Loading...
HomeMy WebLinkAboutB16-1444 061-350-070RECEIVED . x ' 4 JUL 08 �..� TR13 AND ASSOCIATES Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director a 7 County Center Drive T: 530.538.7601 Buttecounty.net/dds It 13uae unLy Oroville, California 95965 F: 530.538.7785 • DEVELOPMENT SERVICES- • F + PLAN CHECK SQUARE FOOTAGE VERIFICATION r - `Permit Number: B16-1444 ' Owner's Name: JABORSKI TRUST Assessor's Parcel Number: 061-350-070 Date of Application: 7/5/2016 . Square Footage Verification' At Application: Change Wing Area 1560 To: arage Area 672 overea Area 0 471 No Change:_ OTES: N Verified y B T�� Date: " . (Plan Check Signature) onfirmed TRAKiT Updated by: Date: . 'r TRB+Associates r• Agency.. County of Butte TRB+ Project Number.' PC 16.054.132.3 Final Plan Review Page 1 of 1 Date: March 10, 2017 4 To: Andy Jaborski PO Box 55 r . Berry Creek, CA 95916 Email: busterr162(aD_gmail.com • r Cc: Philo Hunt, Amber Franzino, Nancy Springer, Deborah DeBrunner; Jordan DeBrunner, Curtis Johnson, Carrie Gomez Email: Phunt(cDbuttecounty.net; AFranzino(ftuttecounty.net, nspringer(cDbuttecounty.net; ddebrunner(a)buttecounty.net; jdebrunneraC�buttecounty.net; cl*ohnson(cD-buttecounty.net; cgomez ftuttecounty. net (via email) RE: Plan Review for: Jaborski Addition Project Address: 101 Tipsoo Peak Road, Berry Creek Agency App. No.: B16-1444 TRB+ Project No.: 16.054.132.3 The following documents were received for review: ,Plans: (2.sets) Sheets dated 10/28/16: A-1 to A-7, S1 to S3, M-1, E-1 Structural Calcs: (2 copies) P. Cole, dated 02/07/17 Energy Calcs: (2 copies) G. Faucette, dated 07/05/16 Other: (2 copies) Response, Arcademe Architects, undated (2 copes) Response, Arcademe Architects, dated 11/28/16 (2 copies) Division A4.6 — Tier 2 and Tier 2 (1 copy) Permit Application (1 copy) Square Footage Verification Form Plans have been reviewed for compliance with the Building Department requirements contained in the 2013 CBC, 2013 CPC, 2013 CMC, 2013 CEC, 2013 CRC, 2013 Green Building Standards Code, 2013 Energy Code, and County of Butte Ordinances. There are no further comments. Sincerely, TRB + ASSOCIATES, INC. Nas Ho�roe,� ICC Certified lans Examiner TRB + Associates, Inc. BUILDING SOLUTIONS 3180 Crow Canyon Place + Suite 216 + San Ramon, CA 94583 for MUNICIPALITIES._ T 925 866.2633 F 925 790.0011 av www.TRBp/us.com �� -- A R C A D E M E architecture L planning architectsRECE'VE® design . BUTTE, August 21, 2016 OCT 0 / 2019 COUNTY 4 County of Butte - First Review TR.B AND ASSOCIATES 0 C T 0 5 2016 Permit App: B16-1444 DEVELOPMENT Plan Review: Jaborski Addition SERVICES Address: 101 Tipsoo Peak Rd, Berry Creek` \'-1���1 The following is in response to plan check by TRB+Associates, Inc. consulting on an item by item basis using their item number system. ARCHITECTURAL COMMENTS: Sheet A-1 comments: 1. Occ type has been changed to R -3/U at 3/A-1 2. Scope of work has been clarified at 3/A-1, 6/A-2 & 1/A-2. 3. Assessor's parcel number shown at 6/A-2 has been added at 3/A-1. 4. Address has been corrected all sheets 5. Fire protection is shown as "none" at 3/A-1 Sheet A-2 comments: 6. Notes have been added to further clarify new & existing structures at 1/A-2 & 6/A-2. A note has been added regarding drainage from building however our design for positive engineered drainage has not been changed. Parcel Plan 6/A-2 shows 2 critical location dimensions from building to property lines and a graphic scale indicating all possible yard setbacks have been met. 7. New deck plan is shown @ 9/A-2 with details at 7/A-2 & 8/A-2. 8. Door 17 is a fire door. Another door is added at 10/A-2. Another note is added at 1/A-3 clarifying fire separation. 9. See note 8 above. 10. There is no habitable space above garage plus see added 5/8"GWB ceiling in garage at 10/A-2 Sheet A-3 comments: 11. The various plans show what is existing and what is new. The elevations as drawn show the work to be done including on the existing. 12. Clarification notes have been added to the various plans as requested. 13. The erroneous section call has been removed. 14. Tempered indicator has been added to elevations sheet A-4 -window schedule has been modified in its entirety at 3/A-3. 15. Window 12 has.been modified from 96x48 to 60x60 for egress. 16. Windows 18 & 21 have been modified to limit opening to 4" -see window schedule 3/A-3. 17. Handrail has been added to interior stairs -see 6/A-3, 9/A-3 & 12/A-3. 18. Runoff from 3rd floor Observation Deck is sheet flow off metal drip edge -see 11/ S-3 19. Vent screens have been added to Elevations sheet A-4. 20. Under floor access is by hinged vent see Sheet A-4. 21. Attic ventilation is by gable vents, eave vents and ridge vents. Insulation baffles are shown in place. See sheet A-4 & details 7/A-6, 3/A-7, 9/A-7 & 12/A-7. 22. Attic access is shown on Floor Plan 1/A-3 & Refl Clg Plan 1/A-6 Sheet A-4 comments: 23. Windows 22, 23 &24 have sills @ +38". Window schedule has been modified in its entirety at 3/A-3. 24. Print settings have been adjusted. 25. See details 8/A-2, 4/A-7 & 5/A-7 for guard requirements satisfied 26. See added notes 1 at 2/A-4. Studio . . . . . . . . . 355 East Ninth Street . . . . . ... Chico, California 95928 e-mail . . . . . . . . patrick(cD-arcademe.com .. . . . . . . . phone 530.343.5709 r ' A R C A D EN E architecture planning _ architects design 27. Notes 05 & 06 have been added at 2/A-4 and keyed to Elevation drawings Sheet A-4. 28. Short guard rail has been added to west side of Observation Deck over roof. 29. Smoke detector/alarms have been added & labeled on plan 1/E-1.. 30. Carbon monoxide detectors have been added & labeled on plan 1/E-1. 31. See legend 7/E-1 & notes 10/E-1 MECHANICAL COMMENTS: Sheet A-3 comments: 1. Door #5 is a pair of full louvered doors. See Door schedule 5/A-1. Sheet E-1 comments: 2. Note 22 has been added at 10/E-1 PLUMBING COMMENTS: 1. Note 25 has been added at 10/M-1 Sheet A-3 comments: 2. Graphics have been added to Floor Plan 1/A-3 & Mechanical Plan 3/M-1 to indicate where the shower head should go 3. See Plans 1/A-3 & 3/A-3 for adequate toilet clearances 4. Door #12 is vented -see door types 5/A-1 & door schedule 6/A-1 ' ELECTRICAL COMMENTS: 1. GFI recepticles have been added 2. Laundry receptacle on dedicated circuit has been added. 3. Same as 2. 4. Find bathroom dedicated circuited recepticles. 5. Find note 20 at 10/E-1 for arc fault interrupter circuits. 6. Find note 21 at 10/E-1 for tamper resistant recepticles. 7. Electrical panels are shown on Plan 1/E-1 4 ENERGY COMMENTS: 1. Find enclosed energy calcs with designer's signature. Butte County does not require T- 24 documents be placed in drawings. It is a waste of paper and contradicts Cal -Green. Sheet E-1 comments: ` 2. See note 22 at 10/E-1 3. See note 23 at 10/E-1 4. See note 24 at 10/E-1 5. Switches have been changed in the Bathrooms at sheet E-1 to separate fans from lights • GREEN BUILDING COMMENTS: _ 1. CALGreen checklist is included herein 2. See added notes at 10/M-1 3. See added note at 10/M-1 ; WILDFIRE EXPOSURE COMMENTS: We have discussed this code conformance with the new Butte County Fire Marshal, Skip Sanner. 1. We have added note on Sheet A-1. Please indicate code requirement and paragraph. 2. Fire Marshal uses Cal Fire requirements in -lieu of CBC. a) We have changed the entire exterior elevations to cement board before the new Fire, Marshal became available to tell us that Cal -Fire has their own list of conforming materials which includes wood. siding. We will change back to wood in the future. Studio . . . . . 355 East Ninth Street .... . . . Chico, California 95928 e-mail . . . . patrick(cD-arcademe.com .. phone 530.343.5709 STRUCTURAL COMMENTS: 1. Stamped & signed structural calculations are included in resubmit. 2. See calculation 3. Structural design load data is at 3/S-1 4. Washers are specified at Framing note #2 at 10/S-1 5. Additional notes have been added to details on S-2 & S-3. 6. The structural lateral force calculations have been modified and expanded for the entire new addition including the existing tower. Seismic is considered at each building mass element comparing wind at each wall line. ASCE7-10 chapter 12 requires general detailing per section 14.5. We use NDS values for the design of the structural members. Column bearing and offset conditions are met. Chapter 13 does not pertain except for kitchen cabinets. Cabinets shall be attached to walls per industry standards. A deferred submittal will be available upon your request. Line 4 has been modified to reduce the type 4 vertical irregularity. `-7. Butte County plan check engineer, Philo Hunt, has agreed to allow mixing of lateral force resisting systems in this structure. 8. Key plans have been added to the calcs. 9. Knowledge of existing soil conditions at Bald Rock justifies using a higher class material for foundation design, however, we have designed using Class 5 bearing values. Rock is not an assumption, it is a fact. Some rational compromises are made due to local soils conditions. Enclosed is a letter serving as an abbreviated soils report at Philo Hunt's request. 10. Gridlines have been corrected in the plans and included- per architect's discretion. 11. Deck plans & details are now on A-2 12. Pre-engineered trusses are used in sections of the new roof, however, there will be a deferred submittal with actual layout and truss calculations at the time of construction. Our office will review the submittal and provide the assurance documentation to the County. The foundations have been designed to accommodate the loads anticipated by several layouts. 13. See 12 above. 14. Detail 7/A-6 has been revised to show shead transfer across the ridge END OF PLAN CHECK Studio . . . . . . . . 355 East Ninth Street . . . . . . . . . Chico, California 95928 e-mail.. . . . . . . . patrick(cD_arcademe.com ., . . . . . . . phone 530.343.5709 w -_^ A R C A D E M E r architecture planning C architects design b) We have changed the window schedule at 1/A-3 - c) We have added deck plans & details using artificial materials. See also note 2a above. d) We have fire resistant eaves e) We have specified compliant exterior doors f) All eaves are fire resistant g) We have detailed 1/16" v c`reen h) We have detailed using compliant corrugated vents. We disagree with the philosophy of the building co3o veY tfi - i �'Ycs..ira.1A/itdf�e- reas. By not venting; the danger is possible dryrot (if improperly designed) which can be repaired when roofing is replaced. A burning ember into the attic could kill a family. Insurance companies should not be allowed to lobby for building code revisions. STRUCTURAL COMMENTS: 1. Stamped & signed structural calculations are included in resubmit. 2. See calculation 3. Structural design load data is at 3/S-1 4. Washers are specified at Framing note #2 at 10/S-1 5. Additional notes have been added to details on S-2 & S-3. 6. The structural lateral force calculations have been modified and expanded for the entire new addition including the existing tower. Seismic is considered at each building mass element comparing wind at each wall line. ASCE7-10 chapter 12 requires general detailing per section 14.5. We use NDS values for the design of the structural members. Column bearing and offset conditions are met. Chapter 13 does not pertain except for kitchen cabinets. Cabinets shall be attached to walls per industry standards. A deferred submittal will be available upon your request. Line 4 has been modified to reduce the type 4 vertical irregularity. `-7. Butte County plan check engineer, Philo Hunt, has agreed to allow mixing of lateral force resisting systems in this structure. 8. Key plans have been added to the calcs. 9. Knowledge of existing soil conditions at Bald Rock justifies using a higher class material for foundation design, however, we have designed using Class 5 bearing values. Rock is not an assumption, it is a fact. Some rational compromises are made due to local soils conditions. Enclosed is a letter serving as an abbreviated soils report at Philo Hunt's request. 10. Gridlines have been corrected in the plans and included- per architect's discretion. 11. Deck plans & details are now on A-2 12. Pre-engineered trusses are used in sections of the new roof, however, there will be a deferred submittal with actual layout and truss calculations at the time of construction. Our office will review the submittal and provide the assurance documentation to the County. The foundations have been designed to accommodate the loads anticipated by several layouts. 13. See 12 above. 14. Detail 7/A-6 has been revised to show shead transfer across the ridge END OF PLAN CHECK Studio . . . . . . . . 355 East Ninth Street . . . . . . . . . Chico, California 95928 e-mail.. . . . . . . . patrick(cD_arcademe.com ., . . . . . . . phone 530.343.5709 i BUILDING ENERGY ANALYSIS REPORT BUTTE COUNTY PROJECT: OCT- 0 5 2016 ` Jaborski Addition DEVELOPMENT SERVICES 101 Tipsoo Creek Rd `l Berry Creek, CA 95916 Project Designer: Arcadene Studio 355 East 9th St Chico, CA 95928 RECEIVED 530-343-5709 ` OCT 0 7 2016 ' TRB AND ASSOCIATES Report Prepared by: Gary- Faucette A.V. Energy & Associates 45263 7th st East #43 Lancaster, CA 93535 661-723-6694 PERMIT BUTTE COUNTY M&OPMENi OERVIC68 F1 EV� • �� t1lf REVIEWED . FOR CODE COMPLIANCE MAR 10 2017 Job Number: AV4760 TRB AND ASSOCIATES ` Date: , 7/5/2016 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. • This program developed by EnergySoft, .LLC — www.energysoft.com. Ener Pro 6.7 by Ener Soft User Number: 6055 ID: AV4760 q TABLE OF CONTENTS � { r , s _ . Cover Page 1 Table of Contents _ 2 Form CF -1 R -PRF -01-E Certificate of Compliance - 3 Form RMS -1 Residential Measures Summary 10 Form MF -1 R Mandatory Measures Summary 11 HVAC System Heating and Cooling Loads Summary - 15 Zone Load Summary 16 Room Load Summary 17 Room Heating Peak Loads 18 Room Cooling Peak Loads 20 Form ECON-1 Energy Use and Cost Summary 22 Form ECON-2 Energy Upgrade Recommendations 23 Utility Incentive Report 24 EnergyPro 6.7 by EnergySoft Job Number: ID: AV4760 User Number: 6055 � { r , EnergyPro 6.7 by EnergySoft Job Number: ID: AV4760 User Number: 6055 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Description: Title 24 Analysis Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Input File Name: Joborski Addition.xml CF1 R -PRF -01 Pagel of 7 - . ' GENERAL INFORMATION ENERGY USE SUMMARY 01 Project Name Jaborskii Addition 04 05 02 Calculation Description Title 24 Analysis 08 Energy Use (kTDV/ft2-yr) 03 Project Location 101 Tipsoo Creek Rd Compliance Margin Percent Improvement 04 City Berry Creek 05 Standards Version Compliance 2015 06 Zip Code 95916 07 Compliance Manager Version BEMCmpMgr 2013-4 (744) 08 Climate Zone CZ11 09 Software Version EnergyPro 6.6 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 0 12 Project Scope Addition and/or Alteration 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ft) 1742 15 Number of Zones 2 16 Slab Area (ft2) 613 17 Number of Stories 2 18 Addition Cond. Floor Area 0 19 Natural Gas Available No 20 Addition Slab Area (ft) 0 21 Glazing Percentage (%) 16.3% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building DOES NOT require HERS Verification Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ft2-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 26.81 18.86 7.95 29.7% Space Cooling 56.35 56.04 0.31 0.6% IAQ Ventilation 0.00 0.00 0.00 0.0% Water Heating 31.41 24.67 6.74 21.5% Photovoltaic Offset ---- 0.00 0.00 Compliance Energy Total 114.57 99.57 15.00 13.1% Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Datelrime: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml 3EQUIRED SPECIAL FEATURES rhe following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. VO SPECIAL FEATURES REQUIRED CF1 R -PRF -01 Page 2of7-,' HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • --None -- Cooling System Verifications: • -- None -- HVAC Distribution System Verifications: • --None -- Domestic Hot Water System Verifications: • --None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. Reference Energy Use Energy Design Rating Margin Percent Improvement Total Energy (kTDV/f2-yr)` 176.16 161.16 15.00 8.5% ` includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Jaborskii Addition 1742 1 2 2 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 1st fl zone Conditioned HVACSI 1228 9 DHW Sys 1 2nd fk zone Conditioned HVACSI 514 9 DHW Sys 1 Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Datelrime: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1R-PRF-01 Page 3 of 7 - OPAQUE SURFACES 01 02 03 04 05 06 07 08 09 10 Name Zone Construction Azimuth Orientation Gross Area (ft) Window & Door Area (ft) Tilt (deg) Status Verified Existing Condition Exterior Front Wall 1 st f 1 st fl zone R-21 Wall w/1 EPS 0 Front 468 20 90 New N/A Exterior Left Wall 1 st fl Exterior Rear Wall wall 1st fl zone 1st fl zone R-21 Wall w/1 EPS R-21 Wall w/1 EPS 90 180 Left Back 306 468 24.9 188.5 90 90 New New N/A N/A Exterior Right Wall 1st f 1st fl zone R-21 Wall w/1 EPS 0 Front 306 54 90 New N/A Roof 1 st fl 1 st fl zone R-30 Roof Attic 1228 New N/A Raised Floor 1 st fl zone R-19 Floor Crawlspace 615 New N/A Exterior Front Wall 2nd f 2nd fk zone R-21 Wall w/1 EPS 0 Front 189 0 90 New N/A Exterior Left Wall 2nd fl 2nd fk zone R-21 Wall w/1 EPS 90 Left 216 52.9 90 New N/A Exterior Rear Wall 2nd fl 2nd fk zone R-21 Wall w/1 EPS 180 Back 189 52.9 90 New N/A Exterior Right Wall 2nd f 2nd fk zone R-21 Wall w/1 EPS 270 Right 216 11.9 90 New N/A Roof 2nd fl 2nd fk zone R-30 Roof Attic 514 New N/A Raised 2nd Floor 2nd fk zone R-19 Floor Crawlspace 514 New N/A ATTIC 01 02 03 04 05 06 07 08 09 10 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Statu s Verified Existing Condition Attic 1st fl zone Attic Roof 1st fl zone Ventilated 4 0.3 0.75 No Yes New No Attic 2nd fk zone Attic Roof2nd fk zone Ventilated 4 0.3 0.75 No Yes New No Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD - - CF1 R -PRF -01 Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Page 4 of 7 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml y = WINDOWS 01 02 03 04 05 06 07 08 09 10 11 Name y Side of Building -' Area (ft) U -factor , Status Verified Existing Condition Front Door Exterior Front Wall 1 st f - 0.50 Verified No Rear Door Exterior Rear Wall wall 102.0 Multiplie New No Existing Name Surface (Orientation -Azimuth) Width(ft) Height (ft) r Area (ft2) U -factor SHGC Exterior Shading Status Condition Left Window Exterior Left Wall 1 st fl (Left -90) ---- ---- 1 24.9 0.32 0.25 Insect Screen (default) New N/A Rear Window Exterior Rear Wall wall (Back -180) ---- ---- 1 86.5 0.32 0.25 Insect Screen (default) New N/A Right Window Exterior Right Wall 1st f (Front -0) ---- ---- 1 54.0 0.32 0.25 Insect Screen (default) New N/A Left Window 2 Exterior Left Wall 2nd fl (Left -90) ---- ---- 1 52.9 0.32 0.25 Insect Screen (default) New N/A Rear Window 2 Exterior Rear Wall 2nd fl ____ ---- 1 52.9 0.32 0.25 Insect Screen (default) New N/A (Back -180) Right Window 2 Exterior Right Wall 2nd f 1 11.9 0.32 0.25 Insect Screen (default) New N/A (Right -270) DOORS 01 02 03 04 05 06 Name y Side of Building -' Area (ft) U -factor , Status Verified Existing Condition Front Door Exterior Front Wall 1 st f 20.0 0.50 New No Rear Door Exterior Rear Wall wall 102.0 0.50 New No Registration Number: Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version- CF1R-04072016-744 HERS Provider: Report Generated at: 2016-07-05 10:31:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis . Input File Name: Joborski Addition.xml CF1 R -PRF -01 Page 5 of 7 = OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 09 Name Zone Total Cavity Winter Design Edge Insul. R -value Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers 56 None 0.8 No New No • Cavity/ Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 • Roof Deck. Wood Siding/sheathing/decking Attic Roof st fl zone Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 • Roofing: Light Roof (Asphalt Shingle) • Floor Surface: Carpeted Floors Over • Floor Deck: Wood Siding/sheathing/decking R-19 Floor Crawlspace Crawlspace Wood Framed Floor 2x6 @ 16 in. O.C. R 19 0.049 • Cavity/Frame: R -19/2x6 • Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x6 R-21 Wall w/1 EPS Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 21 0.051 • Exterior Finish: R4 Synthetic Stucco • Inside Finish: Gypsum Board Ceilings (below • Cavity/Frame: R-9.1 /2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30; 0.032 • Over Floor Joists: R-20.9 insul. • Cavity/ Frame: no insult /2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 • Roof Deck: Wood Siding/sheathing/decking Attic Roof2nd fk zone Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 • Roofing: Light Roof (Asphalt Shingle) SLAB FLOORS 01 02 03 04 05 06 07 08 09 Name Zone Area (ft2) Perimeter (ft) Edge Insul. R -value Carpeted Fraction Heated Status Verified Existing Condition Slab -on -Grade 1st If zone 613 56 None 0.8 No New No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Not Required Not Required Not Required WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction N Status Verified Existing Condition DHW Sys 1 DHW Standard DHW Heater 1 . 1 Annual New No Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1 R -PRF -01 Page 6 of 7 _ WATER HEATERS 01 02 03 04 01 02 03 04 05 06 07 08 Parallel Piping Compact Distribution Point -of Use Tank Volume Energy Factor or DHW Sys 1 Tank Exterior Standby Loss Name Heater Element Type Tank Type (gal) Efficiency Input Rating Insulation R -value (Fraction) DHW Heater 1 Propane Small Instantaneous 0 0.84 EF 175000-Btu/hr 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Recirculation with Manual Control Recirculation with Sensor Control DHW Sys 1 n/a n/a n/a n/a n/a n/a SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) Heating System Cooling System 13 Distribution Fan Floor Area Verified Existing Name System Type Name Ducted Name Ducted System System Served Status Condition HVACSI Heat Pump Heating Heat Pump No 1 Heat Pump No none - 1742 New No and Cooling System System 1 1 System 1 HVAC - HEATING SYSTEMS: Heat Pumps 01 02 03 04 05 06 07 Name Type Heating HSPF/COP Cap 47 Cap 17 Cooling SEER EER Heat Pump System 1 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) 36040 36000 13 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 Name IAQ CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 0 Default 0 Not Required Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:32 r CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1 R -PRF -01 Project Name: Jaborskii Addition` • Calculation Date/Time: 10:30, Tue, Jul 05, 2016 w', Page 7 of 7, Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml • o ' DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Gary Faucette Company: Signature Date: A.V. Energy & Associates 7/5/2016 Address: CEA/HERS Certification Identification (If applicable): 45263 7th st East #43 City/State ip: Lancaster, CA 93535 Phone: 661-723-6694 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: - 1. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. ,- 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval ' h -t ' ilding permit application. Responsible Designer Name: Re onsible De ' ner Signature: Patrick Cole, Company: Date Signed: Arcadene Studio Address: - License: C' r 355 East 9th St City/State/Zip: Phone: Chico, CA 95928 530-343-5709 Registration Number. Registration Date/Time: CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 HERS Provider: Report Generated at: 2016 -07 -OS 10:31:32 RESIDENTIAL MEASURES SUMMARY RMS -1 Project Name Jaborski Addition Building Type m Single Family ❑ Addition Alone ❑ Multi Family m Existing+ Addition/Alteration Date 71512016 Project Address 101 Tipsoo Creek Rd Berry Creek California Energy Climate Zone CA Climate Zone 11 Total Cond. Floor Area 1,742 Addition 0 # of Units 1 INSULATION Construction Type Area Cavity f Special Features Status Floor Wood Framed w/Crawl Space R 19 1,129 New Slab Unheated Slab -on -Grade - no insulation 613 Perim = 56' New Wall Wood Framed R21 1,953 Rigid=R-4.0 New Door Opaque Door no insulation 122 New Demising Wood Framed R 30 1,742 New Roof Wood Framed Attic R 30 1,742 Cool Roof New FENESTRATION Total Area: 283 Glazin Percentage: 16.3 % New/Altered Average U -Factor: Orientation Area U -Fac SHGC Overhang Sidefins Exterior Shades 0.32 Status Left (E) 77.8 0.320 0.25 none none Bug Screen New Rear (S) 139.4 0.320 0.25 none none Bug Screen New Front (N) 54.0 0.320 0.25 none none Bug Screen New Right (W) 11.9 0.320 0.25 none none Bug Screen New HVAC SYSTEMS Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status 2 Packaged Heat Pump 4.20 COP Hydronic Heat Pump 13.0 EER Setback New HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R -Value Status HVACS Ductless/ with Fan Ductless n/a n/a New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Small Instantaneous Gas 0 0.84 Standard New Ener Pro 6.7 by Ener Soft User Number: 6055 RunCode: 2016-07-05710:30:33 ID: AV4760 Pae 10 of 24 .2013 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the ,•. _ _ ___I _.__J r. ..___.:- I_ D-:.,.., tho --t;- t;i -4v ca 6- fnr mnrn infnrmntinn. Building Envelope Measures: §I10.6(a)1: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain § 110.6(a)5: Coefficient (SHGC), and infiltration that meets the requirements of §10-111(a). § 110.7: Exterior doors and windows are weatherstripped; all joints and penetrations are caulked and sealed. § 110.8(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on the CF2R. The thermal emittance and aged solar reflectance values of the cool roofing material meets the requirements of § 110.8(i) when the § 1 10.8(i): installation of a cool roof is specified on the CFI R. § 110.80): A radiant barrier shall have an emittance of 0.05 or less when the installation of a radiant barrier is specified on the CFI R. Minimum R-30 insulation in wood -frame ceiling; or the weighted average U -factor shall not exceed 0.031. Minimum R-19 in a § I50.0(a): rafter roof alteration. Attic access doors shall have permanently attached insulation using adhesive or mechanical fasteners. The attic access shall be gasketed to prevent air leakage. §I50.0(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -value. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U -factor of 0.102 or less (R-19 in 2x6 or 0.074 maximum U - § I50.0(c): factor). § 150.0(d): Minimum R-19 insulation in raised wood -frame floor or 0.037 maximum U -factor. In Climate Zones 14 and 16 a Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior §I50.0(g)1: walls, vented attics and unvented attics with air -permeable insulation. In Climate Zones 1-16 with unvented crawl spaces the earth floor of the crawl space shall be covered with a Class I or Class II § 150.0(g)2: vapor retarder. In a building having a controlled ventilation crawl space, a Class I or Class II vapor retarder shall be placed over the earth floor of § I50.0(g)3: the crawl space to reduce moisture entry and protect insulation from condensation, as specified in the exception to Section 150.0(d). Slab edge insulation shall: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; § 150.0(1): have water vapor permeance rate is no greater than 2.0 perm/inch, be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor meets the requirements of §1 10.8(g). Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors shall have a maximum U- 150.0 § (q)' factor of 0.58; or the weighted average U -factor of all fenestration shall not exceed 0.58. Fireplaces, Decorative Gas Appliances and Gas Log Measures: § 150.0(e) I A: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is § 150.0(e)I B: equipped with a readily accessible, operable, and tight -fitting damper or a combustion -air control device. § 150.0(e) I C: Masonry or factory -built fireplaces have a flue damper with a readily accessible control. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside §I50.0(e)2: of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: § 110.0-§110.3: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified to the Energy Commission. Water heating recirculation loops serving multiple dwelling units meet the air release valve, backflow prevention, pump isolation §I 10.3(c)5: valve, and recirculation loop connection requirements of § 110.3(c)5. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appli- §110.5: ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool ands a heaters. Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA using design conditions specified §I50.0(h)1: in §150.0(h)2. Installed air conditioner and heat pump outdoor condensing units shall have a clearance of at least five feet from the outlet of any §I50.0(h)3A: dryer vent. § 150.0(1): Heating systems are equipped with thermostats that meet the setback requirements of § 110.2(c). Storage gas water heaters with an energy factor equal to or less than the federal minimum standards shall be externally wrapped § 150.00)1 A: with insulation having an installed thermal resistance of R-12 or greater. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, have R-12 external § 150.00)1 B: insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the tank. For domestic hot water system piping, whether buried or unburied: the first 5 feet of hot and cold water pipes from the storage tank, all piping with a nominal diameter of 3/4 inch or larger, all piping associated with a domestic hot water recirculation system § 150.00)2A: regardless of the pipe diameter, piping from the heating source to storage tank or between tanks, piping buried below grade, and all hot water pipes from the heating source to kitchen fixtures must be insulated according to the requirements of TABLE 120.3- A. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve § I50.00)2B: that allows for installation, removal, and replacement of the enclosed pipe and insulation. ,im A unw_Riep RPcidPntial Mandatory Measures Summary Lv Pipe for cooling system lines shall be insulated as specified in §I50.00)2A. Piping insulation for steam and hydronic heating § 150.0(j)2C: systems or hot waters stems with pressure > 15 psig shall meet the requirements in TABLE 120.3-A. §150.00)3: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall either be rated for outdoor use or installed with a cover suitable for outdoor service. For §150.00)3A: example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation protected as specified or painted with coating that is water retardant and provides shielding from solar radiation that degrades the material. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space shall have a Class I § I50.00)3B: or Class 11 vapor retarding facing, or the insulation shall be installed at the thickness that qualifies as a Class I or Class II vapor retarder. Systems using gas or propane water heaters to serve individual dwelling units shall include: a 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the § 150.0(n)1: space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr. § I50.0(n)2: Recirculating loops serving multiple dwelling units shall meet the requirements of § 110.3(c)5. Solar water -heating systems and collectors shall be certified and rated by the Solar Rating and Certification Corporation (SRCC) §150.0(n)3: or by a testing agency approved by the Executive Director. Ducts and Fans Measures: All air -distribution system ducts and plenums installed are sealed and insulated to meet the requirements of CMC §601.0, §602.0, §603.0, §604.0, §605.0 and ANSUSMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-6.0 (or higher if required by CMC §605.0) or enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts are mechanically fastened. Openings shall be sealed § 150.0(m)1: with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. Factory -Fabricated Duct Systems shall comply with specified requirements for duct construction, connections, and closures; joints §I50.0(m)2: and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. Field -Fabricated Duct Systems shall comply with requirements for: pressure -sensitive tapes, mastics, sealants, and other § I50.0(m)3-6: requirements specified for duct construction; duct insulation R -value ratings; duct insulation thickness; and duct labelin . All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic § I50.0(m)7: dampers. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers § 150.0(m)8: except combustion inlet and outlet air openings and elevator shaft vents. