Loading...
HomeMy WebLinkAboutB16-2527 039-300-003r Bum Butte Butte County Building Division °OT's NOV 15.2016 u1w•--- """" "`" `�` `G`'' Y DEVELOPIME1vT Owner s name: e, LA Z A.P.#�-_ SERVICES Home Manufacturer: i �i¢�g-/�� Manufacture Year: Model Number/ Name: S5P7 / Width: (ft.) Length: _ ,} FOOTINGS: Wood - pressure treated or foundation gradef J Other. SUPPORTS: Concrete blocksV Other:[ Provide manufacturer's installation manual, support blocking requirements and state approved or engineered foundation or tie down system specifications. Pier. Footing Sizes and Locations SINGLE WIDE MULTI -WIDE. Line 1TEE -------------------------------------- LM6 1 Line 2Section 1 Line 2 Line 1 ---------- ,� Line 3 Section 2 Line 2 ------------------------------------------ -------=- �ine 4 (triple wide only) Section 3 Line 2 Line 1 Piers. now Loa& psf Pieced @ 30 lb. load Minimum size piers:. j ] X [ ] PLEASE SEE PAGE 29 OF Spacing maximum: INSTALLATION MANUAL From ends maximum:. Line 2 Piers: Minimum size piers: [ �'] X [ Qq"l Spacing maximum: gr From ends maximum: i' Qr Line 3 Roof Loads: Minimum size piers: Location (from front): Minimum size piers: Location (continued): Line 4 Roof Loads: Minimum size piers: Location (from front): Minimum size piers: Location (continued): Line 1 Openina§'ERMITZ52_7 Mirlifhum size pier: [ BUTfE UNTY D VELOPMENT SERVICES Required at each side of eM� Iy,ZgFOR PLIANCE . "Fide V -BYAO All!-) All homes blocked @ 30 psf as a standard. v" i - a w► SIE CoP/ Byj COUNTY Nov 15 2016 DEVELOPMENT SERVICES Gi 6�a5a7 PLATINUM SERIES 40'6" X 73' 4" GSP721K 4 BEDROOM, 3 BATH — 2,855 SQ. FT. s PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR % CODE COMPLIANCE t DATE ((-Z 7n - BY ��y t ., I1�11 1■■(®� - INN j loommm No 11 ,� 1■■■ilI o■■■■■■1 ■■1 C I IN■■■ III\1■ IBJ■■t■■■■►./■•9■■■■11�►7■■■■L IEEE MMMMlMMMMmMMm7 I■■■MI ■■■■■■■MEN �.��. MEN MEN FAME MEN MEN 1 1■■■I ■■■ MEN - MONS■■OMNI . O ` tad■I - ■%IMMEMMEMEMEN ■M■M■■M■MM■ - --- ��01t�s �i::W-ASO lig ila!■iofflimil ■I I■NN■■II■■■!i■ �■■■■�\�I 1■■■■OIMMENTA :.ml •o .o •• o•. PERMIT # BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR % CODE COMPLIANCE t DATE ((-Z 7n - BY ��y t Bu I 11; CoLTNv PERMIT NOV BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR DEVELOPMENT CODE COMPLIANCE SERVICES DATE" -7-94)(0 BY 13'-W CARPET LAYOUT STANDARD CARPET ------ ------- • wsu suir fro w - 2c, 04A Rlr. n( Ijo OMWM 2. A44 cl) A L"T I -QO -j*g,--,gq00 40 2 30 16M 7120 8300 ---------- M. --------------- ------ OPTIONAL CARPET Wsu BATH FMR FMR ----•--------- — - — - — - — - — - --•-----•-------- ------------------ BC3 - Ulm LINIT 20.1 30 140 1240126/0i32001 1200 /Ti "n 31-r 4.4 3M' ----------- ------- — -------- ----------- FAm ftauml 10 w"t, k" A15..y Plml #972 PACIFIC S.W. PAC BLVD. C L"T ALBANY, OR 97321 M Pho'e (541) 926-8631 WODCEOC-, Fax (866) 491-6847 m ------------ CARPET & PIER LOC. - ------ ------- G. UJND Ir WALLS LEGEND SE -:-UP NOTES: 1,ULU SMtb uar-042K-■ 113 AUM PER TABLE 5 THROUGH M RED 17'M 1 Om & 'll!"111.1 - INVAILLAmoN umm I. CENTMIN E FaM M BE LOCATED UNDER RiDGE SUPPORT POSTS. 2. THE STANDARD CONFICURAT; 0: THS HOME MAY HAVE BEEN A CUM PW ON MODIFIED. SKU BE PROADED. IF NOT. THE 4-6-13 5C Or INSTALLATION WANUAL FOR SPACING AND LOADING-niffro— -D SET-UP CONIRAC,01 SNAIL CALL C6 - 'A CUSTOM PIER PRINT. Bu I 11; CoLTNv PERMIT NOV BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR DEVELOPMENT CODE COMPLIANCE SERVICES DATE" -7-94)(0 BY This Project shall comply with the2013 Califomia Building Code (CBC), ( 1' 1 2013 California Residential Code (CRC), 2013 Califomia• Electrical Code (CEC), 2013 California Plumbing Code (CPC), 2013 California ,Fire Code and the 3013.Califomia Green Building Standards Code.. (J a. Non-combustible or ignition resistant ext r C ! I wall coverings in accordance with 2013 C Section R327.7. P b. Extl or glazing in accordance with 201 CRC Sectio R327.8. One pane of window s all also be tem c.Decking aterial in accordance ith 2013 ? PERMIT # CRC Sectio 27.9. _� BUT =COUNTY DEVELOPMENT SERVICES I d. Ignition resist t or non-combu REVIEWED eaves and R�EWE� FORsoffits in actor nce .with Zo 3 exC section �ODE COMPLIANCE R327.7.5. .. e. Fire resistive exteri door in accordance with 7-;W-17 BY r ( 302013 CRC Section R3 7.. ATE f. Ignition resistant or no -combustible exterior �i % %�T .