Loading...
HomeMy WebLinkAboutB17-0321 056-120-109VINCI ASSOCIATES cSfrucfura/ 6nyineers February 22, 2017 I� a' I rt r {$ �F�ix x ,. Alternative Energy:Systems t 13620 Hwy 99 Chico, CA 95973a Subject: Review of minimum footing requirements 1 Project: 18 .Module Photovoltaic Groundmount Installation 1 Arra J C ) � Y) Sweringen Residence 1 - . 53 Cedar Ridge DR, Cohasset, CA 95973 V&A Project No. 12-3457 The purpose of this report is to provide a site specific analysis of the minimum footing requirements for the photovoltaic array groundtrac installation at 53.Cedar Ridge DR ' in Cohasset, CA 95973. Based upon. our review of the 1 Photovoltaic Array, installed 3 modules high and .6: modules wide. The PV Array shall have a transverse spacing of approximately 6.58 feet on :center and a longitudinal spacing of 10.00 feet maximum. Based upon, a wind speed of 110 mph; Exposure C, it was determined that. the minimum required footing depth,is ' 26 inches minimum below grade for a 16 inch diameter pier footing. An alternate footing :17 inches minimum below grade for a 1'-9" wide continuous footing with a post 1 elow grade for a .. longitudinally. 9. spacing of 6.25:ft Ion Itudinall An�alternate footin 19 inches minimum.below 24 Inch diameter pier footing. Footing sizes are based upon .the worst:case loading due to horizontal and vertical wind loading. Refer to attached calculations and details for additional information. ' Our professional services have been performed using the de ree of care and skill ordinarily. P 9 9 Y. exercised under similar circumstances by reputable engineers practicing in this locality. No ' other warranty, expressed orriplied, is made as to the professional options included in'this . report. We hope th' ov des you with the information you need at this time. Please call us if you have q e io s regarding this report. 1 FES %CH4Rp Y Sincere) �5 `y VIN MATES 1 No. S4411 o� Exp. 12/31/17 * PERMIT# Ja s /Vinci, S.E. sr STRUCTUO'%:E000NTYDEVELOPMENTSE VICES Li ense No. 8-4411 9TF0 CA���� EVIEWE® FOriICp, 4.CODE COMPLIANCE �r BY-.. 175 E. WILBUR ROAD, STE 103 THOUSAND-OAKS,'CA 91360 p 805.496-2100 f 805.496-2442 a vinci@vincise.com" 1 DATE: ° ~ 2/22/2017 VINCI & ASSOCIATES SHEET: 1 Al PROJECT: Sweringen Residence &Fuclaral (Srzgineers JOB NO.: , 12-3457 ' 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: iRV Cohasset, CA 95973. p805.496.2100 • f805.496.2442 • evinci@VinciSE.com 1 CLIENT: Alternative Energy Systems ' DESIGN DATA: , WIND DESIGN CRITERIA: BASIC WIND SPEED = 110 mph WIND EXPOSURE = C ' GROUND SNOW LOAD = 0 psf ' ' SOLAR MODULE ARRAY DATA r Sloped Dimension of Array = 132 in ' Angle of Array _ 20 degrees Slope of Array: = 4.10 : 12 No. of Modules in Transverse Direction 3 ' No. of Modules in Longitudinal Direction 6 Total No. of Modules in Project = 18 Transverse Post Spacing = 6.58 , ft Longitudinal Post Spacing = 10.00 ft Number of supports - Transverse Direction = 2 Diameter of Pier Footing = 16 in ' Number of Arrays = 1 Array Uniform Load = 2.8 psf SOIL DESIGN CRITERIA (Based upon Chapter 18 of CBC) ' Allowable Soil Bearing Pressure = 1500 psf Allowable Soil Lateral Bearing = 200 pcf Allowable Shaft Skin Friction = J 200 pcf PROJECT: R5_&;3 wenngen Resliience i , 4 PAGE: A2 , AA a ,t---'y.asi �,97-'CLIENT : 3 Cedar Rldge DR"'Cohasset�CA.95973 t `��� DESIGN BY:JOB NO.:4S75 .z DATE: 02/22/17 REVIEW BY: Vend Anal '§isJofr Open'StrUi to a (Solar_Panels) Base0#1 ASCE 7 2010 ' . � 9 . -;/..2016 CBC INPUT DATA Exposure category (B, C or D) Importance factor, 1.0 only, (Table 1.5-2) I� = 1.00 Basic wind speed (ASCE 7-1026.5.1) V = +110 mph Topographic factor (26.8 & Table 26.8-1) Kp= 1: *m. Flat Jslope = - Height of mean roof h = f ,"5"' ft �TZ Roof slope E4. Roof : 12 t z Roof length L = r 10 ft Roof horizontal projected width - B = jy 10 ft Effective area of component /cladding A = x''10 °r" ft2 a (pr le 4 ` DESIGN SUMMARY 1. Main Wind -Force Resisting System Max horizontal force / base shear from roof = 1.04 kips I + - 0.10 kips (eave & columns increasing) I E 1.15 kips Max vertical download force = 3.05 kips Max vertical uplift force = 2.81 kips Max moment at centroid of base from roof = 9.09 ft -kips r + 0.91 ft -kips (eave & columns increasing) E 9.99 ft -kips 2. Component and Cladding Elements Max inward pressure = 76 psf Max net outward pressure = 81 psf r ANALYSIS ti Velocity pressure t qh = 0.00256 Kh Kv Kd V2 1 = 22.38 psf where: qh = velocity pressure at mean roof height, h. (Eq. 28.3-1 page 298 & Eq. 30.3-1 page 316) Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 28.3-1, pg 299) = 0.85 Kd = wind directionality factor. (Tab. 26.6-1, for building, page 250) = 0.85 , h = height of mean roof 5.00 ft Main Wind -Force Resisting System (Sec. 27.4.3) p=ghGCN ` F=pAf r where: G = gust effect factor. (Sec. 26.9) _ -...0.85 0 = roof angle = 18.88 degree < 45 deg. [Satisfactory] Ar = roof actual area. 52.8 ft2, windward = 52.8 ft2, leeward CN = net force coefficients. (Fig. 27.4-4, page 267) Check Fig. 27.4-4 limitation h / B = 0.50 within [0.25 , 1.0] [Satisfactory] • WIND TO BOTTOM, = 0° WIND TO TOP, = 180° F CLEAR FLOW OBSTRUCTED CLEAR FLOW OBSTRUCTED 'I 0 CASE Crrw Cnn Cnrvu CNI. CNw Crn CNw Cnn A -1.21 -1.46 -1.31 -1.60 1.51 1.70 0.45 -1.05 s -23.03 -27.68 -24.86 -30.50 28.67 32.41 8.59 -19.94 � 18.88. F ki s -1.22 -1.46 -1.31 -1.61 1.51 1.71 0.45 -1.05 B -2.16 -0.16 -2.20 -0.76 2.01 0.65 1.25 -0.14 ' s -41.07 -2.95 -41.92 -14.37 38.18 12.40 23.81 -2.75 F kis -2.17 -0.16 -2.22 -0.76 2.02 0.66 1.26 -0.15 ?ATE: �-'`' ' 2/22/2017 i V I N C I $ 'ASSOCIATES SHEET: t ` A3 PROJECT Sweringen Residence c5lrz�cicrrt� engineers - Jos_No.:F 09-3457 t _ 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS. CA 91360 ENGR.:-.. JRV - ' • Cohasset, CA 95973 p805.496.2100 • f805.496.2442 • esolar@VinciSE.com CLIENT: Alternative Energy Systems ' _ J FOOTING DESIGN - PV Sloped Dimension: 132 in 'MR23y�TYPICC, AL RAY PV Array Angle: 20 degrees - ,' ` Post Spacing: 10.00 ft ' No. of Supports: 2 - Footing Diameter (d): 16 in " MAXIMUM VERTICAL FORCE: 3.05 k / (10.0 x 10.0) 30.54 psf x 0.6 = 18.32 psf , MAXIMUM UPLIFT FORCE: 2:81 k (10.0 x 10.0) = 28.14 