HomeMy WebLinkAboutB17-0058 042-670-005CAkV MOUNT
830 b-io0c)HOUNT
C
,pi ICOM CA, 'T�2,6
SCOPE O� W0QK
), S14()P COUST EVC -Q00
2, vs cojiuE-A)FIAL W000 r-t,?A"lk)C-r
y, SNOP
PLAIJ LABOUT
A, 4 L L P4,4,0 6 OAJ
A P oq2- g 10 -oos,
t-
13MFI
COUNTY
MAR 2 7 2017
DEVELOPMENT
SERVICES
U -j C.S-1 - 3AC�Ef-1ak)TO -- --- ------- -- -- --
BUTTE
COUNTY
MAR 2 7 2017
DEVELOPMENT
SERVICES
244`a*",
PLA 11
`� BUTTE
COUNTY
LIAR 2 7 2017
DEVELOPMENT
SERVICES
of °'3 ✓F " O 7A) —
G
BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING
CONSTRUCTION DEBRIS RECOVERY PLAN: Pre -Construction
Building permit will not be issued until completed plan submitted
APN: 123-45-67
Owner Name: John B
Building Permit #,
Submit completed form in person or by mail
or fax to:
Butte County Development Services -Building
7 County Center Drive
Oroville, CA 95965
Phone: (530)538-7601
Fax: (530)538-2140
Owner Mailing Address: 20 Esplanade, Chico Owner Phone: (S 2,C) CP6 F, 3 cf.q 3
Jobsite Address: 50 Diversion Way Oroville Project Sq. Ft.: 10,001 Project Type: ❑ Construction ❑ Demolition
Jobsite Contact: B.Z. Beaver Company: Fingertight Construction Jobsite Phone:
Brief description of project: Warehouse, office, parking area for distribution company
By signing below, I acknowledge that I am responsible for complying with the requirements of Ordinance 2006-3925 (Chapter 31, Article VII) related to recovery of construction and
demolition debris and the lack of compliance may result in delays in issuance of building/demolition permit(s), hold on final inspection(s) and/or penalties.
Applicant: n p
(Owner /Contractor) Signature: l �,� e, M � _ Date:
Circle / 2
MATERIAL 1
Reuse-
Recycle
Dispose
FACILITIES/SERVICE PROVIDERS TO BE USED 3
Inert Material (concrete, asphalt)
x
x
Will crush most concrete on site and use as base. Remaining inert to Neal Road for recycle
Lumber
x
ABC Disposal and Recycling Co
Plant/Tree Debris
x
City of Oroville Compost Facility
Dry Wall
x
ABC Disposal and Recycling Co
Metal
x
Butte County Scrap Metal Cc
Cardboard
x
ABC Disposal and Recycling Co
Other: Mixed Debris
x
ABC Disposal and Recycling Co
Other: Office waste
x
ABC Disposal and Recycling Co
Recovery Plan approved:
Date:
(Plans Examiner)
Please refer to the Butte County online Recycling Directory for local recycling service providers
at:www.Recycle Butte. net.
DFk'T,MPN7 Y.IT SIRvi CrS
BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING
CONSTRUCTION DEBRIS RECOVERY PLAN: Pre -Construction
Building permit will not be issued until completed plan submitted
APN:
Owner Name
Owner Mailing Address:
Jobsite Address:
Jobsite Contact:
Brief description of project:
Building Permit #
Company:
Owner Phone:
Submit completed form in person or by
mail or fax to:
Butte County Development Services -
Building
7 County Center Drive
Oroville, CA 95965
Phone: (530)538-7601
Fax: (530)538-2140
Project Sq. Ft.: Project Type: ❑ Construction ❑ Demolition
Jobsite Phone:
By signing below, I acknowledge that I am responsible for complying with the requirements of Ordinance 2006-3925 (Chapter 31, Article VII) related to recovery of construction and
demolition debris and the lack of compliance may result in delays in issuance of building/demolition permit(s), hold on final inspection(s) and/or penalties.
Applicant:
(Owner/ Contractor) Signature:
/('irrlol
(2)
Date:
MATERIAL 1
Reuse
Recycle
Dispose
FACILITIES/SERVICE PROVIDERS TO BE USED 3
Inert Material (concrete, asphalt)
Lumber
Plant/Tree Debris
Dry Wall
Metal
Cardboard
Other:
Other:
Recovery Plan approved:
Date:
(Building Division)
Please refer to the Butte County online Recycling Directory for local recycling service providers at:www.RecycleButte.net.
