Loading...
HomeMy WebLinkAboutB16-1287 040-310-0931 t , BUTTE'i-OUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 5 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.338.4365 (Cut off time for inspections is 2pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax: 5.30.538.7785 www.ButteCounty.net/dds Permit No: B16-1287 Issued: 8/25/2016 APN: 040-310-093 Address: 37 SPEEDWAY AVE, CHICO Owner: SMUCKER QUALITY BEVERAGES INC Permit Type: F1/F2 INDUST MANUF Description: METAL BLDG (30260) REMODEL (1178) s ALL PLAN REVISIONS MUST BE APPRO Inspection TV Ve IVR INS P -DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Pool Fel' Pre-Pla"lti:GASBy:- /G' • Date. Electric By: Date: p 'Setbacks— —1737' Blockin /Unde inin Do Not Pour Concrete Until Above arp Sign d Pre -Slab ., : 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor. Framing 149 Underfloor Ducts `' ` • 319 ' Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Coach Info Manufactures Name: Date of Manufacture: Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134 Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Do Not Install Sidin Stucco or RoofinE Until Above i ned Rough Framing 153 y q Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House Gas Test House 403 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 _SwimaainQ.Ennl_.cy Pool Pl Bldg Permit: Gas'Tes , Pre-Gu1i Address: Pre-Deq ------------- -__OFFICE COPY_ .. ' OFFICE r _ _ nM Flood Zone: None SRA Area: No SETBACKS for Zonine. AG W Front: Centerline of Road: Rear: SRA: Side: AG: Other: .Total Setback from Centerline of Road: ^ BY THE COUNTY BEFORE PROCEEDING Inspection Type IVR INSP DATE T -Bar Ceiling 1 145 Stucco Lath 142 _SwimaainQ.Ennl_.cy Pool Pl Bldg Permit: Gas'Tes , Pre-Gu1i Address: Pre-Deq ------------- -__OFFICE COPY_ .. ' OFFICE r _ _ nM Pool Fel' Pre-Pla"lti:GASBy:- /G' • Date. Electric By: Date: p 'Setbacks— —1737' Blockin /Unde inin 612 Tiedown/Soft Set System 611 Permanent Foundation System ' 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Steps/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Is Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final• 538.7281 Sewer District Final "PROJECT FINAL � d7 -rrolecc rinai is a t-eruncace of ueeupaney ror tKesiaennai umY1 PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF IS;UANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION I c�T�J S/1' ra)n �1 • �) ' 9 T �M 7•�i ti1�� �J 1 2,V �J ! cy 'Vly-b 6p:,P7 -j 7a �`•! C�'/1%±ddY�, �i�J�� �)r.}�� �iiJ O'��lJ' �n �.�s�fivL j l��la.;J�n�J v APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION Daily Inspection- Report Concrete R einfor czng DATE: Ur —Z0 (� PROJECT: SNocKEl,S S�lZoJ11 NG y�J(l.,D.I1JC� CLIENT: AioRN VALLEY INSPECTOR: C 3 DESCRIPTION OF WOE: Weather: Ctca� Temp. [�rrived at jobsite at IU)S, hrs. [ erformed special inspection [ ) Performed sampling only [ ] For concrete placed at: [ spected reinforcing placement for; �'•�C� '{NGS [ reinforcing Details;_ ( ar sizes, laps, location, spacing and clearances were as drawn. [ ] First load arrived at h.5. [ ] Verified proper mix design as [ ] Monitored all loads for proper mix and slump [ ] All concrete was properly consolidated by use of a mechanical vibrator. [ ] Performed slump test(s) at load(s)#: [ J Slump measured:____ inches Notes/Comments: 3060 Tho,•i,r— ] Concrete Temp: ] Cast._ set(s) of — cylinders placed at: ] Work was in compliance with approved plans and specifications.