� porch ceilings in ad ce with 2013 CRC ce Section R327.7.6. g. Gable attic vents and foundat n vents shall be fully covered w•th metal re mesh or SNS �e, 511-0 P noncombustible aterials with mimum of 1/16" and shall not exceed 1/8" enim ngs• D EjC f ST 1 �P). ../ �� I6 X32' APpv...or. I compliance wi 2013 CRC Section , 27:6.2. wt ra 12'X 24' 7-.4 46 l �{2 X �% r h. Approved eavk vents that resist the in 'cion of _ Flame and burning embers. Per 201 CBCT Section R3 #1 7.6.3 Exception . i. 'Underfloor areas (skirting) of elevat or overhanging buildings shall be enclosed ito grade in accordance with the acquirements of 2013 CRC Section R327.7.8 and R327.T9. I fie LES WEU— I _-3 i �'P,�Q� PT G MINIMUM EROSION AND SEDIMENT CONTROLS (7"Op 90�E� FOR PROJECTS DISTURBING .LESS THAN. ONE _- _ _ S ' 6Y1sT f ACRE - (ifapplicable) ( �� y1/ST I� t I WITH AM171DOW • Stabili2cd en Provide minimum Y :to 6" I �/ 666 �'� � � 34X4?'� 22'X22 • fractured rock 50'long x'15' wide by 6'•deep over construction grade fabric. - 4- �� -�(J (E) F�t�U�J� t' — • All soils tracked onto paved roadways must be/ y 1339 i q ' I t 130' cleaned up on a daily basis. When streets are wet or during a rain event there shall no I i trackingof soils onto the street. • Wattles installed properly behind curb or �. _. — _ _ _ — _I (e) ME�Q(S) sidewalks. _j 771 • Rock bags (minimum per side) it all drain inlet ' locations within 150' of the project site. • Internal filters placed inside each drain inlet. 106t • Trash bars across the•back of all drain inlets. !E% F�Gt UNE ) g J 1 �Jj • areaStabilize all di 51; o f soils in ,the front yard �y 9 /r,� ��LSA areas within DS' of the back of curb or sidewalk. (Straw or erosion blanket may be Ji used for this application)- • • Stabilize all slopes where erosion could occur>r, So,e rI and.cause silt run off. (Straw blankets may be glp�ro�G 2 used for this application)— eXAll paint, fuel, construction products etc. shall a€ be stored in a covered location away' from (E� w A), t,�J• `sem`^ - tit ILS sidewalks and storm drain inlets. • Portable chemical toilets, if provided on the 7.21N. RJE. M.o.e.&M. 39-30 SITE MAP SCALE: V= 40' site, must be. kept off of streets and sidewalks i ` ' zs PROJECT DESCRIPTION: and at least 50' from the nearest storm drain PARCEL VAP AREA OF INTEREST { . inlet. is / ,10 G (P) Proposed: • All trash must be collected and stored properly. 29 •9wa°°` ` Proposed: Do not let items such as drywall mud boxes, a °a i 28 Demolition and • removal of existing Replacement Manufactured Home paint buckets, cleaning material containers etc. , "' ,,.�.- ,, - Manufactured Home come in contact with any rainfall or storm , I O O 0 . ° Q I Installation of Replacement 2ND Dwelling on Stemwall Foundation System: 40'6" X 73'4"2,9670) water runoff. 40'6" 'x 73'4", 4 BDRM/ 3 BTH, 2,855sf • Provide a designated area for concrete washout. Hay bales lined With h visgueen may be•used for 1. d I Manufactured Home on stemwall foundation APN »°,, ��.. _ I system. This home has 200AMP electrical 039-300-003 105.92 ac. this application. Rollaway bins may also -be laSite' °° service 8910 Seven Mile Lane used. All concrete washout systems shall be • I "p° I ii�n ' �• 18 deep footing; 12" concrete pony wall Chico, CA 95928 placed off of the paved streets. B_z m stemwall perimeter permanent foundation , • Afler installation of the above items is O 1 I Cy.S)4 ! 1` system - wood frame and sidingto match complete a maintenance program needs to be l y Owner: Ronald A. Madery, Jr.,�l P P gr ,mom 1. � � home. 9 1 developed to insure the continued effectiveness Two 3' x 3' landing with steps, and"one "steps Kandida De La Cruz Madery & 1 [LJ' of your Best Management Practices. I I' only" off factory Covered Porch - Redwood Dig out and base rock home pad. Xochitl L. De La Cruz `J Rough Contact: De Ann Marinello / g grading only; No finish grading. i F I Tying into and trenching to/ from all existing utilities. Redline Installations, Inc. „9.»4 01"'` C—ty A,o i 200AMP service disconnect box(530)891 -6719, Ext. 216 z"'underground f deann@redlineinstall com 38.90 1 %," water line from well. BUTTE Mum rdam No 15 HIS, �WI>� Soils Investigation Report for Madery Residence 8910 Seven Mile Lane Chico, California 95928 Prepared for: Redline Installation 13407 Garner Lane Chico, CA 95973 Streamline Project No. 2493 September 23, 2016 Q�pFESS/ON R1CHF�� G�yc _Wo 535 M M 7 OF r'EnIvil SEAL APPLIES TO SHEETS 1 THRU BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR CODE COMPLIANCE DATE 1 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 General.....................................................:..........................3 1.2 Proposed Construction.......................................................... 