DEMOPMENT SERVICES
2016 CALGreen Residential Mandatory Measures
This checklist applies to newly constructed buildings, additions or alterations of existing residential
buildings where the addition or alteration increases the building's conditioned area, volume, orsize.
The requirements shall only apply to and or within the specific area of the addition or alteration.
(2016 CGBSC 301.1.1)
***Note 2016 CGBSC 301.1.1: On and after 11112014, residential buildings undergoing permitted
alterations, additions or improvements shall replace noncompliant plumbing fixtures with water -
conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a
certificate of final completion, certificate of occupancy or final permit approval by the local building
department.
Feature or Measure Required
Building meets or exceeds the requirements of the California Building Energy
Standards. CGBSC 4.201.1.
Multiple showerheads serving one shower. When a shower is served by more than
one showerhead, the combined flow rate of all the showerheads and/or other shower
outlets controlled by a single valve shall not exceed 2.0 gpm at 80 psi, or the shower
shall be designed to allow only one shower outlet to be in operation at a time.
Residential lavatory faucets. The max. flow rate of residential lavatory faucets shall
not exceed 1.2 gpm at 60 psi. The min. flow rate of residential lavatory faucets shall
not be less than 0.8 gpm at 20 psi.
Metering faucets. Metering faucets when installed in residential buildings shall not
deliver more than 0.25 gallons per cycle.
Kitchen faucets. The max. flow rate of kitchen faucets shall not exceed 1.8 gpm at 60
psi.
Checklists\Green Building Page 1 of 3 02/10/2017
Checklists\Green Building Page 2 of 3 02/10/2017
BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING
CONSTRUCTION DEBRIS RECOVERY PLAN: Pre -Construction
Building permit will not be issued until completed plan submitted
APN: 123-45-67 Building Permit #
Owner Name: John Bidwell
Submit completed form in person or by mail
or fax to:
Butte County Development Services -Building
7 County Center Drive
Oroville, CA 95965
Phone: (530)538-7601
Fax: (530)538-2140
Owner Mailing Address:_20 Esplanade Chico
Owner Phone: CPQ, 1� _ I cf-G �
Jobsite Address: 50 Diversion Way Oroville
Project Sq. Ft.: 10.001 Project Type: ❑ Construction ❑ Demolition
Jobsite Contact: B.Z. Beaver Company: Fingertight Construction Jobsite Phone: (_ )
Brief description of project: Warehouse, office, oarkinq area for distribution company
By signing below, I acknowledge that I am responsible for complying with the requirements of Ordinance 2006-3925 (Chapter 31, Article VII) related to recovery of construction and
demolition debris and the lack of compliance may result in delays in issuance of building/demolition permit(s), hold on final inspection(s) and/or penalties.
Applicant:
(Owner/ Contractor) Signature
(Circle)
MATERIAL (1)
Inert Material (concrete, asphalt
Lumber
Plant/Tree Debris
Dry Wall
Metal
Cardboard
Other: Mixed Debris
Other: Office waste
Recovery Plan approved:
2 Date:
Reuse- Recycle Dispose FACILITIEWSERVICE PROVIDERS TO BE USED 3
x x Will crush most concrete on site and use as base. Remaining inert to Neal Road for recycle
x ABC Disposal and Recycling Co
x City of Oroville Compost Facility
x ABC Disposal and Recycling Co
x Butte County Scrap Metal Co
xABC Disposal and Recycling Co
x ABC Disposal and Recycling Co
x ABC Disposal and Recycling Cc
Date:
(Plans Examiner)
Please refer to the Butte County online Recycling Directory for local recycling service providers
at:www.RecycleButte net.
BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES -BUILDING
CONSTRUCTION DEBRIS RECOVERY PLAN: Pre -Construction
Building permit will not be issued until completed plan submitted
APN:
Owner Name:
Owner Mailing Address:_
Jobsite Address:
Jobsite Contact:
Brief description of project:
Building Permit #.
Company:
Submit completed form in person or by
mail or fax to:
Butte County Development Services -
Building
7 County Center Drive
Oroville, CA 95965
Phone: (530)538-7601
Fax: (530)538-2140
Owner Phone: ( )
Project Sq. Ft.: Project Type: Cl Construction ❑ Demolition
Jobsite Phone:
By signing below, I acknowledge that I am responsible for complying with the requirements of Ordinance 2006-3925 (Chapter 31, Article VII) related to recovery of construction and
demolition debris and the lack of compliance may result in delays in issuance of building/demolition permit(s), hold on final inspection(s) and/or penalties.