- ] Per Concrete Details: ] No problems were noted during the placement ] Except as noted below: [ ] A total of yards were placed. ( ] Departed jobsite at_______hys, As �Sf�Ecrre { L civ— cazs _ 0 i u • k-n(co, CA 95973 • Teleppone: (530) 891-6625 • Facsimile: (530) 891-4243 r APPUED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND MSPECTION March 22, 2017 Development Services #7 County Center Drive Oroville, Ca 95965 Attn.: Building Official Re: Smuckers New Sprouting Building (37 Speedway Ave)— Chico Ca The following letter is to serve as summary of our services provided for the above mentioned project located at 37 Speedway Avenue in Chico. We provided special inspection on this project from 08-17=16 through 03-03-17. Listed below are the procedures that were inspected and/or tested along with the applicable standards. Concrete Provided periodic inspection during concrete placement to include reinforcing steel placement and slump tests. Monitored placement operations and consolidation. Prepared compression test samples. Tested concrete compression samples in laboratory per ASTM and UBC standards. High Strength Bolting Verified bolts, nuts and washers are the grade specified in the approved plans. If „ required, obtain samples of the bolts, nuts and washers for physical testing. Establish the minimum test torque using a Skidmore -Wilhelm tension indicating load cell in accordance with AISC Manual for Steel Construction. Epoxied Anchors/Holdowns Verify installation of epoxied seismic anchor bolts per approved plans and specifications, to include: ensuring holes are brushed & blown clean with compressed air, monitoring injection of the adhesive into each hole in sufficient quantity, and'ensuring bolts are rotated during and after insertion. The above mentioned work requiring special inspection was to the best'of our knowledge, in conformance with the approved plans and specifications and section 1701 of the 2013 California Building Code. 3060 Thorntree Drive, Suite 10 - Chico, CA 95973 0 Telephone: (530) 891-6625 • Facsimile: (530)891-4243 Please call if you have questions regarding services described above. Very truly yours, APPLIED TESTING CONSULTANTS Brad Forsythe Charles'`Itoberfs PE,MS President Staff Engineer Director of Operations C-038692 Exp. 3/31/19 APPLIED TESTING CONSULTANTS MATERIAL TESTING, ENGINEERING, AND INSPECTION CERTIFICATE OF BOLTING INSPECTION Date: 12/13/16 Project: Smuckers Sprouting Building Client: North Valley Building System Inspector: Brad Forsythe Bolt Size Req'd TensionTest Torque Turn of the Nut Impact Test (in dia) (lbs) (ft -lbs) (turn past snug) (sec) 1"-1/8" (34) 56,000+5% 1100 X X '/" (270) 28,000+5% 325 X X 7/8" (96) 39,000+5% 600 X X 1" (34) 51,000+5% 900 X X DESCRIPTION OF WORK Arrived at thejobsite at 0900 hours to perform special inspection of high strength bolting at the Sprouting Building Ridge and Haunches. Before tightening the bolts we verified that the materials used in this assembly were in conformance with the requirements of section 2 (Bolts, Nuts, Washers and Paint) and section 3 (Bolted Parts) of the RCSC Specifications. The bolts used in this structure were A325 grade high strength bolts with hardened steel washers beneath hardened steel nuts. The Calibrated Wrench Tightening method was used per Section.9.2.2 of the RCSC Specifications. A representative sample of 3 bolts from each diameter, length, and grade used in this structure were tightened in the Skidmore Wilhelm tension -indicating device using a calibrated dial -indicator torque wrench. Three readings were recorded, on the wrench, for each bolt size, in order to establish an average job test torque to provide