Loading...
HomeMy WebLinkAboutB16-2575 047-460-028BUTTE COUNTY .AREA DEPARTMENT,OF DEVELOPMENT SERVICES 4 " INSPE TION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) :530.538.4365 (Cut off time for inspections is Spm) 'HENT SERVICES Development Services cannot guarantee inspections on the date requested *.. Office: 530.538.7601 Fax: D30 tNo: B16-2575 Issued: 11/21/2016 047-460-028 ;s: 15 PARSLEY LN, CH:ICO THOMPSON SERENA L Type: SOLAR ROOF -RES )tion: • Installation of res. roof mow-Ited solar ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING InsvectionType IVR INSP DATE Setbacks 131 Foundations / Footings. 111.' ' Pier/Column Footings 122, Eufer Ground 216 Masonry Grout 120 Setbacks 131 Do Not Pour Concrete Until Above are -Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Blockin nder inin 612 Tiedow n/Soft- Set System 611 Do Not Install Floor Sheathing or Slab Until Above Signed Shearwall/B.W.P.-Interior 134, Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129' Manometer Test '' 605 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 1 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 . Gas Test House 404 Shower Pan/Tub Test 408' Do Not Insulate Until Above Si ned Permit Final 802 l �[ Electrical Final 803 Mechanical Final 809 Plumbing Final 813. Fire Sprinkler Test or Final 702 Swimming 7771 ilillikm Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes - Setbacks 131 Blockin nder inin 612 Tiedow n/Soft- Set System 611 Permanent Foundation System 61.3 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test '' 605 Continuity Test 602 Skirtin /Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Public Works Final 538.7681 Fire De artment/CDF 3 538.6226 Env. Health Final ' 538.7281 Sewer District Final **PROJECT FINAL' .I -rrojecr rural is a i-ernncate Of Uccupancy Tor Ircesiaennalvnip) PERNIITS BECOME NULL AND VOID 1 1 EAR FROM THE DATE OF ISSUANCE. IF WORK HAS COIi'IMENCED, YOU MAY PAY FOR A I YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION b I Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the following locations: 1. Outside of each separate dweiling,unit sleeping area in the immediate vicinity of the bedroom(s). 2. On every level of a dwelling unit including basements. , R315.1.5 Multiple -purpose alarins: Carbon monoxide alarms combined with smoke alarms shall comply with Section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms. Butte County's Interpretation of 2013 CRC, Sections 314 & 315 for Smoke Alarms & Carbon Monoxide Alarms: Where alterations, repairs or additions exceeding $1,000 in valuation; existing dwellings shall be retrofitted with smoke alarms and those that have attached garages or fuel -burning appliances shall have carbon monoxide alarms installed. Existing smoke alarms can be replaced with dual function alarms for Smoke and Carbon Monoxide and in most cases will comply with the aforementioned code requirements for Carbon Monoxide Alarms. DECLARATION OF INSTALLATION UNDER THE PENALTY OF PERJURY As Owner/Contractor, Uwe affirm and declare under the penalty of perjury, under the laws of the State of California, by our signatures below as Owner/Contractor, that I/we will comply prior to final inspection with Items A & B as specified herein: A. Both Owner/Contractor have read and clearly understand the aforementioned 2010 California Residential Code (CRC) Carbon Monoxide Alarm requirements. B. Both Owner/Contractor are responsible for installing Carbon Monoxide Alarms prior to final'inspection as per the aforementioned building code and maintaining such in Smoke Alarms will, also be.installed prior to final. inspection as.per the 2010 . CRC. Smoke and Carbon. Monoxide alarms are now installed in the following locations: In LWVt1,1G S&S, -6U f;O t A' f-�e* S RC1 ,ol:% OcouA A Nw wr,5toe Owner's name (print): nrn WLx 5 Anl1) "6 TX'*z—L hTTt�S .���it/ tU �/l .fin ��/��� . Owner's signature:_ Contractor's name.i Contractor's signatt CSLB License: rlatc• l v /�S // -7 ProjectAddress:CG1C ULA Ln, CJ01 Q Permit #`,&(Q-015 Page 2 of 2 /°rte,. Butte County Department of Development Services FAM l PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 DBI -01 " °' • ""' '+ Main Phone (530) 538-7601 Fax (530) 538-7785 www.buttecounty.net/dds Declaration of Installation for Smoke Alarms and Carbon Monoxide Alarms The newly adopted 2013 California Residential Code requires the installation of Carbon Monoxide Detectors in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. The policy for Carbon Monoxide Alarms, in Butte County states: "Any permit obtained in which the value of work exceeds $1000 associated with a Residential Group R Dwelling Unit or Sleeping Unit shall conform to the following 2013 California Residential Code requirements for Smoke and Carbon Monoxide Alarms (Section R314 & R315)." 2013 California Residential Code requirements for Carbon Monoxide Alarms: R315.1 New construction: An approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel -burning appliances are installed and in dwelling units that have attached garages. R315.1.2 Power supply: For new construction required carbon monoxide alarms shall receive their primary power from the building wiring where such wiring is served from a commercial .source and shall be equipped with a battery back-up. Alarm wiring shall be directly connected to the permanent building wiring without a disconnecting switch other than as required for over - current protection. EXC¢prlOI1S: r 1. In dwelling units where there is no commercial power supply the carbon monoxide alarm may be solely battery operated. 2. In existing dwelling units a carbon monoxide alarm is permitted to be solely battery operated where repairs or alterations do not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl space. R315.1.3 Interconnection. Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm shall activate all of the alarms in the individual unit. Exception: 1. Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic basement or crawl space, and no Previous method for interconnection existed R315.2 Where required in existing dwellings: Where a permit is required for alterations, repairs or additions exceeding one thousand dollars ($1,000), existing dwellings or sleeping units that have attached garages or fuel -burning appliances shall be provided with a carbon monoxide alarm in accordance with Section R315.1. Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for which the permit was obtained. R315.2.6 Alarm requirements: No person shall install, market, distribute, offer for sale or sell ='any carbon monoxide device in the'State of,California.unless.the device'and instructions have been approved and listed by the State Fire Marshal. Paget of 2 :o vivinTIvIsdar- PV SOLAR SYSTEM SPECIFICATIONS: z a SYSTEM SIZE - 9.975KW DC/ 8.050KW AC w� o N THOMPSON RESIDENCE MODULE TYPE & AMOUNT - (35) JINKO SOLAR JKM285M-60B wm MODULE DIMENSIONS - (UW/H) 64.97in/ 39.06in/ 1.57in z �oZ ;15' PARSLEY LN INVERTER - (35) ENPHASE IQ6-60-2-US voo CH I CO, CA 95973 •INVERTER(S) USED IN THIS DESIGN IS/ARE COMPLIANT WITH CEC 201.690.12 (RAPID SHUTDOWN). SEE MANUFACTURER DATA SHEET. 2 . a INTERCONNECTION METHOD - LOADBREAKER o GOVERNING CODES SHEET'INDEX` ALL WORK SHALL CONFORM TO THE FOLLOWING CODES �tJ • 2016 CALIFORNIA BUILDING CODE PV 0.0 - COVER ,SHEET • 2016 CALIFORNIA ENERGY CODE PV 1.0 - SITE PLAN • 2016 CALIFORNIA ELECTRICAL CODE PV 2.0 -'MOUNTING DETAIL " 2016 CALIFORNIA FIRE CODE PV 3.0 - FRAMING DETAIL • 2016 CALIFORNIA GREEN CODE E 1.0 - 3 -LINE DIAGRAM c " 2016 CALIFORNIA MECHANICAL CODE E 2.0 - NOTES °` m • 2016 CALIFORNIA PLUMBING CODE E 3.0 - WARNING LABELS o®/ v • 2016 CALIFORNIA RESIDENTIAL CODE E 4.0 - WARNING LABELS -CONT. • ANY OTHER LOCAL AMENDMENTS E 5.0 - ELECTRICAL PHOTOS E 5.1 - ELECTRICAL PHOTOS CONT. ' pO 5m � y K N f W 2 * W W m K Z Z Q • - SHEET - NAME: W w - >w " NOTES: • , A PHOTOVOLTAIC MOUNTING RACK INSPECTION MAY BE REQUIRED PRIOR TO PANEL INSTALLATIONS (,) (n _ ANY MODIFICATIONS TO THE EXISTING ROOF AND/OR PLUMBING DRAIN, WASTE, AND/OR VENTS AR TO COMPLY WITH THE 2016 SHEET CBC/CPC NUMBER: ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS WEATHERPROOF FITTINGS THE BACKFEED BREAKER SHALL NOT BE MARKED FOR "LINE" AND "LOAD" MARKINGS 61 CONDUIT RUN THROUGH THE ATTIC OR UNDER EAVES DENOTED WITH DASHED LINES ON SITE PLAN - > SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED, PURSUANT TO SECTIONS R314 AND R 315 OF THE CRC d �' . ®®,� j �'mmm*o to 0 . oio,.8m 'o—<Dm o� Kms. o.o x <m Om Ziy po33N DCjO mvoi `c p�`c u± D3 �� >N; -- 30 3n 3n i r ., O— O— O._ . On On o�. mN' 1� D� m0 ym .