Applicant:
(Owner/ Contractor) Signature: Date:
(Circle) (2)
MATERIAL 1
Reuse
Recycle
Dispose
FACILITIES/SERVICE PROVIDERS TO BE USED 3
Inert Material (concrete, asphalt)
Lumber
Plant/Tree Debris
Dry Wall
Metal
Cardboard
Other:
Other:
Recovery Plan approved:
Date:
(Building Division)
Please refer to the Butte County online Recycling Directory for local recycling service providers at:www.RecycleButte.net.
DEVELOPMENT S$RViCES
REVISIONS
BY
�.J
-j
..ter
i
z�
(j.
r. r..
i`
r,
lsf
�i
Date/,_'� - 2 P
Drawn
Job
Sheet
Of 7 Sheets
WALL CONSTRUCTION
TABLE R602.3(1)
FASTENING SCHEDULE
ITEM
DESCRIPTION OF BUILDING ELEMENTSOF
NUMBER AND TYPE
FASTENER",0 __FSP
ACING AND LOCATION
Roof
Blind and face nail
16d common (3'/2" x 0.162'1
4-8d box (2'/2" x 0.113') or
14
1
Blocking between ceiling joists or rafters to top plate
3-8d common (2'/2" x 0.131'x; or
Toe nail
3 x 12 x 0.036
3 " x 0.131 " nails
3-IOd box (3" x 0.128'); or
4-10 box (3"x 0.128'), or4-3"x
Bottom plate to joist, rim joist, band joist or
3-16d box (3'/2" x10.135'); or
3-3"x 0.131"nails
15
blocking (at braced wall panel)
2-16d common (3'/," x 0.162'); or
4-8d box (2'/2" x 0.113'1; or
4-3" x 14 ga. staples,'/16" crown
2
Ceiling joists to top plate
3-8d common (2'/2" x 0.131'); or
Per joist, toe nail
Nail each layer as follows: 32" o.c.
4-8d box (2'/2" x 0.113'); or
3-1Od box (3" x 0.128'); or
(21/Z' x 0.113") nails
at top and bottom and staggered.
3-16d box (3'/2" x 0.135 "); or
3-3 " x 0.131 " nails
1 O box (3"x 0.128'); or
24" o.c. face nail at top and bottom
Ceiling joist not attached to parallel rafter, laps over
4-1Od box (3"x 0.128'); or
3 " x 0.131 " nails
3
partitions [see Sections R802.3.1, R802.3.2 and Table
3-16d common (3'/2" x 0.162'); or
Face nail
Top or bottom plate to stud
R802.5.1(9)]
4-3" x 0.131 " nails
2-20d common (4" x 0.192'); or
Face nail at ends and at each splice
Ceiling joist attached to parallel rafter (heel joint)
3-1Od box (3" x 0.128'); or
4
[see Sections R802.3.1 and R802.3.2 and Table
Table R802.5.1(9)
Face nail
R802.5.1(9)]
4-16d box (3'/2" x 0.135'); or
Collar tie to rafter, face nail or 1'/4" x 20 ga. ridge strap to
4-1Od box (3" x 0.128'); or
3-16d common (3'/2" x 0.162'); or
4-1Od box (3 x 0.128 ), or
5
rafter
3-1Od common (3" x 0.148"); or
Face nail each rafter
Top plates, laps at corners and intersections
2-16d common (31/2" x 0.162'); or
4-3 " x 0.131 " nails
2-10d (3" x 0.128')
Each end, toe nail
3-3"x 0.131"nails
3-8d box (2'/2" x 0.113'); or
3-16d box nails (3'/2" x 0.135'); or
SPACING OF FASTENERS
ITEM
3-10d common nails (3" x 0.148'D;
2 toe nails on one side and 1 toe nail
6
Rafter or roof truss to plate
or
on opposite side of each rafter or
2-10d box (3" x 0.128'); or
(inches)
4-10d box (3"x 0.128'); or
truss`
2 staples 13/4"
30 3/ "-'/
4-3 " x 0.131 " nails
s 2„
3-8d box (2'/2" x 0.113'); or
31 19/32- 1 ,,
4-16d (3'/2" x 0.135'); or
1 " x 6" sheathing to each bearing
2-8d common (2'/2" x 0.131'); or
Face nail
3-10d common (3'/2" x 0.148'); or
Other wall sheathingo
