BUTTE'i-OUNTY AREA
DEPARTMENT OF DEVELOPMENT SERVICES 5
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (IVR) : 530.338.4365 (Cut off time for inspections is 2pm)
Development Services cannot guarantee inspections on the date requested
Office: 530.538.7601 Fax: 5.30.538.7785 www.ButteCounty.net/dds
Permit No: B16-1287 Issued: 8/25/2016
APN: 040-310-093
Address: 37 SPEEDWAY AVE, CHICO
Owner: SMUCKER QUALITY BEVERAGES INC
Permit Type: F1/F2 INDUST MANUF
Description: METAL BLDG (30260) REMODEL (1178)
s
ALL PLAN REVISIONS MUST BE APPRO
Inspection TV Ve
IVR INS P -DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Pool Fel'
Pre-Pla"lti:GASBy:- /G' • Date.
Electric By: Date: p
'Setbacks— —1737'
Blockin /Unde inin
Do Not Pour Concrete Until Above arp Sign d
Pre -Slab ., :
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor. Framing
149
Underfloor Ducts `' ` •
319 '
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
Coach Info
Manufactures Name:
Date of Manufacture:
Do Not Install Floor Sheathing
or Slab Until Above Signed
Shearwall/B.W.P.-Interior
134
Shearwall/B.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Do Not Install Sidin Stucco or RoofinE Until Above i ned
Rough Framing
153 y q
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
128
Gas Piping House
Gas Test House
403
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
_SwimaainQ.Ennl_.cy
Pool Pl Bldg Permit:
Gas'Tes
,
Pre-Gu1i Address:
Pre-Deq
-------------
-__OFFICE COPY_ .. '
OFFICE
r _ _ nM
Flood Zone: None SRA Area: No
SETBACKS for Zonine. AG W
Front: Centerline of Road:
Rear: SRA:
Side: AG:
Other:
.Total Setback from Centerline of Road: ^
BY THE COUNTY BEFORE PROCEEDING
Inspection Type
IVR INSP DATE
T -Bar Ceiling 1
145
Stucco Lath
142
_SwimaainQ.Ennl_.cy
Pool Pl Bldg Permit:
Gas'Tes
,
Pre-Gu1i Address:
Pre-Deq
-------------
-__OFFICE COPY_ .. '
OFFICE
r _ _ nM
Pool Fel'
Pre-Pla"lti:GASBy:- /G' • Date.
Electric By: Date: p
'Setbacks— —1737'
Blockin /Unde inin
612
Tiedown/Soft Set System 611
Permanent Foundation System ' 613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Skirting/Steps/Landings 610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia:
Is
Public Works Final 538.7681
Fire De artment/CDF 538.6226
Env. Health Final• 538.7281
Sewer District Final
"PROJECT FINAL � d7
-rrolecc rinai is a t-eruncace of ueeupaney ror tKesiaennai umY1
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF IS;UANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
I
c�T�J S/1' ra)n
�1 • �) ' 9 T �M 7•�i ti1�� �J
1
2,V �J !
cy
'Vly-b 6p:,P7 -j 7a
�`•! C�'/1%±ddY�, �i�J�� �)r.}�� �iiJ O'��lJ' �n �.�s�fivL j l��la.;J�n�J
v
APPLIED TESTING CONSULTANTS
MATERIALS TESTING, ENGINEERING AND INSPECTION
Daily Inspection- Report
Concrete R einfor czng
DATE: Ur —Z0 (� PROJECT: SNocKEl,S S�lZoJ11
NG y�J(l.,D.I1JC�
CLIENT: AioRN VALLEY INSPECTOR: C 3
DESCRIPTION OF WOE:
Weather: Ctca� Temp.
[�rrived at jobsite at IU)S, hrs.
[ erformed special inspection
[ ) Performed sampling only
[ ] For concrete placed at:
[ spected reinforcing placement for;
�'•�C� '{NGS
[ reinforcing Details;_
( ar sizes, laps, location, spacing and
clearances were as drawn.
[ ] First load arrived at h.5.
[ ] Verified proper mix design as
[ ] Monitored all loads for proper mix and slump
[ ] All concrete was properly consolidated by use of a
mechanical vibrator.