�Oy IcOC T V Win. mZnOm O y m z y m Z N O (7. r C r C .r'C T y m y T-4 f� qT po 00 < 00. "Z _� yy Z T ,_ CTO 0 ��m.Z zOZ ypz m.0 Z 3 a �.� N N A y A p 3y f0 mT Oz�p ~DO 003 xmxm ov,x zoo' T- V1 r m mm x0 m9 Zy 1nD Q pA Zo �p O mmD �py0 -0 Z- °: �Oo m O y m A px 0 0 O n �0 :3n 0 m i� o3g C C Z X x n m y C myv, O m Oxny Z O y�ln y�l/7z;0 '� V� V o mo Vol y� om pig rS�ZVDjZ � ° �.8op p <(fl <'^ O =� 0 z o'T °o p + m m '3 - o .. 5-9 -1 (.%1 � v V J (71 • y xbm o o'g m < .. ,� p sC1 2 0 c� (n N �m�m N 15 PARSLEY LN, CHICO, CA 95973 m FRONT OF HOUSE_ m .. , - 4 • I ip:i iral, I + V C U) m — — — — — w • m W N � , z m D " Z - z m mm SITE z m INSTALLER: VIVINT SOLAR - p THOMPSONSRESIDENCE zm INSTALLER NUMBER: 1.677.404.4129 PV 1.0 y y V��O�te ���- LEY LN p PLAN CHICO, CA 95973 DRAWN BY: JC S: 5319217 Last Modified: 9/612017 - UTILITY ACCOUNT NUMBER: 42376594174 ui U Z w e (/% Zn! Lu �mm ie WU� O Ird < (/J QUO c� G } O C j e>� o •� ii g < N D: N N Z � >� Z W w m 3 �� 9 Z Z 0 SHEET NAME: (/) Z J c� Lli G Q SHEET NUMBER: 0 NIq a !�r^r •;:�^9c�i:,, il, COMP SHINGLES, ROCK-IT COUPLING MID CLAMP �•"r':'.'%r• � '�' ROCK IT COUPLING jROCK-IT c,{.;+/!,`a, +.:y.'^�w.;�•r �'r MID CLAMP o ' ROCK-IT COUPLING + ^�•,:;T;,,;n� rn,� �„�s: i..+'�,:e;i,; ' MID CLAMP _- • It `r^.•,-i':•;y4•i ROCK-R COUPLING SHELF •C:t1 Ss:`• �K. 'yak .+r{r(. �r. ROCK-IT -ROCK-IT SLIDE SHIP LAP PEDESTAL METAL FLASHING - ROCK•R - METAL- TIE PLATE 5116'x1 1/2' COUPLING SHELF • 5I16Sr316' FLASHING ISOMETRIC VIEW HEX FLANGE BOLT _ HEX FLANGE BOLT SIDE VIEW 300 SERIES SS ISOMETRIC VIEW '300 SERIES SS _ .COMP SHINGLES - ' (1)y1s•:ain•. ' SS LAG SCREW - , TOROUE=1312 FT-LBS. SIDE VIEW I ROCK-IT MOUNT � z ROCK-IT COUPLING ASSEMBLY PV Z.O � 'NOT TO SCALE NOT TO SCALE TOP VIEW • CLAMP+ATTACHMENT CLAMP +ATTACHMENT � COUPLING PERMITTED COUPLING CANTILEVER L/! OR LESS CLAMP SPADING 1 i • =MAX 72' (6' - I I{ -• COUPLING CLAMP RAFTER MODULE ROCK-IT SLIDE .MODULE METAL MODULE - • FLASHING � . EPDM BONDED WASHER RAFTER - � ( I � I , �• I' RAFTER _ FORMS WATERTIGHT SEAL _ — I = ANDSCAP .AMP SPACING • APV SYSTEM MOUNTING DETAIL (2)MODULES IN PORTRAIT/LANDSCAPE L=PORTRAIT PV 2.0 "Of TO �E PV 2.0 rrormwvF CLAMP SPACING COMP. SHINGLES � 2 1/2 MIN 3• MIN AND 6' MA%SETWEEN TOP OF ROOF AND BOTTOM OF MODULE • ONE HOLE STEEL STRAP CONDUIT 5/16141/2' - - ' SS LAG SCREW ' 1 - TOROUE=1312 F7{gg, PV MODULE, TVP. MOUNT O TO FRAMING OF EXISTING PV 3.0 • '� - ROOF TYPE, PARALLEL CONDUIT MOUNT BRACKET . 6' MAYlIf3tl OF ROOF - SECTION VIEW. FLASHING OR TILE STRAP 3 SECTION' VIEW - No7 To SCALE 6 PV ARRAY TYP. ELEVATION 7 CONDUIT MOUNTING DETAIL PV'2.0 Pv z.o roo7msrue Pv z.o -TTG— ui U Z w e (/% Zn! Lu �mm ie WU� O Ird < (/J QUO c� G } O C j e>� o •� ii g < N D: N N Z � >� Z W w m 3 �� 9 Z Z 0 SHEET NAME: (/) Z J c� Lli G Q SHEET NUMBER: 0 NIq a !�r^r •;:�^9c�i:,, il, COMP SHINGLES, ROCK-IT COUPLING MID CLAMP �•"r':'.'%r• � '�' ROCK IT COUPLING jROCK-IT c,{.;+/!,`a, +.:y.'^�w.;�•r �'r MID CLAMP o ' ROCK-IT COUPLING + ^�•,:;T;,,;n� rn,� �„�s: i..+'�,:e;i,; ' MID CLAMP _- • It `r^.•,-i':•;y4•i ROCK-R COUPLING SHELF •C:t1 Ss:`• �K. 'yak .+r{r(. �r. ROCK-IT -ROCK-IT SLIDE SHIP LAP PEDESTAL METAL FLASHING - ROCK•R - METAL- TIE PLATE 5116'x1 1/2' COUPLING SHELF • 5I16Sr316' FLASHING ISOMETRIC VIEW HEX FLANGE BOLT _ HEX FLANGE BOLT SIDE VIEW 300 SERIES SS ISOMETRIC VIEW '300 SERIES SS _ .COMP SHINGLES - ' (1)y1s•:ain•. ' SS LAG SCREW - , TOROUE=1312 FT-LBS. SIDE VIEW I ROCK-IT MOUNT � z ROCK-IT COUPLING ASSEMBLY PV Z.O � 'NOT TO SCALE NOT TO SCALE TOP VIEW • CLAMP+ATTACHMENT CLAMP +ATTACHMENT � COUPLING PERMITTED COUPLING CANTILEVER L/! OR LESS CLAMP SPADING 1 i • =MAX 72' (6' - I I{ -• COUPLING CLAMP RAFTER MODULE ROCK-IT SLIDE .MODULE METAL MODULE - • FLASHING � . EPDM BONDED WASHER RAFTER - � ( I � I , �• I' RAFTER _ FORMS WATERTIGHT SEAL _ — I = ANDSCAP .AMP SPACING • APV SYSTEM MOUNTING DETAIL (2)MODULES IN PORTRAIT/LANDSCAPE L=PORTRAIT PV 2.0 "Of TO �E PV 2.0 rrormwvF CLAMP SPACING COMP. SHINGLES � 2 1/2 MIN 3• MIN AND 6' MA%SETWEEN TOP OF ROOF AND BOTTOM OF MODULE • ONE HOLE STEEL STRAP CONDUIT 5/16141/2' - - ' SS LAG SCREW ' 1 - TOROUE=1312 F7{gg, PV MODULE, TVP. MOUNT O TO FRAMING OF EXISTING PV 3.0 • '� - ROOF TYPE, PARALLEL CONDUIT MOUNT BRACKET . 6' MAYlIf3tl OF ROOF - SECTION VIEW. FLASHING OR TILE STRAP 3 SECTION' VIEW - No7 To SCALE 6 PV ARRAY TYP. ELEVATION 7 CONDUIT MOUNTING DETAIL PV'2.0 Pv z.o roo7msrue Pv z.o -TTG— 'ROOF SECTION 1 ROOF SECTION 1 FROM PV 1.0 MEMBER SIZE: TRUSS 2x6 AT 24" O.C. R C �mw O mQ� az 15'1 O "° L U C t • P U) 3' EAVE �. 12.1' INTERIOR HORIZONTAL DISTANCE CL ROOF SECTION 2 ROOF SECTION 2 FROM PV 1.0 MEMBER SIZE: n m TRUSS 2x6 AT 24" O.C.iL K N 3 Or 30 };Z�F U W W Z m • 0 w 6 ¢ WZ J • • U z • Z Z U O SHM NAME: Z� - 1 O _ _ • LL SNEEi NUMBER: 3' EAVE 16' I PV 3.0 INTERIOR HORIZONTAL DISTANCE ` r a a _ m y c • o� m H n O n 4 • Photovoltaic System - Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) DC System Size (Watts) 9975 Tag If Description Wire Gauge p of Conductors/Color Conduit Type Conduit Size a AC System Size (Watts)8050 1 Enphase Engage Cable THWN-2 12 AWG � 3(1.1, 1.2, G) N/A -Free Air N/A -Free Air � Module/Inverter Count - 35 1 Bare Copper Ground(EGC/GEC) 6 AWG 1 BARE N/A -Free Air N/A -Free Air m 2 THWN - 2 10 AWG 6(31.1 31.2) B/R EMT 3/4" Z M W r^n ' - 2 THWN-2 -Ground 8 AWG 1(GRN) EMT 3/4" N g o - 3THWN-2 8AWG 3(1L11L2IN) 8/R/W EMT 3/4" o a ' 3 THWN-2 - Ground 8 AWG 1(GRN) EMT 3/4" n N E 0 " u a f` OB cq 11.1 �. CID a • to m • m N pp O _ f` OB cq 11.1 a Z m Rapid Shutdown > 7 m ' Disconnect, SquareD Point of Interconnection, Supply Side: > Z -" DU222RB, 240W60A 705.12(A) w w w w ' - XE N PV Circuit3: 10 1 2 t Existing 240V/200A _ SHEET Modules/ Inverter:.Enphase' p A. Service Panel, Single Parallel ... r:j -.106-60-2-US IVf Phase;Ma'n houseload NAME: - - .- on 200A dl sconnect PVCircuit 2: 11 t0 Modules Parallel O00i k - 993 SA ril D s ;.:.: 3 SHEET 'PVCircuit 1:14 1 ner an voy- 140V Conti nuous. NUMBER: Modules / 1 protecdon max 60A breaker on combiner ouput; Parallel wlth lO KAIC circuit breakers - NEMA 4 Junction Box wl th lrreversi ble visa c a e niW Mi ni mum GEC sl ze4 Ground Splice(1YP) A/C 01 sconnect AWG copper .. La SOLAR MODULE Enphase I.._. 146 -60 -2 -US MICRO-INVERTERAT EACH MODULE, ATTACHED WITH ECOLIBRIUM SOLAR HARDWARE #6 BARE CU GROUND (ATTACHED TO FIRST MODULE IN ARRAY). BALANCE OF ARRAY _ GROUNDING CONNECTIONS MADE THROUGH ARRAY HARDWARE MICROINVERTER CONNECTION TO ENGAGE TRUNK CABLE . - Inverter Make/Model 10.6 -60 -2 -US Max. Dc Volt Rating 48 - Volts Max. Power at 40 C 230 Watts Nominal AC Voltage - 240 Volts Max. At Current 0.96 Amps Max. OCPD Rating 20 .Amps Max. Panels/Circuit 16 15 Short Circuit Current 15 Amps • Other Notes .PV Module Rating @'STC 33.6 Module Make/Model ** 1KM285M-60B 1 240 Max. Power -Point Current (Imp) 8.9 Amps Max. Power -Point Voltage (Vm) - 32 Volts .Open -Circuit Voltage (Voc) . 