3 1.3 Scope of Work....................................................................... 3 ' 1.4 Attachments ' 2.0 FINDINGS.................................................................................................. 4 2.1 Site Description:.:.:.................... ..... ..................................... 4 ' 2.2 Subsurface Soil Conditions ................................................... 4 2.3 Erosion Controls.................................................................. 4 2.4 Ground Water...................................................................... 4 2.5 Asphalt Pavement.............................:.................................. 4 2.6 Corrosive Soils..................................................................... 4 3.0 CONCLUSIONS AND RECOMMENDATIONS ....................................... 5 3.1 Site Clearing and Grubbing ............................................... 5 3.2 Site Preparation...........................:........................................ 5 3.3. Engineered Fill Construction ................................................. 5 3.4 Foundation Design Recommendations .................................... 6 ' 3.5 Interior Concrete Slabs on Grade for Living ..........� 3.6 ' Special Inspections................................................................ 7 3.7 Site Geology and Seismicity ....................................... ......... 7- 3.8 Soil Expansion Potential......................................................... 8 3.9 Liquefaction Potential ...... :....:. .................. .............................. 8 3.10 CBC Requirements................................................................ 9 4.0 LIMITATIONS..................................................................................... 10 Figures: Figure 1: Site Location Figure 2: Test Pit Location Plan Figure 3: Unified Soil Classification System Figure 4: USGS Design Maps Summary Report Figure 5: Earthquake Epicenter Map Appendix A: Field Investigation Description and Logs Appendix B: Laboratory Test Data Streamline Project No. 2493 Page 2 of 9 60 Independence Cir., Ste. 201!; Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 1.0 INTRODUCTION 1.1 General Streamline Engineering, Inc. and Applied Testing Consultants have performed an investigation of the soil near the proposed building pad for new home. The purpose of this report is to provide the design parameters for the foundation system required to support the structure described herein. This report is intended to satisfy the requirements of the 2013 CBC Section 1803. This report should not be used for additional structures on this site without written approval of Streamline Engineering. 1.2 Proposed Construction This report is prepared based on the assumption that the proposed structure will be a manufactured home placed on a conventional concrete spread foundations. The pad is located as shown on the map included as "Figure 1". The foundation system design is not within the scope of this report. The foundation designer is solely responsible for providing an adequate foundation design to support all imposed loads on the structure including loads required by the California Building Code (CBC) edition as noted in 1.1 above. 1.3 Scope of Work The scope of our services included the following: • Exploration of the subsurface conditions near the proposed building pad using 1 exploratory test hole. • On-site observations of the area surrounding the building pad to study topography and drainage patterns. • Research maps prepared by the United States Department of Agriculture (USDA) • Provide the seismic design variables, SMs, SM 1, SDs, SD 1, soil site class, and the Seismic'Design Category provided by the Unites States Geologic Survey. • Provide soil classification per Table 1806.2 of the CBC based on on-site observations, soil testing, and USDA mapping of site. • Prepare report of findings and recommendations. • The scope of work excludes any items not mentioned above. 