2-10d box (3',x 0.128'); or
2" structural cellulosic fiberboard
4-10d box (3"x 0.128'); or
Toe nail
7
Roof rafters to ridge, valley or hip rafters or roof rafter
4-3" x 0.131"nails
diameter, or 1"crown staple 16 ga., 1'/4" long
3-16d box 3'/2" x 0.135'x; or
34
to nunimum 2" ridge beam
3-8d common (21/2" x 0.131'); or
2-16d common (31/2" x 0.162'); or
3-1Od box (3"x 0.128'); or
diameter, or 1"crown staple 16 ga., 1'/4" long
3-10d box (3"x 0.128'); or
End nail
3..staples, 1"crown, 16 ga., 13/4" long
1/2" gypsum sheathin
3-3"x 0.131"nails
1 " x 8" and wider sheathing to each bearing
Wall
Wider than 1 " x 8"
16d common (3'/2" x 0.162'
24 o.c. face nail
8
Stud to stud (not at braced wall panels)
IOd box (3" x 0.128'); or
3-8d common (2'/2" x 0.131'); or
7
7
3 " x Q.131 " nails
16" ole. face nail
�
Stud to stud and abutting studs at intersecting wall corners
1
16d box (3/2" x 0.135'); or
3" x 0.131" nails.
12" o.c. face nail
37
(at braced wall panels)
16d common (3'/2" x 0.162')
16" o.c. face nail
4-8d bolt (21/2" x 0.113'); or
1 O
„ t „
Built-up header (2 to 2 header with /2 spacer)
16d common (3'/2" x 0.162'
16" o.c. each edge face nail
16d box (3'/2" x 0.135')
12" o.c. each edge face nail
3-10d box (3"x 0.128'); or
6
12
5-8d box (2'/2" x 0.113'); or
8d deformed (21/2" x 0.120") nail
11
Continuous header to stud
4-8d common (2'/2" x 0.131'); or
Toe nail
22
Rim joist, band joist or blocking to sill or top
4-IOd box (3"x 0.128')
plate (roof applications also)
16d common (3'/2" x 0.162')
16" o.c. face nail
12
Top plate to top plate
1 O box (3 " x 0.128'); or
"
3 " x 0.131 " nails
12" o.c. face nail
23
1"x 6" subfloor or less to each joist
8-16d common (31/2" x 0.162'); or
Face nail
Double top plate splice for SDCs A -D, with seismic
12-16d box (31/2" x 0.135'); or
braced wall line spacing < 25'
12-10d box (3" x 0.128'); or
Face nail on each side of end joint
13
12-3 " x 0.131 " nails
(minimum 24" lap splice length
each side of end joint)
Double top plate splice SDCs Do, Di, or D2; and braced
12-16d (3'/2" x 0.135'
wall line spacing Z25'
WALL CONSTRUCTION
(continued)
TABLE R602.3(1) -continued
FASTENING SCHEDULE
ITEM
DESCRIPTION OF BUILDING ELEMENTS
NUMBER AND TYPE OF FASTENER'.0.`
SPACING AND LOCATION
3-16d box (31/2" x10.135"); or
2-16d common (3'/, x 0.162')
Blind and face nail
16d common (3'/2" x 0.162'1
16" o.c. face nail
14
Bottom plate to joist, rim joist, band joist or
blocking (not at braced wall panels)
16d box (3'/2" x 0.135'); or
12" o.c. face nail
3-16d common (3'/2" x 0.162')
3 x 12 x 0.036
3 " x 0.131 " nails
Band or rim joist to joist
4-10 box (3"x 0.128'), or4-3"x
Bottom plate to joist, rim joist, band joist or
3-16d box (3'/2" x10.135'); or
3 each 16" o.c. face nail
15
blocking (at braced wall panel)
2-16d common (3'/," x 0.162'); or
2 each 16" o.c. face nail
4-3" x 14 ga. staples,'/16" crown
Stractuies in SDC Do, D, and D21
4-3"x 0.131"nails
4 each 16" o.c. face nail
20d common (4".x 0.192"); or
Nail each layer as follows: 32" o.c.
