Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B16-1739 000-000-000
t, BUILDING ENERGY ANALYSIS REPORT PROJECT: Lundberg Farms 5370 Church St. Richvale, CA 95974 , Project Designer: Todd Jersey Architecht 1321 8th St. Suite #2 Berkeley, CA 94710 510.845.7296 Report Prepared by: McClelland Air Conditioning, Inc. 801 Marauder St. Chico, CA 95973 530.891.6202 �- Sig v - PERMIT # _ l ? 3'I BU RE C+QIJRJii' 4&�JlAPMENT SERVICES REVIEWED FOR CODE COMPLIANCE BY 4! Job Number: 10-1553 Date: 11/16/2010 The EnergyPro computer program has been used to perform the calculations summarized in' this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. } This program developed by EnergySoft, LLC — www.energysoft.com. v EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:0 ID: 10-1553 , \ , 'A U� PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF -1C Project Name Date Lundberg Farms 11/16/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 5370 Church St. Richvale CA Climate Zone 11 28,661 n/a :GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates 'Phase of Construction: 0 New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and cgrnpletf Documentation Author Name U'I ��'L Signature &44— � ��Vl Company McClelland Air Conditioning, Inc. Date 1 /'1612010 Address 801 Marauder St. Phone 530.891.6202 City/State/Zip Chico, CA 95973 The Principal Designer hereby certifies that the proposed building design represented in this set of :construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with 'any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please .,check one: 'ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this. document as the person responsible for its preparation; and that I am a licensed contractor performing this work. affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Todd Jersey Signature Company Todd Jersey Architecht Date Address 1321 8th St. Suite #2 License # City/State/Zip Berkeley, CA 94710 Phone 510.345.7296 :Principal Mechanical Designer Signature ,Name Lance Whittaker Company McClelland Air Conditioning, Inc. Date Address 801 Marauder St. License # City/State/Zip Chico, CA 95973 FEHMIT Phone Principal Lighting Designer S Name Signature Company Agri Electric Address 11011 Midway L City/State/Zip Chico, CA 95928 Phone 530.342.4203 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS. (check box if worksheets are included) m ENV -1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. m LTG -1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG -3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. Energ Pro 5.0 by Energ Soft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 3 of 100 r PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3) PERF -1 C Project Name Date Lundberg Farms 1111612010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 5370 Church St Richvale CA Climate Zone 11 28,661 n1a GENERAL INFORMATION Building Type.: ® Nonresidential ❑ High -Rise Residential ❑ HoteVMotel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ® New Construction 0 Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies onlyto a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete, DoctUnentation : uthor Name 1 ((��/. ([ r✓ Signature �� Compa . McClelland Air Conditioning, Inc. Date 1 I 010 Address 801 Marauder St. Phone 530.891.6202 City/Stateop Chico, CA 95973 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets; with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. ' hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ . 13 O sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that.1 am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ 11 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor perfo.rmirlgthis work. affirm that I am eligible under Division 3 of the Business and. Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Todd Jersey Signature Company Todd Jersey Archilecht Date 1.7 U Address 1321 8th St. Suite #2 License 4 3 City/State/Zip Berkeley, CA 94710 Phone 510.345.7296 Principal Mechanical Designer Name Lance Whittaker Signature"'/ Company McClelland Air Conditioning, Inc. Da e Address 801 Marauder St. License -0 City/State/Trp Chico, CA 95973 Phone- 530.691.6202 Principal Lighting Designer .Name Signature Company Agri Electric Date Address 11011 Midway License # City/Stala/Zip Chico CA 95928 Phone 530.342.4203 INSTRUCTIONS TO APPLICANT COMPLIANCE &:WORKSHEETS (check box If worksheets are included) m ENV -1C Certificate of Compliance. Required on plans. 0 MECH-1 C Certificate of Compliance. Required on plans. m LTG -1C Certificate of Compliance_ Required on plans. m MECH-2C PERIdtF7Uffatar_aide/Service Hot Water & Pool Requirements D LTG -2C Lighting Controls Credit Worksheet. m MECH-3C Mech9klti I&IM HVII!IJ h VENT SERVICES ❑ LTG -3C Indoor Ughting Power Allowance. m MECH-5C Mechanl 1173 Ene7g_yPro5.0;y7Ener9ySoff User Number. 7870 RunCode: 2010.1 f-18710.5 i A . ,,,,Page 3 of 100 - DATE By ` � ` , . � 118.96 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF -1 C Project Name —FD—ate Lundberg Farms 11111612010 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Standard Proposed Compliance Energy Component Design Design Mar-qin Space Heating � -Space Cooling Indoor Fans _ Heat Rejection Pumps &Misc. ' -Domestic Hot Water � .Lighting ` Receptacle ' Process Process Lighting U' ' '~'~^~ HeaUng Cooling . Fans � Heat Rej Pumps � OHVV UQhUnQ Receptacle Process ' PnooeuoLto Percent better than Standard 5.3 % 5.3 % excluding process) BUILDING. COMPLIES �GENERAL INFORMATION. � Building Orientation (E) 90 deg Conditioned Floor Area 28,661 Number of Stories I Unconditioned Floor Area 0 sqft. ' :Number of Systems 18 Conditioned'Footprint Area 28,908 sqft. ..'Number of Zones 18 Natural Gas Available On Site' Yes � ` o` ' ^°e.mvv' c*wuu~a Glazmo*rea Front Elevation - Left Elevation ' Rear Elevation Right Elevation Tota �Roof 118.96 89.21 29.76 41.08 40.74 0.34 19,7221 Lighting Power Density 31,124 .1.014 ._Prescriptive Envelope TDV Energy 972,546 18 70.29 68.97 1.31 72.52 72.52 0.00 335.0 318.19 17.78 HeaUng Cooling . Fans � Heat Rej Pumps � OHVV UQhUnQ Receptacle Process ' PnooeuoLto Percent better than Standard 5.3 % 5.3 % excluding process) BUILDING. COMPLIES �GENERAL INFORMATION. � Building Orientation (E) 90 deg Conditioned Floor Area 28,661 Number of Stories I Unconditioned Floor Area 0 sqft. ' :Number of Systems 18 Conditioned'Footprint Area 28,908 sqft. ..'Number of Zones 18 Natural Gas Available On Site' Yes � ` o` ' ^°e.mvv' c*wuu~a Glazmo*rea Front Elevation - Left Elevation ' Rear Elevation Right Elevation Tota �Roof - oqM nqu ` oqft. eqft.� sqft. - oqft. ' �oqft. �soft. sqft. M 3,495 Standard - Proposed - 19,7221 Lighting Power Density 31,124 - oqM nqu ` oqft. eqft.� sqft. - oqft. ' �oqft. �soft. sqft. Standard - Proposed - Lighting Power Density 1.035 .1.014 ._Prescriptive Envelope TDV Energy 972,546 18 PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEW ED OR Olvi PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name Lundberg Farms Date 11111612010 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads System Name Zone Name Occupancy Type s ft. W/sf ' /sf z W/sf 3 W/sf 4 W/sf .Multi -Aqua MHWW-09-H-01 FC -1,2,4,5 Office <= 250 sgft 546 0.000 Multi -Aqua MHNCCW-04-01 FC -3 Office > 250 sgft 137 *0.900 Multi -Aqua MHWW-09-H-01 FC -6,7, 8 Office > 250 sgft 442 *0.900 Multi -Aqua MHWW-I8-H-01 FC -9 **Conference Rooms 390 *1.200 1 -Multi-Aqua MHWW-I8-H-01 FC -10 Convention/Conference/Me 306 *1.400 Multi -Aqua MHWW-09-H-01 FC -11,12 Office > 250 sgft 867 *0.900 Multi -Aqua MHNCCW-04-01 FC -13 Convention/Conference/Me 867 *1.400 Multi -Aqua MHWW-09-H-01 FC -14,15,16 Office > 250 sgft 937 *0.900 Multi -Aqua MHWW-I8-H-01 FC -17 Office > 250 sgft 512 *0.900 Multi -Aqua MHWW-09-H-01 FC -18,19,20 Office > 250 sgft 525 *0.900 Multi -Aqua MHWW-09-H-01 FC -21 Office > 250 sgft 215 *0.900 Multi -Aqua MHWW-I8-H-01 FC -22,23 Electrical, Mechanical Room 488 *0.700 AH -1 AH -1 Lounge, Recreation 1,961 *1.100 AH -2 AH -2 Office > 250 sgft 2,224 *0.900 AH -3 AH -3 Auditorium 3,180 *1.500 AH -4 AH -4 Office > 250 sgft 12,790 *0.900 AH -5 AH -5 Convention/Conference/Me 918 *1.400 AH -6 . AH -6 **Conference Rooms 1,357 *1.200 Notes: 1. See LTG -1 C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C Items above require special documentation items marked with asterisk, see LTG -1 -C b others b others .EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the Items specified in this checklist. These Items require special written ,'justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the • s ecial justification and documentation submitted. This project includes Thermal Energy Storage as shown on the MECH-2-C-TES. A MECH-I5-A must be submitted upon completion. The HVAC System Multi -Aqua MHWW-09-H-01 A Premium Efficiency 0.02 BHP Supply Fan Motor has been specified. The HVAC System Multi -Aqua MHNCCW04-01 A Premium Efficiency 0.13 BHP Supply Fan Motor has been specified. The HVAC System Multi -Aqua MHWW-I8-H-01 A Premium Efficiency 0.05 BHP Supply Fan Motor has been specified. The HVAC System Trane MCCB-06 AH -1 A Premium Efficiency 1.00 BHP Supply Fan Motor has been specified. The HVAC System Trane MCCB-08 AH -2 A Premium Efficiency 1.00 BHP Supply Fan Motor has been specified. .The HVAC System Trane MCCB-12 AH -3 A Premium Efficiency 2.00 BHP Supply Fan Motor has been specified. :The HVAC System Trane MCCB-21 AH -4 A Premium Efficiency 3.00 BHP Supply Fan Motor has been specified. The HVAC System Trane MCCB-03 AH -5 A Premium Efficiency 0.33 BHP Supply Fan Motor has been specified. The HVAC System Trane MCCB-03 AH -6 A Premium Efficiency 0.33 BHP Supply Fan Motor has been specified. '*Denotes an OSHPD Healthcare (I Occupancy) in the list of spaces above, which is NOT regifiL%ii TTE COUNTY DEVELOPMENT SERVICES .The exceptional features listed in this performance approach application have specifically b d: 4d u n18r�nd -documentation for their use have been provided by the applicant. DATE f V �� BY Authorized Signature or Stamp Ener Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page -5 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: fel . Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space a 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: 0 New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembt T ez 10 d a A N acini O z '° 4 M �'° > 0 M ° y� x M w> ° -`� x 7 w u. o 'a"' !a �> `o _' 'a'' 7 5 u_ c CD ca 6 a � a 7 O c:° 0 ra y A a A u 1 Slab 137 (N) 0.730 None 4.4.7 Al New ❑ ❑ 2 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 3 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 4 Slab 137 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 5 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 6 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 7 Slab 137 (N) 0.730 None 4.4.7 Al New ❑ ❑ 8 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 a C °3 � N w O Z 0 o; R 4 2> " 8 v LL o > N = is ^ M °C 02 = o U) vi -E > O y v« o ct a if 1 Window 18 (S) 0.770 Detaultl 0.390 COG ® New ❑ ❑ 2 Window 18 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 3 Window 18 (S) 0.770 Default 0.390 COG fa New ❑ ❑ 4 Window 18 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 5 Wndow 18 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 6 Window 18 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 7 Window 18 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 8 Wndow 18 (S) 0.770 Default 0 COG ® New ❑ ❑ -12 U i Ern- 13 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PQP AL�I ' CE 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to come i EnergyPro 5.0 by EneipySoft User Number. 7870 Runcode: 2010-11-16T10:54: -559 iJ CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Lundberg Farms 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRledg. locatable Public School 0 Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type C 3 Vj o z V u. j � :> c� ac O 0 x�a w> O I x0 w a °=To __ > °=� 5 a x oa a c O N OCL C t� N a — ti 9 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 10 Slab 137 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 11 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 12 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 13 Slab 137 (N) 0.730 None 4.4.7A1 New ❑ ❑ 14 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 15 Roof 146 (S)l 0.061 R-301 I 14.2.5-A35 New ❑ ❑ 16 Slab 150 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type' ¢ c C� ;a U1 cu " w O Z m ii 2> m C7 m S U ii o M z 'O > u) ME O rn A t > O 0 e v 3 02 00 m a — ti 9 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 10 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 11 Window 18 (S) 0.770 Default 0.390 COG m New ❑ ❑ 12 Window 36 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 13 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 14 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 15 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 16 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ PER AIT # ❑ ❑ ❑ ❑ ❑ ELOP EN S RVICESA =D-PnR 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropria ti rO t1"R'k&.V1Pssary. Ener Pro 5.0 by Ener Soft User Number. 7870 RunCode: 2 1-16T10:54:07 ID: 10-1553 pX Page 7 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School m Conditioned Spaces 13 Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly T ez Q LD W O z 0 W U. °' .5 7 l0 ? v o: C « x 2 w> ° Ol « x 7 w LL C 7 2 m 5> C v r-- LL v C z G -, a C U to N a = U. 17 Wall 132 (S) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 18 Roof 160 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 19 Slab 143 (N) 0.730 None 4.4.7A1 New ❑ ❑ 20 Wall 125 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ j ❑ 21 1 Roof 160 (S)l 0.061 R-30 4.2.5-A35 New ❑ ❑ 22 Slab 150 (N) 1 0.7301 None 4.4.7-A 1 New ❑ ❑ 23 Wall 132 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 24 Roof 160 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type 2 m m a c c ui Z Z O 0 A x LL m 2> ° S LL o > N 2 x N 2— U t t7 x o > u) (1) O :0 3 o :? 