a tension not less than five percent in excess of the minimum tension specified in Table 8.1 of the RCSC Specifications. Each bolt assembly was installed and tightened to a snug -tight condition by the contractor prior to tightening. There were a total of 448 bolts in the structure, all were tightened / tested using the above mentioned procedure. Based on the above mentioned procedure, it is our judgment that all A325 high st4ffgtl 'bolts have been properly tensioned in accordance with the RCSC Specifications for Strurctur*a1Joint Manual for Steel Construction. dad Forsythe�` j Charles�J:`Robe:rts` Inspector C-038692"'Exp: =37: Staff Engineer tabled in the structure intained in the Al SC 7 3060 Thorntree Drive, Suite 10 0 Chico, CA 95973 ° Telephone: (530) 891-6625 ° Facsimile -(330) 891-4243 APPLIED TESTING CONSULTANTS r MATERIALS TESTING, ENGINEERING AND rNSPECTION Daily Inspection Re• ort - Concreteeinforc ing DATE: i -? Z O _ PROJECT:. SMocK�s CLIENT: map_N VALLEYs�s,s INSPECTOR: C 3 DESCRIPTION OF WORK: Weather: CL.ER� Temp.• �'�U� ( � rrived at jobsite at 1. 5 hrs, [ 9erformed special inspection Concrete Temp: [ ] Performed sampling only [) Cast _ set(s) of cylinders placed at; [ J For concrete placed at; [ spected reinforcing placement for; ""Ptev FOCIn NGS [ reinforcing Details:_ [ ar sizes, laps, location, spacing and J clearances were as drawn: [ ] First load arrived at hrs. [ ] Verified proper mix design as [ J Monitored all loads for proper mix'and slump [ ] All concrete was properly consolidated by use of a mechanical vibrator' [ J Performed slump test(s) at loads)#: [ ] Slump measured: ` inches Notes/Commerits:�sb'cc O►J C;E •T1fE • � � � h ] Work was in compliance with approved plans and specifications. ] Per Concrete Details:. ] No problems were noted during the placement ] Except as noted below: ; [ J A total of yards were placed. [ ] Departed jobsite at hrs, • � ,,ree vrive, Suite 10 - Chico, CA 95973 -Telephone: (530) 891-6625 • Fnesimile: (530) 891-4243 APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION Daily Inspection Report Concrete/ einfor�, DATE: 6�t %C, Z0, I. CLIENT: N 2 S DESCRIPTION OF WOE: [,]"Arrived at jobsite at -2 hrs. [ 'Performed special inspection [ ] Performed sampling only [ ] For concrete placed at: PROJECT: f-.--, M V G' LS S i'v�DMI D6 INSPECTOR: CC', is [','Inspected reinforcing placement for: -'---- [ 'Reinforcing Details: /, S-1 ( -Bar sizes, laps, location, spacing and clearances were as drawn. [ ) First load arrived at hrs. [ ] Verified proper mix design as [ ] Monitored all loads for proper mix and slump ( ) All concrete was properly consolidated by use of a mechanical vibrator. [ ] Performed slump test(s) at load(s)#: [ ] Slump measured: inches Notes/Comments: 5 1✓' i� C.,E. i �,3 C LE 3060 Thnrnfrau Yr -.-..- n . Weather: Lr= -A•t� Temp.��° r. [ ] Concrete Temp: [ ] Cast set(s) of_ cylinders placed at: [ ] Work was in compliance.w,i.thfapproved pans and specificatioris [ ] Per Concrete Details: [ ] No problems were noted during the placement [ ] Except as noted below: [ ] A total of yards were placed. "Departed jobsite at !dl5... hrs. LA tQ,d c it A� ; - �Tltoe- L.GCti7 GC;t� S c.7rJ v LF ..w„c ,u - C:►'.ico, CA 95973 9 Telephone: (530) 891-6625 • Fnesimile: (530) 891.4243 APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION Nuclear Density Testing Report Per ASTM 1557 Client- North Valley Building Systems Page: 1 of I - Address: #30 Seville Court Date: 11/16/2016 City, State: Chico, CA 95973 Tech: Dietrich Attn: Bret Wood Project: Smuckers Trans Pad Soil Description: Class II AB Pro AS Recycle n Compaction Equipment: Not Specified Req - d 96J Compaction Curve No,: T-1 .. Dry Densit)r. 129.8 `4 W1 Opt. Moist.Content: 9.8 95 'W" I BS Northeast Quadrant FAB 136.7 10.1 126.6 8.0 98% PASS 2 BS Northwest Quadrant FAB 137.2 8.7 128.5 6.8 99% PASS 3 BS Southeast Quadrant FAB 137.1 8.9 128.2 6.9 99% PASS 4 BS Southwest Quadrant FAB 136.2- 8.4 127.8 6.6 99% PASS 5 BS Center FAB 138.3 9.3 129.0 7.2 9 . 