4-8d box (2'/2" x 0.113'); or
galvanized steel late
g" P
(21/Z' x 0.113") nails
at top and bottom and staggered.
3-16d box (3'/2" x 0.135 "); or
4
greater than or equal to 25 feel
1 O box (3"x 0.128'); or
24" o.c. face nail at top and bottom
4-8d common (2'/2" x 0.131'); or
Toe nail
3 " x 0.131 " nails
staggered on opposite sides
4-1Od box (3"x 0.128'); or
layers
16
Top or bottom plate to stud
4-3"x 0.131"nails
2-20d common (4" x 0.192'); or
Face nail at ends and at each splice
3-16d box (3'/2" x 0.135'D; or
3-1Od box (3" x 0.128'); or
2-16d common (3'/2" x 0.162'); or
End nail
3-3 " x 0.131 "nails
3-1Od box (3" x 0.128'); or
4-16d box (3'/2" x 0.135'); or
3-3"x 0.131"nails
Ledger strip supporting joists or rafters
3-16d common (3'/2" x 0.162'); or
4-1Od box (3 x 0.128 ), or
At each joist oist or rafter, face nail
340d box (3 x 0.128'); or
17
Top plates, laps at corners and intersections
2-16d common (31/2" x 0.162'); or
Face nail
2-10d (3" x 0.128')
Each end, toe nail
3-3"x 0.131"nails
3-8d box (2'/2" x 0.113'); or
SPACING OF FASTENERS
ITEM
18
-1"brace- to each stud and plate __... _
2-8d common (2'/2" x 0.131'); or
Face nail
2-10d box (3" x 0.128'); or
(inches)
(inches)
Wood structural panels, subfloor, roof and Interior wall. sheathing to framing and particleboard wall sheathing to framing
2 staples 13/4"
30 3/ "-'/
6d common (2" x 0.113'D nail (subfloor, wall)' 6 12!
s 2„
3-8d box (2'/2" x 0.113'); or
31 19/32- 1 ,,
19
1 " x 6" sheathing to each bearing
2-8d common (2'/2" x 0.131'); or
Face nail
8d (2'/2" x 0.131') deformed nail
Other wall sheathingo
2-10d box (3',x 0.128'); or
2" structural cellulosic fiberboard
11/2" galvanized roofing nail, head head
3
2, staples,, l " crown, 16 ga., 13/4" long
sheathing
diameter, or 1"crown staple 16 ga., 1'/4" long
3-8d box (2'/2" x 0.113'); or
34
25 /32 structural cellulosic
3-8d common (21/2" x 0.131'); or
3-1Od box (3"x 0.128'); or
diameter, or 1"crown staple 16 ga., 1'/4" long
3
6
3..staples, 1"crown, 16 ga., 13/4" long
1/2" gypsum sheathin
20
1 " x 8" and wider sheathing to each bearing
Face nail
Wider than 1 " x 8"
11/, long; 1 /4' screws, Type W or S
4-8d box (2'/2" x 0.113'); or
36
s/8" gypsum sheathing °
3-8d common (2'/2" x 0.131'); or
7
7
340d box Q3 .x 0.128'x; or
ll/ 8 long; 1% screws, Type W or S
4 staples, 1"crown, 16 ga., 13/4" long
37
Floor
6d deformed (2" x 0.120') nail; or
6
4-8d bolt (21/2" x 0.113'); or
21
Joist to sill, top plate or girder
3-8d common (2'/2" x 0.131'); or
Toe nail
38
7/8,,_ 1'
3-10d box (3"x 0.128'); or
6
12
3-3"x 0.131"nails
8d deformed (21/2" x 0.120") nail
8d box"(2'/2" x 0.113')
4" o.c. toe nail
22
Rim joist, band joist or blocking to sill or top
8d common; (21/2" x 0.131'); or
plate (roof applications also)
1 O box (3" x 0.128'D; or
6" o.c. toe nail
3"x 0.131"nails
"
3-8d box (2'/2" x 0.113'D; or
23
1"x 6" subfloor or less to each joist
2-8d common (2'/2" x 0.131'); or
Face nail
3-10d box (3"x 0.128'); or
2 staples, I"crown, 16 ga., 13/4" long
210
24 x as CLEArd aw»
(continued)
2016 CALIFORNIA RESIDENTIAL CODE
WALL CONSTRUCTION
TABLE 602.3(1)
FASTENING SCHEDULE -.continued
ITEM DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENER'' ` SPACING AND LOCATION
Floor
24
2" subfloor to joist or girder
3-16d box (31/2" x10.135"); or
2-16d common (3'/, x 0.162')
Blind and face nail
25
2" planks (plank & beam -floor & roof)
-
3-16d box (3'/2" x10.135 "); or
2-16d common (3'/, x 0.162")
At each bearing, face nail
o
Structures in SDC A -C; and in SDC
311 x 6 x 0.036
3-16d common (3'/2" x 0.162')
3 x 12 x 0.036
26
Band or rim joist to joist
4-10 box (3"x 0.128'), or4-3"x
End nail
galvanized steel plate
(2'/2" x 0.113") nails
0.131"nails; or
or equivalent
or equivalent
4-3" x 14 ga. staples,'/16" crown
Stractuies in SDC Do, D, and D21
3" x 8" by 0.036"
(9) 8d box
20d common (4".x 0.192"); or
Nail each layer as follows: 32" o.c.