06 y a LL 17 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 18 Window 36 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 19 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 20 Window 36 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 21 Window 18 (N) 0.770 Default 0.390 COG ®. New ❑ ❑ 22 Window 18 (N) 1 0.770 Detaultl 0.390 COG ® New ❑ ❑ 23 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 24 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ PERMIT ❑ ❑ ❑ BUTTE C NTY DEV L M ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. Ey 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate acti i 3 a . C:4mA14W Ener Pro 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11 0:54:0 - e 8 of 100 tlY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRledlocatable Public School m Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /I D' AssemblyType z cr,c i .2 ¢ C 3 W O; ° LL v >> A vac o d 7 x M w> 0 or C r x w LL •O N m > or O S d LL IT v _ C C o a -, Q a N o:? U N ca a m LL 25 Slab 135 (N) 0.730 Nonel 4.4.7-A1 New ❑ ❑ 26 Wall 99 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 27 Roof 140 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 28 Slab 255 (N) 0.730 None 4.4.7A1 New ❑ ❑ 29 Wall 177 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 30 Wall 203 (S) 0.106 R-19 4.01 None 4.3.3-A5 New ❑ ❑ 31 Roof 238 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 32 Roof 210 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tez N L c G3 N cW o Z M O d ' LL o N U c 0 d C 2 U .E x U) a o oN n O o : h o V M a _Fenestration iTag/ID' 25 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 26 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 27 Window 18 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 28 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 29 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 30 Window 18 (S) 0.770 Default 0.390 COG ® New ❑ 1 ❑ 31 Window 18 (S) 0.770 Default 0.390 COG 0 New ❑ ❑ 32 Window 18 (S) 0.770 SE # 0.390 COG El New ❑ ❑ BUTTE,CPUNi:DEIIEL E -❑ ED 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate"ion to correct. en y b it i la n Ener Pro 5.0 by Energ Soft User Number: 7870 RtinCode: 2010-11-16T10:54:07 ID: 10- ---F-age.9-oL100 C_/ CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRlellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space Z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: 0. New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType z a 2 3 c N �W O z V 4 n '—' �> 0 0� oC = d xm w> C S icy w L ° d °'m 5> 2 C ==� a x d oa n Q '0 n o«° U w H a = LL 33 Slab 306 (N) 0.730 Nonel 4.4.7-A1 New ❑ ❑ 34 Wall 270 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 35 Roof 226 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 36 Roof 87 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 37 Wall 151 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 38 Slab 243 (N) 1 0.730 Nonel 4.4.7-A1 New ❑ ❑ 39 Roof 239 (N) 0.061 R-30 I 14.2.5-A35 New ❑ 1 ❑ 40 Wall 198 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type a c c� C y d W O Z V m LL 2> 0 5 LL a > u) V S m N 2¢ Up = 'o rn y w0 -E > O c .O 3 u ;°. U u) a e if 33 Window 18 (E) 0.770 Defaultl 0.390 COG ® New ❑ ❑ 34 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 35 Window 120 (M 0.770 Default 0.390 COG ® New ❑ ❑ 36 Window 126 (149 0.770 Default 0.390 COG ® New ❑ ❑ 37 Window 48 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 38 Window 48 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 39 Window 48 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 40 Window 240 (N) 0.770 Default 0.390 COG ® New ❑ ❑ ❑ ❑ ❑ # 13 [3 131. See Instructions in the Nonresidential Compliance Manual, page 3-96. OV I I 1zCOUNTY DEVELOPI E 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriateRlEftigLM b i necessary. Ener Pro 5.0 b Ene Soft User Number: 7870 RunCode: 2010 6 [-Of f>, 9CA a5 3 Page 10 of 100 DATF� d'�r1dp6��.1 BY CJ CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space Z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyT e2 4 0 C N �- O i t; LL M O � N� U M O, X W w> O S X 3 w LL G O 2 l6 > GIM 2 7 5 LL x C CL 6 a � a c y O2 vin lNC a N LL 41 Slab 156 (N) 0.730 Nonel 4.4.7-A1 New ❑ ❑ 42 Wall 138 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 43 Roof 160 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 44 Slab 163 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 45 Wall 145 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 46 Roof 166 (N) 0.061 R-301 4.2.5-A35 New ❑ ❑ 47 Slab 306 (N) 0.730 None 4.4.7A1 New ❑ ❑ 48 Wall 270 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 N Q c o3 " w O Z ALL 2> u 'o > U) v x Cn w _ 'o > U) uJ O c o ;� V� y a ti 41 Window 60 (N) 0.770 Default 0.390 COG ® lNew ❑ ❑ 42 Window 400 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 43 Window 96 (N) 0.770 Default 0.390 COG ❑ New ❑ ❑ 44 Window 40 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 45 Window 32 (E) 1 0.770 Defaultj 0.390 COG ® New ❑ ❑ 46 Window 192 '(1M 0.770 Default 0.390 COG ® New ❑ ❑ 47 Window 21 (VV) 0.770 Default 0.700 Default ® New ❑ ❑ 48 Window 42 (E) 0.770 Default 0.700 Default EI New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96.LOPMENT SERVICES 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate acti to V4 it ssary. Ener Pro 5.0 by EnetgySoft User Number: 7870 RunCode: 2010-11-16T1 l f ! A p e e 11 of 100 uATF__ -- _ "�, - BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28;661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space a 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 l6 Q o ?� C N D W O z a ; R 4 n d z 3 R A� V 0c o d Y x W w> 0 ` Y x 7 w U. � "�" i0 5> 'C "" 7 c U. a x :5 d C O a Q c '6 7 O« V u) N ly0 a ,n_ i0 u- 49 Roof 226 (E) 1 0.061 R-301 I 14.2.5-A35 New ❑ ❑ 50 Roof 87 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 51 Wall 151 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 52 Slab 306 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 53 Wall 270 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 54 Roof 226 (E) 0.061 R-301 4.2.5-A35 New ❑ ❑ 55 Roof 87 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 56 Wall 151 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS /ID' Fenestration Te2 G �a ¢y c 0�' Oz o x R > >Aui ° U xN 2¢ N(U'3 i n Ot c v° o ayL eiiTa 49 Window 21 (S) 0.770 Default 0.700 Default ® New ❑ ❑ 50 Window 24 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 51 Window 21 (N) 0.770 Default 0.700 Default ® New ❑ ❑ 52 Window 96 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 53 Window 42 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 54 Window 26 (E) 0.770 Default 0.390 COG El I New ❑ ❑ 55 Window 48 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 56 Window 192 (VV) 0.770 Default 0.390 COG El New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PERMIT# 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action tohTTifypfilh+p�[of�ILOjES Energ Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16710:54:07 a 12 of 100 G®®E COMPLIMdE DATE BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space a 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType ¢ c 3 CN UT O z U O 0 7. V¢ 0 ` O 6> 0 C W u- O O E> O` E LL e v _ C a N v N C4 a 12 57 Slab 243 (N) 1 0.730 Nonel 4.4.7A1 New ❑ ❑ 58 Roof 239 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 59 Wall 198 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 60 Slab 156 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 61 Wall 138 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 62 Roof 160 (N) 1 0.061 R-301 4.2.5-A35 New ❑ ❑ 63 Slab 163 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 64 Wall 145 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 a c c C N W " O Z ` O U RLL > .0. 5 U i - o ' > N U = N 2— tMc C U a00. L H 0 = 7 'o > o :° e to rn O c) U) a. ii 57 Window 21 (V1) 0.770 Default 0.700 Default VI New ❑ ❑ 58 Window 21 (Vt9 0.770 Default 0.700 Default ® New ❑ ❑ 59 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 60 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 61 Window 72 (N) 0.7701 Default 0.390 COG ® New ❑ ❑ 62 Window 18 (S) 0.770 Default 0.3901 COG ® New ❑ ❑ 63 Window 18 (S) 0.770 Default P&O COG ® New ❑ ❑ 64 Window 18 (S) 0.770 Default 0.390 BU R8 AT-Umm4" 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. DATE 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. a any Energ Pro 5.0 b Ener Soft User Number. 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 13 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRlellocatable Public School m Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type 2 W a 23, C NCn d W c O z ; C LL :5 ? >> m v oc ¢ o a� 7 x to w> G C x w LL ¢ Ccu � 7 a > d' U. x N a o a -, a c 'O C o:a V N 'un, to a = U. 65 Roof 166 (N) 0.061 R-301 4.2.5-A35 New ❑ ❑ 66 Slab 142 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 67 Wall 119 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ,68 Roof 145 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 69 Slab 142 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 70 Wall 119 (N) 0.106 R-191 4.0 None I4.3.3 -A5 New ❑ ❑ 71 Roof 145 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 72 Slab 142 (N) 0.730 None 4.4.7-A1 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type 2 a c c 3 C .°—' Z O V x C 2> V LL o >U) v S -- U V _ 'o cn U) o, c L > O c 'O 7 o :° U 0 a LL 65 Window 472 (N) 0.770 Default 0.390 COG ® New ❑ ❑ 66 Window 12 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 67 Window 396 (S) 0.770 Default 0.390 COG ® New ❑ ❑ 68 Window 18 (Vl9 0.770 Default 0.390 COG ® New ❑ ❑ 69 Window 18 (E) 0.770 Default 0.390 COG ® New ❑ ❑ 70 Window 72 (E) 1.190 Default 0.390 COG ® New ❑ ❑ 71 Window 192 (S) 0.770 Default 0.390 COG ® New 13 72 Window 18 (1Aq 0.770 Default 0.390 COG ® New 13 [3 13 13 C3 ❑ ❑ ❑ AIT, off' 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. qq 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to corr�L� IaWI MICE ; Ener Pro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 114 of 100 vva)t UUIVIFLIANGE DATE By CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRledlocatable Public School 0 Conditioned Spaces EIUnconditioned Spaces ❑ Skylight Area for Large Enclosed Space i 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: 0 New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID'Assembl T 2 a c .R„ N cM Oz t1 n eo 0M O x w> O C x ura O A �> O C �a v C CL o a �Q O o o:° vN m a m a 73 Roof 145 (N) 0.061 R-30 .4.2.5-A35 New ❑ ❑ 74 Wall 99 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 75 Slab 512 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 76 Roof 73 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 77 Roof 392 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 78 Wall 99 (E) 0.106 R-19 4.01 None I 4.3.3-A5 New ❑ ❑ 79 Slab 512 (N) 0.730 None 4.4.7-A I New ❑ ❑ 80 Roof 73 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 Q c o 2 N C W O Z r c; ALL 2> 0 d 5 2 4 oo > N 0 S N ¢ d V i z oo rn ul m -E > O 'o o :a v y a ii ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PERMIT# 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to co%WIY6WJ6 lgridl ICE£: Ener Pro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 15 of 100 CODE COg15 IANC . DATE BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School la Conditioned Spaces [3 Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space Z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 ¢ c C N 41 Wl0 c O z ; LL :50¢ 3 j A m> p M x�o w> p C x5 w LL ==m 5> C C �'� � LL v = d oa -, a D y O 7 o« Q w N m a m LL 81 Roof 392 (E) 0.061 R-301 4.2.5-A35 New ❑ ❑ 82 Slab 131 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 83 Wall 119 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 84 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 85 Slab 131 (N) 0.730 None 4.4.7A1 New ❑ ❑ 86 Wall 119 (S) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 87 Roof 146 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 88 Slab 263 (N) 0.730 None 4.4.7-A1 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration TeZ c •; = O v � LL Vc � =.o > o« cc IL — 0 LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PERMIT# 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to corwfl'?' abLwom . Energ Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16T10:54:07 C/Pt m16 of Inn DATE .' _ BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room able Public School m Conditioned Spaces ❑ Unconditioned Spaces Relo11 Schools (Public School) 13 Bldg. ld . ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyTypCL e A Q c c y uj O z Od A 4 O io V cc p Y j w> pwe «`y w u. ►• 3 5> 01 5 a v x C O c �a 0 U N a� ti 89 Wall 242 (S)l 0.106 R-191 4.0 None I 14.3.3-A5 New ❑ ❑ 90 Roof 292 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 91 Slab 215 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 92 Roof 263 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 93 Roof 31 (IM 0.061 R-30 4.2.5-A35 New ❑ ❑ 94 Slab 259 (N) 0.7301 None 4.4.7-A1 New ❑ ❑ 95 Roof 201 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 96 Wall 234 (E) 6.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration T e2 F, a 0 3 2 °' w O Z r c C1 A LL > V2 LL 'o ;� > N v C7 2 N 2¢ m V` = 'o U) N c W m t > O d c H 'O 3 co ;? O N a U. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate fgftfP 8orrect. Verify building plans if necessary. Ener Pro 5.0 by Ener Soft User Number. 7870 RunCode: 2010-11-16710:54:07 11TiQidN%'6J)EVEL0PMENT SOWCE17 of 100 HEVILWEL) I -OR CODE COMPLIANCE DATE BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blldlocatable Public Schoolg. m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space i 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembl T e2 ►p. ¢ o •C N 'a. W o z ; LL 5 z. 7 �� v W oC p N 2.2 w> c C •« •- W tL O p d p > O C d tL x _ C C d Q c N C r U 6 y aL Li 97 Slab 55 (N) 0.730 None 4.4.7 Al New ❑ ❑ 98 Roof 53 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 99. wall 158 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 100 Slab 181 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 101 Roof 189 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 102 Slab 198 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 103 Roof 223 (M 1 0.061 R-301 4.2.5-A35 New ❑ ❑ 104 Slab 377 (N) 0.730 None 4.4.7A1 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration T e2 ¢ C o � C °' w O Z U x LL > p i M o > m U S A N V` = 'o N N > O c o :4 0 to y 0. U- ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate actioAH6iWoTl�ct. Verify building plans if necessary. Energ Pro 5.0 6 Ener Soft User Number: 7870 RunCode: 2010-11-16710:54:07ER ' .100 r1tVItVVtu FOR CODE COMPLL4N� DATE BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRlellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space a 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 ¢ 0 3 cN O z " LL :50 ?`2 M OCW> oc d X M o X 7 w LL c °' !0 �> -E � LL x 'p O- -144 O R v y A o. c0 LL 105 Wall 299 (tM 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 106 Roof 424 (149 0.061 R-30 4.2.5-A35 New ❑ ❑ 107 Slab 1,386 (N) 0.730 None 4.4.7A1 New ❑ ❑ 108 Wall 366 (W) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 109 Wall 256 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 110 Wall 432 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 111 Roof 460 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 112 Roof 664 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Fenestration Type a c 03 io 41 C O Z r V > ar V j N vin V (7 as N fn rn m > c H Tag/ID a U. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. , ER 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate acfio�i r tiro Ener Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16T10:54:07 A #80 A a,l' n C V I IC V V C L)–ruff— CODE COMPLIAft ICE. N DATE BY EJ CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School to Conditioned Spaces 13 Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType a c am- N W O z V LL 3 7 l�0 0 cc C W (0 1> O C K 7 w a O « l0 �> O I 2 1 5 LL v _ C d C 4 � a N O 7 O .�.. Urn N a = Li 113 Roof 331 (W) 0.061 R-301 14.2.5-A35 New ❑ ❑ 114 Wall 31 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 115 Wall 286 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 116 Slab 682 (N) 0.730 None 4.4.7A1 New ❑ ❑ 117 Roof 619 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 118 Roof 41 (E) 0.061 R-301 I 14.2.5-A35 New ❑ ❑ 119 Slab 1,542 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 120 Wall 250 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration T e2 ¢ c c� .R„ VJ C a, W O Z r O m LL > r d v i LL a > rn U lS 2 A W d C%` i 'oCD (n (n m CO t O c « H .O 7 o -4H ¢ 06 a Ui ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PERMIT # 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to cor — EnergyPro 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11-16T10:54:07 P8�1953•-e ae—a� e�-0 of inn C 6 D E C0MPLIANC' E DATE By U CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRlellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file. affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION /ID' AssemblyType ' c o C V1 ; 21 7 Q ac LU > c ° > v x _ CL a Q N Co o r U yC m aTa 121 Wall 190 (N) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 122 Roof 233 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 123 Roof 1,303 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 124 Wall 120 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 125 Wall 92 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 126 Slab 3,180 (N) 0.7301 None 14.4.7 -Al New ❑ ❑ 127 Wall 252 (lM 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 128 Roof 1,491 (IM 0.061 R-30 4.2.5-A35 New ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' 2 Te N O �W 2 C A r C �• V N7 xFenestration C ON 0 C v N y a� ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PERMIT # 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to gjpq Of WlbpK%gp(W &9LIqVC@EFiWbGES Ener Pro 5.0 by Energ Soft User Number: 7870 Run Code: 2010-11-16T10:54:07 a 210 T 100 DATE I BY CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School m Conditioned Spaces [3Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space a 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembl Type 2 ` a 4� �aN 'r: W O z o V 4 5 O� 0 cc `g •X l0 w > `o_ C •X 7 w LL O •-E IC � > .I'Mv O •z 7 5'L x _ C CL C G e N C 02 0 U) N aL ri 129 Roof 2,088 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 130 Slab 193 (N) 0.730 None 4.4.7A1 New ❑ j ❑ 131 Roof 198 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 132 Slab 187 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 133 Roof 96 (E) 0.061 R-301 4.2.5-A35 New ❑ ❑ 134 Roof 96 (lM 0.061 R-30 4.2.5-A35 New ❑ ❑ 135 Wall 51 (149 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 136 Wall 51 (E) 1 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Z ¢ C °3 r0.. 4I C °—' 2 O r- r r d vv 2 U` -E .O O XM ri 'o mCn = o > o :° E N .. rn N O v N A a ;- U. ;V p ❑ ❑ ❑ r ER ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EneigyPro 5.0 by Ener Soft User Number: 7870 Run Code: 2010-11-16T10:54:07 ID: 10-1553 Page 22 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRlellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 Q 3cc «O N LD LLT O z V 2 �� Q oC O ID « O w> O C « W U. O = C> O C LL Q x _ C O -Oj Q c O N V N N a U. 137 Slab 182 (N) 0.730 Nonel 14.4.7 -Al New ❑ ❑ 138 Roof 185 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 139 Slab 72 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 140 Wall 51 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 141 Roof 74 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 142 Slab 462 (N) 0.730 Nonel 4.4.7-A1 New ❑ ❑ 143 Wall 26 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ j ❑ 144 Wall 265 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' . Fenestration Type 2 q_ v d a r _0 l0 r/i C d W o Z U m C « O d CS d R O t5� S UOt .0 R e u- o m N = o > o Al > > rn °S (n U) O U w Al LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ BU E ❑ ❑ ❑ LEVIEW ❑ DA WT ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Energ Pro 5.0 by EnergySoft User Number., 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 23 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRiellocatabie Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ftz (if checked include the ENV-4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Typ e2 llf a c 03 C V1 y W o z o V l0 u' n d _�' t0 Q¢ c d X W w> `o m ` K 7 w LL s- G N "4' R 5> G i r 7 5 LL v v d C p G a o0 = 3 O v co N a LL 145 Roof 327 (E) 0.061 R-301 4.2.5-A35 New ❑ ❑ 146 Roof 170 (N) 0.061 R-30 4.2.5-A35 New ❑ ❑ 147 Slab 126 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 148 Wall 190 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 149 Roof 139 (N) 0.061 R-30 4.2.5-A35 New ❑ E3- 150 150 Slab 294 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 151 Roof 323 (E) 1 0.061 R-30 4.2.5-A35 New ❑ ❑ 152 Wall 126 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 Z a C c3 C N .°—' w O Z 0 V W ti 2> y Uc o 0 10 V V = (� ` -E .r vy O 7 4- 'o M N = 'o > 02 > co 2 (n N O Q rn M a e LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ PE MIT# ❑ ❑ 0— B COUN D ❑ Cri 0 ' ❑ ❑ ❑ ❑ DA7 E ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Energ Pro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Pae 24 of 100 CERTIFICATE OF COMPLIANCE (Part'l of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Schools (Public School) ❑ RRldg- ❑ Skylight Area for Large Enclosed Space Z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyT e2 a c g3 4 C6 d W O z t5 7 v ¢ O 22 w >U. O C N- p y 5 > C LL v x C C c o N c) u5 a a 153 Wall 78 (E) 0.106 R-19 4.01 None 14.3.3-A5 New ❑ ❑ 154 Roof 159 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 155 Slab 169 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 156 Slab 364 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 157 Roof 375 (E) 0.061 R-301 4.2.5-A35 New ❑ ❑ 158 Wall 121 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 159 Slab 10,743 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 160 Wall 822 (Kq 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type' B a Cy c r 41 N w O Z « V '� ni M> V « d i9 V S U i LL 'o - ^ z o > rn 2¢ co N c -E > O .c0. .O 7 o :? U N a ii ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ PERMIT ❑ ❑ ❑ C UNTY DEV L@rMNT SERVIC ❑ 13 ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. BY 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necess— ary. EnergyPro 5.0 by EnergySoft User Number.- 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 25 of 100 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space z 8000 ftZ (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType z ¢ 3 V1 d W O z U U. td cod V O « 7 x w> d x� w a 7 %=ea 5> °=� 5 a x C G oa ¢ c C o:° V N m a LL 161 Wall 762 (E) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 162 Wall 544 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 163 Wall 442 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 164 Wall 828 (N) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 165 Wall 393 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 166 Wall 1,604 (S) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 167 Wall 315 (W) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 168 Roof 4,492 (N) 0.061 R-30 4.2.5A35 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type' O ¢ t s3 vi OW � z O S IVO m u_ > S d l; LL 'o > rn tm a cs d `m i U 2 -E .O N m z 'O > o :? .- 0 rn O U N a U. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ PE ❑ ❑ ❑ BUTTE OUNTY D a ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. DATE 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to c . correeri Ener Pro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 26 of 100 u CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Blellocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Type 2 ` A a c 3 cog C C W uJ O z o 5 A 4 5 � 5 l6 M> U Cr o d •W 7 X M w> 0 0� ,« '� X 3 ui U. d r l0 5> �� � '� "�" 7 S a x c d CR O 0. CL � a c 'O 3 0 U in Assembl N A a n f0 u- 169 Roof 5,196 (S) 0.061 R-301 4.2.5-A35 New ❑ ❑ 170 Roof 1,851 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 171 Roof 453 (VV) 0.061 R-30 4.2.5-A35 New ❑ ❑ 172 Slab 431 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 173 Wall 119 (1M 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 174 Roof 342 (S) 0.061 R-30 I 4.2.5-A35 New ❑ ❑ 175 Roof 90N(N) 0.061 R-30 4.2.5-A35 New 11 1:1176 Slab 487 0.730 None 4.4.7-A1 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration T Z B a 0 3 Ct5 °' W o Z 0 A 2> .. o _5 ` '� 3o > N L) S A E 2¢ U` Z 30 w u> L > O 0 3 o :a e2 Urn a LL 13 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. PER 1y# . 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to come . Ener Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1 6 V r %.- v,&— y V &. g -'f I V I c CODE COMPL1AM,., DATE BY U CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building T e: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRledlocatable g. Public School to Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (if checked include the ENV -4C with submittal) Phase of Construction: m New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, IN or in Degrees: 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type2 .LDW ¢ c C (n - O z ; tL n � 7 >i l0 0 oC O «O X a W> IM C •« X 7 W LL O O •N l6 �> O L d 7 � LL v d O G -.34 Cr O U <n y M a N U- 177 177 Wall 119 (E) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 178 Roof 237 (E) 0.061 R-30 4.2.5-A35 New ❑ ❑ 179 Roof 261 (S) 0.061 R-30 4.2.5-A35 New ❑ ❑ 180 Wall 275 (E) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 181 Slab 920 (N) 0.730 None I 4.4.7-A1 New ❑ ❑ 182 Roof 469 (E) 1 0.061 R-30 4.2.5-A35 New ❑ ❑ 183 Roof 469 (IM 0.061 R-30 4.2.5-A35 New ❑ ❑ 184 Wall 388 (S) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Type 2 :' a C °3 C N d W O Z « V ALL > U V LL o > CO y U c = U` L 5 7 M^ = o > o ;° A 2— : U) W O L) N a ii ❑ ❑ ❑ ❑j ❑ j ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ENT SEF VIDES ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. ,��qqgg°�� 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action totkic ne Energ Pro 5.0 by Energ Soft User Number: 7870 RunCode: 2010-11-16T 53 Pa a 28 of 100 fJ CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRlellocatable Public School m Conditioned Spaces 13Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' Assembly Type2 Q C U) dW O z ; li n 7 �� A v GC C = x /0 w> 0= 2— x 7 w LL O °'� m > O= °�� 7 ti X _ L �a O G a C O N Ca O 0 N y A a 'A a 185 Wall 246 (W) 0.106 R-191 4.0 None 4.3.3-A5 New ❑ ❑ 186 Slab 338 (N) 0.730 None 4.4.7-A1 New ❑ ❑ 187 Wall 149 (lM 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 188 Roof 345 (tM 0.061 R-30 4.2.5-A35 New ❑ ❑ 189 Slab 338 (N) 0.730 None 4.4.7-A 1 New ❑ ❑ 190 Wall 149 (W) 0.106 R-19 4.0 None 4.3.3-A5 New ❑ ❑ 191 Roof 345 (Kq 0.061 R-30 4.2.5-A35 New ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Ta /ID' 9 Fepea2lon °� v a Cy °3 }a vi ami W O Z S x > E m 5 > cin c7 ar 2 02 t=n in c a -E O v ci in 0- LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ PERMIT # ❑ ❑ ❑ UTTE CON ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96.R§ICE; 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to corr d' sR Ener Pro 5.0 by Ener Soft User Number: 7870 RunCode: 2010-11-16T10:5 D. 3 BY CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV-1 C Project Name Lundberg Farms Ta,/—e 16/2010 ROOFING PRODUCT (COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low-Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or ❑ SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C. ❑ 11 11 Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI 13 that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV-2C. El 13 ❑ ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from ❑ the Cool Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low-sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Roof Slope Product Weight Number' s 2:12 > 2:12 < 51b/ft2 a 5lb/ft2 Product Aged Solar Thermal Type Reflectance3 Emmitance SR 15 Pass Faile ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.cool roofs.ora/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then. use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pj dflw — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at httpJ/www.energy.ca.gov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: ❑ Aluminum-Pigmented Asphalt Roof Coating ❑ Cement-Based Roof Coating ❑ Other. Discrepancies: PERMIT # BUTTE CO SERVICES MR Dg7F �E,7eyP—m5.0 6 Ene Soft User Number. 