psf x 0.6 = 16.89 psf ASD Factor y ' GROUNDTRAC SYSTEM CAST INTO EARTH ' Maximum Vertical Load: (Worst Case: DL + Wind) _ P = 0.75 18.3 2 ' - psf + 2.8 psf DL + 0 psf snow 21.12 psf P = •21.12 psf x ( 124 " '/12 "/ft) x ( 120.0 " /12"/ft) = 2183 lbs for 2 Supports a P = >1092 lbs/footing Try 16" diameter footing- i Soil Bearing =' 1092 / (p x 0.67) = 782.2 psf << 1995 psf, �'." ' 1500 psf x 1.33 (CBC Table 1806.2) Maximum Uplift Load: ,� Therefore O.K. , �+r , P = 16.89 psf 2.8 psf DL = 114.09 psf .. P = x`14.09 psf x ( 124'' /12"/ft) x ( 120.0 " /12"/ft) = 1456 lbs for 2 Supports ' ' P = ..728 lbs/footing ; r Try 16" diameter. x 26 " footing y ' Allowable uplift =' " Concrete DL + Soil Cohesion ( 200 psf x 1.33) per CBC Table 1806.2 i ' [ (7c z (d/2)z) x 150 pcf x 2.2 ft ] + [ (7c x d) x 2.20 ft x 266 psf] = 2911. lbs •-Design Ratio = ( 2,911 lbs / 728 lbs ) ' = 4.0 Therefore O.K. y s . • i_ P i i. . .1 DATE: 2/22/2017 VINCI & ASSOCIATES SHEET: A4.1 PROJECT: Sweringen Residence 51n,chwal (5ngineers JOB NO.: 07-3457 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: JRV CohaSset, CA 95973 p 805.496.2100 • f 805.496.2442 • e vinci@VnciSE.com Check Stiffness of Posts Properties of Post: Size: 1.5 " 2.5 " IpiPe = 0.31 1.53 Actual Load h (ft) Size rpipe = 0.623 0.947 Apipe = 0.799 1.7 3.0 " galy schedule 40 pipe 3.02 in 1.16 in Epipe 2.23 int F = POST HEIGHT Column STIFFNESS % OF LD FORCE TO POST Actual Load h (ft) Size K = 3E1 / h3 N pool (Ibs) 1 2.00 ft 1.5 " 1.951 95% 163 lbs 2 5.25 ft 1.5 " 0.108 5% 9 lbs 121 Sum: 8102 lbs{ 2.059 172 lbs Check Slenderness of Posts K = 1.2 29000 ksi 172 lbs POST HEIGHT Column SLENDERNESS per AISC Allowable Load Actual Load h (ft) Size KI / r Fa (ksi) FALLOW (lbs) FPOST (lbs) 1 2.00 ft 1.5 " 46 18.70 14941 lbs 6951 s 2 5.25 ft 1.5 " 121 10.14 8102 lbs{ ' Ibs ,139.0 t t�#.\' Sum: 167.576 THEREFORE O.K. k ' DATE: 2/22/2017 VINCI & ASSOCIATES PROJECT. Sweringen Residence 61ruclural 6nytneers 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 - THOUSAND OAKS, CA 91360 Cohasset, CA 95973 p805.496.2100 - f805.496.2442 • evinci@VinciSE.com CLIENT: Alternative Energy Systems ■ DESIGN OF PIER FOOTING & POST CHECK ' Post Spacing: 10.00 ft Number of Columns: 2 Horizontal Load: 6.9 psf ' Exposed wind surface 3 . ' ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: (CBC Section 1805.7.2.1) d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) A = (2.34 P) / (S1 ' b) SHEET: A14.2 JOB NO.: 09-3457 ENGR.: JRV ■ P P = 163 lbs (SEE A4.1) h = 2 ft (Max Height) S1 = 266 psf/ft x (d/3) (includes 1.33 increase for wind) h b = 16 in (diameter or diagonal of square) ■ r � 1 � � l r i i r r d t ■ ' GOVERNS >>> Try d = S1 @ (1f3)d A Calc d (ft) (psf) (ft) 1.2 142 2.020 3.34 1.45 171 1.672 2.92 1.7 201 1.426 2.61 1.95 231 1.243 2.38 Y. �. '��2 2.45 290 0.989 2.04 ■ DESIGN COLUMN McoI = Ph = 327 ft -lbs ' S.I = MCI / Fb = 0.17 in Fb = 0.66 x 35,000 psi ' »»> - USE: 1-1/2" Schedule 40 Pipe S= 0.33 in3 with 16 inch diameter x 26 inch MIN. deep concrete footing. DATE: 2/22/2017 VINCI & ASSOCIATES SHEET: A4.3 PROJECT: Sweringen Residence 61ruclural 6nyinee�s roe NO.: 09-3457 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 - THOUSAND OAKS, CA 91360 ENGR.: JRV Cohasset, CA 95973 p805.496.2100 - f805.496.2442 - evinci@VinciSE.com CLIENT: Alternative Energy Systems DESIGN OF PIER FOOTING & POST CHECK Post Spacing: 10.00 ft Number of Columns: 2 Horizontal Load: 6.9 psf Exposed wind surface 3 ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: (CBC Section 1805.7.2.1) d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) A = (2.34 * P) / (S1 * b) D d GOVERNS >>> DESIGN COLUMN P = 9 lbs (SEE A4.1) h = 5.25 ft (Max Height) S1 = 266 psf/ft x (d/3) (includes 1.33 increase for wind) b = 16 in (diameter or diagonal of square) Try d = S1 @ (1f3)d A Calc d (ft) (Psf) (ft) 1.2 142 0.112 0.86 1.45 171 0.092 0.77 1.7 201 0.079 0.71 1.95 231 0.069 0.66 2 2 =260 0:061' w 0;62" 2.45 290 0.055 0.59 M.i = Ph = 47 ft -lbs S.I = MC01 / Fb = 0.02 in Fb = 0.66 x 35,000 psi »»> USE: 1-1/2" Schedule 40 Pipe S = 0.33 in with 16 inch diameter x 26 inch MIN. deep concrete footing. ' DATE: 2/22/2017 VINCI & ASSOCIATES SHEET: A4.2 PROJECT: Sweringen Residence 61rucfura/ Cnyineers JOB No.: 09-3457 ' 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: JRV Cohasset, CA 95973 p805.496.2100 • f805.496.2442 • evinci@VinciSE.com CLIENT: Alternative Energy Systems DESIGN OF PIER FOOTING &POST CHECK I I WORMS ' Post Spacing: 10.00 ft Number of Columns: 2 Horizontal Load: 6.9 psf ' Exposed wind surface 3 ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: ' (CBC Section 1805.7.2.1) d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) h d GOVERNS >>> DESIGN COLUMN P = h = S1 = b = A = (2.34*P)/(S1 -b) 163 lbs (SEE A4.1) 2 ft (Average Max) 266 psf/ft x (d/3) (in..ludes 1.33 increase for wind) 24 in (diameter or diagonal of square) Try d = (ft) S1 @ (1/3)d (psf) A Calc d (ft) 0.6 106 1.796 3.07 0.85 151 1.268 2.41 1.1 195 0.979 2.03 1.35 239 0.798 1.78 1.:6 284: 0673' 1:59. 1.85 328 0.582 1.45 M.i = Ph = 327 ft -lbs S.i = M.i / Fb = 0.17 in3 Fb = 0.66 x 35,000 psi »»> USE: 1-1/2" Schedule 40 Pipe S = 0.33 in with 24 inch diameter x 19 inch MIN. deep concrete footing. DATE: 2/22/2017 VINCI & ASSOCIATES SHEET: + A4.3 , PROJECT: Sweringen Residence c51ruclara/ Cnymeers JOB No.: 09-3457 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.: .)RV Cohasset, CA 95973 p 805.496.2100 • f 805.496.2442 - e vinci@VinciSE.com CLIENT: Alternative Energy Systems DESIGN OF PIER FOOTING & POST CHECK POST 2_ Post Spacing: 10.00 ft Number of Columns: 2 Horizontal Load: 6.9 psf Exposed wind surface 3 ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: (CBC Section 1805.7.2.1) P d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) h Id GOVERNS >>> DESIGN COLUMN Mco, _ S., _ A = (2.34 ` P) / (S1 " b) P = 9 lbs (SEE A4.1) h = 5.25 ft (Max Height) S1 = 266 psf/ft x (d/3) (includes 1.33 increase for wind) b = 24 in (diameter or diagonal of square) Try d = (ft) S1 @ (1/3)d (psf) A Calc d (ft) 0.6 106 0.099 0.81 0.85 151 0.070 0.67 1.1 195 0.054 0.58 1.35 239 0.044 0.53 1.6 28,4 0:037 0.48 1.85 328 