESSIONAL ENGINEER. B. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. G. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILD'IN6 OFFICIAL, THE ENGINEER, THE ARCHITECT, AND OTHER DE516NATED PERSONS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION; THEN, IF UNCORRECTED, TO THE PROPER DESIGN AUTHORITY AND THE BUILDING OFFICIAL. D. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT 516NE12 BY THE REGISTERED PROFESSIONAL STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WA5 IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATION5 AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE G.B.G. S. SPECIAL INSPECTION APPLICATIONS MUST BE REVIEWED AND APPROVED BY THE BUILDING DIVISION PRIOR TO THE ISSUANCE OF A PERMIT. ALL INSPECTION REPORTS SHALL NOTE ANY DISCREPANCIES AND BE FILED WITH THE BUILDING DIVISI ION WEEKLY DURING CONSTRUCTION, WHETHER CORRECTED OR NOT. INSPECTOR SHALL MAINTAIN INSPECTION LOG5 AT THE JOB SITE FOR REVIEW BY THE BUILDING OFFICIAL OR H15 REPRESENTATIVE. 4. INSPECTION PROGRAM: SPECIAL INSPECTION OF THE HIGH 5TREN6TH BOLTS SHALL OCCUR DURING BOLT INSTALLATION AT THE ERECTION OF THE STEEL FRAMING. FOUNDATION I. SOIL PE516N INFORMATION: SOIL DE516N PRESSURE: PAD FOOTINGS 1500 PSF 2. BOTTOM OF FOOTINGS SHALL BE AT LEAST 12 INCHES BELOW LOWEST ADJACENT FINISH GRADE. 3. THE FINISH EXCAVATION FOR FOUNDATIONS SHALL BE NEAT $ TRUE TO LINE WITH ALL LOOSE MATERIAL AND STANDIN6 WATER REMOVED BEFOR ONCRETE 15 PLACED. 4. THE TE5TIN6 LAB SHALL SUBMIT COMPACTION REPORTS FOR ALL FILL TOTHE ENGINEER PRIOR TO REOUE5TIN6 FOUNDATION INSPECTION. ALL LOOSE SOIL AND FILL DIRT, INGLUDIN6 BACKFILL BEHIND RETAININ6WALL5, SHALL BECOMPAGTED TO AT LEAST q0% OF MAXIMUM DENSITY. REINFORCING STEEL I. BAR REINFORCING SHALL CONFORM TO A5TM A615, INGLUDIN6 SUPPLEMENT S1: ALL REINFORCING SHALL BE GRADE 60. 2. DETAILS FOR REINFORCING SHALL CONFORM WITH CHAPTER -7 OF THE AMERICAN CONCRETE INSTITUTE PUBLICATION 318-11, UNLESS OTHERWISE NOTED. 3. LAPS AT BAR SPLICES IN CONCRETE CONSTRUCTION SHALL CONFORM TO CHAPTER 12 OF THE LATEST EDITION OF THE AMERICAN CONCRETE INSTITUTE 318. 4. VERTICAL BARS IN CONCRETE CONSTRUCTION SHALL BE ACCURATELY POSITIONED AT THE CENTER OF THE WALL, UNLESS OTHERWISE NOTED. 5. BAR SUPPORTS SHALL BE PROVIDED A5 SPECIFIED IN THE "MANUAL OF STANDARD PRACTICE" ISSUED BY THE CONCRETE REINFORCING STEEL INSTITUTE. 