7870 RunCode: 2010-11-16T10:54:07 /D: 10-15 B1Pa a 30of 100 �l CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires•a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test Double Metal Clear 3,832 IZI Door Double Metal 147 0 Milgard Classic Low-E Vinyl 72 m 13 11 11 ❑ NTy DEVELOPMENT =Pg,:3�1o�f�1100 EnergyPro 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11-16710:54:07 ID: 10-1553 CERTIFICATE OF COMPLIANCE ; (Part 1 of 3) ," `` LTG -'l C Project'Name - r r' _ . Date , Lundberg Farms 11116120.10 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST.. L• ' Installation Certificate, LTG -1- INST Retaina copy and v'erify' form is`completed and si ried: Field Inspector ❑ Certificate of Acceptance, LTG -2A Retain a copy and verify form,is completed and si ned. + ' Field Inspector . ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces_Installed Lighting Power listed on ' - this Lighting Schedule is only for: m '' CONDITIONED SPACE = 4 . =� } ❑ UNCONDITIONED SPACE- ,m The actual indoorlighting power listed below, includes all installed.permanent and portable lighting'systems in accordance with §146(a). Only for offices: Up to the first'0.2 watts per square foot of portable lighting shalhot be required to be included in the m ; calculation of actual indoor lighting power density in accordance with the Exception to, §146(a). All portable lighting in excess of . 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts s '.. 3 f r Installed Watts V, How wattage Field Was determined S. I ' None .or ' Complete Luminaire Description' �, o ,� — CEC. -- ^ Default O wa m;m ` , is � N Item (Le, 3 lamp fluorescent troffer, ' '`" 3' J From Q F Z J Tag'F32T8, one dimmable electronic ballasts r NA8' - Standard Allowance: 12790sqft of0.900w/sf 0 + ❑ ❑. 11,511�"'b" Standard Allowance: 1357 sqft at 1.200 w/sf0 ❑ ❑ . 1,628® .. . Standard Allowance: 137 sqft at 0.900 w/sf '.; ❑ ❑ 0 ' 123 _- Standard Allowance: 1961 sqft at 1.100 w/sf ❑ i ❑ ❑ 2,157 Standard Allowance: 215 sqft at 6.900 w/sf `:, ❑ z ❑ ❑ 194 Standard Allowance: 2224 sqft at 0:900 w/sf f° ` ❑ ;_' ❑ ❑ } 2,002 Standard Allowance: 306 sqft at 1.400 w/sf ❑' t ❑ ❑ 4280 Standard Allowance: 3180 sqft at 1.500 w/sfr�. ,.❑ ❑" ❑`. 4,770 ❑ Standard Allowance: 390 sqft at 1.200 w/sf 13_ D ❑ 0468 ®f! # Standard Allowance: 442 sqft at 0.900 w/sf ❑ ❑ F ❑ 398 Standard Allowance: 488 sqft at 0.700 w/sf , + • O ❑ ❑ 342j gig Standard Allowance: 512sgft at 0.900 w/sf ❑ - * ❑ ❑ 460 `®® Standard Allowance: 525 sqft at 0.900 w/sf 11 E] ..0 473® Standard Allowance: 867sgft at 0.900 w/sf ate` - ❑- s a •' + ❑ ❑' + 780 Standard Allowance: 867,sqft at 1.400 w/sf '' Y ❑ ; _ l] ❑ , i 11,214 ` Standard Allowance: 918 sqft at 1.400 w/sf ` r - ❑ : .. -. ❑ ❑ - } : 1,285❑ s Standard Allowance: 937sqft at 0.900 w/sf ' - .5 ❑ ❑. ❑ y 843 EV MEN" t r Installed Watts Page Total: 29,075 : �* , • . Fr , PEI"t4ed.Watts Building Total ; ` • "',Building total number of pages + . •. Enter into-Effl!gRVICES - 1. Wattage shall be determined according to Section 130 (d and e). Wattage -shall be rating of light fi t g o 2 : If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate actin correct. enfy it if iRL C ' • . - t Ener Pro 5.0 by EnergySoft User Number. -7870 ++ RunCode: 2010-11-16T10:54:0i ID: 10-1553 agg_ CERTIFICATE OF COMPLIANCE ` . ., �-(Part.2 of 3) •' 'LTG -1 C Project Name Lundberg Farms Date 11/16_/2010_ INDOOR LIGHTING SCHEDULE and FIELD INSPECTION-ENERGY,CHECKLIST" Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 fe, automatic daylighting controls for daylit areas > 2,500 fe, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g), demand responsive automatic, controls for retail stores > 50,000 ft 2, in accordance with" Section 131. - MANDATORY LIGHTING CONTROLS - FIELD INSPECTION ENERGY CHECKLISTield ' 1h-'4 ector# _ - Number Special - r Type/ Description � � of Units � ' Locationin BuildingFeatures Pass. ❑ b", ao - { ❑ d] WIN ❑ Wv ® _o { ❑OWN l ❑ ®,: - ❑ o o . o WWI NO. ❑ ❑ INS , b- ' r ❑ - a ❑ N1 rt 61 o: ate. a . ..._.. ❑~ ® 1 ❑ ❑� ,0 IN W SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of. LTG;1C The local enforcement agency should pay special attention to the items specified in this checklist, These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification; and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted.' a PERMIT Field Inspector's Notes or Discrepancies:' BUTTE CO - _ , �. DATE k e Ene Pro 5.0 6 Ene Soft ,User Number.. 7870 ° RunCode: 2010=11-16T10:54:0 ID: 10-1553 Page 33 of 100 ' CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG-1 C Project Name Date Lundberg Farms 11/16/2010 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 29,075 Installed Lighting 0 from Conditioned LTG-1C, Page 2 from Unconditioned LTG-1C, Page 2 Lighting Control Credit _ 0 Lighting Control Credit Conditioned Spaces from LTG-2C Unconditioned Spaces from LTG-2C 0 Adjusted Installed — 29,075 Adjusted Installed - 0 Lighting Power Lighting Power Complies if Installed 5 Allowed Complies if Installed 5 Allowed Allowed Lighting Power 28,075 Allowed Lighting Power Conditioned Spaces from LTG-3C or PERF-1 Unconditioned Spaces from LTG-3C 0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Controls for Credits LTG-2A Controls and Sensors and Automatic Number of Daylighting Luminaire Controls Equipment Re uirin Testing Descriptio controls Location Acceptance 11 BUTTE CO D TE d EnergyPto 5.0 by EnergySoh User Number: 7870 RunCode: 2010-11-16T10:54:0 ID: 10-1553 f 100 u CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reas6n2 Item or System Tags AC -1, RTU -1, HP -1 100 Ton Air Cooled Recip ❑ 11i.e. Equipment T e3: Reciprocating Chiller ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' n/a ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 5 tons ❑ ❑ Cooling Efficiency' 1.200 Mton ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ ❑ Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 CALMAC 1500c ❑ 11i.e. Equipment T e3: Ice -Slurry Thermal Energy Storage ❑ ❑ Number of Systems 2 ❑ ❑ Max Allowed Heating Capacity' n/a ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Ca acit ' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS n/a ❑ ❑ Economizer n/a ❑ ❑ Thermostat n/a PERMHF ❑ ❑ Fan Control n/a rT ❑ MtNT SERVICES 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (f WS. V E aE c e64�� 1 or from the building plans) the responsible party shall resubmit energy compliance to include the n �a� Ell �'g��Q 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. ��QQ fiance f s it a A ICE 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAIetber BY EnergyPro 5.0 by EnergySoft User Number.- 7870 Run Code: 2010-11-1 6 71 0:54:07 ID: 10-1553 Page 35 of 100 t� CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 800mBtuh ❑ ❑ Equipment T e3: Gas Fired HW Boiler ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 78% ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit & MECH-4-HERS n/a 11 [3MECH-4A Economizer n/a ❑ ❑ Thermostat n/a ❑ ❑ Fan Control n/a ❑ ❑ E ui ment2 Ins ection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-09-H-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value n/a ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume PERMIT # ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from@�16tBdriitffat/tg� the building plans) the responsible party shall resubmit energy compliance to include the new chang ET) ®FO 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance f i e Q�p I i 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC,iher. p LIANI CE EnergyPro 5.0 by EnergySoft User Number- 7870 RunCode: 2010-11-16T10:54:07 IF 10-1553 0 fJ CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotcl/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui menu Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHNCCW-04-01 ❑ ❑ Equipment T e3. 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 9,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 9,800 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui mene Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-09-H-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ PFIRMIT 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (fg �rirere -_ the building plans) the responsible party shall resubmit energy compliance to include the new change ' � /M SERVICES 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fai if RE L&WED Ff�R 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other(; COM PE 9AI BCF EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-161. B Pa a 37 of 100 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-I8-H-01 13 ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 18,100 Btu/hr ❑ ❑ Minimum Heatinq Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 14,100 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 Multi -Aqua MHWW-I8-H-01 11 11i.e. Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 18,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 14,100 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No PERMI iV ❑ ❑ Economizer No Economizer BUTTIMOUN DEVELOpME SE Thermostat Setback Required Fan Control Constant Volume ATE 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from t e ene sr�braiAW the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.0 Fy'EnergySoft User Number 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 38 of 100 (J CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 1 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-09-H-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No [3 ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control. Constant Volume ❑ ❑ E ui menu Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHNCCW-04-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 9,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Ca acit ' 9,800 Btu/hr ❑ ❑ Cooling Efficiency' PERMIT n/a BU -NT SpeVicr-C El Duct Location/ R -Value 0MEVORED ❑ FOR When duct testing is required, submit MM ECH-4A & ECH-4-HERS CO No V O �g C i'bl I S \t IACEP Economizer No Economizer DATE BYE_ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. kEn e Pro 5.0 by En ergySoft User Number. 7870 Run Code: 2010-11-16T10:54:07 ID: 10-1553 Page 39 of 100 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ 'Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 Multi-Aqua MHWW-09-H-01 13 ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R-Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Eq ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 Multi-Aqua MHWW-18-H-01 ❑ 11i.e. Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 18,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a PFRIVIrr ❑ ❑ Max Allowed CoolingCapacity' 14,100 Btu/hr BUTTE COUN DEVIQOPMEN SERVICES ❑ Cooling Efficiency' n/a RE 1E D FOR ❑ Duct Location/ R-Value R-8.0 ("S"019PI NE ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS DATErl No y� ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ 1 ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 40 of 100 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration . Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Energy Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui mentz Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-09-H-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 Multi -Aqua MHWW-09-H-01 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 10,600 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a PERMIT# ❑ ❑ Max Allowed Cooling Capacity' 8,500 Btu/hr E COUN DR/ PMEN S ESVICER Cooling Efficiency' n/a ❑ Duct Location/ R -Value R-8.0 ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS DA No B ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ene Pro 5.0 by EnergySoft User Number: 7870 Run Code: 2010-11-16710:54:07 ID: 10-1553 Page 41 of 100 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 -of 4) MECH-1 C Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ • Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Energy Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail – Describe Reason Item or System Tags AC -1, RTU -1, HP -1 Multi -Aqua MHWW-I8-H-01 ❑ 11i.e. Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 18,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' n1a ❑ ❑ Max Allowed Cooling Capacity' 14,100 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ . ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail – Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 AH -1 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 50,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 100,000 Btu/hr ❑ ❑ Cooling Efficiency' n/a T R-8.0 ❑ DEVE LOPMENT SER ES Duct Location/ R -Value When duct testing is required, submit MECH-4A & MECH-4-HERS No Economizer No Economizer DATE Setback Required f 1 VE - my------ —Fan Thermostat FanControl Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. En ergyPro 5.0 by En ergySoft User Number: 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 42 of 100 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 AH -2 Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 60,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 80,000 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 AH -3 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,342 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 150,000 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No 13 ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ����E 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the ene r: �Q R the building plans) the responsible party shall resubmit energy compliance to include the new changesco 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance 16W a Fail box is decked�UA i>� . A 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. BY E,,,Pro 5.0 by E,,rgyS,tt User Number.• 7870 RunCode: 2010-11-18.710:54:07 ID: 10-1553 Page 413 of 100 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 AH -4 ❑ 11i.e. Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 260,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 300,000 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 AH -5 ❑ ❑ Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 50,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 42,600 Btu/hr ❑ ❑ Cooling Efficiency' n/a 0'4W# ❑ ❑ Duct Location/ R -Value R-8.0 ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No LOp O"rSFRV/C Economizer No Economizer A7F Thermostat Setback Required Fan Control Constant Volume ❑ Y 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro, 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 44 of 100 L.J CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Lundberg Farms Date 11/16/2010 Project Address 5370 Church St. Richvale Climate Zone 11 Total Cond. Floor Area 28,661 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ® New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 1 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 AH -6 11 13i.e. Equipment T e3: 4 Pipe Fan Coil ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 53,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' n1a ❑ ❑ Max Allowed Cooling Capacity' 48,000 Btu/hr ❑ ❑ Cooling Efficiency' n/a ❑ ❑ Duct Location/ R -Value R-8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 ❑ ❑ Equipment T e3: ❑ ❑ Number of Systems ❑ ❑ Max Allowed Heating Capacity' ❑ ❑ Minimum Heating Efficiency' I 'ERMIT P ❑ Max Allowed Cooling Capacity' ®UTTE O CoolingEfficiency' ❑ RVEC Duct Location/ R -Value When duct testing is required, submit & MECH-4-HERS DTE 13MECH-4A Economizer ❑ ❑ Thermostat ❑ ❑ Fan Control ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.0 by EnergySoft User Number: 7870 Run Code: 2 01 0-11-1 6 71 0:54:07 ID: 10-1553 Page 45 of 100 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 Cl FIELD INSPECTION ENERGY CHECKLIST Lundberg Farms BY 11/16/2010 i -nciyy—v u.v uy Clleigvoc)n user rvumner. tutu RunCode: 2010-11-16T10.54.07 ID: 10-1553 Page 46 of 10-0 1 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date Lundberg Farms 11/16/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Re uirin Testing or Verification Qty. I VAV & CAV Unitary I Ducts Controls DCV VAV Test Reset Control Control 100 Ton Air Cooled Recip 1 ❑ ❑ ❑ ❑ ❑ ❑ m m m ❑ CALMAC 1500c 2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ D ❑ ❑ 800mBtuh i ❑ ❑ ❑ ❑ ❑ ❑ m m ❑ ❑ Multi -Aqua MHWW-09-H-01 6 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Multi -Aqua MHNCCW04-01 2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Multi -Aqua MHWW-I8-H-01 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Trane MCCB-06 AH -1 1 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Tra 8-08 AH -2 1 ® 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Trane MCC 1 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Trane MCCB-21 NTy DEVEL ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Trane M C VIC ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 74LEMCCB-03 - ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑ Ene Pro 5.0 b Ener Soft User Number., 7870 Run Code: 20 10-1 1-1 6 71 0:54:07 ID: 10-1553 Page 47 of 100 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Lundberg Farms Date 11/16/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Re uirin Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: 100 Ton Air Cooled Recip 1 ❑ ❑ ❑ ❑ CALMAC 1500c 2 ❑ ❑ ❑ 800mBtuh 1 ❑ ❑ ❑ ❑ Multi -Aqua MHWW-09-H-01 6 ❑ ❑ ❑ ❑ Multi -Aqua MHNCCW04-01 2 ❑ ❑ ❑ ❑ Multi -Aqua MHWW-I8-H-01 4 ❑ ❑ ❑ ❑ Trane MCCB-06 AH -1 1 ❑ ❑ ❑ ❑ Trane MCCB-08 AH -2 1 ❑ ❑ ❑ ❑ Trane MCCB-12 AH -3 1 ❑ ❑ ❑ ❑ Trane MCCB-21 AH -4 1 ❑ ❑ ❑ ❑ Trane MCCB-03 AH -5 1 ❑ ❑ ❑ ❑ Trane MCCB-03 AH -6 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ , ❑ ❑ ❑ ❑ BUTY ❑ ❑ 1:10 T U EVELOFENT s❑ ❑ 11 °— ❑ 11 1:1 ❑ DATE `" ❑ ❑ ❑ BY ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ene Pro 5.0 b Ene Soft User Number 7870 Run Code: 2 01 0-11-1 6 71 0:54:07 ID: 10-1553 Page 48 of 100 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Lundberg Farms 1 11/16/2010 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc...) Item or System Tags i.e. AC -1, RTU -1, HP -1, Vit,° _+ Multi -Aqua MHWW-09-H-01 Multi -Aqua MHNCCW-04-01 Multi -Aqua MHWW-09-H-01 Number of Systems Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 112(a) 112 a 112(b), 11 112(c), 11 121 b 121(b) . 121 c 121 c 122(e) 122(e) 122 123 124 n/a n/a n/a n/a No 0 cfm No No Programmable Switch Setback Required Auto n/a n/a n/a n/a n/a n/a No 0 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a n/a n/a n/a No 0 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 144(a & b n/a n/a n/a 144(a & b 10, 600 Btu/hr 9,000 Btu/hr 10, 600 Btu/hr 144(a & b n/a rVa n/a 144(a & b 5,900 Btu/hr 6,800 Btu/hr 5,900 Btu/hr 144(c) Constant Volume Constant Volume Constant Volume 144(c) 0 Yes No No Economizer Constant Temp Constant Temp No Yes No No Economizer Constant Temp Constant Temp BUTTE COUNTY Yes No No Economizer Constant Temp Constant Temp DATE ""L� %aU#VRJ 1A&SCE BY 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 49= 100 L AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Lundberg Farms 11/16/2010 Item or System Tags Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... ,� g�� i.e. AC -1, RTU -1, HP -1 K`4-11 ,,9 ,# µ.a: Multi -Aqua MHWW-I8-H-01 I Multi -Aqua MHWW-I8-H-01 Multi -Aqua MHWW-09-H-01 Number of Svstems `Y 1 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air. Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a Indicate Pa T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121 (b) 122 122 122 122 123 124 Reference on Plans or Schedule and indicate the n/a n/a n/a n/a No 195 cfm No No Programmable Switch Setback Required Auto n/a Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 153 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 18,100 Btu/hr n/a 11,100 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 348 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 10,600 Btu/hr n/a 5,900 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp MECH-4-A must be submitted 144(k) NO ERMIT # NO No BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxilico%dwomIc n� � 1 i explain which exception(s) to §144(g) apply. DATE GENABY EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 50 of 100 R-8.0 & b n/a &-b) 18,100 Btu/hr & b n/a & b 11,100 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 153 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 18,100 Btu/hr n/a 11,100 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 348 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 10,600 Btu/hr n/a 5,900 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp MECH-4-A must be submitted 144(k) NO ERMIT # NO No BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxilico%dwomIc n� � 1 i explain which exception(s) to §144(g) apply. DATE GENABY EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 50 of 100 J AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Lundberg Farms 1 11/16/2010 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc...) Item or System Tags i.e. AC 1, RTU 1, HP-1Multi-Aqua MHNCCW-04-01 Multi -Aqua MHWW-09-H-01 Multi -Aqua MHWW-I8-H-01 Number of Systems Indicate Page Reference on Plans or Schedule and indicate the applicable excention(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes a T-24 Secti 112(a) 112(a) 112(b), 11: 112(c), 11; 121 (b) 121 122 122 122 122 123 124 n/a n/a n/a n/a No 555 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 9,000 Btu/hr n/a 6,800 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 77 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 10, 600 Btu/hr n/a 5,900 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a n/a n/a No 77 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 18,100 Btu/hr n/a 11,100 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp MECH-4-A must be submitted L144(k) I No No I No aQG�; it K BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric a,0�ll9r oP9'b %5�ftel Jqt�" ed explain which exception(s) to §144(g) apply. vvv v &Ni 11�� lh� 1!"166 ��df DATE BY 1 tnergyvro 5.0 by rnergyson user Number: 1810 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 51 of 100 1 Ll AIR SYSTEM REQUIREMENTS 144(a & b Part 1 of 2 MECH-2C Project Name 144(a & b n/a n/a 144(a & b 5,900 Btu/hr 5,900 Btu/hr Date Lundberg Farms 144(c) 144(c) Yes Yes 11/16/2010 No PERMIT No 144(e) 144(f) 144(f) Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc... Item or System Tags, 144(i) 144(k) No No i.e. AC 1, RTU -1, HP -1) � #, -; ,., rw Multi -Aqua MHWW 09-H-01 Multi -Aqua MHWW MHWW I8 -H-01 Number ofSystems "-H-01Multi-Aqua Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) n/a n/a n/a Cooling Equipment Efficiency 112 a n/a n/a n/a HVAC Heat Pump Thermostat 112(b), 112(c) n/a n/a n/a Furnace Controls/Thermostat 112(c), 115(a) n/a n/a n/a Natural Ventilation 121 b No No No Mechanical Ventilation 121 b 79 cfm 32 cfm 1,192 cfm VAV Minimum Position Control 121 c No No No Demand Control Ventilation 121 c No No No Time Control 122(e) Programmable Switch Programmable Switch Programmable Switch Setback and Setup Control 122(e) Setback Required Setback Required Setback Required Outdoor Damper Control 122(f) Auto Auto Auto Isolation Zones 122 n/a n/a n/a Pipe Insulation 123 Duct Insulation 124 R-8.0 R-8.0 R-8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b n/a n/a 144(a & b 10,600 Btu/hr 10,600 Btu/hr 144(a & b n/a n/a 144(a & b 5,900 Btu/hr 5,900 Btu/hr 144(c) Constant Volume Constant Volume 144(c) 144(c) Yes Yes 144(d) No PERMIT No 144(e) 144(f) 144(f) No Economizer BU 86lNVOLml Constant Temp Constant Te 144 144(i) 144(k) No No n/a 18,100 Btu/hr n/a 11,100 Btulhr Constant Volume Yes No AMC,—r �T SI:f}b�� nstant Temp t Temp BY No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 52 of 100 AIR SYSTEM REQUIREMENTS Project Name Lundberg Farms Item or System Tags i.e. AC -1, RTU -1, HP -1 Indi Reference on Plans or Schedule and indicate the Number of Systems 60,000 Btu/hr MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Pa T-24 Sections 112(a) 112 a 112(b), 112(c) 112(c), 115(a) 121 b 121 b 121 c 121 c 122(e) 122(e) 122(f) 122 123 124 PRESCRIPTIVE MEASURES Part 1 of cate Air AH -1 AH -2 1 1 Reference on Plans or Schedule and indicate the 50,200 Btu/hr 60,000 Btu/hr n/a n/a n/a n/a n/a n/a n/a n/a No No 0 cfm 427 cfm No No No No Programmable Switch Programmable Switch Setback Required Setback Required Auto Auto n/a n/a R-8.0 I R-8.0 Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b n/a n/a 144(a & b 50,200 Btu/hr 60,000 Btu/hr 144(a & b n/a n/a 144(a & b 80,000 Btu/hr 60,000 Btu/hr 144(c) Constant Volume Constant Volume 144(c) 144(c) Yes Yes 144(d) No No 144(e) No Economizer No Economizer 144(f) Constant Temp Constant Temp 144(f) Constant Temp Constant Temp 144 �-- 144(i) 144tk) NO per® is MECH-2C Date 11/16/2010 VAV, or etc...) AH -3 1 plicable exception(s) n/a n/a n/a n/a No 0 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 28,342 Btu/hr n/a 125,000 Btwhr Constant Volume Yes No No Economizer Constant Temp Constant Temp MENT SERVICES BY 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain'which exception(s) to §144(g) apply. EnergyPro 5.0 by EnergySoft User Number. • 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 53 of 100 W AIR SYSTEM REQUIREMENTS Project Name Lundberg Farms Indicate Air Item or System Tags i.e. AC -1, RTU -1, HP -1 R Number of Svstems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Dt L ak S I' If Y Indicate Pa, T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), .115(a) 121(b) 121(b) 122 123 124 144a& 144(a & 144(a & 144a& 144(c) 144(c) 144(c) AH -4 1 Reference on n/a n/a n/a n/a