0.032 0.45 Ph = 47 ft -lbs M., / Fb = 0.02 in Fb = 0.66 x 35,000 psi »»> USE: 1-112" Schedule 40 Pipe S = 0.33 in' with 24 inch diameter x 19 inch MIN. deep concrete footing. DATE: 2/22/2017 VINCI & ASSOCIATES PROJECT: Sweringen Residence &Fucfural Cnyineers 1 53 Cedar Ridge DR 175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 Cohasset, CA 95973 p805.496.2100 - f805.496.2442 - evinci@VinciSE.com CLIENT: Alternative Energy Systems ■ DESIGN OF PIER FOOTING & POST CHECK ' Post Spacing: 6>25 ft r,;; $ < rRE,.DUCED POST SPACING, Number of Columns: 2 Horizontal Load: 6.9 psf ' Exposed wind surface 3 ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: (CBC Section 1805.7.2.1) d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) A = (2.34 " P) / (S1 * b) SHEET: AI,4.2 JOB NO.: '09-3457 ENGR.: JRV POST 17 1 P 1110. P = 163 lbs (SEE A4.1) ' h = 2 ft (Average Max) S1 = 266 psf/ft x (d/3) (irn;ludes 1.33 increase for wind) h b = 29 in (diameter or diagonal of square) d 1 ' GOVERNS >>> Try d = S1 @ (1f3)d A Calc d (ft) (psf) (ft) 0.38 81 1.942 3.25 0.63 135 1.171 2.29 0.88 189 0.839 1.83 1.13 242 0.653 1.56 1'-3 1.63 349 0.453 1.25 DESIGN COLUMN MCoI = Ph = 327 ft -lbs S.I = Mca / Fb 0.17 in 3 Fb = 0.66 x 35,000 psi 1 »»> USE: 1-1/2" Schedule 40 Pipe S= 0.33 in' with 21 inch wide x 17 inch MIN. deep continuous concrete footing. 1 DATE: 2/22/2017 PROJECT: Sweringen Residence 53 Cedar Ridge DR Cohasset, CA 95973 CLIENT: Alternative Energy Syste VINCI & -ASSOCIATES SHEET: A4.3 •' c3lruclural Cayineers JOB NO.: 09-3457 175 E. WILBUR ROAD, STE 103 - THOUSAND OAKS, CA 91360 ENGR.: JRV , p805.496.2100 - f805.496.2442 - evinci@VinciSE.com z DESIGN OF PIER FOOTING & POST CHECK POST 2 ' Post Spacing: 10.00 ft ' Number of Columns: 2 Horizontal Load: 6.9 psf Exposed wind surface 3 ft -DESIGN BASED UPON NON -CONSTRAINED CBC FORMULA: , (CBC Section 1805.7.2.1) d = (A/2) (1 + ( 1 + (4.36h/A) )^.5)) A = (2.34 * P) / (S1 * b) P ' P = 9 lbs (SEE A4.1) h, = 5.25 ft (Max Height) S1 = 266 psf/ft x (d/3) (includes 1.33 increase for wind) , h b = 29 in (diameter or diaaonal of souare) � 1 � 1 1 1 � 1 1 1 , d 1 � GOVERNS >>> DESIGN COLUMN Try d = (ft) S1 @ (1/3)d (Psf) A Calc d (ft) 0.38 81 0.107 0.84 0.63 135 0.065 0.64 0.88 189 0.046 0.54 1.13 242 0.036 0.47 1;.,38 � 296 0:;030 0;43: 1.63 349 0.025 0.39 MCoI = Ph = 47 ft -lbs SSI = M d / Fb = 0.02 in Fb = 0.66 x 35,000 psi ' »»> USE: 1-1/2" Schedule 40 Pipe S = 0.33 in' ' with 21 inch wide x 17 inch MIN. deep continuous concrete footing. 1 i t l , Design -Driven Advantages #1 module aesthetics and efficiency' Unmatched module reliability' No electrolytic capacitors 25 -year Combined Power and Product Warranty Maximize Value for Roof Size system for roof, not string inverter Optimize performance of each module Expand Deployment Options Complex roofs and partial shading Small systems System expandability Simplify & Speed Installation Factory -integrated microinverter Robust, double -locking AC connectors Design Flexibility offsite and onsite No DC string sizing process Fewer installation steps than competing systems Intuitive commissioning Component of Complete System Built for use with SunPower° InvisiMount" and the SunPower Monitoring System Superior system reliability and aesthetics +rte`". �• - + y 3 '+® • f: SERIES Optimize System and Installation Efficiency SunPower AC Modules, which include a.factory-integrated . SunPower microinverter, provide a revolutionary combination;of high efficiency, high reliability, and module -level DC -to -AC power•conversion. Designed specifically for use with SunPower InvisiMount 11 and the SunPower Monitoring System, SunPower AC Modules enable rapid installation, best -in -class system aesthetics, and intuitive visibility into system performance. All this comes with the best Combined Power and Product Warranty. PERMIT# BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR.. CODE COMPLI CE ad Ak DATE ?7 14 1 --BY , sunpower.com f MPY' L •Y y r z SERIES Optimize System and Installation Efficiency SunPower AC Modules, which include a.factory-integrated . SunPower microinverter, provide a revolutionary combination;of high efficiency, high reliability, and module -level DC -to -AC power•conversion. Designed specifically for use with SunPower InvisiMount 11 and the SunPower Monitoring System, SunPower AC Modules enable rapid installation, best -in -class system aesthetics, and intuitive visibility into system performance. All this comes with the best Combined Power and Product Warranty. PERMIT# BUTTE COUNTY DEVELOPMENT SERVICES REVIEWED FOR.. CODE COMPLI CE ad Ak DATE ?7 14 1 --BY , sunpower.com f MPY' ` SPRA22-360-C-AC NOfninal Power (Pnom) 360 W Power -Tolerance' +5/-0% Avg. Panel Efficiency' , _ - 22.2% Temp. Coef. (Powerj •-,-0.30%/° C Shade•Tolerance' , ,• Three bypass diodes Integrated module -level maximum power point tracking nag OUR DR. Output @ 240 V (min./nom./max.) Output @ 208 V (min:/nom./max.) 211/240/264 V 183/208/229 V Operating Frequency (min./nom./max.) 59.3/60.0/60.5 Hz ,Output Power Factor (min.j 0.99 ,AC Max. C6ntinuous Output Current @ 240 V AC Max Continuous'Output Current @ 208 V 1.33 A 1.54 A AC Max. Cont. Output Power 320 W DC/AC CEC Conversion Efficiency . , , _ 96.0% Max. Units Per 20'A Branch Circuit @240 V Max. Units Per 20 A Branch Circuit @208 V. 12 (single phase) - 10 (two pole) Warranties 25 -year limited power warranty 25 -year limited product warranty' UL 1741; including compliance with *' -applicable requirements of IEEE 1547 and IEEE 1547.1 FCC andKES-003 Class B AC module Type 2 Fire Rated . t UL 2703 InvisiMouni"" Listing maintained° Certifications when installed with this AC Module . Class A Fire Rated when installed with ) InvisiMount'" and when distance between roof surface and bottom of SunPower module frame is <_ 3.5" (8.89 cm) Alternating Current (AC) Module clesi;nation ' enables installation in accordance with NEC 690.6 PID Test Potential -induced degradation free 280 mm ' (11.02 in) T" (43.6 in] 1046 mm io ¢ .. . � Hi hest oover3,200 silicon solar arels; Photon Mcdtlle Surve :Feb. 201.1 - mm - S P Y. [1.21nl 141 rank in'Pv Module Durability •ritiaave Public Report:' Fraunhofer CSE, Feb 2013. =rm aut of the _ top eigl-i [al ;est manufacturer, were tested. Campeau, Z. et ;f, "SunPower module Degradanon Rate" - SunPower white paper. Feb 2013. see vAvw,surpcwer.corNfacts for dela ls. I_ 1558 mm f 161.3 Sri] —yl - (+ •. ' :Standard Test Conditions (1000 Wlm2 irradiance. AM 1.5,'25- Q. PLR°L calibration standard: SOMS I _ current,LACCS FFand voltage. Al DC voltage is fully cortained within the module. } .1 a '3asedon avvrace of me>ur_ed p6evervalues durir S production. « � • , w' Please read the safety and installation instructions for details. ` See w•,wn.su�power,comifaas for more refereree infom. ation. 