38.7 Volts Short -Circuit Current (Isc) 9.65 Amps Max. Series Fuse (OCPD) 15 Amps Nom. Max. Power at STC (Pmax) 285 Watts Max. System Voltage - 1000 V DC (UL) Voc Temperature Coefficient -0.29 %/C AC Output Current According to art. 690.8(8)(1) 33.6 Amps Nominal AC Voltage 1 240 1 Volts THIS PANEL IS FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Rooftop conductor ampacities designed in compliance with art. 690.8; Tables 310.15(8)(2)(a), 310.15(B)(3)(a), 310.15(B)(3)(c), 310.15(B)(16), Chapter 9 Table 4, 5, & 9. Loacation specific temperature obtained from ASHRAE 2013 data tables. ASHRAE2013- Highest Monthly 2% D.B. Design Temp.: 38.7 `C Lowest Min. Mean Extreme D.B.: -3.8 °C • Designed according to, and all code citations are relevant to, the CEC 2016. • Utility Service Provided by PGE • No battery back-ups are tied to the designed inverter(s). Inverters) used in.this design is/are compliant with 690.12 (Rapid Shutdown). See manufacturer data sheet • Array grounding and bonding designed in compliance with 690.47(C)(3). Conductor Calculations I a n - Wire gauge calculated from art. code 310.15(8)(16) with ambient temperature calculations from art. 310.15(2)(a). J For "On Roof' conductors we use the 90°C column ampacity, 0.5"-3.5" off -the -roof temperature adjustment from 310.15(B)(3)(c), and raceway fill adjustments from 310.15(8)(16). S o For "Off Roof' conductors we use the 75`C column ampacity, or the 90°C column ampacity with o O the relevant ambient temperature and raceway fill adjustments, whichever is less. E L The rating of the conductor after adjustments MUST be greater than, or equal to, the continuous t Q duty uprated output current. ~ Calculation Example - Wire Rating (90°C) x Ambient Temperature Adjustment x Conduit Fill Adjustment >= Continuous Duty Output Current (On Roof, Tag 2): 10 gauge wire rated for 40 A, 40 A x 0.65 x 0.8 (6 Conductors) = 20.8 A >_ 16.8 A (Off Roof, Tag 3): 8 gauge wire rated for 50 A, 50 A >= 42 A L O N 4112 C OCPD Calculations m ry $ s Breakers sized according to continuous duty output current. PV circuit nominal current based off # a a L, of modules per Circuit X (1.25(art. 210.19(A)(1)(a)j) X (0.96 Max AC current per micro -inverter) o .+ u Circuit #1 = 14 modules, Output Current w/ continuous duty = 16.8 < 20A Breaker z W Circuit #2 = 11 modules, Output Current w/ continuous duty = 13.2 < 20A Breaker m Circuit #3 = 10 modules, Output Current w/ continuous duty = 12 < 20A Breaker m system output current w/ continuous duty = 42 < 45A (System OCPD) � � NUMBER: C4 W ` .Inverter Grounded Systems Per 690:5 C Main Service Panel Signage r -.- _ a (Installed on the Face of the Service Meter) f + ♦, v m n - -ELECTRICAL SHOCK.•D Per 690.54, 690.56(8), & 705.10'" ._ ' rIF A GROUND FAULT IS INDICATED, Note: Rbofline placard not needed unless PV disconnect is not at the c S •NORMALLY GROUNDED CONDUCTORS '• same location as the main service - n v d u • r . MAY BE UNGROUNDED AND ENERGIZED CAUTIONSOLAR ELECTRICAL SYSTEM CONNECTED E o a ` r u B7 + - Combiner Boxes, J -Boxes; Disconnects, Devices, & - - ,- Inverters In Un -Grounded Systems Per 690.35(F) (String .� , • • - • - . • . • • - '[ . systems)e • • • . • • o ' WARNING • .,. • sELECTRICAL SHOCK• . I .n +. F r THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED '7 L_ AND MAY BE ENERGIZED ' ' ' • _ r Conduit, Racewa s, and 1 -Boxes Labeled Eve 10' ., WARNING: PHOTOVOLTAIC POWER SOURCE r AC Disconnect and Any Load Centers (Combiner Panel) ! > - - „,� •n+ ., " Perb90.17(E) &-705.12 _ -r` POWERWARNING: DUAL SOURCE . •PHOTOVOLTAIC- �' - - • o+ 'PHOTOVOLTAIC RATE• •CURRENT: Cr ' - �. .• m: a AC DISCONNECT RATED AC OUTPUT • �• f - r t. NOM. OPERATING AC VOLTAGE:• r , - DC Disconnect Per 690,1.7 ;� _ - _ �• ti - - .. ,.. WARNING % ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON WARNING BOTH THE LINE AND LOAD SIDES MAY BE ELECTRICAL SHOCK HAZARD ENERGIZED IN THE OPEN POSITION DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE Z ENERGIZED IN THE OPEN POSITION t 'q ' Inverter Output Connection (Solar Breaker) at - r^' 'r. r A, .Main Service Panel Pei 705.12 Jr .' _ _ ��' _ - - • • { _ • ._, kb -., z m i r WARNINGt . .. .. ; .i • a .w x t. > INVERTER OUTPUT CONNECTION z DO NOT RELOCATE THIS w w . ♦ Rapid Shutdown Per 690.56(C). -� Rapid Shutdown Disconnect Per 690.12(5) Installed On AC Disconnect - - VI z- - ..PHOTOVOLTAIC SYSTEM EQUIPPED • . • • • • r .. SHEET .. r - ' rWITH RAPID . • _. .• - , - r ' ' . , .. _ NAME: • .., ". 'i. „ SHEET _. - .... . . ., . t • • NUMBER: ALL STICKERS DESCRIBED HERIN SHALL BE MADE OF WEATHERPROOF ADHESIVE, THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO, SMALLER THAN 3/8• WHITE ARIAL FONT TEXT AND HAVE A RED BACKGROUND UNLESS OTHERWISE DEPICTED OR DESCRIBED. ,. _• ., ., r Wyk= � - 1 4 - •f 4 , .' .. .� s ' y CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED A WARNING: DUAL POWER SOURCE (� WARNING 1 9 12 WARNING a Property of Vivint Solar SECOND - SOURCE IS A PHOTOVOLTAIC SYSTEM ELECTRICAL SHOCK HAZARD - ELECTRICAL SHOCK HAZARD a MAIN BREAKER DE -RATED TO ••' DUE TOSOLAR RATED AC OUTPUT CURRENT: '•• A IF A GROUND FAULT IS INDICATED, THE OC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE Z ^ CIRCUITS 2. ***AMPS NOM. OPERATING AC VOLTAGE: ••' V NORMALLY GROUNDED CONDUCTORS UNGROUNDED AND MAY BE ENERGIZED M W N O m MAX OF PV SOURCE ALLOWED Property of Vivint Solar MAY BE UNGROUNDED AND ENERGIZED Property of Vivint Solar s� DO NOT INCREASE MAIN BREAKER RATING WARNING: PHOTOVOLTAIC POWErty of Vivint Solar R SOURCE Prope 5 13 SITE PLAN PLACARD SHOWING ADDITIONAL POWER 0 Q c Property of Vivint Solar Property of Vivint Solar WARNING 10 SOURCE AND DISCONNECT LOCATIONS. PLACARD E a 3 WARNING PHOTOVOLTAIC AC DISCONNECT INVERTER OUTPUT CONNECTION '•• SHALL BE MOUNTED ON EXTERIOR OF ELECTRICAL 0 ELECTRICAL SHOCK HAZARD C6 RATED AC OUTPUT CURRENT: A DO NOT RELOCATE THIS OVERCURRENT DEVICE PANEL (only when necessary) — DO NOT TOUCH TERMINALS. TERMINALS ON BOTH- NOM. OPERATING AC VOLTAGE: ••• V Property of Vivint Solar Property of Vivint Solar D THE LINE.AND LOAD SIDES MAY BE ENERGIZED IN - Property of Vivint SolarPHOTOVOLTAIC POWER SOURCE DC DISCONNECT /1 THE OPEN POSITION 11 14 PV disconnect PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID RATED MAXIMUM POWER POINT CURRENT (IMP) •" A rapid shutdown Property of Vivint Solar 7 SHUTDOWN RATED MAXIMUM POWER POINT VOLTAGE (VMP) ...V placard indicated on E.3 -- Property of Vivint Solar MAXIMUM SYSTEM VOLTAGE (VOC) "• V PHOTOVOLTAIC DC DISCONNECT SHORT CIRCUIT CURRENT (ISC) ...A O 8 Property of Vivint Solar Property of Vivint Solar O •'• - value calculated for each account, for specific value see the previous warning label page • o 11 14 4 7 v m ROOFTOP ARRAY$ 12 6 6 6 2 4 13 IF APPLICABLE EVERY 10' AND WITHIN V OF o ELBOWS ,yo�90 3 9 3 3 3 1 1 2o m ca G� G20 5 5 5 5 5 5 0, s 5 9 <s m uei - MICRO -INVERTER 9 O ' Z m SYSTEMS DC W W J N Z N 9 DISCONNECT •. INSIDE [OR] SHEET SOLAR INVERTERS — — — COMBINER PANEL VISIBLE/LOCKABLE VIVINT SOLAR METER` VISIBLE/LOCKABLE — _ _ _ SUB PANEL MAIN SERVICE NAME: 12 (UNCTION (MAY BE ON ROOFTOP (WHEN USED) A/C DISCONNECT (WHERE REQUIRED) A/C DISCONNECT WHEN REQUIRED) DISCONNECT PANEL 5 STRING -INVERTER BOX INTEGRATED WITH (WHERE REQUIRED) 1O 1O E • w ARRAY) TYPICAL SOLAR GENERATION INSTALLATION INSIDE PANEL �o a tu SYSTEMS (NOT ALL DEVICES ARE REQUIRED IN EVERY JURISDICTION) 3 o - SHEET NUMBER: ALL STICKERS DESCRIBED HERIN SHALL BE MADE OF WEATHERPROOF THESE PLACARDS SHALL BE PLACED ON ALL INTERIOR AND EXTERIOR DIRECT-CURRENT (DC) CONDUIT, ENCLOSURES, RACE -WAYS, CABLE ADHESIVE, THEY SHALL BE REFLECTIVE, THEY SHALL CONTAIN NO ASSEMBLIES, JUNCTION BOXES COMBINER BOXES, AND DISCONNECTS TO ALERT THE FIRE SERVICE TO AVOID CUTTING THEM. MARKINGS 'SMALLER -THAN 3/8° WHITE ARIAL FONT -TEXT, AND HAVE A RED SHALL BE PLACED ON ALL DC CONDUIT EVERY 10 FT (3048 MM), WITHIN 1 FT (305MM) OF TURNS OR BENDS AND WITHIN 1 FT (305 MM), ABOVE Q BACKGROUND, UNLESS OTHERWISE DEPICTED OR DESCRIBED. AND BELOW PENETRATIONS OF ROFF/CEILING ASSEMBLIES, WALLS OR BARRIERS W p !