[ ] Performed slump test(s) at load(s)#:
[ J Slump measured:____ inches
Notes/Comments:
3060 Tho,•i,r—
] Concrete Temp:
]
Cast._ set(s) of — cylinders placed at:
] Work was in compliance with approved
plans and specifications.-
] Per Concrete Details:
] No problems were noted during the placement
] Except as noted below:
[ ] A total of yards were placed.
( ] Departed jobsite at_______hys,
As �Sf�Ecrre
{ L civ— cazs _
0
i u • k-n(co, CA 95973 • Teleppone: (530) 891-6625 • Facsimile: (530) 891-4243
r
APPUED TESTING CONSULTANTS
MATERIALS TESTING, ENGINEERING AND MSPECTION
March 22, 2017
Development Services
#7 County Center Drive
Oroville, Ca 95965
Attn.: Building Official
Re: Smuckers New Sprouting Building (37 Speedway Ave)— Chico Ca
The following letter is to serve as summary of our services provided for the above
mentioned project located at 37 Speedway Avenue in Chico. We provided special
inspection on this project from 08-17=16 through 03-03-17. Listed below are the
procedures that were inspected and/or tested along with the applicable standards.
Concrete
Provided periodic inspection during concrete placement to include reinforcing steel
placement and slump tests. Monitored placement operations and consolidation. Prepared
compression test samples. Tested concrete compression samples in laboratory per ASTM
and UBC standards.
High Strength Bolting
Verified bolts, nuts and washers are the grade specified in the approved plans. If „
required, obtain samples of the bolts, nuts and washers for physical testing. Establish the
minimum test torque using a Skidmore -Wilhelm tension indicating load cell in
accordance with AISC Manual for Steel Construction.
Epoxied Anchors/Holdowns
Verify installation of epoxied seismic anchor bolts per approved plans and specifications,
to include: ensuring holes are brushed & blown clean with compressed air, monitoring
injection of the adhesive into each hole in sufficient quantity, and'ensuring bolts are
rotated during and after insertion.
The above mentioned work requiring special inspection was to the best'of our knowledge,
in conformance with the approved plans and specifications and section 1701 of the 2013
California Building Code.
3060 Thorntree Drive, Suite 10 - Chico, CA 95973 0 Telephone: (530) 891-6625 • Facsimile: (530)891-4243
Please call if you have questions regarding services described above.
Very truly yours,
APPLIED TESTING CONSULTANTS
Brad Forsythe
Charles'`Itoberfs PE,MS
President
Staff Engineer
Director of Operations
C-038692 Exp. 3/31/19
APPLIED TESTING CONSULTANTS
MATERIAL TESTING, ENGINEERING, AND INSPECTION
CERTIFICATE OF BOLTING INSPECTION
Date: 12/13/16 Project: Smuckers Sprouting Building
Client: North Valley Building System Inspector: Brad Forsythe
Bolt Size
Req'd TensionTest
Torque
Turn of the Nut
Impact Test
(in dia)
(lbs)
(ft -lbs)
(turn past snug)
(sec)
1"-1/8" (34)
56,000+5%
1100
X
X
'/" (270)
28,000+5%
325
X
X
7/8" (96)
39,000+5%
600
X
X
1" (34)
51,000+5%
900
X
X
DESCRIPTION OF WORK
Arrived at thejobsite at 0900 hours to perform special inspection of high strength bolting at the Sprouting Building
Ridge and Haunches.
Before tightening the bolts we verified that the materials used in this assembly were in conformance with the
requirements of section 2 (Bolts, Nuts, Washers and Paint) and section 3 (Bolted Parts) of the RCSC Specifications. The
bolts used in this structure were A325 grade high strength bolts with hardened steel washers beneath hardened steel
nuts.
The Calibrated Wrench Tightening method was used per Section.9.2.2 of the RCSC Specifications. A representative
sample of 3 bolts from each diameter, length, and grade used in this structure were tightened in the Skidmore Wilhelm
tension -indicating device using a calibrated dial -indicator torque wrench. Three readings were recorded, on the wrench,
for each bolt size, in order to establish an average job test torque to provide a tension not less than five percent in excess
of the minimum tension specified in Table 8.1 of the RCSC Specifications.
Each bolt assembly was installed and tightened to a snug -tight condition by the contractor prior to tightening. There
were a total of 448 bolts in the structure, all were tightened / tested using the above mentioned procedure.