4 , For more details, see extended datasheec vvvnvsunpovvercorr/clatasheeL;, Document it516046 RevC /LTR US Operating Temp. -40° F to =185° F (-40° C to +85, C) Flax. Ambient Temp.,*,-- 122' F (50° C) Max. Load Wind: 62psf, 3000 Pa, 305 kg/m2 front back t reflective coating t Snow: 125 psi, 6000 Pa, 611 kg/m2 front Impact Resistance 1 inch (25 mm) diameter hail at 52 mph (23 m/s) Warranties 25 -year limited power warranty 25 -year limited product warranty' UL 1741; including compliance with *' -applicable requirements of IEEE 1547 and IEEE 1547.1 FCC andKES-003 Class B AC module Type 2 Fire Rated . t UL 2703 InvisiMouni"" Listing maintained° Certifications when installed with this AC Module . Class A Fire Rated when installed with ) InvisiMount'" and when distance between roof surface and bottom of SunPower module frame is <_ 3.5" (8.89 cm) Alternating Current (AC) Module clesi;nation ' enables installation in accordance with NEC 690.6 PID Test Potential -induced degradation free 280 mm ' (11.02 in) T" (43.6 in] 1046 mm io ¢ .. . � Hi hest oover3,200 silicon solar arels; Photon Mcdtlle Surve :Feb. 201.1 - mm - S P Y. [1.21nl 141 rank in'Pv Module Durability •ritiaave Public Report:' Fraunhofer CSE, Feb 2013. =rm aut of the _ top eigl-i [al ;est manufacturer, were tested. Campeau, Z. et ;f, "SunPower module Degradanon Rate" - SunPower white paper. Feb 2013. see vAvw,surpcwer.corNfacts for dela ls. I_ 1558 mm f 161.3 Sri] —yl - (+ •. ' :Standard Test Conditions (1000 Wlm2 irradiance. AM 1.5,'25- Q. PLR°L calibration standard: SOMS I _ current,LACCS FFand voltage. Al DC voltage is fully cortained within the module. } .1 a '3asedon avvrace of me>ur_ed p6evervalues durir S production. « � • , w' Please read the safety and installation instructions for details. ` See w•,wn.su�power,comifaas for more refereree infom. ation. 4 , For more details, see extended datasheec vvvnvsunpovvercorr/clatasheeL;, Document it516046 RevC /LTR US Solar Cells 96 1Vlonocrystalline Max6on@ Gen 111 Front Glass -transmission tempered glass wiih anti - High . reflective coating t .Environmental Outdoor rated k Rating Frame Class 1 black anodized (highest AANWra(ing), Weigh( 45.5 Ibs'(20.6 ka) 'Max. 'Recommended 1.3 in. (33 mm) ?Module Spacing ' 4 Warranties 25 -year limited power warranty 25 -year limited product warranty' UL 1741; including compliance with *' -applicable requirements of IEEE 1547 and IEEE 1547.1 FCC andKES-003 Class B AC module Type 2 Fire Rated . t UL 2703 InvisiMouni"" Listing maintained° Certifications when installed with this AC Module . Class A Fire Rated when installed with ) InvisiMount'" and when distance between roof surface and bottom of SunPower module frame is <_ 3.5" (8.89 cm) Alternating Current (AC) Module clesi;nation ' enables installation in accordance with NEC 690.6 PID Test Potential -induced degradation free 280 mm ' (11.02 in) T" (43.6 in] 1046 mm io ¢ .. . � Hi hest oover3,200 silicon solar arels; Photon Mcdtlle Surve :Feb. 201.1 - mm - S P Y. [1.21nl 141 rank in'Pv Module Durability •ritiaave Public Report:' Fraunhofer CSE, Feb 2013. =rm aut of the _ top eigl-i [al ;est manufacturer, were tested. Campeau, Z. et ;f, "SunPower module Degradanon Rate" - SunPower white paper. Feb 2013. see vAvw,surpcwer.corNfacts for dela ls. I_ 1558 mm f 161.3 Sri] —yl - (+ •. ' :Standard Test Conditions (1000 Wlm2 irradiance. AM 1.5,'25- Q. PLR°L calibration standard: SOMS I _ current,LACCS FFand voltage. Al DC voltage is fully cortained within the module. } .1 a '3asedon avvrace of me>ur_ed p6evervalues durir S production. « � • , w' Please read the safety and installation instructions for details. ` See w•,wn.su�power,comifaas for more refereree infom. ation. 4 , For more details, see extended datasheec vvvnvsunpovvercorr/clatasheeL;, Document it516046 RevC /LTR US A un dT_ The Orig inal'"Top= Down "-PV 'Mounti'ng System for Ground Application's PERMIT BUTTE COUNTY DEVELOPMEI 1�T SERVICES REVIEWED FOR.. Benefits of GroundTrac®Patent#6,360,491 Ll� CO COMP DAT �J BY _ • Industry's preferred low cost and easiest to install gro nd mount syst m ' Used for kW to Multi -MW projects - I • Patented ground mount system ships from available stock • Proprietary Drop -N -Lock rail insert drops in and Locks ProSolar GroundTrac@ rails in place • Over 10 years of ProSolar's proven design • Pre-engineered and tested for easy permitting • No cross -bracing required - r o - 61>1 Go r, 1 r ��}� J f^ f n _,. �� fir'-" G _ - - • _ � � � S 4,1 professional A SOLAR4 �1� products ��Q a T� ,p.s%?!C x,, �W S' �' *r►�.� 1 '� i��' t{:'[ •' �,A,1��,��, ;�; f-a��Y x � . III( _ C r See Below ...--.. �O is 14_� •F. :Y' - rif i - _ ..:-4,. su.+ _ En's �=.Ts�-.....s.,-...,.,,.,,.... ;•_{ k r � r� If 3" Min. Pq f�d 1 + .J Distance depends �+ + on tilt angle (see angle chart) ('see .engineering chart) �,� Assemble re=usable grade stakes (ProSolar metal grade w .Z. . _.. _ ..-. _ - stake kit shown). Recommend 2"x 4" vertical support. ODig+footings. Use '/z" drill bit and 9/16" socket to attach grade 4 1. Lateral' (left to right) footing spans stake kit to 2" x 4". Attach 1" x 4" wooden horizontal listed on page 4 (bottom), Front to support using 3-1/2" (min.) C -clamps. Grade stake kit rear footing spans listed in angle includes: 24" threaded metal stake, aluminum spacer charts on page 4 (top). Refer to block, bolt and washer. engineering reports for footing specs. I OPlace horizontal 1-1/2" schedule 40 galvanized water pipe with slip-on i Hollaender@ Tees. Adjust C -clamps i as necessary to level pipe. s .2" P 4 Measure vertical pipe lengths, allowing 2" (min.) from bottom of footing to avoid pipe contact with moisture. O al pipes into ten lower tee set screw. Center pipes in footings by sliding left or right. Pour or pump mixed concrete into footings. a Ta.,.r.." .