No 1,919 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 260,000 Btu/hr n/a 280,000 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp Part 1 of 2 'Central, Single Zone, Packac AH -5 1 or Schedule and indicate the n/a n/a n/a n/a No 703 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 50,000 Btu/hr n/a 38,900 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp MECH-2C Date 11/16/2010 VAV, or etc...) AH -6 1 n/a n/a n/a n/a No 441 cfm No No Programmable Switch Setback Required Auto n/a R-8.0 n/a 53,000 Btu/hr n/a 42,000 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp uc a age ea mg. es, a No , --� • • � � -� / Lv MENT SERVIM MECH-4-A must be submitted 144(k) CobCOMPLIANCE DA 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for ea p &tfis heaLisused explain which exception(s) to §144(g) apply. EnergyPro 5.0 by EnergySoft User Number: 7870 Run Code: 2010-11-16T10:54:07 ID: 10-1553 Page 54 of 100 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2C Project Name Date Lundberg Farms 1 11/16/2010 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops Item or System Tags --' k�, 100 Ton Air Cooled Recip 800m8tuh (i.e. AC -1, RTU -1, HP -1) �;w. Number of Systems � .1 �E� A G, 1 1 ,,a�,r�1�� Indicate Page Reference on Plans or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) 1.200 Mton 78 Pipe Insulation 123 CHW Piping HW Piping PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a & b n/a rVa Cooling Tower Flow Controls 144(h) 5 tons 7,800 Btu/hr Variable Flow System Design 144(h) n/a n/a Chiller and Boiler Isolation 144(i) n/a n/a CHW and HHW Reset Controls 144(j) n/a WLHP Isolation Valves 144' n/a n/a VSD on CHW, CW & WLHP Pumps>5HP 144(i) rVa rVa DP Sensor Location 144. rVa ba 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "WA" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating Item or System Tags (i.e. WH -1, WHP, DHW, etc...)' Number of Systems; Indicate Page Reference on Plans or Schedule MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111, 113(a) Water Heater Efficiency 113(b) Service Water Heating Installation 113(c) Pipe Insulation 123 POOL AND SPA Pool and Spa Efficiency and Control 114(a) Pool and Spa Installation 114(b) BUTTE COUNTY r ^� Pool Heater — No' Pilot Light RI g 115(c) R/ @R OD Spa Heater — No Pilot Light 115(d) I DATE Pipe Insulation 123 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put i umn next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "WA" in the column. EnergyPro5.0 by Ener Soft User Number: 7870 Run Code: 2010-11-16T10:54:07 ID: 10-1553 Pae 55 of 100 , , v r THERMAL ENERGY STORAGE (TES) SYSTEMS ','MECH72C (TES) Project Name 1 / Date Lundberg Farms, 11/16/2010 SYSTEM FEATURES x t r 'THERMAL ENERGY STORAGE: Chiller , Item or System Tags) 100 Ton Air Cooled Recip i Number of Systems i i Chiller Parameter' ! Reference on Plaris or Specification s - , Equipment Efficienc Type Centrifu al, Reciprocating, etc): Capacity ( tons • Starting Efficiency kW/ton at end of iceproduction): Ending Efficiency kW/ton at end of'ice production):' Capacity Reduction (%/F): _ s ' 1.200 Mton r ., Recip'rocating' • T t , j i • N 5 tons f. 0.960 kW/ton , . ' 0.960 kW/fon , f"y2.09/✓F t. .1 THERMAL ENERGY STORAGE: Storage -Tank Item`or System Tag(s) '. CALMAC 1500c.'"a . Number`ofTanks 3 t ' ', +, 2 Storage tank Parameter t ' Stora ei e.' "i .;i , Storage Capacity er Tank (ton -hours): Storage Rate (tons): Discharge Rate tons Auxiliary„Power (watts): 7— Tank Area”(sq ft): Tank Insulation (R -Value): • N r. . .1 THERMAL ENERGY STORAGE: Storage -Tank Item`or System Tag(s) '. CALMAC 1500c.'"a . Number`ofTanks 3 t ' ', +, 2 Storage tank Parameter t ' Stora ei e.' "i .;i , Storage Capacity er Tank (ton -hours): Storage Rate (tons): Discharge Rate tons Auxiliary„Power (watts): 7— Tank Area”(sq ft): Tank Insulation (R -Value): -.f PERMIT # r •s a ` BUTTE COUNTY ' T SERVICES WED FOR DATEv CODE COMPLIANCEBY .F NOTES TO FIELD— For Building Department Use Only 5_0 RunCode: 20 f 0-11-16T10:54:0 • N f . -.f PERMIT # r •s a ` BUTTE COUNTY ' T SERVICES WED FOR DATEv CODE COMPLIANCEBY .F NOTES TO FIELD— For Building Department Use Only 5_0 RunCode: 20 f 0-11-16T10:54:0 C MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Lundberg Farms Date 11/16/2010 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area (ft2) CFM per W. Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air FC -1,2,4,5 546 0.15 82 82 0 82 Multi -Aqua MHWW-09-H-01 Total 82 0 FC -3 137 0.15 20 20 0 20 Multi -Aqua MHNCCW-04-01 Total 20 0 FC -6,7,8 442 0.15 66 66 0 66 Multi -Aqua MHWW-09-H-01 Total 66 0 FC -9 390 0.50 195 195 195 Multi -Aqua MHWW-I8-H-01 Total 1951 195 FC -10 306 0.50 153 153 153 Multi -Aqua MHWW-I8-H-01 Total 153 153 FC -11,12 867 0.15 130 130 348 Multi -Aqua MHWW-09-H-01 Total 130 348 FC -13 867 0.50 434 4341 555 Multi -Aqua MHNCCW-04-01 Total 434 555 FC -14,15,16 19371 0.15 141 141 77 164 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must bereater than orequal to H, or use Transfer Air column N to make up the difference. rtrt T # n CFM x 50%; or the design zone outdoor airflow rate per 121. c K nidi 'on LOi%ES L'`f' J7, J 0 CFM Mqq --g TFiis usWeWt2 n n L and greater than orequal to the sum of Columns H plus N. N Txans.fec AiLmmaLbeprovioo where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference Ftween entilation Air Column H and the Design Minimum Air Column M), Column H minus M. Ener Pro 5.0 by Energ Soft User Number: 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 57 of 100 C MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Lundberg Farms Date 11/16/2010 MECHANICAL VENTILATION §121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System Condition Area ft2 CFM per ftp Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REO'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J. K, 300 CFM Design Minimum Air Setpoint Transfer I Air Multi -Aqua MHWW-09-H-01 Total 141 77 FC -17 512 0.15 77 77 Multi -Aqua MHWW-I8-H-01 J79 Total 77 77 FC -18,19,20 525 0.15 79 79 Multi -Aqua MHWW-09-H-01 Total 79 79 FC -21 215 0.15 32 32 32 Multi -Aqua MHVWV-09-H-01 Total 32 32 FC -22,23 488 0.15 73 73 1,192 Multi -Aqua MHWW-I8-H-01 Total 73 1,192 AH -1 1,961 0.50 981 981 0 981 AH -1 Total 981 0 AH -2 2,224 0.15 334 3341 427 AH -2 Total 334 427 AH -3 3,180 1.071 3,403 3,403 0 3,403 AH -3 Total 3,403 0 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E RM/ Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H tion Air REO'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). jv IMu e t H or use Transfer Air column N to make u the difference. I e design zone outdoor airflow rate per 121. K o";na / L Maximum o ns H, , M This must be less than ore Colum L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where wired Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Require entilation Air Column H and the Design Minimum Air Column M), Column H minus M. �MrgyPro 5.0 by Ener Soft User Number: 7870 Run Code: 2010-11-16710:54:07 /0: 10-1553 Page 58 of 100 MECHANICAL VENTILATION AND REHEAT MECH-3C Project NameDate Lundberg Farms 11/16/2010 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System(ft) Condition Area CFM per ftz Min CFM By Area B X C Number Of People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM / ft2 Max. of Columns H, J, K. 300 CFM Design Minimum Air Setpoint Transfer Air AH -4 12, 790 0.15 1,919 1,9191 1,919 AH -4 Total 1,919 1,919 AH -5 918 0.50 459 459 703 AH -5 Total 459 703 AH -6 1,357 0.50 678 678 441 237 AH -6 Total 678 441 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. UTTE .(51 t' a larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). iVQ.e n o H, or use Transfer Air column N to makeup the difference. �. e ei _. aw- 0 >C 50%• or the design zone outdoor airflow rate per 121. Tr K Condition area (ft2)x Q CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Ener Pro_ .0 by Ener Soft User Number. 7870 Run Code:2010-11-16T10:54:07 ID: 10-1553 Page 59 of 100 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Lundberg Farms Date 11/16/2010 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Ot . Eff iciency Tons Ot . Premium GPM BHP Eff. Motor Pump Control 100 Ton Air Cooled Recip Reciprocating 1 1.200 kWAon 5 0 10 10.001 ❑ One -Speed 13 Way Valves Secondary CHW Pumps 1 50 1.00 ❑ One -Speed / 3 Way Valves o DHW / BOILER SUMMARY System Name Type Distribution Ot . Vol. Rated Input (Gals). Energy Factor or RE Standby Loss Tank Ext. or Pilot R -Value Status 800mBtuh Small Gas Hydronic Heating 1 10,000 50 0.58 n/a n/a New MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water ipina Len th ft Control Ot . HP Type In Plenum Outside I Buried Add 1/i' Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Out ut Aux. kW Efficiency Output Eff Iclency Status Multi -Aqua MHWW-09-H-01 4 Pipe Fan Coil 6 10,600 0.0 n/a 81500 n/a New Multi -Aqua MHNCCW04-01 4 Pipe Fan Coil 2 9,000 0.0 n/a 9,800 n/a New Multi -Aqua MHWW-I8-H-01 4 Pipe Fan Coil 4 18,100 0.0 n/a 14,100 n/a New Trane MCCB-06 AH -1 4 Pipe Fan Coil 1 50,200 0.0 n/a 100,000 n/a New Trane MCCB-08 AH -2 4 Pipe Fan Coil 1 60,000 0.01 n/a 80,000 n/a New Trane MCCB-12 AH -3 4 Pipe Fan Coil 1 28,342 0.0 n/a 150,000 n/a New Trane MCCB-21 AH -4 4 Pipe Fan Coil 1 260,000 0.01 n/a 300,000 n/a New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP Premium Eff. Motor CFM Premium BHP Eff. Motor Multi -Aqua -09-H-01 Constant Volume No Economizer 200 0.02 IZI none ❑ Multi -Aqua Constant Volume No Economizer 300 0.13 IZI none ❑ Multi-Aqya M ME a No Economizer 380 0.05 IZI none ❑ Trane - - n olume No Economizer 2,800 1.00 El none ❑ he CCB -08 Al -2 ant Volume No Economizer 3,300 1.00 p none ❑ Trane MCCB-12 6eolume No Economizer 5,000 2.00 p none ❑ Trane MCCB-21 AH -4 stant Volume No Economizer 8,000 3.00 m none ❑ EnergyPro5.0 by Ene Soff User Number.' Run Code: 2010-11-16T10:54:07 ID.7 10-1553 Page 60 of 100 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Lundberg Farms Date 11/16/2010 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Oty, Efficienc Tons Premium Ot . GPM BHP Eff. Motor Pump Control 13 11 DHW / BOILER SUMMARY System Name Type Distribution Ot . Rated Input (Gals). Vol. Energy Factor or RE Standby Loss Tank Ext. or Pilot R-Value Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water iping Length ft Control Ot . HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Oty. Output Aux. kW Eff iclency Output Eff iclency Status Trane MCCB-03 AH-5 4 Pipe Fan Coil 1 50,000 0.0 n/a 42,600 n/a New Trane MCCB-03 AH-6 4 Pipe Fan Coil 1 53,000 0.0 n/a 48,000 n/a New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM Premium BHP Eff. Motor CFM BHP Premium Eff. Motor Trane MCCB-03 AH-5 Constant Volume No Economizer 1,300 0.33 IZI none ❑ Trane M6G8IS No Economizer 1,400 0.33 ❑ none ❑ ❑ ❑ 16:: FOR ❑ ❑ CODE ILUICE ❑ ❑ ❑ ❑ EnergyPro&O by EnergySoft User Number: 7870 RunCode: 2010-11-16710:54:07 1D: 10-1553 Page 61 of 100 ENVELOPE MANDATORY MEASURES:, NONRESIDENTIAL 'ENV -MM, Project Name Date Lundberg Farms 11/16/2010 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4,'Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising.walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding),and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the - applicable default SHGC. §I 16(b): Site Constructed Doors, Windows and Skylights shall be caulked between the' unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). f PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEFOR - CODE COLIANCE DATE BY Ener Pro 5.0 by EnerqySoft User Number. 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Pa a 62 of 100 U LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Date Lundberg Farms 11/16/2010 Indoor Lighting Measures: §131(d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each'area with floor -to -ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131(b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for §131(c): the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. §132(c): Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements listed. J PERMIT# l BUTTE COUNTY DEVELOPMENT SERVICES REVIE FD FOS COIF CO PLIAN('3E i DATE BY Ener Pro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16710:54:07 ID: 10-1553 Page 63 of 100 U MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Lundberg Farms 11/16/2010 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 1 10°F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. PERMIT # BUTTE COUNTY DEVELOPMEi tT SERV S REVIa = ED FOR CODE COMPLIANCE DATE BY [E7,—,gyp,,, 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11-16710:54:07 ID: 10-1553 —:—Page 64 of 100 N 9 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-09-H-01 546 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING CFM Sensible Total Room Loads 414 7,615 Return Vented Lighting 0 Return Air Ducts 381 Return Fan 0 Ventilation 0 0 Supply Fan 112 Supply Air Ducts 1 3811 TOTAL SYSTEM LOAD 1 8,488 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output per System 10,600 846 228 8,247 Total Output Btuh 10,600 Output Btuh/s ft 19.4 412 Cooling System 0 Output per System 8,500 0 0 0 Total Output Btuh 8,500 846 -112 t Total Output ons 0.7 412 Total Output Btuh/s ft 15.6 + Total Output s ft/Ton 770.81 8,960 Air System - CFM per System 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi -Aqua MHWW-09-H-01 5,900 2,600 10,600 Airflow cfm/s ft 0.37 Airflow cfm/Ton 282.4 Outside Air % 0.0% Total Adjusted System Output 1 5,900 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 2,600 10,600 Jul 2 PM Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCH ROM ETRICS Airstream Temperatures at Time of Heating Peak 22 OF 69 OF 69 OF 105 OF Outside Air �- 0 cfm Supply Fan Heating Coil 104 OF 200 cfm i ------- i ROOM' - i. 