Based on the above mentioned procedure, it is our judgment that all A325 high st4ffgtl 'bolts
have been properly tensioned in accordance with the RCSC Specifications for Strurctur*a1Joint
Manual for Steel Construction.
dad Forsythe�` j
Charles�J:`Robe:rts`
Inspector
C-038692"'Exp: =37:
Staff Engineer
tabled in the structure
intained in the Al SC
7
3060 Thorntree Drive, Suite 10 0 Chico, CA 95973 ° Telephone: (530) 891-6625 ° Facsimile -(330) 891-4243
APPLIED TESTING CONSULTANTS
r
MATERIALS TESTING, ENGINEERING AND rNSPECTION
Daily Inspection Re• ort -
Concreteeinforc ing
DATE: i -? Z O
_ PROJECT:. SMocK�s
CLIENT: map_N VALLEYs�s,s INSPECTOR: C 3
DESCRIPTION OF WORK:
Weather: CL.ER� Temp.• �'�U�
( � rrived at jobsite at 1. 5 hrs,
[ 9erformed special inspection Concrete Temp:
[ ] Performed sampling only [) Cast _ set(s) of cylinders placed at;
[ J For concrete placed at;
[ spected reinforcing placement for;
""Ptev FOCIn NGS
[ reinforcing Details:_
[ ar sizes, laps, location, spacing and J
clearances were as drawn:
[ ] First load arrived at hrs.
[ ] Verified proper mix design as
[ J Monitored all loads for proper mix'and slump
[ ] All concrete was properly consolidated by use of a
mechanical vibrator'
[ J Performed slump test(s) at loads)#:
[ ] Slump measured: ` inches
Notes/Commerits:�sb'cc
O►J C;E •T1fE • � � � h
] Work was in compliance with approved
plans and specifications.
] Per Concrete Details:.
] No problems were noted during the placement
] Except as noted below: ;
[ J A total of yards were placed.
[ ] Departed jobsite at hrs,
• � ,,ree vrive, Suite 10 - Chico, CA 95973 -Telephone: (530) 891-6625 • Fnesimile: (530) 891-4243
APPLIED TESTING CONSULTANTS
MATERIALS TESTING, ENGINEERING AND INSPECTION
Daily Inspection Report
Concrete/ einfor�,
DATE: 6�t %C, Z0,
I.
CLIENT: N 2 S
DESCRIPTION OF WOE:
[,]"Arrived at jobsite at -2 hrs.
[ 'Performed special inspection
[ ] Performed sampling only
[ ] For concrete placed at:
PROJECT: f-.--, M V G' LS S i'v�DMI D6
INSPECTOR: CC', is
[','Inspected reinforcing placement for:
-'----
[ 'Reinforcing Details: /, S-1
( -Bar sizes, laps, location, spacing and
clearances were as drawn.
[ ) First load arrived at
hrs.
[ ] Verified proper mix design as
[ ] Monitored all loads for proper mix and slump
( ) All concrete was properly consolidated by use of a
mechanical vibrator.
[ ] Performed slump test(s) at load(s)#:
[ ] Slump measured: inches
Notes/Comments:
5 1✓' i� C.,E. i �,3 C
LE
3060 Thnrnfrau Yr -.-..- n .
Weather: Lr=
-A•t� Temp.��° r.
[ ] Concrete Temp:
[ ] Cast set(s) of_ cylinders placed at:
[ ] Work was in compliance.w,i.thfapproved
pans and specificatioris
[ ] Per Concrete Details:
[ ] No problems were noted during the placement
[ ] Except as noted below:
[ ] A total of yards were placed.
"Departed jobsite at !dl5... hrs.
LA
tQ,d c it A� ; -
�Tltoe- L.GCti7 GC;t� S c.7rJ v
LF
..w„c ,u - C:►'.ico, CA 95973 9 Telephone: (530) 891-6625 • Fnesimile: (530) 891.4243
APPLIED TESTING CONSULTANTS
MATERIALS TESTING, ENGINEERING AND INSPECTION
Nuclear Density Testing Report Per ASTM 1557
Client- North Valley Building Systems Page: 1 of I -
Address: #30 Seville Court Date: 11/16/2016
City, State: Chico, CA 95973 Tech: Dietrich
Attn: Bret Wood
Project: Smuckers Trans Pad
Soil Description: Class II AB Pro AS Recycle
n
Compaction Equipment: Not Specified
Req - d 96J
Compaction Curve No,: T-1 .. Dry Densit)r. 129.8
`4 W1
Opt. Moist.Content: 9.8
95
'W"
I
BS
Northeast Quadrant
FAB
136.7
10.1
126.6
8.0
98%
PASS
2
BS
Northwest Quadrant
FAB
137.2
8.7
128.5
6.8
99%
PASS
3
BS
Southeast Quadrant
FAB
137.1
8.9
128.2
6.9
99%
PASS
4
BS
Southwest Quadrant
FAB
136.2-
8.4
127.8
6.6
99%
PASS
5
BS
Center
FAB
138.3
9.3
129.0
7.2
9 . 9%
PASS
REPORT:
Arrived at jobsite in AM hours perform compaction testing of the above location.