spacing
with braced wall lines acing
galvanized steel late
g" P
(21/Z' x 0.113") nails
at top and bottom and staggered.
(21/2' x 0.113") nails
4
greater than or equal to 25 feel
1 O box (3"x 0.128'); or
24" o.c. face nail at top and bottom
27
Built-up girders and beams, 2 -inch lumber
3 " x 0.131 " nails
staggered on opposite sides
layers
And:
2-20d common (4" x 0.192'); or
Face nail at ends and at each splice
3-1Od box (3" x 0.128'); or
3-3 " x 0.131 "nails
4-16d box (3'/2" x 0.135'); or
28
Ledger strip supporting joists or rafters
3-16d common (3'/2" x 0.162'); or
4-1Od box (3 x 0.128 ), or
At each joist oist or rafter, face nail
4-3"x 0.131"nails
29
Bridging to joist
2-10d (3" x 0.128')
Each end, toe nail
SPACING OF FASTENERS
ITEM
DESCRiPTiON
OF BUILDING ELEMENTS
NUMBER ANDIntermediate
TYPE OF FASTENER" 0.`
Edges n
supports`•
(inches)
(inches)
Wood structural panels, subfloor, roof and Interior wall. sheathing to framing and particleboard wall sheathing to framing
[see Table R602.3(3) for wood structural panel exteriorwall sheathing to wall framing]
30 3/ "-'/
6d common (2" x 0.113'D nail (subfloor, wall)' 6 12!
s 2„
8d common (2'/2" x 0.131') nail (roof)
31 19/32- 1 ,,
8d common nail (2'/2" x 0.131') 6 12'
32 1'/ "-1'/ "
IOd common (3' x 0.148' nail; or
6 12
s a
8d (2'/2" x 0.131') deformed nail
Other wall sheathingo
33
2" structural cellulosic fiberboard
11/2" galvanized roofing nail, head head
3
6
sheathing
diameter, or 1"crown staple 16 ga., 1'/4" long
34
25 /32 structural cellulosic
13/4" galvanized roofing nail,'/16"head
fiberboard sheathing
diameter, or 1"crown staple 16 ga., 1'/4" long
3
6
35
1/2" gypsum sheathin
1'/," galvanized roofing nail; staple galvanized,
7
7
11/, long; 1 /4' screws, Type W or S
36
s/8" gypsum sheathing °
1/4° galvanized roofing nail; staple galvanized,
7
7
ll/ 8 long; 1% screws, Type W or S
Wood structural panels, combination subfloor underiayment to framing
37
3/4"and less
6d deformed (2" x 0.120') nail; or
6
12
8d common (2'/2" x 0.131') nail
38
7/8,,_ 1'
8d common (21/2" x 0.131') nail; or
6
12
8d deformed (21/2" x 0.120") nail
39
1'/4"
1 O common (3" x 0.148" ) nail; or
6
12
8d deformed (21/2" x 0.120") nail
For SI: 1 inch = 25.4 nun, 1 foot = 304.8 nun, 1 mile per hour = 0.447 m/s; 1 ksi = 6.895 MPa.