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 101 / 70 OF 79 / 65 OF 80 / 65 OF 60 / 58 OF o Outside Air 0 cfm Supply Fan Cooling Coil61 / 58 OF 200 cfm _................. 50.0% ROOM 79 165 OF 78 / 65 OF BUTTE COUNTY DEVELOPPAEN? SERVICES r EnergyPro5.0byEnergySoff User Number: 7870 Run Code: 2010-11-16T10:54• - B-%j.r age65of100 DATE BY HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Lundberg Farms Date 11/16/2010 System Name Multi -Aqua MHNCCW-04-01 Floor Area 137 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 96 Return Vented Lighting Return Air Ducts Return Fan Ventilation F 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK ;:.Heating System Sensible Latent CFM Sensible Output per System 9,000 2,323 212 55 2,062 Total Output Btuh 9,000 0 Output Btuh/s ft 65.9 116 103 ' Cooling System 0 0 Output per System 9,800 0 0 0 0 Total Output Btuh 9,800 597 1161 1 3,151 212 -597 Total Output ons 0.8 103 Total Output Btuh/s ft 71.8 Total Output s ft/Ton 167.1 1,671 Air System CFM per System 300 HVAC EQUIPMENT SELECTION Airflow cfm 300 Multi -Aqua MHNCCW04-01 6,800 3,000 9,000 Airflow cfm/s ft 2.20 Airflow cfm/Ton 367.3 Outside Air % 0.0% Total Adjusted System Output 6,800 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 3,000 9,000 Jul 2 PM I Jan 1 AM Outside Air cfm/s ft 0.00 ;,Note: values above given at ARI conditions ;HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 70 OF Outside Air 0 cfm Supply Fan 300 cfm 70 OF 72 OF 105 OF Heating Coil _---777 105 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 101/70°F 78/62°F 80/63°F 55/53°F --►�' aw Outside Air Ar 0 cfm Supply Fan Cooling Coil 55 / 54 OF 300 cfm 41.2 % ROOM i 78/62°F _ _ 78/62°F I PERMIT # -- BUTTE COUNTY DEVELOPMENT SERVICES EnergyPro 5.0 by EnergySoff User Number: 7870 RunCode: 2010-11-16710:54:07 ID: E 100 DATE _ BY -HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY " Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-09-H-01 442 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 327 0 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 10,600 7,447 685 183 6,579 Total Output Btuh 10,600 0 Output Btuh/s ft 24.0 372 329 Cooling System 0 0 Output per System 8,500 0 0 0 0 Total Output Btuh 8,500 112 1 372 1 8,303 685 -112 Total Output ons 0.7 329 Total Output Btuh/s ft 19.2 Total Output s ftlron 624.0 1 7,125 Air System CFM per System 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi -Aqua MHWW-09-H-01 5,900 2,600 10,600 Airflow cfm/s ft 0.45 Airflow cfm/Ton 282.4 Outside Air % 0.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 5,900 2,600 10,600 Jul 2 PM Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak _ 22 OF 68 OF 69 OF 105 OF gA 5 BYO Outside Air 0 cfm Supply Fan Heating Coil 103 OF 200 cfm ROO 68 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 101 / 70 OF 80 / 64 OF 80 / 64 OF 55 / 54 OF Outside Air Ar 0 cfm Supply Fan Cooling Coil57 / 54 OF 200 cfm _....... ..... � 44.2% ROOM 80 / 64 OF 78 / 63 OF PERMIT # lal I��I BUTTE COUNTY DEVELOPMENT SERVICES RE E- � F EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07C0 ME( ? e of 100 DATE _ By___ U HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-18-H-01 390 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING CFM Sensible PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output per System 18,100 Total Room Loads 466 8,951 1,2091 208 7,583 Total Output Btuh 18,100 Return Vented Lighting 0 Return Air Ducts 448 Return Fan 0 Ventilation 195 5,623 Supply Fan 328 Supply Air Ducts 448 TOTAL SYSTEM LOAD 15,797 Output Btuh/s ft 46.4 379 Cooling System 0 Output per System 14,100 2841 195 9,838 Total Output Btuh 14,100 1,493 -328 Total Output Tons 1.2 379 Total Output Btuh/s ft 36.2 Total Output s ft/Ton 331.91 17,852 Air System CFM per System 380 HVAC EQUIPMENT SELECTION Airflow cfm 380 Multi -Aqua MHWW-I8-H-01 11,100 3,000 18,100 Airflow cfm/s ft 0.97 Airflow cfm/Ton 323.4 Outside Air % 51.3% Total Adjusted System Output 11,100 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 3,000 Jul 2 PM 18,100 Jan 1 AM Outside Air cfm/s ft 0.50 `Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 45 OF 46 OF 105 OF Outside Air 195 cfm Supply Fan Heating Coil 104 OF AL 380 cfm ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 102/71°F 89/66°F 90/66°F 55/53°F �.� Outside Air 195 cfm Supply Fan Cooling Coil 56 / 53 OF 380 cfm...._................_............... 48.6 % I ROOMI' I; I' 75 ! 62 OF 74 u e -E IT # �, ^i'-M€SIT SERVICES I BUTTECOUNly REVIEFOR EnergyPro 5.0 by EnergySoft User Number: 7870 Run Code: 2010-11-16T10:5 : Page 68 of 100 DATE U i"HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Lundberg Farms Date 11/16/2010 .System Name Multi -Aqua MHWW-18-H-01 Floor Area 306 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation 1 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM Sensible 613 11,544 0 577 0 153 4,352 328 577 1 17,379 COIL HTG. Latent CFM 3,173 172 -684 153 2,489 PEAK Heating System Sensible Output per System 18.100 6,324 Total Output Btuh 18,100 Output Btuh/s ft 59.2 316 Cooling System 0 Output per System 14,100 7,732 Total Output Btuh 14,100 -328 Total Output ons 1.2 316 Total Output Btuh/s ft 46.2 Total Output s ft/Ton 260.0 14,360 Air System CFM per System 380 HVAC EQUIPMENT SELECTION Airflow cfm 380 Multi -Aqua MHWW-I8-H-01 11,100 3,000 18,100 Airflow cfm/s ft 1.24 Airflow cfm/Ton 323.4 Outside Air % 40.2.% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 11,100 r 3,000 18,100 Jul 3 PM Jan 1 AM Outside Air cfm/s ft 0.50 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 50 OF Outside Air 153 cfm Supply Fan 380 cfm 69 of 51 OF 105 OF Heating Coil 104 OF ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102 / 71 OF 86 ! 66 Outside Air 153 cfm 75 / 64 OF OF 87 / 67 OF 55 / 53 OF ........... Supply Fan Cooling Coil 380 cfm SFR 56 / 54 OF ".. 55.4% R©O 74 163 OF MIT # BUTTE COUNTY DEVELOP REVIE-WED FOR EnergyPro 5.0 by EnergySoft User Number: 7870 Run Code: 2010-11-16T10: a 69 of 100 DATE BY HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi-Aqua MHWW-09-H-01 867 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,441 Return Vented Lighting Return Air Ducts Return Fan Ventilation 348 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK Sensible 26,265 0 1,313 0 9,711 112 1 1,313 1 38,714 COIL HTG. Latent CFM 6,966 406 -3,725 348 3,241 PEAK -Heating System Sensible Output per System 10,600 14,567 Total Output Btuh 10,600 Output Btuh/s ft 12.2 728 Cooling System 0 Output per System 8,500 17,342 Total Output Btuh 8,500 -112 Total Output ons 0.7 728 Total Output Btuh/s ft 9.8 Total Output s ft/Ton 1,224.01 33,254 Air System CFM per System 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi-Aqua MHWW-09-H-01 5,900 2,600 10,600 Airflow cfm/s ft 0.23 Airflow cfmfTon 282.4 Outside Air % 174.2% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEWPEAK 5,900 2,600 10,600 Jul 3 PM I Jan 1 AM Outside Air cfm/s ft 0.40 `Note: values above given at ARI conditions •HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 31 OF 31 OF 105 OF Outside Air 348 cfm Supply Fan Heating Coil 103 OF 200 cfm ROOM 68 OF 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak 102/71 OF 97/70°F 97/69°F 55/53°F ,1F. - Outside Air Ar 348 cfm Supply Fan Cooling Coil57 / 54 OF 200 cfm 62.4% ........................... . R00M is 76 / 66 OF 74 / 65 OF PERMIT # B ES FSP\Ilr:WED FOR Ene7115.0 by EnergySoN User Number: 7870 Run Code: 2010-11-16T10:54:0 of 100 DATE UT HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHNCCW-04-01 867 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING CFM Sensible Total Room Loads 1,711 31,185 Return Vented Lighting 0 Return Air Ducts 1,559 Return Fan 0 Ventilation E 555 15,467 Supply Fan 597 Supply Air Ducts 1 1,559 TOTAL SYSTEM LOAD 50,368 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output perSystem 9,000 9,720 406 14,567 Total Output Btuh 9,000 Output Btuh/s ft 10.4 728 Cooling System 0 Output perSystem 9,800 -8,883 555 27,623 Total Output Btuh 9,800 838 -597 Total Output ons 0.8 728 Total Optput Btuh/s ft 11.3 Total Output s ft/Ton 1,061.6 1 43,049 Air System CFM perSystem 300 HVAC EQUIPMENT SELECTION Airflow cfm 300 Multi -Aqua MHNCCW04-01 6,800 3,000 9,000 Alrflow cfm/s ft 0.35 Airflow cfm/Ton 367.3 Outside Air % 185.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1 6,800 3,000 1 9,000 Jul 3 PM Jan 1 AM Outside Air cfm/s ft 0.64 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 22 OF 23 OF 105 OF Outside Air 555 cfm Supply Fan Heating Coil 103 OF 300 cfm -- ROOM 68 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 102 / 71 OF 102170 Of 103/7101 55 / 52 OF . Outside Air Ar 555 cfm Supply Fan Cooling Coil 57 / 53 OF 300 cfm , 68.4% v ROOM 76 / 67 OF 74/ 67 OF - PERMIT # 4 BUTTE COUNTY DEVELOPMENT SERI/ICES REVIEWED FOR EnergyPro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16T10: 1 e 71 of 100 DATE By. HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-097H-01 937 -ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING CFM Sensible 796 14,944 0 747 0 77 2,180 112 747 18,730 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output per System 10,600 1,682 201 7,389 Total Output Btuh 10,600 Output Btuh/s ft 11.3 369 Cooling System 0 Output per System 8,500 -38 77 3,887 Total Output Btuh 8,500 1,644 -112 Total Output ons 0.7 369 Total Output Btuh/s ft 9.1 Total Output s ftrron 1,322.71 11,903 Air System CFM per System 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi -Aqua MHWW-09-H-01 5,900 2,600 10,600 Alrf low cfm/s ft 0.21 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 5,900 2,600 10,600 Jul 2 PM Jan 1 AM Airflow cfmfTon 282.4 Outside Air % 38.4% Outside Air cfm/s ft 0.08 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 62 OF 62 OF 105 OF Outside Air 77 cfm Supply Fan Heating Coil 104 OF AL 200 cfm 1Y1 M �RV� 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 102 / 71 OF 80 / 64 OF 80 / 64 OF 55 / 54 OF Outside Air 77 cfm Supply Fan Cooling Coil 56 / 54 OF . 200 cfm 50.8 % ....... ....ROOM.._ .. _..... r, 75 / 62 OF _ ERMIT # 74 1.62 OF Zi31JNTDEVELOPMENT SERVICES REv,' WED FC R EnergyPro 5.0 by EnergySoft User Number. 7870 RunCode: 2010-11-16T E/ Page 72 of 100 uH�t 6Y HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-18-H-01 512 ENGINEERING CHECKS SYSTEM LOAD Number of S stems 1 COIL CFM Total Room Loads 413 Return Vented Lighting Return Air Ducts Return Fan Ventilation 77 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 18,100 7,976 1,023 77 2,845 Total Output Btuh 18,100 0 Output Btuh/s ft 35.4 399 142 Cooling System 0 0 Output perSystem 14,100 2,222 52 77 3,919 Total Output Btuh 14,100 328 1,075 -328 Total Output ons 1.2 399 142 Total Output Btuh/s ft 27.6 Total Output s ft/Ton 435.3 11,324 6,720 Air System CFM perSystem 380 HVAC EQUIPMENT SELECTION Alrtlow cfm 380 Multi -Aqua MHWW-I8-H-01 11,100 3,000 18,100 Airflow cfm/s ft 0.74 Airflow cfmrron 323.4 Outside Air % 20.2% Total Adjusted System Output 11,100 3,000 18,100 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK I Jul 2 PM Jan 1 AM Outside Air cfm/s ft 0.15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 60 OF 61 OF 105 OF DEEM Outside Air 77 cfm Supply Fan Heating Coil 105 OF 380 cfm -- ROOM 70 OF 70 IF .COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 102/71°F 80/64°F 81!64°F 55/54°F Efl Outside Air r -4 77 cfm Supply Fan Cooling Coil 56 ! 54 OF 380 cfm 49.5% ROOM 75 ! 62 OF 74/ 62 OF AI IApvmmvC'1FLC NT SERVICES RLVIEWED FOR 12 EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 20 :5 . I : 1 - 3 —Page 73 of 100 U HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-09-H-01 525 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 601 Return Vented Lighting Return Air Ducts Return Fan Ventilation F 79 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK I COIL HTG. PEAK Heating System Sensible Latent I CFM Sensible Output perSystem 10,600 10,980 1.0501 200 7,239 Total Output Btuh 10,600 0 Output Btuh/s ft 20.2 549 362 Cooling System 0 0 Output perSystem 8,500 2,200 -21 79 3,945 Total Output Btuh 8,500 112 1 5491 I 14,390 1,029 -112 Total Output ons 0.7 362 Total Output Btuh/s ft 16.2 Total Output s ft/Ton 741.5 11,796 Air System CFM perSystem 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi -Aqua MHWW-09-H-01 5,900 2,600 10,600 Airflow cfm/s ft 0.38 Airflow cfm/Ton 282.4 Outside Air % 39.4% Total Adjusted System Output 1 5,9001 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 2,600 10,600 Aug 2 PM Jan 1 AM Outside Air cfm/s ft 0.15 Note: values above iven at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 55 OF 55 OF 105 OF VNE Outside Air 79 cfm Supply Fan Heating Coil 104 OF AL 200 cfmROOM j'. 4 + 69 OF 70 OF .COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102/71 OF 84/65°F 84/65°F 55/53°F 650) Outside Air Ar 79 cfm Supply Fan Cooling Coil 57 / 54 OF 200 cfm.......................... .......... ...... 50.6% j' ROOM r 76/ 63 OF _ 74/ 62 OF I 2 vi I I C LIU IENT SERVICES REVIEWED FOR EnergyPro 5.0 by EnergySoff User Number: 7870 Run Code: 2010 - - Page 74 of 100 uHic BY U HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-09-H-01 215 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation r Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING CFM Sensible 171 3,331 0 167 0 32 903 112 167 4,679 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output perSystem 10,600 430 23 861 Total Output Btuh 10,600 Output Stuh/s ft 49.3 43 Cooling System 0 Output perSystem 8,500 33 32 1,652 Total Output Btuh 8,500 463 -112 Total Output ons 0.7 43 Total Output Btuh/s ft 39.5 Total Output s ft/Ton 303.5 1 2,488 .Air System CFM perSystem 200 HVAC EQUIPMENT SELECTION Airflow cfm 200 Multi -Aqua MHWW-09-H-01 5,900 2,600 10,600 Airflow cfm/s ft 0.93 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 5,900 2,600 1 10,600 Jul 2 PM Jan 1 AM Airflow cfm/Ton 282.4 Outside Air % 16.1% Outside Air cfm/s ft 0,15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 62 OF 63 OF 105 OF Outside Air 32 cfm Supply Fan Heating Coil 105 OF 200 cfm - ROOM 70 OF ---���❑❑❑ 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak) 101 / 70 OF 79 ! 