6. ALL REIFORGING SHALL SECURELY TIED IN PLACE PRIOR TO PLAGIN6 CONCRETE OR GROUT. 7. WELDING OF GRO551N6 BARS AND TAGK WELDING OF REINFORCING SHALL NOT BE PERMITTED. REINFORCED CONCRETE I. A. THE MINIMUM 28 DAY GONGRETE COMPRESSIVE STRENGTH SHALL BE: FOUNDATIONS/ FOOTINGS 3000 PSI 5LA55 3000 P51 NO SPECIAL INSPECTION OF CONCRETE IS REQUIRED AS NOTED BELOW PER 2013 GBG SECTION 1"705.3 EXCEPTION I. ISOLATED FOCTIN65 < 3 5TORIE5 AND EXCEPTION 2.1 FOR CONTINUOUS FOOTING5 5UPPORTIN6 LIGHT -FRAME WALLS AND EXGEPTI N 3. FOR NONSTRUCTURAL UCTUAL SLA55 ON GRADE THEREFORE NO SPEC INSPECTION OF CONCRETE SHALL BE REQUIRED. B. THE MAXIM I LUMP SHALL BE 4 INGHE5. G. MIX DESIGNS SHALL BE SUBMITTED FOR ALL CONCRETE WITH REQUIRED STRENGTHS GREATER THAN 3000 PSI. MIX DES16N5 SHALL BE PREPARED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF CALIFORNIA AND SUBMITTED TO THE PROJECT DEV&N PROFE55IONAL FOR REVIEW. 2. PORTLAND GEMENT SHALL CONFORM TO ASTM 6150, TYPE I OR 11. 3. AGGRE6ATE5 FOR NORMAL WEIGHT CONCRETE SHALL CONFORM TO A5TM 033. 4. ADMIXTURES USED TO INCREASE THE WORKABILITY OF THE CONCRETE SHALL NOT BE CONSIDERED TO REDUCE THE SPECIFIED MINIMUM GEMENT CONTENT', 5. READY -MIX CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH ASTM Gq4. b. MINIMUM CONCRETE COVER (IN INCHES) FOR REINFORCING STEEL FOR NON -- PRESTRESSED CONCRETE; A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3" B. FORMED SURFACES EXPOSED TO EARTH OR WEATHER #6 AND LARGER 2" #5 AND SMALLER 1 1/2" "I. SLEEVES, PIPES, AND CONDUITS SHALL NOT BE PLACED THROUGH CONTINUOUS OR SPREAD FOOTINGS, GRADE BEAMS, OR TIE BEAMS. 8. CONSTRUCTION JOINTS SHALL BE ADEQUATELY KEYED. THEIR LOCATIONS AND DETAILS, WHEN NOT SHOWN ON THE DRAWING5, SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. q. CONCRETE PLACEMENTS SHALL BE CONTINUOUS BETWEEN CONSTRUCTION JOINTS. 10. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SLABS ON GRADE SHALL BE CAST IN SQUARE OR RECTANGULAR PATTERNS NOT EXGEEDIN6 400 5QUARE FEET, WITH A MAXIIMUM DIMENSION OF 20 FEET BETWEEN CONSTRUCTION, WEAKENED PLANE, OR CONSTRUCTION JOINTS. WOOD NOTES I. SAWN WOOD MEMBERS SHALL BE DOUGLAS FIR OR LARCH, 545, AND SHALL DE &RADE MARKED BY A GRADING A6ENGY RECOGNIZED BY THE INTERNATIONAL CODE COUNCIL (IGC), UNLESS OTHERWISE NOTED ON DRAWINGS. 