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: insulation exposed to weather shall be suitable for outdoor service. For example, protected by aluminum, §I50.0(m)9: sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)10: Flexible ducts cannot have porous inner cores. When space conditioning systems use forced air duct systems to supply conditioned air to an occupiable space, the ducts shall be §I50.0(m)1 l: sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal §I50.0(m)12: conditioning component, except evaporative coolers, shall be provided with air filter devices that meet the requirements of § 150.0(m)12. Space conditioning systems that utilize forced air ducts to supply cooling to an occupiable space shall have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the supply plenum. The §I50.0(m)13: space conditioning system must also demonstrate airflow > 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy < 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. Zonally controlled central forced air cooling systems shall be capable of simultaneously delivering, in every zonal control mode, an airflow from the dwelling, through the air handler fan and delivered to the dwelling, of> 350 CFM per ton of nominal cooling §I50.0(m)15: capacity, and operating at an air -handling unit fan efficacy of:S 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3. All dwelling units shall meet the requirements of ASHRAE Standard 62.2. Neither window operation nor continuous operation of § 150.0(0): central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing the Whole Building Ventilation. Whole Building Ventilation airflow shall be confirmed through field verification and diagnostic testing, in accordance with § 150.0(0)1 A: Reference Residential Appendix RA3. Pool and Spa Heating Systems and Equipment Measures: Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency § 110.4(a): Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating. Wil I T..nw_Ricp RPcidPntial Mandatory Measures Summary v a. Photocontrol not having an override or bypass switch that disables the photocontrol; or b. Astronomical time clock not having an override or bypass switch that disables the astronomical time clock, and which is programmed to automatically turn the outdoor lighting OFF during daylight hours; or c. Energy management control system which meets all of the following requirements: At a minimum provides the functionality of an astronomical time clock in accordance with §110.9; meets the Installation Certification requirements in §130.4; meets the requirements for an EMCS in § 130.5; does not have an override or bypass switch that allows the luminaire to be always ON; and, is programmed to automatically turn the outdoor lighting OFF during daylight hours. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site shall comply with one of the §I50.0(k)9B: following requirements: i. Shall comply with §I50.0(k)9A; or ii. Shall comply with the applicable requirements in §110.9, §130.0, §130.2, §130.4, §140.7 and §141.0. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by § 150.0(k)9B or 150.0(k)9D § 150.0(k)9C: shall comply with the applicable requirements in § 1 10.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site shall comply § 150.0(k)9D: with the applicable requirements in § 110.9, § 130.0, § 130.2, § 130.4, § 140.7 and § 141.0. Internally illuminated address signs shall comply with §140.8; or shall consume no more than 5 watts of power as determined §I50.0(k)10: according to § 130.0(c). Lighting for residential parking garages for eight or more vehicles shall comply with the applicable requirements for § 150.0(k)l 1: nonresidential garages in § 110.9, § 130.0, § 130. 1, § 130.4, § 140.6, and § 141.0. In a low-rise multifamily residential building where the total interior common area in a single building equals 20 percent or less of § I 50.0(k) I 2A: the floor area, permanently installed lighting for the interior common areas in that building shall be high efficacy luminaires or controlled by an occupant sensor. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the Floor area, permanently installed lighting in that building shall: i. Comply with the applicable requirements in §110.9, §130.0, §130.1, §140.6 and §141.0; and §150.0(k)1213: ii. Lighting installed in corridors and stairwells shall be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors shall be capable of turning the light fully On and Off from all designed paths of ingress and egress. Solar Ready Buildings: Single family residences located in subdivisions with ten or more single family residences and where the application for a § 110.10(a)1: tentative subdivision map for the residences has been deemed complete, by the enforcement agency, on or after January 1, 2014, shall comply with the requirements of § 110.10(b) through §I I0.10(e). §I 10.10(a)2: Low-rise multi -family buildings shall comply with the requirements of §I 10.10(b) through §I 10.10(d). The solar zone shall have a minimum total area as described below. The solar zone shall comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area shall be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for §1 10.10(b)1: buildings with roof areas greater than 10,000 square feet. For single family residences the solar zone shall be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone shall be located on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project and have a total area no less than 15 percent of the total roof area of the building excluding any skylight area. § 1 10.10(b)2: All sections of the solar zone located on steep -sloped roofs shall be oriented between 110 degrees and 270 degrees of true north. No obstructions, including but not limited to, vents, chimneys, architectural features, and roof mounted equipment, shall be § 1 10.10(b)3A: located in the solar zone. Any obstruction, located on the roof or any other part of the building that projects above a solar zone shall be located at least twice § 110.10(b)3B: the distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load shall be clearly § 110.10(b)4: indicated on the construction documents. The construction documents shall indicate: a location for inverters and metering equipment and a pathway for routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of § 110.10(c): interconnection will be the main service panel); a pathway for routing of plumbing from the solar zone to the water -heating system. A copy of the construction documents or a comparable document indicating the information from §I 10.10(b) through §1 10.10(c) §I 10.10(d): shall be provided to the occupant. § 1 10.10(e)1: The main electrical service panel shall have a minimum busbar rating of 200 amps. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a § 110.10(e)2: future solar electric installation. The reserved space shall be: positioned at the opposite (load) end from the input feeder location or main circuit location, and permanently marked as "For Future Solar Electric". wil I T..nw_RicP RPcidPntial Mandatory Measures Summary Any pool or spa heating equipment shall be installed with at least 36 inches of pipe between filter and heater or dedicated suction §I 10.4(b)1: and return lines, or built-up connections for future solar heating. § 110.4(b)2: Outdoor pools or spas that have a heat pump or gas heater shall have a cover. Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or pro- grammed to run only during off-peak electric demand periods. §110.5: Natural gas pool and spa heaters shall not have a continuous burning pilot light. § I50.0(p): Residential pool systems or equipment shall meet specified pump sizing, flow rate, piping, filters, and valve requirements. Lighting Measures: §110.9: All lighting control devices and systems, ballasts, and luminaires shall meet the applicable requirements of §110.9. Installed luminaires shall be classified as high -efficacy or low -efficacy for compliance with §150.0(k) in accordance with TABLE §I50.0(k)IA: 150.0-A or TABLE 150.0-B, as applicable. When a high efficacy and low efficacy lighting system are combined in a single luminaire, each system shall separately comply § 150.0(k)1 B: with the applicable provisions of § 150.0(k). The wattage and classification of permanently installed luminaires in residential kitchens shall be determined in accordance with §130.0(c). In residential kitchens, the wattage of electrical boxes finished with a blank cover or where no electrical equipment has §I50.0(k)1C: been installed, and where the electrical box can be used for a luminaire or a surface mounted ceiling fan, shall be calculated as 180 watts of low efficacy lighting er electrical box. § 150.0(k)I D: Ballasts for fluorescent lamps rated 13 watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans shall be rated to consume no §I50.0(k)IE: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with §I30.0(c). Night lights do not need to be controlled by vacancy sensors. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) shall meet the applicable § I50.0(k)I F: requirements of § 150.0(k). § I50.0(k)2A: High efficacy luminaires must be switched separately from low efficacy luminaires. § 150.0(k)2B: Exhaust fans shall be switched separately from lighting systems. §I50.0(k)2C: Luminaires shall be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § I50.0(k)2D: Controls and equipment are installed in accordance with manufacturer's instructions. § I50.0(k)2E: No control shall bypass a dimmer or vacancy sensor function if the control is installed to comply with § 150.0(k). § I50.0(k)2F: Lighting controls comply with applicable requirements of § 110.9. An Energy Management Control System (EMCS) may be used to comply with dimmer requirements if: it functions as a dimmer § 150.0(k)2G: according to § 110.9; meets Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5; and all other requirements in § I50.0(k)2. An Energy Management Control System (EMCS) may be used to comply with vacancy sensor requirements of § 150.0(k) if: it §I50.0(k)2H: functions as a vacancy sensor according to §110.9; meets Installation Certificate requirements of §130.4; the EMCS requirements of §130.5; and all other requirements in §150.0(k)2. A multiscene programmable controller may be used to comply with dimmer requirements of this section if it provides the § I50.0(k)2I: functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in §I50.0(k)2. § I50.0(k)3A: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. Kitchen lighting includes all permanently installed lighting in the kitchen except internal lighting in cabinets that illuminate only §I50.0(k)3B: the inside of the cabinets. Lighting in areas adjacent to the kitchen, including but not limited to dining and nook areas, are considered kitchen lighting if they are not separately switched from kitchen lighting. Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated §I50.0(k)4: cabinet. A minimum of one high efficacy luminaire shall be installed in each bathroom; and all other lighting installed in each bathroom §150.0(k)5: shall be high efficacy or controlled by vacancy sensors. Lighting installed in attached and detached garages, laundry rooms, and utility rooms shall be high efficacy luminaires and § I50.0(k)6: controlled by vacancy sensors. Lighting installed in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high § I50.0(k)7: efficacy, or shall be controlled by either dimmers or vacancy sensors. Luminaires recessed into ceilings shall: be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; have a label that certifies that the luminaire is airtight with air leakage less than 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; be sealed with a gasket or caulk between the luminaire housing §I50.0(k)8: and ceiling, and shall have all air leak paths between conditioned and unconditioned spaces sealed with a gasket or caulk; and allow ballast maintenance and replacement without requiring cutting holes in the ceiling. For recessed compact fluorescent luminaries with ballasts to qualify as high efficacy for compliance with § I50.0(k), the ballasts shall be certified to the Energy Commission to comply with the applicable requirements in § 110.9. For single-family residential buildings, outdoor lighting permanently mounted to a residential building or other buildings on the same lot shall be high efficacy, or may be low efficacy if it meets all of the following requirements: i. Controlled by a manual ON and OFF switch that does not override to ON the automatic actions of Items ii or iii below; and § 150.0(k)9A: ii. Controlled by a motion sensor not having an override or bypass switch that disables the motion sensor, or controlled by a motion sensor having a temporary override switch which temporarily bypasses the motion sensing function and automatically reactivates the motion sensor within 6 hours; and iii. Controlled by one of the following methods: HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Jaborski Addition 7/5/2016 System Name Floor Area HVACS 1,742 ENGINEERING CHECKS SYSTEM LOAD Number of S stems 2 COIL CFM Total Room Loads 962 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 36,0401 18,611 796 545 22,772 Total Output Btuh 72,080 0 Output Btuhls ft 41.4 0 0 Cooling System 0 0 Output perSystem 36,000 0 0 0 0 Total Output Btuh 72,000 10,075 -10,075 Total Output Tons 6.0 0 0 Total Output Btuh/s ft 41.3 TOTAL SYSTEM LOAD 796 Total Output s ft/Ton 290.3 28,685 12,698 Air System CFM perSystem 2,400 HVAC EQUIPMENT SELECTION Airflow cfm 4,800 Mitsulishi Mini -Split 68,744 0 62,906 Airflow cfm/s ft 2.76 Airflow cfm/Ton 800.0 Outside Air % 0.0% Total Adjusted System Output 68,7441 0 (Adjusted for Peak Design conditions) 62,906 0.00 Outside Air cfm/s ft TIME OF SYSTEM PEAK Aug 3 PM Jan 1 AM Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 68 OF 105 OF 107 OF Outside Air G —" — 0 cfm Heating Coil Supply Fan 107 OF 4,800 cfm ROOM 68 OF 68 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 102/71 OF 75/61 OF 55/54°F 57/55°F Outside Air 0 cfm Supply Fan 57 / 55 OF Cooling Coil 4,800 cfm 45.9% ROOM 75 / 61 OF 75/ 61 OF EnergyPro 6.7 by EnergySoft User Number: 6055 RunCode: 2016-07-05T10:30:33 /D: AV4760 Page 15 of 24 ZONE LOAD SUMMARY Project Name Jaborski Addition System Name HVACS ZONE LOAD SUMMARY Date 7/5/2016 Floor Area 1.742 ZONAL SYSTEM COOLING PEAK I HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heatinq OA CFM Peak Hr CFM Sensible Latent CFM Sensible 1st fl zone 1.0 0 Aug 3 PM 624 12,061 561 391 16,336 2nd fk zone 1.0 0 Aug.3 PM 339 6,550 235 154 6,436 TOTALS 0 0 0 01 Aug 3 PM 1 18,6111 7961 22,772 (BLOCK LOAD EnergyPro 6.7 by EnergySoft User Number. 6055 RunCode: 2016-07-05T10:30:33 ID: AV4760 Page 16 of 24 ROOM LOAD SUMMARY Project Name Jaborski Addition System Name HVACS ROOM LOAD SUMMARY r 7/5/2016 1,742 ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name Room Name Mult. CFM Sensible Latent CFM Sensible Latent CFM Sensible 1st flzone 1stf/zone 1 624 12,061 561 624 12,061 561 391 16,336 2nd fk zone 2nd fl zone 1 339 6,550 235 339 6,550 235 154 6,436 PAGE TOTAL TOTAL 962 18,611 796 545 22,772 962 18,611 796 545 22,772 Total includes ventilation load for zonal systems. EneravPro 6.7 by EnerovSoft User Number: 6055 RunCode: 2016-07-05T10:30:33 ID: AV4760 Pae 17 of 24 ROOM HEATING PEAK LOADS Project Name Jaborski Addition Date 7/5/2016 ROOM INFORMATION DESIGN CONDITIONS Room Name 1 st fl zone Floor Area 1,228.0 ft2 Indoor Dry Bulb Temperature 68 OF Time of Peak Jan 1 AM Outdoor Dry P Bulb Temperature 22 OF Conduction 1.072 Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U-Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT *F = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 46 Btu/hr R- 19 Floor Craw/space 615.0 0.0370 46 1,047 Slab-On-Grade perim = 56.0 0.7300 46 1,880 R-21 Wall w/1 " EPS 1,260.6 0.0541 46 3,136 Wood Door 122.0 0.5000 46 2,806 Sierra Pacific Windows & Doors 165.4 0.3200 46 2,435 'R 30 Wall 1,228.0 0.0560 0 0 R-30 Roof Attic 1,228.0 0.0310 46 1,751 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X Schedule Air Sensible Fraction through an interior surface X 1,228 X Area another room 9.00 X 0.361 Height ACH Page Total /60] X AT 13,055 = 3,282 TOTAL HOURLY HEAT LOSS FOR ROOM 16,336 EnergyPro 6.7 by EnergySoft User Number. 6055 RunCode: 2016-07-05710:30:33 ID: AV4760 Page 18 of 24 ROOM HEATING PEAK LOADS Project Name Jaborski Addition Date 7/5/2016 ROOM INFORMATION DESIGN CONDITIONS Room Name 2nd fl zone Floor Area 514.0 ftz Indoor Dry Bulb Temperature 68 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 22 0 Conduction 1.072 Area U -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT °F = = = = = = = = = = = = = = = = = = = = = = = = = = = = 46 Btu/hr R-19 Floor Crawlspace 514.0 X 0.0370 46 875 R-21 Wall w/1 " EPS 692.3 X 0.0541 46 1,722 Sierra Pacific Windows & Doors 117.7 X 0.3200 46 1,733 'R 30 Wall 514.0 X 0.0560 0 0 R-30 Roof Attic 514.0 X 0.0310 46 733 X X X X X X X X X X X X X X X X X X X X X X X X XX X to another room 9.00 X 0.361 Ceiling Height ACH Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X Schedule Air Sensible Fraction through an interior surface X 514 X Area Page Total /60] X AT 5,062 __ 1,374 TOTAL HOURLY HEAT LOSS FOR ROOM 6,436 EnergyPro 6.7 by EnergySoft User Number: 6055 RunCode: 2016-07-05710:30:33 ID: AV4760 Page 19 of 24 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date 1 Jaborski Addition 7/5/2016 ROOM INFORMATION DESIGN CONDITIONS Room Name 1 st fl zone Outdoor Dry Bulb Temperature 102 OF Floor Area 1,228.0 ffz Outdoor Wet Bulb Temperature 71 °F Indoor Dry Bulb Temperature 75 0 F1 Outdoor Daily Range: 37 OF Opaque Surfaces Orientation Area U -Factor CLTD' Btu/hr R-19 Floor Crawlspace 615.0 X 0.0370 X 12.8 = 291 R-21 Wall w/1 " EPS (N) 700.0 X 0.0541 X 15.0 = 568 Wood Door (N) 20.0 X 0.5000 X 15.0 = 150 R-21 Wall w/1 " EPS (E) 281.1 X 0.0541 X 25.0 = 380 R-21 Wall w/1 " EPS (S) 279.5 X 0.0541 X 18.0 = 272 Wood Door (S) 102.0 X 0.5000 X 18.0 = 918 `R 30 Wall 1,228.0 X 0.0560 X 0.0 = 0 R-30 Roof Attic (N) 1,228.0 X 0.0310 X 6 48. = 1,850 X X = Page Total 4,429 Items shown with an asterisk (`) denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btu/hr Left Window (E) 0.0 X 13.7 + 24.9 X 28.5 = 710 Rear Window (S) 0.0 X 13.7 + 86.5 X 18.8 = 1,625 Right Window (N) 0.0 X 13.7 + 54.0 X 13.7 = 739 X + X = X + X = X + X = X + X = X + X = X + X = Page Total 3,074 Internal Gain Btu/hr Occupants 3 7 Occupants X 245 Btuh/occ. = 903 Equipment 1,228 Floor Area X 0.50 w/sqft = 2,096 Infiltration: 1.072 X 1.06 X 50.65 X 27 = 1,560 Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 12,061 Latent Gain Btu/hr Occupants 3 7 Occupants X 155 Btuh/occ. = 571 Infiltration: 4,806 X 1.06 X 50.65 X 0.00004 = -10 Air Sensible CFM ELA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 571 Ener Pro 6.7 by Ener Soft User Number: 6055 RunCode: 2016-07-05T10:30:33 /D: AV4760 Page 20 of 24 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date 1 Jaborski Addition 7/5/2016 ROOM INFORMATION DESIGN CONDITIONS Room Name 2nd fl zone Outdoor Dry Bulb Temperature 102 OF Floor Area 514.0 ft2 Outdoor Wet Bulb Temperature 71 OF Indoor Dry Bulb Temperature 75 OF1 Outdoor Daily Range: 37 OF Opaque Surfaces Orientation Area U -Factor CLTD' Btu/hr R-19 Floor Crawlspace 514.0 X 0.0370 X 12.8 = 243 R-21 Wall w/1 " EPS (N) 189.0 X 0.0541 X 15.0 = 153 R-21 Wall w/1 " EPS (E) 163.1 X 0.0541 X 25.0 = 220 R-21 Wall w/1 " EPS (S) 136.1 X 0.0541 X 18.0 = 132 R-21 Wall w/1 " EPS (W) 204.1 X 0.0541 X 25.0 = 276 'R 30 Wall 514.0 X 0.0560 X 0.0 = 0 R-30 Roof Attic (N) 514.0 X 0.0310 X 48.6 = 774 X X = X X = Page Total 1,800 Items shown with an asterisk (') denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btu/hr Left Window (E) 0.0 X 13.7 + 52.9 X 28.5 = 1,509 Rear Window (S) 0.0 X 13.7 + 52.9 X 18.8 = 994 Right Window (W) 0.0 X 13.7 + 11.9 X 28.5 = 339 X + X = X + X = X + X = X + X = X + X = X + X = Page Total 2,84 Internal Gain Btu/hr Occupants 15 Occupants X 245 Btuh/occ. = 378 Equipment 514 Floor Area X 0.50 w/sgft = 87 Infiltration: 1.072 X 1.06 X 21.20 X 27 = 653 Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 6,550 Latent Gain Btu/hr Occupants 15 Occupants X 155 Btuh/occ. = 239 Infiltration: 4,806 X 1.06 X 21.20 X 0.00004 = 4 Air Sensible CFM ELA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 239 Ener Pro 6.7 by Ener Soft User Number: 6055 RunCode: 2016-07-05T10:30:33 /D: AV4760 Page 21 of 24 ENERGY USE AND COST SUMMARY ECON-1 Project Name Jaborski Addition 1 Date 7/5/2016 Rate: Fuel Type: Electricity STANDARD PROPOSED MARGIN Energy Peak Use Demand Cost (kWh) (kW) $) Energy Use (kWh) Peak Demand (kW) Cost $) Energy Use (kWh) Peak Demand kW) Cost $ Jan 1,520 3.8 1,041 2.2 479 1.6 Feb 1,042 3.7 674 2.1 367 1.7 Mar 912 3.1 585 1.8 327 1.3 Apr 779 3.0 494 1.9 285 1.1 Mav 662 4.0 407 3.6 255 0.4 Jun 921 4.3 663 4.9 258 -0.6 Jul 1,175 4.5 933 6.7 242 -2.2 Aug1,028 4.4 817 5.9 211 -1.5 Sep 803 4.4 632 5.5 172 -1.1 Oct 608 4.0 407 2.2 200 1.8 Nov 935 3.3 617 2.0 319 1.3 Dec 1,295 3.4 879 2.2 416 1.3 Year 11,680 4.5 8,149 6.7 3,531 -2.2 CO2 lbs/yr lbs/yr lbs/yr Rate: Fuel Type: Propane STANDARD PROPOSED MARGIN Energy Use (therms) Peak Demand Cost kBtu/hr) ($) Energy Use (therms) Peak Demand kBtu/hr) Cost ($) Energy Use (therms) Peak Demand Cost kBtu/hr) $) Jan 0 0.0 0 0.0 0 0.0 Feb 0 0.0 0 0.0 0 0.0 Mar 0 0.0 0 0.0 0 0.0 Apr 0 0.0 0 0.0 0 0.0 May 0 0.0 0 0.0 0 0.0 Jun 0 0.0 0 0.0 0 0.0 Jul 0 0.0 0 0.0 0 0.0 Aua 0 0.0 0 0.0 0 0.0 Sep 0 0.0 0 0.0 0 0.0 Oct 0 0.0 0 0.0 0 0.0 Nov 0 0.0 0 0.0 0 0.0 Dec 0 0.0 0 0.0 0 0.0 Year 0 0.0 0 0.0 0 0.0 CO2 Ibs/ r lbs/yr lbs/yr Annual Totals Energy Demand Cost CosVs ft Virtual Rate Electricity 8,149 kWh 7 kW $ 0 $ 0.00 /s ft $ 0.00 /kWh Propane 0 therms 0 kBtu/hr $ 0 $ 0.00 /s ft $ 0.00 /therm Total $ 0 $ 0.00 /s ft Avoided CO2 Emissions: 0 lbs/yr EnergyPro 6.7 by EnergySoft User Number: 6055 RunCode: 2016-07-05x10:30:3 IU: AV4/bU rage cc U1 cw l • Energy Upgrade Recommendations ECON-2 Project Name Jaborski Addition Documentation Author A. V. Energy & Associates T Project Address 101 Tipsoo Creek Rd Author Address 45263 7th st East #43 Berry Creek, CA 95916 Lancaster, CA 93535 Recommended, _ x s 21 Annual Est: Cost to Sav s' Improvements y . Descri tion Savin Install Site' _ n•TDV. �; t I • to • A Annual > Results Ener Cost• - :End Use' f Existin ' Im rov4d ' -'Savings Space Heating Space Cooling 0 Fans 0 Pumps 0 Domestic Hot Water $0 Indoor Lighting $0 Outdoor Lighting 0 Appliances/Plug Loads $0 Ancilla $0 Renewables 0 TOTAL 0 CO2 Itis/ -ear Existing " -improved . Savings Electricity 0 Fossil Fuel 0 ' 'TOTAL 0 Electricity kWh ., ;Existing. Improved' Savings 1,799 0 86 0 893 90 1,954 1,429 0 8,149 Fossil Fuel therms Existin .Im roved • ,Savin s I —I � I . . 1 Climate Zone: 11 - Electric Rate: r ' Gas Rate: Floor Area: 1,742 Type: - Single Family Average Demand kW 4.26 TDV Energy kBtu/ft2- r The estimated operating costs shown in this report are dependent upon many factors. The construction and conservation features of the project clearly are important.- Equally mportant:Equally important is the thermostat setting. How the thermostat is used, appliance use, and occupant interaction all influence the annual operating cost. The estimates provided in this report are based on typical conditions; your actual usage will vary. Ener Pro 6.7.0.4 by Energ Soft User Number: 6055 RunCode: 2016-07-05T10:30:33 /D: AV4760 Page 23 of 24 ' a _ california Home Incentive: $ 800 advanced homes CARP Incentive Report (CIR) Project Size and`Locatiori 0rientation'and Type Conditioned Floor Area 1742 sq. ft. I Project Type Single Family Climate Zone CZ11 (Red Bluff) Front Orientation (in degrees) 0 Kicker and Incentive Summary's :U �Energ ; se Summary y _` CAHP Score Initial , f DOE Zero Energy Ready Home (3 possible) -0 Future Code Preparation (5 possible) -0 High Efficacy Lighting Credit (3 possible) t Low Energy Use Home (5 possible) -0 Ultra Low Use Home (5 possible) -0 CAHP Score Final c / 280,741 Incentive -Amount .. .$0,8001 Kicker and Incentive Summary's :U �Energ ; se Summary y _` CAHP Score Initial , f DOE Zero Energy Ready Home (3 possible) -0 Future Code Preparation (5 possible) -0 High Efficacy Lighting Credit (3 possible) -0 Low Energy Use Home (5 possible) -0 Ultra Low Use Home (5 possible) -0 CAHP Score Final c Total Project kTDV Energy 280,741 Incentive -Amount .. .$0,8001 0.00 0.00 0.00 Other HVAC 0.00 0.00 0.00 0.00 Water Heating 0.00 0.00 31.41 24.67 Inside Lighting 0.00 0.00 Kicker and Incentive Summary's :U �Energ ; se Summary y _` CAHP Score Initial 79 DOE Zero Energy Ready Home (3 possible) -0 Future Code Preparation (5 possible) -0 High Efficacy Lighting Credit (3 possible) -0 Low Energy Use Home (5 possible) -0 Ultra Low Use Home (5 possible) -0 CAHP Score Final 79 Total Project kTDV Energy 280,741 Incentive -Amount .. .$0,8001 150 x+5:'4 140 130 120 110 100 y 90 i• 70 50 50 40 30 20 10 . 0 CAHP Score M: Project:Savings-Margins� - Project Savings (kW) 0.2 Project Savings (kWh/yr) 3530 Project Savings (therms) 0 { :U �Energ ; se Summary y _` :• j - End Use ' ' Savings (kWh/yr) = e, 'Savings-, (therms),1 CAHP Std (kTDV/ft2) '. Proposed (kTDV/ft2) 4 Space Heating 756.00 0.00 ' 29.03 18.86 Space Cooling 184.00 0.00 83.17 56.04 IAQ Ventilation 0.00 0.00 0.00 0.00 Other HVAC 0.00 0.00 0.00 0.00 Water Heating 0.00 0.00 31.41 24.67 Inside Lighting 0.00 0.00 11.45 11.45 Appl. & Cooking 0.00 0.00 24.85 24.85 Plug Loads 0.00 0.00 24.21 24.21 Exterior 0.001 0.001 1.08 1.08 PV Credit 0.00 Compliance Total 143.61 99.57 TOTAL, • 3529.00 -103.001 205.20 161.16 Name of Model,File:, ,, Jaborskii Addition Date and Time of Analysis::' , w 10:30, Tue, Jul 05, 2016 Pacific Gas and SOUTHERN GLIFORNIA S001hem E D I S O N` SO Cal'rfomia Electric Company J �� Gas Company - An F.D/SON IA'TERNATIONAL"Company , aSempra Energy ucirty® ' ASempra Energy ueuly CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1 R -PRF -01 Page 1 of 7 GENERAL INFORMATION 01 Building Complies with Computer Performan e' 01 Project Name Jaborskii Addition 04 -�. � w-- �-,. ,r- nom. � ,r�.4 w s R ir-�. � ir., irl 02 Calculation Description Title 24 Analysis 08 Energy Use (kTDV/ftZ-yr) 03 Project Location 101 Tipsoo Creek Rd Compliance Margin Percent Improvement 04 City Berry Creek 05 Standards Version Compliance 2015 06 Zip Code 95916 07 Compliance Manager Version BEMCmpMgr 2013-4 (744) 08 Climate Zone CZ11 09 Software Version EnergyPro 6.6 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 0 12 Project Scope Addition and/or Alteration 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ftZ) 1742 15 Number of Zones 2 16 Slab Area (ftZ) 613 17 Number of Stories 2 18 Addition Cond. Floor Area 0 19 Natural Gas Available No 20 Addition Slab Area (ft) 0 21 Glazing Percentage (%) 16.3% COMPLIANCE RESULTS 01 Building Complies with Computer Performan e' 02 This building DOES NOT req HERS Ve�atio�n� �� ��- 04 -�. � w-- �-,. ,r- nom. � ,r�.4 w s R ir-�. � ir., irl y H E R S !f 1 �. J' 1/ r EE Registration Number: 216-A0227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016=07-05 10:31:47 ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ftZ-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 26.81 18.86 7.95 29.7% Space Cooling 56.35 56.04 0.31 0.6% IAQ Ventilation 0.00 0.00 0.00 0.0% Water Heating 31.41 24.67 6.74 21.5% Photovoltaic Offset ---- 0.00 0.00 ---- Compliance Energy Total 114.57 99.57 15.00 13.1% Registration Number: 216-A0227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016=07-05 10:31:47 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01 Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Page 2 of 7 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml - REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. NO SPECIAL FEATURES REQUIRED HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • -- None -- Cooling System Verifications: • -- None -- HVAC Distribution System Verifications: -- None -- Domestic Hot Water System Verifications: • --None -- ENERGY DESIGN RATING This is the sum of the annual TDV energy consumption for energy use components included in the performance compliance approach for the Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics) and accounting for the annual TDV energy offset by an on-site renewable energy system. AOO" M I ...., Reference Energy Use, ri Energy Design Rating Margin Percent Improvement Total Energy (kTDVlf2-yr)' X1.76.16* It ��� i> c 161.16 W 15.00 8.5% includes calculated Appliances and Miscellaneous Energy Use (AMEU BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Jaborskii Addition 1742 1 2 2 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 1stfl zone Conditioned HVACSI 1228 9 DHW Sys 1 2nd fk zone Conditioned HVACSI 514 9 DHW Sys 1 Registration Number: 216-A0227019A-000000000-0000 I Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:47 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 AnalysisInput File Name: Joborski Addition.xml C01 R -PRF -01 Page 3 of 7 OPAQUE SURFACES 01 02 03 04 05 06 07 08 09 10 Name Zone Construction Azimuth Orientation Gross Area (ft2) Window & Door Area (ft2) Tilt (deg) Status Verified Existing Condition Exterior Front Wall 1st f Exterior Left Wall 1st fl 1st fl zone 1 st fl zone R-21 Wall w/1 EPS R-21 Wall w/1 EPS 0 90 Front Left 468 306 20 24.9 90 90 New New N/A N/A Exterior Rear Wall wall 1st fl zone R-21 Wall w/1 EPS 180 Back 468 188.5 90 New N/A Exterior Right Wall 1st f 1 st fl zone R-21 Wall w11 EPS 0 Front 306 54 90 New N/A Roof 1 st fl 1 st fl zone R-30 Roof Attic 1228 New N/A Raised Floor 1 st fl zone R-19 Floor Crawlspace 615 New N/A Exterior Front Wall 2nd f 2nd fk zone R-21 Wall w/1 EPS 0 Front 189 0 90 New N/A Exterior Left Wall 2nd fl 2nd fk zone R-21 Wall w/1 EPS 90 Left 216 52.9 90 New N/A Exterior Rear Wall 2nd fl 2nd fk zone R-21 Wall w/1 EPS 180 Back 189 52.9 90 New N/A Exterior Right Wall 2nd f 2nd fk zone R-21 Wall w/1 EPS 270 Right 216 11.9 90 New N/A Roof 2nd fl 2nd fk zone R-30 Roof Attic 514 New N/A Raised 2nd Floor 2nd fk zone � R-19 F_,Ioor C �awtsp e lF))-1 —l� �� �51a4 �, New N/A It IL 114 F 1 41 ATTIC 1 Nom, l�I.i IJ ��—rai• Ili i# i3 U a�`V U U U �O 01 02 1.1 L 03H `�° f 04� k t U 05V I U 06 R 07 08 09 10 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Statu s Verified Existing Condition Attic 1 st fl zone Attic Roof 1st fl zone Ventilated 4 0.3 0.75 No Yes New No Attic 2nd fk zone Attic Roof2nd fk zone Ventilated 4 0.3 0.75 No Yes New No Registration Number: 216-A0227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-04072016-744 Report Generated at: 2016-07-05 10:31:47 -V CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30,�Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1 R -PRF -01 Page 4of7 , WINDOWS 01 02 03 04 05 06 07 08 09 10 11 U -factor Status Verified Existing Condition Front Door A Exterior FrontcWa ll 1 V fir I _J L20.0%., 90150, AV" New No Rear Door ExterioA6ZI—A Wall wall L, -1 ' U102-" W, I Verified Multiplie Existing Name Surface (Orientation -Azimuth) Width(ft) Height (ft) r Area (ft2) U -factor SHGC Exterior Shading Status Condition Left Window Exterior Left Wall 1 st fl (Left -90) ---- ---- 1 24.9 0.32 0.25 Insect Screen (default) New N/A Rear Window Exterior Rear Wall wall (Back -180) ---- ---- 1 86.5 0.32 0.25 Insect Screen (default) New N/A Right Window Exterior Right Wall 1 st f (Front -0) ---- ---- 1 54.0 0.32 0.25 Insect Screen (default) New N/A Left Window 2 Exterior Left Wall 2nd fl (Left -90) ---- ---- 1 52.9 0.32 0.25 Insect Screen (default) New N/A Rear Window 2 Exterior Rear Wall 2nd fl ____ ___- 1 52.9 0.32 0.25 Insect Screen (default) New N/A (Back -180) Right Window 2 Exterior Right Wall 2nd f 1 11.9 0.32 0.25 Insect Screen (default) New f N/A (Right -270) DOORS - 01 02 03 04 05 06 Name Side of Building A(ft2). 14 U -factor Status Verified Existing Condition Front Door A Exterior FrontcWa ll 1 V fir I _J L20.0%., 90150, AV" New No Rear Door ExterioA6ZI—A Wall wall L, -1 ' U102-" W, I 0.50 New No 3 \; HER -S RR,OVID-ER Registration Number: 216-Ao227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-04072016-744 Report Generated at: 2016-07-05 10:31:47 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1 R -PRF -01 Page 5 of 7 OPAQUE SURFACE CONSTRUCTIONS - 01 02 03 04 05 06 07 07 08 09 Name Total Cavity Winter Design � R Perimeter (ft) Construction Name Surface Type Construction Type Framing R -value U -value Assembly Layers 613 56 None 0.8 No New • Cavity/ Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Roof1 st fl zone Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) • Floor Surface: Carpeted Floors Over Floor Deck: Wood Siding/sheathing/decking R-19 Floor Crawlspace Crawlspace Wood Framed Floor 2x6 @ 16 in. O.C. R19 .0.049 Cavity/ Frame: R -19/2x6 • Inside Finish: Gypsum Board • Cavity / Frame: R-21 / 2x6 R-21 Wall w/1 EPS Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 21 0.051 Exterior Finish: R4 Synthetic Stucco • Inside Finish: Gypsum Board Ceilings (below Cavity / Frame: R-9.1 / 2x4 R-30 Roof Attic attic) Wood Framed Ceiling 2x4 @ 24 in. O.C. R 30 0.032 Over Floor Joists: R-20.9 insul. • Cavity / Frame: no insul. / 2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic Roof2nd fk zone Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) SLAB FLOORS H l( a! In) V 01 02`t � M U 03-tt=0 X64l U U ftc:0' tI 05 U U U \t= O . 