1.4 Attachments This report contains Site and Test Pit Location Plans, a profile log for test pit 1, laboratory test data sheets, and ASCE 7-10 Standard Seismic Design Provisions from the website: http://www.earthouake.usgs.gov/research/hazmaps/design/index phi). See figures and appendices. Streamline Project No. 2493 Page 3 of 9 60 Independence Cir., Ste. 201 • Chico, CA 95973 1 (530) 892-1100 1 Fax: 892-1115 2.0 FINDINGS 2.1 Site Description The development site is located on a parcel as shown on "Figure 1" in Chico, California. It is bounded by existing buildings and agricultural land. The site is relatively flat. We made a site visit on 9 / 09 / 16 and found no significant areas of standing water. The building site had no trees or buildings on it at the time of our observation. 2.2 Subsurface Soil Conditions The soil encountered in the top 60" of our test hole consisted predominately of fat clay. The soil would be classified as OH (Organic Clay) as shown on the "Sieve Analysis - Combined" per the Unified Soil Classification chart. See Appendix A for more information and soil profile. 2.3 Erosion Controls It is not within the scope of this report to determine erosion controls. The owner is solely responsible for monitoring erosion for this site. Erosion on our near the site could have a negative impact on any proposed structures on this site. The owner shall maintain the site and surrounding areas as necessary to protect the structure(s) from the effects of erosion and be in compliance with all government requirements. 2.4 Ground Water At the time of our field investigation, no groundwater was encountered in our test holes. It should be noted that the groundwater level on this site will vary depending on the local rainfall, irrigation practices, and runoff conditions. It is possible to find perched groundwater on this site. 2.5 Asphalt Pavement It is not within the scope of this report to provide any recommendations for the construction of asphalt pavement. 2.6 Corrosive Soils It was not in the scope of this report to test for corrosive soils. It should be noted that. Streamline Engineering does not provide corrosion engineering services. If it is necessary to test for corrosive soils, we recommend that a qualified corrosion engineer be retained to provide the necessary services and testing. Streamline Project No. 2493 Page 4 of 9 60 Independence Cir., Ste. 201 0 Chico, CA 95973 0 (530) 892-1100 • Fax: 892-1115 3.0 CONCLUSIONS AND RECOMMENDATIONS 3.1 Site Clearing and Grubbing The site was cleared at the time of our observation. Existing foundations, utilities, septic tanks, and leach fields must be located and removed prior to grading the site. Tree roots larger than 1" in diameter within 5' of the building pad shall be removed and replaced with properly compacted engineered fill. All voids resulting from the removal of foreign objects shall be replaced with properly compacted engineered fill. The thickness of the finished building pad may vary from the scarified depth. 3.2 Site Preparation After completing site clearing and grubbing, the exposed native soil to receive engineered fill should be scarified to a minimum depth of 8" and then uniformly moisture conditioned to within + 4 percent of the ASTM D 1557 optimum moisture content. All surface grades shall be constructed to drain surface water away from the structure pad for a minimum of 10' on all sides. Roof drain discharge should be collected and directed to discharge down slope from the building pad a minimum of 10' away from the building. All compactions shall be observed by Applied Testing Consultants. 3.3 Engineered Fill Construction Where engineered fills are used to support the proposed structure(s) they shall be constructed as noted below: Prior to placement of engineered fill within the pad areas, all organics shall be removed and replaced with compacted engineered fill. The exposed sub -grades should be moisture conditioned and compacted to a minimum of 90% relative compaction, based on test method ASTM D1557. Engineered fill should be placed in 8" loose lifts, moisture conditioned and compacted to 90% relative compaction. The compacted thickness of each layer shall not exceed 6 inches. Compaction control and testing should be performed by a qualified testing agency to insure the recommendations of this report are followed. Depending on the amount of rock encountered in the on-site or import soils. We recommend that compaction testing be performed using Sand Cone methods (per ASTM D1556), or Nuclear Density methods (per ASTM D2922). If imported off-site material is required to build the pads