9% PASS REPORT: Arrived at jobsite in AM hours perform compaction testing of the above location. Performed 5 nuclear density tests at random locations as indicated above. -The 5 test results indicate at least 95% relative compaction. Note: The results of these tests apply only to the soil at the location and elevation at which the tests were performed. No other conclusion is rendered based upon these tests unless such conclusion is presented in the form of report. Applied Testing Consultants is not the fou* nclation design engineer for this project. We are reporting soil compaction results only. Designs for consolidation, differential settlement slope stability, slope angles and setbacks, erosion control and bearing on fill materials are by others. lCopies to: Reviewed 3060 Thorntree Drive, Suite 10 a Chico, CA 95973 e Telephone: (530) 891-6625 a Facsimile: (530) 891-4243 APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION ASTM 1557 Moisture/Density Curve Client: Address: City, State Zip: Attn: Project: Soil Description: Sample location: Sample depth: Trial No: Water Added Gross compacted wt: Container Tare: Net compacted wt: Wet density, pcf: Dry density, pcf; North Valley Building Systems #30 Seville Court Chico, CA 95973 Smuckers Trans Pad Closs It AB- Pro -AG Recycle Jobsite N/A Pan No: Gross wet wt: Gross dry wt: Pan tare: Net dry wt: Moisture loss: % Moisture Content: 50 150 1 250 350 79.7 77.3 80.7 81.2 7304 7554 1 7516 7 8 2780 2780 1 2780 2780 1 4524 477-4-T 4736 4718 lm133.0 140.4 1 1392 138.7. . --4275:: .--1247,,::]'.:-..122.5 Pan No: Gross wet wt: Gross dry wt: Pan tare: Net dry wt: Moisture loss: % Moisture Content: 1151.6 1187.31 1165.4 1144.0 1071.0 1085.4 1052.0 1020.0 79.7 77.3 80.7 81.2 991.3 1008.1 971.3 938.8 80.6 101.9 113.4 1 124.0 8.1%.... .10.1% . .-.41.7% .-1 .13.2%: Sample No: T-1 Date: 16 -Nov -16 Tech: McKeehan Sample Weight: Total sample wt: +3/4 rock wt: %of +3/4 rock: Specific Gravity of +3/4: Rock adi. densitv- 1 5400.0 g I on' ASTM D4718 '2- --'-=27-585.0 128.0 127.0 -0 126.0 CL 125.0 aCi 124.0 123.0 .. ......... . x' - 85623X2 +962 122.0 Y 2 R 121.0 . ..... .... 7.0% 8.0% 9.0% 10.0% 11.0% 12.0% 13.00/6 14.0% 15.0% Moisture Content (% of dry weight) Max density from curve: 127.6 Max adjusted density: 129.8 pd Optimum Moisture: This test was performed per ASTM 1557 Reviewed by: 3060 Thorntree Drive, Suite 10 e Chico, CA 95973 9 Telephone: (530) 891-6625 * Facsimile: (530) 891-4243 2.621 129 9.8% APPLIED TESTING CONSULTANTS MATERIAL TESTING, ENGINEERING, AND INSPECTION CERTIFICATE OF BOLTING INSPECTION. Date: 3-20-17 Project: Smuckers, Trailer Inspection Platform Inspector: Mark Bruckenstein Bolt Size Req'd Tension Test Torque Turn of the Nut Impact Test (in dia) (lbs) (ft -lbs) (turn past snug) (sec) 5/8" 19,000+5% %11 28,000+5% 350 n/a n/a 7/8" 39,000+5% 1" 51,000+5% DESCRIPTION OF WORK Arrived at the jobsite at 0800 hours to perform special inspection of high strength bolting at the trailer inspection platform. Before tightening the bolts we verified that the materials used in this assembly were in conformance with the requirements of