WALL CONSTRUCTION
TABLE R602.3(i)-continued
FASTENING SCHEDULE
a. Nails are smooth -common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall have minimum
average bending yield strengths as shown: 80 ksi for shank diameter of 0.192 inch (20d common nail), 90 ksi for shank diameters larger than 0.142 inch but
not larger than 0.177 inch, and 100 ksi for shank diameters of 0.142 inch or less.
b. Staples are 16 gage wire and have a minimum '/,Cinch on diameter crown width.
c. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches or greater.
d. Four -foot by 8 -foot or 4 -foot by 9 -foot panels shall be applied veaically.
e. Spacing of fasteners not included in this table shall be based on Table R602.3(2).
f. Where the ultimate design wind speed is 130 mph or less, nails for attaching wood structural panel roof sheathing to gable end wail framing shall be spaced 6
inches on center. Where the ultimate design wind speed is greater than 130 mph, nails for attaching panel roof sheathing to intermediate supports shall be
spaced 6 inches on center for minimum 48 -inch distance from ridges, eaves and gable end walls; and 4 inches on center to gable end wall framing.
g. Gypsum sheathing shall conform to ASTM C1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall conform to ASTM C208.
h. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and at floor perimeters only.
Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members and required blocking. Blocking of roof or floor
sheathing panel edges perpendicular to the framing members need not be provided except as required by other provisions of this code. Floor perimeter shall be
supported by framing members or solid blocking.
L Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one side of the rafter and toe rails from
the ceiling joist to top plate in accordance with this schedule. The toe nail on the opposite side of the rafter shall not be required.
TABLE 8602.3.2
SINGLE TOP -PLATE, SPLICE CONNECTION DETAILS
For SI: 1 itch = 25.4 mm, 1 foot = 304.8 mm.
212
t
2016 CALIFORNIA RESIDENTIAL CODE
cr�vtt.��i t t,�;,.1Lnr�•
A. 2016Cafif. Residential Code --
B. 2016 Calif. Building Code. (structural only)
C. 2016 Calif. Mechanical Code.
D. 2016 Calif. Plumbing Coda
E. 2016 Calif. Electrical Code.
E. 2016 California Energy Code (2016 Building Energy Efficiency Standards)
E 2016 Califolvia Green Pudding Standards Code.
.EHAh1T BUTTE COUNT/ DEVELOPMENT SERVICES
REVIEWED FOR
cODE COMPLIANCE 14w_-1.1
`�
CAT
BUTTE
COUNTY
MAR 2 7 2017
DEV111,taPIMENT
ShI2Vt�� `
REVISIONS BY
Date
Scale
Drawn
Job
Sheet
Of Sheets
TOP -PLATE SPLICE LOCATION
CONDITION
Corners and intersecting walls
Butt Joints in straight walls
Splice plate size
Minimum nails
each side of joint
Splice plate size
Minimum nails
each side of Joint
Structures in SDC A -C; and in SDC
311 x 6 x 0.036
(6) 8d box
3 x 12 x 0.036
(12) 8d box
Do, D, and D2 with braced wall line
galvanized steel plate
(2'/2' x 0.113") nails
galvanized steel plate
(2'/2" x 0.113") nails
spacing less than 25 feet
or equivalent
or equivalent
Stractuies in SDC Do, D, and D21
3" x 8" by 0.036"
(9) 8d box
3' x 16" x 0:036"
(18) 8d box
spacing
with braced wall lines acing
galvanized steel late
g" P
(21/Z' x 0.113") nails
galvanized steel plate
(21/2' x 0.113") nails
4
greater than or equal to 25 feel
or equivalent
or equivalent
For SI: 1 itch = 25.4 mm, 1 foot = 304.8 mm.
212
t
2016 CALIFORNIA RESIDENTIAL CODE
cr�vtt.��i t t,�;,.1Lnr�•
A. 2016Cafif. Residential Code --
B. 2016 Calif. Building Code. (structural only)
C. 2016 Calif. Mechanical Code.
D. 2016 Calif. Plumbing Coda
E. 2016 Calif. Electrical Code.
E. 2016 California Energy Code (2016 Building Energy Efficiency Standards)
E 2016 Califolvia Green Pudding Standards Code.
.EHAh1T BUTTE COUNT/ DEVELOPMENT SERVICES
REVIEWED FOR
cODE COMPLIANCE 14w_-1.1
`�
CAT
BUTTE
COUNTY
MAR 2 7 2017
DEV111,taPIMENT
ShI2Vt�� `
REVISIONS BY
Date
Scale
Drawn
Job
Sheet
Of Sheets
II
:VISIONS I BY
a
Date
Scale
Drawn
Doti
Sheol
Of
Sheets