to finish grade, it must be approved by a representative from our office and meet the following minimum criteria. Import material must have a plasticity index of less than 4; be non -expansive (EI<20); have 100% passing the 3" sieve; 30% to 60% passing the #4 sieve; and no more than 20% passing the #200 sieve. Streamline Project No. 2493 Page 5 of 9 60 Independence Cir., Ste. 201 • Chico, CA 95973 0 (530) 892-1100 • Fax: 892-1115 3.4 Foundation Design Recommendations: , Based on the results of our field investigation, it is our professional opinion that the structure described in Section 1.2 may be supported on continuous reinforced concrete footings. The footings shall be properly sized by a design professional to support the design loads without exceeding the allowable design values provided in this report. The bottom of all footings shall be level and clean. Design Criteria: NOTE: THESE VALUES SHOWN ARE MINIMUM DESIGN VALUES AND DIMENSIONS. LARGER DIMENSIONS AND LOWER DESIGN VALUES MAY BE USED AT THE DISCRETION OF THE DESIGN PROFESSIONAL. IT IS NOT WITHIN THE SCOPE OF THIS REPORT TO DESIGN THE FOUNDATIONS. Class of Materials: 0 to -5'+ - Class 5 OH Allowable Foundation Pressure: , Dead + Live loads: 1,500 psf Wind or seismic loads: 2,000 psf Allowable Lateral Bearing Pressure: 100 pcf Lateral Sliding Resistance:, 130 psf Minimum Footing Depth: 18" at perimeter into undisturbed soil and 18" below finished exterior grade Minimum footing steel: Continuous footings: As determined by design professional Isolated footings: 0.002 times the cross sectional area of the footing in each direction Minimum interior/ exterior slabs: As determined by design professional Moisture control through slabs: As determined by design professional Note: Any deviation from the assumptions stated above will require written approval of Streamline Engineering. Streamline Project No. 2493 Page 6 of 9 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 3.5 Interior Concrete Slabs on Grade Not applicable 3.6 Special Inspections The foundation system is conventional in nature and within the scope of the required Building Department inspections. There are no special inspections required for the. excavations or concrete footings associated with this project. 3.7 Site Geology and Seismicity The site is not within an Alquist-Priolo Special Studies Zone according to the State of California Department of Conservation. There are no active faults running through the site according to the book, "Maps of Known Active Fault Near -Source Zones in California and Adjacent Portions of Nevada". Based on these sources, surface rupture due to faulting activity should not be an issue for this site. Due to the frequency of earthquakes in Northern California, ground motion should be expected to occur at this site during the life of the proposed structure. Based on the ASCE 7-10 Standard Seismic Design Provisions for this parcel we have the following Seismic variables: For Lat. = 39.628698 degrees N and Long. = 121.909390 degrees West Soil Site Class D (per CBC 1613.5.2) Ss, Period 0.2 sec.: 0.626 g S1, Period 1.0 sec.: 0.280 g SMs = Fa x Ss: 0.813 g SM1=FvxSl: 0.515g SDs = 2/3 x SMs: 0.542 g " SD1 = 2/3 x SM1: 0.344 g ' Seismic Design Category: D (As defined by the CBC) Streamline Project No. 2493 Page 7 of 9 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 3.8 Soil Expansion Potential The surface and near surface soils encountered at the site were found to contain a certain amount of clay, which has potential for volumetric changes. Based on the EI test that was performed on a sample by Applied Testing Consultants the upper layer of soil is considered to be expansive. Even under ideal conditions the risks for damage to structures due to the swelling and shrinking of soils are not completely eliminated. 3.9 Liquefaction Potential Liquefaction is a phenomenon in which the strength and stiffness of a soil is reduced by earthquake shaking or other rapid loading. Liquefaction occurs in saturated soils, that is, soils in which the space between individual particles is completely filled with water. This water exerts a pressure on the soil particles that influences how tightly the particles themselves are pressed together. Prior to an earthquake, the water pressure is relatively low. However, earthquake shaking can cause the water pressure to increase to the point where the soil particles can readily move with respect to each other. When liquefaction occurs, the strength of the soil decreases and, the ability of a soil deposit to support foundations for structures is significantly reduced. Based on our site review, the soil types found at this site are not prone to liquefaction. 