`� ' Z+ A -- 1 N 2m INSTALLER: MINT SOLAR . i THOMPSON RESIDENCE E 5.0 m m ELEC. m INSTALLER NUMBER: 1.877.404.4129 v'�/'nT� l, �, p PHOTOS ~ v . r . c cHlco cnsssi3 DRAWN BY: JC S: 5319217 1 Last Modified: 916/2017 UTILITY ACCOUNT NUMBER: 42376594174 x 7 I Y f i 41k Qf it X. Jt 13 y e C i Z = INSTALLER:VIVINT SOLAR 15 PARSLEY LN E 5.1 mm ELEC. m I.STAIIERNUMBER:1.877.404.4129 df��ri� ����Ll THOMPSON RESIDENCE p PHOTOS " CH CO, CA 95973 DRAWN BY: JC S: 5319217 Last Modified: 9!6/2017. UTILRY ACCOUNT NUMBER: 42376594174 www.jinkosolar.com' + �• -fin PERC, . i ® 0 ® ® • +, 1• O O - O o 1500V Avoilable� tolerance-of •• KEY FEATURES ' 1000V , High Voltage e 1000V standard: 1500V option lowers BOS costs and yields better LCOS ' Innovative Solar Cells • + Four busbor cell technology improves module efficiency PID -Free !o m: World's IsIPID-Free module at85C/85%RH Low -Light Performance New glass iec hnology improves light absorption and retention P .< • ��++ Strength and Durability 1 t ' saoow Certified For nigh snow (540OPol and wind 1240OPol loads Weather Resistance' +nnsuur Certified for salt mist and ammonia resistance t • ` - _ LINEAR PERFORMANCE WARRANTY • • • - 10 Year Product Warranty 25 Year Linear Power Warranty • IS09001:2008 Qualily Standards • IS014001:2004 Environmental Standards • OHSAS18001 Occupational Health 3 Safely Standards. o- • 100%®- Linear performance warranty Nomenclature: - - = 9796. Aatll+ -' Standard performance-orranty ` JKM300M 60 _ - T 9s% fa^a1 vis+ue /rom ✓;nk Coda FrnmetBacksheel code eeniflcalionm gopy. _ •K o Saar'S +ane nWl 81-kMh1le null WON �" .•Q a�, - 0 BlacklBlwk V +'15M ^�,�±-}'�' us O i CE,years ®nLISTEDr .. ^ t IDI(Im IUIII Iilll �mun Ilml um I[mlllul®I 0!1 Ilfl>1(Illl�ll( �,I�VI ai? �Im(Illuul �Ilnlc I'�mulrmlm aurum �Illluu�ltl �� (�[�lIIg1M�(IIII(�(ull �� DW �IIIIIIIIIIrlllll Packaging Configurations' kao boxes.One pallet 1 - r' 26pcs/ box , 52pcs/pallet, 728 pr-s/d0'HQ Container - • a Current -Voltage 9 Power -voltage Curves(29a1N) Temperaturo 0ependen of IsC,VaaPmax .r F!�� ■Aoe Module Type JKM,280101-604 JKM285M-60-V JKM290M-60-V JKM295M-60-V N ,p M ! � :\ 10 to !M • • ,ratagef V; col l^iereralm )' 'Mechanical Cell Type Characteristics . Mono -crystalline PERC 156x 156mm (6:Inch) `��y��i31♦,,29;;32V...:r.',�299V^`7'3_2.2Vy.r.,302,V,,..�+;32t4Vn.S}30:6V,., _ - Nn of rvlk - 60 (fix 10)- Fe~ Dimensions 1650.992:40nun (G4.97.,39.06.1,57 orc11) Weight 19.0 kg (41 .9 lbs.) , !j r Front Glass 3.2mm,.High Transmission, Low -.Iron,,— i S1;7>72,h,.. AR Coating -Tempered Glass % -- 1 Operating Temperature(T) 40'C- 85"C I Frame Anodized Aluminium .Alloy - S) -r Power tolerance �~ r!= , • - �-` • . ' 0 -*3 k. - . Junction Box IP67 Rated Output Cables 12 AWG, Length:900mm (35,13 inch) Fire type Type t' Nornitiaboperating iceil ternperattire .. (NOC1) V 7 {` e`er¢ _Z22° `� � _ _ ;2;47. . Module Type JKM,280101-604 JKM285M-60-V JKM290M-60-V JKM295M-60-V , JKM3001VI-60-V rrr - =u �1 + •i SfC'; NOCT3t rlt iC`, '' NOCT STC w!e(I e. / LrvOCTgj^ NOCT •�285Wp SIC! NOCTi Maximum Power (Pmax) .280wp 209wp 212Wp 290Wp 216Wp 295Wp 224Wp 300Wp; 227Wp - `��y��i31♦,,29;;32V...:r.',�299V^`7'3_2.2Vy.r.,302,V,,..�+;32t4Vn.S}30:6V,., .. 1_326'V° 303V:_ Maximum Power Current (Imp) 8.81A 7.01A 8.9A 7,12A 9,02A ' 7,15A n 9.1A 7.32A 9.3A'r ' 7.4A - I •��+"_'�'t98 91r ^ 36 ZV; 36,N 6;4V - k39 SV36�BV, 39:71%7 V i, '+4b >r :.:..°„ _ ••.., :v -r.•' r�._.::.. �#tle�-...ltd.:-:..- »J. .S .:.w•--... Vii.__. Short-circuit Current (Isc) 9,49A ''7,62A 9.51A 7.72A 9.55A 7,81A •9.61A - 8.01A 9.83A 8.12A S1;7>72,h,.. Operating Temperature(T) 40'C- 85"C Maximum system voltage • - } '_ i500VDC(UL), M t w rT �t'7�^r"t, Maximum series fuse rating 15A - S) -r Power tolerance �~ r!= , • - �-` • . ' 0 -*3 k. - . Temperature coefficients of Pmax Temperature coefficients of Voc - 1, � � - ' M .-0:29%PC Temperature coefficients of Isc _ 0.05%/*C ?� ' Nornitiaboperating iceil ternperattire .. (NOC1) V 7 {` e`er¢ _Z22° `� � _ _ ;2;47. . STC: : Irradiance 1000W/ml Cell Temperature 25`C AM 1-.5 NOCT: 'if= irradiance 800W/m,' Ambient Temperature 20°C AM=1.5 ' '-Wind Speed 1 m/s ' Power measurement tolerance: t 3% CAUTION: READ SAFETY AND INSTALA.ATION INS1-RUCTIONS BEFORE USING THE PRODUCT- Jir•ko Solar Co_ Ltd: All rights reservec specifications included in this dalasheet are subject to change without notice,. US -MKT -300M -00-V v1.0 rev2017 - - ar i -;I. 1 3; ----1 Enphase Microiniierters Enphase Designed for higher powered modules, the smart grid - ready Enphase IQ 6 Micro'"' and Enphase IQ 6+ Micro'" IQ6 and IQ 6+ are built on the sixth -generation platform and achieve /� Mi c r®i n ve rte rs, the highest efficiency for module -level power electronics and reduced cost per watt. Part of the Enphase IQ System, the IQ 6 and IQ 6+ Micro integrate seamlessly with the Enphase IQ Envoy', Enphase IQ Battery", and the Enphase Enlighten' 'monitoring and analysis software. . The IQ 6 and IQ 6+ Micro are very reliable as they have fewer parts and undergo over 1 million hours of testing. Enphase provides an industry-leading warranty of up to 25 years. Easy to Install Lightweight Simple cable management Built-in rapid shutdown (NEC 2014) Productive Optimized for high powered modules Supports 60 and 72 -cell modules Maximizes energy production Smart Grid Ready Complies with fixed power factor, voltage and frequency ride -through requirements Remotely updates,to respond to changing grid requirements Configurable for varying grid profiles U` To EN PHAS E. learn more about Enphase offerings, visit enphase.com Enphase IQ b and IQ b+ Microinverters INPUT DATA (DC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND IQ6PLUS-72-5-US Commonly used module pairings' 195 W - 330 W + 235 W - 400 W + Module compatibility 60 -cell PV niodules only 60 -cell tied 72 -cell PV rnudules Maximurn input DC voltage 4E V 62V Peak power tracking voltage '2/ V - 37 V 2/ V - 45 V Operating range 16V -48V 16 V - 62 V IVlin/Max start voltage 22 V / 48 V 22 V / 62 V Max DC short circuit current (module Isc) 15A 15 A hI Overvoitage class DC port II II DC port backfeed under single fault 0 A 0 A PV array configuration 1 x. 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ6-60-2-US AND IQ6-60-5-US IQ6PLUS-72-2-US AND I06PLUS-72-5-US Peak output power 240 VA 290 VA Maximum continuous output power 230 VA 280 VA Nominal voltage/range2 240 V / 211-264 V 208 V (10) i 183-229 V 240 V / 211-264 V 208 V (1(0) / 183-229 V Nominal output current 096 A 1.11 A 1.17 A 1.35 A Nominal frequency 60 Hz a 60 Hz Exlanded hequency Lange 47- 68 Hz 47 - 68 Hz Power factor at raled Dower 1.0 1-0 Maximum units per 20 A branch circuit 16 (240 VAC) 13 (240 VAC) 14 (single -Phase 208 VAC) 11 (single-phase 208 VAC) Overvoltage class AC port III III AC port backfeed under single fault 0 A 0 A Power factor (adjustable) 0.7 leading_. 0.7 lagging 0.7 leading... 0:7 lagging EFFICIENCY @240 V @208 V (10) @240 V @208 V (10) j CEC weighted efficiency 97x7 °% 96.5% 97.G% 96.5% MECHANICAL DATA l Ambient.ternperature.range. - _ __ __ _ -40?C.to_+65°C Z_ _. Relative humidity range 4°i to 100% (condensing) Connector type MC4 or Amphenol H4 UTX - Dimensions (WxHxD) 219 mm x 191 mm x 37.9 rnrn (without bracket) Weight 1.5 kg. (3.3 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 y Environmental category / UV exposure rating; Outdoor - NEMA 250; type,6 (I P67.) - - - i FEATURES Communication Power. line R Monitoring Enlighten Manager and MyEnlighten monitoring options Compatible with Enphase IQ Envoy Compliance —U, UL-1,,741/IEEE1547, FCC Part 156CIass B;, ICES-0o03�0ass:B, CANLCSA.C22.2 NO. 107:1-01 This product is UL Listed -as PV Rapid Shut Down.Equipment and'conforms with NEG-2014�and' NEC-2017'section169012 andC22.1-2018,Rule 64=218 Rapid Shutdown,of PV Systems, for -AC andiDC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at enphase:com&m-us/support/module-com atn� ibillty, 2. Nominal voltage range can be extended beyond.nominal if required by the utility. r To learn more about Enphase offerings, visit enphasexam 'J 2017 6aphase Energy. All rights reserved All trademarks cr brands used are the property of cnphase Energy, Inc, E N P H A S E. ^2017-03.15 \� D dOa EcoFasten Solar°'. d Committed to the connection i� Contents Pg. 1......................................................................................................................................... Assets'of Design Features System Components Pg. 2.......................................................................................................................... Rock -It 2.0 Mount Assembly Rock -It 2.0 Coupling Assembly Pg. 3........................................................................................................ Rock -It 2.0 Hybrid Mount Assembly Rock -It Clip SS Assembly Pg. 4....................................................................................................................................... .............. Array Layout GreenFasten Flashing Install Pg. 5•..................................'