06 07 08 09 Name "1► H `t Zone E R S Area (ft2) � R Perimeter (ft) 0 V I D E R Edge Insul. R -value Carpeted Fraction Heated Status Verified Existing Condition Slab -on -Grade 1st fl zone 613 56 None 0.8 No New No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (011) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Not Required Not Required Not Required --- WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction N Status Verified Existing Condition DHW Sys 1 DHW Standard DHW Heater 1 1 Annual New No Registration Number: 216-Ao227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:47 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition, Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml kl CF1 R -PRF -01 Page 6 of 7 4 WATER HEATERS . 01 02 03 04 05 06 07 08 09 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) 1 Tank Volume Energy Factor or Recirculation with - Tank Exterior Standby Loss Name Heater Element Type Tank Type (gal) Efficiency Input Rating Insulation R -value (Fraction) DHW Heater 1 Propane Small Instantaneous 0 0.84 EF 175000-Btu/hr 0 0 WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) 1 Heating System ; Recirculation with Recirculation with Name Pipe Insulation Parallel Piping Compact Distribution Point -of Use Manual Control Sensor Control DHW Sys 1 n/a n/a n/a n/a n/a n/a SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) 1 Heating System ; Cooling System - 7 13 Distribution Fan Floor Area Verified Existing Name System Type Name Ducted rk Name Ducted System System Served Status Condition Heat Pump Heating Heat Pump Heat Pum` 3 IkN'O' neHVACSIand 1742 New No Cooling System SystemNo tem FF' i! HVAC - HEATING SYSTEMS: Heat Pumps 01 02 03 04 05 06 07 Name Type Heating HSPF/COP Cap 47 Cap 17 Cooling SEER EER Heat Pump System 1 AirToWaterHeatPump - Air to water heat pump (able to heat DHW) 1 36040 7 36000 - 7 13 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 Name IAQ CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 0 Default 0 Not Required Registration Number: 216-A0227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:47 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Jaborskii Addition - Calculation Date/Time: 10:30, Tue, Jul 05, 2016 Calculation Description: Title 24 Analysis Input File Name: Joborski Addition.xml CF1R-0RF-01 Page 7 of 7 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: �a�ccet�e Gary Faucette _ Company: Signature Date: A.V. Energy & Associates 2016-07-05 10:42:40 Address: CEA/HERS Certification Identification (If applicable): 45263 7th Street East #43 City/State/Zip: _ Phone: Lancaster, CA 93535 - 661-723-6694 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1: I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.; l certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted,to tfi�e enforceme`t,agen y�f r approval with,hF.b Gilding permit application. Responsible Designer Name: LLQ L It Responsible Designer Signature: ! C� Patrick Cole �!l\ 07 U R, 0 Company: HERS- RFR�..3VIDER Date Signed: r - ARCADEME 2016-07-05 10:44:24 Address: License: NA 355 East 9th Street City/State/Zip: Phone: Chico, CA 95928 530-343-5709 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 216-A0227019A-000000000-0000 Registration Date/Time: 2016-07-05 10:44:24 HERS Provider: CaiCERTS inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-04072016-744 Report Generated at: 2016-07-05 10:31:47 BUTTE •.; , COUNTY DIVISION A4.6 -.TIER 1 AND TIER 2 - RECEIVED SECTION A4.602 OCT 0 5 2016 RESIDENTIAL OCCUPANCIES APPLICATION CHECKLIST tUEVELO['VIENT - '~ OCT 0'1 2016 July '1, 2015 SUPPLEMENT SERVICES '+ + ` Effective July,1, 2015 a A_ ,TRB AND ASSOCIATES VERIFICATIONS LEVELS 4 ENFORCING AGENCY TO SPECIFY APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives" Enforcin Installer or Third f+ ' FEATURE OR MEASURE g Agency Designer party " Mandatory Tier 1 Tier 2 All All A All PLANNING AND DESIGN to Selection'.,, -- A4.103.1 A site which complies with at least one ofthe characteristics is selected: _following 1. An infill site is selected. + ❑ ❑ ❑ ❑ ❑ 2. A greyfield site is selected. + ❑ ❑ 0 0 0 3' An EPA -recognized Brownfield site is selected. , •' ❑ ❑ ❑ ' ❑ ' A4.103.2 Facilitate community connectivity by one ofthe following methods:' 1. Locate project within a 1/4 -mile true walking distance ' of at least 4 basic services; 0 ❑ ❑ 0 1 ❑ ti 2. Locate project within '/2 -mile true walking distance , '�• N of at least 7 basic services; ❑ ❑ ❑ ❑ ` ❑ 3. Other methods increasing access to additional r resources. ❑ 0 0 0 ❑ Site Preservation 5. ' A4.104.1 An individual with oversight responsibility for the project has participated in an educational program. '' • , ❑ , ❑ promoting environmentally friendly design ordevelopment ❑. ❑ and has provided training or instruction to appropriate ' entities. "« Deconstruction and Reuse of Ezistit Materials` A4.105.2 Existing buildings are disassembled for reuse or. recycling of building materials. The proposed structure'. , utilizes at least one ofthe following materials which can be j easily reused: •. r 1. Light fixtures . , + 2. Plumbing fixtures w , ❑ ❑ ❑ ❑ 3. Doors and trim 4. Masonry 5. Electrical devices - .� •A 1' 6. Appliances , -4 9a OU�e,A�1V tl 7. Foundations or portions of foundations an A' CAr� Site Develo mein .: M a;�,u• _ rtii ii�4 �a 4.106.2 A plan is developed and implemented to manage ' r - �y jlima storm water drainage during construction. k 4.106.3 Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. ❑D x' + to keep water from entering buildings. 4.106.4 Provide capability for electric vehicle charging in y ' one- and two-family dwellings and in townhouses with �• �❑ ❑ ❑ ❑ attached private garages; and 3 percent of total parking:— s aces, asspecified, for multifamily dwellings. A4.106.1 Reserved.` A4.106.2.1 Soil analysis is performed by a licensed design professional and the findings utilized in the structural _ ❑ ` ; . ❑ T ❑ ❑ ❑ design ofthe building. • a "• VERIFICATIONS LEVELS ENFORCING AGENCY TO SPECIFY APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives' Enforcin Installer or Third FEATURE OR MEASURE g Agency Designer party 0 0 0 ' Mandatory Tier 1 Tier 2 All All All A4.106.2.2 Soil disturbance and erosion are minimized by at least one of the following: + I. Natural drainage patterns are evaluated and ❑ ❑ ❑ ❑ ❑ erosion controls are implemented to minimize "erosion during construction and after occupancy. 2. Site access is accomplished by minimizing the f ❑ ❑ ❑ ❑ amount of cut and fill needed to install access roads and driveways. 3. Underground construction activities are ❑ ❑ ❑ ❑ ❑ coordinated to utilize the same trench, minimize the amount of time the disturbed soil is exposed and the soil is replaced using accepted compaction methods. A4.106.2.3 Topsoil shall be protected or saved for reuse ❑ ❑ ❑ as specified in this section. + " Tier 1. Displaced topsoil shall be stockpiled for nF 0' reuse in a designated area and covered or protected from erosion. Tier 2. The construction area shall be identified and delineated by fencing or flagging to limit construction activity to the construction area. A4.1063 Postconstruction landscape designs accomplish one or more of the following: 1. Areas disrupted during construction are restored ❑ ❑ ❑ ❑ ❑ to be consistent with native vegetation species and patterns. 2. Limit turf areas to the greatest extent possible. a. Not more than 50 percent for Tier 1. ❑ ❑ ❑ ❑ ❑ b. Not more than 25 percent for Tier 2. ❑ ❑ 3. Utilize at least 75 percent native California or ❑ 1 ❑ ❑ ❑ drought tolerant plant and tree species appropriate for the climate zone region. •, 4. Hydrozoning irrigation techniques are ❑ ❑ ❑ ❑ ❑ incorporated into the landscape design. A4.106.4 Permeable paving is utilized for the parking, walking or patio surfaces in compliance with the following: Tier 1. Not less than 20 percent of the total parking, ❑ ❑ ❑ walking or patio surfaces shall be permeable. Tier 2. Not less than 30 percent of the total parking, ❑ ❑ ❑ walking or patio surfaces shall be permeable. A4.106.5 Roofing materials shall have a minimum 3 -year aged solar reflectance and thermal emittance or a minimum Solar Reflectance Index (SRI) equal to or greater than the values specified in Tables A4.106.5.1(1) and A4.106.5.1(2) for low-rise residential buildings and Tables A4.106.5.1(3) and A4.106.5.1(4) for high rise residential buildings. , Low-rise Residential Tier 1 roof covering shall meet or exceed the values contained in Table A4.106.5.1(1). nF Tier 2 roof covering shall meet or exceed the values contained in Table A4.106.5.1(2). High-rise Residential, Hotels and Motels Tier 1 roof covering shall meet or exceed the values contained in Table A4.106.5.1(3). ly Tier 2 roof covering shall meet or exceed the values contained in Table A4.106.5.1(4). N F VERIFICATIONS d VERIFICATIONS LEVELS ENFORCING AGENCY TO SPECIFY APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives' Enforcing Agency Installer or Designer Third party FEATURE OR MEASURE Mandatory Tier 1 Tier 2 All All All A4.106.6 Install a vegetated roof for at least 50 percent of the ❑' ❑ ❑ ❑ ❑ roof area. Vegetated roofs shall comply with requirements for roof gardens and landscaped roofs in the California Building Code, Chapters 15 and 16. A4.106.7 Reduce nonroof heat islands for 50 percent of ❑ ❑ ❑ sidewalks, patios, driveways or other paved areas by using one or more of the methods Iisted. A4.106.8.1 Tier I and Tier 2 for one- and two-family 12. ❑ ❑ ❑ dwellings and townhouses with attached private garages. Install a dedicated 208/240 -volt branch circuit, including an overcurrent protective device rated at 40 amperes minimum per dwelling unit. A4.106.8.2 Tier I and Tier 2 for multifamily dwellings. W2 Kr� Provide capability for future electric vehicle charging in ❑ ❑ ❑ percent of total parking spaces, as specified. A4.106.9 Provide bicycle parking facilities as noted belowor meet a local ordinance, whichever is more stringent. Number of bicycle parking spaces may be reduced, as approved by the enforcing agency, due to building site characteristics, including but not limited to, isolation from other development. 1. Provide short-term bicycle parking, per Section A4.106.9.1. ❑ ❑ ❑ ❑ ❑ 2. Provide long-term bicycle parking for multifamly buildings, per Section A4.106.9.2. A ❑ ❑ ❑ ❑ 3. Provide long-term bicycle parking for hotel and motel , buildings, per Section A4.106.9.3. A4.106.10 JHRJ Outdoor lighting systems shall be designed and installed to comply with: 1. The minimum requirements in the California Energy , Code for Lighting Zones 1-4; and 2. Backlight, Uplight and Glare (BUG) ratings as defined in ❑ . , ❑ ❑ ❑ IES TM -15-11; and 3. Allowable BUG ratings not exceeding those shown in Table A4.106.10; or Comply with a lawfully enacted local ordinance, whichever is ❑ ❑ ❑ ❑ ❑ more stringent. LEVELS VERIFICATIONS APPLICANT. TO SELECT ELECTIVE ENFORCING AGENCY TO SPECIFY MEASURES VERIFICATION METHOD' " $' . Prerequisites and electives' ' Enforcin g Agency Installer or Designer i . FEATURE OR MEASURE t MandatoryTier 1 Tier 2 All All All Inn ovative,Concepts and LOA ' t Environmental Conditions' � e • j. • � !. •. .fry ` f �, , ' Item 1 ❑ .. } ❑ ❑ ❑ , Item 2 r ❑ ❑ ❑ ti ❑ ❑ Item 3 . ' ❑ ` • : �,. , t ..: ❑ _ ❑ ❑. - ENERGY EFFICIENCY LEVELS VERIFICATIONS APPLICANT. TO SELECT ELECTIVE ENFORCING AGENCY TO SPECIFY MEASURES VERIFICATION METHOD' " $' . Prerequisites and electives' ' Enforcin g Agency Installer or Designer Third party . FEATURE OR MEASURE t MandatoryTier 1 Tier 2 All All All Inn ovative,Concepts and LOA �_ '.' , t Environmental Conditions' A4.108.1 Items in this section are necessary to address ' • . ` ' innovative concepts or local environmental conditions. Item 1 ❑ .. } ❑ ❑ ❑ , Item 2 r ❑ ❑ ❑ ti ❑ ❑ Item 3 . ' ❑ ` • : �,. , t ..: ❑ _ ❑ ❑. - ENERGY EFFICIENCY r -1.' J General 4.201.1 Building meets or exceeds the requirements ofthe }.r ., * ❑ ' ❑ California Building Energy Efficiency StandardS3. r Performance Approach'for Newly Constructed z ` , �' ,. ' ` . Buildings ` �• r ." A4.203.1.1.1 An Energy Design Rating for the Proposed Design f "' ❑ ❑ r ,Building is included in the Certificate of Compliance ', - &, IJ ❑' ` Y documentation. ,44.203.1:1.2 QII procedures specified in the Building Energy `f '; " ❑7 ❑ ❑ ` Efficiency Standards Reference Residential Appendix RA3.5 are . completed. ' A4.203.1.1.3 All permanently installed lighting is high efficiency ®2 ,2 , 'r ` ❑ ❑ ❑ ' and has required contiols. _ ,44.203.1.2.1 The Energy Budget is no greater than 85 percentof • the Title 24, Part 6, Energy Budget for the Proposed Design �. ,: r ' ` ❑ ❑. ❑ Building. ` - A4.203.1.2.2 The Energy Budget is no greater than 70 percent of ' ❑ ❑ the Title 24, Part 6, Energy Budget for the Proposed Design 1 Building. Performance Approach for Additions and Alterations A4.204.1.1.1 All newly installed, permanently installed lighting ®2 t`` ti . ❑ ❑ ❑ is high efficacy and has required controls. A4.204.1.2.1 When one and only one mechanical system is added or modified, the Energy Budget is no greater than 95.. t percent of the Title 24, Part 6, Energy Budget for the Proposed �' i Y. ❑ ❑ Design Building. When two or more mechanical systems areWL " added or modified, the Energy Budget is no greater than 90 percent of the Title 24, Part 6, Energy Budget for the Proposed a ' a i Design Building.. Y ' ,44.204.1.2.2 When one and only one mechanical system is ^ -` , ;yr,Q added or modified, the Energy Budget is no greater than 90 percent of the Title 24, Part 6, Energy Budget for the Proposed K j , ❑ Design Building. When two or more mechanical systems are ? ❑ . ❑ added or modified, the Energy Budget is no greater than 85 percent of the Title 24, Part 6, Energy Budget for the Proposed ` Design Building. * _ - � . � •,� r ¢. � � . ,. �. . _.71 � it ' �,,�{�r r f( • VERIFICATIONS • • LEVELS' , ' ENFORCING AGENCY TO SPECIFY .+ ,' APPLICANT• TO SELECT ELECTIVE MEASURES ', VERIFICATION METHOD } . R Prerequisites and electives' Enforcing Agency Installer or Designer Third party + FEATURE OR MEASURE � . . • - • -fir , o o •• ;� a Mandatory, Tier 1. Tier 2 All All All WATER• EFFICIENCY AND .CONSERVATION E' f' lndoor,,Water Use - 4303.1 Plumbing fixtures (water closets and urinals) and Qx Y' +,* r' ❑ . ❑ ❑ fittings (faucets and showerheads) installed in residential buildings shall comply with the prescriptive requirements , t of Sections 4.303.1.1 through 4.303.1.4.4. 4303.2 Plumbing fixtures and fittings required in Section �x , . ' y ' ❑ •' ❑ 0 4.303.1 shall be installed in accordance with the .'L i - California Plumbing Code, and shall meet the applicable referenced standards. A4303.1 Kitchen faucets. The maximum flow rate of. , r kitchen faucets shall not exceed 1.5 gallons per minute at j 60 psi. Kitchen faucets may temporarily increase the flow r.. ' •, , above the maximum rate, but not to exceed 2.2 gallons -�. 'e' ^ '• , ❑ ❑ ❑ per minute at 60 psi, and must default to a maximum flow "- , rate of 1.5 gallons per minute at 60 psi. Note: Where complying faucets are available, aerators , or other means may be used to achieve reduction. ^ A4303.2 Alternate water source for nonpotable r r ,� - applications. Alternate nonpotable water sources are used r for indoor potable water reduction. Alternate nonpotable i ❑ ❑ , • , - "• ❑ , ❑ ❑ water sources shall be installed in accordance with the ' + �' California Plumbing Code. "4•, A4.303.3 Appliances. Dishwashers and clothes washers in r ` - ;, residential buildings shall comply with the following: ` Install at least one qualified ENERGY STAR r �� appliance with maximum water use as follows: ' 1. Standard Dishwashers - 4.25 gallons per cycle.o ' r ❑ ❑ . ❑ 2 Compact Dishwashers 3.5 gallons per cycle. '?❑ a ❑ ❑ ❑ ❑ 3. Clothes Washers - water factor of 6 gallons per cubic feet of drum capacity. • �' ❑ ❑ ❑ ❑ A4.303.4 Nonwater supplied urinals or waterless toilets - ' ❑ '❑ ' ❑ ❑ . . ❑ are installed. +� Outdoor Water User' • - 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather or soil ❑ ` ❑ ❑ moisture -based.. A4304.1 Install a low-water consumption irrigation ❑ ❑ �• ❑ `❑ ' system which minimizes the use of spray type heads. A4.304.2 A rainwater capture, storage and re -use system r } ❑ 0 : 0 • ❑ ❑ is designed arid installed. A4.304.3 A water budget shall be developed for ®z ®2 0'1 `❑ ❑ landscape irrigation. A4.304.6 For new water service connections, landscaped i irrigated areas more than 2,500 square feet shall be ❑ ' �. ❑ ❑ ❑ provided with separate submeters or metering devices for .*., outdoor potable water use. _� , VERIFICATIONS " r LEVELS ENFORCING AGENCY TO SPECIFY APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives. Enforcin Installer or Third FEATURE OR MEASURE g Agency Designer party • Mandatory . Tier1 Tier All All All A4.304.4 Provide water efficient landscape irrigation r ` ; ❑ ❑ . ' ❑ e design that reduces the use of potable water. times 1912 ' Tier 1. Does not exceed 65 percent of ETo the ! landscape area. Tier 2. Does not exceed 60 percent of ETo times the 4nF landscape area. + A4.304.5 A landscape design is installed which does ❑ , ❑ El not utilize potable water. A304.6 For new water service connections, landscaped ' irrigated areas more than 2,500 square feet shall be ❑ 0 .0 ❑ f ❑ provided with separate submeters or metering devices x for outdoor potable water use. WATER REUSE SYSTEMS A4.305.1 •Piping is installed to permit future use of a ` graywater irrigation system served by the clothes r ` , ❑ ❑ e ❑ ' '' ❑ ❑ washer or other fixtures. A4.305.2 Recycled water piping is installed. ❑ ❑ ❑ ❑ +' ❑ A4.305.3 Recycled water is used for landscape `- ❑ , ❑ ` ❑ irrigation. Innovative Concepts and Local Environmental ~ . Conditions , A4.306.1 Items in this section are necessary to address , innovative concepts or local environmental conditions. Item) ❑ ❑ ❑ Q ❑ . ❑. Item 2 ❑ i ❑ ❑ ❑ ❑ - ❑ Item 3 ` ❑ ❑ ❑ Cl F ❑ ❑ MATERIAL CONSERVATION AND ,RESOURCE EFFICIENCY FoundationSysteinSo• r` A4.403.1 A Frost-protected Shallow Foundation ❑ �` , ' (FPSF) is designed and constructed. " A4.403.2 Cement use in foundation mix design is .01 ❑ ❑ reduced. in Tier 1. Not less than a 20 percent reduction cement use. r s J ' Tier 2. Not less than a 25 percent reduction in , ' -.cement use. Efficient FramingTechniques . A4.404.1 Beams and headers and trimmers are the. .; '❑ , ❑ - ❑ ❑ t minimum size to adequately support the load. ` A4.404.2 Building dimensions and layouts are designed ` " ❑ , ❑ , ' ❑ ❑ to minimize waste. A4.404.3 Use premanufactured building systems to 0 .0 �- ` ❑ " ❑ ❑ eliminate solid sawn lumber whenever possible.. F" A4.404.4 Material lists are included in the plans which ,, '' specify material quantity and provide direction for t, ❑ ❑ ❑ . ❑ « ❑ on-site cuts. LIP VERIFICATIONS LEVELS ENFORCING AGENCY TO SPECIFY + . APPLICANT TO SELECT ELECTIVE MEASURES • 1. + r r > Prerequisites and electives' Enforcin g Agency VERIFICATIONS LEVELS ENFORCING AGENCY TO SPECIFY + . APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD + r r > Prerequisites and electives' Enforcin g Agency Installer or Designer Third party + FEATURE OR MEASURE _ } 0 • Mandatory Ti71-Tier 2 All .0 All All Niaterial Sources o - - A4.405.1 One or more of the following building materials, f ❑ �' ❑ ❑ that do not require additional resources for finishing are " r `. �❑ used: "• . I' Exterior trim not requiring paint or stain y 2. Windows not requiring paint or stain ` 3. Siding or exterior wall coverings which do not require paint or stain A4.405.2 Floors that do not require additional coverings are used including but not limited to stained, natural or I `: i ❑ ❑ ❑ ❑ stamped concrete floors. [ A4.405.3 Postconsumer or preconsumer recycled content ❑ ❑ . ❑ value (RCV) materials are used on the project. t a `• ', Tier 1. Not less than a 10 -percent recycled content ' _ E2' ' value. Tier 2. Not less than a 15 -percent recycled content value. r A4.405.4 Renewable source building products are used. ❑ ❑ ❑ ❑ ❑ ` Enhanced Durability, and Reduced MV intenance + 4.406.1 Annular spaces around pipes, electric cables,^ x❑ - r; - ❑ ❑' ❑ _.. conduits or other openings in plates at exterior walls shall, f; k" be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or similar y I �' method acceptable to the enforcing agency. l Water Resistaoce'and MoistureFManagement ' A4.407.1 Install foundation and landscape drains. • - `❑ �' ❑ ❑ + ❑' A4.407.2 Install gutter and downspout systems to route water at least 5 feet away from the foundation or connect' to landscape drains which discharge to a dry well, sump, y ❑ ❑ ❑ . ` ❑ ❑ t bioswale, rainwater capture system or otherapproved a + on-site location. A4.407.3 Provide flashing details on the building plans and comply with accepted industry standards or ' ❑ ❑ ,. ❑ ❑ ' manufacturer's instructions. - A4.407.4 Protect building materials delivered to the ❑ , , . ❑ �. ❑ ❑ construction site from rain and other sources of moisture. - A4.407.5 In Climate Zone 16 an ice/water barrier is . installed at roof valleys, eaves and wall to roof ❑ ❑ ❑ ❑ ' �* ❑ intersections. ? _ A4.407.6 Exterior doors to the dwelling are protected to � , ❑ ,' ❑ ❑ prevent water intrusion. A4.407.7 A permanent overhang or awning at least 2 feet�� ° a❑ ' • , ❑ ❑ ❑ in depth is provided. !T• '} 'S •. , yy � • • ' i ` y ` J � '•+�y , " ', � �' .- i _' qtr. ! F `� VERIFICATIONS LEVELS ENFORCING AGENCY TO SPECIFY '•'�, APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD ' F t fiy Prerequisites and electives' Enforcin g Agency Installer or Designer Third party i . I. FEATURE OR MEASURE 0 r 0 Mandatory' Tier 1 Tier 2 All All All IConstruction Waste Reduction; Disposal and r 4.408.1 Recycle and/or salvage for reuse a minimum of50 Q' .�' ❑ ❑ ❑ percent of the nonhazardous construction and demolition yr .waste in accordance with one of the following: l ., I. Comply with a more stringent local construction and demolition waste management ordinance; or - - 2. A construction waste management plan, per Section v 4.408.2; or ,. 3. A waste management company, per Section 4.408.3; or 4.The waste stream reduction alternative, per Section t 4.408.4.' A4.408.1 Construction waste generated at the site is { diverted to recycle or salvage in compliance with oneof the following: IkTier 1 at least a 65 percent reduction. ❑ ❑ ❑' 2. Tier 2 at least a 75 percent reduction. ,,: ❑ f ❑ ❑ - Exception: Equivalent waste reduction methods r are developed by working with local agencies. ' Building Maintenance and Operation 4.410.1 An operation and maintenance manual shall be * ❑ ❑ ❑ provided to the building occupant or owner. Innovative. Concepts and Local Environmental A4.411.1 Items in this section are necessary to address innovative concepts or local environmental conditions. Item 1 i ❑ : t-. ; ' ❑ ❑ ❑. ❑ Item ..` ` ❑ l❑ t ❑. ❑ ❑ ❑ Item 3 ❑ ❑ ❑ ❑ ❑ ❑ ENVIRONMENTAUQUALITY .: Fireplaces d 4.503.1 Any installed gas fireplace shall be adirect-vent sealed -combustion type. Any installed woodstove or pellet i,}' stove shall comply with US EPA Phase II emission limits ❑x ;; r, t ❑; . i ❑ '❑ where applicable. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. Pollutant Control: u - 4.504.1 Duct openings and other related air distribution ❑,� ❑ component openings shall be covered during construction. 4.504.2.1 Adhesives, sealants and caulks shall be • ❑x. i } ' ` ❑ ' Q compliant with VOC and other toxic compound limits. 4.504.2.2 Paints, stains and other coatings shall be t r ' ❑ ' ' ❑ compliant with VOC limits: ' _ 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROC and other toxic a -';i a ❑ , compounds. 4.504.2.4 Documentation shall be provided to verifythat - ❑ ` ❑ ❑ compliant VOC limit finish materials have been used. -, � � . - � ' t. r ii1 �`► • f r - �'+ � •.4T r 1\ -. + A ' ,+ r j ` _ , VERIFICATIONS ` +' LEVELS ENFORCING AGENCY TO SPECIFY APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives Enforcing Installer or Third FEATURE OR MEASURE. r . • 'Agency -Designer party Mandatory Tier V :' Tier 2 All All All 4.504.3 Carpet and carpet systems shall be compliant S . , ❑ _ ❑ ❑ with VOC limits. 4.504.4 80 percent of floor area receiving resilient flooring shall comply with specified VOC criteria. 4.504.5 Particleboard, medium density fiberboard t, (MDF) and hardwood plywood used in interior finish ; ' ' r ►' �' ❑ ❑ ❑, systems shall comply with low formaldehyde emission •. standards. A4.504.1 Use composite wood products made with • t JI s either California Air Resources Board approved ` ❑ -=f ❑ ❑ ❑ ❑ ' no -added formaldehyde (NAF) resins orultra-low I , • ; ;r •. emitting formaldehyde (ULEF) resins: r ' A4.504.2 Install VOC compliant resilient flooring ❑ ❑ ❑ systems. N.. t .� Tier 1. At least 90 percent of the resilient flooring h installed shall comply. Y1 Tier 2. At least 100 percent oft he resilient flooring •, , f installed shall comply. r A4.504.3 Thermal insulation installed in the building +i ` , �❑ ❑ ❑' shall meet the following requirements: Tier L Install thermal insulation in compliance with VOC limits. Tier 2. Install insulation which contains No -Added + , Formaldehyde (NAF) and is in compliance with Tier I. 'Interior,MoistureControl'`•` 4.505.2 Vapor retarder and capillary break is installed at - ` _ ❑ ❑ slab -on -grade foundations. 4.505.3 Moisture content of building materials used in - ;21 *• ❑ ❑ wall and floor framing is checked before enclosure. Indoor Air Quality and Exhaust - A4.506.1 Return air filters with a value greater than ,�.` • '� •„ . MERV 6 shall be installed on HVAC systems. Pressure " { 4 ❑ '� ❑ ❑ i ti ❑ ❑ drop across the filter shall not exceed 0.1 inches water ' , • l' ' column. A4.506.2 JHRJ Provide filters on return air openings rated MERV 6 or higher during construction when it is I '' ❑ • ! r. ' ❑ . ❑ ❑ ;;., ; ❑ necessary to use HVAC equipment. A4.506.3 Direct -vent appliances shall be used when r equipment is located in conditioned space; or the ❑ , • ,,❑ : ❑ ❑ equipment must be installed in an isolated mechanical room. -, � � . - � ' t. r ii1 �`► • f r - �'+ � •.4T r 1\ -. + A ' ,+ r j ` _ , ' ... VERIFICATIONS } LEVELS' ENFORCING AGENCY TO SPECIFY 3''•` APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATION METHOD Prerequisites and electives Enforcin ,.Installer or Third FEATURE OR MEASURE C r g Agency : Designer party MandatoryTier T Tier 2 " All All All Environmental Comfort , 4.507.1 Reserved. f 4.507.2. is selected using the following methods: w ❑x 4 ; ' 0" 0 1. Establish heat loss and heat gain values accordingto ,� ,� ' ANSUACCA 2 Manual J-2004 or equivalent. . 2. Size duct systems according to ANSUACCA I , Manual D-2009 or equivalent. c 3. Select heating and cooling equipment according to ANSUACCA 3 Manual S-2004 or equivalent. Outdoor Air,�Qualityr Reserved Innovative Concepts and Local Environmental ,Conditions A4.509.1 Items in this section are necessary to address innovative concepts or local environmental conditions. Item 1 0 0 0 0' Item 2 0 0 0 '' ' 0 0 ❑ Item 3 0 0 ' 0 0 0 installer and Special lnspectot•,Quali ,cations' � t - Y ,Qualifications :� .: � 702.1 HVAC system installers are trained and certified in ` the proper installation of HVAC systems. 702.2 Special inspectors employed by the enforcing agency must be qualified and able to demonstrate * ' xQ 0 ❑ 0 competence in the discipline they are inspecting. + Verifications'" F r r . .. 703.1 Verification of compliance with this code may include construction documents, plans, specifications' ` + builder or installer certification, inspection reports, or t! x❑ +' a �• . a a other methods acceptable to the enforcing agency which% t show substantial conformance. • +' �. 1. Green building measures listed in this table may be mandatory if adopted by a city, county, or city and county as specified in Section 101.7. r ` 2. Required prerequisite for this.Tier. 3. These measures are currently required elsewhere in statute or in regulation f i • h, . • `. •` F •'L it r- • �� • • .. • '� October 28, 2016 ARCADEME architects BUTTE cotnv'rx FEB 2 2,201?i DEVELOPMENT ES architecture planning design SER VI C County of Butte - Second Review sl _ 14lly , Permit App: 1316-1444 recheriZ Plan Review: Jaborski Addition 2o1i Address: / 101 Tipsoo Peak Rd, Berry Creek Xsso ctA,19% ya The following is in response to plan check by TRB+Associates, Inc. Consulting datbRM5 tober 12, 2016 on an item by item basis using their item number system. In response, a few general points: The code is the worst we're allowed to build. We are not intending to build down to the code level. Actual load paths in complex wood frame construction is indeterminate. Design load path choices are somewhat arbitrary and forces are actually attenuated by many divergent elements. ARCHITECTURAL COMMENTS: Sheet A-3 comments: A18 Runoff from 3`d floor Observation Deck is sheet flow off metal drip edge —see 5/A-7. There is no baseboard, only a bottom rail for the guard at 4" above deck. Sheet A-4 comments: A24 Drafting layers and line weights have been modified to read better. / ,� Y� /"- / Vy 11/ S-3 & WILDFIRE EXPOSURE COMMENTS: PERMIT# BUTTE COUNTY DEVELOPMENT SERVICES W1 We have relocated note to 3/A-1 about Wildland Fire jurisdiction. REVIEWED FOR CODE COMPLIANCE STRUCTURAL COMMENTS: Z,` `D' S3. SDC has been changed to at 3/S-1. DATE S5 Drafting layers and line weights have been to better. modified read S7 Bracing types are no longer mixed. All lateral resistance is through engineered walls. S12 Truss layout and signature engineering calculations are included herein. S14 See 7/A-6. S15 No longer pertains. Simpson OMF has been replaced by Simpson Strong Wall shear walls and details have been reviewed by Simpson Engineer Philip Hui for conformance.. S16 No longer pertains. S17 No longer pertains - S18 See detail 10/A-6 for HPA holdown strap in concrete S19 Shearwall types and lengths are shown on Floor Plan A-3.. S20 See detail 10/A-6 for HPA holdown strap in concrete REVIEWED S21 No longer —see note S7 above FOR CODE COMPLIANCE pertains S22 No longer pertains —see note S7 above MAR S23 No longer pertains —see note S7 above 10 2097 S24 Calcs now itemize the loads and the distribution. S25 See elevations sht A-4 for wall strap placements TR8 AND ASS �CIATE� � S26 Line G requires hold downs see calcs & plans S27 See calcs & plans S28 See special top plate detail 9/S-1 S29 Wind governs -see calcs S30Forces summed —see calcs I� S31 shear walls revised throughout END OF PLAN CHECK Studio . . . . . . . . . 355 East Ninth Street . . . . . . ... . Chico, California 95928 e-mail . . . . . . Patrick@arcademe.com .. . . . . . . . phone 530.343.5709 --- J TRB + Associates Agency: County of Butte TRB+ Project Number- 16.054.132.2 Second Plan Review Page 1 of 5 Date: . October 12, 2016 To: Andy Jaborski PO Box 55 Berry Creek, CA 95916 Email: busterr162(@gmail.com Cca Philo Hunt, Amber Franzino, Nancy Springer, Deborah DeBrunner; Jordan DeBrunner, Curtis Johnson, Carrie Gomez Email: Phunt(a)-buttecountv.net; AFranzino(&,buttecountv.net, nspringer(a)buttecounty.net; ddebrunner(a)buttecounty.net; idebrunner(cD.buttecounty.net; cliohnson(a)_buttecountv.net; cgomez(ftuttecounty. net (via email) RE: Plan Review for: Jaborski Addition v Project Address: 101 Tipsoo Peak Road, Bery Creek Agency App. No.: B16-1444 TRB+ Project No.: 16.054.132.2 The following documents were received for review: Plans: (2 sets) Sheets dated 8/10/16: A-1 to A-7, E-1, M-1, S1 to S3 Structural Calcs: (2 copies) P. Cole dated 10/3/16 Energy Calcs: (2 copies) G Faucette, dated 7/5/16 Other: (2 copies) Arcademe architects undated (2 copies) Division A4.6 — Tier 2 and Tier 2 Plan review comments are listed on the following pages ` Sincerely, TRB + ASSOCIATES, INC. Nicholas Ho ICC Certified Plans Examiner TRB + Associates, Inc. BUILDING SOLUTIONS - 3180 Crow Canyon Place + Suite 216 + San Ramon, CA 94583 for MUNICIPALrr ES T 925 866.2633 { F 925 790.0011 ms ; www.TRBplus.com PROJECT DATA Agency: County of Butte TRB+ Project Number: 16.054.132.2 Occupancy Group: R-3/1.1 Type of Construction: VB Number of Stories: Three Total Conditioned Floor Area (s.f.): 1,560 (new) Garage (s.f.): 672 Covered Deck (s.f.): 471 Fire Sprinkler System: No Valuation:. - FOREWORD , ■ This plan review is only for the purpose of evaluating compliance with the provisions contained in the 2013 CBC, 2013 CPC, 2013 CMC, 2013 CEC, 2013 CRC, 2013 Green Building Standards Code, 2013 Energy Code, and County of Butte Ordinances. Please note that our review does not encompass provisions regulated and enforced by Planning, Engineering, Public Works, Health Departments; or other authorities outside the jurisdiction of the Building Department. ■ Please address all of the following items and return a copy of this list, along with a response sheet, indicating the location of all required changes to the plans, specifications and/or calculations. Be as specific as possible in your responses so that we may expedite your recheck. ■ If any changes have been made to the plan documents unrelated to those items identified in this. comment list, please list the changes on a separate sheet and include in your resubmittal documentation. ■ Please submit two (2) complete revised sets of plans and plan documents, wet stamped and signed by the Architect and/or Engineer of Record, to: County of Butte Department of Development Services 7 County Center Drive Oroville, CA 95965 -, OR TRB + Associates, Inc. Attention: Todd Bailey 3180 Crow Canyon Place, Suite 216 San Ramon, CA 94583 ARCHITECTURAL COMMENTS Review performed by: Nicholas Ho Al 8. Please clarify how run-off will be drained from the third floor balcony/patio. Include drain sizes and specify secondary drainage type. Please see CPC Section 1101.11 for code requirements. /t appears from Details 11/S-3 & 8/A-6 there is a continuous baseboard enclosing the perimeter of the P Floor Observation Deck. Please provide details showing deck sloped to drain over deck edge or to drains. CRC Section R903.4 Sheet A-4 A24. Exterior decks, balconies, and guards are too faint and not visible on the elevation plans. Please verify the drawing so that they can be clearly seen on the elevation plan and ' identify new and existing structures. + Page 2 of 5 TRQ Agency. County of Butte TRB+ Project Number. 