•v,. ..+� «.. �_.�1.....—.w.._; �..•--.w""`�'r"..''.,..�- •�v oras-••-.,_ .Y..*�.-•...- ., `Rest rail`on top of horizontali pipes. Run string level;~ on top or bottomtto align -tops of support rails:, ,....,..Fasten4 aillin„place bybsing,GroundTrac@.drill; guide- -- along top and•bottom,of,horizontal:pipes:-Drill! U' -bolt locking holes Tin,place. Leave at least one drilll guide attached after`drillingrto keep rail5in place • �aF O Install,at least one rail' every 10' for proper pipe spacing. GroundTrac@ Drill Guide Base and Drill, Bit. O Insert U -bolt into locking rail holes and place Drop -N -Lock insert into the rail. Remove remaining drill guide and proceed with other rails. Remove grade stakes. 8 Tighten all tee set screws to 17 ft -lbs with torque wrench. Install remaining rails, evenly tightening U -bolt nuts. r u Pre -assemble clamping hardware and install solar EZ rail modules and EZ rail endcaps. Completed endcap Install 1-1/2" plastic pipe O installation. endcaps for schedule 40 pipe as necessary. 1 ♦ . AC Circuit Ampacity Calculator Meter # 1007544775 t -Customer Name: SWERINGEN, DAVE } Location: 53 CEDAR RIDGE DR. , COHASSET, CA 95973_` _ �� _ _ _ t w - '• _ _ _. 4 - Wire Note: AC -1 Description: INVERTER TO AC DISTRIBUTION PANEL x - - ' Wire Calculation - Y ` 3.84- kWatts-'� 240 VAC ' Split Voltage Configuration . TRUE TL Inverter? F 10 Minimum Wire and Conduit Size based on Voltage Drop and Ampacity? 10 Minimum Ground Size Based on NEC 20.00 A 'Minimum Ciruit'Breaker/Fuse Size ► : 10 Actual Ground Size Based on.NEC 20.00 A. Ampacity 'After Derate 10 Wire Size Based on Ampacity, r.J 30 A' H. R+ 0.496 % ofVoltage Drop '. 10 Wire Size'Based on Voltage Drop ' , .30 A +'• . �16 A •',Circuit Ampacity;a' 1 Factor r s 1 Phases - 0.96 Conditions of Use Derate Factor 16.67 A Minimum Conductor Ampacity Based on Conditions of Use 20.00 A Minimum Conductor Ampacity Based on 1.25 Rule Conditions of _5_e_ ' 0.96 Derate Total ` 35 °C Temp Coef (ambient + Sunlight) 95 °F 0.96 Derate 35 °C Ambient Temp 95 °F none Sunlight Exposure 32 °F . , 0 `C Temp adder 3 or less Number of Current Carrying Conductors L 1 J Derate applied to Temp Coeficient Voltage Drop:.Allowable Tolerance (Solar Generation•1 o Distribution 3%) -240 V Circuit Voltage 16 A Circuit Amps 1.24 Resistance 30 ft One Way Distance 10 1 Wire Size 0.496 % of Loss Conduit Size (Conduit FiII Can Not be mpre'th�n �4n%) , None Conduit Type 0.16 i Wire Size Diameter# FE N AlConcluit Fill percentage 1 Conduit Size 1 ;0.16 lGround Wire Size Diameter MWA-1 _ WA - Conduit Internal Diameter 600 V System Voltage ` THWN-2 Wire Type - - y - ' ` ' a • ♦ , a a �• � •, . 1 ♦i f ~ ... T .. t • 4 1 L" ,, � w - - 1. ,. Y.. .... a -, - r •'-+ " ' 1 • ..'' �. - • * J _ ;. � • i �• ' `. { ` _ it . •� ' + , - - ^: `^ ... 1 . ` ,, +,' s. ` • , .w . . • T •� - P AC Circuit Ampacity Calculator ' �" `" ` Meter #: 1007544775 , w Customer Name: SWERINGEN, DAVE Location: 53 CEDAR RIDGE DR. , COHASSET; CA 95973 _ • '` .,, - Wire Note: AC -2 Description: AC DISTRIBUTION PANEL TO AC SERVICE PANEL ~' = r r "53 Calculation ; kWatts 240 VAC Split Voltage Configuration TRUE TL Inverter?Minimum Wire and Conduit Size based on Voltage Drop and Ampacity 10 Minimum Ground Size Based on NEC • 30.00 A Minimum Ciruit Breaker/Fuse Size 10 Actual Ground Size Based on NEC . .t . 30.00 A Ampacity After Derate 10 Wire Size Based on Ampacity 30 A _ _ ,Q.99210 of Voltage Drop 10 Wire Size Based on Voltage Drop • , 30 A 24 A Circuit Ampacity • 1 lFactor 1 Phases _ 0.82 Co11 nditions of Use Derate Factor ` 29.27 A Minimum Conductor Ampacity Based on Conditions of Use 30.00 A Minimum Conductor Ampacity Based on 1.25 Rule Conditions of Use" `r 0.82 Derate Total ; r -50 °C Temp Coef (ambient + Sunlight) 122 °F 0.82 Derate ` 50 °C Ambient Temp 122 °F .. none Sunlight Exposure "' 32 °F 0 °C Temp adder 3 or less Number of Current Carrying Conductors I Derate applied to Temp Coeficient Voltage Drop: Allowable Tolerance (Solar. Generation 1% , Distribution 3%)' ` 240 V - Circuit Voltage 24 A' Circuit Amps 1.24 Resistance 40 ft One Way Distance 10 Wire Size 0.992 % of Loss Conduit Size (Conduit Fill Can Not be more than 4�°h) ,;_ s •�� z" '^' "' ` - " PVC Conduit Type 0.16 Wire Size Diameter, 2Q% Conduit Fill percentage 3/4 Conduit Size 0 16' Ground•Wire Size Diameter, • 0.:409 Conduit Internal Diameter 600 V -System Voltage. •' THWN-2 Wire Type DIRECTION MAP: PROJECTOWNER: PAGE # CONTENT SWERINGEN, DAVE. I -'-� PV -1.0 - ••SCOPE 3 . 53 CEDAR RIDGE DR.. ' r PV -1.1 1 CODE REFERENCE COHASSET; CA 95973,. ! PV -2.0 r -PARCEL MAP • ° rr APN:056.120.109 PH#:530:899X2873: �- PV -3.0 r; f SINGAL LINE LAYOUT ` } EMAIL:davesweringen7@att.net - !�- PV -3.1 �• LABEL DIAGRAM +- ' ti 'Q < - - =� 4 ~ - PV -4.0 ' •` _STRINGING &RAIL LAYOUT �• ;' ` *' 7 PV -5.0. 1 FOOTING LAYOUT ro • `, • + k w ~ • •' + PV -5.1 POST LAYOUT o -T53 PV -5.-2 DETAILS 53CedaiRtdge69ait ., �`_' �_ _ . wf,i ~'- -; " _ATTACHMENT MODULE SPECS Y,r R , j a - _ a. ' INVERTER SPECS , WIRE CALLS 4 . .gvlendocairo.Way. - CONTRACTOR: ALTERNATIVE ENERGY SYSTEMS INC. _r 13620 HIGHWAY 99 CHICO, CA 95973 ` �" I Its �; �. ;�•. .:.; :. - - - _ CSLB: 853351 C-10, C-46 pacy Ave „ �,. C,�•a,_». �'. � K3 c,�, fid ��{µ<� t.. SCOPE: BUILDING JURISDICTION: ' <� INSTALL GROUND MOUNTED BUTTE COUNTY 'Q47 .,PHOTOVOLTAIC SOLAR SYSTEM IN c - DEPT. OF DEVELOPMENT SERVICES _ ZONE FR -5 AND UPDATE ELECTRICAL - EQUIPMENT AS NEEDED IN 7 �: • r M •ACCORDANCE WITH ALL 'APPLICABLE ' `- 7 COUNTY CENTER DRIVE CA 95965 -- ; ' • - -- •"•' ' BUILDING CODES SPECIFICALLY - OROVILLE, ' OFFICE#: (530) 538-7601 J." "- a,.:.,REFERENCING THE 2016 CALIFORNIA„ FAX#: (530) 538-2140 , I .ELECTRICAL CODE/ 2014 NEG _C,USIN• ? `? MON-FRI 8AM-3PM ' L :..,.,THE'FOLLOWING SPECIFIC .r •� �n .