3.10 CBC Requirements This section is intended to address the applicable requirements listed in section 1803 (Foundation and Soils Investigations) of the CBC. The following code sections have been specifically addressed as noted below: 1803.3.1 The classification and investigation of the soil has been made by a registered design professional. The wet stamp and signature of the individual responsible for the report is on the cover sheet. 1803.5.1 The soil classification has been determined based on the soils map provided by the USDA, and on-site observation. For the purpose of soil classification, on-site observation by a registered design professional without testing is acceptable per Section 1803.3.1 of the CBC. See "Design Criteria" in Section 3.4 for soil classification. 1803.5.3 See section 3.8 "Soil Expansion potential" in this report. Streamline Project No. 2493 Page 8 of 9 60 Independence Cir., Ste. 201 0 Chico, CA 95973 0 (530) 892-1100 • Fax: 892-1115 4.0 LIMITATIONS This report was prepared according to the scope of work included in our "Contract for Professional Services" agreement made between Streamline Engineering and our client. This report is intended for the sole use of our client. Use of the report by a third party is neither expressed nor implied and shall be at the party's sole risk. Our recommendations contained in this report are based on our engineering judgment, research of government documents, and site observations for the site location described in this report. This report was prepared specifically for the proposed structure(s) described in this report. If additional structures are constructed at this property, the owner shall contact Streamline Engineering for approval. Our findings are based on the condition of the site as it existed at the time of our site observation. If site conditions have changed since our investigation was completed, we shall be notified to examine the changes and determine if our initial recommendations are still valid. This report is only valid for the CBC edition shown in section 1.1. For structures built under newer additions of the CBC, written approval from Streamline Engineering is required. If on-site excavations during construction reveal conditions different than specified in this report, Streamline shall be contacted for a follow up evaluation and possibly new recommendations. This report is not valid for discovery items or other changes to the site. This report should not be used after 2 years of the specified date on the cover sheet without written approval of Streamline Engineering. It is not within the scope of our work to locate buried objects or problems that were concealed by others. These objects include, but are not limited to existing foundations, leach fields, septic tanks, fuel tanks, and underground utilities. We cannot be held liable for hidden objects. The elevation of the groundwater noted in this project is only relevant for the date of the site observation. This depth to groundwater can change with time and location. Itis not within the scope of our work to identify or locate hazardous materials that may be contained on this site. These materials could be manmade or naturally occurring. If the owner would like to have a hazardous material survey performed, it is the owner's responsibility to contact a specialist in this field to perform the survey as needed. These findings are based on our professional opinion and are not intended as a warranty of any kind. Design for consolidation, differential settlement, and engineered fill are by others. No warranty is expressed or implied. Please contact us with any questions at 530-892-1100 Streamline Project No. 2493 Page 9 of 9 60 Independence Cir:, Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 FIGURES 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS SYMBOLS CODE TYPICAL NAMES Grain Size <3 Very Loose GW in Millimeters Well graded gravels or gravel - sand mixtures; little or no fines N GRAVELS GPPoorly o o graded gravels or gravel - sand mixtures, little of no fines o (More than a of coarse 76.2 to 4.76 c 3" to 3/4" GM fine ( f) Silty gravels, gravel - sand - silt