2. WOOD GRADES, UNLESS NOTED, SHALL BE A5 FOLLOWS: LIGHT FRAMING (2" TO 4" THICK 4 2" TO 4" WIDE) NO.2 JOISTS a HEADERS (2" TO 4" THICK, 6", a WIDER) NO.2 BEAMS 4 STRINGERS (bX 4 LARGER) NO -1 POST 4 TIMBERS (bX 4 LARGER) NO.1 3. BOLTS SHALL CONFORM TO A5TM A30-7. NUTS SHALL CONFORM SO ASTM A565, HEX GRADE A. 4. ALL BOLT HEADS, NUTS, AND LAG SCREWS BEARING ON WOOD SHALL HAVE STANDARD GUT WASHERS UNLESS NOTED. 5. BOLT HOLES DRILLED IN WOOD SHALL BE DRILLED I/32 LARGER THAN THE NOMINAL BOLT DIAMETER EXCEPT FOR PILOT HOLES TO RECEIVE LAG BOLT THREADS. b. NAILING OF SAWN WOOD MEMBERS, UNLESS OTHERWI5E NOTED, SHALL BE DONE WITH COMMON WIRE NAILS AND CONFORM TO TABLE 2304.4.1 OF THE GBG. -1. GUTTING, DRILLIN6, OR NOTCHING OF BEAMS/JOISTS/PO5TS SHALL BE PERMITTED ONLY A5 SHOWN ON THE DRAWINGS OR AS INDICATED IN WRITING BY THE ENGINEER. 8. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY, WHICH 15 IN CONTACT. WITH THE EARTH, SHALL BE PRE55URE TREATED DOU6LA5 FIR. q. PROVIDE BLOGKIN6 OR BRIDGING PER SEG 2308.8.2 OF THE GBG AND 5EG 4.4.1.2 OF THE NATIONAL DESIGN SPECIFICATION. 10. MOISTURE CONTENT OF WOOD AT THE TIME OF PLAGIN6 SHALL NOT EXCEED IQ PERCENT. BUILDING CODE ANALYSIS: CALIFORNIA BUILDING CODE 2013 EDITION OCCUPANCY 6R.OUP5: UTILITY AND MISCELLANEOUS U PRIVATE GARAGE TYPE OF CONSTRUCTION V -B ALLOWABLE AREAS: ALLOWABLE AREA (Aa) (W/INCREASES PER SEC, 506.1) If = (F/P - 0.25) * W/30 If = (115/q5 - 0.25) * 30/30 = DEI F = 015 FT P=q5 FT W=30 FT Ig = O U OCCUPANCY (ALLOWABLE AREA) TABLE 505 BASIC ALLOWABLE (At) = 55,00 5F Ao = (At + (At*If) + (At*Is)) = Ao = (5500 + (5500*."15) + (5+500*0)) = q,625 5F U ALLOWABLE AREA 4,6255E U ACTUAL AREA 513 SF JOK NEW GARAGE FIRE PROTECTION ANALYSIS: TABLE 601 TYPE V -B REOUIRE5 0 FIRE -RESISTANCE RATING AT ALL BUILDIN6 ELEMENTS. 2013 CALIFORNIA BUILDIN6 CODE 2013 CALIFORNIA MECHANICAL CODE Burr 2013 CALIFORNIA FIRE CODE COST 2013 CALIFORNIA ELECTRICAL GORE 2013 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS AUG 10 2016 DEVELOPMENT SERVICES �is�3o�3 WEST ELEVATION ELEVATION A -A 1/1" = V -CJ 2- 865 GALLON WATER TANKS 2 SEE ELEVATION A -A THIS SHEET SPECIAL FRAMING REQUIREMENTS NORTH ELEVATION 1/4" = I' -O" SOUTH ELEVATION 1/4" = 1'-0" � OVER „ „ , „ SIDING AT EXTERIOR FACE TYP EAST ELEVATION A COVER WALL WITH SHEAR WALL 5HEATHIN6 PER PLAN 4 SCHEDULE „.