......................_...................................................................... Rock -It System 2.0 Install Pg. 6 ....................................... ................................. .................................................. Ground Lug Install Rock -It Clip SS Install Pg. 7 -11.............................................:....:.................:.....................................................• Standoff Spacing Tables Snow Load 0-20 psf Snow Load 21-30 psf Snow Load 31-40 psf Snow Load 41-50 psf Snow Load 51-60 psf Pg. 12 .......... .:..................:............................................................._.....:.......................... Grounding Information Bonding Assembly and Bonding Path pg. 1........................................Thermal Thermal Expansion and Bonding 3; Bracket Spacing Staggered Layout Cantilever Pg. 14 ...... :........... :.:.:.:...... ............. ::.............. :........ :........................................... Evaluated, Compatible Modules System Specifications www.ecof6stensolar.com info@ecofastensolar.com 877-859-3947 ROCK -IT SYSTeM 2.0 Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that arc fast and easy to install, straightforward, secure and cost-effective. EcoFasten offers a wide variety of standard products as well as custom solutions, for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two decades. FeaTures • Fastest, easiest to level system on the market • Conforms to L11- 2703 First Edition • ClasS A Fire Rating with Type 1 moriules • Integrated electrical bonding • SIMPLE- only 4 components • North-South adjustability • Only one tool required (1 /2" deep well socket) • Vertical adjustment of Y-4" S9STem comPonenTS* - reouireD ROCK -IT SLIDe ROCK -IT 2.0 ROCK -IT 2.0 COUPLInG 4" For COMP SHInGLe MOunT & LoaD BeannG F=OOT 8" For TILe SYSTem comPOnenTS* - OPTIOnaL ROCK -IT 2.0 I 9Br_ID MounT (ReFer TO PG. 5) ROCK -IT CLIP SS (ReFer TO PG. 6) ROCK -IT 2.0 Array SKIrT A U_EcoFasten Solar EcoFasten Solar products are protected by the following U.S. Patents: 8,151,522 8,153,700 8,181,398 8,166,713 8,146,299 8,209,914 8,245,454 8,272,174 8,225,557 9,010,038 9,134,040 9,175,478 9,212,833 *Components for use with 32mm modules are available as special order. Components for use with 32mm modules are labeled as such on packaging. Side profile of Mid -Clamps on Rock -It 2.0 Mount and Rock -It 2.0 Couplings is slightly different for use with 32mm modules. Please refer to evaluated, compatible modules on page 14. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 1 ROCK -IT 2.0 MounT ASSeMBLJ- NOTe: ITemS 1-7 SHIP assemBLeo iTem 6 Pre-TOroueo 1 5/16"-18 Hex Flange Bolt (orHexw/starwasher) 300 Series SS 2 Rock -It Mid -Clamp 6000 Series AL (fig, A: Mid -Clamp for use with 32mm modules) 3 Conical, Spring 300 Series SS 4 Rock -It Shelf 2.0 6000 Series AL 5 Flange Level Nut 300 Series SS 6 Rock -It Pedestal 6000 Series AL 7 Rock -It -Tie Plate 6000 Series AL 8 Rock -It -Slide -Tile 2.0 6000 Series AL (sold separately) 9 Rock -It -Slide -Comp 2.0 6000 Series AL (sold separately) o� O - ITems 8-9 are accePTaBLe r BracKeTS FOr use WITH THe ROCK -IT 2.0 (SOLD separaTeLY ) ROCK -IT 2.0 COUPLING aSSel'1'1BLY NOTe: ITet71s 1-4 SHIP a552rr1B1 eD 1 5/16"-18 x 1.25" or 1.5" Hex Flange Bolt 300 Series SS 2 Rock-It-Coupling-MiclClamp 6000 Series AL (fig. A: Mid -Clamp for use with 32mm modules) 3 Conical Spring 300 Series SS 4 Rock -It -Coupling -Shelf -2.0 6000 Series AL 5 Load Bearinq Foot fig: A (32mm) www.ecofastensolar.com info@ecofasiensolar.com. 877-859-3947 2 j ROCK -IT 2.0 HYBRID MOI. nT ASseMBLY NOTe: ITems 1-10 SHIP assemBLeD -,T 1 1 5/16"-18 x 1.25" or 1.5" Hex Flange Bolt 300 Series SS 2. Rock-It-Coupling-MidClamp 6000 Series AL (fig. A: Mid -Clomp foi use with 32mm modules) 3 Rock -It -Coupling -Shelf -2.0 6000 Series AL 4 Crushable Spacer - Cardboard or Similar 5 Flange Level Nut 300 Series SS -` ._. 6 Rock -It Pedestal 6000 Series AL 7 3/8" ID Star Washer 300 Series SS J 8 3/8"-16x 3" Hex Tap Bolt 300 Series SS 9 5/16"-18 x 3/8" Hex Serrated Flange Dolt 300 Series SS 10 Rock -It Tie -Plate -T 6000 Series AL n fig. A (32mm) ROCK -IT CLIP SS ASsemBLY NOTe: iTems 1-3 SHIP assemBLeD 1 Stainless Steel Carriage Bolt -.313-18X.75 2 Rock-lt Clip SS - 3 Stainless Steel Flange nut .313-18 www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 Array L_agOUT Find the required structural attachment points. Mark these using a vertical (N -S) chalk line on the center of the rafters. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser bracket spacing in the E -W axis vs. the maximum spacing. Max spacing is 48"for portrait orientation and 72"for landscape orientation. Consult project layout diagram for project specific bracket spacing on the roof. Install Rock -It Mounts to predetermined mount spacing. • The array skirt sections are the width of a typical 60 cell module — use the array skirt as a guide to lay out module placement. Note: The distance between the rows of mounts is calculated by the module dimension N -S plus 1 3/8" (35mm). Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1/2". GreenFasTen FLasHinG insTaLL position for each GreenFasten flashing. vertical lines to mark the installation 2 Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. EcoFasten Solar recommends an EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt through the EPDM bonded washer, the Rock -It slide, the gasketed hole in the flashing and into the rafter. Torque: The range is between 100-140 torque inch -pounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install. "The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 ROCK -IT SYSTeM Z.O inSTaLL Install Eco Fasten Solar Flashing with Rock -It Mounts Follow EcoFasten Solar Install instructions for flashing and bracket install (GreenFasten shown above) Optimum vertical distance between lag bolts is 1 3/8"plus module dimension Set mounts on eave most row so that the Rock -It Pedestal is an the South end of Rock -It Slide Set mounts on all upper rows so that the Rock -It Pedestal is on the North end of Rock -it Slide 2 Install Array Skirt on Eave Mounts Loosen Hex Flange Bolt in Rock -It Mid -Clamp Slide Array Skirt into front channel on Rock -It Shelf Tighten Hex Flange Bolt to engage the Array Skirt 3.5 Install Rock -It Couplings Snap Load Bearing Foot into the bottom of every Rock -It Coupling prior to mounting on the roof (Each Load Bearing Foot is set to same height as the Rock -it Mounts- adjust accordingly) On eave row only, slide Rock -It Skirt into front channel on Rock -It Coupling On eave raw only, tighten the west most Array Skirt bolt on Coupling first to 150 in -lbs., followed by tightening the east bolt, drawing the Array Skirt sections together Upon final levelling of entire array (see step 11), utilize the Levelling Nut to ensure that the Load Bearing Feet engage the roof surface NOTE: If a coupling lands on a rafter, the Hybrid Mount* should be used in place of the Rock -It Coupling (refer to image 3a) 6 Align and Mount can be made in the field by assembling a coupling to,a mount pedestal, or by purchasing separately Straighten First Row of the Rock -It System with Array Skirt Use North-South adjustment of the Roc-ItPedestal to