section 2 (Bolts, Nuts, Washers and Paint) and section 3 (Bolted Parts) of the RCSC Specifications. The bolts used in this structure were A325 grade high strength bolts with hardened steel washers beneath hardened steel nuts. The Calibrated Wrench Tightening method was used per Section 9.2.2 of the RCSC Specifications. A representative sample of 3 bolts from each diameter, length, and grade used in this structure were tightened in the Skidmore Wilhelm tension -indicating device using a calibrated dial -indicator torque wrench. Three readings were recorded, on the wrench, for each bolt size, in order to establish an average job test torque to provide a tension not less than five percent in excess of the minimum tension specified in Table 8.1 of the RCSC Specifications. Each bolt assembly was installed and tightened to a snug -tight condition by the contractor prior to tightening. There were a total of 58 bolts in the structure, al I were tightened using the above mentioned procedure. Based on the above mentioned procedure, it is ourjudgment that all A325 high strength,bolts installed in the structure have been properly tensioned in accordance with the RCSC Spec ification`s:for,StructuraI Joints contained in the AISC Manual for Steel Construction. ®Mark BnxkensWn iio S cm 0704m, OCi EXP. M ra Inspector f �F .. . ,. .... . Charles J. Roberts, PE C-038692 Exp. 3/31/19 Staff Engineer 3060 Thorntree Drive, Suite 10 0 Chico, CA 95973 0 Telephone: (530) 891-6625 0 Facsimile: (530) 891-4243 ..�....�tivvv P. INSUTAIION Insulation Certificate Job Address 37 SPEEDWAY. Subdivision & Lot # City & State CHICO, CA County BUTTE Roof Description Of Products Instaned _ Insulation Type Brand Name " Thickness (Inches) R -Value Ceiling ' Batt or Blankett Type FIBERGLASS Thickness (inches) 6.5 Brand Name JOHNS AN Loose Fill ,Type. R -Value 19 Minimum Thickness Loose Fill Ibs.Jsq.ft. R -.Value ----------------- Exterior Walls Insulation Type Thickness (Inches) 3.5 Raised Floors Insulation Type Thickness (Inches) =oundation Walls Insulation Type Thickness (Inches) Brand Name JOHNS MANVILLE R -Value 13 Brand Name R -Value Brand Name R --Value )eclaration I hereby certify that the above insulation was installed in the building at the above location in conformance with le current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) > indicated on the Certificate of Compliance, where applicable. Contractor's Lic.# C.L.#951769 Contractor's Name Diaz Insulation Date Certified April 27, 2017 Signature STEVE.KELLEY Apr 271701:47p Diaz Insulation f " 9530)894-3080 p,1 D1A Z INSULATION l ` `,� Insulation Certificate '�' Job Address 37 SPEEDWAY Subdivision & Lot # City & State CHICO, CA. County BUTTE Roof Description Of Products Installed Insulation Type Brand Name Thickness (Inches) R -Value .Ceiling Batt or Blankett Type FIBERGLASS Brand Name JOHNS MANVILLE Thickness (inches) 6.5 R-Yalue 19 Loose Fill Type. Minimum Thickness Loose Fill Ibs./sq.ft.. R -Value Exterior Walls Insulation Type Thickness (Inches) Brand Name JOHNS MANVILLE 3.5 R -Value 13 Raised Floors Insulation Type Brand Name Thickness (Inches) R -Value Foundation Walls Insulation Type Brand Name Thickness (Inches) R -Value Declaration I hereby certify that the above insulation,was installed in the building at the above location in conformance with he current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) ;s indicated on the Certificate of Compliance, where applicable. - Contractor's Lic.# Date Certified C.L.#951769 Contractor's Name Diaz Insulation April 27, 2017 Signature STEVEXELLEY