16.054.132.2 Exterior decks, balconies, and guards remain to be too faint and not visible on the elevation plans. Comment remains. ' MECHANICAL COMMENTS No further comments. PLUMBING COMMENTS No further comments. ELECTRICAL COMMENTS No further comments. ENERGY COMMENTS No further comments. GREEN BUILDING COMMENTS No further comments. FLOOD ZONE COMMENTS No comments notes. " WILDFIRE EXPOSURE CONSTRUCTION REQUIREMENTS W1. Pleases specify on the cover sheet the dwelling is located within a Wildland Urban Interface Area. Information could not be located on the cover sheet Comment remains. STRUCTURAL COMMENTS Review performed by: Dan McLaughlin, PE S3. On sheet S-1, provide complete design loads and other information pertinent to the structural design as required by CBC Section 1603.1. See CBC Sections 1603.1.1 thru 1603.1.9. Please note that the seismic design category shown on this sheet does not match with the calculated seismic design category. The seismic design category shown on the plans is C. Please correct such that design category D is indicated.' S5. Plans and details given on Sheets S-2 and S-3 seem not showing complete structural information. Provide complete engineering drawings and details (and supporting calculations) prepared and stamped by a registered design professional. Please note that more comments may follow in subsequent. Additional comments have been generated below; see "New Structural Comments'. Page 3 of 5 1 RB Agency. County of Butte TRB+ Project Number: 16.054.132.2 S7. In areas where new lateral bracing is required, please do not mix conventional wall bracing (designed per CBC Section 2308 or CRC Section R602.10) with engineered shear walls in this structure. Conventional light frame construction as outlined in the CRC is permitted in an engineered structure but each line of resistance must either be conventional light framed construction or designed by a professional but not both. This applies vertically along the same line of resistance. Additional comments below have been generated. S12. Sheet S-3 indicates that pre-engineered manufactured trusses are being used in this project. If so, provide truss layout and calculations. As the County of Butte does not allow deferred truss submittal, please submit truss calculations and details for review. S14. ' Detail 7/A-6 appears to show continuous ridge vents. If so, revise the detail to show how structural shear transfer requirements are satisfied at such ridges. The lines in the details are faded and as such they appear to be missing. Please adjust the line thickness. Many lines throughout the structural details appear to have the same issue. Please correct. New Structural Comments S15. The provided Simpson Ordinary Moment Frame calculations assume that the frame is anchored into a concrete foundation but the OMF is shown to be supported by a first story exterior shearwall. A connection to a wood shearwall below could not be located in Simpson's documents and ESR report. Since it is a proprietary product please obtain a letter from Simpson stating that their product may be used in this manner. Please also provide calculations justifying the connection between the OMF and wall below (see comment below). S16. Detail 7 on sheet S-3 shows the connection of the OMF to the wall below but it appears to be incomplete. Please provide a detail showing edge distances of bolts, blocking below OMF, and how the OMF is secured to the 6x beam on the underside. Additionally, show how the beam is connected to the wall such that the forces are transferred to the foundation. Show a continuous load path and justify with calculations. SIT In the calculations of lateral line 6, the load transferred from the OMF frame above to the wood shearwall below uses the load as if the OMF had an R of 6.5. Since the R of an OMF is 3.5, please increase the lateral load transferred to the story below such that the load was calculated using an R of 3.5 as given in the OMF calculations. The load to the first story shearwall may be calculated using an R of 6.5 per ASCE 7-10 sec. 12.2.3.1 exception 3 but the load transferred from above must us an R of 3.5. S18. Please provide a detail showing a standard hold down and strap into a concrete foundation. S19. In sheet A3, please indicate the length of each shearwall and braced wall panel. S20. The lateral calculations of line D conclude that HPA28 anchors are to be used to resist uplift at the shearwalls but sheet S-2 shows the use of PA51's which do not Page 4 of 5 1 RB+ Agency: County of Butte TRB+ Project Number. 16.054.132.2 have adequate capacity. Please coordinate and correct Please also provide a detail showing the installation requirements of HPA28s per the Simpson Catalog. S21. Lateral line C calculations indicate that braced wall panels are to be used per conventional light framed construction as given in the 2013 CRC. Per CRC sec. R602. 10.ZZ 1, a braced wall panel is to be within 10 feet from each end of the braced wall line. Please verify and provide a panel actor within 10 feet of gridline 4. S22. It's unclear if lateral line E is to be conventional construction. If not, i.e. engineered, please provide calculations. If so, please provide a hold down with a minimum capacity of 18001bs to the stud of the braced wall panel closest to the end of the braced wall line at gridline 3. CRC sec. R602.10.2.2.1(Exception 2) S23. Along the wall lines deemed to be designed using conventional light framed construction, please provide panels at each end or indicate how one of the 3 exceptions is met CRC sec. R602.10.2.2.1 S24. In lateral line calculation of line G, it is unclear how the lateral forces at each level were determined. Please distribute the forces at each level per ASCE 7-10 sec. 12.8.3 S25. Line G lateral calculations show hold down straps between the 2"d level and the 1St level to resist overturning of the 2"d story shearwall. These straps could not be . located in the plans. Please provide and show a detail of this connection. S26. In line G calculations, please provide calculations showing whether hold downs are required at the first story. 'u' S27. Please provide justification and/or verification that there are adequate collectors, straps or ties between the shear walls. ASCE 7-10 Sec. 12.10.2 S28. Please provide a top plate detail and indicate the number of fasteners at the overlap splice. S29. In lateral line 2 calculations, please.provide an analysis of the seismic load to verify that wind does govern. S30. In lateral line 3 calculations, please include the lateral load from the second story into the first story and verify the capacity of the shear wall with added load. It could not be determined if the forces were summed at the first story. S31. The drawings show along shearwall line 4 that shearwall type 2 is to be used but type 2 is not located in the shearwall schedule. Please provide. The calculations indicate a type A wall. [END] Page 5 of 5 1 RB+ STRUCTURAL CALCULATIONS FOR THE JABORSKI ADDITION FOR ANDY & CATHY JABORSKI 101 TIPSOO PEAK ROAD BER - FEEK, A. 95916 ti L f ce�aFed�by ` A R C A D E M E 355 EAST NINTH STREET Chico, CA 95928 Patrick Cole - Principal Architect Phone: 530 343 5709 Date prepared: April 10, 2016 Revised:: October 3, 2016 October 28, 2016 February 7, 2017 A R C A D E M E Studio. . . . . . . . 530.343.5709 355 East Ninth Street Chico, California 95928 THE JABORSKI ADDITION 101 TIPSOO PEAK ROAD BERRY CREEK, CA. 95916 TABLE OF CONTENTS CALC DATA LOAD DATA KEY PLANS KEY ELEVATIONS ROOF MEMBERS FLOOR MEMBERS SEISMIC DESIGN WIND DESIGN LATERAL CALCS FOOTINGS A R C A D E M E Design: General Design Data Project Name: JABORSKI ADDITION S t u d i o . . . . . . . . . 5 3 0. 3 4 3. 5 7 0 9 Project Number: 1501 355" East Ninth Street Date: February 7, 2017 Chico; California 95928 Page: of BUILDING DEPARTMENT: County of Butte TELEPHONE: CONTACT: Philo Hunt (see roof loads) ' DATE: Tuesday, December 08, 2015 LOCATION: Berry Creek ELEVATION: 2981' ROOF LOADING: 55 psf snow load from Butte Co table w REDUCTION:. NO REDUCTION SEISMIC DESIGN CATEGORY: D % OF SNOW LOAD: 20% for seismic WIND SPEED: 110 mph WIND GOVERNS t EXPOSURE: C - OPEN WITH TREES, SOILS .REPORT REQ'D.?: NO - Soil Site Class D SOIL BEARING: 1500 psf Granite Bedrock. . FREEZE DEPTH: 0 INCHES no expansion r CLIMATE ZONE: N/A SPECIAL CONSIDERATIONS: i LL 1 i 1 LL L O LL LL i f LL OL �. LL L O LL LL LU } L J ui Z >� L JW IY Q LL< LL LE O O O LL O �1 Lu J 'U>L'11 '' LU > LU Q i� LU Z O V� �� � �� ,' ' �. f �� � �� • B OR AGGE55 24x18" 4 ° 9X12" VENT -a I 5- I I I , 1 I I I I I I I 1 I # ®I6" O i i II 8 iii 5-2 (REMODEL '� iNEW i i AREA) - i ADDITION), 1 4X8 DF#I GIRDER ON CIXI2" VENT i 1 PIERS 5EE ; L ----------------------------- b � ' 1 DECK -5EE 9/A-2 3 6 5-2 nE 01 1 z " T -HOLD I ' • I I � ._I I 1 I ♦ U:r ----------� - ' S-2 2916.16 I T -HOLD " - I � I 1 I , I I , I I , I 1 1 1 J (EXISTING' i i • AREA) L - ---1 10 r_______1 II S-2 L____________ I -1 -1 i I I I 1 I ' I I 5- I I I , 1 I I I I I I I 1 I # ®I6" O i i II 8 iii 5-2 (REMODEL '� iNEW i i AREA) - i ADDITION), 1 4X8 DF#I GIRDER ON CIXI2" VENT i 1 PIERS 5EE ; L ----------------------------- b � ' 1 DECK -5EE 9/A-2 3 6 5-2 nE 4 .a -. o- .t, .� o- a- ,�. o-- ��. � � �o- .. t � .' .. �� ,�. - �f � S /tel S A R C A D E M E Studio. . . . . . . . . 530.343.5709 355 ` East Ninth Street Chico, California 95928 Design: ROOF LOADS Project Name: JABORSKI ADDITION Project Number: 1501 Date: February 7, 2017 Page: of ROOF LOADS: SLOPED FLAT TOWER LIVE LOAD: COUNTY SNOW LOAD TABLE 55.0 psf 44.0 psf 66.0 psf DEAD LOAD: ROOFING: METAL ROOF 1.5 psf 1.5 psf 1.5 psf SHEATHING: 5/8" PLYWOOD 1.8 psf 1.8 psf 1,8 psf FRAMING: TRUSSES @ 24" 2.3 psf 2X10" @ 24" 1.9 psf 2X6" @ 24" 1.1 psf INSULATION: 10" BATTS 2.0 psf 2.0 psf 0.0 psf CEILING: 5/8" GYP BD 2,8 psf 2.8 psf 0.0 psf MISC: 0.6 psf 1.0 psf 0.6 psf TOTAL DEAD LOAD: 11.0 psf 11.0 psf 5.0 psf TOTAL ROOF LOAD: 66.0 psf 55.0 psf 71.0 psf BASIC LOAD COMBINATIONS ASCE 2.4.1 -sloped warn roofs D= 11 psf (DEAD LOAD) 1. 11 D E= 2 psf (E seisnnic) 2. N/A 31 D + L F= 0.0 psf (FLUID) 3. 55 D+(LR or S or R) 44.0 H= 0.0 psf (LATERAL EARTH,WATER,BULK) 4. N/A -59 D+.75(L)+.75(LR or S or R) 44.0 LR= 20 psf (ROOF LIVE) 5. -9 D+(.6W or 0.7E) -20.0 L= 40.0 psf (FLOOR LIVE) 6a. N/A 44 D+.75(L)+.75(.6W)+,75(LR or S or R) 44.0 R= 0.0 psf (RAIN) 6b.* N/A 61 D+.75(L)+,75(.7E)+.75(S) } 44.0 S= • * psf (SNOW -see below) 7. -13 0.6D+0.6W T= 0.0 psf (SELF STRAIN) 8. 8 0.6D+0.7E W= -33 psf (WIND) MWFRS from windsimple zone 3 psf DESIGN ROOF MAX GRAVITY CASE #3 DL+LL= 55.0 psf DESIGN ROOF MAX WIND UPLIFT CASE #5 DL+LL= -13.4 psf . SLOPED ROOF 4:12: PS Cs P/ = 66 TOWER 44 OTHERS FLAT ROOF <5%: Pr= 0.7 Ce C, IS pg = 66 TOWER 55 OTHERS Cg= TOWER ROOF= 1.00 OTHER ROOFS= 0.8 (ASCE Figure 7.2) Ce= TERRAIN C PARTIALLY EXPOSED DUE TO TREES = 1.0 (ASCE Table 7.2) C,= - TOWER ROOF= 1.20 OTHER ROOFS= 1.0 (ASCE Table 7.3) Is= RISK CATEGORY= - II. (ASCE Table 1.5-1) SNOW IMPORTANCE= 1.0 (ASCE Table 1.5-2) pg= GROUND SNOW LOAD FROM BUTTE COUNTY 55.0 PSF WALL WEIGHTS 5/8" GYP BD = 2.8 psf 7/8" PLASTER = 9.5 psf 2X4" @ 16" OC = 1.1 psf 2X6" @ 16" OC = 1.7 psf INSUL = 0.0 psf m LuR21 BATT.INSUL = 1.3 psf aw 1/2" PLY = 0.0 psf a- 1/2" PLY = 1.5 psf 5/8" GYP BD = 2.8 psf 5/8" GYP BD = 2.8 psf WALL WEIGHT. = 6.7 psf WALL WEIGHT = 16.8 psf WOOD SIDING = 2.3 psf 5/8" GYP BD = 2.8 psf r, 2X6" @ 16" OC = 1.7 psf 2X6" @ 16" OC = 1.7 psf R21 BATT INSUL = o 1.3 psf ILU2X4" @ 16" OC = 1.1 psf uJuJ 1/2" PLY = 1.5 psf 0- 1/2" PLY = 1.5 psf 5/8" GYP BD = 2.8 psf 5/8" GYP BD = 2.8 psf WALL WEIGHT = 9.6 psf WALL WEIGHT.= 9.9 psf a LOWER FLOOR LOADS: RADIANT CONC LIVE LOAD: RESIDENTIAL FLOOR LOAD 40.0 psf DEAD LOAD: SHEATHING: 3/4” PLYWOOD A R C A D E M -E Design: LOWER FLOOR LOADS INSULATION: 6" BATTS 1.20 psf MISC: Project Name: JABORSKI ADDITION Stu d`i o . . . . . . . . . 5 3 0 . 3 4 3 . 5 7 0 9 Project Number: 1501 355 East Ninth Street Date: February 7, 2017 Chico, California 95928. Page: of LOWER FLOOR LOADS: RADIANT CONC LIVE LOAD: RESIDENTIAL FLOOR LOAD 40.0 psf DEAD LOAD: SHEATHING: 3/4” PLYWOOD 2.30 psf FLOOR JOISTS: 2x8" @ 16" OC 1.50 psf CEILING: 5/8" GYP BD 2.80 psf INSULATION: 6" BATTS 1.20 psf MISC: 2.20 psf 2" RADIANT CONC 20.0 psf LOWER FLOOR DEAD LOAD: 30.0 psf TOTAL LOWER FLOOR LOAD: .70.0 psf SECOND FLOOR LOADS: 2X8 , LIVE LOAD: RESIDENTIAL FLOOR LOAD 40.0 psf DEAD LOAD: SHEATHING: 3/4". PLYWOOD 2.30 psf ` FLOOR JOISTS: 2x8" @ 16" OC 1.50 psf CEILING: 5/8" GYP BD 2.80 psf 'INSULATION: NONE 0.00 psf MISC: 1.40 psf LOWER FLOOR DEAD LOAD: 8.0 psf TOTAL LOWER FLOOR LOAD: 48.0 psf THIRD FLOOR LOADS: AT DECK LIVE LOAD: RESIDENTIAL FLOOR LOAD 40.0 psf DEAD LOAD: SHEATHING: 3/4" PLYWOOD 2.30 psf FLOOR JOISTS: 2x12" @ 16" OC 3.30 psf CEILING: 5/8" GYP BD 2.80 psf INSULATION: 6" BATTS 1.20 psf 1 MISC: 0.40 psf LOWER FLOOR DEAD LOAD: 10.0 psf TOTAL LOWER FLOOR LOAD: 50.0 psf i D= 10 psf r t A R C A, D M E- Design: 2. 50 D + L Project Name: Stu d i. o . . . . .. . . . 530.343 . 5 709 Project Number: 355 East Ninth Street Date: Chico, C-aIifor.riia 95928 Page: Of FLOOR LOADS: LIVE LOAD: RESIDENTIAL FLOOR LOAD .40.0 psf 4 DEAD LOAD: SHEATHING: 3/4" PLYWOOD 2.30 psf FLOOR JOISTS: 2x12" @ 16" OC 3.30 psf CEILING: 5/8" GYP BD 2.80 psf INSULATION: 6" BATTS 1.20 psf MISC: 0.40 psf y t LOWER FLOOR DEAD LOAD: 10.0 psf TOTAL LOWER FLOOR LOAD: 50.0 psf UPPER FLOOR LOADS JABORSKI ADDITION 1501 February 7, 2017 LOAD COMBINATIONS UPPER FLOORS D= 10 psf (DEAD LOAD) 1. 10 D E= 2 psf (E SEISMIC) 2. 50 D + L t F= 0.0 psf (FLUID) 3. 10 D+(LR or S or R) 0.0 H= 0.0 psf (LATERAL EARTH,WATER,BULK) 4. 10 D+.75(L)+.75(LR or S or R) 0.0 LR= 0 psf (ROOF LIVE) 5. 9 D+(.6W or 0.7E) 4.4 L= 40.0 psf (FLOOR LIVE) 6a. 9 D+.75(L)+.75(.6W)+.75(LR or S or R) 0.0 R= 0.0 psf (RAIN) f 6b. 12 D+.75(L)+.75(.7E)+.75(S) 0.0 S= 0.0 psf (SNOW) 7. 6 0.6D+0.6W T= 0.0 psf (SELF STRAIN) 8.,, 7 0.6D+0.7E W= 0 psf (WIND) MWFRS from'windsimple zone 2 DESIGN ROOF MAX GRAVITY CASE #3 DL+LL= 10.0 psf DESIGN ROOF MAX WIND UPLIFT CASE #5 ' DL+LL= 8.6 psf DESIGN UPPER FLOOR NO CONCRETE LAYER DL= 0.0 psf LL= 0.0 psf TL= 0.0 psf DESIGN LOWER FLOOR WITH 2" HYDRONIC CONCRETE LAYER DL= 0.0 psf LL= 0.0 psf TL= 0.0 psf DESIGN STAIRS WITH SPECIAL LOADS DL= 10.0 psf LL= 90.0 psf TL= 100 psf WALL WEIGHTS= 2X6" @ 16" OC = 1.7 psf 2X6" @ 16" OC = 1:7 psf 6" BATTS = 1.2 psf 6" BATTS = 1.2 psf 5/8" GYP BD = 2.8 psf 5/8" GYP BD = 2.8 psf 1/2" PLY = 1.5 psf 1/2" PLY = 1.5 psf WOOD SIDING = 2.3 psf 7/8" PLASTER = 9.5 psf WEIGHT WOOD WALL = • 9.5 psf WEIGHT PLASTER WALL = 16.7 psf A R C A D E' M E • Studio. . . . . . . . . 530.343.5709 355 East Ninth Street Chico, California 95928 BASED ON 2010 CBC & ASCE 07-10 SEISMIC FORCE -RESISTING SYSTEM: Site location= BALD ROCK short period spectral response 1 sec period spectral response Occupancy Risk Category Importance Factor Soil Site Class Site coefficient -short period Site coefficient -1 sec period Spectral response accel'n-short period Spectral response accel'n-1 sec period Spectral design parameter -short period Spectral design parameter -1 sec period Seismic Desion Cateaory Design: GENERAL SEISMIC Project Name: JABORSKI ADDITION Project Number: 1507 Date: Febivary 7. 2017 Page: of I(ASCE 07 -table 12.2.1 p122) Lat= Ss= St= Occ= I= = Fa= Fv= Sans= SMt= bDs= Sf„= SDC= 39.6296 0.673 0.256. II 1.0 D 1.26 1.89 0.848 0.484 0.560 0.324 D Long= 121.3447 site class D rSGS REF SGS REF ASCE 07 -table 1.5-1 ASCE 07 -table 1.5-2- (ASCE 07 -Ch 20 & bldE ASCE 07 -table 11.4-1 ASCE 07 -table 11.4-2 (ASCE 07 - Eq 11.4-1 p '- E_qTTT2 p - Eq 11.4-3 p (ASCE 07 - Eq 11.4-4 p (ASCE 07 -table 11.6-1- a Equivalent Lateral Force Analysis (ASCE 07 section 12.8) b Modal Response Spectral Analysis (ASCE 07 section 12.9) c Seismic Response History Procedures (ASCE 07 chapter 16) Seismic Base Shear V = CsW I(ASCE 07 -eq 12.8-1) p89 _ 5Ds Cs R ( ASCE 07 -eq 12.8-2) p89 Sos = 0`.56 from above wood frame wood shear anel R = 6.50 ASCE 07-10 -table 12.14.1 _p101) item A-13 I = 1.00 from above R'= 6.50 V = 0.086 W Simplified Design Procedure detailing @ 14.5 seismic roof weight with snow= W= D + 20% Pf (ASCE 07-10 -12.7.2.4) p89 seismic effect for vert load combos Ev = 0.20 SDs D ( ASCE 07 - Eq 12.4-4 p86) Ev = 0.11 D ' A R C A? D E M E Design: TOWER ROOF SEISMIC Project Name: JABORSKI ADDITION Studio. 530.343.57.09 Project Number: 1507 355 East Ninth Street Date: February 7. 2017 Chico, California 95928 Page: of BASED ON 2010 CBC & ASCE 07-10 SEISMIC FORCE -RESISTING SYSTEM: F(-ASCE 07 -table 12.2.1 p122) Site location= BALD ROCK Lat= 39.6296 Long= 121.3447 short period spectral response Ss= 0.673 site class I USGS REPORT 1 sec period spectral response S,= 0.256 D JUSGS REPORT L Occupancy Risk Category OCC= II ASCE 07 -table 1.5-1 2 Importance Factor I= 1.0 ASCE 07 -table 1.5-2-p5) z Soil Site Class = D (ASCE 07 -Ch 20 & bldg official) U Site coefficient -short period Fa-'- 1.26 ASCE 07 -table 11.4-1 66 o Site coefficient -1 sec period Fv= 1.89 ASCE 07 -table 11.4-2 66 9 Spectral response accel'n-short period SMs= 0.848 (ASCE 07 - Eq 11.4-1 p65). N Spectral response accel'n-1 sec period bmi= 0.484 - Eq - p65) Spectral design parameter -short period SDs= 0.560 TA= 07 - Eq - p65) Spectral design parameter -1 sec period SDI= 0.324 (ASCE 07 - Eq 11.4-4 p65) Seismic Design Category SDC= D (ASCE 07 -table 11.6-1-p67) Choose Seismic Analysis Procedure (SAP) = a Equivalent Lateral Force Analysis (ASCE 07 section 12.8) b Modal Response Spectral Analysis (ASCE 07 section 12.9) c Seismic Response History Procedures (ASCE 07 chapter 16) Seismic Base Shear V = CSW I( ASCE 07 -eq 12.8-1) p89 '- _-SDS CS R ( ASCE 07 -eq 12.8-2) p89 * SDs = 0.56 from above wood frame wood she anel R = 1.50 ASCE 07-10 -table 12.2.1 _p101) item G-6 I= 1.00 from above R = 1.50 V= 0:373 W S i= 2 seismic effect for vert load combos Ev = 0.20 SDs D ( ASCE 07 - Eq 12.4-4 p86) Ev = 0.11 D Desi Maps Detailed Report 4 Design P P http://ehpl-earthquake.cr.usgs.gov/designmaps/us/reporkphp?templa... ZUSf" Design Maps Detailed Report ASCE 7-10 Standard (39.6295601\1, 121.34473°W) Site Class D - "Stiff Soil", Risk Category I/II/III 6Section 11.4.1 — Mapped Acceleration Parameters ` Note: Ground motion values provided below aye for the. direction of maximum horizontal spectral response acceleration. They have been converted from corresponding geometric mean ground motions computed by the USGS by applying factors of 1.1 (to obtain Ss) and 1.3 (to obtain Sl). Maps in the 2010 ASCE-7.Standard are provided for Site Class B. 'Adjustments for other Site Classes are made, as needed, in Section 11.4.3. - From Figure 22-1 [l] . . . - Ss = 0.673 g From figure 22-2 [2] S, = 0.256 g Section 11.4.2 — Site Class The authority having jurisdiction (not the USGS), site-specific geotechnical data, and/or the default has classified the site as Site Class D, based on the site soil properties in accordance with Chapter 20. Table 20.3-1 Site Classification Site Class Vs Rork s„ A. Hard Rock >5,000 ft/s N/A N/A B. Rock 2,500 to 5,000 ft/s N/A N/A C. Very dense soil and soft rock 1,200 to 2,500 ft/s >50 >2,000 psf D. Stiff Soil 600 to 1,200 ft/s 15 to 50 1,000 to 2,000 psf E. Soft clay soil <600 ft/s <15 <1,000 psf Any profile with more than 10 ft of soil having the characteristics: • Plasticity index PI > 20, • Moisture content w >_ 40%, and • Undrained shear strength s,, < 500 psf a F. Soils requiring site response See Section 20.3.1 analysis in accordance with Section 21.1 For SI: 1ft/s = 0.3048 m/s llb/ft2 = 0.0479 kN/1112 r t 2/23/2016 10:00 AM . Design Maps Detailed Report h //eh 1 -earth uake.cr.us ttP P q gs.gov/designmaps/us/report php?templa... Section 11.4.3 - Site Coefficients and Risk -Targeted Maximum Considered Earthquake (MCEo) Spectral Response Acceleration Parameters Table 11.4-1: Site Coefficient Fa Site Class Mapped MCE R Spectral Response Acceleration Parameter at Short Period Ss 5 0.25 Ss = 0.50 Ss = 0.75 SS = 1.00 Ss >_ 1.25 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 C 1.2 1.2 1.1 1.0 1.0 '. D 1:6 1.4 - 1.2 1.1 1.0 E y 2.5 1.7 1.2 0.9 .. 0.9 :k F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of Ss For Site Class = D and S5 = 0.673 g, Fe = 1.262 Table 11.4-2: Site Coefficient F„ Site Class Mapped MCE R Spectral Response Acceleration Parameter at 1-s Period S <010 S =020 S =03 - 0 S -040 S> 2 of 6 2/23/2016 10:00 AM �-1_0.50 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 C 1.7 1.6 1.5 1.4 1.3 D 2.4 2.0 1.8 1.6 1.5 E 3.5 3.2 2.8 2.4 2.4 F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of Sl For Site Class = D and Si =.0.256 g, F„ = 1.888 2 of 6 2/23/2016 10:00 AM Design Maps Detailed Report http://ehpl-earthquake.cr.usgs.gov/desigmnaps/us/report.php?templa... Equation (11.4-1): SMs = FaSs = 1.262 x 0.673 = 0.849 g Equation (11.4-2): SMl = F„S1 = 1.888 x 0.256 = 0.483 g Section 11.4.4 — Design Spectral Acceleration Parameters Equation (11.4-3): SDS = % SMS = 3/ x 0.849 ='0.566 g Equation (11.4-4): Sol — % SMl — %x 0.483 = 0.322 g Section 11.4.5 — Design Response Spectrum From Figure 22-12131 rigure 11.4-1: resign Response Spectrum ,. TL = 16. seconds Sas =0.566 --.. T9STSTs:So=SoS yi T,<TST,:S,=So,/T C i T>TL:S.=SaTL1T' � 1 I L d 1 , V 1 i 4 ' ' St., 0.322 --'---------__L__------- U1 ' C 1 I 1 0 1 I 1 V I 1 I I I 1 CL I 1 in Ta = 0.114 Ts = 0.569 1.000 Period, T(sec) 3 of 6 2/23/2016 10:00 AM f Design Maps Detailed Report - 4 http://ehpI-earthquake.cr.usgs.gov/designmaps/us/report.php?templa... Section 11.4.6 — Risk -Targeted Maximum Considered Earthquake (MCER) Response y Spectrum The MCER Response Spectrum is determined by multiplying the design response spectrum above by - S,15 = 0.84 9 - - 01 1 C d i 1 V I 1 S,,,=0.483 --'-----------L-1 -------- d I w C CL I 1 1 N 1 I 1 99 VV I 1 L 1 1 T, = 0.114 T; = 0.569 1.000 Period, T (sec) - ,1c . r A 4 of 6 2/23/2016 10:00 AM IDesign Maps Detailed Report http://ehpl-earthquake.cr.usgs.gov/designmaps/us/reporkphp?templa... Section 11.8.3 - Additional Geotechnical Investigation Report Requirements for Seismic (Design Categories D through F From Figure 22-7[4] PGA = 0.267 . i 7 Equation (11.8-1): PGAM = FPGAPGA =.1.267 x 0.267 = 0.338'g Table 11.8-1: Site Coefficient FPGA Site Class Mapped MCE Geometric Mean Peak Ground Acceleration, PGA ' PGA :5 0.10 PGA = 0.20' PGA = 0.30 PGA = 0.40 PGA >_ 0.50 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 r C 1.2 1.2 1.1 1.0 1.0 D 1.6 1.4 1.2 1.1 1.0 E 2.5 1.7 1.2 0.9 0.9 F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of PGA For Site Class = D and PGA = 0.267 g, FPGA = 1.267 Section 21.2.1.1 - Method 1 (from Chapter 21 - Site -Specific Ground Motion Procedures for Seismic Design) From Figure 22-17151 CRs = 0.977 From Figure 22-18[61 CRI 1.009 r 5 of 2/23/2016 10:00 AM Design Maps Detailed Report. V http://ehpI-earthquak6.cr.usgs.gov/designmaps/us/report.php?templa... Section 11.6 — Seismic Design Category .. Table 11.6-1 Seismic Desian Cateanry eased nn Shnrt Parinri Rocnnnco VALUE OF Sos RISK CATEGORY I or II III IV SDs < 0.1679 A A A 0.167g 5 SDS < 0.33g B. B C 0.338 5 SDS < 0.509 C C D 0.509 5 SDS D D D ror KLSK category = i and 5Ds = 0.566 g, Seismic Design Category = D Table 11.6-2 Seismic Desian Cateanry eased nn 1-S Parind Rocnnnco Arroiomf-inn D--f— VALUE OF S • SM, RISK CATEGORY I or II III IV SM < 0.067g A A A 0.067g 5 SM < 0.133g B B C 0.1338 5 SM < 0.20g C C D 0.208 5 SM D D D For Risk Category = I and SD, = 0.322 g, Seismic Design Category = D Note: When Sl is greater than or equal to 0.75g, the Seismic Design Category is E for buildings in Risk Categories I, II, and III, and F for those in Risk Category IV, irrespective of the above. Seismic Design Category "the more severe design category in accordance with Table 11.6-1 or 11.6-2" = D Note: See Section 11.6 for alternative approaches to calculating Seismic Design Category. References 1. Figure 22-1: http://earthquake.usgs..gov/hazards/designmaps/downloads/pdfs/2010_ASCE- 7_Figure_22-1. pdf 2. Figure 22-2: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE- 7_Figure_22-2. pdf 3. -Figure 22-12: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE- 7_Figure_22-12. pdf 4. Figur6 22-7: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE- 7_Figure_22-7.pdf S.. Figure -22-17: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE- ,. 7_Fig u re_22-17. pdf 6. Figure 22-18: http://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE- 7_Fig u re_22-18. pdf 0 6 of 6 2/23/2016 10:00 AM .CHAPTER 12 SEISMIC DESIGN REQUIREMENTS FOR BUILDING STRUCTURES, or hooked around the reinforcing steel or otherwise terminated so as to effectively transfer forces to the reinforcing steel. 12.14.7.6 Bearing Walls and Shear Walls Exterior and interior bearing walls and shear walls and their anchorage shall be designed for a force equal to 40 percent of the short period design spectral response acceleration SDs times the weight of wall, W,, normal to the surface, with a minimum force of 10 percent of the weight of the wall. Inter- connection of wall elements and connections to supporting framing systems shall have sufficient ductility, rotational capacity, or sufficient strength to resist shrinkage, thermal changes, and differential foundation settlement where combined with seismic forces. 12.14.7.7 Anchorage of Nonstructural Systems Where required by Chapter 13, all portions or components of the structure shall .be anchored for the seismic force, F,,, prescribed therein. 12.14.8 Simplified Lateral Force Analysis Procedure An equivalent lateral force analysis shall consist of the application of equivalent static lateral forces to. a linear mathematical model of the structure. The lateral forces applied in each direction shall sum to a total seismic base shear given by Section 12.14.8.1 and shall be distributed vertically in accordance with Section 12.14.8.2. For purposes of analysis, the structure shall be considered fixed at the base. 12.14.8.1 Seismic Base Shear The seismic base shear, V, in a given direction shall be determined in accordance with Eq. 12.14-11: where V _ FSDs W R (12.14-11) S's =3F.S, where Fa is permitted to be taken as 1.0 for rock sites, 1.4 for soil sites, or determined in accordance with Section 11.4.3. For the purpose of this section, sites are permitted to be considered to be rock if there is no more than 10 ft (3 m) of soil between the rock surface and the bottom of spread footing or mat foundation. In calculating SDs, S, shall be. in accor- dance with Section 11.4.1, but need not be taken larger than 1.5. lt1I:� F = 1.0 for buildings that are one story above grade plane F = 1.1 for buildings that are two stories above grade plane F = 1.2 for buildings that are three stories above grade plane R = the response modification factor from Table 12.14-1 W = effective seismic weight of the structure that includes the dead load, as defined in Section 3. 1, above grade plane and other loads above grade plane as listed in the following text: 1. In areas used for storage, a minimum of 25 percent of the floor live load shall be included. EXCEPTIONS: a. Where the inclusion of storage loads adds no more than 5% to the effective seismic weight at that level, it need not be included in the effective seismic weight. b. Floor live load in public garages and open parking structures need not be included. 2. Where provision for partitions is required by Section 4.2.2 in the floor load design, the actual partition weight, or a minimum weight of 10 psf (0.48 kN/ml) of floor area, whichever is greater. 3 Total operating weight of permanent equipment. 4. Where ttf6flat rodf'snow-"load, Ph exceeds"- 30 psf (1.44 kN/m'), 20 percent of the uniform design snow load, regardless of actual roof slope. 3.—We-igh[ of ani ndscaping and other materials at roc gardens and similar areas. 12.14.8.2 Vertical Distribution The forces at each level shall be calculated using the following equation: F, _ V (12.14-12) where w., = the portion of the'effective seismic weight of the structure, W, at level x. 12.14.8.3 Horizontal Shear Distribution The seismic design story shear in any story, V. (kip or kN), shall be determined from the following equation: V.=�F,• (12.14-13) I=x 1501 DECK COLUMNS 100216 WOOD COLUMN - COMBINED FLEXURE AND AXIAL LOAD WOODCOL.XLS PROJECT: JABORSKI PAGE: 1 ROJ NUMBER: 1501.00 DATE: 10/2/2016 COLUMN: DECK COLUMNS USE: 5.50 X 5.50 ' N "*** UNITY CHECK*** 0.21 (cannot exceed 1) "fc/F'c + fb/F'b-Jfc <= 1 COLUMN DIMENSION I MAJOR AXIS: (di)= 5.50 INCHES COLUMN DIMENSION / MINOR AXIS: (d2)= 5.50 INCHES UNSUPPORTED LENGTH / MAJOR AXIS: (lel)= 64.00 INCHES UNSUPPORTED LENGTH I MINOR AXIS: (le2)= 108.00 INCHES BUCKLING MODE / MAJOR AXIS: Ke = 2.10 136.17 BUCKLING MODE / MINOR AXIS:. Ke = 2.10 35.19 AXIAL LOAD: P= 1200 POUNDS MAX BENDING MOMENT IN COLUMN: M = 3776 INCH POUNDS ALLOWED COMPRESSION STRESS: Fc = 1400 P.S.I. ALLOWED FIBER BENDING STRESS: Fb = 850 P.S.I. MODULUS OF ELASTICITY: E = 1600000 P.S.I. K =.0.671 * SQUARE ROOT E/Fc = 22.68 SHORT COLUMN Pc = 0.00 INTERMEDIATE COLUMN F'c = 0.00 .LONG COLUMN F'c = 803.84 EFFECTIVE LENGTH (L*Ke) le = 134.40 SLENDERNESS RATIO (le/d) = 24.44 (cannot exceed 50) ADJUST FACTOR (le/d-1 1)/K-1 1 J = 0.00 0<=J<=1 J= 1.00 ACTUAL UNIT COMPRESS STRESS fc = 39.67 ACTUAL UNIT BENDING STRESS fb = 136.17 BEAM SLENDERNESS FACTOR Cs = 0.90 (cannot exceed 50) Ck = 35.19 SLENDER ADJUST FIBER STRESS F'b = 850.00 BUCKLING MODES (Ke): Ke = 0.65 if end 1: rotation fixed, translation fixed Ke = 0.80 if end 1: rotation fixed, translation fixed Ke = 1.00 if end 1: rotation free, translation fixed Ke = 1.20 if end 1: rotation fixed, translation free Ke = 2.10 if end 1: rotation fixed, translation fixed Ke = 2.40 if end 1: rotation free, translation fixed U Page 1 end 2: rotation fixed, translation fixed end 2: rotation free, translation fixed end 2: rotation free, translation fixed end 2: rotation fixed, translation fixed end 2: rotation free, translation free end 2: rotation fixed, translation free A R C A D E M E Studio. . . . . . . . . 530.343.5709 355 East Ninth Street Chico, California 95928 Design: Project Name: JABORSKI ADDITION Project Number: 1507 Date: 07 -Feb -17 Page: of PROJECT: JABORSKI PAGE: PROJ NUMBER: 1501 DATE: ,lune 2, 2016 BEAM: UPPER STAIR ROOF USE: 2 x 10 DF #2 STRENGTH= DF #2 TRIAL MEMBER S.F. Fv (psi)= 150 b= 1.50 A= 13.9 OK 297% Fb (psi)= 850 h= 9.25 S= 21.4 259% E (psi)= 1.60E+06 1= 98.9 'O_ K 376% INPUT OUTPUT' SPAN (inches)= 93 max HORIZ. SHEAR (Vmax)= 467.60 lbs. TRIB WIDTH (feet)= 2 max AREA REQUIRED (A)= 4.68 IN UNIFORM LIVE LOAD (psf)= 55 MOMENT (Mmax)= 12.07 KIP IN UNIFORM DEAD LOAD (psf)= 12 SECTION REQUIRED (S)=8.26 IN 3 • DEFLECTION (span/x)= 360, . MOM INERTIA REQ'D (1)= 26.31 IN Fb Adjustment Factors Fv Adjustment Factors Adjusted Bending Stress Fb (psi)i: 1461 Adjusted Shear Stress FV (psi) = 150 Duration (Cd) = 1.15 Duration (Cd) = 1.00 NDS Size Factor = 1.30 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 Repetitive Member (Cr) = 1.15 ' t r PROJECT: JA130RSKI ' PAGE: PROJ NUMBER: 1501 DATE: April 12, 2016 BEAM: MBR FLOOR JOIST USE: 2 x 8 DF #2 STRENGTH= DF #2 TRIAL MEMBER S.F. . Fv (psi)= 150 b= 1.50 A= 10.9 ;OK , 305% Fb (psi)= 850 h= 7.25 S= 13.1 SOK • ' " ` 130% E (psi)= 1.60E+06 1= 47.6 *`- 117% INPUT OUTPUT SPAN (inches)= 136 max HORI2. SHEAR ('Vmax)= 356.74 Ibs. TRIS WIDTH (feet)= 1.33 max AREA REQUIRED (A)= 3.57. IN UNIFORM LIVE LOAD (pst)= ' 40 MOMENT (Mmax)= 12.81 KIP IN UNIFORM DEAD LOAD (psf) = 10 SECTION REQUIRED (S)= 10.08 IN DEFLECTION (span/x)= 360 MOM INERTIA REQ'D (I)= 40.84 IN Fv Adjustment Factors Fb Adjustment Factors Adjusted Bending Stress Fb (psi)=1271 Adjusted Shear Stress Fb (psi) = 150 Duration (Cd) = 1.00 Duration (Cd) = 1.00 NDS Size Factor =1.30 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 Repetitive Member (Cr) =1.15 PROJECT: JABORSKI PAGE: PROJ NUMBER: 1501 DATE: April 12, 2016 BEAM: M/BR EDGE BEAM USE: 6 x 8 STRENGTH= DF #1 TRIAL MEMBER S.F. - Fv (psi)= 150 b= 5.50 A= 39.9 OK 141% ' Fb (psi)= 1350 h= 7.25 S= 48.2 OK , 103% y. E (psi)= 1.60E+06 I= 174.7 OK 110% INPUT OUTPUT SPAN (inches)= '108 max HORIZ. SHEAR (Vmax)= 3249.19 TRIB WIDTH (feet)= 1 max AREA REQUIRED (A)= 28.25 UNIFORM LIVE LOAD (psf)= 642 MOMENT (Mmax)= 94.04 UNIFORM DEAD LOAD (psf)= 132 SECTION REQUIRED (S)= 46.60 DEFLECTION (span/x) 240 MOM INERTIA REQ'D (1)= r 158.69 FV Adjustment Factors Fb Adjustment Factors • Adjusted Bending Stress F'b (psi)= 2018 Adjusted Shear Stress F v (psi) = 172.5 Duration (Cd) = 1.15 Duration (Cd) = 1.15 NDS Size Factor = 1.30 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 Repetitive Member (Cr) = 1.00 MULTIPLE TRIBS "RIB (ft) LOAD UNIFORM ROOF LIVE LOAD= 6.00 67.0 LB/SF = 402.0 LB/LF. UNIFORM ROOF DEAD LOAD= 6.00 12.0 LB/SF = 72.0 LB/LF UNIFORM FLOOR LIVE LOAD= 6.00 40.0 LB/SF 240.0 LB/LF UNIFORM FLOOR DEAD LOAD= 6.00 10.0 LB/SF = 60.0 LB/LF TOTAL LIVE LOAD= 6.00 107.0 LB/SF = 642.0 LB/LF TOTAL DEAD LOAD= 6.00 22.0 LB/SF 132.0 LB/LF t A Y OJECT: JABORSKI PAGE: MBER: 1501 DATE: April 12, 2016 BEAM: M/BR DECK JOIST USE: 2 x 6 DF#2 ENGTH= DF#2 TRIAL MEMBER S.F. Fv (psi)= 150 b= 1.50 A= 8.3 OK► ..