straighten array skirt Torque screw on side of Rockat Pedestal to 150 in -lbs to secure it to the Rock -It Slide Adjust Flange Level Nut to level the system (optional — can be leveled during or after installation) 7-10 install 1 st Row of PV Modules Slide upslope. Rock -It Mounts down to engage top of first:module Install Rock -It Couplings on the upslope side of 1 st row of panels Torque 1st and 2nd row of Mid -Clamps on Rock -It Mounts and Rock -It Couplings to 150 inabs. (Torque to 130 in -lbs. when installing with 32mm modules) Install balance of PV modules, ensuring that the Rock -It Pedestals are in the appropriate position, then torque Mid -Clamps to secure modules level the Rock -It System • When assembly is complete, level the entire system by adjusting Flange Level Nuts (Flange Level Nuts have no torque value) www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 GrounDinG LUG InSTaLL Necessary Components: Burndy CL50-1 TN Ground Lug (UL Listing #KDER,E9999) Note: Drill and deburr hole in Ground Lug prior to installation 14 AWG - 4 AWG Copper Ground Wire* 8-32 x 0.5" Serrated Flange Head Bolt (300 Series SS) 8-32 Serrated Flange Nut (300 Series SS) 11/32" and 1/4" wrenches or ratchets/sockets 1 Insert the Flange bolt into the module ground hole. Place Ground Lug over the bolt and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten set screw to complete assembly. Torque Values: 14-10 AWG= 20 in -lbs. 8 AWG= 25 in -lbs. 6-4 AWG= 35 in -lbs. *Minimum of 1/4" clearance required between bare copper wire and aluminum. ROCK -IT CLIP SS InSTaLL r1CCcyltnfue MLlttitlr�l.GG;JttVns p � rrl ,i!p, 'wY•, rrlln tefn R4 i' .. .I W' 1 Locate all parts -Locatethe Rock -It Clip SS, micro-inverter/power optimizer, and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. See fig. A for acceptable mounting locations. 2 Install the Rock -It Clip SS • Slide the Rock -It Clip SS onto the lip of the module frame. • Slide the micro-inverter/power optimizer into the opposite lip of the Rock -It Clip SS. • Tighten the bolt to 20 ft -Ib to clamp the Rock -It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock -It Clip SS. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the Clip Flange to avoid rotation during tightening. iM www.ecofastensolar.com i nfo@ecofasten sola r.conn 877-859-3947 6 Snow Load 0-20 psf Modules in Landscape. r �: Wind Speed Exposure Category 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Znne 2 Zone 3 Zone 1 Zone. 2 Zone. 3 ne.1 91 _Zone 2_. X53-33. B 159 93 59 v t 85 mph 110 mph C 114 67 42 88 88 50 z r �42 � r 50 D 96 56 1 74 74 35;;. .�32' '20 a .�52� . 8 146 85 54�� 1111111111311111111111. 90 mph 115 mph C 104 61 38 80 80 46 46 D 88 51 32 83 68 68 h 35 22 56 8 123 72 45 95 95 100 mph 125 mph C 88 51 32 83 68 68 B a 100 mph:t�T� D /4 • 43 21 /u 8% 5/ R"118 47y h 39 c B 98 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 B D 59 34 22 56 46 46 40 23 B 85 50 31 81 66 66 120 mph 150 mph C 61 36 22 58 47 47 #� 26 D 51 30 19 49 40 40 Notes: ® Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. however the designer must round down to meet appropriate rafter spacing 2 ) Maximum allowed spacing approved by EcoFasten Solar is 72" t. 3.) Maximum allowed standoff capcity = 547# (per testing results) 4 ) Includes additional factor ofsafety of 1.5 for larf pullout Capacity 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7 ) All adjustment factors are set to 1• No site sper:ifir. engineering is included in this table Snow Load 0-20 psf Notes: -Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" p 3.) Maximum allowed standoff capcity = 547# (per testing results) 4,) Includes additional factor of safety of 1.5 for lag pullout capacity 5,) Values based on a maximum module length.of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table 7 i www.ecofastensolar.com info@ecofastensolar.com { 877-859-3947 d a .7 0 o le P.ts Wind Speed Exposure —Cate o 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7_-05. ASCE. T-10- ne.1 91 _Zone 2_. X53-33. —Zone 3 Zone_1.... _Zone.2— .Zone 3. : 85 mph:*.C+ x ` 14} ar 65 38!, _ w 4 r T' 61'j 50 z r �42 � r 50 ► �.srihr _� _ E) 55. ra. .�32' '20 a .�52� . __42.y, i B 83 49 30 46 46 90 mph 115 mph C 59 35 22 56 D 50 70 29 44°7.e- 1'8 47 =v 2_6= 38 54,:.. 38 54"►-" B a 100 mph:t�T� e i_ R"118 47y h 39 c 39� t 56 33 40 20 53 32_r 43 .;.1 B 43 110 mph 140 mph C , 40 23 14 38 31 31 D 34 19 28 12 32 26 26 8 46' K3_7:7_- "r3g" 120mph'=7 150mph r -qC 5.. ' 35w X20 '""12 ' -F 33 �" 1i'�27.� ? 27� a . 01� f . ' rD F .� 29Y � k � 17� r' 10_ a .213"! 4 . -22� .22 # , Notes: -Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" p 3.) Maximum allowed standoff capcity = 547# (per testing results) 4,) Includes additional factor of safety of 1.5 for lag pullout capacity 5,) Values based on a maximum module length.of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feel in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table 7 i www.ecofastensolar.com info@ecofastensolar.com { 877-859-3947 d a .7 0 Snow Load 21-30 psf Modules in Landscape Wind Speed - Exposure +Eon Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 - ASCE 7-05 ASCE 7-10 Cate o Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph mph 110 mph 115 mph B C D C B 93 67 56 85 61 51 72 59 ;+ 42 ��.66 35B 5490 38D 32 45 SS mpha, 9. 110 'mph 100 mph 125 mph C 88 51 32-^ 018. a•'lil� ISE 57 57 49 D 74 43 27 6S, :' C + 6 98, 57 36 B" r '� 54 54 110 mph 140 mph C 70 41 26 66 �4 y � D'+� � i50p^• t "42: D 59 34 22 56 46 46 B 56, B 85 50 '31 SO 66 66 120 mph 150 mph C 61 36 22 58 47 47 D 34 0 F. 51 .30 19 49 40 40 Notes: Spacing Governed Govened by Snow Load + 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff. however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72"'. + 3.) Maximum allowed standoff capcity = 5479 (per testing results) 4.) Includes additional factor of safely of 1:5 for lag pullout capacity 5.) Values based on a maximum module width of 40" 6.1 Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to i. No site specific engineering is included in this table Snow Load -21-30 psf , ,, �: ,. �� .tt M'aur 40 .bt#rait 1 ' �' "�=�ti`.� Wind Speed Exposure 2:12 < Roof Pitch < 6:12 ` '7:12 < RoofPitch < 12:12 Zone 1 Zone 2 Zone 3 Zone 1, Zone 2 Zone 3 ASCE 7-05 ASCE 7-10 Category SS mpha, 9. 110 'mph F�awnvF 8 {� CT ,+65� 55; rR 587- A r+�36"t ,.,9 33 i+ trr�424+ `f B4 49 30 90 mph 115 mph C 59 35 22 r '� V S,50 41i z e 26 18 38 38 00 m h f I +T . '1�;r 125 mph (a a^ �4 y � D'+� � i50p^• t "42: a 29 SKS 26 1i + X18 k 1;.•15,: 39' h rt,39 Z- ' Fes`. 40 _ '.32� ,., � 321'* B 56, 33 20 110 mph 140 mph C 40'. 23 14 38 31 31 D 34 19 12 32 26 26 120 mph, ` 150,mph ftB� ' Cs 1,49`28 35', 20 18`y , r37.; t 37 *� 33, 1Y. 27 7 27 J, y n n � � 10M 28 ir+ 14. Notes: Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" t' 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1:5 for lag pullout capacity 5.) Values based on a maximum module length of 70" , 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height. , ). I 7.) All adjustment factors are set to 1. No site specific engineering is included in this table . s www.ecofastenso'lar.com. info@ecofastensolar.com 877-859-3947 s Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure , Category 2:12 < Roof Pilch < 6:12 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3? 65 mph 110 mph B C D `' 'ar U 83 Aa 59 42 5t 35 '` U. 51 �' 5t,, x`51 67 56 90 mph 115 mph C 83 54 38 t 5;? '51 1, 100 mph',, 61 100 mph 125 mph D B. C ".6`3 Q3 ' 51 32 SS 45 51 32 _ 51, 52 - 51 C 40 23 14 D - 74 43 27 a1,. " fit. sp . �. �►� B K 57 36 8'1` SA ' 51 ` • 70 110 mph 140 mph C 41 26 bt s v D 59 34 2'L si 46 46 120 mph 150 mph B y C 50 36 31 $1 22 1 - 61 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load , 4. +C 1.) Valvas in ahove lahia represent the maximum allnwahle spacing in inches fnr pullnut fomes only nn FcnFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capuily = 5474 (per testing results) 4.) Includes ddditiunal factur of safely of 1.5 for lay pullout cupacily ; 5.) Values based on a maximum module width of 40" "} 6.) Based on Risk Category it (ASCE 7-10) structures less than 30 feet in height I 7.) All adjustment factors are set to 1. No site specific engineering is included in this table tj Snow Load 31-40 psf 'i Madtatas4A.P orfrai# F Wind Speed Exposure 2:12 < Roof Pitch :....Cats o � -. Zone.1._ ;-Zone-2 < 6:12 7:12.