Performed 5 nuclear density tests at random locations as indicated above.
-The 5 test results indicate at least 95% relative compaction.
Note: The results of these tests apply only to the soil at the location and elevation at which the tests were performed. No
other conclusion is rendered based upon these tests unless such conclusion is presented in the form of report.
Applied Testing Consultants is not the fou* nclation design engineer for this project. We are reporting soil compaction results
only. Designs for consolidation, differential settlement slope stability, slope angles and setbacks, erosion control and bearing
on fill materials are by others.
lCopies to:
Reviewed
3060 Thorntree Drive, Suite 10 a Chico, CA 95973 e Telephone: (530) 891-6625 a Facsimile: (530) 891-4243
APPLIED TESTING CONSULTANTS
MATERIALS TESTING, ENGINEERING AND INSPECTION
ASTM 1557 Moisture/Density Curve
Client:
Address:
City, State Zip:
Attn:
Project:
Soil Description:
Sample location:
Sample depth:
Trial No:
Water Added
Gross compacted wt:
Container Tare:
Net compacted wt:
Wet density, pcf:
Dry density, pcf;
North Valley Building Systems
#30 Seville Court
Chico, CA 95973
Smuckers Trans Pad
Closs It AB- Pro -AG Recycle
Jobsite
N/A
Pan No:
Gross wet wt:
Gross dry wt:
Pan tare:
Net dry wt:
Moisture loss:
% Moisture Content:
50
150
1 250
350
79.7 77.3 80.7 81.2
7304
7554
1 7516
7 8
2780
2780
1 2780
2780
1 4524
477-4-T
4736
4718
lm133.0
140.4 1
1392
138.7.
. --4275::
.--1247,,::]'.:-..122.5
Pan No:
Gross wet wt:
Gross dry wt:
Pan tare:
Net dry wt:
Moisture loss:
% Moisture Content:
1151.6 1187.31 1165.4 1144.0
1071.0 1085.4 1052.0 1020.0
79.7 77.3 80.7 81.2
991.3 1008.1 971.3 938.8
80.6 101.9 113.4 1 124.0
8.1%.... .10.1% . .-.41.7% .-1
.13.2%:
Sample No: T-1
Date: 16 -Nov -16
Tech: McKeehan
Sample Weight:
Total sample wt:
+3/4 rock wt:
%of +3/4 rock:
Specific Gravity of +3/4:
Rock adi. densitv-
1 5400.0 g I
on' ASTM D4718
'2-
--'-=27-585.0
128.0
127.0
-0 126.0
CL
125.0
aCi 124.0
123.0
.. ......... .
x' - 85623X2 +962
122.0 Y 2
R
121.0 . ..... ....
7.0% 8.0% 9.0% 10.0% 11.0% 12.0% 13.00/6 14.0% 15.0%
Moisture Content (% of dry weight)
Max density from curve: 127.6
Max adjusted density: 129.8 pd Optimum Moisture:
This test was performed per ASTM 1557 Reviewed by:
3060 Thorntree Drive, Suite 10 e Chico, CA 95973 9 Telephone: (530) 891-6625 * Facsimile: (530) 891-4243
2.621 129
9.8%
APPLIED TESTING CONSULTANTS
MATERIAL TESTING, ENGINEERING, AND INSPECTION
CERTIFICATE OF BOLTING INSPECTION.
Date: 3-20-17 Project: Smuckers, Trailer Inspection Platform
Inspector: Mark Bruckenstein
Bolt Size
Req'd Tension
Test Torque
Turn of the Nut
Impact Test
(in dia)
(lbs)
(ft -lbs)
(turn past snug)
(sec)
5/8"
19,000+5%
%11
28,000+5%
350
n/a
n/a
7/8"
39,000+5%
1"
51,000+5%
DESCRIPTION OF WORK
Arrived at the jobsite at 0800 hours to perform special inspection of high strength bolting at the trailer inspection
platform.