� d ANCHORS PER PLAN FESS/pN J. 3 CP B� i C 42028 * EXP.03/31i18 \� CIV11. �P �CFCALIFO�� JUN 0 6 2035 REVISIONS BY PLAN 10/25 015 CHECK 0. N W_ }; co 0 Q P m 5 3Q g W r w V N a Z}v Wc: Q�� _.. m to a O -Loo C 0 LL a sC�� 10/22/2015 1/4 -■I' -O' UON DRAWN did JOB 15034 SHEET OF SHEETS I i a Ll i 1 I CARGO I jLLJ CONTAINER Q WEST ELEVATION ELEVATION A -A 1/1" = V -CJ 2- 865 GALLON WATER TANKS 2 SEE ELEVATION A -A THIS SHEET SPECIAL FRAMING REQUIREMENTS NORTH ELEVATION 1/4" = I' -O" SOUTH ELEVATION 1/4" = 1'-0" � OVER „ „ , „ SIDING AT EXTERIOR FACE TYP EAST ELEVATION A COVER WALL WITH SHEAR WALL 5HEATHIN6 PER PLAN 4 SCHEDULE „.� d ANCHORS PER PLAN FESS/pN J. 3 CP B� i C 42028 * EXP.03/31i18 \� CIV11. �P �CFCALIFO�� JUN 0 6 2035 REVISIONS BY PLAN 10/25 015 CHECK 0. N W_ }; co 0 Q P m 5 3Q g W r w V N a Z}v Wc: Q�� _.. m to a O -Loo C 0 LL a sC�� 10/22/2015 1/4 -■I' -O' UON DRAWN did JOB 15034 SHEET OF SHEETS STUD WALL' TO SIDES OF BEAM 2x4 @ 16"o.c• FOR ITEMS HANGERS N/ NOT NOTED 'A54' CLIP SEE DTL 1/2 BEAM PER PLAN 2 I6d 51NKER5 TYP 2x4 DIAD. BRACE ® 48"o.c. 2x4#2 SOFFIT JOISTS ® 16"o.c. 2x BLK'G 'U' HANGERS —� BETWEEN 2x'5 2X4 LEDGER N/ 2-16d SINKERS ® 16" (EACH STUD) (D—f. = r -c. STRAP PER PLAN - NAIL TO LEDGERS OVER BEAM BEAM PER PLAN FRAME INTO WALL P05T GAP PER PLAN 4x4 #1 POST UNDER BEAM A (cY_r 2x4 ® 16"o.c. 51DING PER PLAN STUD WALL d ELEVATIONS 2x4 PRESSURE TREATED SILL PLATE N/ 1/2"x 10" ANCHORS ® 48"o.c. W/ 'BPI/2-5' PLATE NASHER5 N SLAB PER PLAN — 1- #4 CONTINUOUS TOP i BOTTOM CARGO CONTAINER BEA BOUNDARY BY NAIL APLAN 10/25 SHEATHING ed GALVANIZED CASING ® b" o.c. 1/2" x 10" AS ® 48" o.c. PER PLAN 2x8 BLK'G ®24" 2 PLAN 1/26/2016 R 150541 N/3 -8d COMMON 4V2" GLR POST GAP PER PLAN POST UNDER BEAM ®IB 'H2.5' TIE ®24" 2 ROOF JOISTS OVER JOIST PER PLAN ®IA OR BLOCKING CONTINUOUS ROW -f I 24' EDGE NAILING 2 1- #4 xn 3 SIDIE5I/4 \ 2x4 5LK'6 EACH CORNER BETWEEN 5TUD5 U' HANGERS i 2x8 LEDGER N/ 4- Ibd SINKERS ® 16 "o.c. (EA STUD) SIDING PER i m d 16d 51NKER5 ® 6"o.c. PLAN 8 TO BLK'G BETWEEN STUD* ELEVATIONS ROOF JOISTS PARALLEL - —� TO WALL ® IS S" 2x4 ® 16"o.c. A A SALOON FRAMED STUD WALL t � s@)—r PLAN VIEW p STUD WALL' TO SIDES OF BEAM 2x4 @ 16"o.c• FOR ITEMS HANGERS N/ NOT NOTED 'A54' CLIP SEE DTL 1/2 BEAM PER PLAN 2 I6d 51NKER5 TYP 2x4 DIAD. BRACE ® 48"o.c. 2x4#2 SOFFIT JOISTS ® 16"o.c. 2x BLK'G 'U' HANGERS —� BETWEEN 