< Roof Pitch < 12:12 ' ASCE-7-10; � Zone 3 Zone-.1�-- �-Zone �A�,,!_SCCE�--7�.-0�5- { 85 mph e110mph ,4C c� yr 38 i' B '` 49 r�:1-24y:" 30 90 mph 115 mph C 35 22 D 29 4_1 -,-t 4 18 226 100 mph',, • B 33 20 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 � p j �►� Y;120mph,, GpY"uyrrc�Dtw'> 150mphr �y-C yLrX35+'-� t20 ;.N29`?aa+r1.7,,. 27� i S•i27;?--- i. %10`.'.� 28 ":': 22 A. ,IiM'22' Notes: r - v!. Spacing Governed by Snow Load l� " 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar slandoll F 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 5474 (per testing results) f 4.) Includes additional factor of safety of 1.5 for lag pullout capacity 5.) Values based on a maximum module length of 70" ` 6.) Based on Risk Category 11 (ASCE 7-10) s-ructures less than 30 feet in height t 7.) All adjustment factors are set to 1, No site specific engineering is included in this table ri r www:ecofastensolar.com 'info@ecofastensolar.com ' 877-859-3947- Modules 77-859-3947 i i. 9 i u Snow Load 41-50 psf 'Modules.in Landscape WIn&S add Exposure 2:12 < Roof Pitch < 6:12 7:12 < Roof Pitch < 12:12 Cate o Zone 1 Zone 2 Zone 3 . . Zone 1 Zone 2 Zone 3 ASCE 7-05 ASCE 7-10 7.12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 3 1 Zone 2 Zone 3 Ai85 mph, 'r7 110 mph 85 mph 110 mph C , 66: a� '5 42 B 30 56 90 mph D BTi< ,� � 35 57'w. 22 B C4 '` 54 y S t St • ' Sh 14125 90 mph 115 mph C �G6 .. 61 _ 38 �tiati 1 r i iii ` r �f t B ' 33 D = t s6; f 51 32 140 mph C 23 ' 14• B f36 49 12 100 mph 125 mph C 51 32 5: K; < ti'S{: 5j •` ISt,. ti D 6a ";' 43 27 5J' $1 . •r. B- ,6p8:� 57 36 . L 110 mph 140 mph C R ' : 41 26 ;$i D , 59 34 22 4 art: 46 46 B 50 31 47 47 120 mph 150 mph C 61 36 ,r51.yry 22 ' ` -,kAl D 51, 30 19 49 ` 40 40 rvares: - Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing . . 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff -apcity = 547# (per testing results) 4.) Includes additional factor of safely of 1.5 for lag pullout capacity _ 5.) Values based on a maximum -module width of 40" f 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7-) All adjustment factors are set to 1. No site specific engineering is included in this table Snow Load 41-50 psf Notes: - .,is� Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only an EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" e. 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity v 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table t ' r U a www.ecofastensolar.com info@ecofastensolar.com 877-859-3947, 10 Wind S eed Exposure 2:T7rRoof Pitch,<6:12 Category Zone 1 Zone 2 7.12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 3 1 Zone 2 Zone 3 Ai85 mph, 'r7 110 mph "•...T•.!_ TBI I: 1Z��one '._S'.. /Zone _ ,``C B 30 90 mph 115 mph C 35 - 22 D_ 29' " f'B tC 18 26 *Y100 14125 mph mph�a" r'29 v.y 18 B ' 33 20 110 mph 140 mph C 23 ' 14• D 19 12 g K 2 2 �120mph1�177 ti -A Notes: - .,is� Spacing Governed by Snow Load 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only an EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" e. 3.) Maximum allowed standoff capcity = 547# (per testing results) 4.) Includes additional factor of safety of 1.5 for lag pullout capacity v 5.) Values based on a maximum module length of 70" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table t ' r U a www.ecofastensolar.com info@ecofastensolar.com 877-859-3947, 10 r n l I' 4 . �T I S� I � IIi t; - A Snow Load 51-60 psf Modules .In Landscape Wind Speed Exposure( Category. -2:112 < Roof Pitch < 6:12 - 7:12 < Roof Pitch < 12:12 ASCE 7-05 ASCE 7-10 Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3,i 30 B '550". C 22 85 mph 110 mph C 56 55 42 '11' 3d . , $4 ., 110 mph O 38 35. 35 .34 '' '. 34. ,. 3a. D d8 �-i 1217 19 12 2B �:29�.i�' ..>.'17. �t c.� 10G• :'v. 90 mph 115 mph C S9' 38+{ 24,,;;;. 34 ' D b5' 51 32 34% B 55 45 7. 34` "3,4 3,4 1 ' 100 mph 125 mph C .r}6;. 51 32 34' DW . 43 27 < • .. B �i6 36 a r 5 Ll 110 mph 140 mph C 1,56: 41 25 hot r 32t,'34: art - D 3 34 22 ' !4 ", 34;'' B , 50 31 34,"j -';i, .ra 34 120 mph 150 mph ' C 36 22, ;377 w ` k d'3A "' 34 51 D 1 30 _ 19 '34. ; ` '' t 34 Notes: j Spacing Governed by Snow •_oad r 1. 1.) Values in above table represent the maximum allowable spacing in inrhes for pullout forces only on FcaFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing ! 2.) Maximum allowed spacing approved by EcoFasten Solar is 72" 3.) Maximum allowed standoff capcity = 547# (per testing results) If 4.) hidudes addiliunal factur of safely of 1.5 rut lag pulluut capacity -t 5.) Values based on a maximum module width of 40" 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height k 7.) All adjustment far..tors are set to 1. No site specific engineering is included in this table a Snow Load 51-60 psf ` t ,• ale Notes:_ ! ®Spacing Governed by Snow Load +i 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 54?9 (per testing results) .4.) Includes additional factor of safety of 1.5 for lag pullout capacity ' 5,) Values based on a maximum module length of 70" _ 4 tl 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table 4 � t www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 n I 6 I ap. I 2:12 < Roof'Pitch < 6:12 Zone -1 - —Zone 2_-_Zone.3— =—Zone•1-- 24 7:12 < Roof Pitch .—Zone -2—_ Zone 3' Wind S eed Exposure .Cate o ..— * C � ASCE-7,05, X85 mpfi ASM -7-1T X110 mp B 30 90 mph 115 mph C 22 100 mpti-t -'�, X125 mph D 8 3 - ` Cr �; 29 18 26 g,- 'N18x 5�`'. B 20 110 mph 140 mph C 23 14 1120 mph,'4 mph D d8 �-i 1217 19 12 2B �:29�.i�' ..>.'17. �t c.� 10G• :'v. Notes:_ ! ®Spacing Governed by Snow Load +i 1.) Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.) Maximum allowed spacing approved by EcoFasten Solar is 48" 3.) Maximum allowed standoff capcity = 54?9 (per testing results) .4.) Includes additional factor of safety of 1.5 for lag pullout capacity ' 5,) Values based on a maximum module length of 70" _ 4 tl 6.) Based on Risk Category II (ASCE 7-10) structures less than 30 feet in height 7.) All adjustment factors are set to 1. No site specific engineering is included in this table 4 � t www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 n I 6 I ,.GrounDinG inFormaT1on The rail -free Rock -It System may be used to mount and ground PV modules that comply with UL 1703, only when that specific module has been evaluated for mounting and grounding, in compliance with the included installation instructions. Note: Grounding lug must be visible to inspectors from the entire perimeter of the PV array. ' Multiple Use Grounding Pins sr' t Grounding pins within the Mid -Clamp are multiple use bonding/grounding devices. Modules will need to be adjusted if the Mid -Clamps are loosened to ensure there isnnewr+metal to'pierce into upon retightening. ` Grounding Method r Rock -It 2.0 Mount bonds N -S rows of modules ; Rock -It 2.0 Coupling bonds E -W rows of modules Array Skirt 2.0 bonds E -W along the entire array when installed One Burndy CL50-ITN ground lug is required per PV array, limited to 300 modules placed in either portrait or landscape orientation. BonDinG ASseMBL-Y anD BonDinG PaTH J_ r µ 'r Bond Path Bond Path 'c i• - j 0 Grounding lug ' gnetalry to earth pound ,,4 r::1 „r. �; k�. fit, -. ��•.,.,,, �._ EquWment Grounding - • 1 � •l 1) Fi • Rotk-IrMmmt J Conductor IEGC!- generally to earth d , • Wound. �• " m. Ruck -It Coupling . w Ruck -LL Coupling J -i tt• - R � - a • RgCk.tt Mount e Rock -It Array Skirt _ �ROCk-Il Array Skirt .. www.ecofastensolar.com I ti Integrated Bonding + + r�•. �-�L �� r 'rcr � �' s r µ Bond Path •L' f Grouodinglug �[.t�', t� ,= { '*''� ' '.