Before tightening the bolts we verified that the materials used in this assembly were in conformance with the
requirements of section 2 (Bolts, Nuts, Washers and Paint) and section 3 (Bolted Parts) of the RCSC Specifications.
The bolts used in this structure were A325 grade high strength bolts with hardened steel washers beneath hardened
steel nuts.
The Calibrated Wrench Tightening method was used per Section 9.2.2 of the RCSC Specifications. A representative
sample of 3 bolts from each diameter, length, and grade used in this structure were tightened in the Skidmore
Wilhelm tension -indicating device using a calibrated dial -indicator torque wrench. Three readings were recorded, on
the wrench, for each bolt size, in order to establish an average job test torque to provide a tension not less than five
percent in excess of the minimum tension specified in Table 8.1 of the RCSC Specifications.
Each bolt assembly was installed and tightened to a snug -tight condition by the contractor prior to tightening. There
were a total of 58 bolts in the structure, al I were tightened using the above mentioned procedure.
Based on the above mentioned procedure, it is ourjudgment that all A325 high strength,bolts installed in the
structure have been properly tensioned in accordance with the RCSC Spec ification`s:for,StructuraI Joints contained in
the AISC Manual for Steel Construction.
®Mark BnxkensWn
iio S cm 0704m,
OCi EXP. M ra
Inspector
f �F
..
. ,. .... .
Charles J. Roberts, PE
C-038692 Exp. 3/31/19
Staff Engineer
3060 Thorntree Drive, Suite 10 0 Chico, CA 95973 0 Telephone: (530) 891-6625 0 Facsimile: (530) 891-4243
..�....�tivvv P.
INSUTAIION
Insulation Certificate
Job Address 37 SPEEDWAY. Subdivision & Lot #
City & State CHICO, CA
County BUTTE
Roof
Description Of Products Instaned
_
Insulation Type Brand Name "
Thickness (Inches)
R -Value
Ceiling '
Batt or Blankett Type FIBERGLASS
Thickness (inches) 6.5 Brand Name JOHNS AN
Loose Fill ,Type. R -Value 19
Minimum Thickness
Loose Fill Ibs.Jsq.ft.
R -.Value
-----------------
Exterior Walls
Insulation Type
Thickness (Inches) 3.5
Raised Floors
Insulation Type
Thickness (Inches)
=oundation Walls
Insulation Type
Thickness (Inches)
Brand Name JOHNS MANVILLE
R -Value 13
Brand Name
R -Value
Brand Name
R --Value
)eclaration
I hereby certify that the above insulation was installed in the building at the above location in conformance with
le current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations)
> indicated on the Certificate of Compliance, where applicable.
Contractor's Lic.# C.L.#951769 Contractor's Name Diaz Insulation
Date Certified April 27, 2017 Signature
STEVE.KELLEY
Apr 271701:47p Diaz Insulation
f "
9530)894-3080 p,1
D1A
Z
INSULATION l ` `,�
Insulation Certificate '�'
Job Address 37 SPEEDWAY Subdivision & Lot #
City & State CHICO, CA. County
BUTTE
Roof
Description Of Products Installed
Insulation Type
Brand Name
Thickness (Inches)
R -Value
.Ceiling
Batt or Blankett Type
FIBERGLASS Brand Name JOHNS MANVILLE
Thickness (inches)
6.5 R-Yalue 19
Loose Fill Type.
Minimum Thickness
Loose Fill Ibs./sq.ft..
R -Value
Exterior Walls
Insulation Type
Thickness (Inches)
Brand Name JOHNS MANVILLE
3.5
R -Value 13
Raised Floors
Insulation Type
Brand Name
Thickness (Inches)
R -Value
Foundation Walls
Insulation Type
Brand Name
Thickness (Inches)
R -Value
Declaration
I hereby certify that the above insulation,was installed in the building at the above location in conformance with
he current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations)
;s indicated on the Certificate of Compliance, where applicable. -
Contractor's Lic.#
Date Certified
C.L.#951769 Contractor's Name Diaz Insulation
April 27, 2017 Signature STEVEXELLEY