63 OF 80 / 63 OF 55 / 54 OF U Outside Air Ar 32 cfm Supply Fan Cooling Coil 56 / 54 OF 200 cfm 49.1% Re ROOM' °F 75!62PERMIT# OF ICES i REVIEWED FOR EnergyPro 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11-16710:54:07 f 100 My U HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area Multi -Aqua MHWW-18-H-01 488 ..ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM Sensible 290 5,688 0 284 01 1,192 34,880 328 284 1 41,465 COIL HTG. Latent CFM 381 160 6,472 1,192 6,853 PEAK Heating -System Sensible Output per System 18,100 5,873 Total Output Btuh 18,100 Output Btuh/s ft 37.1 294 Cooling System 0 Output per System 14,100 60,403 Total Output Btuh 14,100 -328 Total Output ons 1.2 294 Total Output Btuh/s ft 28.9 Total Output s ft/Ton 415.6 1 66,535 Air System CFM per System 380 HVAC EQUIPMENT SELECTION Airflow cfm 380 Multi -Aqua MHWW-I8-H-01 11,100 3,000 18,100 Airflow cfm/s ft 0.78 Airflow cfm/Ton 323.4 18,100 I Jan 1 AM Outside Air % 313.7% Total Adjusted System Output 1 11,100 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 3,000 Jul 3 PM Outside Air cfm/s ft 2 44 eNote: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 22 OF 23 OF 105 OF Outside Air 1,192 cfm Supply Fan Heating Coil 104 OF 380 cfm ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102/71 OF 102/70°F 103/7001 55/52°F aw ---►—� Outside Air M 1 192 cfm Supply Fan Cooling Coil 56 / 53 OF 380 cfm 44.1 % , . p ; ROOM PERMIT # I. 75 / 60 OF - BUTTE COUNTY DEVELOPMENTgr:.. ES .H� °-WED FOR CODS EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 201 •54:07 0:10-1553 age 76 of 100 �J HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Lundberg Farms Date 11/16/2010 System Name AH -1 Floor Area 1,961 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING CFM Sensible Total Room Loads 4,373 82,609 Return Vented Lighting 0 Return Air Ducts 4,130 Return Fan 0 Ventilation 0 0 Supply Fan 3,070 Supply Air Ducts 1 4,130 TOTAL SYSTEM LOAD 93,940 PEAK COIL HTG. PEAK Heating System Latent CFM Sensible Output per System 50,200 43,745 1,084 39,883 Total Output Btuh 50,200 Output Btuh/s h 25.6 1,994 Cooling System 0 Output per System 100,000 0 0 0 Total Output Btuh 100,000 43,745 -3,070 Total Output ons 8.3 1,994 Total Output Btuh/s ft 51.0 Total Output s ftrron 235.3 40,801 Air System CFM per System 2,800 HVAC EQUIPMENT SELECTION Airflow cfm 2,800 Trane MCCB-06 AH -1 80,000 20,000 50,200 Airflow cfm/s ft 1.43 Airflow cfmfTon 336.0 Total Adjusted System Output 80,000 20,000 1 50,200 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jul 3P ml F Jan 1 AM Outside Air % 0.0 % Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 69 OF Outside Air 0 cfm Supply Fan 2,800 cfm 69 OF 70 OF 105 OF Heating Coil 104 OF _ ROOM ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102/71 OF 75!67°F 76/67°F 55/54°F (off Outside Air 0 cfm Supply Fan Cooling Coil 56 / 55 OF 2,800 cfm PERMIT# 66.8% ROOM 75 67 °F BUTTE COUNTY DEVELOPMENT SERVICES 74 / 66 OF / VIBAGM FOR -J ®�'� C®fV�PLiANCE DA EnergyPro 5.0 by EnergySoft User Number. 7870 Run Code: 2010-11-16T10:54:07 ID. 10- age 77 of 100 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area AH -2 2,224 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 2,581 Return Vented Lighting Return Air Ducts Return Fan Ventilation F 427 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK I COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 60,000 50,591 4,789 959 35,473 Total Output Btuh 60,000 0 Output Btuh/s ft 27.0 2,530 1,774 Cooling System 0 0 Output per System 80,000 12,483 723 427 21,731 Total Output Btuh 80,000 3,070 5,512 -3,070 Total Output ons 6.7 2,530 1,774 Total Output Btuh/s ft 36.0 Total Output s ftfron 333.6 1 71,203 57,681 Air System CFM per System 3,300 HVAC EQUIPMENT SELECTION Airflow cfm 3,300 Trane MCCB-08 AH -2 60,000 20,000 60,000 Airflow cfm/s ft 1.48 Airflow cfm/Ton 495.0 Outside Air % 12.9% Total Adjusted System Output 60,000 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 20,000 60,000 Jul 2 PM I Jan 1 AM Outside Air cfm/s ft 0.19 Note: values above given at ARI conditions I HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 63 OF 64 OF 105 OF o" Outside Air 427 cfm Supply Fan Heating Coil 104 OF 3,300 cfm I ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102 / 71 OF 78 / 63 OF 79 / 63 OF 55 / 54 OF Outside Air 427 cfm Supply Fan Cooling Coil 56 / 54 OF 3,300 cfm .............._ ..... . 48.3% ROOM Al PERMIT # 75 / 61 OF 74 / 61 OF BUTTE COUNTY DEVELOPMFNT REVIEWED FOS CO® EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-DATST10:54:07 ID: 10-1553 Page 78 of 100 U HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area AH -3 3,180 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 5,982 0 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 28,342 139,147 61,613 639 23,814 Total Output Btuh 28,342 0 Output Btuh/s ft 8.9 6,957 1,191 Cooling System 0 0 Output perSystem 150,000 0 0 0 0 Total Output Btuh 150,000 6,069 1 6,957 1 159,131 61,613 -6,069 Total Output ons 12.5 1,191 Total Output(Bt uh/s ft 47.2 Total Output s ft/Ton 254.4 20,126 Air System CFM perSystem 5,000 HVAC EQUIPMENT SELECTION Airflow cfm 5,000 Trane MCCB-12 AH -3 125,000 25,000 28,342 Airflow (cfm/scito 1.57 Airflow cfm/ron 400.0 Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1 125,000 25,000 28,342 Jul 3 PM Jan 1 AM Outside Air M 0-0% Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 70 OF 71 OF 105 OF Outside Air 0 cfm Supply Fan Heating Coil 105 OF 5.000 cfm -----....... _.. -- — ROOM 70 OF 70 OF 'COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 102 / 71 OF 79 ! 67 OF 80 / 67 OF 55154 OF Outside Air Ar 0 cfm Supply Fan I Cooling Coil 54 °F PP PERMIT # 56 ! 5,000 cfm BUTTE COUNTY DEVELOpy _. ;± �x RtE:1p ° E V l ,4* / �': tf y 79 / 67 OF , ®� g C IV -1 ""LIMN 166 OF DATE_ 9 5 !9 � r, BY``` EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16710:54:07 ID: 1071553 Page 79 of 100 !J HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Lundberg Farms Date 11/16/2010 System Name AH -4 Floor Area 12,790 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 13,246 1,919 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 260,000 249,136 26,604 3,853 141,158 Total Output Btuh 260,000 0 Output Btuh/s ft 20.3 12,457 7,058 Cooling System 0 0 Output perSystem 300,000 54,593 474 1,919 97,017 Total Output Btuh 300,000 8.798 12,457 1 337,441 27,078 -8,798 Total Output ons 25.0 7,058 Total Output Btuh/s ft 23.5 Total Output s ftfron 511.6 243,493 Air System CFM perSystem 8,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 8,000 Trane MCCB-21 AH -4 280,000 20,000 260,000 Airflow cfm/s ft 0.63 Airflow cfmfron 320.0 Outside Air % 24.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1 280,000 20,000 1 260,000 Jul 3 PM I Jan 1 AM Outside Air cfm/s ft 0.15 Note: values above given at ARI conditions I HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 58 OF Outside Air 1,919 cfm Supply Fan 8,000 cfm 69 OF 59 OF 105 OF Heating Coil 104 OF ------- ROOD 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102/71 OF 82/64°F 83/65°F 55/53°F o Outside Air I-- Ar Supply Fan Cooling Coil 1,919cfm 8,000 cfm PERMIT # 75/62°F DATE 56 / 54 OF 50.0% ROOM BUTTE COUNTY DEVELOPMENT REVIEWED FOR 74!62°F B BY EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T10:54:07 ID: 10-1553 Page 80 of 100 -HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Lundberg Farms Date 11/16/2010 System Name AH-5 Floor Area 918 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation F703 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL CFM 1,492 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent, CFM Sensible Output perSystem 50,000 28,734 10,968 156 5,817 Total Output Btuh 50,000 0 Output Btuh/s ft 54.5 1,437 291 Cooling System 0 0 Output perSystem 42,600 20,309 -2,768 703 35,989 Total Output Btuh 42,600 1,353 1 1,437 I 53,270 8,200 -1,353 Total Output ons 3.6 291 Total Output Btuh/s ft 46.4 Total Output s ft/Ton 258.5 41,034 Air System CFM perSystem 1,300 HVAC EQUIPMENT SELECTION Airflow cfm 1,300 Trane MCCB-03 AH-5 38,900 3,700 50,000 Airflow cfm/s ft 1.42 Airflow cfmfron 366.2 Outside Air % 54.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 1 38,900 3,700 50,000 Jul 2 PM I Jan 1 AM Outside Air cfm/s ft 0.77 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 44 OF Outside Air 703 cfm Supply Fan 1,300 cfm 70 OF 45 OF 105 OF Heating Coil 105 OF --- —,. ROOM 70 IF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102 / 71 OF 90 ! 67 OF 91 / 67 OF 55 / 53 OF Outside Air Ar 703 cfm AL Supply Fan Cooling Coil 1,300 cfm iii s`1 T 75 / 63 OF TF— 56 / 53 OF 54.7% ° ROOM BUTTE VOUNTY DEVELOPMENTSERvic �`-`a�re;,.��� �D FOR E COMPEIANCE _ BY h77T770 5.0 by EnergySoft User Number: 7870 Run Code: 2010-11-16T10:54:07 ID: 10-1553 Page 61 of 100 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Lundberg Farms 11/16/2010 System Name Floor Area AH -6 1,357 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,767 Return Vented Lighting Return Air Ducts Return Fan Ventilation 441 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 53,000 33,854 8,536 758 27,702 Total Output Btuh 53,000 0 Output Btuh/s ft 39.1 1,693 1,385 .,Cooling System 0 0 Output perSystem 48,000 12,717 -1,092 441 22,278 Total Output Btuh 48,000 1,353 1,693 1 51,310 7,444 -1,353 Total Output ons 4.0 1,385 Total Output Btuh/s ft 35.4 Total Output s ft/Ton 339.2 51,396 Air System CFM perSystem 1,400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 Trane MCCB-03 AH -6 42,000 6,000 53,000 Airflow cfm/s ft 1.03 Airflow cfmfron 350.0 Outside Air°/, 31.5% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 42,000 6,000 53,000 Jul 3 PM Jan 1 AM Outside Air cfm/s ft 0.33 Note: values above given at ARI conditions I HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 22 OF 54 OF 55 OF 105 OF Outside Air 441 cfm Supply Fan Heating Coil 104 OF 1,400 cfm Pt00M 69 OF 70 OF ,COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 102/71°F 84/65°F 85/66°F 55/53°F Outside Air Ar 441 cfm Supply Fan Cooling Coil 56 / 54 OF cfm �,....................._.... _..._.........,i .. ,1,400 53.1 % ;''; ROOM. 75 / 63 OF PERMIT # 74 / 63 OF 4 ze, 4 3 oRUTTE Ent iNN r1FVi=i nPMFNT SF yi _S REVIEWED FOR EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16T :07 ID: 16-156-3 Page 82 of 100 C ZONE.., .. Project Lundbergte Farms .. 1111612010 System Multi -..Floor. ,. , _- .. ZONE ... SUMMARY ZONAL..HEATING PEAK -ZONE•AD SUMMARY Project Lundberg Farms 1111612010 Name A.MHNCCW-04-01 FloorSystem 137 ZONE LOAD MWW 0���y.� L • _i��Y� ME MIMPLAW �__-__--_�___ mew, (BLOCKLOAD) EnergyPro ..70 . . 00 ZONE LOAD SUMMARY Project ••- • Farms 1111-612010 System Name Multi -Aqua/• / Floor ZONE LOAD •COOLING MM (BLOCKLOAD) C,. LOAD SUMMARY ProjectZONE Lundberg Farms , ate 1111612010 Name Multi-Aquai FloorSystem • C ... ,. Project Lundbergate Farms . 1111612010 J System Name ... .. ,. ZONE ... SUMMARY COOLING IM ... EnergyPro 5. ,. ,, ZONE •SUMMARY ProjectDate Lundberg Farms 1111612010 Name Multi-Aqua0' FloorSystem :. ZONE LOAD SUMMARY COOLINGZONAL SYSTEM A SYSTEM NAME ... ..,. ., Page 88 of 100 ZONE •AD SUMMARY Project.. Lundberg Farms te 1111612010 System Name Multi -Aqua MHNCCW-04-01 —Ro"rea 867; ZONE LoA6 ZONAL SYSTEM .. SYSTEM NAME BUTTE COUNTY (BLOCKLOAD) ZONE •Ar SUMMARY • Lundbergroject Name Farms Date 1111612010 Name Multi-Aqua0• FloorSystem ZORE ... SUMMARY COOLING NAME My wan LOAD)SYSTEM ZONE •SUMMARY Project Name !Lun••- • Farms Date 1111612010 Name iMulti-Aqua FloorSystem ZONE LOAD ZONAL•• (BLOCK• • EnergyPro 5. 0 by EnergySoft User Number 7870 RunCode: 2010-11-16TIO:54:07 ID:10-1553 Page 91 of 00 ZONE •AD SUMMARY ..- Lundberg Farms .. te 1111612010 Name Multi-Aqua 0• FloorSystem 525 ZONE ... SUMMARY SYSTEM NAME FC- 18,19,20 /Rinrk-IOAD),. ZONE •SUMMARY Project Lundberg Date 1111612010 System Name Multi-AquaI• Floor 215 ZONE LOAD SYSTEM NAME Yn 911M., SIN (BLOCKZONENAME LOAD) EnergyPro 5.0 by EnergySoft User Number: 7870 RunCode: 2010-11-16TIO:54:07 0:10-1553 Page 93 of 100 C► C ... .- . Lundberg Farms Date 1111612010 System .. .. ::: ZONE .., SUMMARY COOLINGZONAL SYSTEM C . ZONE .... P. Lundbergte Farms ,. 1111612010 Name AH -I FloorSystem 1,961 -- Mr-M. (BLOCKLOAD) qtw ZONE •AD SUMMARY Project Lundberg Farms 1111612010 Name FloorSystem 2,224 ZONE LOAD SUMMARY ZONAL.. NAME RPM Owl LOAD)SYSTEM ZONE •A. SUMMARY • . Lundberg Farms Date 1111612010 Name FloorSystem ., 4:1 V,M-9701 "11 (BLOCKLOAD) En-ergyPro 5. 0 by Energ-ySoft User Number., 78 70 RunCode: 2010-11-16TIO:54:07 ID:10-1553 Page 97 of 100 M 4+ ZONE •SUMMARY Project Lundberg Farms Date 1111612010 System Name - -- .. .I ZONE LOAD (BLOCK.., EnergyPro5.0byEnergySoft User Number: 78 70 RunCode: 2010-11-16TIO:54:07 ID:10-1553 Page 98 of 100 ZONE •SUMMARY Project.. Lundberg Farms te i Name AH -5 FloorSystem 918 ZONE LOAD COOLINGZONAL SYSTEM (BLOCKWINE LOAD) ZONE LOAD SUMMARY Project Name Lundberg Farms I Date 1111612010 System Name ;AH -6 floor Area 1,357 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK LORI U -Mi SYSTEM NAME M1,4 NO - MR2 M-4 - -(BLOCK LOAD) EnergyPro 5. 0 by EnergySoft User Number: 7870 RunCode: 2010-11-16TIO:54:07 0:10-1553 Page 100 of 100