mixtures A Q^yN fraction > No. 4 sieve size) til H .moi 4.76 to 0.074 coarse ( c) No. 4 to No. 10 4.76 to 2.00 z -n No. 10 to No. 40 GC fine ( f) Clayey gravels, gravel - sand - clay mixtures 0.420 to 0.074 SILT & CLAY Below No. 200 Below 0.074 oS W 1 • . , : Well graded sands or gravely sands, little or no fines c N SANDS SP Poorly graded sands of gravely sands, little or now fines p (More than } of coarse SMSilty sands, sand - silt mixtures CJ fraction < No. 4 sieve size) SC Clayey sands, sand - clay mixtures ML Inorganic silts and very fine sands, rock , silty or clayey fine c SILTS & CLAYS sands or clayeystilts with slight plasticity CL Inorganic clays of low to medium plasticity, gravely clays, sandy —1 z v LL < 50 clays, silty clays, lean clays OL Organic silts and organic silty clays of low plasticity zo W 'y lI 1 1 1 I 1 I 1 I 1 I Inorganic silts, micaceous of diatomaceous fine sandy or silty til = N SILTS & CLAYS 1 ( I 1 1 coils, elastic silts w a z c CH Inorganic clays of high plasticity, fat clays c:. LL > 50 OHNA ♦ Organic clays of medium to high plasticity, organic silty clays, organic silts HIGHLY ORGANIC SOILS PT — — — _ Peat and other highly organic soils OTHER SYMBOLS = Drive Sample: 2-1/2" O.D. California sampler = Drive Sample: no recovery = Initial Water Level X —Final Water Level — — — = Estimated or gradational material change line = Observed material change line Laboratory Tests P1= Plasticity Index EI = Expansion Index UCC = Unconfined Compression Test TR = Triaxial Compression Test GR = Gradation Analysis (Sieve) CON = Consolidation Test GRAIN SIZE CLASSIFICATION CLASSIFICATION RANGE OF GRAIN SIZE Below/ R Description U.S. Standard Grain Size <3 Very Loose sieve size in Millimeters BOULDERS Above 12" Above 305 COBBLES 12" to 3" 305 to 762 GRAVEL 3" to No.4 76.2 to 4.76 coarse\se (c) 3" to 3/4" 76.2 to 19.1 fine ( f) 3/4" to No. 4 19.1 to 4.76 SAND No. 4 to No. 200 4.76 to 0.074 coarse ( c) No. 4 to No. 10 4.76 to 2.00 medium ( an No. 10 to No. 40 2.00 to 0.420 fine ( f) No. 40 to No. 200 0.420 to 0.074 SILT & CLAY Below No. 200 Below 0.074 CONSISTENCY CLASSIFICATION COHESIVE SOILS GRANULAR SOILS Description Below/ R Description Below/ & Very Soft <3 Very Loose <5 Soft 3-5 Loose 5-15 Medium ( firm) 6-10 Medium Dense 1640 Stiff 11-20 Dense 4165 Very Stiff 21-40 Very Dense >65 Hard >40 Figure 3 APPLIED TESTING CONSULTANTS 3060 Thorntree Drive, Suite #10 - Chico, CA 95973 - Telephone: (530) 891-6625 - Facsimile: (530) 891-4243 Design Maps,$ummary Report http://ehpI-earthquake.cr.usgs.gov/designmaps/us/summary.php?tempi... Design Maps Summary Report User -Specified Input Report Title Madery Fri September 23, 2016 22:06:11 UTC Building Code Reference Document ASCE 7-10 Standard (which utilizes USGS hazard data available in 2008) [; Site Coordinates 39.62870N, 121.90939°W Site Soil Classification Site Class D - "Stiff Soil" Risk Category I/II/III P , f J tr�se•''� '►ial{Ih Fld �r ...fit, i :1 �^�.' 4!_ �+,'�•,I #�vr'c_j ,�. .J �� ..� .-� �� � �, �' k: as i�c„► < �• t{� a a j ✓ �.,i' ?i-•'°`" .�w ., �.c• ��6U6,, f�t2i11 ,e i �� V �; _ u4.�4. n t. �.� .. +ter :+T •.. 1 USGS-Provided Output Ss = ' 0.626 g Sms = 0.813 g SDs = 0.542 g Sl = 0.280 g SMl 0.515 g- SDI = 0.344 g +For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and -deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the "2009 NEHRP" building code reference document. MCER Response Spectrum Design Response Spectrum 0.99 0.90-- 0.91 .90 0.81 0.54 r 0.720.48 0.63 0.42 CP 0.54 O� 0.36 H - 0.45 to 0.30 } 0.36 0.24 ' 0.27F-' - 0.18 0.12 0.09 0.06 0.00 0.00 0.00 0.20 0.40 0.60 0,80 1.00 1.20 1.40 1.60 1.80 2.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 Period. T (sec) Period, T (sec) For PGAM, T�, CRS, and CRI values, please view the detailed report. 1 of 2 9/23/2016 3:06 PM CALIFORNIAEARTHQUAKE EPICENTER MAP 4 1932 to 2000 " APPENDIX A 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 60 Independence Circle, Ste. 201 Chico, CA 95973 Ph: (530) 892-1100 Fax: 892-1115 APPENDIX B 60 Independence Cir., Ste. 201 • Chico, CA 95973 • (530) 892-1100 • Fax: 892-1115 4 r * APPLIED TESTING CONSULTANTS ' MATERIALS TESTING; ENGINEERING AND INSPECTION Sieve Analysis - Combined , 7 Client: Streamline Engineering Sample No:.TP1S1 Address: ' 60 Independence Circle ' Date: 9/14/2016 City, State, Zip: j - Chico, CA 95973: " '. Tech: McKeehan Attn.: Jeff Richelieu Project:: - 1{: Madery Residence Sample source: ° Taken by ATC Sample Description:" OH- Or ganlC Clay Sample location: Test Pit 1 Sample 1 } Sample depth: minus 1'-0" i - 1 Start Wt, Course: _ 17,489.0 Start Wt. fine: _511.6g „ ., SieveSie , AWeight,Retaired,� PercentiretamedW MMQI-WARP mulatrvetPer4cent W Sgecified '. ' Q14' W..a . v �� .. Refained Passing,_s., I? - _ 4 ri 100.0% .. 