�,1 `. a , -INSPECTION LINE: (530) 538-4365 " REQUESTS PHONED IN BY 2PM WILL BE p- ,. :! jMODULES: SUNPOWER+ APPROXIMATLY 12 MILES FROM - INSPECTED THE NEXT BUSINESS DAY, i CHICO AIRPORT. / ,o - •'(18)SPR=X22-360-CAC- „•. ' �: t " "b :�' N 6480kW SYSTEM _ • ' 1 *'' ;� :•' i �3 329 SQFT COVERED' _ `INVERTER(S): SUNPOWER ` L. deosa'N (18) MODULE INTEGRATED 320W :PERMIT# �:�—•��2r� BUTTE COUNTY DEVELOPMENT SERVICES .�. r • rR VIEWED FOR REVISION , wr o 00 Lnm cn VN m,N C cu >_ 01 a`�; ; iI, w 'Ln O I . z �• . N U f'1 00 rn < cu J qj �. ® T W vl r d C ' W ^+ IO C Q 00 n - � • CN 00 a. Orn yw Ln ,. Lu o, Quj (DrnC� 0 0 , - �„.7 uj z oC (V ` �a(nLn oQO w v -x z V) u) oU Q ' SCALE '..� NTS G' .DATE MODIFIED • . 02/21/2017 1 DATE CREATED , 30/09/2014 DESIGNER: ' R. CORREA - CONSULTANT: S. HUBER SHEET PV=1.0 L SCOPE 4 1 •.. Y �� t "- kr «. ,; • - t r-: :* s CODE :C, +�. - * Tr., Sr. r - .,. �"_ +t 1° .. a.. r .�. .-•�.a + - - :.e°' - ., r - s' "' ' 4 .r .. " .. f, A •;.: ,.:.:� _CE ,.. - _ _ , • ' DATE' i BY r.. ' ; • r ,- 4ti . r:C *- :e +r-' c .M .. - , p: •-:.Y .. h-.: - �' ' -.. �~ _ .. r - ` L • ' - - -.. - _ r - - _ ••� �.,,. . t `- ,. REVISION , wr o 00 Lnm cn VN m,N C cu >_ 01 a`�; ; iI, w 'Ln O I . z �• . N U f'1 00 rn < cu J qj �. ® T W vl r d C ' W ^+ IO C Q 00 n - � • CN 00 a. Orn yw Ln ,. Lu o, Quj (DrnC� 0 0 , - �„.7 uj z oC (V ` �a(nLn oQO w v -x z V) u) oU Q ' SCALE '..� NTS G' .DATE MODIFIED • . 02/21/2017 1 DATE CREATED , 30/09/2014 DESIGNER: ' R. CORREA - CONSULTANT: S. HUBER SHEET PV=1.0 L SCOPE 4 KA ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE 2014 NATIONAL ELECTRIC CODE (NEC), OR LOCAL MUNICIPAL CODE, AND FIRE DISTRICT REGULATIONS. 1. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER, RECOGNIZED ELECTRICAL TESTING LABORATORY AN INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. 2. ALL INVERTERS SHALL BE IEEE 929 COMPLIANT AND SHALL BE INSPECTED BY LOCAL UTILITY BEFORE COMMISSIONING, TESTING, AND OPERATION OF THE SYSTEM. 3. ALL OUTDOOR EQUIPMENT SHALL BE MINIMUM NEMA 3R, INCLUDING OUTDOOR MOUNTED TRANSITION BOXES, COMBINER BOXES, AND SWITCHES. 4. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ART.250,690. 5. NEC. ART. 690.9(A). ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES. 6. NEC ART. 690.18. DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION AND SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY WITH AN OPAQUE COVERING. 7. PHOTOVOLTAIC SYSTEM SHALL BACKFEED THE DISTRIBUTION SYSTEM ON SITE PER THE REQUIREMENTS OF NEC ART.690.64(B). ALL BACKFEED BREAKERS SHALL BE IDENTIFIED AS SUCH AND SHALL BE SECURED IN PLACE BY ADDITIONAL FASTENER PER THE REQUIREMENTS OF NEC 408.16(F) (408.36 IN 2014 NEC. 8. FALL ARREST PROTECTION PER OSHA REQUIREMENTS SHALL BE PROVIDED FOR ALL ROOF WORK. 9. ALL CONDUCTORS AND TERMINATIONS SHALL BE RATED FOR 75° C MINIMUM. 10.NEC ART. 690.14. -.SEE SHEET RE -4.3 FOR LABEL DIAGRAM 11.NEC ART. 690.53. - SEE SHEET RE -4.3 FOR LABEL DIAGRAM 12.NEC ART. 690.17. EACH AC DISCONNECT SHALL ALSO BE LABELED WITH: "WARNING! -ELECTRICAL SHOCK HAZARD - DO NOT TOUCH TERMINALS. TERMINALS ON . BOTH LINE AND LOAD SIZE MAY BE ENERGIZED IN THE OPEN POSITION". 13.DC DISCONNECT AT THE INVERTER WILL BE READILY ACCESSIBLE AFTER THE INSTALLATION IS COMPLETE PER 2014 NEC ART. 690.17 WHERE TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. PROVIDE A WARNING SIGN OF THE HAZARDS PER 2014 NEC ART.690.17 14.CONTRACTOR TO PROVIDE GROUND FAULT PROTECTION FOR ROOF MOUNTED PHOTOVOLTAIC ARRAYS LOCATED ON DWELLINGS PER 2014 NEC ART.690.17. 15.WHERE MORE THAN ONE NOMINAL VOLTAGE SYSTEM EXIST, THE DIFFERENT SYSTEMS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER 2014 NEC ART.210.4D 16.PROVIDE AN ACCESSIBLE DISCONNECT DEVICE THAT IS LOCKABLE IN OPEN POSITION AND IS LOCATED WITHIN 10'-0" OF THE METER PER LOCAL ELECTRICAL UTILITY REGULATIONS. - 17.PHOTOVOLTAIC SOURCE CURRENTS MUST BE RATED AT BOTH 125% OF THE PARALLEL MODULE AND AT A CONTINUOUS LOAD OF ANOTHER 125% FOR A TOTAL OF 156% OF THE LOAD. 18.PROVIDE PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECT MEANS IF THEY ARE NOT IN THE SAME LOCATION PER 2014 NEC ART.690.56. 19.INSTALLATION OF PV PANEL ARRAYS SHOULD RESIST SLIDING AND POP-UP RESULTING FROM SEISMIC EVENTS AND SHOULD COMPLY WITH CBC SECTION 1613A AND ASCE STANDARD 7-05, CHAPTER 13. 20.PV SYSTEM INSTALLER WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLATION OF ALL RELATED EQUIPMENT, CABLES, ADDITIONAL CONDUITS, BOXES WIREWAYS AND OTHER ACCESSORIES NECESSARY FOR COMPLETE AND OPERATIONAL PHOTOVOLTAIC SYSTEMS. 21.PV SYSTEM CONTRACTOR SHALL COORDINATE ALL THE WORK WITH THE ENGINEER, THE CONSTRUCTION MANAGER AND ALL OTHER CONTRACTORS TO ENSURE THAT PV SYSTEM IS INSTALLED AS SPECIFIED IN THESE DRAWINGS. 22.DRAWING IN GENERAL OR DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE EQUIPMENT AND WORK INCLUDED. THE INTENTION OF THE DRAWING IS TO INDICATE SIZE, CAPACITY, APPROXIMATE LOCATION AND GENERAL RELATIONSHIP, BUT NOT EXACT DETAIL OR PHYSICAL PLACEMENT. 23.FIELD VERIFIES EXACT AIC RATING REQUIRED OF THE MAIN SWITCHBOARD FROM LOCAL UTILITY. 24.A PV SYSTEM WITH MULTIPLE INVERTERS, WHERE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, WILL HAVE A DIRECTORY CREATED FOR EACH LOCATION. AS PER 2014 NEC 690.5(H) AND IN. ACCORDANCE WITH 2014 NEC 705.10. Nv 130-T-TE00, &ON ApP� `t/Al/ REVISION E O I-! O w L, m m M zr N U! m Q1Lnm00 m 3Q=oo x u rn L'ip 9 _ = x N U d LL -0 fillp M 00 N C; C, oq 0 M Ln M CL. Lu 'o, LLI a�< (Dcr r4 crW`—' Fr�16 LLJQo W U = Z LMn UU Q SCALE NTS DATE MODIFIED 02/21/2017 DATE CREATED 10/09/2014 DESIGNER: R. CORREA CONSULTANT: S. HUBER SHEET PV -1.1 CODE REFERANCE - - - ' - REVISION , -. �_• �. -..-. - • 509' r• '17, / T SETBACKS PER • ,.. V F ZONE: FR -5 0 f a; • _ - - 2/1 (E) WELL - r` % `: C COMPLY WITH .CALlFORIVlA — - ' — --- - - . _- _ • ( _ M * N v A !�N On ELECTRICAL CODE— AR77CLE250 _ CALL FOR BUTTE COUNTY "' °° =Vwrn 0, i REQUIREMENTS FOR GROUNDING i BUILDING INSPECTION BEFORE 0 AND BONDING s OOVCRINO TO VERIFY " U) = = Q INSTALLATION P cu (P) TRENCH (E) PGE METER & - ' " "� f (E) SERVICE PANEL o A V „ ( (N)MONITORING & _ _ R ti E / (N)DISTRIBUTION PANEL LOCATION £ 1L T 98'-2" (P) ARRAY ,�, .