- 305% Fb (psi)= 850 h= 5.50 S= 7.6 OK7 115% E (psi)= 1.60E+06 1= 20.8 OK 102% INPUT OUTPUT SPAN (inches)= 136 max HORIZ. SHEAR (Vmax)= 270.79 Ibs. TRIB WIDTH (feet) 0.83 max AREA REQUIRED (A)= 2.71 IN „ UNIFORM LIVE LOAD (psf)= 55 MOMENT (Mmax)= 9.59 KIP IN UNIFORM DEAD LOAD (psf)= 5 SECTION REQUIRED (S)= 6.57 IN DEFLECTION (span/x) 240 MOM INERTIA REQ'D (1)= 20.39 IN Fb Adjustment Factors F7 Fv Adjustment Factors justed Bending Stress Fb (psi)= 1461 Adjusted Shear Stress Fv (psi) = 150 Duration (Cd) = 1.15 Duration (Cd) = 1.00 NDS Size Factor = 1.30 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 ' Repetitive Member (Cr) = 1.15 i 1 CANTILEVER -UNIFORM L Fv (psi)= 150 b= 5.50 A= 39.9 OK 277% Fb (psi)= 1350 h= 7.25 S= 48.2 OK 195% ?' .. E (psi)= 1.605+06 1= 174.7 OK 281 % ' FREE@/1, FU INPUT OUTPUT CANT SPAN (inches)= 48 HORIZ. SHEAR@B (Vmax)= 1222.5 lbs. ' TRIB WIDTH (feet)= 6 AREA REQUIRED (A)= 14.38 IN UNIFORM LOAD (psf)= 60 MOMENT@B (Mmax)= 34.56 KIP IN DEFLECTION (span/x)= 240 SECTION REQUIRED (S)= 24.76 IN MOM INERTIA REQ -D (1)= 62.21 IN Adlustment Factors Adjustment Factors Adjusted Bending Stress F'b (psi)= 1396 Adjusted Shear Stress F'v (psi) = 127.5 Duration (Cd) = 1.15 Duration (Cd) = 1.00 Size Factor = 1.06 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1:00 Wet Service (Cm) = 0.85 Wet Service (Cm) = 0.85 Repetitive Member (Cr) = 1.00 - M PROJECT: JABORSKI PAGE: PROJ NUMBER: 1501 'DATE: April 12, 2016 BEAM: LOWER FLOOR JOIST USE: 2 x 8 DF #2 STRENGTH= DF #2 TRIAL MEMBER S.F. Fv (psi)= 150 b= 1.50 A= 10.9 OK 290% Fb (psi)= 850 h= 725 S= 13A OK 159% ` E (psi)= 1.60E+06 1= 47.6 OK 105% - INPUT OUTPUT MAX SPAN (inches)= 104 max HORIZ. SHEAR (Vmax)= 375.3 lbs. TRIS WIDTH (feet}: 1.33 max AREA REQUIRED (A)= 3.8 IN UNIFORM LIVE LOAD (psf)= 40 MOMENT (Mmax)= 10.5 KIP IN - UNIFORM DEAD LOAD (psf)= 30 SECTION REQUIRED (S)= 8.3 IN3 DEFLECTION (span x)= 640 MOM INERTIA REQ'D (1)= 45.5 IN Fb Adjustment Factors il:v AdJustment Factors Adjusted Bending Stress Fb (psi)= 1271 Adjusted Shear Stress FV (psi) = 150 Duration (Cd) = 1.00 Duration (Cd) = 1.00 NDS Size Factor = 1.30. Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 Repetitive Member (Cr) = 1.15 INCREASED DEAD LOAD FOR 2" RADIANT CONCRETE FLOOR LAYER M PROJECT: JABORSKI PROJ NUMBER: 1501 BEAM: LOWER FLOOR GIRDER PAGE: DATE: April 12, 2016 USE: 4 x 8 DF #1 STRENGTH= DF #1 . TRIAL MEMBER S.F. UNIFORM ROOF DEAD LOAD= Fv (psi)= 150 b= 3.50 A= 25.4 ,OK 143% ' LB/LF Fb (psi)= 1350 h= 725 S= 30..7 iQK 126% 240.0 E (psi)= 1.60E+06 1= 111_ .1 OK 110%. 10.0 LB/SF INPUT OUTPUT TOTAL LIVE LOAD= MAX SPAN (inches)= 88 max HORIZ. SHEAR (Vmax)= 2041.97 Ibs. TRIB WIDTH (feet)= 8.67 max AREA REQUIRED (A)= 17.76 IN UNIFORM LIVE LOAD (psf)= 40 MOMENT (Morax)= 48.96 KIP IN UNIFORM DEAD LOAD (psi)= 30 SECTION REQUIRED (S)= 24.26 IN DEFLECTION (span/x)= 360 MOM INERTIA REO'D (1)= 100.97 IN Fb Adjustment Factors Fv Adjustment Factors Adjusted Bending Stress Fb (psi)=2018 Adjusted Shear Stress FY (psi) = 172.5 Duration (Cd) = 1.15 Duration.(Cd) = 1.15 NDS Size Factor =1.30 Shear Stress (Ch) = 1.00 Temperature = 1.00 Temperature = 1.00 Wet Service (Cm) = 1.00 Wet Service (Cm) = 1.00 Repetitive Member (Cr) =1.00 MULTIPLE TRIBS RIB (ft) LOAD UNIFORM ROOF LIVE LOAD= 6.00 67.0 LB/SF = 402.0 LB/LF UNIFORM ROOF DEAD LOAD= 6.00 12.0 LB/SF = 72.0 LB/LF UNIFORM FLOOR LIVE LOAD= 6.00 40.0 LB/SF 240.0 LB/LF UNIFORM FLOOR DEAD LOAD= 6.00 10.0 LB/SF = 60.0 LB/LF TOTAL LIVE LOAD= 6.00 107.0 LB/SF = 642.0 LB/LF TOTAL DEAD LOAD= 6.00 22.0 LB/SF 132.0 LB/LF 12 Project: JABORSKY ADDITION • , Prepared by: P COLE 2/23/2016 Software licensed to: ARCADEME Phone: 530 343 5709. Email: patrick#arcademe.com ' Wind Simple Version 1.0.0 Input - See ASCE 7-10 Section 26.3 for symbol definitions ,.' V=110m h t P Topographic Factor Exposure Category C h = 20 ft is " Calculate K zt at 0.33h * 2-dimensional escarpment -'L = 60 ft r Building is downwind of feature. B=40ft Lh =200 ft, H=50ft, x=30ft Y ' Hip Roof: Pitch = 6:12 . . � - • F . - , . • r Kzt for walls = 1.383 Kzt for roof = 1.320 ` This is a valid Class 1 building, • Main Wind -Force Resisting System ASCE 7-10 Directional Procedure, MWFRS - Chapter 27, Part 2 ' - This procedure applies to wind loads of enclosed simple diaphragm buildings; as defined in Section 26.2 MWFRS Wall Pressures (psf) r .} 9Ma11.v��Total Wmd a d W.•LEee - d " qStdet� axIiite alp 'p 33.8. 28.9 ,-24.6 +/.5.6, z, d=16.1 33.2 28.4 T NMFRS Roof Pressures (psf) • 1VMM Roof Overhang Pressures aa_ ' • • , �, , ' r 2. povh @ Zone 1 = 13.0 psf =Pooh,@ Zone 3•= 24.9 psf �► :y Pressures indicated are applied to underside of overhang ons windward side only, simultaneously with other roof pressures* . • � �re ��:• ♦.. �r Ads, - • , �."`,. 3 ,rr .e •�. •; '.. r _ �.. - '.. _ � Vii- - ♦, , !• ♦ . . . ®_ S.K.•Ghosh Associates Inc. 334 E Colfax Street, Palatine, IL, 60067_- Page lof 2 • "`� ', wwIw.skghoshassociates.com , d h �' 1L'oadQas -17.3. -2.1.6 -33.3 -29.6 -24.3 iLoadCase�2 ; ' 13.6 , -10.3 '0.0 0.0 0.0 �tiNsr W1ns•Vrt.!a't^:t`+M+X r:� , • 1VMM Roof Overhang Pressures aa_ ' • • , �, , ' r 2. povh @ Zone 1 = 13.0 psf =Pooh,@ Zone 3•= 24.9 psf �► :y Pressures indicated are applied to underside of overhang ons windward side only, simultaneously with other roof pressures* . • � �re ��:• ♦.. �r Ads, - • , �."`,. 3 ,rr .e •�. •; '.. r _ �.. - '.. _ � Vii- - ♦, , !• ♦ . . . ®_ S.K.•Ghosh Associates Inc. 334 E Colfax Street, Palatine, IL, 60067_- Page lof 2 • "`� ', wwIw.skghoshassociates.com , d h �' Project: JABORSKY ADDITION Prepared by: P COLE - 1 2/23/2016 Software licensed to: ARCADENM Phone: 530 343 5709 1 Email: Datric"areademe-com Wind Simple Version 1.0.0 ,Components and Cladding ASCE 7-10 Directional Procedure, C&C - Chapter 30, Part 4 This procedure applies to wind loads of enclosed buildings, as defined in Section 26.2 C&C Wall and Roof Pressures (Dsf) Nt. 'z Z' =Zone 2% ,Zone,. - '3- 4 n, 14. 'Zone Eff6ctiyb', Load Load` Load Load d" iP Wind �s tW' T, Load .,LbAd,- Load Case 2 Load -a Load '�'4pa- q�X Load 'vlxv X" Case 2 1Q,02, Case 2 '40 Case 2 ap&;" Case 2 C Case 2 {`-58'9 Nrimi 22.0 25.9 23.7 10 21.3 21.3 21.3 37.0 33.8 t,4 �4*21V'4, 500 �56 19.1 -4,777 19.1 '69.T!�J-- 19.1 -.'--32J 25.9 23.7 200 3 V.2g!. 19.6 -49 ' .9 19.6 173."V,,� i 19.6 T 0 28.5 43 Ott 26.0 " 100 20.0 51 9 20.0 20.0 30.4 27.8 . C&C Roof OverhanL, Pressures (vsf) S.K. Ghosh Associates Inc. 1334 E Colfax Street, Palatine, IL, 60067 Page 2of 2 - www.skghoshassociates.com Qy 01 &6 n, 14. 'Zone Wind Area (ff) Load Load` Load Load d" iP Load g .1 Case 2 !P. age Case 2 asg, Case 2 '�'4pa- q�X Case 2 10 21.3 1Q,02, 24.4 '40 37.0 ' 0 ,, 33.8 500 {`-58'9 21.3 22.0 25.9 23.7 S.K. Ghosh Associates Inc. 1334 E Colfax Street, Palatine, IL, 60067 Page 2of 2 - www.skghoshassociates.com a, M. • MINIMUM DESIGN LOADS Main Wind Force Resisting System — Part 2 h!5 160 ft. Table 27.6-2 F Wind Pressures -Roof Application of Roof Pressures Enclosed Simple Diaphragm Buildings 0 Flat Roof a• ..................... h (0 < 10 deg) O.Sh Wind . O.Sh IS 7 ♦ 5 O Gable Roof 0 0 0 •`•�'� \ ' Wlod h� O.Sh 03h tVioe A 5 2 0.3h 4 5 3 o.sh O O ........... s = '`.0`l • Qfifr , Hip Roof \. n o.sn h Wine 0.5h C 3 Wind Y. Wind i I <-3 e h h \ B • h Wind Wiod y4'••Or 0.11 ' 011 h Wind Monoslope Roof � osn 0.511 11 Mansard Roof I A R C A D E M E Studio. ... . . . . . 530.343.5709 355 East 9th Street Chico, California 95928 Design: Project Name: t. Project Number: Date: REVISED 061716 Page: of VERTICAL BLOCKED DIAPHRAGM -1/2"PLYWOOD -1/2" ANCHOR BOLTS - 8d NAILS • (INCLUDES 3!8' WITH STUDS @16'OC MAX) (NOTE: WOOD & FASTENER VALUES BASED ON NATIONAL DESIGN SPEC (NDS) PLYWOOD & OSB SHEAR VALUES ARE BASED ON AMERICAN PLYWOOD \ ASSOCIATION (APA) & CBC TABLE 2306.3 ANCHOR BOLTS = 1/2" (TABLE 8.2E) (A307 BOLTS MEET CODE REQ'D FY=45000PSI) 11/2" DOUGLAS FIR LOADED PARALLEL TO GRAIN= 620 LBS/BOLT X 1.33 = 825 #/BOLT 21/2" DOUGLAS FIR LOADED PARALLEL TO GRAIN= 730 LBS/BOLT X 1.33 =. 971 #/BOLT 16d BOX NAILS = (79#)(1.33) = 105 #/NAIL (TABLE 12.3A) (ADJUSTED PER TABLE 7.3.1) SIMPSON A-34 CLIP = (345#)(1.25) = - 431 #/CLIP 25% WIND/SEISMICMAX INCREASE) 1/2" OSB OR CDX PLYWOOD WITH 8d @ 6"/12" = 280 #/FT ANCHOR BOLTS = 825 / 280 = 2.95 FT = 35.3 INCHES ON CENTER MAXIMUM ' 16d BOX NAILS = 105 / 280 = 0.38 FT = 4.5 INCHES ON CENTER MAXIMUM SIMPSON A-34 CLIP = 431 / 280 = 1.54 FT = 18.5 INCHES ON CENTER MAXIMUM D 1/2" OSB OR CDX PLYWOOD l• WITH 8d@ 4"/12"= 430 #/FT ANCHOR BOLTS = 825 / 430 = 1.92 FT = 23.0'• INCHES ON CENTER MAXIMUM 16d BOX NAILS = 105 / 430. = 0.24 FT = 2.9 INCHES ON CENTER MAXIMUM SIMPSON A-34 CLIP = 431 / 430 = 1.00 FT = 12.0 INCHES ON CENTER MAXIMUM (@ SDC D,E & F WHERE SHEAR > 350 PLF -USE 3X OR DOUBLE 2X PANEL EDGES) 1/2" OSB OR CDX PLYWOOD WITH 8d @ 3"/12" = - 550 #/FT • ANCHOR BOLTS = 971 / 550 = 1.77 FT = 21.18 INCHES ON CENTER MAXIMUM 16d BOX NAILS = 105 / 550 = 0.19 FT = 2.29 INCHES ON CENTER MAXIMUM ' SIMPSON A-34 CLIP = 431 / 550 = 0.78 FT = 9.409 INCHES ON CENTER MAXIMUM (@ SDC D,E & F WHERE SHEAR > 350 PLF -USE 3X OR DOUBLE 2X PANEL EDGES) D 1/2" OSB OR CDX PLYWOOD WITH 8d @ 2"/12" = 730 #/FT ANCHOR BOLTS = 971 / 730 = 1.33 FT = 15.96 INCHES ON CENTER MAXIMUM 16d BOX NAILS = 105 / 730 = 0.14 FT = 1.73 INCHES ON CENTER MAXIMUM ' SIMPSON A-34 CLIP = 431 / 730 = 0.59 FT = 7.089 INCHES ON CENTER MAXIMUM (@ SDC D,E & F WHERE SHEAR > 350 PLF -USE 3X OR DOUBLE 2X PANEL EDGES) • r _ r J 1ABORSKI LINE 1 A R C A D E M E Studio. . . . . . . . . 5 3 0. 3 43 . 5 709 355 - East Ninth Street Chico, California 95928 ............................................................... 'LATERALLIN�1 Design: LATERAL LINE 1 Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 Page: of WIND SHEAR TRIB AREA ROOF = 53.7 SF @ 28.9. PSF= 1551.9 LBS COLLECTED @ TOP PLATE AND WALL = 54.7 SF @ 28.9 PSF= 4580.8 LBS DISTRIBUTED TO FOUNDATION BASE SHEAR DUE TO WIND = 3132.8 LBS THRU SHEAR WALL LENGTH OF WALL = 18.0 FT UNIT SHEAR DUE TO WIND = 174.0 #/FT <280 -USE SHEARWALL'A' SEISMIC DL+SNOW TRIB ROOF = 234.0 SF @ 23.0 PSF= X 0.086 = 462.9 LBS DL TRIB WALL 1 = 197.8 SF @ 9.5 PSF= X 0.086 = 1.61.6 LBS DL TRIB WALL B = 54.7 SF @ 9.5 PSF= X 0.086 = 44.7 LBS DL TRIB WALL C = 54.7 SF @ 9.5 PSF= X 0.086 = 44.7 LBS BASE SHEAR DUE TO SEISMIC = 713.8 LBS WIND GOVERNS WEIGHT ON WALL DL ROOF = 98.7 SF @ 11.0 PSF= 1,086 LBS NO SNOW WEIGHT IF WIND DL WALL = 197.8 SF @ 9.5 PSF= 1,879 LBS GOVERNS SHEAR WALL LENGTH OF WALL = 18 FT= 216 IN HEIGHT OF WALL = 8.0 FT FORCE AT TOP OF WALL = 3,133 LBS 174 #/FT <280 -USE SHEARWALL'A' TOTAL OVERTURN MOMENT (OTM) = 25,062 FT # - TOTAL RESISTING WEIGHT = 2,965 LBS ARM TO CENTROID OF WEIGHT= 9 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 26,683 FT # �FT NO HOLD DOWNS REQUIRED OTM - WRM= (1,621) # 0. JABORSKI LINE 2 WEST A R C A D E M E Studio-. 530.343.5709 355 East Ninth Street ChiCo California -95928 LATERAL LINE.2 BETWEEN B&D WITH WEST WIND Design: LATERAL LINE 2 WEST Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 - Page: of WIND SHEAR TRIB LOW ROOF = 94.0 SF @ 28.9 PSF= 2,717 LBS WEST WIND MOST CRITICAL FOR WALL = 57.4 SF @ 28.9 - PSF= 1,660 LBS 1 STORY BASE SHEAR DUE TO WIND = 4,377 LBS LENGTH SHEAR WALL LINE2 @ B/D = 13.333 FT UNIT BASE SHEAR DUE TO WIND = 328.3 #/FT <430 -USE SHEARWALL 'B' SEISMIC TRIB TO WALL LO ROOF = 489.0 SF @ 23.0 PSF= X 0.086 = 967 LBS DLTRIB WALL 2 = 118.8 SF @ 9.5 PSF=X 0.086 _ `97 LBS DL TRIB WALL B = 89.9 SF @ 16.7 PSF= X 0.086 = 129 LBS DL TRIB WALL C 89.9 SF @ 16.7 PSF= X 0.086 = 129 LBS DL TRIB WALL D = 17.7 SF @ 16.7 PSF= X 0.086 = 25 LBS REDUNDANT w/ EAST BASE SHEAR DUE TO SEISMIC = 1348 LBS WIND GOVERNS RESISTING WEIGHT ROOF o/ WEST WALL = 17.4 SF @ 11.0 PSF= 191.4 LBS NO SNOW WEIGHT IF WIND DL WEST WALL = 69.5 SF @ 6.7 PSF= 465.7 LBS GOVERNS DL EAST WALL = 37.6 SF @ 6.7 PSF= 251.9 LBS DL EAST WALL TRUSS = POINT LOAD FROM TRUSS 1969.0 LBS WESTERLY SHEAR WALL LENGTH WEST SHEARWALL = 8.7 FT= 104 IN HEIGHT WEST SHEARWALL1 = 8.0 FT PROPORTIONED WIND LOAD = 1998.0 LBS 231. #/FT <280 -USE SHEARWALL 'A' OTM IN SHEARWALL = 15,984 FT # WEIGHT ON SHEARWALL = 657 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 4.3 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 2,847 FT # OTM - WRM= 13,137 FT # MAX UPLIFT = 1,516 LBS HOLDDOWN REQ'D -USE PA68 t EASTERLY SHEAR WALL LENGTH EAST SHEARWALL = 4:7 FT= 56 IN HEIGHT EAST SHEARWALL = 8.0 FT ` PROPORTIONED WIND LOAD= 2378.7 LBS 510 #/FT <550 -USE SHEARWALL'C' TOP OTM IN SHEARWALL= 12,255 FT # PLATE 4' LAP w/ 10- 8d & STRAP WEIGHT ON SHEARWALL = 2,221 LBS LSTA36 (2510#) ARM TO CENTROID OF WEIGHT ON SHEARWALL= 2.3 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 5,182 FT # OTM - WRM= 7,073 FT # MAX UPLIFT = 1,516 LBS HOLDDOWN REQ'D -USE PA68 G�N�Z u�r�� R C A D E M E im ly A 52. NIP V4 - `--- 7m 41- + 4 V, + 4-4- lz xk- I J i 7 rof JABORSKI LINES A R C A D E M E Design: LATERAL LINE 3 ' Project Name: JABORSKI ADDITION Studio. ... 5 3 0. 3 4 3. 5 7 0 9 Project Number: 1501 355 East Ninth Street, Date: 12 -Feb -17 Chico,- California 95928 Page: of LATERAL I LINE 13 I BETWEEN D & F WITH EAST WIND (west wind blocked by one story) WIND BASE SHEAR TOWER ROOF = 17.3 SF @ 28.9 PSF= 500 LBS COLLECTED TO EACH SUCCESSIVE WALL F TRIB TO HI ROOF = 25.0 SF @ . 28.9 PSF= 723 LBS FLOOR DOWN FROM TOWER ROOF INTO LINE 3 -MOST CRITICAL WIND FROM WALL F & G TRIB TO 3rd FL = 50.2 SF @ 28.9 PSF= 1,451 LBS EAST - WEST WIND BLOCKED BY ONE WALL F & G TRIB TO 2nd FL .= 66.0 SF @ 28.9 PSF= 1,907 LBS STORY SECTION TAKEN AT LINES 2&4 BASE SHEAR DUE TO WIND = 4,581 LBS E LENGTH SHEAR WALLS = 19.33 FT UNIT BASE SHEAR DUE TO WIND = 237.0 #/FT <280 -USE SHEARWALL'A' SEISMIC BASE SHEAR. TbWER ROOF = 49.6 SF @ 27.0 ' PSF= X 0.373 = 499.5 LBS INCL 22psf SEISMIC HI ROOF = 96.4 SF @ 33.0 PSF=* X 0.086 = 273.6 LBS SNOW LOAD WALL TYPE D LINE 3 = 448.0 SF @ 9.9 PSF= X 0.086 = 381.4 LBS WALL TYPE B LINE F = 84.4 SF @ 16.8 PSF= X 0.086 = 121.9 LBS 3rd FL = 84.0 SF @ 9.5 PSF= X 0.086 = 68.6 LBS HI STAIR = 15.6. SF @ 10 PSF= X 0.086 = 13.4 LBS 2nd FL' = 50.0 SF @ 9.5 PSF= X 0.086 = 40.9 LBS LO STR = 13.9 SF @ 10 PSF= X- 0.086 = 12.0 LBS BASE SHEAR DUE TO SEISMIC = 1411.3 LBS WIND GOVERNS WEIGHT ON WALL DL TOWER ROOF = 17.3 SF @ 5.0 PSF= 87 LBS NO SNOW WEIGHT IF WIND DL HI ROOF = 96.4 SF @ 11.0 - PSF= 1,060 LBS - GOVERNS DL WALL 3 = 81.4 SF @ 9.5 PSF= 773., LBS DL 3rd FL = 51.9 SF @ 10.0 PSF= 519 LBS DL SHRWALL 2 = 91.5 SF @ - 10 PSF= 915 LBS DL 2nd FL = 117.8 SF @ 10 PSF= 1,178 LBS DL SHRWALL 3 = 46.8 SF @ 10 PSF= 468 LBS a JABORSKI LINE 3 UPPER SHEARWALL LENGTH SHEARWALL 3a ABOVE 3rd FLOOR= 14.9 - FT= 101 IN+ 78 IN SEE DRAWINGS 2/S-1 HEIGHT OF SHEARWALL 3a ABOVE 3rd FLOOR= • M CUMUL LAT FORCE @ TOP WALL= 1222.5 LBS 82 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL 1 = 8,252 FT # - WEIGHT ON SHEARWALL 1 = 1,920 LBS UPPER SHEARWALL LENGTH SHEARWALL 3a ABOVE 3rd FLOOR= 14.9 - FT= 101 IN+ 78 IN SEE DRAWINGS 2/S-1 HEIGHT OF SHEARWALL 3a ABOVE 3rd FLOOR= 6.8 FT CUMUL LAT FORCE @ TOP WALL= 1222.5 LBS 82 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL 1 = 8,252 FT # - WEIGHT ON SHEARWALL 1 = 1,920 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL 1 = 7.5 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 14,320 FT # OTM - WRM= (6,068) FT # HOLDDOWN NOT REQ'D MIDDLE SHEARWALL LENGTH SHEARWALL 3b = 12.0 FT= 144 IN * - HEIGHT OF SHEARWALL 3b ABOVE 2nd FLOOR=' 6.8 FT CUMUL LAT FORCE @ TOP WALL= 2673.3 - LBS 223 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL 3b = 18,178 FT # WEIGHT ON SHEARWALL 3b = 3,354 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL 3b = 6.0 FT - (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 20,124 FT # OTM - WRM= (1,946) FT # _ HOLDDOWN NOT REQ'D LOWER SHEARWALLS CUMUL LENGTH SHEARWALLS 3c,3d & 3e = 19.3 FT=' -232 IN 172 IN+ 60 IN HEIGHT OF SHEARWALL 3c,3d & 3e = 7.3 FT CUMUL LAT FORCE @ TOP WALL= 4581 LBS 237 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL 3c,3d & 3e = 33,439 FT # WEIGHT ON SHEARWALL 3c,3d & 3e = 3,939 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL 3c,3d & 3e = '9.7 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 38,071 FT # OTM - WRM= (4,632) FT # HOLDDOWN NOT REQ'D A R C A• D' E M E Studio. . . . . . . . 530.343.5709 355 East Ninth Street Chico, California 95928 LATERAL LINE 4 ONE STORY Design:. LATERAL LINE 4 Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 Page: of WIND SHEAR TRIB ROOF = 37.3 SF @ 28.9 PSF= 1,078 LBS SIMPLE SHEAR WALL COLLECTED IN WEST WIND WALL A/B TRIB 33.0 SF @ 28.9 PSF= 954 LBS DOUBLE TOP PLATE. BASE SHEAR DUE TO WIND = 2,032 LBS SEISMIC BASE SHEAR ROOF = 96.4 SF @ . 33.0 PSF= X 0.086 = 273.7 LBS INCL22psf SEISMIC WALL LINE 4 = 98.0 SF @ 9.6 PSF= X 0.086 = 80.9 LBS . SNOW LOAD WALL LINE A/B = 33.0 SF @ 9.6 PSF= X 0.086 = 27.2 LBS - BASE SHEAR DUE TO SEISMIC = 381.8 LBS r WIND GOVERNS WEIGHT ON WALL DL ONLY ROOF = 62.5 SF @ 33.0 PSF= 2,063 LBS NO SNOW WEIGHT IF WIND GOVERNS DL ONLY WALL 4 = 20.0. SF @ 9.6 PSF= 192 LBS TOTAL RESISTING WEIGHT = 2,255 LBS SHEARWALL LENGTH SHEARWALL = 5.0 FT= 60 IN HEIGHT OF SHEARWALL = 8.0 FT CUMUL LAT FORCE @ TOP WALL= 2032 LBS 406 #/FT <430 -USE SHEARWALL'B' OTM IN SHEARWALL 1 = 16,253 FT # WEIGHT ON SHEARWALL 1 = 2,255 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL 1 = 2.5 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 5,636 FT # HOLDDOWN REQ'D USE: OTM - WRM= 10,617 FT # HTT5 w/ SSTB16 HOLDOWN & MAX UPLIFT = 2,123 LBS 5/8" A307 ALL -THREAD JABORSKI LINE 5 , r -A�- R C A D E M E Studio. . . . 530.343.5709 355 East Ninth Street .Chico, California 95928 LATERAL LINE 5 TOWER ONLY - MBR TRIB TO LINE 6 Design: LATERAL LINE 5 Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 Page: of WIND SHEAR TRIB TOWER ROOF = 17.3 SF @ 28.9 PSF= 499 LBS TRIB INTO 3rd FL - - 22.2 SF @ 28.9 • PSF= 640 LBS LOADS FROM LINES E/G & 3/5 TAKEN THRU LINE 5 - LOADS AT LINES.D/E & 3/6 TRIB INTO 2nd FL = 44.4 ' SF @ 28.9 PSF= -1,282 LBS TAKEN IN LINE 6 - BASE SHEAR DUE TO WIND = 2,421. LBS LENGTH BASE SHEAR WALL = 4.67 FT UNIT BASE SHEAR DUE TO WIND = 518.5 #/FT <550 -USE SHEARWALL'C' SEISMIC BASE -SHEAR- TOWER ROOF = 49.6 SF @ 27.0 PSF= X 0.37 = 499.5 LBS INCL 22psf SEISMIC 3rd DECK FLOOR= = 72.0 SF @ 32.0 PSF= X 0.09. _ . 198.1 LBS SNOW LOAD WALL 5 TYPE C = 178.5 SF @ 9.6 PSF= X 0.09 _ - 147.4 LBS WALL G TYPE C = 70.5 SF @ 9.6 PSF= X 0.09 = 58.2 LBS 2nd FLOOR= 72.0 SF @ 10 PSF= X 0.09 = ` ' 61.9 LBS WIND GOVERNS BASE SHEAR DUE TO SEISMIC = 965.2 LBS WEIGHT ON WALL DL ONLY TOWER = 49.6 SF @ 5.0 PSF=. 248 LBS NO SNOW WEIGHT IF DL ONLY 3rd FLOOR = 72.0 SF @ 10.0 PSF= 720 LBS WIND GOVERNS DL ONLY HI WALL 5 = 59.2 SF @ 9.6 PSF= 568 LBS DL ONLY LO WALL'5 = 48.5 SF @ 9.6 PSF= 466 LBS DL ONLY 2nd FL = 72.0 SF @ 10 PSF= 720 LBS - TOTAL RESISTING WEIGHT = 2,722 LBS UPPER SHEARWALL LENGTH UPPER SHEARWALL ABOVE 2nd FLOOR= 7.3 FT= 88 IN HEIGHT UPPER SHEARWALL ABOVE 2nd FLOOR= 6.8 FT CUMUL LAT FORCE @ TOP WALL= 1139 LBS 155 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL = 7,747 FT # WEIGHT ON SHEARWALL = 1,536 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 3.7 FT (WRM), WEIGHT RESISTING MOMENT OF SHEARWALL = 5,631 FT # OTM - WRM= 2,116 FT # - STRAP REQ'D -USE LSTA24 MAX UPLIFT = 289 LBS (1235#) LOWER SHEARWALL LENGTH LOWER SHEARWALL ABOVE FLOOR= 4.7 FT= 561N HEIGHT LOWER SHEARWALL ABOVE'FLOOR= 7.3 FT .. CUMUL LAT FORCE @ TOP WALL= 2421 LBS 518 #/FT <550 -USE SHEARWALL.'C' OTM IN SHEARWALL = 17,748 FT # WEIGHT ON SHEARWALL = 2,722. LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 2.3 FT _ (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 6,356 FT # - HOLDDOWN REQ'D USE: OTM - WRM= 11,392 FT # HTT5-3/4 w/ 3/4" A36 ALL'THREAD MAX UPLIFT = 2,439 LBS & SET EPDXY -9" EMBED(2700#) A R C A D 'E M E Design: � LATERAL LINE 6 y Project Name: JABORSKI ADDITION S t u d i o . . . . . . . .. 5 3 0. 3 4 3. 5 7 0 9 Project Number: 1501 3 5 5 E a s t Ninth Street Date: 12-Feb-17 Chico, California 95928 Page: of LATERAL LINE 6 WIND SHEAR TRIB ROOF INTO WALL PL = 27.8 SF @ 28.9 PSF= 803 LBS WALL INTO UPPER PL = 29.7 SF @ 28.9 PSF= 858 LBS WIND LOADS FROM 3 TO 6 & D TO E - TRIB INTO 2nd FL = 54.3 SF @ 28.9 PSF= 1,569 LBS WEST WIND MOST CRITICAL EXPOSURE BASE SHEAR DUE TO WIND = 3,231 LBS LENGTH BASE SHEAR WALL = 7.66 FT UNIT BASE SHEAR DUE TO WIND = 421.8 #/FT <430 -USE SHEARWALL'B' SEISMIC BASE SHEAR MBR ROOF = 137.5 SF @ 33.0 PSF= X 0.09 = 390.2 LBS INCL 22psf SEISMIC UPPER LINE D TYPE B _ -29.7 SF @ 16.8 PSF= X 0.09 = 42.9 LBS SNOW LOAD UPPER LINE E TYPE D = 29.7 SF @ 9.9 PSF= X 0.09 = 25.3 LBS FLOOR = 83.8 SF ~ @ 8.0 PSF= X 0.09 = 57.7 LBS DECK = 48.0 SF @ 6.0 PSF= X 0.09 = 24.8 LBS - LOWER LINE D TYPE B = 54.3 SF @ 16.8 PSF= X 0.09 = 78.5 LBS LOWER LINE E TYPE D = 56.2 SF @ 9.9 PSF= 'X 0.09 = 47.8 LBS WIND GOVERNS BASE SHEAR DUE TO SEISMIC = 667.1 LBS JABORSKI LINE 6 T WEIGHT ON WALL DL MBR ROOF = 137.5 SF @ 11.0 PSF= 1,513 LBS NO SNOW WEIGHT IF WIND GOVERNS WALL ABOVE PORTAL = 34.6 SF @ 16.8 PSF= 581 LBS UPPER WALL LINE 5 = 83.7 SF @ 16.8 PSF= 1,406 LBS LOWER.WALL LINE 5 = 92.3 SF @ 16.8 PSF= 1,551 LBS TOTAL RESISTING WEIGHT = 3,500 LBS UPPER WALL CUMUL LAT FORCE @ TOP WALL= 1662 LBS ' SHEAR PER PANEL— ` 831 LBS 2 SIMPSON STRONGWALLS OVER CONVENTIONAL SHEARWALLS CUMUL AXIAL LOAD ABOVE HEADER= 2094 LBS (174 PLF) BELOW -1640# WIND ALLOWED EA SPAN OF HEADER= 8 FT ALLOWED ASD SHEAR LOAD = 1640 LBS ANCHOR TENSION= 0.67(831X84)/(22-5.25) = 2792 LBS DOUBLE SW24X8X6-RF w/ 7/8"A36 • ALL THREAD TO SSTBs BELOW LOWER WALL -2 PANELS CUMUL LAT FORCE @ TOP WALL= 3231 LBS + SHEAR PER PANEL= 1616 LBS 422 #/FT <430 -USE SHEARWALL'B' CUMUL AXIAL LOAD EA PANEL= 1750 LBS LENGTH EACH PANEL = 3.8 FT= 46 IN HEIGHT EACH PANEL= 7.5 FT - OTM IN SHEARWALL = 12,116 FT # ' 2289+2792LBS < 7310-SSTB28 OK ARM TO CENTROID OF AXIAL LOAD = 1.9 FT - (WRM) WEIGHT RESISTING MOMENT EA PANEL = 3,351 FT # HOLDDOWNS STTB28(7310LBS) & OTM - WRM= 8,765 FT # HD7B(13080LBS)TO SW24 ABOVE MAX UPLIFT = 2,289 LBS PLUS STHD10 FOR WINDOW KINGS JABORSKI LINE A/B 021817 • I - A R 'C A D E'- M E Studio. . . . . 530.343.5709 355 East Ninth Street Chico, Cafifornia 95928 LATERAL LINE A/B Design: LATERAL LINE A/B Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 Page: of WIND SHEAR TRIB AREA ROOF = 42.0 SF @ 33.8 PSF= 1420 LBS . A&B ACT TOGETHER WALL = 30 SF @ 33.8 PSF= 1014 LBS TRANSFERRED THRU ROOF BASE SHEAR DUE TO WIND = 2434 LBS SHTG AND SHTG ABOVE FIRE + CUMUL LENGTH OF WALL = 14.4 FT OPENING UNIT SHEAR DUE TO WIND = 169 #/FT <280 -USE SHEARWALL'A' SEISMIC. TRIB TO WALL ROOF = . 502.0 SF @ 23.0 PSF= X 0.086 = 992.96 _LBS INCL SNOW DL TRIB WALL AB = 234 SF @ 9.5 PSF= X 0.086 = 191.18 LBS DL TRIB WALL 1 = 30.0 SF @ 9.5, PSF= X 0.086 = 24.51 LBS ' DL TRIB WALL 2 = 30.0 SF @ 9.5 PSF= X 0.086 = 24.51. LBS DL TRIB WALL 4 = 30.0 SF @ 9.5 PSF= X 0.086 = 24.51 LBS WIND BASE SHEAR DUE TO SEISMIC = 1233.2 LBS GOVERNS WEIGHT ON WALL DL ROOF 502 SF @ 11.0 PSF= 5522 LBS NO SNOW WEIGHT IF WIND DLWALLS = 234 SF @ 9.5 PSF= 2223 LBS GOVERNS SHEAR WALL LENGTH SHEARWALL = 14.4 1 FT= ### IN HEIGHT SHEARWALL = 8.0 FT CUMUL WIND FORCE AT TOP OF WALL = 2434 LBS 169 #/FT <280 -USE SHEARWALL'A' OVERTURNING MOMENT = 19469 FT # TOTAL RESISTING WEIGHT = 7745 LBS ARM TO CENTROID OF WEIGHT = 7.2 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 55764 FT # OTM - WRM = (36295) FT # NO HOLD DOWNS REQUIRED LATERAL LINE C WIND JABORSKI LINE C 021817 86.6 SF @ 28.3 PSF= 2449.9 LBS COLLECTED INTO TOP PLATE A- R Ci A D E M E Design: LATERAL LINE C - FROM ROOF ABOVE & TRUSS Project Name: JABORSKI ADDITION Studio. ... . . . . . . 5 30 .343.5 %09 Project Number: 1501 355 -East Ninth Street Date: 12 -Feb -17 Chico, California 95928 Page: of LATERAL LINE C WIND SHEAR TRIB AREA ROOF = 86.6 SF @ 28.3 PSF= 2449.9 LBS COLLECTED INTO TOP PLATE WALL = 56 SF @ 28.3 PSF= 1584.8 LBS FROM ROOF ABOVE & TRUSS BASE SHEAR DUE TO WIND . = 4034.7 LBS SPANNING FROM 2 TO 4 SEISMIC TRIB TO WALL ROOF = 515.5 SF @ 23.0 PSF= X- 0.086 = 1020 LBS INCL SNOW DL TRIB WALL C = 117.36 SF @ 9.5 -PSF= X 0.086 = 96 LBS DL TRIB WALL 1 = 78.0 SF @ 9.5 PSF= X 0.086 64 LBS DL TRIB WALL 2 = . 78.0 - SF @ 9.5 PSF= X 0.086 = 64 LBS DL TRIB WALL 4 _ :156.0 SF @ 9.5 PSF= X 0.086 = 127 LBS WIND BASE SHEAR DUE TO SEISMIC 1243 LBS GOVERNS WEIGHT ON WALL DL ROOF = 200.8 SF @ 11.0 PSF= 2209 LBS NO SNOW WEIGHT IF WIND DLWALLS = •117.4 SF @ 9.5 PSF= 1115 LBS GOVERNS DL TRUSS @ C/.2 = POINT LOAD FROM TRUSS 1969 LBS SHEARWALL LENGTH SHEARWALL = 13.1 FT= 105 IN & 52 IN HEIGHT SHEARWALL = 8.0 FT WIND FORCE @ TOP OF WALL= 4034.7 LBS 308 #/FT <430 -USE SHEARWALL'B' OTM IN SHEARWALL= 32,278 FT # WEIGHT ON WALL= 3,324 LBS ARM TO CENTROID OF WEIGHT ON WALL= 6.5 FT (WRM) WEIGHT RESISTING MOMENT OF WALL= 21,743 FT# OTM - WRM= 10,535 FT # HOLDDOWN REQ'D -USE STHD8 MAX UPLIFT = 805 LBS 3 EA - USE PB66 @ C/2 NOTE: DRAG TRUSS ACROSS ROOF ALONG LINE C AT LINE 2 = 1463 LBS TENSION -USE ST2215 JABORSKI LINE D 021819 A. R C A D E M E Studio. 530.343.5709 355 East Ninth Street Chico, California 95928 LATERAL LINE D Design: LATERAL LINE D Project Name: JABORSKI ADDITION Project Number: 1501 , Date: 12 -Feb -17 Page: of WIND SHEAR TRIB INTO STAIR ROOF = 26.3 SF . @ 28.3 PSF= 744 LBS 3 LEVELS ONTO 3 PANELS @LOWER WIND FROM SOUTH INTO 3RD FLOOR = 44.1 SF @ 28.3 PSF= 1,248 LBS CRITICAL INTO 2ND FLOOR = 50.3 SF @ 28.3 PSF= 1,423 LBS LEVEL BASE SHEAR DUE TO WIND = 3,416 LBS E LENGTH SHEAR WALLS' = 14.42 FT UNIT SHEAR DUE TO WIND = 237 #/FT <280 -USE SHEARWALL'A' ` V WEIGHT SEISMIC DL UPPER STAIR ROOF = 47.2 SF @ 33.0 PSF= X 0.086 = 134.0 LBS DL INT ROOF = 124.9 SF @ 33.0 PSF= X 0.086 = 354.5 LBS 1374 INCL 22psf SEISMIC DL .LO ROOF = 25.0 SF @ 33.0 PSF= X 0.086 = 71.0 LBS 275 SNOW LOAD DL WALL D INTO STAIR ROOF = 38.2 SF @ 16.7 PSF= X 0.086 = 54.9 LBS 638 DL WALL D INTO 3rd FLOOR = 68.4 SF @ 16.7 PSF= X 0.086 = 98.2 LBS 1142 DL WALL D INTO 2nd FLOOR = 189.2 SF @ 12 PSF= X 0.086 = 195.3 LBS 2270 DL WALL 2 INTO STAIR ROOF = 19.1 SF @ 16.7 PSF= X 0.086 = 27.4 LBS DL WALL 3 INTO STAIR ROOF = 19.1 SF @ 16.7 PSF= X 0.086 = 27.4 LBS DL WALL 2 INTO 3rd FLOOR = 43.6 SF @ 16.7 PSF= X 0.086 = 62.6 LBS DL WALL 3 INTO 3rd FLOOR = 43.6 SF @ 6.7 PSF= X 0.086 = 25.1 LBS DL WALL 2 INTO 2nd FLOOR = 50.3 SF @ 16.7 PSF= X 0.086 = 72.2 LBS DL WALL 3 INTO 2nd FLOOR = 50.3 SF @ 6.7 PSF= X 0.086 = 29.0 LBS DL 3rd FL = 41.3 SF @ 10 PSF= X 0.086 = 35.5 LBS DL 2nd FL =. 117:5 SF @ 10 PSF= X 0.086 = 101.1 LBS 1175 DL 2nd FL DECK = 24.0 SF @ 7 PSF= X 0.086 = 14.4 LBS 168 BASE SHEAR DUE TO SEISMIC = 1288.1 LBSI 7043 IWINDGOVERNS UPPER WALL LENGTH UPPER SHEARWALL ABOVE 3rd FLOOR= 5.8 JFT=J 69 IN 2 PANELS HEIGHT UPPER SHEARWALL ABOVE 3rd FLOOR= 6.8 FT CUMUL LAT FORCE @ TOP WALL= 744 OTM IN SHEARWALL= 5,061 FT # WEIGHT ON SHEARWALL= 1,209 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 2.9 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 3,476 FT # STRAP UPPER TO LOWER @ OTM - WRM= 1,585 FT # WINDOW KINGS & CORNERS 4EA MAX UPLIFT = 276 LBS LSTA24 1235# JABORSKI LINE D 021819 MIDDLE WALL LENGTH UPPER SHEARWALL ABOVE 2nd FLOOR= 24.0 1 FT= 12881 IN ` 1 PANEL HEIGHT UPPER SHEARWALL ABOVE 2nd FLOOR= 8.0 FT CUMUL LAT FORCE @ TOP WALL= 1992 - OTM IN SHEARWALL= 15,939 FT # WEIGHT ON SHEARWALL= 2,915 LBS - ARM TO CENTROID OF WEIGHT ON SHEARWALL= 12.0 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 34,985 FT # OTM - WRM= (19,046) FT # MAX UPLIFT — (794) LBS HOLDDOWN NOT REQ'D LL)WEK WALL -3 PANELS CUMUL LENGTH LOWER SHEARWALLS= HEIGHT SHEARWALLS ABOVE FLOOR= 14.4 7.8 - FT= FT 173 IN SOLVE FOR EQUAL CUMUL LAT FORCE V @ TOP WALL= 3416 LBS HOLDDOWNS BY METHOD LENGTH NORTH SHEARWALL= 3.75 IFT=l45 IN OF MOMENTS - THIS CALC SOUTH WIND V @ NORTH SHEARWALL= 358. LBS 96 PLFI<280 -USE SHEARWALL'A' SHOWS THE PROOF NOT- Q WEIGHT ON NORTH SHEARWALL= 501- LBS THE METHOD OTM IN NORTH SHEARWALL= 2778 FT # ARM TO CENTROID OF WEIGHT ON SHEARWALL= (WRM) WEIGHT RESISTING MOMENT = 1.88 939 FT FT # z OTM - WRM= 1838.7 FT # HOLDDOWN REQ'D USE: PA51 MAX UPLIFT = 490.3 LBS 2025# LENGTH CENTER SHEARWALL= 4.83 IFT=l 58 IN Q SOUTH WIND V @ CENTER SHEARWALL= 1,597 LBS 330 PLF 1<430 -USE SHEARWALL'B' WEIGHT CENTER SHEARWALL= 4,145 LBS OTM IN CENTER SHEARWALL= 12,380 FT # L ARM TO CENTROID OF WEIGHT ON SHEARWALL= 2.42 FT z (WRM) WEIGHT RESISTING MOMENT = 10,017 FT # Lu OTM - WRM= 2,363 FT # HOLDDOWN REQ'D USE: PA51 MAX UPLIFT = 488.8. LBS 2025# LENGTH SOUTH SHEARWALL= 5.83 IFT=l 70 IN J SOUTH WIND V @ SOUTH SHEARWALL= 1,460 LBS 250 PLF 2280 -USE SHEARWALL 'A' ,WEIGHT SOUTH SHEARWALL= 2,898 LBS OTM IN SOUTH SHEARWALL= 11,317 FT # ARM TO CENTROID OF WEIGHT ON SHEARWALL= 2.92 FT (WRM) WEIGHT RESISTING MOMENT = 8,452 FT # STRAP BM TO PL ST2215 HOLDDOWN REQ'D USE: PA51 OTM - WRM= 2,864 FT # MAX UPLIFT = 491.0 LBS 2025# JABORSKI LINE E 021817. ti A R' C-- A D. E M E Stu d-io. 530.343.5709 355 East Ninth Street Chico, California 95928 Design: LATERAL LINE E ` Project Name: JABORSKI ADDITION Project Number. .,1.501 Date: 12 -Feb -17 Page: of LATERAL LINE E WITH SOUTH WIND (North wind blocked by garage) WIND BASE SHEAR TOWER ROOF = 17.3 SF @ 28.9 PSF= 500 LBS TOP COLLECTED TO DECK/PL AS UPPER WALL 5 TRIB TO DECK = 19.0 SF @ 28.9 PSF= 549 LBS CHORD OF MIDDLE WALL DOWN TO LOWER WALL 6 TRIB TO ROOF = 37.3 SF @ 28.9 PSF= 1,078 LBS . WALL -STAIR TOWER TAKEN INTO LINE F w/ WALL 5 TRIB TO 2nd FLOOR = 44.0 SF @ 28.9 PSF= . 1,272 LBS NORTH WIND WALL 6 TRIB TO 2nd FLOOR = 50.5 SF @ ' 28.9 PSF= 1,459 LBS BASE SHEAR DUE TO WIND = 41858 LBS LENGTH BASE SHEAR WALL = 11.83 FT UNIT BASE SHEAR DUE TO WIND = 410.7 #/FT <430 -USE SHEARWALL'B' SEISMIC BASE SHEAR TOWER ROOF = 49.6 SF @ 27.0 PSF= X 0.373 = 499.5 LBS INCL 22psf SEISMIC MIDDLE ROOF = 117.9 SF @ 33.0 PSF= X 0.086 = 334.6 LBS SNOW LOAD 3rd FLOOR = 72.0 SF @ 10.0 PSF= X 0.086 = 61.9 LBS WALL E TO 3 FLOOR = 42.0 SF @ 9.9 PSF= X 0.086 = 35.8 LBS - WALL 3 TO 3 FLOOR = 32.0 SF @ 9.9 PSF= X 0.086 = 27.2 LBS WALL 5 TO 3 FLOOR = 22.1 SF @ 9.6 PSF= X 0.086 = 18.2 LBS r WALL 6 TO ROOF TO 3 FLOOR = 37.3 SF @ 16.7 PSF= X 0.086 = 53.6 LBS 2nd FLOOR = 201.5 SF @ 8 PSF= X 0.086 = 138.6 LBS WALL E TO 2 FLOOR = 79.3 SF @ 9.9 PSF= X 0.086 = 67.5 LBS WALL 3 TO 2 FLOOR = 61.5 SF @ 9.9 PSF= X 0.086 = 52.4 LBS WALL 5 TO 2 FLOOR = 44.0 SF @ 9.6 PSF= X 0.086 = 36.3 LBS WALL 6 TO 2 FLOOR = 49.9 SF @ 16.7 PSF= X 0.086 = 71.7 LBS BASE SHEAR DUE TO SEISMIC = 1325.7 LBS IWIND GOVERNS WEIGHT ON WALL DL TOWER ROOF = ..49.0 SF @ 5.0 PSF= 245 LBS NO SNOW WEIGHT IF WIND GOVERNS MIDDLE ROOF = 117.9 SF @ 11.0 PSF= 1,297 LBS DL WALL E ABOVE 2nd = 48.3 SF @ 9.6 PSF= 464 LBS DL WALL E ABOVE 1st = 75.4 SF @ 9.6 PSF= 724 LBS UPPER SHEAR WALL LENGTH SHEARWALL ABOVE 2nd FLOOR= 5.8 FT= 70 IN HEIGHT SHEARWALL ABOVE 2nd FLOOR= • 7.0 FT CUMUL LAT FORCE @ TOP WALL= 2127.0 LBS 365 #/FT <430 -USE SHEARWALL'B' OTM IN SHEARWALL = 14,889 FT # - WEIGHT ON SHEARWALL = 2,006 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 2.9 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 5,846 FT # OTM - WRM= 9,043 FT # STRAP UPPER TO LOWER LSTA36 MAX UPLIFT = 1,551 LBS 1640# LOWER SHEAR WALL E LENGTH SHEARWALLS ABOVE 1st FLOOR= 11.8 FT= 88 IN+ 54 IN HEIGHT SHEARWALL ABOVE 1st FLOOR= 7.5 FT CUMUL LAT FORCE @ TOP WALL= 4858.1 LBS 411 #/FT <430 -USE SHEARWALL'B' OTM IN SHEARWALL = 36,436 FT # WEIGHT ON SHEARWALL = 2,729 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 5.9 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 16,145 FT# HOLDDOWN REQ'D USE: HTT5 OTM - WRM= 20,291 FT # w/ 5/8" A36 ALL -THREAD & SET EPDXY - MAX UPLIFT = 1,715 LBS 7.5" EMBED (2100#) A R .;..-C A D E M Studio. . . . . . . . . 