2x'5 2X4 LEDGER N/ 2-16d SINKERS ® 16" (EACH STUD) (D—f. = r -c. STRAP PER PLAN - NAIL TO LEDGERS OVER BEAM BEAM PER PLAN FRAME INTO WALL P05T GAP PER PLAN 4x4 #1 POST UNDER BEAM A (cY_r 2x4 ® 16"o.c. 51DING PER PLAN STUD WALL d ELEVATIONS 2x4 PRESSURE TREATED SILL PLATE N/ 1/2"x 10" ANCHORS ® 48"o.c. W/ 'BPI/2-5' PLATE NASHER5 N SLAB PER PLAN — 1- #4 CONTINUOUS TOP i BOTTOM CARGO CONTAINER BEA PER PLAN 'HUG' HANGER STRAP PER PLAN TO SIDE OF BEAM A I BACKSIDE OF 2'-O" 21'-0" LEDGER - 2x BLOCKING BETWEEN JOISTS ROOF JOISTS PLAN VIEW PER PLAN POST PER PLAN POST BASE PER PLAN CONTINUE REINFORCING FROM FOOTING BEYOND RE I NFORG I NG PER PLAN 5HEATHING: BY REMONS APLAN 10/25 015 ed GALVANIZED CASING ® b" o.c. 1/2" x 10" AS ® 48" o.c. CHECK did 2 PLAN 1/26/2016 R 150541 4V2" GLR POST GAP PER PLAN POST UNDER BEAM M PER PLAN 'HUG' HANGER STRAP PER PLAN TO SIDE OF BEAM A I BACKSIDE OF 2'-O" 21'-0" LEDGER - 2x BLOCKING BETWEEN JOISTS ROOF JOISTS PLAN VIEW PER PLAN POST PER PLAN POST BASE PER PLAN CONTINUE REINFORCING FROM FOOTING BEYOND RE I NFORG I NG PER PLAN SLAB PER PLAN • 1- #4 CONTINUOUS TOP 8 BOTTOM BEAM PER PLAN A 'r BEAM —/ PER PLAN 'A55' CLIP 2- 2x4 UNDER BEAM 4 A5 A SINGLE PLY MEMBRANE ROOFING EXTENDS UP ROOF 5HEA1 MECHANICAL WELL WALL 15/32" APA f PAN DRAIN N/ DOME 5HEATHING (i OVERFLOW (2 REQUIRED) UNBLOCKED PRIMARY ROOF DRAIN SHOWN 6d COMMON NEAR 51ME N/ DRAIN TO STORM ® 6'o.c. EDG DRAIN BELOW, SECONDARY ROOF BOUNDARY 1 DRAIN BEYOND THRU WALL FILED NAIL R PRIMARY 6 SECONDARY DRAINS UNDER ROOF DOWN THROUGH SOFFIT INTO COLLECTION !^LATER TANKS THE SECONDARY ROOF DRAINAGE SYSTEM SHALL BE PROTECTED BY A STRAINER AND SHALL -BE COMPLETELY INDEPENDENT OF THE PRIMARY ROOF DRAINS AND D15GHARGE5 SHALL BE IN A READILY OBSERVABLE LOCATION. PRIMARY ROOF DRAIN OUTLETS SHALL NOT ALLOW WATER TO FLOW OVER 51DNALK5 A �Fj per- C V7AN GL dEPMIT # (� - Q 3 BUTTE COUNTY DEVELOPMENT SERVICES C�(DE CI MED FOR D/17E � l 1 Q j[ C, BY _� O 1 F INDICATES E OF BOTTOM yr rwvr- SHEATHING FOR ROOF SLOPE 5HEATHING: BY REMONS APLAN 10/25 015 ed GALVANIZED CASING ® b" o.c. 1/2" x 10" AS ® 48" o.c. CHECK did 2 PLAN 1/26/2016 R 150541 4V2" GLR O 2 AT DONE SHEETS I 24' 2 1- #4 xn 3 SIDIE5I/4 '�- DONEL AT EACH CORNER i CARGO CONTAINER m —� S" I s, L4x4x5/ ® t x 0'-4" LONc6 PLAN VIEW p N/ I- 5/4"m 51MP50N CARBON CARGO '#t_ STEEL STRONG -BOLT