( W a+ LU 51 Remove vegetation and debris from under- j IV k and away from structure. Maintain r - ! c a clearance for a fire safe environment:_ KEEP CALIFORNIA GREEN �-,.. / �} PREVENT_ WILDFIRES IN BUTTE .COUNTY. ; N � �f• (E) GARAGE �LV7 •�• % (E) LEACH LINES AND SEPTIC j (E) PROPANE c r r n 00 (E) RESIDENCE � . !. �� • o xi ROUTER LOCATION Lon 71 3 of r /✓' z w• « - _ +: _ .� - y� 6 r K0.17 Q � _ .c /• / ... It Lu F- U Ci Or N F4 Ln Ln 7 - - - SCALE v _ , le { .. - 1" = 50'(1:600) • - ` - O - _ - .. - - — DATE MODIFIED 02/21/2017 DATE CREATED - • .. . • - , 0/09/2014 :4":1-.. P ... .. t. v • :u ,., q -_y: .t':W V' -` F.:- Y:{ 'v .R :F"'iP/ iR N' IG :. "-,<:DES NER:R. CORRLA r//.ONSULTANT: ��a•. f: E at'. /.f/F` S. HUGER a - » • - .509' - - SHEET - PERMIT# , 017"•- U321 ' - BUTTE COUNTY DEVELOPMENT SERVICES, PV -2.0 } 'r. ,♦ y -. a ` ? ` ~ rt' - - .. , ..REVIEWED FOR 'MAP PARCEL .. CODE COMPLI CE . DATE_:_' 61I --------------------` I I AC -1 (2)TRANSITI0N CABLE(S) I 1 I WIRE RUN: 5' I• IMP: 20A I I. I j (18) PV MODULES/INVERTERS I JUNCTION SUNPOWER: SPR -X22 -360 -C -AC BOX . 240V/1P/133A I I I l- - - - - - - --- - - - - - - Provide separate grounding conductor from main electric service panel to � AC -1 (1) 3/4" EMT w/ (4) #10 THWN-2 CU. & (1) #10 THWN-2 CU. GRD. WIRE RUN: 5' IMAX: 20A i remote structures and remote subpanels - - - t I I r CEC Art 250.32(D) } COMPLY WITH CALIFORNIA �— ELECTRICAL CODE- ARTICLE 690 REQUIREMENTS FOR SOLAR � PHOTOVOLTAIC SYSTEMS - COMPLY WITH CALIFORNL4 l� ELECTRICAL :CODE=ARTICLE=250=°- `REQUIREMENTS:FOR�GROUNDNG'' �7-AND-BONDIN---_.--�z-= AC -2 (1) 3/4" PVC w/ SERVICE VOLTAGE (3) #10 THWN-2 CU. & 120V=N-L1-L2=240V (1).#10THWN-2 CU. GRD. 120V=N-L2-L3=NAV WIRE RUN: 40' V= -L3- 1=N V REVISION - 0 C 00 ._ 00 — tD >- Ln r+n m M V N v A rn rn o00 aci m 01 m ao m >- 01 0 _" `Ln Ciono m=°Q'IU r V a U_ -0 rV }. C ON N W � o m d W a L a - -- fuse(s),switch(es) and their accessories (E) AC SERVICE PANEL (N)AC DISTRIBUTION PANEL as required and defined in California 200A/ 1P/ 240V m 125A/ 1P/ 240V Electrical Code SCIR: 10,000 0 METER# : 1007544775 oli AC -MONITORING -. ON (1) 1/2" EMT w/ o rn Ln (2) #14 THWN-2 CU. & (1) #14 THWN-2 CU. GRD._ ma - WIRE a - WIRE RUN: 10' LU > O Ln rn W L3uo AC MODULE (D CC w SUPERVISOR o Ln ko a Ln PVS5X _ W u = z SCALE rr CAT -5 . ± DATE MODIFIED NTS CAT 5 02/21/2017 DATE CREATED ' I 10/09/2014 - DESIGNER: ENH2O2 TENH2O2 _ _ - R. CORREA ANTENNA ANTENNA CONSULTANT: ROUTER S.HUBER. SHEET PERMIT # i 0'32 ( - BUTTE COUNTY DEEVELOPMENT SERVICES PV -3.0 REVIEWED FOR � - LAYOUT SINGLE LINE CO COM1 LI c ` DATE '� BY 20 1P 240 2 1P 240 1 1P 240 REVISION - 0 C 00 ._ 00 — tD >- Ln r+n m M V N v A rn rn o00 aci m 01 m ao m >- 01 0 _" `Ln Ciono m=°Q'IU r V a U_ -0 rV }. C ON N W � o m d W a L a - -- fuse(s),switch(es) and their accessories (E) AC SERVICE PANEL (N)AC DISTRIBUTION PANEL as required and defined in California 200A/ 1P/ 240V m 125A/ 1P/ 240V Electrical Code SCIR: 10,000 0 METER# : 1007544775 oli AC -MONITORING -. ON (1) 1/2" EMT w/ o rn Ln (2) #14 THWN-2 CU. & (1) #14 THWN-2 CU. GRD._ ma - WIRE a - WIRE RUN: 10' LU > O Ln rn W L3uo AC MODULE (D CC w SUPERVISOR o Ln ko a Ln PVS5X _ W u = z SCALE rr CAT -5 . ± DATE MODIFIED NTS CAT 5 02/21/2017 DATE CREATED ' I 10/09/2014 - DESIGNER: ENH2O2 TENH2O2 _ _ - R. CORREA ANTENNA ANTENNA CONSULTANT: ROUTER S.HUBER. SHEET PERMIT # i 0'32 ( - BUTTE COUNTY DEEVELOPMENT SERVICES PV -3.0 REVIEWED FOR � - LAYOUT SINGLE LINE CO COM1 LI c ` DATE '� BY REVISION AC PV ARRAY i ,+ 4 AC:DISCONNECT MAIN SERVICE - SUB PANEL 12 METER [ AMPS AMPS �,. t. • , . ..r , - _ a . . y PHASE PHASE + - +• -• + - + + - + - - - - w VOLTS VOLTS a � . _.. _ - /� ^ /ems. , ^y. /�• /� -ti ;,,e - t' - ' • a- . 'i:! .. - .F� 7 AMMAMPS�PHASE ,�00VOLTS +. s••- _ - ,:i : m .o .'o; CrI • .. .. ...• s:i - y ,. r y - S! -' Ql.. Owl 'n 00 t0 - �J AMPS . _ 3 Q = o o. PHASE _ � w � � • U j C. VOLTS q g 7 ii ID < ai NUaLL_ _0 • - AMPS - PHASE VOLTS u , N • �. .WARNING .. C - LU - _ r POWERUTILITY INTERACTIVE _ - FLOWING THROUGH THIS','PANEL KW SOLAR GENERAT.611 Q AC •.VOLTA POWERPHASE WARNING DUAL SUPPLY PHOTOVOLTAIC . . Per NEC 690.54, Interactive Point of Interconnection _ m installed at all Electrical Distribution Panel covers that I" ..00 - provide a path from PV to Utility. r ^ w �'- Per NEC 705.10, Point of Connection,. Located On Main Service Panel. 00 LIJ _v -.: •r .y t r` �`'� x .ic tiff r !+, r Y, s� h vitt _ �,� Yk y y4 _ . PHOTOVOLTAIC C- + 01 O' �• :b't. •4I r L -;�. � .. ...+•+ z S ,«'^ ^:e+ �._ �`• t,= t '` +3 - s• •+ r' * i a �` •n. - i"' h' _ .A.'x p U « DISCONNECT 1714 e FOR UTILITY < '� � , 7 •t � ,• _ '� - .� �« ,E �. x• + i. ♦.- .. - 'T t. 5/ 4: 4� . SCALE � i J Per NEC 690.14, Disconnection means at the single AC DATE MOD FIEOf - e 02/21/201 Disconnect or Main Breaker. • DATE CREATED - [ _ ." i s ' , + _ t • . ,i -. wir , . _ Mt f ' + , 10/09/2014 t '; '^•M ,-_ .� _ r• M _ ,� - - + DESIGNER: R. CORREA - - �•. 9 /. , -� ` ' * _ r - ;7 SOLAR • . CONSULTANT: + ~. ; S. HUBER 4- DO NOT RELOCATE @any breaker passing SHEET - w M PERMIT Solar breaker label BUTTE COUNTY DEVELOPMENT Power- N.PV - p��{ VIEWED � OPMENTSERVICES _- ' .. i• s ,�. F c, 1 ! E V' EWE ® FOR r .+ LABEL • r + , - _ _ ; . �®DE �OM�LI //�//•��,'' _ , .�•� - r DIAGRAM [ BY ° : , . % a • Y _ - , . - ' - - - - - . r - • ' REVISION a icv�W ko 0 X .ul � M = = Q cu a--1 U d LL 'D ti V a Q ® N 4. O ,O k!• obi' O - VJ T tn..''m OO J M V N M N y r C Ol , Ql Ln W yOl O 3 a O a C I 00 _ 1 icv�W ko 0 X .ul � M = = Q cu a--1 U d LL 'D ti V a Q ® N 4. O ,O k!• obi' O - VJ T tn..''m OO J M V N M N y r C Ol , Ql Ln W yOl O 3 a O a icv�W ko 0 X .ul � M = = Q cu a--1 U d LL 'D ti V a Q ® N C I _ 1 STRINGING LAYOUT W l O LD N CO ri tD O 00 N . i O MV1 00 O lY1 111 00 r4 1714 cn 00 . a i m • ,.' `• it • - - L iii adi •ir •\ '3_ _ Y '• F; i, '.•♦ �w• a ,�"' '•,J. ('tl d s. xe - - - H -^'� 71 'fir. �.. t. Le„r ♦ ,F - `i 1. ;,� .r. G:.%- .n a atT' L - - .F't • .._ et- - Q W V1 Ol- 01 U OLu. -. T 1. y.! _ l ` 7 W t _ �z y•y _- -,ry. O _ As... -'i a j +' .:. •x - a - ._ s ♦ ✓ ., t . W Z cn [ .. s l T `PERMIT# �Jirl Z SCALE • -�". . e BUTTEM NTS DATE MODIFIEDt4, d • f w -OUN FOR 02/21/2 0 17 DATE CREATEDr . -REVIAWED 10/09/2014 _ . • - ' . - Z'CODE CO //'^/'' M PSI E,. DE51 NE - - s - .