� -Bond Path ' gnetalry to earth pound [ - 40 Grounding Lug + , Equipment Grounding �• CanduaorlEGCi- • Rotk-IrMmmt ground y lu cetUt , • Wound. �• " m. Ruck -It Coupling . - _ - 8, Rock -IC Mount e Rock -It Array Skirt _ It .. www.ecofastensolar.com I ti Integrated Bonding + + r�•. �-�L �� r 'rcr � �' s Bond Path •L' f Grouodinglug �[.t�', t� ,= { '*''� ' '.� EquiuniGrounding ' gnetalry to earth pound a Rock -It Coupling • Rotk-IrMmmt - � J � Rock -Ir Array Skit I info@ecofastensolar.com <t 877-859-3947 12 THermaL ExPansion anD BonDinG A thermal expansion gap is required per each continuous 40' length of modules. Omit a coupling and leave a 2" 1 gap in the array skirt and also between the modules at that point. BracKeT sPacinG Portrait Orientation Bond Pail) ® Grounding Lug onVpinent Grounding Cductor (EGq- gerlCrally lU CLIh glow:d ROCk,lt Coupling • Rock -It Mount Rock•it Array Skirt R Landscape Orientation i 32mm, 35mm & 40mm Modules: _ . Max east/west�bracket! spacing is 72"OC. Maximum east/west bracket spacing is 48" OC. 32mm Modules: Max east/west bracket spacing is 48"OC. Spacing may vary depending upon project specific structural requirements; i.e. high snow and wind load areas may require lesser spacing E -W than the maximum. sTaGGereo LaYOUT' canTILever anD oFFseT Staggered Mounting Pointsi .•.• ..� O Rock -It Mount ®Rock -It Coupling Cantilever. Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing. The array layout instructions in this installation manual offer a general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 • .I i 13 4 Fir " �'s ,, • +`x . , �.......,� „�? � . ,,,.. t'' r. s r� .. r O Rock -It Mount ®Rock -It Coupling Cantilever. Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations, check layout prior to installing. The array layout instructions in this installation manual offer a general overview of layout. Periodically, due to a variety of Offset: Offset from all roof edges depends on wind speed, snow factors (roof obstacles, shading, etc.) other layouts are required. loads, local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 • .I i 13 ROCK -IT SCJ- STeM 2.0 EvaLuaTeD, compaTIBLe MODULes Module Manufacturer Model Type (X used to indicate variable lest) Module Dimensions (mm) Module Dimensions (in) Trina Solar TSM-XXX-PX05.08 1640 x 992 x 40 64.57 x 39.06 x 1.57 Canadian Solar CS6P-XXXM 1638 x 982 x40 64.50 x 38.70 x 1.57 Canadian Solar CS6P-XXXP 1638 x 982 x 40 64.50 x 38.70 x 1.57 Jinko Solar JKMXXXP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXPP-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Jinko Solar JKMXXXMM-60 1650 x 992 x 40 65.00 x 39.05 x 1.57 Yingli Solar YL2XXP-29b 1650 x 990 x 40 65.00 x 38.98 x 1.57 LG Electronics LG300N1C-B3 1640 x 1000 x 35 64.57 x 39.37 x 1.38 LG Electronics LG300N1 K -G4 1640 x 1000 x 40 54.57 x 39.37 x 1.57 Axilec Solar AC-XXXM/156-60S 1640 x 992 x 40 64.57 x 39.06 x 1.57 RECOM RCM-XXX-6MB 1640 x 992 x 35 64.60 x 39.00 x 1.38 Silfab SLA 2XXP 1650 x 990 x 38 64.96 x 38.98 x 1.50 Solaria PowerXT XXXR-8X 1621 x 1056 x 40 63.82 x 41.57 x 1.57 Hanwha Q Cells Q.PRO G4 2XX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q. PRO BFR G4 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PRO BFR G4.3 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells I Q.PEAK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells Q.PEAK BLK G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha 0 Cells B.LINE PLUS BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 Hanwha Q Cells B.LINE PRO BFR G4.1 XXX' 1670 x 1000 x 32 65.70 x 39.40 x 1.26 'Hanwha 32mm modules to be used wills special order Rock -It System components. Call for details. • Fastest, easiest to level system on the market SIMPLE- only 4 components • Conforms to UL 2703 First Edition North-South adjustability • Class A Fire rating with Type 1 modules Only one tool required (1 /2" deep well socket) • Integrated electrical bonding Max No. of Panels 300 Modules per ground lug Materials 300 Series Stainless Steel 6000 Series Aluminum Max System Voltage 1000VOC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703 Type 1 Rated Modules ILug Specifications Burndy CL50-1TN Ground Lug (UL Listing #KDER E9999) Leveling Range 3-4" Ground Wire Per above Lug spec 14 AWG- 4 AWG Copper Ground Wire Rock -it Slide -Comp 2.0 Range Rock -It Slide -Tile 2.0 Range 3" 7" Max Module Size 64.96"(1650mm) x 39.05"(992mm) x 2"(SOmm) Min/Max Roof Slope 1/2:12/12:12 'Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing (35mm/40mm) Max Anchor Spacing (32mm) 72" 48" Rock -It Mount Load Rating 547lbs with Single 5/16" Lag 3.0 Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is 1/3 bracket spacing Rock -It Slide Box QTY SO units Coupling Box QTY 12 units I Warranty 20 Year Material and Workmanship System marling (placed on side or underside Codes: National Electric Code, ANSI/NEPA 70, NEC 250, NEC 690,1k, IBC of Sock -Il Mount and (oupling) Standards: UL 2703 First Edition, UL 1703 4'eEcoFasten Solar' ROCK -IT SYSTEM WG ID CODE: xXK-QQ-YM CONFORMSTO La. °' A n.' EcoFasten Solar �o www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 I PZ81 structu ra l ENGINEERS January 16,2017 Rillito River Solar, LLC dba EcoFasten Solar 289 Harrel Street Morrisville, VT 05661 TEL: (877) 859-3947 Attn.: Engineering Department, Re: Engineering Certification for the EcoFasten Rock -it System Installation Manual This letter is to document that PZSE, Inc. -Structural Engineers has reviewed EcoFasten Rock -it System Installation Manual published October 12, 2015 and specifically the "Loading Tables". M SCOPE OF THE SYSTEM: The EcoFasten Rock -it System is a solar panel support system for installing solar. photovoltaic arrays on sloped roofs of buildings. Typically such buildings are residential with shingle or tile roofs. The number and spacing of attachments to the roof structure can vary depending on various site specific criteria including, but not limited to, roof slope, spacing of supporting structural members and environmental loading. SCOPE OF OUR REVIEW: PZSE, Inc.—Structural Engineers provided a review of the following • Rock -it System design methodology • Rock -it System Installation Manual • Rock -it System Loading Tables and has determined that. all information, data and analysis contained within the Installation Manual are based on, and are in compliance with, the structural requirements of the following Reference Documents: • Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-10 • International Building Code, 2015 Edition, by International Code Council, Inc. . California Building Code, 2016 Edition, by California Building Standards Commission • Aluminum Design Manual, 2010 & 2015 Editions, by The Aluminum Association This letter certifies that the Ecof asten Rock -it System Installation Manual and Loading Tables are in compliance with the. above Reference Documents.. 8150 Sierra College Boulevard, Suite 150, .Roseville. CA 95661 916.961.3960 916,961.3965 www.pzse.com 4-�,` t�,1:• :d ..' 1-:.�:..�V Wr..T'_, .: t�rNj: s. .PZ8 structural ENGINEERS DESIGN RESPONSIBILITY: The Rock -it System Installation Manual is intended to be used under the responsible charge of a registered design professional where required by the authority leaving jurisdiction. hi all cases, the user ufthe Installation Manual has sole responsibility for the accuracy of the design and integrity of the system. The Installation Manual does not check the capacity of the building structure to support the loads imposed on the building by the array, such as bending strength of roof rafters spanning between supports. This requires additional knowledge of the building and is outside the scope of the Installation Manual and our review. If you have any questions on the above, do not hesitate to call. Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA 8150 Sierra College Boulevard, Suite 150, Roseville, CA 95661 916.961.3960 916.961.3965- www.pzse.com