530.343.5709 `355 East Ninth Street Chico, California 95928 1ABORSKI LINE F 021817 E _ Design: LATERAL LINE F. Project Name: JABORSKI ADDITION Project Number: 1501 Date: 12 -Feb -17 Page: of LATERAL LINE F WITH NORTH WIND (TOWER ROOF TAKEN IN LINE G) WIND BASE SHEAR WALL.2 TO ROOF 21.9 SF @ 28.9 PSF= 633 LBS ~ COLLECTED TO EACH SUCCESSIVE WALL 2 TO LANDING = 45.1 SF @ 28.9 PSF= - 1,303 LBS FLOOR DOWN FROM TOWER ROOF INTO WALL 2 TO LANDING 27.5 SF @ 28.9 PSF= 795 LBS LINE G -STAIR TOWER TAKEN IN LINE F BASE SHEAR DUE TO WIND, _ 2,731 LBS LENGTH BASE SHEAR WALL = 8.333 FT UNIT BASE SHEAR DUE TO WIND = 327.7 #/FT SEISMIC BASE SHEAR STAIR ROOF = 86.8 SF @ 33.0 PSF= X 0.086 = 246.3 LBS INCL 22psf SEISMIC 2nd LANDING FLOOR = 22.5 SF @ 10.0 PSF= X 0.086 = 19.4 LBS SNOW LOAD y WALL F TO LANDING 2 = 86.9 SF @ 16.8 PSF= X 0.086 = .125.6 LBS WALL 2 TO LANDING 2 = 43.9 SF @ 16.8 PSF= X .0.086 = 63.4 LBS WALL 3 TO LANDING 2 = 43.9 SF @ 12 PSF= X 1.086 = .572.1 LBS 1st LANDING FLOOR = 22.5 SF @ .10 PSF= X 0.086 = 19.4 LBS WALL F TO LANDING 1 = - 93.7 SF @ 16.8 PSF= X 0.086 = 135.4 LBS WALL 2 TO LANDING "1 = 27.5. SF @ 16.8 PSF= X 0.086 = 39.7 LBS WALL 3 TO LANDING 1 = 27.5 SF @ 9.6 PSF= X 0.086 = 22.7 LBS BASE SHEAR DUE TO SEISMIC = -1243.9 LBS WIND GOVERNS WEIGHT ON WALL DL ROOF = 9.0 SF @ 11.0 PSF= 99 LBS NO SNOW WEIGHT IF WIND GOVERNS WALLABOVE LANDING = 92.1 SF @ 16.8 PSF= 1,547 LBS WALL BETWEEN LANDINGS = 75.4 SF @ 9.6 PSF= 724 LBS WALL BELOW LANDING 1 = 76.4 SF @ 10.6 PSF= 810 LBS UPPER SHEAR WALL LENGTH SHEARWALL ABOVE 2nd LANDING= . 6.1 FT='' 40 IN+ 33 IN­ 2 PANELS 33"X114" HEIGHT SHEARWALL ABOVE 2nd FLOOR= 9.5 FT CUMUL LAT FORCE @ TOP WALL= 633 LBS 104 #/FT <280 :USE SHEARWALL'A' OTM IN SHEARWALL = 6,013 FT # - WEIGHT ON SHEARWALL = 1,646 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 3.0 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 5,007 FT # STRAP UPPER TO LOWER @ WINDOW OTM - WRM= 1,005 FT # KINGS & CORNERS LSTA24 (1235#) MAX UPLIFT = 165 LBS MIDDLE SHEAR WALL LENGTH SHEARWALL ABOVE 1st LANDING=' 6.1 FT= 40 IN+ 33 IN 2 PANELS 33"X114" HEIGHT SHEARWALL ABOVE 1st LANDING= 8.3 FT • CUM UL LAT FORCE @ TOP WALL=. -1936 LBS 318 #/FT <430 -USE SHEARWALL'B' OTM IN SHEARWALL = 16,129 FT# WEIGHT ON SHEARWALL = 2,370 LBS + ARM TO CENTROID OF WEIGHT ON SHEARWALL = 3.0 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 71209 FT#*STRAP UPPER TO LOWER @ WINDOW OTM - WRM= 8,920 FT # KINGS & CORNERS 4EA MSTA30 MAX UPLIFT= 1,466 LBS (2050#) BASE SHEAR WALL LENGTH SHEARWALL BELOW 1st LANDING= 8.3 FT= 100 IN 1 PANEL 33"X114" HEIGHT SHEARWALL BELOW 1st LANDING= 3.2 FT CUMUL LAT FORCE @ TOP WALL= 2731 LBS 328 #/FT <430 -USE SHEARWALL'B' I OTM IN SHEARWALL = 8,685 FT # WEIGHT ON SHEARWALL = 3,180 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 4.2 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 13,245 FT # NO ADDITIONAL UPLIFT - HD REQ'D TO OTM - WRM= (4,560) FT# TIE MIDDLE WALL DOWN 4 PLCS USE MAX UPLIFT = (547) LBS PA51 (2025#) JABORSKI LINE G.021817 A R C A D E. M E _ Design: f LATERAL LINE G Project Name: JABORSKI ADDITION S .t u d i o..... .. ... 5 30. 343 . 5 7 0 9 Project Number: 1501 3 5 5 E a s t. Ninth Street Date: 12 -Feb -17 Chico, California 95928 Page: of LATERAL LINE G WITH SOUTH.WIND (North wind blocked by garage) WIND BASE SHEAR TOWER ROOF = .17.3 SF @ 28.9 PSF=- 500 LBS WALL 5 TRIB TO DECK "_ 22.3 ' SF @ 28.9 ' PSF= 644 LBS' COLLECTED TO EACH SUCCESSIVE FLOOR DOWN FROM TOWER ROOF INTO WALL 5 TRIB TO 2nd FLOOR 49.1 SF @ ' 28.9 PSF= 1,419 LBS LINE G -STAIR TOWER TAKEN IN LINE F . BASE SHEAR DUE TO WIND = 2,563 LBS LENGTH BASE SHEAR WALL = 9.33 FT . r UNIT BASE SHEAR DUE TO WIND = 274.8 #/FT <280 -USE SHEARWALL'A' SEISMIC BASE SHEAR TOWER ROOF = 49.6 SF @ 27.0 PSF=; X' 0.373 = 499.5 LBS INCL 22psf SEISMIC 3rd FLOOR = 72.0 SF @ 10.0 PSF= X 0.086 61.9 LBS SNOW LOAD WALL G TO 3 FLOOR = 48.3 SF @ 9.6 PSF= . X 0.086 = 39.9 LBS WALL 3 TO 3 FLOOR = 20.7 SF @ . 9.9 PSF= X 0.086 17.6 LBS WALL 5 TO 3 FLOOR = 20.7 SF @ 9.6 PSF= X 1.086 = 215.8 LBS 2nd FLOOR = 72.0 SF @ 10 PSF= X 0.086 = 61.9 LBS WALL G TO 2 FLOOR = 93.7 SF @ 9.6 PSF= X 0.086 = 77.4 LBS WALL3 TO 2 FLOOR = 49.4 SF @ 9.9 PSF=. X 0.086 = 42.1 LBS WALL 5 TO 2 FLOOR = 49.4 SF @ 9.6 PSF= X 0.086. _ 40.8 LBS BASE SHEAR DUE TO SEISMIC = 1056.9 LBS WIND GOVERNS WEIGHT ON WALL DL TOWER ROOF. = 49.0 SF @ 5.0 PSF= 245 LBS NO SNOW WEIGHT IF ' DL WALL G ABOVE 2nd = 48.3 SF @ 9.6 PSF= 464 LBS WIND GOVERNS DL WALL G ABOVE 1st = 75.4 SF @ 9.6 PSF=. 724 LBS UPPER SHEAR WALL LENGTH SHEARWALL ABOVE 2nd FLOOR= 7.0 FT= 84 IN HEIGHT SHEARWALL ABOVE 2nd FLOOR= 6.8 FT CU.MUL LAT FORCE @ TOP WALL= 1144.4 LBS 163 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL = 7,725 FT # - WEIGHT ON SHEARWALL = 709 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 3.5 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 2,480 FT # OTM - WRM= 5,245 FT #. STRAP UPPER TO LOWER LSTA24 MAX UPLIFT= 749 LBS (1235#) LOWER SHEAR WALL LENGTH SHEARWALL ABOVE 1st FLOOR= 9.3 FT= 112 IN HEIGHT SHEARWALL ABOVE 1st FLOOR= 7.5 FT CUMUL LAT FORCE @ TOP WALL= 2563.4 LBS 275 #/FT <280 -USE SHEARWALL'A' OTM IN SHEARWALL = 19,226 FT # _ WEIGHT ON SHEARWALL = 1,433 LBS ARM TO CENTROID OF WEIGHT ON SHEARWALL = 4.7 FT (WRM) WEIGHT RESISTING MOMENT OF SHEARWALL = 6,683 FT # HOLDDOWN REQ'D USE: HTT5 OTM - WRM= 12,543 FT # w/ 5/8"A36 ALL -THREAD & SET EPDXY - MAX UPLIFT = 1,344 LBS 5" EMBED (1400#) A, , R C A D E M E Design:TowciL tA7rp4t, Project Name: THE JABORSKI ADDITION S t u d i o . . . . . . . . . 5 3 0. 3 4 3. 5 7 0 9 Project Number: 1501 3 5 5 E a s t Ninth Street Date: 20 -Sep -16 Chico, California 95928 -.Page: of .......... ........... I .......... ......... .................... .................... .................... ............. ..................... .......... ................................... ................................................. .............. . ......... ......... ....... .......... A!v. ....... el5. .......... ................... ......... .......... ...... . . . . ........ . ........... ... . .... I �l . ........ ..................... .......... .... ...... .. ..... '01 ..... ......... ................. .... ..... .. y .. .. ... . ....... Uv ............. ...... ......... .......... .... ........ ...... . i.- I ... ........... ....... ..... ......... . ....... J 2- fq T I .. ......... ......... ....... .... .... ......... ....... ....... .. . ..... .......... .......... ...... ...... t ......... :..........I.........5 .................... .......... ......... ...... ..... ......... X . .......... ......... ........ ......... ....... . .. +- 21 ........... . ........ .......lt...... .I......... . .. .......... nh4l .... ..... .. .. -;5e <, - ,.- -- - -1--0 � 0 74 i. -40. . ......... ................. -4 ................... .......... Design: FTG LINE 6 Project Name: THE JABORSKI ADDI' Project Number: 1507 .Date: 04 -Oct -16 Page: of Wf= Ws= Nx= Ex= 0.00 0.00 A, R C A D E M E . WL= 0.90 0.00 .Studio.. '. . . . . . . 530.343.5709 3'55 East Ninth Street Chico, California 95928 ""SPREAD FOOTING (RECTANGULAR) -LINE 6 , FOOTING WIDTH (x) = 36.00 (W =. inches) 3.00 FOOTING LENGTH (y) = 144.00 (L = inches) 12.00 EQUIVALENT FOOTING THICK (z) = 10.00 (T = inches) 0.83 F VOLUME -OF FOOTING = 30.00 (V = C. F.) FOOTING DENSITY = 145.00 (@c = P.C.F.) FOOTING WEIGHT= 4350.00 (Wt = pounds) SOIL DENSITY = 110.00 (@s = P.C.F.) SOIL DEPTH ABOVE FTG = 0.00 (inches) 0.00 AXIAL COLUMN LOAD = 2990.00 (Pz = pounds) Design: FTG LINE 6 Project Name: THE JABORSKI ADDI' Project Number: 1507 .Date: 04 -Oct -16 Page: of Wf= Ws= Nx= Ex= 0.00 0.00 Ey= 0.02 0.16' WL= 0.90 0.00 183 0 LOAD dx FROM Y AXIS = 8.00 (dx = INCHES) 1 Pz*dx/Nz= LOAD dy FROM X AXIS ,= 0.00 (dy = INCHES) '0 Pz*dy/Nz= ` APPL MOMENT ABOUT X = 0.00' (Mx = inch pounds) 0 APPL MOMENT ABOUT Y = 1420.00 (My = inch pounds) 118. APPLIED SHEAR X =(+X DIR) 1420.00 (Vx = pounds) 1 APPLIED SHEAR Y =(+Y DIR) 0.00 j(Vy = pounds) CAUTION SIGN CONVENTION generally: negative shear in Y direction RIGHT HAND RULE produces positive moments about X axis SOIL STRESS CORNER QUADRANT 1 = 387 P.S.F. +,+=1 COUNTERCL SOIL STRESS CORNER QUADRANT 2 = 21 P.S.F. SOIL STRESS CORNER QUADRANT 3 = 21 P.S.F. SOIL STRESS CORNER QUADRANT 4 = 387 P.S.F. ! .. EQUATIONS""'� Sx = Ix/Cy Nz = Pz + WLT@c + WLD@s Eccentricity Ex = My/Nz + T*Vx/Nz + Pz*dx/Nz Ey = Mx/Nz - T.*Vy/Nz + Pz*dy/Nz s SOIL STRESS =-Nz/A ± MyCx/ly ± MxCy/Ix = Nz/LW (1 ± 6Ey/W A 6Ex/L ) NOTE:. Soil stress must be above zero, otherwise Nz is outside the kern and part of footing uplifts. , Pagel AC1318 ., 1501 JA%BORSKI FOUNDATION BEAM LINE D SINGLE REINFORCED - CONCRETE BEAM ACI -318 MOMENT DUE TO DEAD LOAD (Mdl) = 14.00 (inch kips) 59.04 MOMENT DUE TO LIVE LOAD (MII) = 45.04 (inch kips) ' MAXIMUM HORIZONTAL SHEAR IN BEAM (V) = 2.620 (kips) CONCRETE COMPRESSIVE STRENGTH (fc) = 2500 (psi) -0.08 REINFORCING STEEL YIELD STRENGTH (fy) = 60000 (psi) ' BEAM WIDTH (b) = • 12.0 (inches) BEAM DEPTH TO STEEL (d) = 8.0 (inches) CAPACITY REDUCTION FACTOR ' (a) = 0.90 (bending = 0.90) BETA FACTOR PER ACI 10.2.7 ((3) = 0.85 (0.85 for fc<4000psi) ULTIMATE MOMENT (Mu=1.4*Mdl+1.7*MII) = 96.2 (inch kips) Cb= 4.73 DESIGN MOMENT (Mu/((x) = 106.9 (inch kips) 8.90 ab= 4.02 BALANCED STEEL (Asb=.85 fc a.b/fy) = 1.71 (square inches) z= 5.99 - MAXIMUM STEEL ALLOWED (Asmax=.75 Asb) = 1.28 (square inches) AREA STEEL REQUIRED (Asreq) = 0.30 (square inches) MINIMUM STEEL (Asmin=200bd/fy) = -0.32 (square inches) ' OR WHICHEVER IS LESS (4/3 Asreq) = 0.40 (square inches) TRIAL STEEL AREA (As) = 0.62 (square inches) RATIO OF STEEL TO CONCRETE (p) = 0.006. (As/bd CHECK DEFLECTION.IF p > 0.008 (.18 fc/fy) OK DESIGN SHEAR REINFORCEMENT IF 2.6 > Vc = 4.80 (kips) OK - BEAM CAPACITY Mu=OAsfyd(1-.59pfy/fc) = 243.3 (inch kips) 228% Pagel • 4011 Sierra College Blvd., Loomis, CA 95650'•" t. Phone (916)652-4655 Fax (916) 652=3860 • 5033 Feather River Blvd., Olivehurst, CA 95961 Phone (530) 743-8855 Fax (530) 743-8856 ."Serving The Best BuildersWWW.GOHOMEWOOD.COM Truss Calc Subm Client: j Jaborski Residence Project: 101 Tipsob Peak.Rd. Berry Creek, CA Truss Designer: Tracking / Work Order #: Bryan Wagner 0581116 blyanw@homewoodtruss.co m Phone: (530) 743-8855 ......................... ............ AOG m O I U. a v 7) C 11 �o (4 M03 A015 .n D04 D03 D02 D01 ]08- ]06 ]04 o Co 5) 1 ;-10 2 1l ti S) 3 PH (530) 743-8855 JABOR_ SKI RESMDENCE Fax (530)743-8856 JAB OR S K 31 HOMEWOOD TRUSS CO 101 T2PS00 PEAK ROAD BERRY CREEK, CA 5033 FEATHER RIVER BLVD SALES REP: BW DUE DATE: 11/30/16 DSGNR/CHKR: AW / BW WOX: 0581116 SCALE: 1^�8' O^ Date: 12/1/2016 9:15 TC Live 20.00 psf DurFac-Lbr 1.25 TC Dead 9.00 psf DurFac-Plt 1.25 - BC Live 0.00'psf O.C. Spacing: 2 BC Dead 12.60 psf Design Spec: CRC -2013 OTr/er.fn- Al / 17 I , ALPINE . •Ft: fitV LCN.tiAiIY - ti Engineering eJob 12/15/2016 This eJob is prepared exclusively for: Homewood Truss (5824) PO Box 5010 Marysville, CA 95901-8501 Work Order: 0581116 ` Job Customer: JABORSKI Job Name: JABORSKI RESIDENCE .'' Job Address: 101 TIPSOO PEAK ROAD , BERRY CREEK, CA -Alpine ID: T553667.J582460 I hereby verify that this document was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer. I am responsible for the design of each component detail only -- not for the proper manufacture of the components. This document is no longer valid if any modifications are made to it.. Alpine, a division of ITW Building Components Group Inc. 2820 N. Great Southwest Pkwy. Grand Prairie, TX 75050 800-521-9790 r' ALPINE mi fTw CC .Wiv Table of Contents Engineering eJob 12/15/2016 Page No. Truss Label Page No. Truss Label Page No. Truss Label 1 A01 2 A01S 3 AOG 4 BO 5 B01S 6 C01 7 COG 8, D01 9 D02 10 D03 11 D04 12 GT1 13 J02 14 J04 15 J06 16 J08 17 M03 Alpine, a division of ITW Building Components Group Inc. 2820 N. Great Southwest Pkwy. Grand Prairie, TX 75050 800-521-9790 4 Engineering eJob 12/15/2016 Truss Engineer Design Responsibilities The engineer's signature on this design certifies that the individual component depicted, if built with the materials and to the placements and tolerances specified, will bear the loads shown on the drawing. Users of the component are responsible for determining that any as -built component conforms to the design. The loading and dimensions specified have been provided by others and have not been verified' by the signing engineer. The building designer is s., responsible for determining that the dimensions and loads for each component match those required by the plans and by the actual use of the individual component. The building designer is responsible for ascertaining that the loads shown on the designs meet or exceed applicable building code requirements and any additional factors required in the particular application. The engineer's seal on the attached component designs indicates acceptance of professional engineering responsibility solely for the design of the individual component assuming that the loading and dimension requirements are as represented to the engineer. The suitability and use of this component for any particular building is the responsibility of the building designer in accordance with ANSI/TPI 1 Chapter 2. The engineer certifying this component is not responsible for anything beyond the specific scope of work set forth above, including but not • limited to, the loading factors used in the design of the component, the dimensions of the component, the transfer of lateral loads from the roof and/or forward to the shear walls down to the foundation, connection of the components to the bearing support, the design of the bearing supports, the design and connection to the shear walls, the design of temporary or permanent .building bracing required in the roof and/or floor systems, transfer of vertical loads down to the foundation, the design of the foundation or analysis in connection with the roof and/or floor diaphragms of the building. This is a high quality facsimile of the original engineering document. A wet or embossed seal copy of this engineering document is available upon request. Alpine, a division of ITW Building Components Group Inc. 2820 N.- Great Southwest Pkwy. Grand Prairie, TX 75050 800-521-9790 7 , i ALPINE y . .. dV QW CCX:�itNY r t • Engineering eJob 12/15/2016 Required Details* Other Available Details* http://www.itwbcg.com/trussconnections.php *Sealed versions of these details are available upon request. Alpine, a division of ITW Building Components Group Inc. 2820 N. Great Southwest Pkwy. Grand Prairie, TX 75050 800-521-9790 r s r . 0 Job Name: JABORSKI RESIDENCE Truss ID: A01. - Qty: 6 BRG X -LOC REACT SIZE REQ'D .TC 2x6DFL g2 - Designed per ANSI/TPI 1-2007 UPLIFT.REACTION(S) : r 1 0- 2-12 1591 5.50" 1.70" BC 2x4 DFL #1 d Btr. � 'Fab n cation Tolerance - 20.0% Support C&C Wind Non -Wind 2 17- 9- 4 1591 5.SO" 1.70" MAX DEFLECTION (span) WEB 2x4 DFL STANDARD - - Bearings designed for an FcPerp value of the 1 -109 lb Y _ L/999 MEM 7-8 (LIVE) LC 41 2x4 DFL S1 6 Btr. 7-3 Kcr (creep factor) - 2.00 lesser of the truss chord lumber value.0r 625 for all bearings. _ 2 -109 lb Y This truss is designed using the L= -0.20" D= -0.16" T= -0.35" IRC/IBC truss plate values are based on Refer to Joint QC Detail Sheets for . , ASCE7-10 Wind Specificatipn ® Joint Locations ® I G- o- 0 6 0- a 0 testing and approval as required by IBC 1703 AN Cq factors and Rotational Tolerances. Bldg Enclosed - Yes, 2 s- 9- 4 7 6- 2-12 and and are reported in ESR -1118. PLATING BASED ON GREEN LUMBER VALUES. Loaded for 10 PSF non -concurrent BCLL. ASCE7-10 SNOW LOAD DESIGN CRITERIA: Truss Location = Not End Zone 3 9-0-0 . 8 12-0-0 a 12- 0- 0 9 1B- o- o _ - Not designed for attic storage unless Pg = 79 psf, Ce.= 0.9, I = 1.0, Ct = 1.10 - Ex Cate or C P 9 Y= ' Bldg Length = 18.00 ft, Bldg Width 28.00 ft 5 18- 0- 0 noted otherwise. 20.00 psf f Mean roof height = 11.51 ft, mph 110 CRITICAL KEMBER FORCES: ��� - - Occupancy Category II, Dead Load = 9.6 psf Tc COKP.jD%j, Tills (1.6 CSI -39101 230(1.600.59 lateral restraint n webs int have rbracbVeport view d per BCS/ sections B3, 67 or 810, as eppOraNe. Apply plates m each tee of true and pO°m0n as anown above and on the Joint Details report nmesss noted othenwLse. po tion as shown g Desi ned as Main Wind Force Resistin S stem1-2 -37071.15 29100((1.600.23 " owDu 5 nowDu r L=1.15 P=1.15 !:// UI - Low-nse and Components and Claddsng iY2-3 3-4 -23391.15/ 228 1.60 0.28 II Tributary Area = 36 sqft 4 -S -24231.15/ 165 1.60 0.43- TC Dead - - ac COMP. DUR. / TENS. OUR. CSI ,onlormarce wilh ANSVTPI 1, or for haMgrV. sNppbV. bt"atWn 8 braWg of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility . 6-7 _.-1S7 1.60 / 3346 1.15 0.55 1.15 / 1.10 / 1.10 2820 N. Great SWPAtry. GrandPra614 T)y 73050 solely for the design shown. The suitability and use of tiffs drawing for any structure Is the responsibility of the Building 7-8 -46 1.60 / 1494 1.15 0.42 BC Dead 7.00 psf - 0. C. Spaci ng 2- 0- 0 B-9 -94 1.60 / 1962 1.15 0.38 Designer per ANS01011 Sec.2 ' We COMP. WR. / TENS. (OUR. CSI TRUSPLUS 6.0 VER: T6.5.20 TFor moreNformagPI: wonseethhjob'saeneralnotespageardthesewebsgn: ALPINE:=5=11p-rcrc ICC: ;=;Wmmcglsr�dx�L9m: 2-7 -672(1.153/ 132(1.603 0.09. Bid9 Code: CRC -2013 DEFL RATIO: L/240 TC: L/24 3-7 -166 1.60 / 2625(((1.153) 0.36 ' 3-8 -117 1.60 / 867 1.15 0.38 4-8 -954 1.15 / 13S 1.60 0.17 I9-0-0 1 9-0-0 1 1 2 3 4 5 6.00 6.0 8X10 1.5X3 1.5X3 - 504 504 7X10 SHIP T 6X10 1-5-5 3X10 T 0-6 4 0-6-4 - •sxs - B1 E12 W:508 3.0 -3.00 W:508 R:1591 01R:1591 U:-109 5 9 4 1 1 6 0 0 1 U:-1 09 5-9-4 18-0-0 6 7 8 9 T. No. C 72160 ' �pF - - " All connector plates are ALPINE Wave 20 ga., unless preceded by *H' for High Strength 20 ga.,'S' for Super Strength IS Be. Plates are to be positioned per Joint Detail Report Circled plates and false frame plates CAV •� A c 2I SI O ere posi0oned as shown above. Shift gable stud plates to avoid overlap with structural plates. 1 1 V 268 - Homewood Tr S "WARNING!" READ AND FOLLOWALL NOTES ON THIS DRAWING/ Cust: JABORSKI "IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri vej4_OS81116_L00007_J00001 n of BCSI (BuOdi g Component require edreme care In faMkaBip. handgre, shipping. IrmtalIM and brach V. Refer to aid fo0ow the latest eddbm W0: D rT ve_M-0 581116_L000 Safety Intormatbn, by TPI and WTCA) for safety precdces prior to performing Ines . furmlUo butallem shag provide temporary bracing per SCSI. Unless Ds gn r : AW #LC = 43 WT/PLY : 1164 v VTosses ry no ted otherwise, top chord shag have property attached structure! aheaftV and Dottom chord and have a property aft -J d rigid ceffiM. Locations atmwn •: TC Live 20.00 psf f Li r L=1.25 P=1.25 �y ��� � r� rl lu^\\VVI lateral restraint n webs int have rbracbVeport view d per BCS/ sections B3, 67 or 810, as eppOraNe. Apply plates m each tee of true and pO°m0n as anown above and on the Joint Details report nmesss noted othenwLse. po tion as shown TC 5 now (Pf) 55.00 psf owDu 5 nowDu r L=1.15 P=1.15 !:// UI II Alpine, a divubn of nW Bwdbv Components Group Inc, Mag not be responsible for any deviation from ihh dr -N. any faflure to bulitl the toes in TC Dead 13.00 psf Rep Mb r Bnd /Comp /Tens AN lTNrC08fPANY ,onlormarce wilh ANSVTPI 1, or for haMgrV. sNppbV. bt"atWn 8 braWg of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SWPAtry. GrandPra614 T)y 73050 solely for the design shown. The suitability and use of tiffs drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf - 0. C. Spaci ng 2- 0- 0 Designer per ANS01011 Sec.2 ' TRUSPLUS 6.0 VER: T6.5.20 TFor moreNformagPI: wonseethhjob'saeneralnotespageardthesewebsgn: ALPINE:=5=11p-rcrc ICC: ;=;Wmmcglsr�dx�L9m: Bid9 Code: CRC -2013 DEFL RATIO: L/240 TC: L/24 Job Name: JABORSKI RESIDENCE Truss ID: A01 Qty: 1 BRG X -LOC REACT SIZE REQ'D ' TC 2x6 DFL #2 Designed per ANSI/TPI 1-2007 UPLIFT REACTION(S) 1 0- 2-12 1580 5.50" .1.68" 'BC 2x4 DFL#1 6 Btr. Fabrication Tolerance = 20.0% • Support C&C Wind Non -Wind 2 17- 7- 6 1563 1.75 1.67" WEB 2x4 DFL STANDARD Bearings designedfor an FcPerp value of the 1 -108 16 MAX DEFLECTION (span) 2x4 DFL #1 & Btr. 7-3 'lesser of the truss chord lumber value or 2 -107 lb L/999 MEM 7-8 (LIVE) LC 41 Kcr (creep factor) = 2.00 625 for all bearings. This truss is designed using the f L. -0.20" D= -0.16" To -0.36" IRC/IBC trussplate values are based on Refer to Joint QC Detail Sheets for ASCE7-10 Wind Specification i ® joint Locations ® 1 a- o- 0 6 O o testing and approval asPPrequired b IBC 1703 Cq factors and Rotational Tolerances. Bldg Enclosed = Yes, 6- 2 5- 9- 4 7 6- 2-12 and ANPLATINGIBASEDTPI and are ON GREENLUMBERVALUESorted in -1118. aded for 10 PSF non -concurrent CLL. Trus p CategoLocry Not End Zone 3 9- o- o e 1z- o- o s ii- e q 9 17- 8- 4 . Not designed for attic storage unless noted otherwise._ g ASCE7 10 SNOW LOAD DESIGN CRITERIA P = 79 9 psf, Ce 0.9, I = 1.0, Ct = 1.10 yg = 00 ft glean theight 8 O011tSlBft9 CRITICAL MEMER FORCES: TC COMP.000R. / 7ENs.InCS1 - " - - - - roof mph 110 Occupancy Category II, Dead Load 9.6 psf ,. , 1-2 ae7o(1.15/ 22703 0.59 Li veDu r L-1.25 P-1.25 A Designed as Main Wind Force Resisting System 2-3 -3667 L15 / 2880))) 0.23 - -Low-nse and•Components and Cladding3-4 -2220 1.1S /. 2241.60 0.22 TC Snow(Pf) 55.00 psf SnowDu r L=1.15 P=1.15 Tributary Area 3S sgft4-5 -2330 1.1S / 1621.60 0.42 J� BC COMP. WR. / TENS. CSI R15)) psf TC Dead 13.00 f Re Mb r B nd / Com / Tens P P 6-7 -156((1.603/ 3310((1W. 0.55 confome- with ANSUTPI 1, or tot handling, shipping, Installation a bracing of mase.. A seal on lids drawing or cover page listing This drawing, Indicates acceptance o1 professional engineering responsibility - s 7-8 -44(1.603/ 1460(1.153 0.41 2820 N. Great SWPrrt y. Grand wants• nr 76050 solely for the design shown The suitability and use of this drawing for any structure is the responsibility of the Building ' r 4 8-9 -89 1.60 / 1861 1.1S 0.35 ' - •.. • , WB COMP.(WR. / TENS. (DUR. CSI - TRU S P LU $ 6.0 VER: T6.5.20 2-7 -674(1.153/ 132(1.603 0.09 3-7 -165 L60 / 2610(((1.153) 0.36 Bldg Code: CRC -2013 ,1 • - 3-8 -116 1.60 / 767 1.1S 0.34 4-8 -880 1.15 / 133 1.60 0.16 I 9-0-0 I 8-8-4 I 1 2 3 4 5 t 6.00 "O - 8X10 - • ; 1.5X3 1.5X3 5-114 r 5-114 7X10 = SHIP 6X10 1- 5 5X8 �. 0T-4 .. 0-8-2 B1 B2 W:508 3.0 -3.00 W:112 11:1580 R:1563 U:-108 5-94 1 I 5-8-4 I U:-107 5.9-4 - -4 0-3-12 6 7 8 9 STUB T. No. C 72160 �9 CN{1. Or dpth 20 ha., 'S* All connector plates ere ALPINE Wave 20 ga., unless precedeoint Detail d Dyy •H' or Hiiyh StrenCircled *forSuper 18 am to, Slreare gdaaslates pates pO loneshown above. Sh' gablesitioned per stud plates o avoid o overlap with structural plates. 12/15/2016 268 - Homewood Truss **WARNINGI** READAND FOLLOWALL NOTES ON THIS DRAWING! Cust: JABOR5KI (CA's **IMPORTANT** DIR: Dri vejL0581116_L00007_J00001 /\ FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. Trusses require ememe care in tabricaarg, handling, "pig, installing and bracing. Refer to and follow the latest edition o1 BCSI (Building Component W0: Drive M 0581116_1-000 Safety Information• by TPI and WTCA) for safety pracacn prior to performing these functions. Installers shag provide temporary bracing; per BCSL unless Ds gn r : AW #LC = 43 WT/PLY: 115 n noted otherwise, op decd shall Java properly attached structural sheathbV and baaam chord shat have a prapedy attached rigid cemng. Locators al- n r� m to permanent lateral restraint of webs"have bracing bsdaed pw BCSI sactom B3• B7 on Sill, m appOcable. Apply ptates o each face of toss and TC Live 20.00 psf Li veDu r L-1.25 P-1.25 A ILIA �� �UI�\�� positron a anown above and an m Joint Detab report unless noted otherwise. TC Snow(Pf) 55.00 psf SnowDu r L=1.15 P=1.15 J� Alpine• a dfdskn of 11W Building Components Group mc, shall not be respnesibo for any deviation from thio drav&V. any faflure to bulk the Inas in psf TC Dead 13.00 f Re Mb r B nd / Com / Tens P P AN RW COMPANY confome- with ANSUTPI 1, or tot handling, shipping, Installation a bracing of mase.. A seal on lids drawing or cover page listing This drawing, Indicates acceptance o1 professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SWPrrt y. Grand wants• nr 76050 solely for the design shown The suitability and use of this drawing for any structure is the responsibility of the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSMI1 Sec.2 TRU S P LU $ 6.0 VER: T6.5.20 Far more infor-don gee We Jobb general notes page and arse web sites: ALPINE? WAftIDYdRID:TPI: •WTCAjY>70.RbcinduMom*ICC: www.iccaafaom Bldg Code: CRC -2013 DEFL RATIO: 1-/240 TC: 1-/24 Job Name: JABORSKI RESIDENCE Truss ID: AOG Qty: 1 BRG X -LOC REACT SIZE REQ'D TC 2x6 DFL t2 Designed per ANSI/TPI 1-2007 UPLIFT REACTION(S) : 1 0- 3- 6 282 6.75 1.S0 BC 2x4 DFL $1 & Btr. Fabrication Tolerance - 20.0% Support C&C Wind -174 l.ls / Non -Wind 2 1- 7- 6 42 3.50" 1.50" WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the 1 -19 lb , 3 2- 8- 0 451 3.50" 1.S0" Kcr (creep factor) - 2:00 lesser of the truss chord lumber value or 2 -6 lb 4 4- 0- 0 312 3.50" 1.50" Refer to Joint QC Detail Sheets for 625 for all bearings. 3 -45 lb S 5- 4- 0 342 3.50" 1.50 Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on 4 -18 lb 6 7 6-.8- 0 8- 3- 0 361 361 3.50 3.50" 1.50 1.50" Loaded fr 10 PSF non -concurrent BCLL. testing and approval as required by IBC 1703 5 -20 lb 1.5X3 8 9- 9- 0 361 3.S0 1.50" ASCE?-1DOS NOW LOAD DESIGN CRITERIA: and AN and are reported in ESR -1118. 6 -23 lb j 9 11- 4- 0 381 3.50" 1.50" Pg - 79 psf, Ce = 0.9, I - 1.0, Ct - 1.10 Mark all interior bearing locations. 7 -23 lb SHIP 10 12- 8- 0 342 3.SO" 1.50" Permanent bracing is regwired to Install interior suppport(s).before erection. designer 8 -23 lb 11 14- 0- 0 312 3.50" 1.50" pprevent rotation/toppling. See BCSI ANSI/TPI 1. Building shall verify gable loads loads, if 9 10 -23 lb lb 12 SS- 4- 0 451 3.50" 1.50" and PLATING BASED ON GREEN LUMBER VALUES. and eave appplicable. Refer to appropriate ITWBCG's Standard 11 -20 -18 lb / 13 14 16- 4-10 17- 8-10 42 282 3.50" 6.75" 1. S0" 1.50" HORIZONTAL REACTION(S ; Gable Details for information regarding 9 g 12 -45 lb MAX DEFLECTION (span) support 1 176 b support 14 -176 lb the bracing of this gable truss. This truss is designed using the 13 14 -6 -19 lb lb �L�OAi_ L/999 L- MEM 12-13 0.00" D. (LIVE) 0.00" LC 40 T. 0.00'" Not designed for attic storage unless ASCE7-10 Wind Specification 9-21 / -36115 / -17011111S 32 1.60 0.08 1.1 `Y 10-22 -32415 / 20 1.601 0.05 noted otherwise. Bldg Enclosed = Yes, 11-23 -2931S / 22 1.60 0.04 ® 1 Joint Locations 0- 0- 0 14 ® 0 o- o 12-24 6-19 -43815 / -17015 / Truss Location = Not End Zone f 14 15 16 17 18 19 20 21 22 23 24 25 2 2- 8- 0 1s 2- - a- o Exp Category = C 3 a- o- 0 16 4- 0- 0 - Bldg Length 18.00 ft, Bldg Width'= 28.00 ft �4 CIV11.. 4 5- 4- 0 17 5- 4- o SOF CAV Mean roof height = 11.51 ft, mph 110 AD connector plates are ALPINE Wave 20 ga., unless preceded by'Fr for High Strength 20 ga..'S' for Super S 6 6- e- 0 18 8- 3- 0 19 8- a- 8- o 0 12/15/2016 - Occupancy Categor II, Dead Load 9.6 psf Truss designed to support 1-0-0 top chord outlookers 7 9- o- o zo 9- 9- 9- o Cust: 3ABORSKI DIR: Designed Main ind Force Resisting System g ed and cladding load not to exceed 10 PSF one face, and 8 9- 9- 0 21 11- 4- o Tnases require edreme rare in fanrirawg, handlre, shippi g, Instamrg and bracbg. Refer to and fellow the latest edition of BCS/ (Buildin0 Component ,as - Low-rise and Components and Cladding 24" span opposite face. Top chord must not be cut or 9 11- 4- 0 22 12- 8- o ' Tributary Area - 81 sqft notched. 103.2- 11 8- 0 23 14- 0- 0 24 14- 0- 15- 4- 0 0 y� n e of ss and o permanent hte of "d of webs shah rave b actrg Installed per SCSI sections B3, B3, B7 at 870, applicable. Apply plates to each txm far TC Live 20.00 psf f r Li ve Du L=1.25 P-1.25 12 15- 4- 0 2S 18- 0- 0 �u(�\\� position as shown above and on the Jobs Detain report. unless noted othem&e. TC Snow(Pf) 55.00 psf SnowDu r L=1.15 P=1.15 TC comp. WR. / TENS. DUR. CSI 1-2 -165 1.15 / 32 1.15 0.07 9-0-0 9-0-0 - 2-3 3-4 -164 1.15 / -1 s7 1.15 / 1 1.60 0.06 12 1.60 0.04 1 1 I 1 2 3 4 5 6 7 8 9 10 11 12 13 4-S :IS -1S9 1:IS / 33 1.60 0.03 e , S-6 -174 l.ls / 60 1.60 0.04 0.03 - 6.00 6-7 7-8 -146 / -146 1 A / 54 1.60 54 1.60 0.03 6X6 8-9 9-10 -174 1.15 / -159 1.15 / 60 1.60 0.04 33 1.60 0.03 10-11 -157 1.15 / 12 1.60 0.04 1.5X3 1.5X3 - 11-12 12-13 -164 1.15 / -155 i.ls / 1 1.60 0.06 32 1.15 0.07 1.5X3 1.5X3 Bc 1a-ls CDNP.CCWR. / TENS. `WR. CSI -101(1.15;/ 6s<l.so� 0.03 1.5X3 1.5X3 - t 17 161� % 00.003 5 1.5X3 _ 1.5X3 39- o j 01 0.011 1.5X3 1.5X3 SHIP 20-21 / 0.01 21-22 23 24 / % 0.01 0.01 2X4 2X4 24-25 / 0.03 �4 0---4 WB 2-15 3-16 CDNP. WR. / TENS. WA. CSI -438 1.15 / 57 1.60 0.05 -293 l.ls / 22 1.60 0.04 1.5X3 1.5X3 1.5X3 1.5X3 1.5X3 �L�OAi_ 4-17 5-18 6-19 8-20 -324 l.ls / -361 1.15 / -170 1.15 / S 20 1.60 01:1 32 1.60 0.0& 0.05 0.05 1.5X3 1.5X3 1.5X3 1.5X3 1.5X3., 9( T. T,qN A 9-21 / -36115 / -17011111S 32 1.60 0.08 1.1 `Y 10-22 -32415 / 20 1.601 0.05 11-23 -2931S / 22 1.60 0.04 t 18-0-0 I 12-24 6-19 -43815 / -17015 / 57 1.60 0.05 0.05 f 14 15 16 17 18 19 20 21 22 23 24 25 8-20 -170 / 0.05 No. C 72160 �4 CIV11.. SOF CAV AD connector plates are ALPINE Wave 20 ga., unless preceded by'Fr for High Strength 20 ga..'S' for Super Strength 18 sta. Plates are to be positioned per Joint Detail Report Circled plates and false frame plates OVER CONTINUOUS SUPPORT 12/15/2016 are positioned as shown above. Shin gable stud plates to avoid overlap with structural plates. 268 - Homewood Truss "WARNING!'" READ AND FOLLOW ALL NOTES ON THIS DRAWING/ **IMPORTANT""' Cust: 3ABORSKI DIR: (G4) FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. ve-M Tnases require edreme rare in fanrirawg, handlre, shippi g, Instamrg and bracbg. Refer to and fellow the latest edition of BCS/ (Buildin0 Component ri 05811116_L00007�00001 W0: D ri V eJILO 581116_L000 Safety Information. by TPI and WTCA) for safety practices prior to performing these functions Installers shall provide temporary bracbg per SCSI. Unless Dsgn r : AW #LC = 43 Vr/PLY : 1334 noted otherwise, top chord shall have property amsched structural sheathN and bottom chord shal have a property affiched A& calling. Locations shown y� n e of ss and o permanent hte of "d of webs shah rave b actrg Installed per SCSI sections B3, B3, B7 at 870, applicable. Apply plates to each txm far TC Live 20.00 psf f r Li ve Du L=1.25 P-1.25 LM �u(�\\� position as shown above and on the Jobs Detain report. unless noted othem&e. TC Snow(Pf) 55.00 psf SnowDu r L=1.15 P=1.15 J� AlpBn e. a diWbn of ITW 8WkMg Componerds Group Inc, eha8 not be responsible for any deviation from Nb drawing, any failure to Wid the fres b TC Dead 13.00 psf Rep Mb r Brill / Comp / Tens AN 111NC081PANY wrdormarcro, eh ANSVTPI 1. or for ha�ire, W*pbg, Installation & ma I l; of busses A seal on this drawing or cover page listing this drawing, Indicates acceptance of profesalonal engineering responsibility BC Live 0.00 psf 1.00 / 1.00 / 1.00 28to N. Grwar SW Pkry. Grand Frarrle, 7X 75050 solely for the design shown The suitability and use of this drawing for any strucovre Is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 DesignerperANSI/TPl i Sec.2 TRUSPLUS 6.0 VER: T6.5.20 For mnreinformation wethis joWsgenerslnates page and these web ease: ALPINE: 'TPI: 'WiCA:lpptpyyt LRm,ICC:www.iccsaie.om Bld Code: CRC -2013 9 DEFL RATIO: L/240 TC: L/2401 Job Name: JABORSKI RESIDENCE Truss ID: B01 Q 5 BRG X -LOC REACT SIZE REQ'D TC 2x6 DFL 92 Designed per ANSI/TPI-1-2007 • UPLIFT REACTION(S) : ' 1 0- 2-12 1591 S.50" 1.70 BC 2x4 DFL &1 6 Btr. Fabrication Tolerance = 20.0% Support C&C Wind Non -Wind F 2 17- 9-. 4 1591 5. SO" 1.70" WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the - 1 -109 lb MAX DEFLECTION (span) : Kcr (creep factor) - 2.00 lesser of the truss chord lumber value or 2 -109 lb L/999 MEM 4-S (LIVE) LC 40 Refer to Joint QC Detail Sheets for 625 for all bearings. + This truss is designed using the L= -0.10" D= -0.04" T= -0.14" - Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on ASCE?-10 Wind Specification ® Joint Locations ® 1 0- 0- 0 6 0- o- o Loaded for 10 PSF non -concurrent BCLL. ASCE7-10 SNOW LOAD DESIGN CRITERIA: testing and approval as required by IBC 1703 Bldg Enclosed = Yes, 2 z- 9- 4 7 S- 9- 4 3 9-0-0 a 12-0-o P 79 psf Ce 0.9, I = 1.0, Ct = 1.10 g- p +or and AN PLATING and are reported in ESR -1118. BASED ON GREEN LUMBER VALUES. Truss Location = Not End Zone Ex Cate or P 9 Y= C 4 12- 0- 0 9 le- 0- 0 s 18- 0- 0 Not designed attic storage unless noted otherwise. Alpine, a dlvbbn of ITW Bidk ft components Group Inc., chalf not be responfble for any deviation from this drawing, any failure to build the truss In Bldg Length = 18.00 ft, Bldg Width 28.00 ft g CRITICAL MEMBER FORCES: TC (((W1TENS (J.:. CSI Re Mb r B nd / Com / Tens P P AN RW COMPANY conformance with ANSVTPI 1. or for harr®rg, sMpphg. Wmeatbn 8 bracing of trusses. A seat on this drawing or cover page listing ihls drawing, Indicates acceptance of professional engineering responsibility _ Mean roof height 11.51 ft, mph 110 Occupancy Cate or II, Dead Load 9.6 psf g -240CONP 1-2 -2409 1.1s/ 160(1.603 o.a3 2820 N. Great SW Muir. Grand Pralrfe. TX 73050 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building - Designed as Main incl Force Resisting System s)))/ 2-3 -2329 1.15 / 224i((1.603) 0.26 Designer per ANSI/7P11 Sec.2 - Low-rise and Components and Cladding 3-4 -2296 1.1s / 224 1.60 0.29 Bldg Code: CRC -2013 DEFL RATIO: L/240 TC: L/2461 Tributary Area 36 sgft ' 4-S -2384 1.15 / 159 1.60 0.48 BC COMP. WR. / TENS. CSI R15)) r . 