• ` •r` - �, d,.,s - . s "'e t _ . +x a . c. - �e' _ .- Ty :. A- ,, r .r ;. - �j, V Cl R. CORREA CONSULTANT: DATE BY S. HUBER SHEET RAIL LAYOUTS PV -4.0 STRINGING & L - ^ "{t • • RAIL LAYOUT . r r- '. r 'T •, .. V. f' . > _ .• Y al •- r_,. • -• � . ..� +,i 'i a. it . rri �, - . . f . . .. a - PIER FOOTING LAYOUT ( SCALE: 1/16" = 1'-0") :PIER FOOTIN&DETAIL I REVISIONnp ' TYPICAL POST _ `. ' • , +, 'i - I •�. t� 16 kD • , 1., .y + - • r -` i.. I r.. '• f ` f'I -r 16"DIA. :; ; - fV ! Ir ! O 26" ;: PIER FOOTING"zx SEE ALT FOOTING DETAIL - - - • , , a NII - •j � 00 LO p , -------- -- -------- ---=------- -- -------- -- ----------- -------- -------------- -- - ------ :ALTERNATE PIER FOOTING DETAIL r . i 3 a—" m o 2' OFF CENTER _. r - -- - - ' U v Cd1,. - -- ' - -- OF POST, ; ' r - I ` UU *t o0 •.� :..�1: _ 1 1 1 1 1 1 1 1 1 1: -- I_'1- __ _ Lu TYP. U.N.O. - - U a LL Z 1 N I Q rn o M m o m : io b o m io b I - S . TYPICAL POST s - > 2'-0" E vi LU1 PIER FOOTING .i c z 9r�,4{ 24" DIA 'w N , ; oy '�� OG xp. 2 31/17 ALTERNATE SEMI -CONTINUOUS FOOTING LAYOUT ( SCALE: 1/16" = 1'-0") c\E :ALTERNATE SEMI -CONTINUOUS FOOTING, DETAIL - / /17 I I O.3 ! TYPICAL POST STRUC L ONLY., 1 I OPTIONAL 12"x12"x6" x I , 3 -PEDESTAL AT COLUMNrn a _ #3f TIE AT PEDESTAL I ^�' y, cs/ruc'riyineers 1 �u ,, ..� (2) #5 CONT. o i i .,' o I o 3/8 DIA 175 E. WILBUR ROAD, SUITE 103 -THOUSAND OAKS, CA 913¢0 « }� 1 TOP &BOTTOM ai i •'N M.B. THRU POST ` i e rn + . r P- 805.496.2100 'f- 805.496.2442 e- Yinci@VinciSE.co ;� • }, i (FOUR TOTAL) .r "1'' L^ AT BOTTOM OF FOOTIrn NG . 6'-7„' -j Fj (-j—�-j I j I j (3' `f j f_j (j _+4— r • • S - R.'* 4, �., t I�7 Yx _. - ' w :sl,�` `f' .i,e.. - of �`•`Fw .� tLl1'01 _ �' • ..5; r_. L _ _ • - _ ' ,,r . 1 .`M '' r- 't`.;. , E '� �� •, - S , r a r .. . i : M •I f 00 xQ 'r I' fso- I I S. . I' I I �� -, _' •'' r, 4 z LLJ u o wALTERNATE SEMI -CONTINUOUS FOOTING AT F < i I I I I BEDROCK DETAIL • _ :' �, Z o ILn DL• a : n z w Q O. O� 'O O - O _O ' O ` ?O x O O ` O• zD. I i ^ , e I . F.y C ,.. W U = Z.. co rn .4 m r, i ° �.. I 6” TYPICAL POST 5 u O a • .. r to . - a • .,'�- .. q , - . i I f !. f ,` i «, ,y V1 Ln ,U 3/8" DIA. M.B.-THRU POST , SCALA E ' * & BOTT AT BOTTOM I - AS NO 1 i `,�f • " � (2) #5 CONT TMP OF FOOT NG TED'- _, . • ' - _ , - _ - I ` - ,' TOP O s DATE MODIFIED t , .w (FOUR TOTAL) EA21/2017 PERMIT# ' _ � O�fi f I # r 1 I € d II r$o > Q r +. DATE CREATED » .. .' • I 1+�` "t; I -'ir }I I' _ `'- 10/09/2014 BUTTE COUNTY DEVELOPMENT SERVICES ;+ } - i `BEDROCK DESIGNER: 1 _ REVIEWED FOR R. CORREA CONSULTANT: 1 r r s I o{ S. HUGER C,ODE COMPEL CE t t r pnr »�' k - SHEET . ` I -y,s't wS, oaf,•' i ' .` •,1 - „DATE Q I .(-i aY y �, r - e _ - '` i� �. M d .1. (2) #5 x 18" LONG REBAR t a �• '.- { i ; ' u EMBED 6" INTO BEDROCK PV -5.0 + 1'-9' r 'FOOTING • r-. f c { - } . I 't' _ f 1 AT 32" O.C. , e ' FLAYOUT -------------- �� REVISION STRUCTU NLY 1,_� i 1 +4,� s" UJI Z QLLJ w6 �1 Cl & AS I 1A.TES _UMZ 200 In In. **MAX HEIGHT 5'-3" w u 2 Z Vliuc- ura 6nyineers : _ _ - • . . " SCALE E- +2 -_On POSTS: - ��/ �///JJJ, AS NOTED 175 E. WILBUR ROAD, SURE 103 -THOUSAND OAKS, CA 91360 1 1/2" DIA.. SCHED. 40 PERMIT # - EN � � � � DATE MODIFIED GALV. PIPE, TYP. u.rv.0. BUTTE COUNTY DEVELOPMENT SERVICES °ATED P - E. WIL UR R f - SUITE 103 -THOUSAND e - VIf1Cl AKS,Ci A 9136 DATE CREATED REVIEWED FOR09/2014 1R. CORREA DESIGNER: CODE COMPLI CE R. HUBER - _ 6�_7° L '• CONSULTANT: • FOR FOOTINGS s.HURER SEE PV -5.0 DAT 5 BY SHEET 2 PV SECTION VIEW POST SCALE: 1/2" = 1'-0" LAYOUT NEC 2014 TABLE 300.5 , I I I Fi I - • 18" = IN TRENCH BELOW 2" THICK CONCRETE 18" = UNDER 4" THICK CONCRETE WITH NO VEHICULAR TRAFFIC 24" = UNDER STREETS, HIGHWAYS, ROADS, ALLEYS, DRIVEWAYS; AND PARKING LOTSPERMrT#ell - O�Z( 18" = RESIDENTAIL DEWLLING DRIWAYS & OUTDOOR PARKING ; BUTTE COUNTY DEVELOPMENT SERVICES 18 IN OR UNDER AIRPORT RUNWAYS, INCLUDING ADJACENT AREAS - i C i REVIEWED FOR CO COMP.LI CE I ' ! ' DATE � l BY 4 TRENCH FILL DETAIL REVISION E O , 0 00 = 0) o 0 T w 5. rn m m m mv r� ar rn m a rn v mrnmo0 } Q = 0 0 Ln w Z o O � m rm-I u CL Iai a m 1\ 00 (V Ol OD 0 m ui u m a z n > � w Q Q o U O (D F- -' v; o Q CD Luum V)LnoQ SCALE NTS DATE MODIFIED 02/21/2017 DATE CREATED 10/09/2014 DESIGNER: R. CORREA CONSULTANT: S. HUBER ;HEET PV -5.2 DETAILS END CAP PV RACKS & i TYP. HORIZONTAL PIPE MODULES PER PLAN 11/2" DIA. SCHED. 40 ' GALV. PIPE, TYP. U.O.N. 1 I 1 1" METALLIC FLEX 1 I 1 I 8"x8"x6" NEMA 3 I ENCLOSURE STRUT PER PLAN • - i c ," I SOLAR MODULE 3/8- 16x1 STAINLESS 11/2" DIA. SCHED. 40 i POST SIZE PER i• STRUT PER PLAN HEX WASHER HD TYPE F SELF TAPPING PRE DRILL GALV. PIPE, TYP. U.O.N. i PV -5.1, 30" INBED MIN, i ALL WIRES TO BE RUN INSIDE `T / 5/16 DIA. TYP'. i TYP. U.N.O. 1 RACK AND CABLE TRAY TO AVOID 24" MIN. GEC, PER NOTE I 1 I i EASY ACCESS POST CONSTRUCTION TYPICAL HORIZONTAL MEMBER PV -4.0 I I � I I I 1 1/2" HOLLAENDER "T', TYP. SEE FOOTING I I II DETAIL ON PV -5.0 CONCRETE FOOTING i CABLE TRAY (f'c=2000PSI) i HOLLAENDER "T" PER PV -5.1 SEE FOOTING SEE FOOTING I I I I DETAIL ON PV -5.0 DETAIL ON PV -5.0 ' I 1 TYPICAL U -BOLT ASSEMBLY 1 TYPICAL J -BOX AT BACK OF ARRAY 2 TYPICAL PROSOLAR GROUND MOUNT RAIL TO PIPE DETAIL ; 3 CABLE TRAY DETAIL I I I I I I I I I I I I I FINISH GRADE I 1 r� j , SEE TABLE NATIVE SOIL BELOW ��• >� \/�%\ CONDUIT I • , I I 1 a I I • NEC 2014 TABLE 300.5 , I I I Fi I - • 18" = IN TRENCH BELOW 2" THICK CONCRETE 18" = UNDER 4" THICK CONCRETE WITH NO VEHICULAR TRAFFIC 24" = UNDER STREETS, HIGHWAYS, ROADS, ALLEYS, DRIVEWAYS; AND PARKING LOTSPERMrT#ell - O�Z( 18" = RESIDENTAIL DEWLLING DRIWAYS & OUTDOOR PARKING ; BUTTE COUNTY DEVELOPMENT SERVICES 18 IN OR UNDER AIRPORT RUNWAYS, INCLUDING ADJACENT AREAS - i C i REVIEWED FOR CO COMP.LI CE I ' ! ' DATE � l BY 4 TRENCH FILL DETAIL REVISION E O , 0 00 = 0) o 0 T w 5. rn m m m mv r� ar rn m a rn v mrnmo0 } Q = 0 0 Ln w Z o O � m rm-I u CL Iai a m 1\ 00 (V Ol OD 0 m ui u m a z n > � w Q Q o U O (D F- -' v; o Q CD Luum V)LnoQ SCALE NTS DATE MODIFIED 02/21/2017 DATE CREATED 10/09/2014 DESIGNER: R. CORREA CONSULTANT: S. HUBER ;HEET PV -5.2 DETAILS