CONTAINER 0 EMBED 55,4" Q SLAB PER PLAN • 1- #4 CONTINUOUS TOP 8 BOTTOM BEAM PER PLAN A 'r BEAM —/ PER PLAN 'A55' CLIP 2- 2x4 UNDER BEAM 4 A5 A SINGLE PLY MEMBRANE ROOFING EXTENDS UP ROOF 5HEA1 MECHANICAL WELL WALL 15/32" APA f PAN DRAIN N/ DOME 5HEATHING (i OVERFLOW (2 REQUIRED) UNBLOCKED PRIMARY ROOF DRAIN SHOWN 6d COMMON NEAR 51ME N/ DRAIN TO STORM ® 6'o.c. EDG DRAIN BELOW, SECONDARY ROOF BOUNDARY 1 DRAIN BEYOND THRU WALL FILED NAIL R PRIMARY 6 SECONDARY DRAINS UNDER ROOF DOWN THROUGH SOFFIT INTO COLLECTION !^LATER TANKS THE SECONDARY ROOF DRAINAGE SYSTEM SHALL BE PROTECTED BY A STRAINER AND SHALL -BE COMPLETELY INDEPENDENT OF THE PRIMARY ROOF DRAINS AND D15GHARGE5 SHALL BE IN A READILY OBSERVABLE LOCATION. PRIMARY ROOF DRAIN OUTLETS SHALL NOT ALLOW WATER TO FLOW OVER 51DNALK5 A �Fj per- C V7AN GL dEPMIT # (� - Q 3 BUTTE COUNTY DEVELOPMENT SERVICES C�(DE CI MED FOR D/17E � l 1 Q j[ C, BY _� O 1 F INDICATES E OF BOTTOM yr rwvr- SHEATHING FOR ROOF SLOPE /\ ROOF FRAMING PLAN TYPICAL TOP WALL PLATE SPLICES SHALL BE 2- 2x4#2 1/4" = I' -O" PLATES N/ 8- Ibd SINKERS BETWEEN 5PLIcCES IN THE TOP Ad BOTTOM 2x PLATES. I r m A FLOOR/FOUNDATION PLAN SHEAR WALL SCHEDULE: 1/4" = 1'-0" CONTAINER A A MARK 5HEATHING: BY REMONS APLAN 10/25 015 ed GALVANIZED CASING ® b" o.c. 1/2" x 10" AS ® 48" o.c. CHECK did 2 PLAN 1/26/2016 R 150541 ' 3 OWNER CHANSE O /\ ROOF FRAMING PLAN TYPICAL TOP WALL PLATE SPLICES SHALL BE 2- 2x4#2 1/4" = I' -O" PLATES N/ 8- Ibd SINKERS BETWEEN 5PLIcCES IN THE TOP Ad BOTTOM 2x PLATES. I r m A FLOOR/FOUNDATION PLAN SHEAR WALL SCHEDULE: 1/4" = 1'-0" CONTAINER A A MARK 5HEATHING: EDGE NAILING SILL PLATE ANGORAGESPECIAL CONSTRUCTION 5 5/8" APA RATED SIDING ed GALVANIZED CASING ® b" o.c. 1/2" x 10" AS ® 48" o.c. NONE NOTES: I. ALL UNSUPPORTED PANEL EDGES SHALL BE BLOCKED N/ MIN 2x4 FLAT. 2. ALL PLYWOOD NAILING SHALL BE DONE WITH GALVANIZED CASING NAILS OR A GUN NAIL EQUIVALENT. S. ALL MUDSILL ANCHOR BOLTS SHALL HAVE 'BPI/2-3' PLATE NA5HER5. FIXTURES, LAMP HOLDER5, AND RECEPTACLES OUTLETS SHALL BE SECURELY SUPPORTED. A FIXTURE WEIGHING MORE THAN 6# OR EXCEEDS 16" IN ANY DIMENSION SHALL BE SUPPORTED BY THE SCREW SHELL OF A LAMP HOLDER. OUTLET BOXES SHALL NOT BE THE 50LE SUPPORT FOR CEILING (PADDLE) FANS. JUN 0 G 2Q!F DATE 10/22/2015 �,tI/4 "N'-1--o' ' ■ 1 b' UON DRAYM did JOB 150541 SHEET 2 DF SHEETS 5� 1