6-7 -86 1.603/ 1953((D1U. 0.30 7-8 -29 1.60)/ 1234(1.153 0.22 - 8-9 -83 1.60)/ 1923 1.15 0.31 - WB CORP .ri/ TENS: (DUR.) CSI 2-7 -92753/ 135(1.60) 0.16 - 3-7 -1090)1)/ 12380(1.15))) 0.55 3-8 -1090 / 1251 1.15 O.ss 4-8 -955s / 138 1.60 0.18 5- 3X10 T B1 W:508 R:1591 U:-109 1 9-0-0 I 9-0-0 1 1 2 3 4 5 6.00 8X10 6 7 8 t - 504 SHIP 0 T D-6-4 B2 W:508 R:1591 U:-109 9 T. Pio. C 72160 9- 'Q�OF GAL1F� ' All connector plates are ALPINE Wave 20 ga., unless preceded by 'H' for H'gh Strength 20 gam ' for rr Super Strength 18 ga. Plates are to be posttroned par Joint Detail RepoA. Circled Dfates and false frame are positioned as shown above. Shin gable shed plates to avoid overlap with structural plates. 12/15/2016 268 - Homewood Tru *"WARNING!** READ AND FOLLOWALL NOTES ON THIS DRAWING! Cust: JABORSKI (cy)s **IMPORTANT'"!' FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri ve_AL0581116_L00007 300001 Tnasn require a meme care In fabricating. handling. shipping. hsbMV and bractrp. Refer to and fosaw the latest edition of BCSI (BuBding Component WO: D ri ve M 0 581116_1-000 \v safety Information, by TPI and WrcA) for safety praceen prior to performing these tunctwns Instaeere shelf provide temporary bracing per BCBI. Umess D s g n r : AW #LC - 43 Wr/PLY : 118 v/ fir ^ yf noted othm ae, top chord shalf have property attached alruchnal sheathbg and bottom chord &hal have a property atmched d& ceffi g. Location shown for pemunent wood restraint a1 weed aW have bract g bmm0ed per BCSI section W. 87 or 810, as applicable. Appy plates to each face of into and TC Live 20.00 psf Li ve Du r L=1.25 P=1.25 d ��� I`JI�\FIJI posmmnas= above and onthe Jowoetamrepon,unleanotedotherwise. TC Snow(Pf) 55.00 psf SnowDur L=1.15 P=1.15 Alpine, a dlvbbn of ITW Bidk ft components Group Inc., chalf not be responfble for any deviation from this drawing, any failure to build the truss In TC Dead 13.00 psf P Re Mb r B nd / Com / Tens P P AN RW COMPANY conformance with ANSVTPI 1. or for harr®rg, sMpphg. Wmeatbn 8 bracing of trusses. A seat on this drawing or cover page listing ihls drawing, Indicates acceptance of professional engineering responsibility 8C Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SW Muir. Grand Pralrfe. TX 73050 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C . 5 pati ng 2- 0- 0 Designer per ANSI/7P11 Sec.2 TRUSPLUS 6.0 VER: T6.5.20 For tome ntomution&ee thiojob's general notes page and these web edea: ALPInE TPI: wrcA: ICC: Bldg Code: CRC -2013 DEFL RATIO: L/240 TC: L/2461 9- I Job Name: JABORSKI RESIDENCE BRG X -LOC REACT SIZE REQ'D TC 2x6 DFL C2 1 0- 4-10 1563 1.75" 1.67" BC 2x4 DFL S1 & Btr. 2 17- 9- 4 1580 5.50" 1.68" WEB 2x4 DFL STANDARD MAX DEFLECTION (span) : a Kcr (creep factor) = 2.00 L/999 MEM 4-5 (LIVE) LC 40 Referto Joint QC Detail Sheets for - L. -0.10" D. -0.05" T. -0.14" Cq factors and Rotational Tolerances. ® 3oint Locatimis ® Loaded for 10 PSF non -concurrent BCLL. 1 0- o- 0 6 0- o 0 ASCE7-10 SNOW LOAD DESIGN CRITERIA: 2 5- 5- 6 7 5- S- a pg = 79 sf, Ce 0.9, I = 1.0, Ct = 1.10 3 e- 8- a 6 11- B- 4 p 4 11- e- a 9 17- e- 4 � Not deliyned for attic storage unless 5 17- 8- a noted otherwise. CR 1fICAL MEMBER FORCES: -. Tc COMP. BUR. / TENS. BUR. a1 1-2 -2315 1.15 / 157 1.60)) 0.40 2-3 -2209 1.1S / 220 1.60) 0.21 3-4 -2273 1.15 / 222 1.603 0.29 4-S -2362 1.1S / 1S7 1.60 0.48 BC COMP.(WR. / TENS.(WR. CSI .6-7 -B1(1.603/ 1851(1.153 0.36 7-8 -28 1.60 / 1205 1.1S 0.23. 8-9 82 1.60 / 1903 1.1S 0.31 Will COMP.((BUR. / TENS. Ir R.)))CSI2-7-8S7(1. 15j/13460!0.153-7 -107 1,60 /112515 0.503-8 -109 1.60 / 12SS1.1S O.S5 4-8 -954 1.15 / 1381.60 0.18 Truss ID: B01S Qty: 1 Designed per ANSI/TPI 1-2007 UPLIFT REACTIONS) : Fabrication Tolerance = 20.0% , Support C&C Wind .Non -Wind Bearings designed for an FcPerpp value of the 1 -107 lb, lesser of the truss chord lumber value or 2 -108 lb 625 for all bearings. This truss is designed using the IRC/IBC truss plate values are based on ASCE7-10 Wind Specification a testingy and approval as required by IBC 1703 Bldg Enclosed = Yes, and AN and are reported in ESR -1118. Truss Location = Not End Zone PLATING BASED ON GREEN LUMBER VALUES. Exp Category = C Bldg Length = 18.00 ft, Bldg Width = 28.00 ft Mean roof height 11.51 ft, mph 110 Occupancy Category II, Dead Load = 9.6 psf Designed as Main Wind Force Resisting System -Low-rise and Components and Cladding. Tributary Area = 3S sqft s t 8-8-4 1 9-0-0 J I 1 2 3 4 5 F6_0 _0 8X10 • i 1.5X3 1.5X3 5-11-4 5-114 SHIP 5X8 3X10 0-1-20-6T•d 4X6 4X6 B1 B2 W:112 W:508 R:1563 R:1580 U:-107 U:-108 0-3-12 t 17-8-41 STUB 6 7 8 9 1 C�FFSSi T. No. C 72160 AO connector plates are ALPINE Wave 20 ga., unless preceded b 'H' for High Strength 20 ga., •S• for Super \�C c' Strength t8 ga. Plates are to be positioned per Joint Detail Report. Circled plates and false frame plates 12/15/20 16 are positioned as shown above. Shift gable stud plates to avoid overlap with structural plates. 268 - Homewood Truss "`WARNINGI** READ AND FOLLOW ALL NOTES ON THIS DRAWING! Cust: JABORSKI (cy) "IMPORTANT" FURNISH THIS DRAWING TOALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri ve-K_0581116_L00007_JO0001 Tnma require ememe tune In tabrkasrt, handling, shipping, UutaNrg and bractrg. Refer toand follow the West edition of SCSI (BuwbV Component WO: D ri ve_M 0 581116_1-000 Safely Intmmatbn, by TPI and WTCA( for safety practices prior to performing these functions Iretaeem ahae provide temporary br-bV per SCSI. Unless Dsg n r : AW gLC = 43 WT/PLY: 117 ry ^� ^ n R d IL�� �iJj�\�IJ� noted otherwise. top chord shall have properly attached structural sheathbg and bottom chord shall have a property attached r W cemrg. Locations shown fm permenaN lateral restraint of webs shall have bracing; boosted per SCSI sections B3. B7 or 810, as applicable. Appy plates to each fare of truss and position as shown anweand anthe .fo"DelemreporLunl�noted otherwise. TC Live 20.00 psf TC Snow(Pf) 55.00 psf Li veDu r L-1.25 P=1.25 5nowDur L=1.15 P=1.15 Alp(ne, a division of ITvv BulWing Components Group Inc., shall not be responsible for any deviation from f)ds drewbg, airy (sauce to build the tnea in TC Dead 13.00 psf P Re Mbr Bnd Com P / p / Tens AN lT1N C088PANY ceNormarre with ANSViPI 1, or for handers, shipping. Installation A brectfg of tr,sses. A seal on tits drawing or cover page lisdng Oda drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Grow SW Pkry. Grand Prafn4 TX 75050 solely for the design shown The sukablilly and use of this drawing for any structure is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer per ANSVTPI1 Sec.2 TRUSPLUS 6.0 VER: T6.5.20 For more information see thbJobs general rot" pap and these websites: ALPINE TPI: WTCA ICC: Bld Code: CRC -2013 g _ DEFL RATIO 1-/240 TC: L 24 Job Name: JABORSKI RESIDENCE BRG X -LOC REACT SIZE ' REQ'D TC - 2x6 DFL #2 1 0- 2-12 1117S SO, 1.50" BC 2x4 DFL #1 6 Btr. 2 il- 9- 4 1117 S.SO" 1.50. WEB 2x4 DFL STANDARD MAX DEFLECTION (span) Kcr (creep factor) - 2.00 L/999 MEM 7-8 (LIVE) LC 39 Refer to Joint QC Detail Sheets for L= -0.07" D- -O.OS" T- -0.12' Cq factors and Rotational Tolerances. ® )oint Locations ® Loaded for 10 PSF non -concurrent BCLL. ' 1 a- o- 0 6 0- o- o .•.ASCE7-10 SNOW LOAD DESIGN CRITERIA: 2 4- 0- 0 7 4- a 0 Pg - 79 psf, Ce = 0.9, I = 1.0, Ct 1.10 4 e 0- 0 9 e- 0- 0 . Not designed for attic storage unless - 5 12- 0- 0 l0 12- O- 0 . noted Otherwise. CRITICAL MEMBER FORCES: Re Mb r B n /om d CTens P P / TC COMP.J-R_j� TENS. WR. CSI1-2 conformance wth ANSVTPI 1, or for handg in, shops g, Irsanallon a bracbg of tnases A seal on this drawing or cover page listing this drawing, Indicates acceptance of professional engineering responsibility -22531S1951,0.24 1.15 / 1.10 / 1.10 2-3 -16641.1S172.0.13 solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building 3-4 -16641.15/ 172 1.60 0.13 0. C .Spacing 2- 0- 0 4-5 -2253MS/ 19S 1.60 0.24 Designer per ANS&TplI Sec.2 BC COMP. OUR. / TENS.(W0.. CSI - 6-7 -141 1.603/ 1869(1.153 0.37 For maretfarmatonseembjob'egenealroaapageadtrseweGC:2 ALPINE: TPt: •tNTCA tc: 7-8 -145 1.603)/ 1919(((1.153) 0.34 DEFL RATIO: L/240 TC: L/24 8-9 -145 1.60 / 1918 1,15 0.34 9-10 -141 1.60 / 1889 1.15 0.37 WB COMP.(WR. / TENS. (OUR. CSI 2-7 -73(1.153/ 67(1.253 0.03 2-8 -438((((1.15))))/ 79((((1.153)) 0.06 3-8 -107 1.60 / 1042 1.15 0.46 4-8 -438 1.15 / 79 1.15 0.06 4-9 -73 1.15 / 67 1.25 0.03 ' Truss ID: C01 Qty: 7 Designed per ANSI/TPL 1-2007 = UPLIFT REACTION(S) Fabrication Tolerance = 20.0% Support C&C Wind Non -Wind n ' Bearings designed for an FcPerp value of the 1 -103 lb lesser of the truss chord lumber value or 2 -103 lb 62S for all bearings. This truss is designed using the IRC/IBC truss plate values are based on ASCE7-10 Wind Specification testing and approval as required by IBC 1703 Bldg Enclosed = Yes, and AN and are reported in ESR -1118. Truss Location - Not End Zone` PLATING BASED ON GREEN LUMBER VALUES. - Exp Category = C Bldg Length = 18.00 ft, Bldg Width 28.00 ft Mean roof height = 10.76 ft, mph 110 Occupancy Category II, Dead Load = 9.6 psf Designed as Main Wind Force Resisting System - Low-rise and Components and Cladding Tributary Area - 24 sqft 6 6-0-0 { 6.00 6.0 2.5X4 2.5X4 3-6-4 5X6 6X10 6X10 1.5X3 1-4-10 • � � 1.5X3Ell B2 016-4 W:508 3.0 -3.00 5 W:508 R:1117 5-6-8 I I I R:1117 U:-1 D3 r8 . U:-103 12-0-0 6 7 8 9 10 p -„T. rq,y�INN No. C 72172160 cnn%- -. V AB connector plates are ALPINE Wave 20 ga., unless preceded by 'Fr for High Strength 20 ga.,'S' for Super A C A c Strength 18 ga. Plates are to be positioned per Joint Detail Report. Clyde . pietas and false frame plates Z/ 1 JI� O 1 v are positioned as shown above. Shift gable stud plates to evotd 0vertap with structural plates. 268 - Homewood Trus. **WARNINGI rdr READ AND FOLLOWALL NOTES ON THIS DRAWING! Cust: ]ABORSKI (CAT **IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri vejL0581116_L00007_100001 ^ require extreme care In IahricatUg, handing, shippuq. Wtaft and bracing. Refer to and fonow the latest eddlon of SCSI (BuOdbhg Component W0: Drive -M-05811161.000 Safety ornnatbn, by TPI and WTCA) for saary prececes prior to performing these function. Insare neshag prmde temporary bracing per SCSI. unless lnf Dsgn r: AW #LC = 43 tui/PLY: 764 v VTrusses it it f� f1 f� . noted othemfte. tap chord shan have properly atached abuchm2f sheathing and bottom chord shat have a property attached rW cePog. Locations ashcan for permanerd lateral restraint of webs shag lhave bracing buta0ed par BCSI sections B3, B7 or 810, as ap�wble. Appy ptates to each lace of tnm and TC Live 20.00 psf Li ve Du r L=1.25 P=1.25 IIS 1�1�\\VVI 11111 yL�_� AL�� poy�n as drown above and on the ,b4¢ Dem repeg unless nwktl otherwise. TC S now (Pf) 55.00 psf S nowDu r L=1.15 P=1.15 `//-/QUI III Alpine, a dbmion of ITW Ba1tng Components Group Inc., shag not be responsible for any deviation from this drawing, any faiWre to h.M the bass In TC Dead 13.00 psf P Re Mb r B n /om d CTens P P / AN ITW COMPANY conformance wth ANSVTPI 1, or for handg in, shops g, Irsanallon a bracbg of tnases A seal on this drawing or cover page listing this drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SW Pkwy. Grand Prahie, TX 75050 solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer per ANS&TplI Sec.2 • TRUSPLUS 6.0 VER' T6.5.20 For maretfarmatonseembjob'egenealroaapageadtrseweGC:2 ALPINE: TPt: •tNTCA tc: Bldg g Code: CRC -2013 DEFL RATIO: L/240 TC: L/24 Job Name: JABORSKI RESIDENCE Truss ID: COG Qty: 1 - BAG X -LOC REACT SIZE REQ'D TC 2x6 DFL S2 Designed per ANSI/TPI 1-2007 UPLIFT REACTION`S) 1 0- 3- 6 335 6.7S" 1.50" Bc 2x4 DFL CS & Btr. Fabrication Tolerance = 20.0% Support CBC Wind Non -Wind 2 1- 7- 6 44 3.SO" .1.50" WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the - 1 -14 lb 3 2- 8- 0 428 3.50" 1. SO" Kcr (creepp factor) - 2.00 lesser of the truss chord lumber value or 2 -4 lb - •- 4 4- 0- 0 263 3.SO" 1.50" Refer to ]oint QC Detail Sheets for 625 for all bearings. 3 -68 lb 5 S- 3- 0 239 3.SO" 1. S0" Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on 4 ' -43 lb 6. 6- 9- 0 239 3.50" 1.50 Loaded for 10 PSF non -concurrent BCLL. testing and approval as required by IBC 1703 5 -4 lb 7 8 8- 0- 0 9- 4- 0 263 3.50" 1, So" 428 3.50" 1.50" A5CE7-10 SNOW LOAD DESIGN CRITERIA: and AN and are reported in ESR -1118. 6 -4 lb 9 10- 4-10 44 3.SO" 1.50 pg 79 psf, Ce = 0.9, I = 1.0, Ct 1.10 Mark all interior bearingg locations. 7 -43 lb 10 11- 8-10 335 6.75" 1.50" Building designer shall verify gable loads Install interior supports) before erection. 8 -68 lb MAX DEFLECTION (span) and eave loads, if appplicable. PLATING BASED ON GREEN LUMBER VALUES. 9 -4 lb L/999 MEM 1-2 (LIVE) LC 41 Refer to appropriate.ITtl8C6's Standard HORIZONTAL REACTION(S) 10 -14 lb - L. 0.00' D. 0.00' T= 0.00" Gable Details for information regarding 9 9 support 1 pport 1 188 b This truss is designed using the ® Joint Locations ® the bracing of this gable truss. Not designed for attic storage unless support 2 -113 lb - support 9 113 lb ASCE7-10 Wind Specification Bldg Enclosed - Yes, 1 2 0- 8- o- 0 0 1O11 2- o-2- 0-8- oo noted otherwise. support 10 -188 lb Truss Location = Not End Zone 3 s- o- 0 12 4- o- o -- � Exp Category = C 4 5- 3- 0 13 5- 3- 0 Bldg Length = 18.00 ft, Bldg Width = 28.00 ft 5 6- 0- 0 14 6- 9- 0 Mean roof height - 10.76 ft, mph = 110 6 7 6- 9- 0 15 $- 0- 0 16 e- 0- 0 9- 4- 0 Occupancy Cate or II, Dead Load 9.6 psf 9 8 9- 4- 0 17 12- o- o t Designed•as Main ind Force Resisting System 9 12- 0- 0 - Low-rise and Components and Cladding CRITICAL NEKHER FORCES: Tributary Area 24 sgft TC 1-z CORP. DUR. -17s 1.1s / TENS. DUR. CSI / S.1,1s o.06 Truss designed to support 1-0-0 top chord outlookers 2-3 3-4 -1s9 1.15 -14S 1.1S / 32 1.60 0.05 / s2 1.60 0.02 - and cladding load not to exceed 10 PSF one face, and 4-5 127 1.1s / S3 1.60 0.01 24" span opposite face. Top chord must not be cut or 5-6 -127 1.15 / 53 1.60 0.01 notched. 6-7 7-8 -14s 1.15 -159 / S2 1.60 0.02 32 1.60 O.OS - 8-9 -175 J.ls / 27 1.15 0.06 BC COnP. (OUR. / TENS. WR. CSI 6-0-0 6-D- 1 112 -114(1.15;� s3�1.603 0:01 1 2 3 4 5 6 7 8 9 12-13 / 0.01 1a 1s % 0.01 6 0 16 17 % 0.03 - VB COMP. DUR. / TENS. R. CSI 2-11 -416 1.15 / 81 1.60 O.Os 3-12 -244 1.15 / SS 1.60 4-13 -110 1.15 / 8 1.60 0.02 6-14 -110 1.15 / 8 1.60 0.02 7-15 -244 1.15 / SS 1.60 0.03 8-16 -416 1.15 / 81 1.60 O.OS 4-13 -110 1.15 / 8 1.60 0.02 6-14 -110 1.1s / a 1.60 0.02 3-6-4 2X4 01-4 4X6 3 SHIP 1; 1.5X3 - _ 1.5X3 1.5X3 1.5X3 `_ rT. 1 12-0-0 10 11 12 13 14 15 16 17 - No. C 72160 OVER CONTINUOUS SUPPORT �OF CAV Ali connector plates are ALPINE Wave 20 ga., unless preceded by'H' for High Strength 20 ga., 'S' for Super - Strength 18 ga. Plates are to be positioned per Joint Detail Report Circled plates and false frame plates are positioned as shown above. Shpt gable stud plates to avoid overlap with structural plates. _ 12/15/2016 268 - Homewood Trus **WARNINGI** READ AND FOLLOWALL NOTES ON THIS DRAWINGi Cust: 3ABORSKI (C4T **IMPORTANT`* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Drive- LO581116_L00007_100001 - /\ Tnmses require edreme ore in fabricating• handft, ahipphia. irmlaft and brac V. Refer to and follow the latest edition of Br -SI (Bulldl g Component WO: D ri V e-JL0581116_LO DD 79 Safety Information, by TPI and WTCA) tw safety, praWcea prior to perfomr6g tlmae functions Install- shall provide temporary taactrg per BCSI. Unless Dsgn r : AW #LC = 43 .- WT/PLY: rr ^ y� anted otherwise. top droll shall have property attached stAxbual sheathbV and bottom chord shag have a properly attached rbid cemrg. Locations shown weM snag haw bmtaged per sections B3, B7 or B10, as app8oble. Appy platesto each tam of testa and psoas faterat reatand TC Live 20.00 psf =1.2 5 - Li veDu r L=1.25 P=1.25- � ''Jim\\IJI ��� reporg Cher p�+�ahorh+atwwamw,me.la6doeamnepparwlesanotmwnen�e. Positionn Po TC Snow(Pf) 55.00 psf SnowDur L=1.15 P=1.15 Alpine, a divbbn of ITW Building CarrymneNe Group Inc.. shag not be responsible far airy deviation frown tlrm draw6g, any (allure ro Mdtl the toss b TC Dead 13.00 psf Rep Mb r B n d / Comp / Tens AN nW COMPANY mntormance with ANSVTPI 1, w for handlIM. shlppIrS Installation a bracing of trusses. A seal on this drawing or cover page lisdng this drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. roneat SIN Pkery. Grand Prairl4 TX 76030 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer per ANSI/TPI1 Sec.2 TRUSPLUS 6.0 VER: T6.5.20 �iiFor more Wom+ation see IALa jobb general notes page and them web at ALPINE: moi: .t,,RCAwww,ftind-ft - Bldg Code: CRC -2013 JDEFL RATIO: L/240 TC: L/24 1; Job Name: JABORSKI RESIDENCE BRG X -LOC REACT SIZE' REQ'D TC 2x6 DFL d2 1 0- 2-12 1000 S.SO" 1.S0" BC 2x4 DFL S1 6 Btr. 2 9- 6- 0 963 HGR - 1.50" WEB 2x4 DFL STANDARD BRG HANGER/CLIP NOTE Kcr (creep factor) - 2.00 2 THASR/218 Refer to Joint QC Detail Sheets for Support Connections)/Hanger(s) are Cq factors and Rotational Tolerances. not desiggned for horizontal loads. Loaded for 10 PSF non -concurrent BCLL. SEE SIMPSON CATALOG ASCE7-10 SNOW LOAD DESIGN CRITERIA: FOR ADDITIONAL INSTALLATION NOTES Pg = 79 psf, Ce - 0.9, I - 1.0, Ct = 1.10 MAX DEFLECTION (span) ; This truss is designed using the L/999 MEM 1-2 (LIVE) LC 46 ASCE7-10 Wind Specification L. -0.08" D. -0.03" T- -0.10" Bldg Enclosed = Yes, EX.WB DEF CRITERIA:L/120 Truss Location - Not End Zone IN MEM 9- S; T= 0.00" Exp Category = C ® Joint Locations ® Bldg Length 18.00 ft, Bldg Width 28.00 ft 1 0- o- 0 6 0- o- o 2 S- 9- 4 7 S- 9- 4 Mean roof height - 11.51 ft, mph = 110 3 8- 0- o 8 8- O_ 0 Occupancy Category II, Dead Load = 9.6 psf 4 9- 0- 0 9 9- 7-12 Designed as Main Wind Force Resisting System S 9- 7-12 - Low-rise and Components and Cladding CRITICAL MEMBER FORCES: TC CONP. OUR. / TENS. OUR. CSI Tributary Area - 19 sgft 1-2 -1914 1.15 / 128 1.60 0.43 Vertical members exposed to wind: 9- S 2-3 -775 1.15 / 8l 1.60 0.32 � �� 3-4 -572 1.15 / 80 1.60 O.OS 4-5 -42 1.15 / 58 1.60 .0.03 8c COMP.(DUR. / TENS. [OUR. CSI . 6-7 -237(1.603/ 1572(1.153 0.28 7-8 -237 1.60 / 1578((1.153 0.33 8-9 67 1.60 / 153 1.1S 0.38 Acme; a division of ITW Buitlbg Components Group firm. shall not be responsible for any deviation from this drawing, any failure to build the in= In Truss ID: D01 Designed per ANSI/TPI 1-2007 Fabrication Tolerance - 20.0% Bearings designed for an FcPerp value of the lesser of the truss chord lumber value or 62S for all bearings. IRC/IBC truss plate values are based on testingg and approval as required by IBC 1703 and AN and are reported in ESR -1118. PLATING BASED ON GREEN LUMBER VALUES. End verticals are designed for axial loads only, unless noted otherwise. 4 Not designed for attic storage unless noted otherwise. WB COMP.( R.) TENS. R. CSI 2-7 / 137 1.25 0.06 _ 2-8 -11001.15/ 125 1.60 0.17 3-8 -181.15/ 36 1.60 0.01 • 6� 4-8 -1351.60/ 960 1.15 0.42 ' 4-9 -7931.15/ 143 1.fi0 0.12 S-9. -11011.151/ 38 -6.001 1.60 0.11 It 8X10 1.5X3 1.5X3 T 2.5X4 2-9-12 SHIF 2.5X� 1.5X3 7X10 3X(3,0�� 1-1¢10 �4 11 VV 08 3.001 'BTHASR/218 R:1000� 7�8 W:308 U:-92 r I I R:963 1_7_12 9-7-12 U:-153 6 7 8 91 Qty: 2 Required bearing widthsand bearing areas app! when truss not supported in a hanger. , UPLIFT REACTION(S) : Support C&C Wind Non -Wind 1 -92 lb 2 -153 lb HORIZONTAL REACTIONS) - support 1 207 111 support 2 207 lb �OF CAV All connector plates are ALPINE Wave 20 ga., unless preceded by'H• or Heigh Strength 20 ga 'S* for Super Strenplates positionedtesalplateahhaa 18 gdBas are positioned tioneth shown above. gable stud plates odavoido v rlap�withlsstru 12/15/2016 268 - Homewood Trus **WARNING[** READ AND FOLLOWALL NOTES ON THIS DRAW/NGI Cust: )ABORSKI (CAT "IMPORTANT"* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri veJ+L0581116_L00007-100001 7nocyes regWre e:dreme care in Iabrice0rg, haMDig, Wpo g, In ta01ng and Mach. Refer to and follow the latest edition of BCSI (Bull ft Component WO: Dri veJrL0581116_L000 Safety Infornmilm by TPI and WTCA) for eatery, practices prior to parronni g tfwese functions. Instalten emir provide temporary bracing; per SCSI. Unless Ds gn r : AW yLC = 49 WT/PLY : 7 tr noted otherwise. tap chord aha' have properly 81"ned "n'an'. s "n"a and bottom chord - have a properly stashes 119Ie "[lin" ' 000 am shown ^ r� n latemt restrainteper eeetw m a3.87 or 818, as app'wble. Appy prate, o each mos of taro. am them w' have maort mess TC Live 20.00 psf Li veDu r L=1.2 5 P=1.2 5 � �� �uf�\\�J� and n n & paa<'an � shown above am on me xw oeram report �me� noted a<n�w�e• position TC Snow (Pf) 55.00 psf SnowDu r L=1.15 P=1.15 !j/d-� Acme; a division of ITW Buitlbg Components Group firm. shall not be responsible for any deviation from this drawing, any failure to build the in= In TC Dead 13.00 psf Rep Mb r Bnd / Camp / Tens AN RW COMPANY conformance with ANSVTPI 1, or for hand ft. shipping. Installation 8 bnwbv of tru e - A seal on tilts drawing or cover page listing this drawing, Indicates acceptance of prolesslonal engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Grew SWPrw)•. Ground Prwrfe, iX 75050 solely for the design shown The sultabiltty and use of this drawing for any structure Is the responsibility o/ the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSMI1 Sec.2 TRUS PL US 6.0 VER: T6.5.20 Por more Inrwmation see tab lob's general notes page and these web seen: ALPINE: www.alalrrcilw.mm iPl: WTCA:y ffly&jy W=ICC: Bldg Code: CRC -2013 DEFL RATIO: L/240 TC: L/24 FA Job Name: JABORSKI RESIDENCE Truss ID: D02 Qty: 2 BRG X -LOC REACT SIZE REM., TC 2x6 DFL d2 Designed per ANSI/TPI 1-2007 Required bearing widths and bearing areas 1 0- 2-12 1182 5.50" 1.50" BC 2x4 DFL SS & Btr. Fab n cation Tolerance = 20.0% apply when truss not supported in a hanger. 2 11- 6- 0 927 HGR 1.50" BRG HANGER/CLIP NOTE WEB - 2x4 DFL STANDARD Bearings designed for an FcPerp value -of the - -lesser UPLIFT REACTIONS) : 2 THASR/218 Kcr (creep factor) = 2.00 Refer to Joint QC Detail Sheets for of the truss chord lumber value or :625 for all bearings. Support C&C Wind Non -Wind - 1 lb Support Connection(s)/Hanger(s) are Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on - -97 2 -137 lb• not designed for horizontal loads. SEE SIMPSON CATALOG Loaded for 10 PSF non -concurrent BCLL.., testingg and approval as required by IBC 1703 HORIZONTAL REACTION(S)) ' " FOR ADDITIONAL INSTALLATION NOTES ASCE7-10 SNOW LOAD DESIGN CRITERIA: and AN and are reported in ESR -1118. support 1 146 lb MAX DEFLECTION (s an) : Pg = 79 psf, Ce a 0.9. I a 1.0, Ct 1.10 PLATING BASED ON GREEN LUMBER VALUES. support 2 146 lb L/999 MEM 1-2 (LIVE) LC 46 This truss is designed using the End verticals are designed for axial loads more Information we this lob's general rotes page and these web sites: ALPINE: atolasioeLrsm TPI: 28rBjIlnslnro:WrCA:MW sbcindusiry =I ICC: L. -0.13" D. -0.06" T= -0.19" ASCE7-10 Wind Specification only, unless noted otherwise. EX.WB DEF CRITERIA:L/120 Bldg Enclosed a Yes, Not designedfor attic storage unless IN MEM 7- 4; T. 0.00" Truss Location = Not End Zone Exp Category = C noted otherwise. ® Joint Locations ® Bldg Length 18.00 ft, Bldg Width 28.00 ft ' 1 o- 0- 0 S 0- 0- 0 2 6- 0- 0 6- 6- 0- 0 Mean roof height = 11.51 ft, mph = 110 3 9- 0- 0 7 11- 7-12 Occu pancy Categg ory II, Dead Load = 9.6 psf ' 4 11- 7-12 Designed as Main Wind Force Resisting System CRMCAL MEMBER FORCES: - Low-rise and Components and Cladding Tc COMP. DUR. / TEJ15. WR. Csi Tributary Area - 23 sqft i-2 -2486 1.15 / 166 1.60 0.56 2-3 -2453 1.15 / 272 1.60 0.20 vertical members exposed to wind: 7- 4 34 -124 1.1S / . 101 1.15 OAS I 9-0-0 1 2-7-12 1 1 2 T3 4 6.00 $.0 RY1n 5-11-4 Di4 B1 v: -for W:508 -3.0 R:1182 58 I I U:-97 5 7-12 5 6 7{ 1.5X3 T 2-3-12 1 4 10 5_ SHIP T. No. C 72160 f OF CAU A8 connector plates are ALPINE Wave 20 ga., unless preceded by'H' for Hiyh Stns 20 gapateSuper Strength 18 ga. Plates are to be positioned per Joint Detail Report Circled pates an false frame12/15/2016 are positioned as shown above. Shin gable stud plates to avoid overlap with structural plates. C?%2 S-6 6g7 276 1.60 / 1.60)/ 2071 1.15 0.42 599(1.15) 0 26 , WB COMP. DUR. / TF175.(OUR.) CSI 2-6 -8S2 1.1S3/ 143(1.60) 0.11 3-6 -214 1.60 / 2064(((1.153) 0.91 3-7 -944 1.15 / 142 1.60 0.27 4-7 -307 1.15 / 76 1.60 0.08 I 9-0-0 1 2-7-12 1 1 2 T3 4 6.00 $.0 RY1n 5-11-4 Di4 B1 v: -for W:508 -3.0 R:1182 58 I I U:-97 5 7-12 5 6 7{ 1.5X3 T 2-3-12 1 4 10 5_ SHIP T. No. C 72160 f OF CAU A8 connector plates are ALPINE Wave 20 ga., unless preceded by'H' for Hiyh Stns 20 gapateSuper Strength 18 ga. Plates are to be positioned per Joint Detail Report Circled pates an false frame12/15/2016 are positioned as shown above. Shin gable stud plates to avoid overlap with structural plates. 268 - Homewood Trus' i *WARNINGI** READ AND FOLLOWALL NOTES ON THIS DRAWINGi Cust: IABORSKI ((AT "IMPORTANT'" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri ve_.M_0581116_L00007-100001 j\ Trusses regwre wdreme rare in fabdwtifg, harmbp, snipphg, Istamna aro bredng. Refer to and follow aro latest editkn of BCS (aummg Compofrent Wit: Dri veJ+L0581116_L000 Safety Information, by TPI and WrCA) for safety preodras prior to performhg these functions. Installers shall provide temporary brechg per BCSL UMess Dsgn r: AW SLC = - 49 WT/PLY: 811 tv r� rested otherwise, top chord sha0 have properly attached rirucboal sheathhg and bottom chord aha" have a properly attached rigid callI g. Locations sh- for germane d lateral reaaand of webs eras nave per ot sectioro 83. B7 or 810, as applicable. Appy plates to each face of truss aM TC Live 20.00 psf Li veDu r L-1.25 P-1.25 I �Uj�\\�J� ��� reportmessInstalled posruw asa robaoeta other TC Snow(Pf) 55.00 psf SnowDur L=1.15 P=1.15 !j/Q- �f isim-nwearclonme t5Grou tnc.. hnoted aDnettberespo Aline, a drvabn of fTW BWimrg Componenda Group brc., eha0 net be responsible tar arty dev¢ibn from Nb drawtrg, arty fa0ure to bndW the tnaa in TC Dead 13.00 psf Rep Mb r Bn d / Comp / Tens AN rrw COMPANY condormarce with I WSVTPI 1, or for h-BUXI, ahipp6g, Installation a bradre of Irusece. A seal on this drawing or cover page listing this drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820N. Great SW Pkwy. Grand Prattle, TY 75050 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSYMI 1 See.2 TRUSPLUS 6.0 VER: T6.5.20For more Information we this lob's general rotes page and these web sites: ALPINE: atolasioeLrsm TPI: 28rBjIlnslnro:WrCA:MW sbcindusiry =I ICC: jBldg Code: CRC -2013 DEFL RATIO: L/240 TC: L/24 Job Name: JABORSKI-RESIDENCE Truss ID: D03 Qty: 2 BRG X -LOC REACT SIZE REM,, TC 2x6 DFL &2 -BC - Designed. per ANSI/TPI 1-2007 Required bearing widths and bearing areas 1 0- 2-12 1331 5.50" 1.50" 2x4 DFL S1 & Btr. -Fabrication Tolerance = 20.0% apply when truss not supported in a hanger. 2 13- 6- 0 1073 HGR, 1.50" WEB 2x4 DFL STANDARD '- Bearings. designed for. an FcPerp value of the UPLIFT REACTIONSS) : BRG HANGER/CLIP NOTE Kcr (creep factor) = 2;00 lesser of the truss chord lumber value or Support C&C Wind Non -Wind s '° 2 THASR/218 Refer to Joint QC Detail Sheets for. 625 for all bearings. 1 -101 lb Support Connection(s)/Hanger(s) are Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on 2 -121 lb not designed for horizontal loads. SEE SIMPSON CATALOG - Loaded for 10 PSF non -concurrent BCLL.. ASCE7-10 SNOW LOAD DESIGN CRITERIA: testing and approval as required by IBC 1703 and This truss is designed usingthe FOR ADDITIONAL INSTALLATION NOTES natio otherwise, top chard shall have properly, aftadred stnxhnal ehe .n a end bo0om chord shat have a properly aftacned rlgW ceimg. Location °flown for permanent lateral reahaind of webs °hat haw bmchg battled po BCS/ °ediorm 83, B7 °r 810. °a appkr bk. Appy prates to aach race of truss and_ and AN are reported in ESR -1118. ASCE7-10 Wind Specification MAX DEFLECTION (s an) pg 79 psf, Ce = 0.9, I = 1.0, Ct = 1.10 PLATING BASED ON GREEN LUMBER VALUES. Bldg Enclosed = Yes, L/999 MEN 2-3 (LIVE) LC 45 Not designed for attic storage unless `noted End verticals are designed for axial loads Truss Location = Not End Zone L. -0.1S" D. -0.07" T= -0.22" otherwise. - only, unless noted otherwise. Exp Category = C EX.WB DEF CRITERIA:L/120 - Bldg Len g 18.00 ft, Bldg Width 28.00 ft 4th IN HER 8- ; T. 0.00" TC Dead 13.00 psf Rep Mb r Bn d / Camp / Tens Mean roof height = 11.51 ft, mph = 110 conformance with ANSVM 1, ot for harding, shops g. Installation s bracing of trusses. A seal on this drawing or cover page Uffdng Bila drawing Indicates acceptance of professlonal engineering responsibility BC Live 0.00 psf Occupancy Category II, Dead Load 9.6 psf ® 3oint Location;-. 1 0- o- o s a o- o solely for the design shown The suitability and use or this drawing for any structure Is the responsibility of the Building Designed as Main Wind Force Resisting System 2 4- 0- 0 6 4- 0- 0 Designer per ANSUTPI t Sec.2 - Low-rise and Components and Cladding 3 9- 0- 0 7 9- 0- 0 TRUSPLUS 6.0 VER: T6.5.20 Tributary Area = 27 sqft 4 13- 7-12' 8 13- 7-12 Bld Code: CRC -2013 9 DEFL RATIO: 1-/240 TC: 1-/24 Vertical members exposed to wind: 8- 4 CRITICAL KERBER FORCES: TC CONP. OUR. / TENS. WR. CSI . 1-2 -3311 1.15 / 245 1.60 0.36 - 2-3 -1232 1.15 / 118 1.60 0,49 3-4 -1090 1.15 / 118 1.60 0.43 - - BC CONP.(DUR. / TENS.(WR. CSI 5-6 -294(1.603/ 2857(1.1SS 0.64 6-7 -276 1.60 / 2625 1.15 0.47 7-e 24 1.60 / 76 1.60 0.11 116 caN DU1111.)/ TENS. OUR.) CS1 L 9-0-0 1 4-7-12 I 2-6 -30(1.603/ 6ezl.ls3 0.30 1 2 3 4 2-7 -177201.15 / 180(1.603)) 0,76 3-7 - / 2431.15 0.11 4-7 81 1.60)/ 99011.15 0.44 6.00 -0.0 + 4-8' -1052(1.15)/ 135 1.60 0.14 , 8X10 T 4 4X4 - 4X4 T , SHIP 1-9-12 6X10 4 8 6X8 2X4 0 1 -10 B1 B2 W:508 3.0 *THASW'308 R/218 R:1331 3-641 1 1 R:1073 U:-... 9-7-12 U:-121 13-7-12 5 6 7 8 �OF[3AU ' AB connector plates are ALPINE Wave 20 ga., un ess preceded by'H" for Hi h Streit 20 ga.e pateSuper Strength 18 Be. Plates are to be T,&Ioned per Joint Detail Report Cuded plgates end false ffrraa 12/15/2016 are positioned as shown above. Shffl gable stud plates to avoid overlap with structural plates. 268 - Homewood Tru S ""WARNINGI** READ AND FOLLOWALL NOTES ON THIS DRAWING/ Cust: JABORSKI (G 'IMPORTANT`* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Drive -M -0581116-L00007-100001 ^ require edreme care In tabrlcatirg, harming, shippirg, Instating and bractrg. Refer to and fellow the latest edition of BCS/ (Building; Component W0: Drive A 0 5 8 1116-1-0 0 0 ' Safety Information, by TPI and WTCA) tar safety practices prior to performhg avers funrdbro. installersshat protide temporary brachg per SCSI. UNesa Ds gn r : AW #LC = 49 WT/PLY : 97 v VTrnnses ry r\ 1l natio otherwise, top chard shall have properly, aftadred stnxhnal ehe .n a end bo0om chord shat have a properly aftacned rlgW ceimg. Location °flown for permanent lateral reahaind of webs °hat haw bmchg battled po BCS/ °ediorm 83, B7 °r 810. °a appkr bk. Appy prates to aach race of truss and_ TC Live 20.00 psf Li veDu r L-1.25 P=1.25 A �r^,� posit- asahownsto-ardonf Joint Detalbreport unkasrartedotherwise. TC Snow(Pf) 55.00 psf SnowDur L=1.15 P=1.15 IIUUtrrUJ�-+�I I�J�\v�� Atoz. a zzon of r7W Building Components Group Ina., shall not be responsible for any deviation from thn drawl g, any 120une to build the truces in TC Dead 13.00 psf Rep Mb r Bn d / Camp / Tens AN ITW COMPANY conformance with ANSVM 1, ot for harding, shops g. Installation s bracing of trusses. A seal on this drawing or cover page Uffdng Bila drawing Indicates acceptance of professlonal engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Greer SINPlrry. Grand Rath, TX 75050 solely for the design shown The suitability and use or this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer per ANSUTPI t Sec.2 TRUSPLUS 6.0 VER: T6.5.20 FOf"O0"fonallonaeeeiLsJvb�6Bener81notG°pap and these watowin: ALP irJE: TPi: WTCA 7plpmLtl>fikxhn r,m ICC:7plplV,�}g,� Bld Code: CRC -2013 9 DEFL RATIO: 1-/240 TC: 1-/24 J Job Name: JABORSKI RESIDENCE Truss ID: D04 . Qty: 2 BRG X -LOC REACT SIZE REQ'D TC 2x6 DFL A2 Designed per ANSI/TPI 1-2007 Required bearing widths and bearing areas 1 0- 2-12 1460 5.50" 1. S6" BC 2x4 DFL Al & Btr. -.Fabrication Tolerance = 20.0% a 1 when truss not supported in a hanger. 2 1S- 6- 0 1351 RR 1,S0" WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the UPLIFT REACTION(S) : BRG HANGER/CLIP NOTE Kcr (creep factor) = 2;00 lesser of the truss chord lumber value or Support C&C Wind Non -Wind 2 Hanger TBE- -HANGER(S) TO BE ENGINEERED Refer to Joint QC Detail Sheets for 62S for all bearings. 1 -JOS lb Cq factors and Rotational Tolerances. IRC/IBC truss plate values are .based on 2 -111 lb Support Connection(s)/Hanger(s) are not designed for horizontal loads. Loaded for 10 PSF non -concurrent BCLL. testingg and approval as required by IBC 1703 This truss is designed using the MAX DEFLECTION (span) : ASCE7-10 SNOW LOAD DESIGN CRITERIA: Pg = 79 psf, Ce = 0.9, I = 1.0, Ct = 1.10 and ANSI/TPI and are reported in ESR -1118. PLATING BASED ON GREEN LUMBER VALUES. ASCE7-10 Wind Specification Bldg Enclosed = Yes, L/999 MEM 8-9 (LIVE) LC 45 Not designed for attic storage unless -204(1.603/ 1.1S) 0.64 Truss Location = Not End Zone L. -0.12" D. -0.12" T= -0,2S" - noted otherwise. • - - - 'Exp Category = C EX.WB DEF CRITERIA:L/120 - Bldg Length 18.00 ft, Bldg Width = 28.00 ft IN MEM 10- 6; T= 0.00" M 10s 9-10 -116 1.60 / 1237 1.1S 0.29 Mean roof height = 11.51 ft, mph 110 ® ® "Vocationo- - Occupancy Category II, Dead Load 9.6 psf 1 a- 6 IS- 7-12 - Designed Main Wind Force Resisting System 3 6- 0- 0 6 2 0- 0 2-8 3-8 3-9 1.15 0.10 -115 1.60 / 763I -IS 0.34 -1074 1.15 / 1241.60 0.31 / •221ID11 •as - Low-rise and Components and Cladding 4 9- o- 0 9 9- 0- o - Tributary Area 31 sgft ST - a o -10 15- 7-12 - Vertical members exposed to wind: 10- 6 Tc ODNP. DUR. / TENS. DUR. r5I 1-2 -3105 1.15 / 192 1.60 0.38 2-3 -2904 1.15 / 254 1.60 0.61 - 3-4 -1413 1.15 / 140 1.60 0.31 4-S 5-6 -1257 1.15 / 143 1.60 0.14 -146 1.15 / 186 1.15 0.22 - ec CONP. ((1" / TENS.