3 1/2 i .100.0% 3_ n 2 1/2 100:0% , . 2 100.0% Q� •' 0 100.0%110101, 100. / °�� � 1 219.9g 1.3% 1.3% 98.7% �t 3/4" 119:8g`.: 0.7% ". �"1.9% 98.1%��F ; 1/2' !; .. 471.7 g 2.7,% 4.6% . 95-.4% .:. 3/8 ai.: -390.28 2.2% 6.9% 93:1% #4' �, .. 237.7 g 1.4% 8.2% 91.8% e- . #8 4.3 g . ::0.8% 9:0% ' " #16 6.1 g 1.1% 10.,1% 89.9%min #30 '� ,.. " ' _ . 14.2 ,8 ; 2.5% 126% 87.4% #50,,' 28.6 g :, . 5.1% 17.8% 82.290 #100.,_, 53.3 g ; _ 9.6% : '27.3%.72.7%IMM, 1130 #200 , 613 g 11.0% 38.4%61.6,' • r This test was"Performed according to ASTM D2487, 3060 Thorntge Drive, Suite 10 •Chico, CA 95973 • Telephone: (530)891-6625 P,Facsimile: (530),891=4243 APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION Sieve Analysis - Combined 3060 Thorntree Drive, Suite 10 • Chico, CA 95973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 Sample No: 1 Client: Streamline Engineering Date: 14 -Sep -16 Address: 60 Independence Circle Tech: 42627 City, State, Zip: Chico, CA 95973 Attn.: Jeff Richelieu Project: Madery Residence Sample source: Taken by ATC Sample Description: 01-1- Organic Clay Sample location: Test Pit 1 Sample 1 Sample depth: minus 1'-0° D10 = n/a CU Dao = n/a Cc = n/a Dbo = n/a GRADATION CURVE U.S. STANDARD SIEVE OPENING IN INCHES U.S. STANDARD SIEVE NUMBERS 100.0% 90.0% w 80.0% 70.0% m60.0% w 50.0% Z 40.0% a z 30.0% V 20.0% w 10.0% a 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS 3060 Thorntree Drive, Suite 10 • Chico, CA 95973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION ;Plasticity Index Project: " Madery Residence Sample No: TP1S1 Client: Streamline Engineering Date: 14 -Sep -16 Address 60 Independence Circle Technician: McKeehan City, State, Zip: Chico, CA 95973 Attention: Jeff Richelieu Source: Taken by ATC 4 Material. Description: OH- Organic Clay Liquid Limit: Trial Number: Tin Label: Wet Weight +Tare: Dry Weight + Tare: - Weight of Water: Weight of Tare: Weight of Dry Soil: Moisture,Content: Number of Blows: 1 2 3 4 5 6 11, 12 13 36.51 37.36 38.05 34.28. 34.79 35.32 2.23 2.57 2.73 .. . .30.14. , 30.16 30.54 4.14 4.63 4.78 53.86% 55.5,1% - . 57.11% - 36 .26 17 Liquid Limit, LL Plastic Limit, PL Plasticity Index, PI ". 56.- 22 33. Above A Line , Plastic Limit:' Trial Nun-ber: Tin Label: Wet Weight + Tare:. Dry Weight + Tare: Weight of Water: Weight of. Tare: Weight of dry soil: Moisture Content: 3060 Thorntree Drive, Suite 10. • Chico, CA 05973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 5 I a. . J 5 R 5 is f A 3060 Thorntree Drive, Suite 10. • Chico, CA 05973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 5 I a. . J 5 R 5 is f 3060 Thorntree Drive, Suite 10. • Chico, CA 05973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 5 I a. . J 5 5 3060 Thorntree Drive, Suite 10. • Chico, CA 05973 • Telephone: (530) 891-6625 • Facsimile: (530) 891-4243 Expansion Index Test APPLIED TESTING CONSULTANTS MATERIALS TESTING, ENGINEERING AND INSPECTION Sample No: 0 Client: Streamline Engineering Project: Madery Residence Contact: Jeff Richelieu Soil description: OH- Organic Clay Sample location: Test Pit 1 Sample 1 Sample taken by: Sampled by ATC Depth of sample: minus 11-011 Moisture determination Gross wet wt: 406.3 Gross dry wt: 361.1 Pan wt: 79.3 Net dry wt: 281.8 Moisture Loss: 45.2 . Moisture content: 0.0161 Density determination 0.0223 Wt of soil & ring: 539.1 . Tare of ring: 199.0 Net compacted soil wt: 340.1 Dry Density, pcf: 88.9 Saturation determination Volume of solids: 0.527 Volume of water: 0.228 Volume of air: 0.245 Degree of saturation: 48.3% Gross final wet wt: Reading Gross final dry wt: A96.3 Final moisture loss: Final net dry wt: 1 290.4 Final moisture content: 33.2% This test was performed per ASTM D-4829-88 Start 4 E 03/08/02 7 E S 1C 17 1c 1: 14 1- 1E 17 1E 15 2C Final Date: 16 -Sep -16 Tech: McKeehan Time Reading 11:00 0.0000 11:15 0.0016 11:30 0.0035 12:30 0.0111 1:30 0.0161 2:30 0.0223 3:30 0.0298 9:15 0.0660 10:15 0.0660 .11:15 0.0660 3:30 0.0660 Expansion Index: 66 3060 Thorntree Drive, Suite 10 • Chico, CA 95973 • Telephone: (530) 891-6625 0 Facsimile: (530) 891-4243