(OUR.) CSI ' 7-8 -204(1.603/ 1.1S) 0.64 • 8-9 -ls4 1.60 / 1875((1.153 0.43 1875 ' 9-10 -116 1.60 / 1237 1.1S 0.29 I 9-0-0 - I 6-7-12 I - We COIIP.(DUR.)/ TENS. uR. cS1 1 2 3 4 5 6 2-8 3-8 3-9 1.15 0.10 -115 1.60 / 763I -IS 0.34 -1074 1.15 / 1241.60 0.31 / •221ID11 6.DD 4-9 S-9 -68 1.60 / 8061.15 0.36 -401 1.15 / 101.15 0.12 - 5-10 6-10' -1565 1.15 / 128.60 0.51 -356 1.15 / SS1.60 0.04 - 8X10 5-0„4 4X4 5X6 $ 1.5X3 SHIP 1.5X3 6X10 1-3-12 • T � 4 3X10 3X8 W1X12 0$10 B2 131 W:308 3.0 QA R: -l1 1 R:1460 U:-111 R:146 �y T. TigN c� 1-6-8 I I U:-105 7 J 13-7-12 I 15-7-12 I 7 8 9 10 No. C 72160 �4 cNl%. Ali connector plates are ALPINE Wave 20 ga., unless preceded by 'H' for High Strength 20 ga., •S• for Super Strength 18 ga. Plates are to be positioned per Joint Detail Report Circled plates and false frame plates 12/ 15/2016 are positioned as shown above. Shift gable stud plates to avoid overlap with structural plates. 268 - Homewood Truss WARNING!** READ AND FOLLOWALL NOTES ON THIS DRAWING! **IMPORTANT" Cust: JABORSKI DIR: Dri ve A 0581116_L00007_J00001 (U) FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. Trusses require extreme ora N Fabricathg, handUM. shipp4p, fmfamrg and brocbg. Refer to and follow the latest eddbn of BCSI (Building Component W0: D ri ve R 0 581116_1-000 WT/PLY 11 94 Safety Ntormatim by TPI and WTCA) fm safety practices prior to perfomr'vg these functions. Installm shall provide temporary bracing per BCSL Unless Dsgn r: AW ALC = 49 : 1r noted oiherwoe, p....'.. perty a0ached ewaurel sheathhg andbodom rJrord shay have a properly a lod mmrg. Lecatiom shown Apply race truss TC Live 20.00 psf Li ve Du r L=1. 25 P=1. 2 5 ^ ��� o r� rI IUI�\\`\jlJll T went slid have breorg Insisted ed BCSI sections B3, e7 on et0, as apPOobte. plates to each of and lateral above nor pemne. shown posttionasehownabweardonlheJolntDetamraparLunlesenoOedoUenvke. and TC Snow Pf) < 55.00 psf SnowDur L=1.15 P=1.15 U/ -/LI Alpine, a division of ITW Building Components Grmrp Inc.. shall net be responsible for any davfaWn from this drawug, any falkne to build Uro Men, N TC Dead 13.00 psf Rep Mb r Brill / Comp / Tens AN iTW COMPANY c°rd°rma"c° with ANS VTPI 1, w for handling, shipping. Installation a bracing of fruseea A seal on this drawing or cover page listing this drawing, Indicates acceptance o1 professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SW P*W. GrandPralrfe, IX75OW solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSUMI 1 Sec.2 '• TRUSPLUS 6.0 VER: T6.5.20 Fornwrefnfonnation-athhjob•sgeneralnotespageardthesawebsaea: ALPINE: MY1V.a�ijp7LlmID; TPI: WTCA: ' ICC: Bld Code: g CRC -2013 DEFL RATIO: L/240 TC: L/24 Job Name: JABORSKI RESIDENCE Truss ID: GT1 Lust: JABOW)K1 Qty: 4 BRG X -LOC REACT SIZE REW D TC 2x6 DFL #2 Designed per ANSI/TPI 1-2007 UPLIFT REACTION(S) : Safety Nfa nation, M TPI and PTCA) for eafety practices prior to perfarmhG these NnWiom Imtallere shall provide temporary bracing per BCSL Unless DS gn r : AW #LC = 43 WT/PLY: 2054 1 0- 2- 6 5509 4.75" 1.50" BC 2x8 DFL SS Fabrication Tolerance = 20.0% Support C&C Wtnd Non -Wind lateralwn 21, and of webs shat bracing; per other sect ons or as ell plates to each of tam and for pamtanerd shown Pou�naaafrownam�naandanme.tawoammrePaLrm�a^oo-saahe^r'se. TC Snow(Pf) 55.00 psf 2 24- 9- 2 9355 4.75" 2.49 WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the 1 -541 lb AN/TWCOMPANY CO"}O1"'a-*m`ANS�I1.orfmharmng.eh�sg•Installaea"6m°angofIrma— A seal on this drawing or cover page lisdng this drawing, Indicates acceptance or processional engineering respons/bilify MAX DEFLECTION (span) : 1.15 / 1.10 / 1.10 2x4 DFL #1 & Btr. 12-4 lesser of the truss chord lumber value or 2 - -1005 lb 0 . C .Spacing 2- 0- 0 L/666 MEM 12-13 (LIVE) LC 39 Kcr (creep factor) = 2.00 625 for all bearings. This truss is designed using the DEFL RATIO: L/240 TC: 1-/24 L= -0.44" D= -0.71" T= -1.15" IRC/IBC truss plate values are based on Refer to Joint QC Detail Sheets for ASCE7-10 Wind Specification ® Joint Locations ® testing and approval as required by IBC 1703• Cq factors and Rotational Tolerances. Bldg Enclosed = Yes, 1 0- 0-105 9 0- o- 0 and AN and are reported in ESR -1118. Loaded for 10 PSF non -concurrent BCLL. Truss Location Not End Zone 2 6- 0- 10 6- 0-1S 3 9- 3- 5 9- 3- S + + + + + + + + + + + + + + + + + + + + + + ASCE7-10 SNOW LOAD DESIGN CRITERIA: Exp Category = C 12 a 12- 5-12 12 12- 5-1z Nail pattern shown is for PLF loads and P P = 79 psf,= 0.9, I 1.0, Ct = 1.10 9 Bld Length = 18.00 ft, Bldg 9 9 Width 28.00 ft 5 1a-11- s 13 1a-11- s point loads converted to PLF loads only. .Ce Permanent bracing is required to Mean roof height = 11.47 ft, mph = 110 6 17- 4-15 14 17- 4-1S 7 19-10- 8 15 19-10- 8 Concentrated loads shall be distributed to prevent rotation/toppling. See Occupancy Category II, Dead Load = 9.6 psf a 24-11- 8 16 24-11- s each ply equally. Multi -ply with hangers are SCSI and ANSI/TPI 1. Designed,as Main Wind Force Resisting System CRITICAL MENBFA fGRCES: based on hanger nails using 3.0" nails min. 9 9 PLATING BASED ON GREEN LUMBER VALUES. - Low-rise and Components and Cladding and. 9 7c CONP. OUR. / 7EN5.(WR.) CSI roto the carrying member. 4-PLYI Simpson 6.0" SDS or equivalent Tributary Area 364 sgft -23926 1.15 / 2-3 -23757 1.1S / 0.43 0.38 If shown, use additional fasteners for--------- point screws, staggered (per ND --PER - LOAD CASE DESIGN LOADS ---------------- 3-4 -21117 1.15 / 0.23 loads from the back plysr distributed symm. in: TC- 1 BC- 1 WEBS- 25) L. Dir L.PIf L.Loc R.Loc LL/TL0.61 4-5 -21062 3.15 / 0.23 in the chords, within 12' of hanger flange. loa s may u Webs and chords without tie-in loads may use TC Vert 66.00 0- 0- 0 66.0f 66.00 24-11- 8 0.61 5-6 -26290 1.15 / 6-7 -30894 1.15 / 0.36 0.a7 IF 2.S" GUN NAILS ARE USED, ANY NAIL CLUSTER AMOUNTS SHOWN shall BE INSTALLED FROM THE SDS screws 0 24" o.c. instead, or may use 10d nails G 6" o.c. in layers. BC Vert 14.00 0- 0- 0 .Type... lbs X.Loc 14.00 LL/TL 24-11- 8 0.00 Fastener 7-8 -33990 1.15 / 0.74 FRONT AND BACK FACE EQUALLY(TOTAL NAILS Cluster screws if shown, are 6.0" long. BC Vert 218.0 2-10- 8 0.SO 8C COMP.(DUR.)/ TENS. CSI DOUBLE THE AMOUNT SHOWN), 3 PLY OR LESS. Full height blocking reinforcement required BC Vert 504.0 5- 9- 8 0.SO 9-10 / 22710IDUR, 1.1 10-11 231031.15 0.61 0.62 10d = 10d NAILS, SDS = Simpson SDS screws to prevent buckling of members over Brg 2. BC Vert 790.0 8- 8- 8 0.SO / 11-12 / 227691.15 0.43 or equivalent substitute. Special ConnectionReq. (by Blocking design and attachment are per the Bgilding Designer. BC Vert 1074.0 11- 7- 8 BC Vert 1850.0 14- 6- 8 0.50 0.50 12-13 / 246221.15 13-14 / 293221.15 0.53 0.64 (a) = others) NAIL attern shown is based on: Notdesiynedfor attic stora a unless 914-15 BC Vert 1762.0 17- S- 8 O.SO / 324041.15 1s-16 / 328121.15 0.75 0.81 lOd OX = 0.128" dia. x 3.0" iong nail 10d COMMON 0.148" dia. 3.0" long, h noted otherwise. BC Vert 2038.0 20-'4- 8 BC Vert 2578.0 3- 8 0.50 0.50 = x nail 16d BOX = 0.135" dia. x 3.S" Ion? nail 23- WB COMP.(DUR. / TENS. (OUR.) 2-10 -516(1.153/ CSI 0.02 16d COMMON = 0.162" dia. x 3.5" long nail 2-11 -206(1.15)/ 859(1.15) 3-11 / 1364(1.15) 0.09 0.15 ++++++++++++++++++++++ 3-12 -2802(1.15)/ 0.15 4-12 / 13161(1.15) 0.45 r 12-2 .12-5-12 5-12 -5123(1.15)/ S-13 / 4140(1.15) 6-13 -4528(1.15)/ 0.21 0.46 0.17 1 2 3 4 5 6 7 8 6-14 / 2950(1.15) 7-14 -2885(1.15)/ 0.33 0.11 4.24 7-15 / 1188(1.25) 0.12 4-PLYS REQUIRED R 0-6-4 B1 WA12 R:5509 U:-541 10X10 A2 (3) SDSI (5) SDS v 17 S 790# J 1074# v 1850# 62# 218# J 504# 2038#S 1 (6) SDS 0-h12 2.1 -2.12 2578# Y 0-h12 12-1-0 12-1-0 24-11-8 9 10 11 12 13 14 15 16 TYPICAL PLATE: 3X8 Ali plates am PINE Wave 20 ga., unless preceded H' for Hi 20 Strength positio ned ed as sa. hown aLbove. s are to be Shin gable studlates o avoid overlap with structurald p Ni all false Plates spec 4-11-3 tSHIP I 0.6-4 B2 W:412 R:9355 U:-1005 No. C 72160 cfvl%. �P �OF CAU 12/15/2016 268 - Homewood Tr S "WARN/NGI" READ AND FOLLOWALL NOTES ON THIS DRAWINGI Lust: JABOW)K1 **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. DIR: Dri veJ20581116_L00007_300001 Tnrssee require aareme rare in tabricaft. harming, "pkV, Installing and bracing. Refer to and follow W hint edition of SCSI (BuD*V Component Wil: Drive -M -O S 81116_1-000 Safety Nfa nation, M TPI and PTCA) for eafety practices prior to perfarmhG these NnWiom Imtallere shall provide temporary bracing per BCSL Unless DS gn r : AW #LC = 43 WT/PLY: 2054 Tr noted otherwise, top chord shall have property attached structural aheaihvg and bosom chord shat have a property attached rigid calling. Locations shown have Installed B3. B7 810, bk. Appy face TC Live 20.00 psf Li r L=1.25 P=1.25 lateralwn 21, and of webs shat bracing; per other sect ons or as ell plates to each of tam and for pamtanerd shown Pou�naaafrownam�naandanme.tawoammrePaLrm�a^oo-saahe^r'se. TC Snow(Pf) 55.00 psf owDu SnowDur L=1.15 P=1.15 J Alpine, a dMsbn of ITW Building components Group Inc., shm not be resporside for any deviation from this draw4g, any failure to build the inure In TC Dead 13.00 psf Rep Mbr Bnd / Comp / Tens AN/TWCOMPANY CO"}O1"'a-*m`ANS�I1.orfmharmng.eh�sg•Installaea"6m°angofIrma— A seal on this drawing or cover page lisdng this drawing, Indicates acceptance or processional engineering respons/bilify BC Live .0.00 psf 1.15 / 1.10 / 1.10 2820 N. Graaf sw Pkwy. Grana Prafrfe. Tx 75050 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility or the Building BC Dead 7.00 psf 0 . C .Spacing 2- 0- 0 Designer per ANSTRPI I Sec.2 TRUSPLUS 6.0 VER: T6.5.20 Far more Inlormation see this Job's general rotes page and these web sites ALPINE TPI: AewLtRio2= wren ICC: XmmLtgmajcam Bldg Code: CRC -2013 DEFL RATIO: L/240 TC: 1-/24 Job Name: JABORSKI RESIDENCE Truss ID: J02 . Qty: 2 BRG X -LOC REACT SIZE REQ'D TC 2x6 DFL C2 °O[PM)=PLATE MONITOR USED -See Joint Report- Required bearing widths and bearing areas 1 0- 2-12 139 5.50" .1.SO" BC 2x4 DFL g1 & Btr. - Designedper ANSI/TPI 1-2007 'a 1 when truss not supported in a hanger. - 2 1- 7- 0 108 HGR 1.S0" WEB 2x4 DFL STANDARD Fabrication Tolerance = 20.0% UPLIFT REACTIONS) : BRC HANGER/CLIP NOTE Kcr (creep factor) - 2.00 Bearings designed for an FcPerp value of the Support C&C Wind .Non -Wind ' 2 °TJC37 Refer to Joint QC Detail Sheets for lesser of the truss chord lumber value or 1 -18 lb r Support Connection(s)/Hanger(s) are Cq factors and Rotational Tolerances. 625 for all bearings. 2 -37 lb not designed for horizontal loads. Loaded for 10 PSF non -concurrent BCLL: IRC/IBC truss plate values are based on This truss is designed using the. SEE SIMPSON CATALOG ASCE7-10 SNOW LOAD DESIGN CRITERIA: testing and approval as required by IBC 1703 ASCE7-10 Wind Specification FOR ADDITIONAL INSTALLATION NOTES MAX DEFLECTION (span) Py 79 psf, Ce 0.9, I = 1.0, Ct = 1.10 and AN and are reported in ESR -1118. Bldg Enclosed = Yes, L/999 MEM 2-3 (LIVE) LC PLATING BASED ON GREEN LUMBER VALUES. Shim bearings (if needed) for req. support. Truss Location Not End Zone Exp Category C 0. L= 0.00' D= 0.00" T= 0.00" - Not designed for attic storage unless noted otherwise. - 55.00 psf = Bldg Length 18.00 ft, Bldg Width - 28.00 ft ft, ® loin Locations ® 1 0- 0- 0 4 0- o- o Mean.roof height 9.42 mph = 110 Occupancy Categor II, Dead Load = .9.6 psf 2 1- 5-12 '5 1- 5-12 3 1- 7-12 6 1- 7-1z A�tre, a division of rTw BrdkBrg components Group Inc., shag not be responsible for arty deviation both this drawing, arty failure to build the trios b Designed as Main Ind Force Resisting System CRITICAL KEKB(ER FORCES: - AN 17W COMPANY - Low-rise and Components and Cladding TC COMP.(((WR.33/ i�NS16 .((ouit CSI BC Live � Tributary Area - 3 sqft 1-2 0.01 30(1.60) solely for the design shown. The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 2-3 -19(1.1S)% 0.01 0. C. Spaci ng 2- 0- 0 - - BC CORP.(WR. / TENS. (DLR.) CSI 4-S -1301.603/ 32(1.60) 0.03 5-6 -10((1.603/ 26 1.1S 0.04 -101111-6205 - - 6-0 / 0 1.60 0.00 JDEFL RATIO: L/240 TC: L 24 - 2YB C�lll(l0U,i �46(O1U.60) 0 O1 1. •23 6.00 1 -9 1-4-2 2X4 1 -4 -SHIP 0- -9 1 B2 'TJC37 _3 001 w:108 R:108 1-7-12 V-37 0W 139 r 18 4 56 No. C 72160 t *W 'S' Super �T,9 C1NilrP - AB connector plates ere ALPINE Wave 20 ga., unless preceded by for High Stranpth 20 ga for Strength 18 ga. Plates are to be positioned per Joint Detail Report. Circled plates and teIse trema plates are positioned as shown above. Shift gable stud plates to avoid overlap with structural plates. 268 - Homewood Tr s **WARNING!'* READ AND FOLLOWALL NOTES ON THIS DRAWING! Cust: JABORSKI DIR: DrivejL0581116_L00007_J00001WO C IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. • /\ Trusses ration, Are- care b febrbs hardsr6. spWWia, and Refer to sed follow, the latest adorn of SCSI (Bur ingSC Component Dri ve�L0581116_L000 ' & LC 49 WT/PLY : 10 error it sebracing.Punct Safety Information, W TPI aro N?CA) for satnry practices purr ro pertormtg these functions. installers e1ra0 provide temporary taadrg per SCSI. Unless ate Ds gn r : AW = tY noted otherwise, top chard shall have properly attached structural sheathing and bottom chord shat have a properly attached rlgW cetibg. Locations shown TC Live 20:00 psf Li r L=1.25 P=1.25 ��� _ r� ri I�►�\\V\IJII for p.nord lateral restraint m webs aha, have report mamOW per cher sectionsB3, B7 or B1o, as applicable. Appry ptatm m each face of truss end podtbnasanownabove and onthe JowoetamreporLunkssnoted otherwlse. TC Snow(Pf) 55.00 psf owDu SnowDur L=1.15 P=1.15 A�tre, a division of rTw BrdkBrg components Group Inc., shag not be responsible for arty deviation both this drawing, arty failure to build the trios b TC Dead 13.00 psf Rep Mb r Bnd / Comp / Tens AN 17W COMPANY CO"tonn - with ANSVTPI t, or for handling, shippUU installation & bradrg of trusses A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Creat SWPAwy. Grand Prairie, 7X 75050 solely for the design shown. The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSLIPII Sec.2 TRUSPLUS 6.0 VER: T6.5.20 For more Information we this job's general rates page and these web sites: ALPINE TPI: ymnWnst,m wren ICC: momkouita= Bldg Code: CRC -2013 JDEFL RATIO: L/240 TC: L 24 Job Name: JABORSKI RESIDENCE Truss ID: J04 Qty: 2 BRG X -LOC REACT SIZE REQ D.. TC 2x6 DFL S2 Designed per ANSI/TPI 1-2007 Required bearing widths and bearing areas 1 0- 2-12 287 S.so" 1.50" BC 2x4 DFL #1 6 Btr. Fab n cation Tolerance = 20.0% appl when truss not supported in a hanger. 2 3- 7- 0 260 HGR 1.50", BRG HANGER/CLIP NOTE WEB" 2x4 DFL STANDARD Kcr factor) Bearings designed for an FcPerp value of the lesser lumber UPLIFT REACTIQN(S) Support CdC Wind Non " 2 °TIC37 (creep - 2.00 Refer to 3oint QC Detail Sheets for of the truss chord value or 625 for all bearings. -Wind i - -46 lb - Support Connection(s)(Hanger(s) are Cq factors and Rotational Tolerances. IRC/IBC truss plate values are basedon2 -78 lb ' not desiggned for hon z0ntal loads, SEE SIMPSON CATALOG Loaded for 10 PSF non -concurrent BCLL. testing and approval as required by IBC 1703 This truss is designed using the FOR ADDITIONAL INSTALLATION NOTES MAX DEFLECTION (span) ASCE7-10 SNOW LOAD DESIGN CRITERIA: Pg 79 psf, Ce = 0.9, I - 1.0, Ct = 1.10 and AN and are reported in ESR -1118. Shim bearings (if heeded) for req support. ASCE7-10 Wind Spec fication Bldg Enclosed - Yes, L/999 MEM 4-S (LIVE) LC 47 Not designed for attic,storage unless PLATING BASED OW GREEN LUMBER VALUES. Truss Location Not End Zone '"Exp L= -0.01' D= -0.01' T- -0.02" ' noted otherwise. Category = C Bldg Length = 18.00 ft, Bldg Width = 28.00 ft Joint Locations ® i o- o- o a O- 0- o Mean roof height = 9.92 ft mph 110 toad 2 3- S-10 5 3- 5-12 2X4 0 9 Occupancy Category II, Dead = 9.6 psf 3 3- 7-12 6 3- 7-12 - Designed as Main Wind Force Resisting System CRITICAL MEMBER FORCES: 82 - -- - Low-rise and Components and Cladding TC COMP. (oils.)/ 7ER5. (OBR.) CSI Tributary Area = 7 sqft 1-2 _71(1.15)/ 93(1.153 0.13 2-3 19 1.15 / 0(1.25 0.01 JC37 11 BC COMP.(DUR. / TE1%j? R. CSI _ B1T. 4-5 83(1.603 0.11 - p(tO IQti� _32(1.603/ 5-6 20 1.so / 63 1.153 0.09 6-0 -1 1.2S / 0 1,60 0.D0 W:508 2M5-250(O1U. 15)% " 92(1.60) 0,03 • 1 3 00 F6.00 c _ 1.5X3 . 2- �-2 2-4-2 SHIP r 2X4 6 2X4 0 9 G 82 1 JC37 11 _ B1T. W:108 U. a 09 p(tO IQti� • W:508 8:287 J U:-46 I 3-7-12 4 6 No. C 72160 OF All y g Strength ga gth 1p 8 gall Plates are to be positioned gper Joint Detail Circled pplates and false frame plates Super Streconnector are positioned as shown above. Shit gable stud plates to avoid overlap with structural plates.'12/15/2016 268 - Homewood Truss **WARNING!*' READ AND FOLLOW ALL NOTES ON THIS DRAWINGI "IMPORTANT" Cust : JABORSKI DIR: (C) FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. ^ 7rusaea require eWema care N tabdcatinp, haMGrg, aNppbg, Installing and bracb4 Refer to and follow the latest edition of BCSI (Buddhg Componerrt functions. Installers temporary bracing SCSI. Unless rive WO: D rl V e��O Dsg n r : AW 5811116_000007_]00001 SB1116_L000 #LC = 49 WT/PLY : 20 re Safety Informatlon, by TPI and WTCA) for safety practices prior to perfomJng these shall provide per noted ethenw .top chord shall have properly attached structural sheathing and bottom chord Mal have a property asa hed rigid coiling. Locations shown TC Live 20.00 psf L, Dur L=1. 2 5 P=1. 2 5 ^ � D r� r7 IU^\\V�lJll for permaned latennl reatreW of webs Mal nave bracing rdese, d per other aectbm 89. 67 or e+o, as app�lkabb. Apply plates to each face of trues and poaaion m etmwn ebwe and on Inc clow oetaRt mpo4 rmtrss noted otnenwe. TC S now(Pf) 55.00 psf SnowDu r L=1.15 P=1.15 o L�/UI Alpine, a c"iun of rr Buftarg Componersa Group Inc., Mag not be resporsiDb for any deviation from this dravMg, any fallure to build the truss In TC Dead 13.00 psf Rep Mb r Bnd / Comp / Tens AN ITW COPAPANY conforman ca with ANSUTPI 1, or for hardWU shlpphng, hntabdon a bree g of biases. A seal on this drawing or coverpage listing this drawing, Indicates acceptance o1 professional engineering responsiblrlfy BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great s W PRnry. C -.d P. d,#% TX 7SOW solely for the design shown The suitability and use o1 this draw6lg for any structure is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer perANSUTPI t Sec.2 TRUSPLUS 6.0 VER: T6.$.20 For rnoretill°iiiadonsee Ws)ob�sgeneral notes papeand these "ebat=: ALPINE* �gy,R)OjOrjppLfBm; TPF: WMA: tip Wrod{m .om: ICC: www l=ate aro Blit Code: g CRC -2013 DEFL RATIO: 0/240 7C: 0/24 Job Name: JABORSKI RESIDENCE Truss ID: J06 Qty: 2 BRG X -LOC REAR SIZE REQ'D TC 2x6 DFL #2 Designed per ANSI/TPI 1-2007 Required bearing widths and bearing areas 1 0- 2-12 437 S. SO" 1.50" BC 2x4 DFL t1 & Btr. Fab n cation Tolerance = 20.0% app/ when truss not supported in a hanger. 2 5- 7- 0 410 HER 1.S0" WEB 2x4 DFL STANDARD Bearings designed for an FcPerp value of the UPLIFT REACTION(S) : BRG HANGER/CLIP NOTE Kcr (creep factor) = 2.00 lesser of the truss chord lumber value or - Support C&C Wind Non -Wind + 2 SUR24 Refer to Joint QC Detail Sheets for 625 for all bearings. ." 1 -74 lb Support Connection(Hanger(are Cq factors and Rotational Tolerances. IRC/IBC truss plate values -are based on 2 -118 lb not designed for horizontal loads. SEE SIMPSON CATALOG Loaded for SO PSF non -concurrent BCLL. - testingg and approval as required by IBC 1703 ASCE7-10 SNOW LOAD DESIGN CRITERIA: ANSI/T.PI in HORIZONTAL REACTIONS)) FOR ADDITIONAL INSTALLATION NOTES and and • are reported ESR -1118. support 1 124 lb• MAX DEFLECTION (s an) Pg = 79 psf, Ce = 0.9, I = 1.0, Ct 1.10 Shim bearings (if needed) for req. support. This truss is designed using the PLATING BASED ON GREEN LUMBER VALUES. support 2 124 lb L/999 MEM 1-2 (LIVE) LC 47 L= -0.01' D= -0.01" T= -0.02" ASCE7-10 Wind Specification Not designed for attic storage unless .Bldg Enclosed = Yes, - - noted otherwise. Joint Locations ® Truss Location Not End Zone i o- o- 0 5 0- o- o 2 3- 9- 0 6 3- 9- 0 Exp Category = C 3 5- 5-12 7 S- 5-12 Bldg Length = 18.00 ft, Bldg Width 28.00 ft 9 4 5- 7-12 a s- 7-1z Mean roof height = 10.42 ft, mph 110 - CRITICAL KEKBER FORCES: .Occupancy Category II, Dead Load = 9.6 psf 7C COKP. WR. / TENS. WR. CSI Designed as Main Wind Force Resisting System 1-2 -607 1.15 / 79 1.60 0.11 2-3 -63 1.15 / 28 1.15 0.059 - Law -rise and Components and Clad d1O " 3-4 -19 1.1s / 0 0.90 0.01 Tributary Area = 11 sgft - BC CWIP. DU0.. / TENS. DU0.. CSI S-6 -158 1.60 / 480 1.15)) 0.08 6-7 -150 1.60 / 451 1.15) o.22 - 7-8 -29 1.60 / 99 1.153 0.18 ` 8-0 -1 1.25 / 0 1.15 0.00 MB COMP. OUR. / TENS.(OUR. CSI 2-6 -6(1.603/ 123(1.253 O.OS ' 2-7 -514 1.15 / 169 1.60 0.07 _ 3-7 -105 1.15 / 28 1.60 0.01 1 2 8 1:5X3 - 2.5X4 2-0-9 3-4-2 SHIP e 2.5X4 , 2X4 1.5X3 1 _19 • jl 0-66-4 J • B1 WURS24 :18 RAID 3.0W C7FSI U:-118 508 RA37 R:437 U:-74 • 5.7-12 . J s 6 9 No. C 72160 clvly �P • �OF CAU Super AB connector plates are ALPINE Wave 20 ga., unless preceded by'H' for Hi h Strength 20 game Strength 18 ga. Plates are to be pos8lonted per Joint Detail RepoX CucIN plgatas end false frame plates =overlap 12/ 15/.2016 are positioned as shown above. Shia gable stud plates to with structural plates. 268 - Homewood Trus "WARNING]'" READ AND FOLLOWALL NOTES ON THIS DRAW/NGI "IMPORTANT" Cust: JABORSKI DIR: Dri ve-YL0581116_L00007_J00001 (G4T FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. Trusses require extreme care in tafxkathg, hanaM. sh0pkng. Instamng and bracing. Refer to and follow the latest edition of SCSI (Bunds g Component W0: Drive -M-05811.16-1-000 Safety Information, by TPI and WTCA) for safety practices prior to perform6g these functions. Installers shall provide temporary bracing per SCSI. Unless Ds gn r : AW ALC = 49 WT/PLY : 354 n, noted otherwise. top chord shall nave properly attached structural sheathirg and bottom chord shall haw a property attschad rigid "ft. I.-."- at.- tau TC Live 20.00 psf f Li ve Du r L=1.25 P=1.25 ��O O r� rt IF for of trues and pion as sh lateral rve and of webs shat haw reportrdessInstalled par SCSI senlloro Bit, 87 or 810, as app8casb. Apply plates to each positlonmahownasweeMonthe JoWDetaibrepo4unleasnoted otherwfx. TC Snow(Pf) 55.00 psf SnowDur L=1.15 P=1.15 IlLllr�\\\VIJII Aline, a dNbbn of IiW &ds9np Components crap Mc, ensu net be responsible for any devmttlon from the dravMp, any (allure fa Gnilo the thus N . TC Dead 13.00 psf Rep Mb r B nd / Comp / Tens AN FFW COMPANY c°nt°n"°"c° with ANSVTPI 1, or far haMbg, shipptrg, Installation & bracing of tn- A seal on this drawing or cover page listing this drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. cow SW Pkwy. Grand Prams, 7X 75050 solely for the design shown The suitability and use of this drawing for any structure Is the responsibility of the Building BC Dead 7.00 psf 0. C .Spacing 2- 0- 0 Designer perANSYTPl f Sec.2 TRUS PLUS 6.0 VER: T6. 5.20 For more Information see this Jobb general notes page and these web sites: Blit Code: CRC -2013 g DEFL RATIO: 1-/240 TC: 1-/24 I ALPINE ' TPI: ' WfCA: ' CC: Job Name: JABORSKI RESIDENCE Truss ID: J08 Qty: 2 BRG 'X -LOC REACT SIZE REQ D,. TC 2x6 DFL #2.' Designed per ANSI/TPI 1-2007 _ Required bearing widths and bearing areas 1 0- 2-12 586 5.50" 1.50" BC 2x4 DFL &1 b Btr. 'Fab n cation Tolerance = '20.0% appl when truss not supported in a hanger. 2 7- 7- 0 560 HGR 1.50" WEB 2x4 DFL STANDARD Bearings designed for an FcPerc value of the UPLIFT REACTION(S) : - BRG HANGER/CLIP NOTE Kcr (creep.factor) = 2.00 lesser of the truss chord lumber value or Support C&C Wind Non -Wind •' 2 °SUR26 Refer to Joint QC Detail Sheets for 625 for all bearings. 1 -84 lb Support Connection(s)/Hanger(s) are Cq factors and Rotational Tolerances. IRC/IBC truss plate values are based on 2 -143 lb a not designed for horizontal loads. Loaded for 10 PSF non -concurrent BCLL. SEE SIMPSON CATALOG testingg and approval as required by IBC 1703 HORIZONTAL REACTION(S) ASCE7-10 SNOW LOAD DESIGN CRITERIA: FOR ADDITIONAL INSTALLATION NOTES Pg n 79 psf, Ce ,= 0.9, I = 1.0, Ct a 1.10 MAX DEFLECTION (span) : and AN and are reported in ESR -1118. Shim bearings (if needed) for req support. support 1 157 b support 2 1S7 lb .This truss is designed using the - - PLATING BASED ON GREEN LUMBER VALUES. o.01 L/999 MEN 1-2 (LIVE) LC 47 ASCE7-10 Wind Specification Not designed for attic storage unless .COMP. (((DUR. / TENS.(DUR.) L= -0.03' D= -0.02" T= -0.04" Bldg Enclosed = Yes, noted otherwise. ' ® Joint Locations ® Truss Location Not End Zone 1 0- o- 0 5 0- o- o Exp Category = C ' 2 3 4- 9- 0 6 4- 9- 0 7- 5-12 7 7- 5-1z- are positioned as shown above. Shift gable stud plates to avoid overlap with structural plates. Bldg Length 18.00 ft, Bldg Width,= 28.00 ft 4 7- 7-12 8 7- 7-12 Mean roof height a 10.92 ft, mph 110 CRITICAL MEMBER FORCES: FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. Occupancy Category II, Dead Load 9.6 psf TC CpIP. DUR. / TEAK. dirt. CSI Designed as Main Wind Force Resisting System - 1 -2 2-3 -976 1.15 / 118 1.60 -97 1.15 / 54 1.15 0.18 0.10 - Low-rise and Components and Cladding 9 3-4 -19 1.15 / 0 1.1s o.01 Tributary Area 15 sgft BC .COMP. (((DUR. / TENS.(DUR.) CSI 5-6 -223(1.603/ 794(1.15) 0.14 e3. BT an Btg, as applicable. Appy plow co each race of truss and anew tale al resvaim of webs shag nave rbrabVeport s�sed per Sher otherwise. posiBonasshownabove-onthe wmtDafaBsreparLunless rofeeon,en�e. 6-7 -z17 1.60 / .765 1,1S 0.33 7-8 35 1.60 / 136 1.15 0.25 *0.00 8-0 1 1.25 / 0 1.60 TC Dead 13.00 psf ' . Cd1P. (DUR.)/ TENS. d1R. CSI BC Live 0.00 psf 2-6 / 158 1.25 0.06 3-7 247 Designer per ANSMI1 Seat -162(1.15)/ 1.60 0.02 i For mare Information see this lob's general rotes page and these web sdes: ALPINE TPI: Wycn wwws Indus"am lcc: Bldg Code: CRC -2013 IDEFL RATIO: L/240 TC: L/24 r6.00 1.5X3 2.5X4 2-4 ;-9 4-4-2 JSHIP 2.5X4' " 2.5X4 1.5X3 1-9-9 0-6-4 SUR26 VV:108 W:508 3.00I U: 143 R:586 U:-84 7-7-12 t 5 6 81 t ^ K OFMS1 Fy T. rq,�,, 414NO.0 72160 q�OF� 'for for Ali connector plates are ALPINE Wave 20 ga., unless preceded Dy'W for High Strength 20 fram'S' Strength 18 ga. Plates are to be positioned per Joint Detail Repoft Circled plates and false frame 12/15/2 016 are positioned as shown above. Shift gable stud plates to avoid overlap with structural plates. 268 - Homewood Tr S WARNING[** READ AND FOLLOW ALL NOTES ON THIS DRAWING! ''`IMPORTANT*" Cust: 7ABORSKI DIR: Dri v FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. �pL0581116_L00007�00001 Trussesregwra ememe care in tabdwurg, handling, anippirg, iosmmro and bracing. Refer to and follow the latest edition of SCSI (Building Component WO: D ri ve A 0581116_1-000 4LC 49 VT/PLY: 47 safety Information, by TPI and WTCA) for safety practices prior to performing these functions. Installers shall prwide temporary bracing per BCSL Unless Dsg n r : AW - ry mted .,W-. top chord - have properly attached structural sheathing and bottom chord shall have a properly attached rigid calling. Locations shown TC Live 20.00 psf Li veDu r L-1.25 P=1.25 e3. BT an Btg, as applicable. Appy plow co each race of truss and anew tale al resvaim of webs shag nave rbrabVeport s�sed per Sher otherwise. posiBonasshownabove-onthe wmtDafaBsreparLunless rofeeon,en�e. TC 5now(Pf) 55.00 psf P=1.15 Alpine, a dhisbn al I TW Bulkfi g Camponenm Group Inc., shall not be responsible far any devWWn from this drawing. any failure to build the truss In TC Dead 13.00 psf Rep Mb r Bell /Comp /Ten s RepSnowDur ell / C AN fTW C08tPANY conformance wnh ANSVTPI 1, or for hanasrg, shlppirg, InstzBzUon 8 bracing of trusses. A seal on this drawling or cover page listing this drawing, Indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Great SWPhry. Grand Pral'i% TX TWW solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building BC Dead 7.00 psf 0. C. Spaci ng 2- 0- 0 Designer per ANSMI1 Seat TRUSPLUS 6.0 VER: T6.S.20 For mare Information see this lob's general rotes page and these web sdes: ALPINE TPI: Wycn wwws Indus"am lcc: Bldg Code: CRC -2013 IDEFL RATIO: L/240 TC: L/24 Job Name: JABORSKI RESIDENCE BRG ' X -LOC REACT SIZE REQ'D TC 2x6 DFL #2 1 N/A BC 2x4 DFL #1 6 Btr. 2 3- 9-12 499 1.50" 1.50" WEB 2x4 DFL •STANDARD 3 3- 9-12 83 HGR 1.S0" Kcr (creepp factor) - 2.00 BRG HANGER/CLIP . NOTE Refer to ]dint QC Detail Sheets for 3 LUS26. Cq factors and Rotational Tolerances. Support Connection(s)/Hanger(s) are Loaded for 10 PS non-concurrent BCLL. not designed for horizontal loads. ASCE7-10 SNOW LOAD DESIGN CRITERIA: SEE SIMPSON CATALOG Py e 79 psf, Ce - 0.9, I - 1.0, Ct 1.10. FOR ADDITIONAL INSTALLATION NOTES Pm a 20 psf MAX DEFLECTION (span) : PLATING BASED ON GREEN LUMBER VALUES. L/890 MEM 3-4 (LIVE) LC S4 Not designed for attic storage unless L- -0.05" D= 0.00" T- -0.05" noted otherwise. EX.WB DEF CRITERIA:L/120 IN MEM 4- 2; T- 0.00" Joint Locations 2 3-10- B 4 3-10- 8 CRITICAL MEMBER FORCES: TC COMP. OUR. / TENS. OUR. CSI 1-2 -279 1.603/ 1121((1.153 0.38 2-0 -304 1.603/ 1121 Ell 3 0.19 0-0 -1 1.15 / 1(1.60 0.00 BC COMP. OUR.)/ '261. OUR.) CSI 3-4 -1034 1.153/ 263(1.603 0.17 4-0 -1034 1.15 / 2S1 1.60 0.03 0.0 / (( )) 0.80 2-4 _89(1W.60)/ '61(01%2 02 E Truss ID: M03 Designed per ANSI/TPI 1-2007 Fabrication Tolerance - 20.0% Bearingsdesigned for an FcPerp value of the. lesser of the truss chord lumber value or 62S for all bearings. IRC/IBC truss plate values are based on testingy and approval as required by IBC 1703 and ANSI/TPI and are reported in ESR -1118. Mark all interior bearing locations. Install interior support(s) before erection. Shim bearings (if needed) for req. support. + + + + + + + + + + + + + + + + + + + + + + THIS TRUSS HAS BEEN DESIGNED WITH PINNED SUPPORTS AS INDICATED BY THE HORIZONTAL REACTIONS. THE SUPPORTING STRUCTURE SHALL BE DESIGNED TO ACCOMMODATE THE VERTICAL AND HORIZONTAL REACTIONS SHOWN. THE BUILDING DESIGNER IS RESPONSIBLE FOR THE CONNECTIONS AND ADEQUATE DESIGN OF THE STRUCTURE. + + + + + + + + + + + + + + + + + + + + + +. 3.00 2 B2 W:108 R:499 U:-161 Qty: 42 Rpegqpuiired bearing widths and bearing areas UPLIVIrenCTION�truss not supported in a hanger. Support C& -161 Wind Non-Wind lb , HORIZONTAL REACTION(S) support 2 1034 1b support 3 -1034 lb This truss is designed using the ASCE7-10 Wind Specification Bldg Enclosed - Yes, Truss Location Not End Zone Exp Category = C Bldg Length T 18.00 ft, Bldg Width 28.00 ft Mean roof height a 9.49 ft, mph 110 Occupancy Category II, Dead Load a 9.6 psf Designed as Main Wind Force Resisting System - Low-rise and Components and Cladding Tributary Area - 8 sgft Vertical members exposed to wind: 4- 2 T. B3 3-104 LUS26 3 4 W:108 R:83 U:-29 No. C 72160 AD *H* �OF �V connector plates are ALPINE Wave 20 ga., un ess preceded by for High Siren Oth 20 ga., S' for Super Strength 18 ga. Plates are to be positioned Joint Detail Report Circled false frame per plates and plates are positioned as shown above. Shift gable stud plates to avoid overlap Will structural plates. 268 - Homewood Tr S (X WARNINGI** READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT"* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS. Cust: JABORSKI DIR: Drive-M-0581116_L00007_JO0001 Tnmsaa require eodreme are In fabricating. Iwdliig, d0pvtg, Instamrg and bracing. Refer to aM follow the latest edition of SCSI (BuWbV Component W0: Drive -M05811161-000 as" InformaboR by TPI and WrCA) for safety practices prior to perfomnbg these functions, tmtelens aha0 provide temporary braWa per SCSI. Unlet Dsgn r: AW #LC = 59 VT/PLY: 2 041 >v noted otherwise, top chord shati have properly attached structural sheatNng and bottom chord shat have a property aftachW ripk ce ft. Locations shown �r-�� d �ILII��-- r� n �Uj\\\J� for P.Mam ra lateral restraint of webs shall have bracing; bnta0ed pm BCSI sections B3, B7 or B10, as applicable. Apply plates o each face of tons and pwiflon as shown ebwe and on tM Joint Deole report unless noted otherwhe. TC Live TC SnOW (Pf) 20.00 psf 5 5.00 Li veDu r L-1.25 P=1.25 SnowDu r L=1.15 P=1.15 AN /TINCOMPANY Alpha, a mvhmn of IiW Suipinp Components Group Inc, arae not be responsible ton any deviation from this drawing, arty failure to build the fora. H condormareewith ANSVTPll,offor handling, shipaM.Instailatlonabraatrgoftrusaea. TC Dead psf 13.00 psf Rep Mbr Bind /"Comp / Tens A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility BC Live 0.00 psf 1.15 / 1.10 / 1.10 2820 N. Gaeaf S W Pkwy. Grand Pratrfq TX 75050 solely for the design shown. The suitability and use of fila drawing for any structure Is fire responsibility of the Building, BC Dead 7.00 0. C. S i ng 2- 0- 0 Designer per ANSYMII Sec.2 psf pac TRUSPLUS 6.0 VER' T6.5.20 For more information see thisjobs general rotes page and these web ekes: ALPINE: TPI: WTCA [rC: Bldg Code: CRC -2013 IDEFL RATIO: L/240 TC: L/24